EP1488073B2 - Dynamic annular pressure control apparatus and method - Google Patents

Dynamic annular pressure control apparatus and method Download PDF

Info

Publication number
EP1488073B2
EP1488073B2 EP03742832A EP03742832A EP1488073B2 EP 1488073 B2 EP1488073 B2 EP 1488073B2 EP 03742832 A EP03742832 A EP 03742832A EP 03742832 A EP03742832 A EP 03742832A EP 1488073 B2 EP1488073 B2 EP 1488073B2
Authority
EP
European Patent Office
Prior art keywords
fluid
pressure
drilling
backpressure
drill string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP03742832A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP1488073B1 (en
EP1488073A1 (en
Inventor
Egbert Jan Van Riet
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
?balance Bv
Original Assignee
@Balance BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=27757721&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP1488073(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by @Balance BV filed Critical @Balance BV
Publication of EP1488073A1 publication Critical patent/EP1488073A1/en
Publication of EP1488073B1 publication Critical patent/EP1488073B1/en
Application granted granted Critical
Publication of EP1488073B2 publication Critical patent/EP1488073B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • E21B21/106Valve arrangements outside the borehole, e.g. kelly valves

Definitions

  • the present method and apparatus are related to a method for dynamic well borehole annular pressure control, more specifically, a selectively closed-loop, pressurized method for controlling borehole pressure during drilling and other well completion operations.
  • drilling rig In its simplest form, this constitutes a land-based drilling rig that is used to support a drill bit mounted on the end of drill string, comprised of a series of drill tubulars.
  • a fluid comprised of a base fluid, typically water or oil, and various additives are pumped down the drill string, and exits through the rotating drill bit. The fluid then circulates back up the annulus formed between the borehole wall and the drill bit, taking with it the cuttings from the drill bit and clearing the borehole.
  • the fluid is also selected such that the hydrostatic pressure applied by the fluid is greater than surrounding formation pressure, thereby preventing formation fluids from entering into the borehole. It also causes the fluid to enter into the formation pores, or "invade” the formation. Further, some of the additives from the pressurized fluid adhere to the formation walls forming a "mud cake” on the formation walls. This mud cake helps to preserve and protect the formation prior to the setting of casing in the drilling process, as will be discussed further below.
  • the selection of fluid pressure in excess of formation pressure is commonly referred to as over balanced drilling.
  • the fluid then returns to the surface, where it is bled off into a mud system, generally comprised of a shaker table, to remove solids, a mud pit and a manual or automatic means for addition of various chemicals or additives to the returned fluid.
  • a mud system generally comprised of a shaker table, to remove solids, a mud pit and a manual or automatic means for addition of various chemicals or additives to the returned fluid.
  • the clean, returned fluid flow is measured to determine fluid losses to the formation as a result of fluid invasion.
  • the returned solids and fluid may be studied to determine various formation characteristics used in drilling operations.
  • This overbalanced technique is the most commonly used fluid pressure control method. It relies primarily on the fluid density and hydrostatic force generated by the column of fluid in the annulus to generate pressure. By exceeding the formation pore pressure, the fluid is used to prevent sudden releases of formation fluid to the borehole, such as gas kicks. Where such gas kicks occur, the density of the fluid may be increased to prevent further formation fluid release to the borehole.
  • the addition of weighting additives to increase fluid density (a) may not be rapid enough to deal with the formation fluid release and (b) may exceed the formation fracture pressure, resulting in the creation of fissures or fractures in the formation, with resultant fluid loss to the formation, possibly adversely affecting near borehole permeability.
  • the operator may elect to close the blow out preventors (BOP) below the drilling rig floor to control the movement of the gas up the annulus. The gas is bled off and the fluid density is increased prior to resuming drilling operations.
  • BOP blow out preventors
  • overbalanced drilling also affects the selection of casing during drilling operations.
  • the drilling process starts with a conductor pipe being driven into the ground, a BOP stack attached to the drilling conductor, with the drill rig positioned above the BOP stack.
  • a drill string with a drill bit may be selectively rotated by rotating the entire string using the rig kelly or a top drive, or may be rotated independent of the drill string utilizing drilling fluid powered mechanical motors installed in the drill string above the drill bit.
  • an operator may drill open hole for a period until such time as the accumulated fluid pressure at a calculated depth nears that of the formation fracture pressure. At that time, it is common practice to insert and hang a casing string in the borehole from the surface down to the calculated depth.
  • a cementing shoe is placed on the drill string and specialized cement is injected into the drill string, to travel up the annulus and displace any fluid then in the annulus.
  • the cement between the formation wall and the outside of the casing effectively supports and isolates the formation from the well bore annulus and further open hole drilling is carried out below the casing string, with the fluid again providing pressure control and formation protection.
  • Fig. 1 is an exemplary diagram of the use of fluids during the drilling process in an intermediate borehole section.
  • the top horizontal bar represents the hydrostatic pressure exerted by the drilling fluid and the vertical bar represents the total vertical depth of the borehole.
  • the formation pore pressure graph is represented by line 10. As noted above, in an over balanced situation, the fluid pressure exceeds the formation pore pressure for reasons of pressure control and hole stability.
  • Line 12 represents the formation fracture pressure. Pressures in excess of the formation fracture pressure will result in the fluid pressurizing the formation walls to the extent that small cracks or fractures will open in the borehole wall and the fluid pressure overcomes the formation pressure with significant fluid invasion. Fluid invasion can result in reduced permeability, adversely affecting formation production.
  • the annular pressure generated by the fluid and its additives is represented by line 14 and is a linear function of the total vertical depth.
  • the pure hydrostatic pressure that would be generated by the fluid, less additives, i.e., water, is represented by line 16.
  • the annular pressure seen in the borehole is a linear function of the borehole fluid. This is true only where the fluid is at a static density. While the fluid density may be modified during drilling operations, the resulting pressure annular pressure is generally linear.
  • the hydrostatic pressure 16 and the pore pressure 10 generally track each other in the intermediate section to a depth of approximately 7000 feet. Thereafter, the pore pressure 10 increases in the interval from a depth of 7000 feet to approximately 9300 feet. This may occur where the borehole penetrates a formation interval having significantly different characteristics than the prior formation.
  • the annular pressure 14 maintained by the fluid 14 is safely above the pore pressure prior to 7000 feet.
  • the differential between the pore pressure 10 and annular pressure 14 is significantly reduced, decreasing the margin of safety during operations.
  • a gas kick in this interval may result in the pore pressure exceeding the annular pressure with a release of fluid and gas into the borehole, possibly requiring activation of the surface BOP stack.
  • additional weighting material may be added to the fluid, it will be generally ineffective in dealing with a gas kick due to the time required to increase the fluid density as seen in the borehole.
  • Fluid circulation itself also creates problems in an open system. It will be appreciated that it is necessary to shut off the mud pumps in order to make up successive drill pipe joints. When the pumps are shut off, the annular pressure will undergo a negative spike that dissipates as the annular pressure stabilizes. Similarly, when the pumps are turned back on, the annular pressure will undergo a positive spike. This occurs each time a pipe joint is added to or removed from the string. It will be appreciated that these spikes can cause fatigue on the borehole cake and could result in formation fluids entering the borehole, again leading to a well control event.
  • WO-A-0250398 discloses a system for drilling of wells whereby drilling fluid is pumped down a drill string and up an annular space formed between the drill string and the wellbore wall, the annular space being closed at its upper end by a pressure containment device.
  • the drilling fluid is discharged from the annular space via a pipe provided with a flow/pressure control device controlled by a central data acquisition and control system that is programmed to detect a real time discrepancy between predicted and monitored flow-out and to control the flow/pressure control device to maintain a desired backpressure in the well.
  • WO-A-0079092 discloses a system for controlling formation pressure during the drilling of a subterranean formation, comprising a drill string extending into a borehole, the drill string including a bottom hole assembly comprising a drill bit, a primary pump for selectively pumping a drilling fluid from a drilling fluid source, through said drill string, out said drill bit and into an annular space created as said drill string penetrates the formation, a fluid discharge conduit in fluid communication with said annular space for discharging said drilling fluid to a reservoir to clean said drilling fluid for reuse, and a fluid backpressure system connected to said fluid discharge conduit; said fluid backpressure system comprised of a fluid choke, a backpressure pump, and a fluid source, whereby said backpressure pump may be selectively activated to increase annular space drilling fluid pressure.
  • the present invention is directed to a closed loop, overbalanced drilling system having a variable overbalance pressure capability.
  • the present invention further utilizes information related to the wellbore, drill rig and drilling fluid as inputs to a model to predict downhole pressure.
  • the predicted downhole pressure is then compared to a desired downhole pressure and the differential is utilized to control a backpressure system.
  • the present invention further utilizes actual downhole pressure to calibrate the model and modify input parameters to more closely correlate predicted downhole pressures to measured downhole pressures.
  • the system according to the invention is defined by claim 1.
  • the present invention is capable of modifying annular pressure during circulation by the addition of backpressure, thereby increasing the annular pressure without the addition of weighting additives to the fluid. It will be appreciated that the use of backpressure to increase annular pressure is more responsive to sudden changes in formation pore pressure.
  • the present invention is capable of maintaining constant annular pressure during primary pump shut down when drill pipe is being added to or removed from the string. By maintaining pressure in the annulus, the mud cake build up on the formation wall is maintained and does not see sudden spikes or drops in annular pressure.
  • the present invention utilizes an accurate mass-balance flow meter that permits accurate determination of fluid gains or losses in the system, permitting the operator to better manage the fluids involve in the operation.
  • the present invention includes automated sensors to determine annular pressure, flow, and with depth information, can be used to predict pore pressure, allowing the present invention to increase annular pressure in advance of drilling through the section in question.
  • the present invention is intended to achieve Dynamic Annulus Pressure Control (DAPC) of a well bore during drilling and intervention operations.
  • DAPC Dynamic Annulus Pressure Control
  • FIG. 2 is a plan view depicting a surface drilling system employing the current invention. It will be appreciated that an offshore drilling system may likewise employ the current invention.
  • the drilling system 100 is shown as being comprised of a drilling rig 102 that is used to support drilling operations. Many of the components used on a rig 102, such as the kelly, power tongs, slips, draw works and other equipment are not shown for ease of depiction.
  • the rig 102 is used to support drilling and exploration operations in formation 104.
  • the borehole 106 has already been partially drilled, casing 108 set and cemented 109 into place.
  • a casing shutoff mechanism, or downhole deployment valve, 110 is installed in the casing 108 to optionally shutoff the annulus and effectively act as a valve to shut off the open hole section when the bit is located above the valve.
  • the drill string 112 supports a bottom hole assembly (BHA) 113 that includes a drill bit 120, a mud motor 118, a MWD/LWD sensor suite 119, including a pressure transducer 116 to determine the annular pressure, a check valve, to prevent backflow of fluid from the annulus. It also includes a telemetry package 122 that is used to transmit pressure, MWD/LWD as well as drilling information to be received at the surface While Fig. 2A illustrates a BHA utilizing a mud telemetry system, it will be appreciated that other telemetry systems, such as radio frequency (RF), electromagnetic (EM) or drilling string transmission systems may be employed within the present invention.
  • RF radio frequency
  • EM electromagnetic
  • the drilling process requires the use of a drilling fluid 150, which is stored in reservoir 136.
  • the reservoir 136 is in fluid communications with one or more mud pumps 138 which pump the drilling fluid 150 through conduit 140.
  • the conduit 140 is connected to the last joint of the drill string 112 that passes through a rotating or spherical BOP 142.
  • a rotating BOP 142 when activated, forces spherical shaped elastomeric elements to rotate upwardly, closing around the drill string 112, isolating the pressure, but still permitting drill string rotation.
  • Commercially available spherical BOPs such as those manufactured by Varco International, are capable of isolating annular pressures up to 10,000 psi (68947.6 kPa).
  • the fluid 150 is pumped down through the drill string 112 and the BHA 113 and exits the drill bit 120, where it circulates the cuttings away from the bit 120 and returns them up the open hole annulus 115 and then the annulus formed between the casing 108 and the drill string 112.
  • the fluid 150 returns to the surface and goes through diverter 117, through conduit 124 and various surge tanks and telemetry systems (not shown).
  • the fluid 150 proceeds to what is generally referred to as the backpressure system 131.
  • the fluid 150 enters the backpressure system 131 and flows through a flow meter 126.
  • the flow meter 126 may be a mass-balance type or other high-resolution flow meter. Utilizing the flow meter 126, an operator will be able to determine how much fluid 150 has been pumped into the well through drill string 112 and the amount of fluid 150 returning from the well. Based on differences in the amount of fluid 150 pumped versus fluid 150 returned, the operator is be able to determine whether fluid 150 is being lost to the formation 104, which may indicate that formation fracturing has occurred, i.e., a significant negative fluid differential. Likewise, a significant positive differential would be indicative of formation fluid entering into the well bore.
  • the fluid 150 proceeds to a wear resistant choke 130. It will be appreciated that there exist chokes designed to operate in an environment where the drilling fluid 150 contains substantial drill cuttings and other solids. Choke 130 is one such type and is further capable of operating at variable pressures and through multiple duty cycles.
  • the fluid 150 exits the choke 130 and flows through valve 121.
  • the fluid 150 is then processed by an optional degasser 1 and by a series of filters and shaker table 129, designed to remove contaminates, including cuttings, from the fluid 150.
  • the fluid 150 is then returned to reservoir 136.
  • a flow loop 119A is provided in advance of valve 125 for feeding fluid 150 directly a backpressure pump 128.
  • the backpressure pump 128 may be provided with fluid from the reservoir through conduit 119B, which is fluid communications with the reservoir 1 (trip tank).
  • the trip tank is normally used on a rig to monitor fluid gains and losses during tripping operations. In the this invention, this functionality is maintained.
  • a three-way valve 125 may be used to select loop 119A, conduit 119B or isolate the backpressure system.
  • backpressure pump 128 is capable of utilizing returned fluid to create a backpressure by selection of flow loop 119A, it will be appreciated that the returned fluid could have contaminates that have not been removed by filter/shaker table 129. As such, the wear on backpressure pump 128 may be increased. As such, the preferred fluid supply to create a backpressure would be to use conduit 119A to provide reconditioned fluid to backpressure pump 128.
  • valve 125 would select either conduit 119A or conduit 119B, and the backpressure pump 128 engaged to ensure sufficient flow passes the choke system to be able to maintain backpressure, even when there is no flow coming from the annulus 115.
  • the backpressure pump 128 is capable of providing up to approximately 2200 psi (15168.5 kPa) of backpressure; though higher pressure capability pumps may be selected.
  • the ability to provide backpressure is a significant improvement over normal fluid control systems.
  • the pressure in the annulus provided by the fluid is a function of its density and the true vertical depth and is generally a by approximation linear function.
  • additives added to the fluid in reservoir 136 must be pumped downhole to eventually change the pressure gradient applied by the fluid 150.
  • the preferred embodiment of the present invention further includes a flow meter 152 in conduit 100 to measure the amount of fluid being pumped downhole. It will be appreciated that by monitoring flow meters 126, 152 and the volume pumped by the backpressure pump 128, the system is readily able to determine the amount of fluid 150 being lost to the formation, or conversely, the amount of formation fluid leaking to the borehole 106. Further included in the present invention is a system for monitoring well pressure conditions and predicting borehole 106 and annulus 115 pressure characteristics.
  • FIG. 3 is a block diagram of the pressure monitoring system 146 of the preferred embodiment of the present invention.
  • System inputs to the monitoring system 146 include the downhole pressure 202 that has been measured by sensor package119, transmitted by MWD pulser package 122 and received by transducer equipment (not shown) on the surface.
  • Other system inputs include pump pressure 200, input flow 204 from flow meter 152, penetration rate and string rotation rate, as well as weight on bit (WOB) and torque on bit (TOB) that may be transmitted from the BHA 113 up the annulus as a pressure pulse.
  • Return flow is measured using flow meter 126.
  • Signals representative of the data inputs are transmitted to a control unit 230, which is it self comprised of a drill rig control unit 232, a drilling operator's station 234, a DAPC processor 236 and a back pressure programmable logic controller (PLC) 238, all of which are connected by a common data network 240.
  • the DAPC processor 236 serves three functions, monitoring the state of the borehole pressure during drilling operations, predicting borehole response to continued drilling, and issuing commands to the, backpressure PLC to control the variable choke 130 and backpressure pump 128. The specific logic associated with the DAPC processor 236 will be discussed further below.
  • the DAPC processor 236 includes programming to carry out Control functions and Real Time Model Calibration functions.
  • the DAPC processor receives data from various sources and continuously calculates in real time the correct backpressure set-point based on the input parameters.
  • the set-point is then transferred to the programmable logic controller 238, which generates the control signals for backpressure pump 128.
  • the input parameters fall into three main groups.
  • the first are relatively fixed parameters 250, including parameters such as well and casing string geometry, drill bit nozzle diameters, and well trajectory. While it is recognized that the actual well trajectory may vary from the planned trajectory, the variance may be taken into account with a correction to the planned trajectory.
  • temperature profile of the fluid in the annulus and the fluid composition are generally known and do not change over the course of the drilling operations.
  • one objective is keeping the fluid 150 density and composition relatively constant, using backpressure to provide the additional pressure to control the annulus pressure.
  • the second group of parameters 252 are variable in nature and are sensed and logged in real time.
  • the common data network 240 provides this information to the DAPC processor 236.
  • This information includes flow rate data provided by both downhole and return flow meters 152 and 126, respectively, the drill string rate of penetration (ROP) or velocity, the drill string rotational speed, the bit depth, and the well depth, the latter two being derived from rig sensor data.
  • the last parameter is the downhole pressure data 254 that is provided by the downhole MWD/LWD sensor suite 119 and transmitted back up the annulus by the mud pulse telemetry package 122.
  • One other input parameters is the set-point downhole pressure 256, the desired annulus pressure.
  • the functionally the control module 258 attempts to calculate the pressure in the annulus over its fill well bore length utilizing various models designed for various formation and fluid parameters.
  • the pressure in the well bore is a function not only of the pressure or weight of the fluid column in the well, but includes the pressures caused by drilling operations, including fluid displacement by the drill string, frictional losses returning up the annulus, and other factors.
  • the control module 258 considers the well as a finite number of segments, each assigned to a segment of well bore length. In each of the segments the dynamic pressure and the fluid weight is calculated and used to determine the pressure differential 262 for the segment. The segments are summed and the pressure differential for the entire well profile is determined.
  • the flow rate of the fluid 150 being pumped downhole is proportional to the flow velocity of fluid 150 and may be used to determine dynamic pressure loss as the fluid is being pumped downhole.
  • the fluid 150 density is calculated in each segment, taking into account the fluid compressibility, estimated cutting loading and the thermal expansion of the fluid for the specified segment, which is itself related to the temperature profile for that segment of the well.
  • the fluid viscosity at the temperature profile for the segment is also instrumental in determining dynamic pressure losses for the segment.
  • the composition of the fluid is also considered in determining compressibility and the thermal expansion coefficient.
  • the drill string ROP is related to the surge and swab pressures encountered during drilling operations as the drill string is moved into or out of the borehole.
  • the drill string rotation is also used to determine dynamic pressures, as it creates a frictional force between the fluid in the annulus and the drill string.
  • the bit depth, well depth, and well/string geometry are all used to help create the borehole segments to be modeled.
  • the preferred embodiment considers not only the hydrostatic pressure exerted by fluid 150 , but also the fluid compression, fluid thermal expansion and the cuttings loading of the fluid seen during operations. It will be appreciated that the cuttings loading can be determined as the fluid is returned to the surface and reconditioned for further use. All of these factors go into calculation of the "static pressure".
  • Dynamic pressure considers many of the same factors in determining static pressure. However, it further considers a number of other factors. Among them is the concept of laminar versus turbulent flow. The flow characteristics are a function of the estimated roughness, hole size and the flow velocity of the fluid. The calculation also considers the specific geometry for the segment in question. This would include borehole eccentricity and specific drill pipe geometry (box/pin upsets) that affect the flow velocity seen in the borehole annulus. The dynamic pressure calculation further includes cuttings accumulation downhole, as well as fluid rheology and the drill string movement's (penetration and rotation) effect on dynamic pressure of the fluid.
  • the pressure differential 262 for the entire annulus is calculated and compared to the set-point pressure 251 in the control module 264.
  • the desired backpressure 266 is then determined and passed on to programmable logic controller 238, which generates control signals for the backpressure pump 128.
  • downhole pressure utilized several downhole parameters, including downhole pressure and estimates of fluid viscosity and fluid density. These parameters are determined downhole and transmitted up the mud column using pressure pulses. Because the data bandwidth for mud pulse telemetry is very low and the bandwidth is used by other MWD/LWD functions, as well as drill string control functions, downhole pressure, fluid density and viscosity can not be input to the DAPC model on a real time basis. Accordingly, it will be appreciated that there is likely to be a difference between the measured downhole pressure, when transmitted up to the surface, and the predicted downhole pressure for that depth. When such occurs the DAPC system computes adjustments to the parameters and implements them in the model to make a new best estimate of downhole pressure.
  • the corrections to the model may be made by varying any of the variable parameters.
  • the fluid density and the fluid viscosity are modified in order to correct the predicted downhole pressure.
  • the actual downhole pressure measurement is used only to calibrate the calculated downhole pressure. It is not utilized to predict downhole annular pressure response. If downhole telemetry bandwidth increases, it may then be practical to include real time downhole pressure and temperature information to correct the model.
  • the DAPC control system 236 further operates to index the inputs such that real time inputs properly correlate with delayed downhole transmitted inputs.
  • the rig sensor inputs, calculated pressure differential and backpressure pressures, as well as the downhole measurements, may be "time-stamped” or "depth-stamped” such that the inputs and results may be properly correlated with later received downhole data. Utilizing a regression analysis based on a set of recently time-stamped actual pressure measurements, the model may be adjusted to more accurately predict actual pressure and the required backpressure.
  • Figure 5 depicts the operation of the DAPC control system demonstrating an uncalibrated DAPC model.
  • PWD downhole pressure while drilling
  • the DAPC predicted pressure 404 is significantly less when compared to the non-time shifted PWD 400.
  • the DAPC predicted pressure differs significantly.
  • this differential is addressed by modifying the model inputs for fluid 150 density and viscosity. Based on the new estimates, in Fig. 6 , the DAPC predicted pressure 404 more closely tracks the time stamped PWD 402.
  • the DAPC model uses the PWD to calibrate the predicted pressure and modify model inputs to more accurately predict downhole pressure throughout the entire borehole profile.
  • the DAPC control system 236 will calculate the required backpressure level 266 and transmit it to the programmable logic controller 240.
  • the programmable controller 240 then generates the necessary control signals to choke 130, valves 121 and 123, and backpressure pump 128.
  • the advantage in utilizing the DAPC backpressure system may be readily in the chart of Fig. 7 .
  • the hydrostatic pressure of the fluid is depicted in line 302.
  • P the pressure
  • the fluid density
  • TVD the total vertical depth of the well
  • C the backpressure.
  • the density is that of water.
  • the backpressure C is zero.
  • the fluid is weighted, thereby increasing the pressure applied as the depth increases.
  • the pore pressure profile 300 can be seen in Fig.
  • the use of the DAPC permits an operator to make essentially step changes in the annular pressure.
  • Multiple DAPC pressure lines 304, 306, 308 and 310 are depicted in Fig. 7 .
  • the back pressure C may be increased to step change the annular pressure from 304 to 306 to 308 to 310 in response to increasing pore pressure 300b, in contrast with normal annular pressure techniques as depicted in line 303.
  • the DAPC concept further offers the advantage of being able to decrease the back pressure in response to a decrease in pore pressure as seen in 300c.
  • the difference between the DAPC maintained annular pressure 310 and the pore pressure 300c, known as the overbalance pressure, is significantly less than the overbalance pressure seen using conventional annular pressure control methods 303.
  • Highly overbalanced conditions can adversely affect the formation permeability be forcing greater amounts of borehole fluid into the formation.
  • Figure 8 is a graph depicting one application of the DAPC system in an At Balance Drilling (ABD) environment.
  • the situation in Fig. 8 depicts the pore pressure in an interval 320a as being fairly linear until approximately 2 km TVD, and as being kept in check by conventional annular pressure 321a.
  • a sudden increase in pore pressure occurs at 320b.
  • the answer would be to increase the fluid density to prevent formation fluid influx and sloughing off of the borehole mud cake.
  • the resulting increase in density modifies the pressure profile applied by the fluid to 321b. However, in doing so it dramatically increases the overbalance pressure, not only in region 320c, but in region 320a as well.
  • the alternative response to the pressure increase seen at 320b would be to apply backpressure to the fluid to shift the pressure profile to the right, such that pressure profile 322 more closely matches the pore pressure 320c, as opposed to pressure profile 321b.
  • the DAPC method of pressure control may also be used to control a major well event, such as a fluid influx.
  • a major well event such as a fluid influx.
  • the only option was to close the BOPs to effectively to shut in the well, relieve pressure through the choke and kill manifold, and weight up the drilling fluid to provide additional annular pressure. This technique requires time to bring the well under control.
  • An alternative method is sometimes called the "Driller's" method, which utilizes continuous circulation without shutting in the well.
  • a supply of heavily weighted fluid e.g., 18 pounds per gallon (ppg) (3.157 kg/l) is constantly available during drilling operations below any set casing.
  • the backpressure is increased, as opposed to adding heavily weighted fluid.
  • the circulation is continued. With the increase in pressure, the formation fluid influx goes into solution in the circulating fluid and is released via the choke manifold. Because the pressure has been increased, it is no longer necessary to immediately circulate a heavily weighted fluid. Moreover, since the backpressure is applied directly to the annulus, it quickly forces the formation fluid to go into solution, as opposed to waiting until the heavily weighted fluid is circulated into the annulus.
  • An additional application of the DAPC technique relates to its use in noncontinuous circulating systems.
  • continuous circulation systems are used to help stabilize the formation, avoiding the sudden pressure 502 drops that occurs when the mud pumps are turned off to make/break new pipe connections.
  • This pressure drop 502 is subsequently followed by a pressure spike 504 when the pumps are turned back on for drilling operations.
  • Fig. 9A These variations in annular pressure 500 can adversely affect the borehole mud cake, and can result in fluid invasion into the formation.
  • the DAPC system backpressure 506 may be applied to the annulus upon shutting off the mud pumps, ameliorating the sudden drop in annulus pressure from pump off condition to a more mild pressure drop 502.
  • the backpressure Prior to turning the pumps on, the backpressure may be reduced such that the pump on condition spike 504 is likewise reduced.
  • the DAPC backpressure system is capable of maintaining a relatively stable downhole pressure during drilling conditions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Chemical Vapour Deposition (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
EP03742832A 2002-02-20 2003-02-19 Dynamic annular pressure control apparatus and method Expired - Lifetime EP1488073B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US35822602P 2002-02-20 2002-02-20
PCT/US2003/005012 WO2003071091A1 (en) 2002-02-20 2003-02-19 Dynamic annular pressure control apparatus and method
US358226P 2010-06-24

Publications (3)

Publication Number Publication Date
EP1488073A1 EP1488073A1 (en) 2004-12-22
EP1488073B1 EP1488073B1 (en) 2006-08-09
EP1488073B2 true EP1488073B2 (en) 2012-08-01

Family

ID=27757721

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03742832A Expired - Lifetime EP1488073B2 (en) 2002-02-20 2003-02-19 Dynamic annular pressure control apparatus and method

Country Status (11)

Country Link
EP (1) EP1488073B2 (no)
CN (1) CN100535380C (no)
AR (1) AR038529A1 (no)
AU (1) AU2003211155B9 (no)
CA (1) CA2477242C (no)
EG (1) EG23370A (no)
MX (1) MXPA04008063A (no)
NO (1) NO338967B1 (no)
OA (1) OA12776A (no)
RU (1) RU2301319C2 (no)
WO (1) WO2003071091A1 (no)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016028320A1 (en) * 2014-08-22 2016-02-25 Halliburton Energy Services, Inc. Downhole pressure sensing device for open-hole operations
US11459879B2 (en) 2019-08-28 2022-10-04 Baker Hughes Oilfield Operations Llc Mud pulse transmission time delay correction

Families Citing this family (80)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1637695A1 (en) * 2000-09-22 2006-03-22 Weatherford/Lamb, Inc. Methods and apparatus for remote monitoring and control.
US7185719B2 (en) 2002-02-20 2007-03-06 Shell Oil Company Dynamic annular pressure control apparatus and method
US8955619B2 (en) 2002-05-28 2015-02-17 Weatherford/Lamb, Inc. Managed pressure drilling
US7836946B2 (en) 2002-10-31 2010-11-23 Weatherford/Lamb, Inc. Rotating control head radial seal protection and leak detection systems
CN100532780C (zh) 2003-08-19 2009-08-26 @平衡有限公司 钻井系统及方法
US7337660B2 (en) 2004-05-12 2008-03-04 Halliburton Energy Services, Inc. Method and system for reservoir characterization in connection with drilling operations
MY140447A (en) * 2004-09-22 2009-12-31 Balance B V Method of drilling a lossy formation
US8826988B2 (en) 2004-11-23 2014-09-09 Weatherford/Lamb, Inc. Latch position indicator system and method
US7926593B2 (en) 2004-11-23 2011-04-19 Weatherford/Lamb, Inc. Rotating control device docking station
US7836973B2 (en) 2005-10-20 2010-11-23 Weatherford/Lamb, Inc. Annulus pressure control drilling systems and methods
MX2008008658A (es) * 2006-01-05 2008-11-28 At Balance Americas Llc Metodo para determinar la entrada de fluidos de yacimientos o la perdida de fluidos de perforacion de un agujero de pozo usando un sistema de control de presion anular dinamico.
CA2867376C (en) 2006-11-07 2016-01-12 Charles R. Orbell Method of constructing a riser string by installing a valve and an annular seal
US8069921B2 (en) * 2007-10-19 2011-12-06 Baker Hughes Incorporated Adjustable flow control devices for use in hydrocarbon production
US7997345B2 (en) 2007-10-19 2011-08-16 Weatherford/Lamb, Inc. Universal marine diverter converter
US8286734B2 (en) 2007-10-23 2012-10-16 Weatherford/Lamb, Inc. Low profile rotating control device
US8844652B2 (en) 2007-10-23 2014-09-30 Weatherford/Lamb, Inc. Interlocking low profile rotating control device
US8281875B2 (en) 2008-12-19 2012-10-09 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
US8322432B2 (en) 2009-01-15 2012-12-04 Weatherford/Lamb, Inc. Subsea internal riser rotating control device system and method
US9359853B2 (en) 2009-01-15 2016-06-07 Weatherford Technology Holdings, Llc Acoustically controlled subsea latching and sealing system and method for an oilfield device
US9567843B2 (en) 2009-07-30 2017-02-14 Halliburton Energy Services, Inc. Well drilling methods with event detection
US8347983B2 (en) 2009-07-31 2013-01-08 Weatherford/Lamb, Inc. Drilling with a high pressure rotating control device
US8360170B2 (en) * 2009-09-15 2013-01-29 Managed Pressure Operations Pte Ltd. Method of drilling a subterranean borehole
US8381838B2 (en) 2009-12-31 2013-02-26 Pason Systems Corp. System and apparatus for directing the drilling of a well
GB2478119A (en) * 2010-02-24 2011-08-31 Managed Pressure Operations Llc A drilling system having a riser closure mounted above a telescopic joint
WO2011106004A1 (en) 2010-02-25 2011-09-01 Halliburton Energy Services, Inc. Pressure control device with remote orientation relative to a rig
US8844633B2 (en) * 2010-03-29 2014-09-30 At-Balance Americas, Llc Method for maintaining wellbore pressure
US8347982B2 (en) 2010-04-16 2013-01-08 Weatherford/Lamb, Inc. System and method for managing heave pressure from a floating rig
US8820405B2 (en) 2010-04-27 2014-09-02 Halliburton Energy Services, Inc. Segregating flowable materials in a well
US8201628B2 (en) 2010-04-27 2012-06-19 Halliburton Energy Services, Inc. Wellbore pressure control with segregated fluid columns
EP2392772A1 (de) 2010-06-07 2011-12-07 Siemens Aktiengesellschaft Verfahren und Vorrichtung zur Erhöhung einer Ausbeute einer Lagerstätte
EP2395352A1 (de) 2010-06-07 2011-12-14 Siemens Aktiengesellschaft Verfahren und Vorrichtung zur Bestimmung der lokalen räumlichen Ausdehnung der Phase an Wertstoff-Mineral in einem Gestein
EP2392768B1 (de) * 2010-06-07 2013-08-28 Siemens Aktiengesellschaft Verfahren und Vorrichtung zur Erhöhung einer Ausbeute einer Lagerstätte
US8240398B2 (en) 2010-06-15 2012-08-14 Halliburton Energy Services, Inc. Annulus pressure setpoint correction using real time pressure while drilling measurements
US9175542B2 (en) 2010-06-28 2015-11-03 Weatherford/Lamb, Inc. Lubricating seal for use with a tubular
GB2483671B (en) 2010-09-15 2016-04-13 Managed Pressure Operations Drilling system
US8955602B2 (en) * 2010-11-19 2015-02-17 Letourneau Technologies, Inc. System and methods for continuous and near continuous drilling
US9163473B2 (en) 2010-11-20 2015-10-20 Halliburton Energy Services, Inc. Remote operation of a rotating control device bearing clamp and safety latch
US8739863B2 (en) 2010-11-20 2014-06-03 Halliburton Energy Services, Inc. Remote operation of a rotating control device bearing clamp
US20120227961A1 (en) * 2011-03-09 2012-09-13 Sehsah Ossama R Method for automatic pressure control during drilling including correction for drill string movement
US9016381B2 (en) * 2011-03-17 2015-04-28 Hydril Usa Manufacturing Llc Mudline managed pressure drilling and enhanced influx detection
MX2013011657A (es) 2011-04-08 2013-11-01 Halliburton Energy Serv Inc Control de presion automatico del tubo estabilizador en perforacion.
EP2694773A4 (en) * 2011-04-08 2016-04-27 Halliburton Energy Services Inc BOREHOLE PRESSURE CONTROL WITH HOLES WITH OPTIMIZED PRESSURE
US9249638B2 (en) 2011-04-08 2016-02-02 Halliburton Energy Services, Inc. Wellbore pressure control with optimized pressure drilling
US9080407B2 (en) 2011-05-09 2015-07-14 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
US9222350B2 (en) 2011-06-21 2015-12-29 Diamond Innovations, Inc. Cutter tool insert having sensing device
MY172254A (en) 2011-09-08 2019-11-20 Halliburton Energy Services Inc High temperature drilling with lower temperature drated tools
US9447647B2 (en) 2011-11-08 2016-09-20 Halliburton Energy Services, Inc. Preemptive setpoint pressure offset for flow diversion in drilling operations
US9725974B2 (en) 2011-11-30 2017-08-08 Halliburton Energy Services, Inc. Use of downhole pressure measurements while drilling to detect and mitigate influxes
CN102434120B (zh) * 2011-12-27 2014-07-02 中国石油集团西部钻探工程有限公司 控压钻井用回压补偿装置
SI2805008T1 (en) * 2012-01-20 2018-04-30 Strada Design Limited Drilling system with double circulation
CA2871620C (en) * 2012-04-27 2017-01-03 Schlumberger Canada Limited Wellbore annular pressure control system and method using gas lift in drilling fluid return line
GB2501741B (en) * 2012-05-03 2019-02-13 Managed Pressure Operations Method of drilling a subterranean borehole
CN103510893B (zh) * 2012-06-29 2016-08-03 中国石油天然气集团公司 一种利用流量监控实现井底压力控制的钻井装备与方法
AU2012384530B2 (en) * 2012-07-02 2016-09-22 Halliburton Energy Services, Inc Pressure control in drilling operations with offset applied in response to predetermined conditions
WO2014015323A1 (en) * 2012-07-20 2014-01-23 Merlin Technology, Inc. Inground operations, system, communications and associated apparatus
CN102828709B (zh) * 2012-09-06 2015-02-18 四川省广汉市恒生石油设备有限责任公司 钻井安全智能监控方法和钻井安全监控报警装置
US9823373B2 (en) 2012-11-08 2017-11-21 Halliburton Energy Services, Inc. Acoustic telemetry with distributed acoustic sensing system
AU2012398043B2 (en) * 2012-12-31 2016-07-14 Halliburton Energy Services, Inc. Regulating drilling fluid pressure in a drilling fluid circulation system
RU2527962C1 (ru) * 2013-04-30 2014-09-10 Общество с ограниченной ответственностью Научно-производственная фирма "ВНИИГИС-Забойные телеметрические комплексы" (ООО НПФ "ВНИИГИС-ЗТК") Способ наземного приема-передачи информации в процессе бурения и устройство для его реализации
US9650884B2 (en) * 2013-09-20 2017-05-16 Weatherford Technology Holdings, Llc Use of downhole isolation valve to sense annulus pressure
AU2013406174B2 (en) * 2013-11-27 2017-06-15 Landmark Graphics Corporation Lumped data modeling of tool joint effects in underbalanced drilling
GB2521374A (en) 2013-12-17 2015-06-24 Managed Pressure Operations Drilling system and method of operating a drilling system
GB2521373A (en) 2013-12-17 2015-06-24 Managed Pressure Operations Apparatus and method for degassing drilling fluid
CN104847287B (zh) * 2014-02-19 2018-03-02 中国石油化工集团公司 一种平衡压力钻井控压方法
WO2015142819A1 (en) 2014-03-21 2015-09-24 Canrig Drilling Technology Ltd. Back pressure control system
RU2688652C2 (ru) * 2014-05-12 2019-05-21 Нэшнл Ойлвэл Варко, Л.П. Способы эксплуатации скважинного бурового оборудования на основе условий в стволе скважины
CN105781530A (zh) * 2014-05-29 2016-07-20 中国石油集团钻井工程技术研究院 全程环空压力测量方法
CN105672991A (zh) * 2014-05-29 2016-06-15 中国石油集团钻井工程技术研究院 一种用于测量钻柱上下运动产生抽吸环空压力波动的方法
CN105672992A (zh) * 2014-05-29 2016-06-15 中国石油集团钻井工程技术研究院 一种用于实现钻井全过程的环空压力测量方法
CN104358557A (zh) * 2014-11-04 2015-02-18 北京中冶迈克液压有限责任公司 控压钻井装备液气控制系统
CN105201485A (zh) * 2015-09-16 2015-12-30 贵州省地质矿产勘查开发局111地质大队 一种钻井信息远程管理系统
US9759012B2 (en) * 2015-09-24 2017-09-12 Merlin Technology, Inc. Multimode steering and homing system, method and apparatus
CN105840176A (zh) * 2016-04-08 2016-08-10 中国石油集团钻井工程技术研究院 随钻当量密度测量方法及装置
CN107269239A (zh) * 2017-08-04 2017-10-20 西南石油大学 一种稳定油套环空压力的装置及其方法
RU2752374C1 (ru) * 2017-09-19 2021-07-26 Нобл Дриллинг Сёрвисиз Инк. Способ обнаружения притока или утечки текучей среды в скважине и обнаружения изменений эффективности насоса текучей среды
WO2020097060A2 (en) * 2018-11-05 2020-05-14 Schlumberger Technology Corporation Fracturing operations pump fleet balance controller
CN109812710B (zh) * 2019-01-28 2020-10-27 新昌县陆恒机械有限公司 一种油田输送管线增压装置
RU2728079C1 (ru) * 2019-06-10 2020-07-28 Федеральное государственное бюджетное образовательное учреждение высшего образования "Астраханский государственный технический университет" ФГБОУ ВО "АГТУ" Устройство для управления процессом бурения скважин
US11473418B1 (en) 2020-01-22 2022-10-18 Vermeer Manufacturing Company Horizontal directional drilling system and method
US20220155117A1 (en) * 2020-11-16 2022-05-19 Sensia Llc System and method for quantitative verification of flow measurements

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3552502A (en) 1967-12-21 1971-01-05 Dresser Ind Apparatus for automatically controlling the killing of oil and gas wells
US3827511A (en) 1972-12-18 1974-08-06 Cameron Iron Works Inc Apparatus for controlling well pressure
US4630675A (en) 1985-05-28 1986-12-23 Smith International Inc. Drilling choke pressure limiting control system
US4739325A (en) 1982-09-30 1988-04-19 Macleod Laboratories, Inc. Apparatus and method for down-hole EM telemetry while drilling
US5168932A (en) 1990-07-25 1992-12-08 Shell Oil Company Detecting outflow or inflow of fluid in a wellbore
US5359324A (en) 1991-10-31 1994-10-25 Schlumberger Technology Corporation Well logging apparatus for investigating earth formations
US5975219A (en) 1996-12-23 1999-11-02 Sprehe; Paul Robert Method for controlling entry of a drillstem into a wellbore to minimize surge pressure
US6177882B1 (en) 1997-12-01 2001-01-23 Halliburton Energy Services, Inc. Electromagnetic-to-acoustic and acoustic-to-electromagnetic repeaters and methods for use of same
US6370082B1 (en) 1999-06-14 2002-04-09 Halliburton Energy Services, Inc. Acoustic telemetry system with drilling noise cancellation
WO2002050398A1 (en) 2000-12-18 2002-06-27 Impact Engineering Solutions Limited Cloded loop fluid-handing system for well drilling

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK150665C (da) * 1985-04-11 1987-11-30 Einar Dyhr Drosselventil til regujlering af gennemstroemning og dermed bagtryk i
GB2239279B (en) * 1989-12-20 1993-06-16 Forex Neptune Sa Method of analysing and controlling a fluid influx during the drilling of a borehole
US6035952A (en) 1996-05-03 2000-03-14 Baker Hughes Incorporated Closed loop fluid-handling system for use during drilling of wellbores
US5857522A (en) 1996-05-03 1999-01-12 Baker Hughes Incorporated Fluid handling system for use in drilling of wellbores
US6176323B1 (en) * 1997-06-27 2001-01-23 Baker Hughes Incorporated Drilling systems with sensors for determining properties of drilling fluid downhole
US6415877B1 (en) * 1998-07-15 2002-07-09 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure
GC0000342A (en) * 1999-06-22 2007-03-31 Shell Int Research Drilling system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3552502A (en) 1967-12-21 1971-01-05 Dresser Ind Apparatus for automatically controlling the killing of oil and gas wells
US3827511A (en) 1972-12-18 1974-08-06 Cameron Iron Works Inc Apparatus for controlling well pressure
US4739325A (en) 1982-09-30 1988-04-19 Macleod Laboratories, Inc. Apparatus and method for down-hole EM telemetry while drilling
US4630675A (en) 1985-05-28 1986-12-23 Smith International Inc. Drilling choke pressure limiting control system
US5168932A (en) 1990-07-25 1992-12-08 Shell Oil Company Detecting outflow or inflow of fluid in a wellbore
US5359324A (en) 1991-10-31 1994-10-25 Schlumberger Technology Corporation Well logging apparatus for investigating earth formations
US5975219A (en) 1996-12-23 1999-11-02 Sprehe; Paul Robert Method for controlling entry of a drillstem into a wellbore to minimize surge pressure
US6177882B1 (en) 1997-12-01 2001-01-23 Halliburton Energy Services, Inc. Electromagnetic-to-acoustic and acoustic-to-electromagnetic repeaters and methods for use of same
US6370082B1 (en) 1999-06-14 2002-04-09 Halliburton Energy Services, Inc. Acoustic telemetry system with drilling noise cancellation
WO2002050398A1 (en) 2000-12-18 2002-06-27 Impact Engineering Solutions Limited Cloded loop fluid-handing system for well drilling

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
G V CHILINGARIAN: "Dilling and Drilling Fluids", 1981
GERD SCHAUMBERG: "BOHRLOCH KONTROLL HANDBUCH", vol. 1+2, 1998, DRUCK GOSLAR SUEDWALL, D 29221 CELLE

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016028320A1 (en) * 2014-08-22 2016-02-25 Halliburton Energy Services, Inc. Downhole pressure sensing device for open-hole operations
GB2542720A (en) * 2014-08-22 2017-03-29 Halliburton Energy Services Inc Downhole pressure sensing device for open-hole operations
GB2542720B (en) * 2014-08-22 2020-10-21 Halliburton Energy Services Inc Downhole pressure sensing device for open-hole operations
US11459879B2 (en) 2019-08-28 2022-10-04 Baker Hughes Oilfield Operations Llc Mud pulse transmission time delay correction

Also Published As

Publication number Publication date
AU2003211155A1 (en) 2003-09-09
MXPA04008063A (es) 2005-06-20
AU2003211155B2 (en) 2008-04-17
AU2003211155B9 (en) 2008-06-05
CN100535380C (zh) 2009-09-02
OA12776A (en) 2006-07-06
EG23370A (en) 2005-02-28
EP1488073B1 (en) 2006-08-09
WO2003071091A9 (en) 2004-06-24
WO2003071091A1 (en) 2003-08-28
CA2477242A1 (en) 2003-08-28
RU2301319C2 (ru) 2007-06-20
RU2004127944A (ru) 2005-05-10
NO338967B1 (no) 2016-11-07
NO20043906L (no) 2004-11-17
CN1643233A (zh) 2005-07-20
EP1488073A1 (en) 2004-12-22
WO2003071091A8 (en) 2004-10-14
AR038529A1 (es) 2005-01-19
CA2477242C (en) 2011-05-24

Similar Documents

Publication Publication Date Title
EP1488073B2 (en) Dynamic annular pressure control apparatus and method
US6904981B2 (en) Dynamic annular pressure control apparatus and method
US7562723B2 (en) Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system
EP2467571B1 (en) Method for determining formation fluid control events in a borehole using a dynamic annular pressure control system
US7395878B2 (en) Drilling system and method
US8490719B2 (en) Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation
US20070227774A1 (en) Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System
US20070246263A1 (en) Pressure Safety System for Use With a Dynamic Annular Pressure Control System
US9435162B2 (en) Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation
WO2004033855A2 (en) Well control using pressure while drilling measurements
BRPI0307810B1 (pt) Sistema e método para controlar pressão de formação durante a perfuração de uma formação subterrânea

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20040809

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

17Q First examination report despatched

Effective date: 20050209

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE GB

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060809

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: SECURE DRILLING INTERNATIONAL L.P. (BERMUDA)

Effective date: 20070404

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

RDAF Communication despatched that patent is revoked

Free format text: ORIGINAL CODE: EPIDOSNREV1

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: ?BALANCE B.V.

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

APAH Appeal reference modified

Free format text: ORIGINAL CODE: EPIDOSCREFNO

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20110609 AND 20110615

APBU Appeal procedure closed

Free format text: ORIGINAL CODE: EPIDOSNNOA9O

PUAH Patent maintained in amended form

Free format text: ORIGINAL CODE: 0009272

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT MAINTAINED AS AMENDED

27A Patent maintained in amended form

Effective date: 20120801

AK Designated contracting states

Kind code of ref document: B2

Designated state(s): BE GB

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20211230

Year of fee payment: 20

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20230218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20230218