EP1475512B1 - Instrument d'assemblage de tuyaux - Google Patents
Instrument d'assemblage de tuyaux Download PDFInfo
- Publication number
- EP1475512B1 EP1475512B1 EP04103894A EP04103894A EP1475512B1 EP 1475512 B1 EP1475512 B1 EP 1475512B1 EP 04103894 A EP04103894 A EP 04103894A EP 04103894 A EP04103894 A EP 04103894A EP 1475512 B1 EP1475512 B1 EP 1475512B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pipe
- segment
- top drive
- assembly
- running tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 2
- 241000239290 Araneae Species 0.000 description 33
- 238000005553 drilling Methods 0.000 description 8
- 230000007246 mechanism Effects 0.000 description 8
- 210000005069 ears Anatomy 0.000 description 5
- 238000012546 transfer Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/16—Connecting or disconnecting pipe couplings or joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
- E21B19/07—Slip-type elevators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B19/086—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods with a fluid-actuated cylinder
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
Definitions
- This invention relates to well drilling operations and, more particularly, to a device for assisting in the assembly of pipe strings, such as casing strings, drill strings and the like.
- the drilling of oil wells involves assembling drill strings and casing strings, each of which comprises a plurality of elongated, heavy pipe segments extending downwardly from an oil drilling rig into a hole.
- the drill string consists of a number of sections of pipe which are threadedly engaged together, with the lowest segment (i.e., the one extending the furthest into the hole) carrying a drill bit at its lower end.
- the casing string is provided around the drill string to line the well bore after drilling the hole and ensure the integrity of the hole.
- the casing string also consists of a plurality of pipe segments which are threadedly coupled together and formed with through passages sized to receive the drill string and/or other pipe strings.
- the conventional manner in which plural casing segments are coupled together to form a casing string is a labor-intensive method involving the use of a "stabber" and casing tongs.
- the stabber is manually controlled to insert a segment of casing into the upper end of the existing casing string, and the tongs are designed to engage and rotate the segment to threadedly connect it to the casing string. While such a method is effective, it is cumbersome and relatively inefficient because the procedure is done manually.
- the casing tongs require a casing crew to properly engage the segment of casing and to couple the segment to the casing string. Thus, such a method is relatively labor-intensive and therefore costly.
- using casing tongs requires the setting up of scaffolding or other like structures, and is therefore inefficient.
- the tool includes a pivotable manipulator which is designed to engage a pipe segment and raise the pipe segment up into a power assist spider, which relies on gravity to hold the pipe segment.
- the spider is coupled to the top drive and may be rotated by it.
- the pipe segment may be brought into contact with a casing string and the top drive activated to rotate the casing segment and threadedly engage it with the casing string.
- While such a system provides benefits over the more conventional systems used to assemble casing strings, such a system suffers from shortcomings.
- One such shortcoming is that the casing segment may not be sufficiently engaged by the power assist spider to properly connect the casing segment with the casing string.
- the system fails to provide any means for effectively controlling the load applied to the threads at the bottom of the casing segment. Without the ability to control the load on the threads, cross-threading may occur, resulting in stripped threads and a useless casing segment.
- the present invention is directed to a pipe running tool for use in drilling systems and the like to assemble casing and/or drill strings.
- the pipe running tool is coupled to an existing top drive assembly which is used to rotate a drill string, and includes a powered elevator that is powered into an engaged position to securely engage a pipe segment, for example, a casing segment. Because the elevator is powered into the engaged position, the pipe segment may be properly coupled to an existing pipe string using the top drive assembly.
- the system of the present invention in one illustrative embodiment is directed to a pipe running tool mountable on a rig and including: a top drive assembly adapted to be connected to the rig for vertical displacement of the top drive assembly relative to the rig, the top drive assembly including a drive shaft, the top drive assembly being operative to rotate the drive shaft; and a lower pipe engagement assembly including a central passageway sized for receipt of the pipe segment, the lower pipe engagement assembly including a powered engagement device that is powered to an engaged position to securely and releasably grasp the pipe segment, the lower pipe engagement assembly being in communication with the drive shaft, whereby actuation of the top drive assembly causes the lower pipe engagement assembly to rotate.
- the present invention is directed to a method of assembling a pipe string, including the steps of: actuating a lower pipe engagement assembly to releasably engage a pipe segment; lowering a top drive assembly to bring the pipe segment into contact with a pipe string; monitoring the load on the pipe string; actuating a load compensator to raise the pipe segment a selected distance relative to the pipe string, if the load on the pipe string exceeds a predetermined threshold value; and actuating the top drive assembly to rotate the pipe segment to threadedly engage the pipe segment and pipe string.
- FIGS. 1 and 2 there is shown a pipe running tool 10 depicting one illustrative embodiment of the present invention, which is designed for use in assembling pipe strings, such as drill strings, casing strings, and the like.
- the pipe running tool 10 comprises, generally, a frame assembly 12, a rotatable lower drive shaft 14, and a lower pipe engagement assembly 16 that is coupled to the rotatable shaft for rotation therewith.
- the pipe engagement assembly is designed for selective engagement of a pipe segment 11 (FIGS. 1, 2, and 5A) to substantially prevent relative rotation between the pipe segment and the pipe engagement assembly.
- the rotatable lower drive shaft 14 is designed for coupling with a top drive output shaft from an existing top drive, such that the top drive, which is normally used to rotate a drill string to drill a well hole, may be used to assemble a pipe string, for example, a casing string or a drill string, as is described in greater detail below.
- the pipe running tool 10 is designed for use, for example, in a well drilling rig 18.
- a well drilling rig 18 A suitable example of such a rig is disclosed in U.S. Patent Number 4,765,401 to Boyadjieff, which is expressly incorporated herein by reference as if fully set forth herein.
- the rig includes a frame 20 and a pair of guide rails 22 along which a top drive assembly, generally designated 24, may ride for vertical movement relative to the rig.
- the top drive assembly is preferably a conventional top drive used to rotate a drill string to drill a well hole, as is described in U.S. Patent Number 4,605,077 to Boyadjieff, which is expressly incorporated herein by reference.
- the top drive assembly includes a drive motor 26 and a top drive output shaft 28 extending downwardly from the drive motor, with the drive motor being operative to rotate the drive shaft, as is conventional in the art.
- the rig defines a drill floor 30 having a central opening 32 through which a drill string and/or casing string 34 is extended downwardly into a well hole.
- the rig 18 also includes a flush-mounted spider 36 that is configured to releasably engage the drill string and/or casing string 34 and support the weight thereof as it extends downwardly from the spider into the well hole.
- the spider includes a generally cylindrical housing which defines a central passageway through which the pipe string may pass.
- the spider includes a plurality of slips which are located within the housing and are selectively displaceable between disengaged and engaged positions, with the slips being driven radially inwardly to the respective engaged positions to tightly engage the pipe segment and thereby prevent relative movement or rotation of the pipe segment and the spider housing.
- the slips are preferably driven between the disengaged and engaged positions by means of a hydraulic or pneumatic system, but may be driven by any other suitable means.
- the pipe running tool 10 includes the frame assembly 12, which comprises a pair of links 40 extending downwardly from a link adapter 42.
- the link adapter defines a central opening 44 through which the top drive output shaft 28 may pass.
- Mounted to the link adapter on diametrically opposed sides of the central opening are respective upwardly extending, tubular members 46 (FIG. 1), which are spaced a predetermined distance apart to allow the top drive output shaft 28 to pass therebetween.
- the respective tubular members connect at their upper ends to a rotating head 48, which is connected to the top drive assembly 24 for movement therewith.
- the rotating head defines a central opening (not shown) through which the top drive output shaft may pass, and also includes a bearing (not shown) which engages the upper ends of the tubular members and permits the tubular members to rotate relative to the rotating head body, as is described in greater detail below.
- the top drive output shaft 28 terminates at its lower end in an internally splined coupler 52 which is engaged to an upper end of the lower drive shaft 14 (not shown) which is formed to complement the splined coupler for rotation therewith.
- the top drive output shaft 28 is rotated by the top drive motor 26, the lower drive shaft 14 is also rotated.
- any suitable interface may be used to securely engage the top and lower drive shafts together.
- the lower drive shaft 14 is connected to a conventional pipe handler, generally designated 56, which may be engaged by a suitable torque wrench (not shown) to rotate the lower drive shaft and thereby make and break connections that require very high torque, as is well known in the art.
- the lower drive shaft 14 is also formed with a splined segment 58, which is slidably received in an elongated, splined bushing 60 which serves as an extension of the lower drive shaft.
- the drive shaft and bushing are splined to provide for vertical movement of the shaft relative to the bushing, as is described in greater detail below. It will be understood that the splined interface causes the bushing to rotate when the lower drive shaft rotates.
- the pipe running tool 10 further includes the lower pipe engagement assembly 16, which in one embodiment comprises a torque transfer sleeve 62 which is securely connected to the lower end of the bushing 60 for rotation therewith.
- the torque transfer sleeve is generally annular and includes a pair of upwardly projecting arms 64 on diametrically opposed sides of the sleeve.
- the arms are formed with respective horizontal through passageways (not shown) into which are mounted respective bearings (not shown) which serve to journal a rotatable axle 70 therein, as described in greater detail below.
- the transfer sleeve connects at its lower end to a downwardly extending torque frame 72 in the form of a pair of tubular members 73, which in turn is coupled to a spider ⁇ elevator 74 which rotates with the torque frame.
- the torque frame may take many, such as a plurality of tubular members, a solid body, or any other suitable structure.
- the spider ⁇ elevator 74 is preferably powered by a hydraulic or pneumatic system, or alternatively by an electric drive motor or any other suitable powered system.
- the spider ⁇ elevator includes a housing 75 which defines a central passageway 76 through which the pipe segment 11 may pass.
- the spider ⁇ elevator also includes a pair of hydraulic or pneumatic cylinders 77 with displaceable piston rods 78 (FIGS. 5A and 5B) which are connected through suitable pivotable linkages 79 to respective slips 80.
- the linkages are pivotally connected to both the top ends of the piston rods and to the top ends of the slips.
- the slips include generally planar front gripping surfaces 82, and specially contoured rear surfaces 84 which are designed with such a contour to cause the slips to travel between respective radially outwardly disposed, disengaged positions, and radially inwardly disposed, engaged positions.
- the rear surfaces of the slips travel along respective downwardly and radially inwardly projecting guiding members 86 which are complementarily contoured and securely connected to the spider body.
- the guiding members cooperate with the cylinders and linkages to cam the slips radially inwardly and force the slips into the respective engaged positions.
- the cylinders (or other actuating means) may be empowered to drive the piston rods downwardly, causing the corresponding linkages to be driven downwardly and therefore force the slips downwardly.
- the surfaces of the guiding members are angled to force the slips radially inwardly as they are driven downwardly to sandwich the pipe segment 11 between them, with the guiding members maintaining the slips in tight engagement with the pipe segment.
- the cylinders 77 are operated in reverse to drive the piston rods upwardly, which draws the linkages upwardly and retracts the respective slips back to their disengaged positions to release the pipe segment.
- the guiding members are preferably formed with respective notches 81 which receive respective projecting portions 83 of the slips to lock the slips in the disengaged position (FIG. 5A).
- the spider ⁇ elevator 74 further includes a pair of diametrically opposed, outwardly projecting ears 88 formed with downwardly facing recesses 90 sized to receive correspondingly formed, cylindrical members 92 at the bottom ends of the respective links 40, and thereby securely connect the lower ends of the links to the spider ⁇ elevator.
- the ears may be connected to an annular sleeve 93 which is received over the housing 75, or may be formed integral with the housing.
- the pipe running tool 10 includes a load compensator, generally designated 94.
- the load compensator preferably is in the form of a pair of hydraulic, double rodded cylinders 96, each of which includes a pair of piston rods 98 that are selectively extendable from, and retractable into, the cylinder.
- the upper rods connect to a compensator clamp 100, which in turn is connected to the lower drive shaft 14, while the lower rods extend downwardly and connect at the respective lower ends to a pair of ears 102 which are securely mounted to the bushing 60.
- the hydraulic cylinders may be actuated to draw the bushing upwardly relative to the lower drive shaft 14 by applying a pressure to the cylinders which causes the upper piston rods to retract into the respective cylinder bodies, with the splined interface between the bushing and lower drive shaft allowing the bushing to be displaced vertically relative to the shaft.
- the pipe segment 11 carried by the spider ⁇ elevator 74 may be raised vertically to relieve a portion or all of the load applied to the pipe segment 11, as is described in greater detail below.
- the lower rods are at least partially retracted, resulting in the majority of the load from the pipe running tool 10 is assumed by the top drive output shaft 28.
- the cylinders 96 will automatically react the load to prevent the entire load from being applied to the threads of the pipe segment.
- the pipe running tool 10 still further includes a hoist mechanism, generally designated 104, for hoisting a pipe segment upwardly into the spider ⁇ elevator 74.
- the hoist mechanism is disposed off-axis and includes a pair of pulleys 106 carried by the axle 70, the axle being journaled into the bearings in respective through passageways formed in the arms 64.
- the hoist mechanism also includes a gear drive, generally designated 108, that may be selectively driven by a hydraulic motor 111 or other suitable drive system to rotate the axle and thus the pulleys.
- the hoist may also include a brake 115 to prevent rotation of the axle and therefore of the pulleys and lock them in place, as well as a torque hub 116.
- a pair of chains, cables, or other suitable, flexible means may be run over the respective pulleys, extended through a chain well 113, and engaged to the pipe segment 11, and the axle is then rotated by a suitable drive system to hoist the pipe segment vertically and up into position with the upper end of the pipe segment 11 extending into the spider ⁇ elevator 74.
- the pipe running tool 10 preferably further includes an annular collar 109 which is received over the links 40 and which maintains the links locked to the ears 88 and prevents the links from twisting and/or winding.
- a work crew may manipulate the pipe running tool 10 until the upper end of the tool is aligned with the lower end of the top drive output shaft 28.
- the pipe running tool 10 is then raised vertically until the splined coupler 52 at the lower end of the top drive output shaft is engaged to the upper end of the lower drive shaft 14 and the links 40 are engaged with the ears 88.
- the work crew may then run a pair of chains or cables over the respective pulleys 106 of the hoist mechanism 104, connect the chains or cables to a pipe segment 11, engage a suitable drive system to the gear 108, and actuate the drive system to rotate the pulleys and thereby hoist the pipe segment upwardly until the upper end of the pipe segment extends through the lower end of the spider ⁇ elevator 74.
- the spider ⁇ elevator is then actuated, with the hydraulic cylinders 77 and guiding members 86 cooperating to forcibly drive the respective slips 84 into the engaged positions (FIG. 5B) to positively engage the pipe segment.
- the slips are preferably advanced to a sufficient extent to prevent relative rotation between the pipe segment and the spider ⁇ elevator, such that rotation of the spider ⁇ elevator translates into rotation of the pipe segment.
- the top drive assembly 24 is then lowered relative to the frame 20 by means of the top hoist 25 to drive the threaded lower end of the pipe segment 11 into contact with the threaded upper end of the pipe string 34 (FIG. 1).
- the pipe string is securely held in place by means of the flush-mounted spider 36 or any other suitable structure for securing the string in place, as is well known to those skilled in the art.
- the top drive motor 26 is then actuated to rotate the top drive output shaft, which in turn rotates the lower drive shaft of the pipe running tool 10 and the spider ⁇ elevator 74, which causes the coupled pipe segment to rotate and thereby be threadedly engaged to the pipe string.
- the pipe segment 11 is intentionally lowered until the lower end of the pipe segment rests on the top of the pipe string 34.
- the load compensator 94 is then actuated to drive the bushing 60 upwardly relative to the lower drive shaft 14 via the splined interface between the two.
- the upward movement of the bushing causes the spider ⁇ elevator 74 and therefore the coupled pipe segment 11 to be raised, thereby reducing the weight on the threads of the pipe segment. In this manner, the load on the threads can be controlled by actuating the load compensator.
- the top drive assembly 24 is raised vertically to lift the entire pipe string 34, which causes the flush-mounted spider 36 to disengage the string.
- the top drive assembly 24 is then lowered to advance the string downwardly into the well hole until the upper end of the top pipe segment 11 is close to the drill floor 30, with the entire load of the pipe string being carried by the links 40 while the torque was supplied through shafts.
- the flush-mounted spider 36 is then actuated to engage the pipe string and suspend it therefrom.
- the spider ⁇ elevator 74 is then controlled in reverse to retract the slips 84 back to the respective disengaged positions (FIG. 5A) to release the pipe string.
- the top drive assembly 24 is then raised to lift the pipe running tool 10 up to a starting position (such as that shown in FIG. 1) and the process may be repeated with an additional pipe segment 11.
- the tool includes a conventional load cell 110 or other suitable load-measuring device mounted on the pipe running tool 10 in such a manner that it is in communication with the lower drive shaft 14 to determine the load applied to the lower end of the pipe segment 11.
- the load cell is operative to generate a signal representing the load sensed, which in one illustrative embodiment is transmitted to a processor 112.
- the processor is programmed with a predetermined threshold load value, and compares the signal from the load cell with that value.
- the processor then controls the load compensator 94 to draw upwardly a selected amount to relieve at least a portion of the load on the threads of the pipe segment.
- the processor controls the top drive assembly 24 to rotate the pipe segment 11 and thereby threadedly engage the pipe segment to the pipe string 34. While the top drive assembly is actuated, the processor continues to monitor the signals from the load cell to ensure that the load on the pipe segment does not exceed the threshold value.
- the load on the pipe segment 11 may be controlled manually, with the load cell 110 indicating the load on the pipe segment via a suitable gauge or other display, with a work person controlling the load compensator 94 and top drive assembly 24 accordingly.
- the pipe running tool 200 of the present invention includes a hoisting mechanism 202 which is substantially the same as the hoisting mechanism 104 described above.
- a lower drive shaft 204 is provided and connects at its lower end to a conventional mud-filling device 206 which, as is known in the art, is used to fill a pipe segment, for example, a casing segment, with mud during the assembly process.
- the mud-filling device is a device manufactured by Davies-Lynch Inc. of Texas.
- the hoisting mechanism 202 supports a pair of chains 208 which engage a slip-type single joint elevator 210 at the lower end of the pipe running tool 200.
- the single joint elevator is operative to releasably engage a pipe segment 11, with the hoisting mechanism 202 being operative to raise the single joint elevator and pipe segment upwardly and into the spider ⁇ elevator 74.
- the tool 200 includes the links 40 which define the cylindrical lower ends 92 which are received in generally J-shaped cut-outs 212 formed in diametrically opposite sides of the spider ⁇ elevator 74.
- the pipe running tool 10 efficiently utilizes an existing top drive assembly to assemble a pipe string, for example, a casing or drill string, and does not rely on cumbersome casing tongs and other conventional devices.
- the pipe running tool incorporates the spider ⁇ elevator 74, which not only carries pipe segments, but also imparts rotation to them to threadedly engage the pipe segments to an existing pipe string.
- the pipe running tool provides a device which grips and torques the pipe segment 11, and which also is capable of supporting the entire load of the pipe string as it is lowered down into the well hole.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Claims (6)
- Outil de pose de tubes (10) pouvant être monté sur un appareil de forage (18) et conçu pour être utilisé dans la manutention de segments de tubes et pour accrocher des segments de tubes à un train de tubes (34), l'outil de pose de tubes comprenant :un assemblage d'entraînement supérieur (24) apte à être accouplé à l'appareil de forage (18), l'assemblage d'entraînement supérieur (24) incluant un arbre moteur de sortie supérieur (28), l'assemblage d'entraînement supérieur (24) étant fonctionnel pour faire tourner l'arbre moteur de sortie supérieur ;un arbre de commande inférieur (14) couplé à l'arbre moteur de sortie supérieur (28) et comprenant un segment ajustable qui est ajustable sélectivement pour ajuster la longueur de l'arbre de commande inférieur ;un assemblage inférieur d'accrochage de tubes (16) comprenant un passage central (76) dimensionné pour la réception du segment de tube (11), l'assemblage inférieur d'accrochage de tubes (16) étant fonctionnel pour saisir le segment de tube de façon à pouvoir le libérer, l'assemblage inférieur d'accrochage de tubes (16) étant couplé à l'arbre de commande inférieur, moyennant quoi l'actionnement de l'assemblage d'entraînement supérieur (24) a pour effet de faire tourner l'assemblage inférieur d'accrochage de tubes (16) ; et caractérisé par :un dispositif de mesurage de la charge monté sur l'outil de pose de tubes (10) d'une manière telle qu'il est en communication avec l'arbre de commande inférieur (14) pour déterminer la charge appliquée à l'extrémité inférieure du segment de tube (11)un moyen d'application d'une force sur l'arbre de commande inférieur pour faire en sorte que la longueur du segment ajustable soit raccourcie lorsque la charge sur l'extrémité inférieure du segment de tube dépasse une valeur seuil prédéterminée.
- Outil de pose de tubes selon la revendication 1, dans lequel le moyen d'application d'une force comprend un compensateur de charge (94) comprenant une paire de cylindres hydrauliques (77).
- Outil de pose de tubes selon la revendication 1, dans lequel l'assemblage inférieur d'accrochage de tubes (16) est actionné par l'un parmi un système hydraulique et un système pneumatique (77).
- Outil de pose de tubes selon la revendication 1, dans lequel l'assemblage inférieur d'accrochage de tubes (16) comprend un logement globalement cylindrique (75) définissant un passage central (76), et une pluralité de coins (80) disposés à l'intérieur du logement et déplaçables radialement vers l'intérieur pour venir en prise avec un segment de tubage s'étendant à travers le passage.
- Outil de pose de tubes selon la revendication 1, comprenant en outre un bloc couplé à l'assemblage d'entraînement supérieur (24) et apte à venir en prise avec une pluralité de câbles raccordés à l'appareil de forage afin de relever et d'abaisser sélectivement l'assemblage d'entraînement supérieur (24).
- Procédé d'accrochage par vissage d'un segment de tube (11) à un train de tubes (34) au moyen d'un système d'assemblage d'un train de tubes (34) comprenant un assemblage d'entraînement supérieur (24), un assemblage inférieur d'accrochage de tubes (16) couplé à l'assemblage d'entraînement supérieur (24) afin de tourner avec celui-ci et fonctionnel pour accrocher un segment de tube de façon à pouvoir le libérer, et un compensateur de charge (94) fonctionnel pour relever l'assemblage inférieur d'accrochage de tubes (16) par rapport à l'assemblage d'entraînement supérieur (24), comprenant les étapes suivantes :actionnement de l'assemblage inférieur d'accrochage de tubes pour accrocher un segment de tube de façon à pouvoir le libérer ;abaissement de l'assemblage d'entraînement supérieur (24) pour amener le segment de tube (11) au contact du train de tubes (34) ; caractérisé parla surveillance de la charge sur l'extrémité inférieure du segment de tube ;l'actionnement du compensateur de charge (94) pour relever le segment de tube d'une distance choisie par rapport au train de tubes si la charge sur l'extrémité inférieure du segment de tube dépasse une valeur seuil prédéterminée ; etl'actionnement de l'assemblage d'entraînement supérieur (24) pour faire tourner le segment de tube (11) afin d'accrocher par vissage le segment de tube (11) au train de tubes (34).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12291599P | 1999-03-05 | 1999-03-05 | |
US122915P | 1999-03-05 | ||
EP00913746.4A EP1171683B2 (fr) | 1999-03-05 | 2000-03-03 | Instrument d'assemblage de tuyaux |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00913746.4A Division EP1171683B2 (fr) | 1999-03-05 | 2000-03-03 | Instrument d'assemblage de tuyaux |
EP00913746.4A Division-Into EP1171683B2 (fr) | 1999-03-05 | 2000-03-03 | Instrument d'assemblage de tuyaux |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1475512A1 EP1475512A1 (fr) | 2004-11-10 |
EP1475512B1 true EP1475512B1 (fr) | 2006-05-31 |
Family
ID=32992174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04103894A Expired - Lifetime EP1475512B1 (fr) | 1999-03-05 | 2000-03-03 | Instrument d'assemblage de tuyaux |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1475512B1 (fr) |
DK (1) | DK1475512T3 (fr) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7866390B2 (en) | 1996-10-04 | 2011-01-11 | Frank's International, Inc. | Casing make-up and running tool adapted for fluid and cement control |
CN105350934B (zh) * | 2015-12-11 | 2018-09-11 | 韩咏利 | 一种油田钻修井环形防喷器 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2523635A1 (fr) * | 1982-03-17 | 1983-09-23 | Bretagne Atel Chantiers | Dispositif pour le montage d'un train de tiges de forage et pour son entrainement en rotation et translation |
US4781359A (en) * | 1987-09-23 | 1988-11-01 | National-Oilwell | Sub assembly for a swivel |
US5036927A (en) * | 1989-03-10 | 1991-08-06 | W-N Apache Corporation | Apparatus for gripping a down hole tubular for rotation |
GB9425499D0 (en) * | 1994-12-17 | 1995-02-15 | Weatherford Lamb | Method and apparatus for connecting and disconnecting tubulars |
-
2000
- 2000-03-03 EP EP04103894A patent/EP1475512B1/fr not_active Expired - Lifetime
- 2000-03-03 DK DK04103894T patent/DK1475512T3/da active
Also Published As
Publication number | Publication date |
---|---|
EP1475512A1 (fr) | 2004-11-10 |
DK1475512T3 (da) | 2006-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6443241B1 (en) | Pipe running tool | |
US8037949B2 (en) | Pipe running tool | |
US6637526B2 (en) | Offset elevator for a pipe running tool and a method of using a pipe running tool | |
EP1896687B1 (fr) | Outil d'assemblage de tuyaux ayant un organe de préhension interne | |
US6691801B2 (en) | Load compensator for a pipe running tool | |
US7510006B2 (en) | Pipe running tool having a cement path | |
EP1896685B1 (fr) | Outil d'assemblage de tuyaux à télémétrie sans fil | |
US7140443B2 (en) | Pipe handling device, method and system | |
US7770654B2 (en) | Pipe handling device, method and system | |
EP1475512B1 (fr) | Instrument d'assemblage de tuyaux |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 1171683 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17P | Request for examination filed |
Effective date: 20050504 |
|
AKX | Designation fees paid |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 1171683 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20060531 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 Ref country code: LI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 Ref country code: CH Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Ref country code: CH Ref legal event code: EP |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: VARCO I/P, INC. |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 60028425 Country of ref document: DE Date of ref document: 20060706 Kind code of ref document: P |
|
NLT2 | Nl: modifications (of names), taken from the european patent patent bulletin |
Owner name: VARCO I/P, INC. Effective date: 20060607 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060911 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061031 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070301 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070305 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070303 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060531 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20100325 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20100406 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20100219 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110303 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20111130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110331 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 60028425 Country of ref document: DE Representative=s name: JOSTARNDT PATENTANWALTS-AG, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20190219 Year of fee payment: 20 Ref country code: GB Payment date: 20190227 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 60028425 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20200302 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20200302 |