EP1468390A1 - System and method for order group planning - Google Patents
System and method for order group planningInfo
- Publication number
- EP1468390A1 EP1468390A1 EP02806238A EP02806238A EP1468390A1 EP 1468390 A1 EP1468390 A1 EP 1468390A1 EP 02806238 A EP02806238 A EP 02806238A EP 02806238 A EP02806238 A EP 02806238A EP 1468390 A1 EP1468390 A1 EP 1468390A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- date
- order
- orders
- time
- replenish
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Definitions
- the present invention relates to systems and methods for planning the use of manufacturing resources, more particularly, the invention relates to attribute based planning systems and methods that can operate in highly complex and dynamic environments and generate plans for the use of multiple resources in order to fulfill demand. Discussion of the Related Art
- a business such as a large manufacturer, is typically made up of a vast network of manufacturing, warehousing, marketing and other production/marketing sites. Further, each of these sites may consist of a number of resources such as assembly lines and storage facilities all interacting and working together to produce finished goods for customers.
- the complexity of manufacturing networks alone often makes it extremely difficult to plan and schedule the vast numbers of resources that typically make-up a manufacturing or supply chain network.
- Each of these orders may also include other important information such as the date or range of dates that the customer would like to receive or be able to obtain the order goods, the location where the goods will be available such as a specific dealer site, the customer chosen option packages and possible substitute configurations.
- each order will typically have several parameters that define how, what, when and where that the order must be fulfilled.
- planning systems will preferably be able to take into account the various constraints that may be associated with each network resources. These constraints may be based on a number of factors such as time, quantity, quality, types of goods available, and the like. Any model used to represent a resource network will also preferably be robust so that the dynamic nature of many resource networks may be accounted for. The addition of these fluid constraints in any model used with a planning system adds to the overall complexity of the planning process.
- models used for planning must take into account timing issues. In order to plan network resources, realistic timing requirements must be taken into account. This means that actual time lags, for example, the advance time needed to order a component parts for an assembly line before the parts are actually needed, must be accounted for. In addition, time availability of items, such as finished goods, work in progress and raw materials, needs to be accounted for in any effective planning system.
- the present invention is directed to a system and method for planning the optimal use of resources of businesses to fulfill orders. More particularly, the present invention provides a system and method for generating, and maintaining constraint and attribute sensitive plans for the use of multiple resources at multiple locations to fulfill one or more orders.
- SKU stock keeping unit
- An alternative approach may be to use an attribute based approach. Constraints and business rules that govern supply chain planning are often driven by certain fundamental characteristics (attributes) of products, market, and the operational environment. The representation of the model should therefore be done in terms of these attributes.
- a system called an attribute based planning (“ABP”) system may include a computing device in communication with a database.
- Demand as defined by one or more orders having attributes, may be inputted into the system generating a plan for the optimal utilization of resources within a network. Orders may be either internally or externally generated orders or may even represent projected customer demand.
- the ABP system may generate plans for the optimal utilization of network resources in order to fulfill demand.
- stock keeping unit attribute definition (“SAD”) groups are created and defined.
- the ABP system may utilize SAD groups to provide various system functionalities.
- SAD groups may be used to prioritized orders and organize resources into groups as part of configurations and/or Bill of materials ("BOMs"), and the like.
- BOMs Bill of materials
- various tables may be created.
- the tables that may be created include a temporary table for unplanned orders, BOM and Configuration tables, SAD groups, and the like.
- a transportation matrix may also be created in order to track and to account for transportation issues.
- the process for planning the utilization of resources in order to meet demand may include initialization process.
- the initialization process may include several steps that may include a step for creating and/or loading a static model. In order to model the resource network, various items will preferably be defined.
- the initialization steps may include the step of initializing buckets. Initialization of the buckets may be accomplished by associating one or more constraints to the buckets.
- the initialization process may also include the steps of placing initial assignments and allocating materials.
- the initialization process may also include the step of creating a temporary table or tables of unplanned orders.
- a process for processing orders may be included in the process for planning the utilization of network resources.
- This second process may include the steps of selecting a slice of orders based on a SAD group, loading a window with the slice of orders and their associated data, prioritizing each order in the window and processing each order in the window according to their priority.
- the ABP system may plan by processing orders in groups, one group at a time. Each group of orders being processed may be placed into a window. The orders in the window may be prioritized and processed for planning based on their priority. Data associated with each order may also be loaded into the window. Such data may include, for example, SKU based BOMs, configurations, subordinate stock keeping units, finished goods stock keeping units, and the like.
- the process for processing orders may include the steps of processing each unplanned order in the window, one order at a time.
- the system Prior to planning for unplanned orders, the system may issue initial assignments for resources in order to freeze the resources for particular orders. Once initial assignments have been generated, planning for the unplanned orders may commence.
- the ABP system may review the BOMs, configurations, associated finished goods stock keeping units, subordinate stock keeping units, SAD groups, ant the like, in order to plan for each order.
- Each configuration (and its associated SAD groups, subordinate SKUs) associated with each order may be reviewed and checked to determine which location/resource/bucket opportunities provides the optimal opportunity.
- determining the best opportunity for each order may be accomplished by the following steps. First, selecting a configuration and prioritizing admissible locations. Then selecting highest priority location/finished good stock keeping unit. Initializing the finished good stock keeping unit and determining a collection of admissible resources for the highest priority location. A material feasibility may be determined for each resource. In determining material feasibility, the ABP system may first check the resource inventory to determine if inventory can supply the requested quantity of goods. If the resource inventory is unable to fully supply sufficient quantity of goods under specified parameters as defined by, for example, the user or customer, such as by need date, then the system may check other possible methods for meeting the demand through that resource.
- the other methods for meeting demand include, for example, replenishment by manufacturer, replenishment by purchase and/or replenishment by substitution.
- the ABP system may make an assessment of constraint feasibility and a check of material capacity compatibility. These steps may be repeated for each acceptable location/resource/bucket opportunity.
- Each location resource/bucket opportunity may then be evaluated based on various goals and customer preferences. The best location/resource/bucket opportunity may then be selected for purposes of planning the utilization of network resources and an output may be generated.
- freeze SAD groups may be created and used to freeze one or more orders. This may be used to ensure that an order is planned even if the order is infeasible.
- the ABP system recognizes a multi-level object function to determine the optimal location/resource/bucket opportunity. The multi-level object function provides criteria for reaching desirable planning results.
- the ABP system preferably incorporates a multi-level objective function to determine the best placement for an order on the plan. If the ABP system finds multiple opportunities for planning an order, the ABP grades each opportunity and selects the best opportunity based on multiple objectives.
- various tables may be created to provide a number of functionalities. These tables include, for example, a pre-determined assignment table, a BOM table, a SAD groups table, and the like.
- a group of orders may be selected and planned for by creating one or more SKU attributes groups, wherein the SKU attribute groups are associated with one or more orders by the attributes, prioritizing the orders based on one or more of the SKU attribute groups, selecting one or more of the orders based on the priority of the orders to be loaded in a window, selecting an order from the window, and planning use of resources for fulfilling the selected order from the window.
- a determination of replenishment of a resource by manufacture may be accomplished by determining attribute data relating to the order, wherein the data includes a stock keeping unit that is associated with the order, associating one or more configurations to the order based on the order attributes wherein the configurations comprising of one or more subordinate stock keeping units, evaluating the configurations based on each configuration data and determining whether each of the configurations are feasible, and selecting a feasible configuration for planning the use of resources based on the evaluation of configurations.
- a determination of replenishment of a resource by purchase may be accomplished by determining time items, wherein the time items are specific points in time or time periods relating to the order, determining timing events based on the time items, creating a timeline comprising of the timing events and time items, selecting an applicable scenario based on the timeline from a group of predetermined scenarios and generating an output based on the applicable scenario.
- scheduling control may be used to derive optimal resource utilization plans.
- Scheduling controls are schemes used to affect the manner in which buckets are searched to find feasible opportunities to place an order. There are several types of scheduling controls available including, forward, backward, just-in-time, frozen and do not schedule.
- a method for planning the utilization of network resources in order to fulfill demand as defined by an order is provided.
- the order having attribute data and the method comprising the steps of defining parameters of the order, associating one or more configurations to the order based on the order attribute data, determining acceptable location-resource-bucket opportunities based on the configurations, wherein the configurations comprising of one or more stock keeping units, evaluating each location-resource-bucket opportunities and selecting one of the location-resource-bucket opportunities as the best location-resource-bucket opportunity based on the evaluation of each location-resource-bucket.
- a method for planning the utilization of network resources in order to fulfill demand as defined by an order is provided.
- the method comprising the steps of first identifying a finished good stock keeping unit associated with an order based on the order attribute data, initializing the finished good stock keeping unit, determining a collection of admissible locations and a collection of admissible resources for each admissible location based on the initialized finished goods stock keeping unit, evaluating location-resource-bucket opportunities for each admissible location and admissible resource combination, and selecting one of the bucket-resource opportunities as the best bucket resource opportunity based on the evaluations. Additional features and advantages of the invention will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practice of the invention.
- FIG. 1 is a block diagram of an exemplary environment where a system according to one embodiment of the present invention may operate;
- FIG. 2A is a flow diagram of an initialization process according to one embodiment of the present invention.
- FIG. 2B is a flow diagram of a process for planning the utilization of resources in order to meet demand according to one embodiment of the present invention
- FIG. 3A is a flow diagram for a process to place initial assignments
- FIG. 3B is a flow diagram for a process to prioritize orders.
- FIG. 3C is a block diagram depicting the relationship between a SAD group, orders and a freeze group table.
- FIG. 4 is a flow diagram of process for resource planning in order to fulfill demand as defined by order [s];
- FIGS. 5A to 5H are block diagrams depicting an exemplary process for resource planning in order to fulfill an order
- FIG. 51 is a black diagram depicting various combinations of order attribute values for exemplary orders
- FIG. 6 is a flow diagram for a process to determine material feasibility.
- FIGS. 7A to 7D are timelines that depicts an exemplary inventory level and need quantity over a period of time
- FIGS. 8A to 8C are block diagrams depicting visual representations of exemplary relationships between SAD groups and SKUs in the BOM;
- FIG. 9 is a block diagram depicting an exemplary relationship between a , configurations and subordinate SKUs
- FIGS. 10A and 10B is a flow diagram for a process for replenishment by manufacture
- FIGS. IOC to 10F are block diagrams depicting BOM sets
- FIG. 10G is a block diagram depicting an exemplary BOM
- FIG. 11 is a flow diagram depicting a flow process for replenishment by purchase
- FIGS. 12A to 12D are timelines that depict exemplary time events.
- FIG. 13 is a flow diagram depicting a process for generating outputs based on particular scenarios.
- FIG. 14A is a flow diagram depicting a process for generating outputs based on particular scenarios
- FIG. 14B is a flow diagram depicting a process for replenishment by substitution
- FIG. 15A is a flow diagram depicting a process for determining constraint feasibility
- FIG. 15B is a flow diagram for a process for determining an effective scheduling interval
- FIGS. 15C to 15F are timelines depicting various scheduling control concepts
- FIG. 16 is a block diagram depicts a visual representation of an exemplary search process for finding a satisfactory time bucket.
- FIG. 17 is a block diagram depicting an attribute base planning system according to one embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
- the present invention provides a system and method for optimal planning and scheduling of resources in a manufacturing or supply chain network.
- the system called an attribute based planning ("ABP") system, can model SKUs as well as attributes.
- the ABP system and the process implemented by the system generate an output that defines a plan for using the resources of a supply chain.
- the output may be in text, raw data, graphical or any other form useful for planning purposes.
- the ABP system may interface with various other business planning, scheduling, purchasing, collaboration, and promising type systems and applications as are known in the art, including NetWORKS StrategyTM,
- GLOSSARY ABP System Attribute Based Planning system.
- BOM Bill of Material. A structure that describes the various ways a SKU can be manufactured. Each record typically associates a parent item with a child item and a draw quantity that tells how many child units are required for each parent unit. Additionally, attribute restrictions may be present that tell when the record may be applied.
- Bucket A time interval typically used for constraints and allocations.
- the planning horizon is usually divided into a number of buckets.
- the buckets may have the same length or they may be telescoping in that bucket durations may increase.
- buckets may be defined for a week at the day level, three weeks at the week level, and three months at the month level. This would give 13 buckets that cover 4 months. If buckets are modeled at the day level for 4 months, approximately 120 buckets would be modeled.
- the number of buckets is important because the fewer buckets the system models, the smaller the model and the faster the algorithm.
- Configuration A set of BOM records that completely defines a specific buildable configuration for an order for a SKU.
- Constraints Any limitation placed on any entity, such as resource, that is recognized by the ABP system. Constraints may be hard (a solution should never violate) or soft (a solution should attempt to accommodate). Constraint Bucket: A bucket associated with a constraint that has a capacity limitation. Typically there will be a maximum. There may also be relaxation information that tells how much the capacity can be overused and the cost for doing so.
- Constraint Rules A short-hand way for defining the capacities of constraint buckets.
- the demand on a system consists of external demand and dependent demand.
- the external demand consists of customer orders and forecast.
- the dependent demand is additional demand required to meet the independent demand.
- Dependant demand This is the set of orders that the system generates that are consequences of the way material and capacity are allocated to the independent demand.
- Effective Need Date The need date less transportation time required to deliver the goods to a specified location.
- FG SKU Finished good stock keeping unit. A SKU that is a finished good.
- Flags are used to indicate the existence of a specific condition, a preference, a constraint, and the like. Flags may also be used to control the planning process. Flags are used to indicate, for example, that a scheduling opportunity is not feasible, therefore, the ABP system needs to look at other scheduling opportunities.
- Freeze Group A SAD group whereby each order associated with the group is frozen. This is used in the planning cycle ensuring that an order will be scheduled even if infeasible. Freeze Group Table: This table identifies the SAD groups that should be treated as frozen. Independent Demand: This is the set of orders that is given to the system as opposed to dependent demand, which is related to orders generated by the ABP system.
- Initial Assignment An assignment that is given to the system that represents previous commitments that should be honored whether feasible or not. Each time the planning process is run, initial assignments will be placed into buckets before any other orders are planned. This placement of initial assignments ensures that frozen orders are always in the same place on the plan.
- Location A location is a place in the supply chain. Every location has a name. Need Date: The most desirable date for order delivery and/or availability.
- the ABP system preferably incorporates a multi-level objective function to determine the best placement for an order on the plan. If the ABP system finds multiple opportunities for planning an order, the ABP grades each opportunity and selects the best opportunity based on multiple objectives.
- Order consists of predefined and user defined attributes.
- Predefined attributes may include, for example, an identifier, SKU, quantity, start date (optional), need date, customer, priority, and effective need date.
- orders and SKUs can both have values for user defined attributes. If both have values, the value for the order always takes precedence. For example, an order could be for a blue truck with sunroof and alloy wheels for a customer by the name of Joe Dealer.
- the finished good i.e., the order
- Parent Item A BOM record relates a parent item and a subordinate item. See BOM.
- Plan An assignment of demand to resources through time used to fulfill one or more customer orders over a certain time period (i.e., planning horizon).
- Period Maximums Maximum quantity of goods that may be available for a specified bucket.
- Resource A resource may be any entity that is a source of a good including assembly lines, manufacturing machine, a warehouse, storage facility, storage tanks, suppliers, and the like. Generally each resource may be uniquely identified by a name and a location.
- SAD Group SKU attribute description group. SAD groups are associated with various modeling concepts and tell which orders are applicable. Each SAD Group can have a list of SKUs and lists of attribute values for some or all of the attributes associated with orders. For example, if SKUs for modell@l. model 1@2. and mode!2@2 exist, with attributes for color (red, blue), and sunroof (yes/no) then one could define a SAD Group across all modell vehicles that are red conceptually by writing (Sku: (model 1@1 or modell@2) and color (red)). SAD groups may be used to control how the ABP system schedules orders and plan the use of resources.
- order groups may be used to determine how orders are sorted before the orders are process, the maximum early and maximum late time for groups of orders, scheduling controls for groups of orders, metrics and objective that define the "best" placement for an order, and the like.
- Each SAD group may be prioritized such that orders belonging to one SAD group may be scheduled prior to orders belonging to a lower prioritized SAD group.
- Scheduling Controls Schemes used to affect the manner in which buckets are searched to find feasible place to an order. There are several types of scheduling controls available including, forward, backward, just-in-time, frozen and do not schedule.
- Scheduling Opportunity A location/resource/bucket or resource/bucket defined opportunity to schedule an order that satisfies all the constraints applicable to the order and the bucket, resource and/or location.
- SKU Each SKU associates an Item and a Location.
- the SKU has predefined attributes and user defined attributes.
- the SKU may be raw material, work-in- process ("WIP"), finished good, or both WIP and finished good.
- WIP work-in- process
- the SKU may be hard or soft constrained and if raw material will have a replenishment model that tells whether the material can be replenished, and if so, how.
- Smoothing constraint a type of constraint that directs the system to compute the average amount of capacity per unit time for a constraint based on the load and the total amount of time available in a horizon. The maximum in each bucket is set to the amount of available time times the average amount per time unit.
- Subordinate Item A BOM record relates a parent item and a subordinate item.
- UDA User Defined Attribute
- the present invention relates to an attribute based system for planning orders and resources.
- examples along with an explanation of various concepts are provided below.
- the following example introduces concepts that may be of use in understanding the novel aspects of the present invention.
- the ABP system is a robust planning system that can operate in a highly complex and highly dynamic environment.
- FIG. 1 is a block diagram depicting an ABP system 100 operating in an exemplary environment.
- the ABP system 100 may be implemented using a combination of both hardware and software.
- the ABP system 100 may include a database lOlor may interface with one or more databases located on a single or multiple computer devices such as personal computers, workstations, servers, and the like.
- FIG. 1 is a block diagram depicting an ABP system 100 operating in an exemplary environment.
- the ABP system 100 may be implemented using a combination of both hardware and software.
- the ABP system 100 may include a database lOlor may interface with one or more databases located on a single or multiple computer devices such as personal computers, workstations
- the network comprises of three manufacturing sites 102 to 106 in Atlanta, Denver and Rockville. Each site 102 to 106 in turn comprises of multiple resources 110, 120 and 130.
- a resource 110, 120 and 130 may be an assembly line, a warehouse, plant equipment, inventory or any other entity that is a source for any finished goods that may be requested by a customer.
- Each resource 110, 120 and 130 may be unique in the sense that each may have differing capacity, operating time, product lines, and other constraints.
- Constraints may exist that are specific to a resource, to a group of resources, to a location or a group of resources. Further, the automaker may implement certain rules that place more limitations on the resources and locations.
- Each resource 110, 120 and 130 may be associated with one or more materials 140.
- Material 140 is any component part or component material or even finished goods that may be needed by a resource to produce finished goods.
- One way to view the resources 110, 120 and 130 is to view them as a well that may be replenished by, for example, manufacture, purchase or substitution.
- other materials may also support materials 140. That is, materials 140 that go into resources 110 to 130 may be made from other materials.
- the automaker has several customers 150 who submit orders 160 to the automaker.
- the orders are parsed by the ABP system 100 and a plan is generated for the optimal use of the resources for fulfilHng multiple orders.
- Each order contains relevant information that may be used to create certain parameters when scheduling orders. These include requested delivery date and location, identification of the requested goods, quantity of requested goods, customer identification, transportation mode, and the like.
- the finished goods requested in the order may be viewed as a "finished good stock keeping unit" ("FG SKU").
- FG SKU finished good stock keeping unit
- BOM bill of material
- manufacturing resource planning systems must be able to accommodate a number of other important factors when planning the utilization of network resources. For instance, ordering and/or manufacturing component parts and material at the right time is required if the finished goods are to be delivered on or near the desirable date. If materials are not ordered at the proper time, then there will be insufficient material to fulfill orders. Ordering of component parts prior to the time when the parts are needed is one of the keys to having efficient and timely manufacturing capabilities.
- Planning and scheduling is a continuous process.
- any effective planning system must be able to accommodate already scheduled assignments or orders that have been scheduled before attempting to fulfill new orders using the manufacturing resources available.
- a reliable planning system will be able to accommodate idiosyncrasies, business rules and goals of many types of manufacturers including those having large and complex manufacturing networks.
- a manufacturer may follow Just- in-Time concepts and would therefore want the ordered goods to be made just before the requested delivery date.
- the manufacturer may prefer to deliver goods on the earliest date that is acceptable to the customer.
- These goals are specific to each manufacturer and may be specific to certain types of orders (through model, customer, priority, etc) and may help a manufacturer to realize its long-term goals.
- a business such as large manufacturer, typically receives a number of orders from multiple customers and/or may make forecasts for customers that have yet to give their orders.
- a customer may be a third party, a division within the same business, a supply chain partner or any other buyer.
- Each order received by the business may be defined by its attributes such as customer name, order identification, requested SKU, need date, quantity and the like.
- a SKU will be defined by at least two attributes, name of good[s] and location.
- An SKU may have values for user- defined attributes.
- SKUs may also be grouped into finished good ("FG") SKUs, work in process (WIP) SKUs, or raw material SKUs.
- the items for raw material and WIP SKUs may be subordinate in the BOM.
- a subordinate item is a component part or material that is needed to create another item.
- the values for user defined attributes for orders may override the values for user-defined attributes for SKUs.
- a SKU may have a default value of false for a sunroof user defined attribute (meaning no sunroof).
- a particular order can override this value and set the sunroof user defined attribute to true.
- the ABP system 100 may organize SKUs, and user defined attribute values into SKU attribute description (herein "SAD") groups.
- SAD group for orders will be associated with any orders having "at least" the same attributes that define the SAD group.
- orders that have more attributes than the attributes that define the SAD group may belong to the SAD group as long as they have "at least" the attributes that define the SAD group.
- all orders having those two attributes, regardless of whether the orders are associated with other attributes, will belong to that SAD group.
- SAD groups may be used to: define attribute-sensitive bills of materials ("BOM") for orders; define attribute sensitive inventory; define attribute-sensitive substitutions; apply constraints to orders; define maximum, early/late dates for orders; define dedicated resource groups for orders; apply metrics to orders; define scheduling controls for orders; define sort criteria to sort orders before the planning process is run; apply rate models to orders for a location; and apply violations to orders.
- BOM attribute-sensitive bills of materials
- An order violation indicates when an order violates a soft constraints or when an order could not be planned because it would have violated a hard constraint. It typically has an ID and some associated values that can be displayed to the user in a internationalized, localized format.
- the planning process may be simplified providing optimal planning solutions.
- a SAD group's data may be stored in a SAD group table.
- Certain fields in the table may make up the definition for each attribute name/attribute value pair in the SAD group. These include, for example, attribute type, attribute name, attribute value, index, attribute match flag, attribute present flag, and the like. Attribute type and attribute name identify which order attribute to compare against. Attribute value is the value to compare against the data from the order.
- An index may be used to specify how multiple name value pairs within a group may be associated (e.g., "and” or "or” connector relationships).
- An index of -1 means that the name/value pair is evaluated and 'or'ed with the rest of the group. Name/value pairs with the same index are 'and'ed together and 'or'ed with the rest of the group.
- the attribute match flag specifies if the attribute value from the order should match or not match the attribute value from the name/value pair.
- the attribute present flag specifies the behavior if the attribute is not present on the order. For instance, if the attribute value is color, the allowable values could be "red”, "blue", or no value present. This flag indicates whether no value present matches or not.
- a number of attributes may be used to define a SAD group. These attributes include, for example, item identifier, planned location, requested location, start date-begin, start date-end, need date-begin, need date-end, preference date begin, preference date end, minimum quantity, maximum quantity, minimum priority, maximum priority, customer name, customer location, SKU and any other user defined attributes useful for implementing the ABP system 100.
- a planned location attribute may be used to group orders by the location at which they are planned.
- the requested location attribute may be used to group orders by each order's requested location.
- the start date-begin and start date-end dates attributes are used to group orders by a range of start dates.
- the start date-begin and start date-end attributes may be used individually or in combination to define a range of start dates.
- a start date can identify the soonest (i.e., earliest) bucket that an order can be planned in. This is an optional field, which may use the latest of the following dates [horizon start, the order start date, order need date - maximum earliness].
- the start date identifies the soonest bucket that the order is allowed to be planned in. Note that capacity or material feasibility can make the actual start date later but no earlier than the earliest start date.
- the need date-begin and need date-end attributes are used to group orders by a range of need dates. Need date-begin and need date-end may be used individually or in combination to define a range of need dates.
- the preference date-begin and preference date-end attributes may be used to group together orders by a range of preference dates. They may be used individually or in combination to define a range of preference dates.
- the minimum and maximum quantity attributes may be used to group together orders based on each order's requested acceptable minimum and/or maximum quantities.
- the minimum priority and maximum priority attributes may be used to group orders by priority.
- the ABP system 100 supports an attribute-based bill of materials (herein "BOM"). However, unlike the BOMs in traditional planning systems, the BOMs associated with the ABP system 100 allow the modeling of option-based and rule-based material requirements. For example, in the automobile industry, car models typically have a number of features and options.
- Each feature or option drives the types of components that will be needed to provide such a feature or option.
- materials i.e., component parts
- 4W motor for driving the power window
- the presence of specific combination of features or options may also affect the materials needed for the combination. For example, if in addition to the power window option in the above example, a second option, an automatic sunroof, is needed. This may result in the addition of a sunroof assembly and changing the 4W motor requirement (originally required only when the power window was present) to a 10 W motor requirement.
- BOMs are essentially recipes for SKUs or finished goods and show the required component parts or material for all possible configurations of the finished good that satisfies the attribute requirements of a SKU.
- a BOM for a SKU e.g., car model
- the components e.g., power window assembly, 4W motor, engine, brakes, etc.
- the presence or absence of a feature therefore drives the requirements for materials.
- Substitutions s may be used as necessary to attempt to make a configuration feasible.
- a substitution model may be created to facilitate substitutions.
- the substitution model identifies the substitutable SKUs for a given SKU, the priority, and the substitute draw quantity. If the base configuration is not feasible, then a substitute SKU may be tried. Chaining is allowed in that one may be allowed to substitute SKU2 for SKU1. If SKU2 is not feasible and has a substitute SKU3, then SKU3 may be tried. Circular substitution is detected and not allowed. Substitutes may be limited by the present of SAD Groups. SAD groups may be used to group other items. For example, SAD groups may be used to created dedicated resource groups. Dedicated resource groups may be created and used to restrict the orders that can be planned for specified resources. Dedicated resource groups may be implemented using SAD groups. Any resource that references a dedicated resource group will only be able to manufacture orders that belong to the SAD group associated with the dedicated resource group. SAD groups may be used to group other items, some of which will be described in the following sections.
- the ABP system 100 is a bucketed planning system. That means that the ABP system 100 attempts to plan orders into buckets. Buckets may be defined by several parameters such as time, constraint [s], resource, and the like. For example, an order that need to be scheduled on one of the resources depicted in FIG. 1 may be assigned to a bucket that is defined by a time interval and is specific to the resource at that location. For instance, suppose an order has been assigned to resource "A" 110 at the
- the order may then be assigned to a bucket that is defined by a time interval, a resource and a location such as "September 11 to September 12,” “resource A,” and "Atlanta, GA.”
- a number of database tables may be created.
- the tables are made up of rows and columns. The value of the rows and columns will depend upon the type of tables they are. Tables may be created for a number of entities including BOM, buckets, SKU groups, SAD groups, inventory table, Items (all finished goods and subordinate materials should be listed), Locations, Resource, Resource groups, and the like.
- FIG. 2A and 2B are two high-level flow processes 200 and 220 for creating a plan or modifying an existing plan for utilizing network resources in order to fulfill demand according to one embodiment of the present invention.
- the flow process 200 will be called an initializing flow process and flow process 220 will be called an order planning flow process.
- flow process 200 and 220 a discussing that briefly introduces the various steps defined for each flow processes 200 and 220 is provided below followed by a more detailed discussion of specific steps and concepts introduced in the two processes.
- the process 200 begins at step 202 when a static model is loaded and/or created.
- the static model may be modeled by defining or loading, for example, data relating to available resources, locations, calendars, metrics, constraints, business rules, SKU SAD groups, bills of materials ("BOM”), dedicated resource groups and the like. This includes SKUs that may be marked as "keep in memory” and BOM relationships that are referred by these SKUs.
- initialize buckets To initialize buckets, each bucket may be associated and/or defined by constraints. These constraints may include, for example, capacity constraints.
- create temporary table of unplanned order or orders A more detailed description of some these steps are provided below.
- a second process 222 for processing orders, may commence.
- the second overall process 220 is for planning the utilization of network resources in order to fulfill demand as defined by, for example, orders that have not yet been planned (i.e., unplanned orders).
- the process 220 begins when a slice of one or more orders is selected at step 222.
- a slice of orders is a group of orders that are each associated with a particular SAD group based on the SAD group's attribute values.
- load the next window with the selected slice of order or orders and its associated items.
- the items that may be associated with the order or orders include for example, configurations, BOMs, subordinate SKUs, Finished Good SKUs ("FG SKUs"), and the like.
- FG SKUs Finished Good SKUs
- step 228 select the highest prioritized order not yet planned and plan the order. If there are any more unplanned orders in the window then the next highest prioritized order is scheduled as indicated by step 230. Otherwise at step 232, write assignments so that appropriate resources and/or materials that are needed to fulfill the orders may be reserved. Once the assignments have been written, the dynamic data in the temporary table may be unloaded at step 234. At step 236, determine whether other slices of orders need to be processed and if so, return to step 222 to begin the process 220 over again.
- the initialization process 200 typically begins when the static portions of the planning model is defined at step 202.
- the relationships between resources, dedicated resource groups and its location may be defined.
- Specific information relating to each of the resources such as capacity and the types of goods available at a particular resource may also be defined.
- Constraints that are generally static may be defined during initial modeling.
- a transportation matrix may be created to define the transportation time required for various legs of the supply chain including time required for delivery to particular customers. Items such as calendars, buckets, business rules, SKUs, BOMs may be defined.
- New constraints may also be added just before order planning for specific planning horizons or for specific conditions such as for a one-time customer.
- New or emended business rules may also be added at the last moment to reflect the constantly changing needs of businesses. Finally, the most recent orders will typically be inputted at the last moment before order planning is implemented.
- the processes 200 and 220 generate plans for using resources for fulfilHng demand (e.g., both independent and dependent orders).
- Specific buckets may be reserved for specific orders. Buckets are time intervals that may be associated with, for example, a resource and represents scheduling opportunities.
- buckets are initialized by placing constraints on them. These constraints may include quantitative constraints as well as qualitative constraints.
- the states (buckets) on all the constraints are created and the capacities on these states are set.
- Constraints may be incrementized and implemented in buckets.
- These constraint buckets may parallel resource buckets.
- a specific constraint such as a resource capacity constraint, may be defined for specified buckets.
- Constraints may be modeled using three database tables, a constraint table, a constraint rule table, and a bucket table.
- Initial assignments are used to "freeze" orders. That is, they may be used to reserve a location/resource/bucket [s] for fulfilling a particular order[s] before the planning process is run. This may be accomplished by initial assignments that are typically placed into buckets before any other orders are planned to ensure that they are always in the same place on the plan.
- orders with pre-determined assignments will preferably be scheduled. This may be accomplished by invoking an initial assignment placement routine.
- a pre-assignment table may be created to define pre- determined assignments.
- Such a table may contain information such as: the ID of the order to be assigned, the resource to which the order is assigned, the scheduled bucket for order, and the quantity of the order to be associated with this assignment (probably does not belong here).
- the BOM configuration information for initial assignments may be stored in a BOM table.
- the initial assignments may be processed in the pre-assignment table. Referring to FIG. 3A, which is a flow process 300 for the placement of an initial assignment. At step 302, place the quantity of the order in the initial assignment on the designated resource in the designated bucket using the designated BOM configuration. At step 304, update material availability without assessing material feasibility for the order.
- Material in this context, may be any component material or finished goods used to replenish a resource.
- temporary database table or tables for unplanned order or orders may be created. These unplanned orders are the targeted orders that are yet to be planned by the processes 200 and 220. This table[s] may identify all orders that have not been fully fulfilled though initial assignments. This table may be used to restrict the loading of orders through the remainder of the planning process 200 to only those orders identified in this table. In processing orders by sHces or groups of orders, memory requirements of the ABP system 100 may be reduced.
- the orders are prioritized and sorted. In general, when multiple orders are present, the orders are processed one after the other. Orders that are processed first generally get the first access to materials and capacity. Since it is preferable that certain orders be process before others, preferably the system uses a mechanism for prioritizing orders. This mechanism for prioritizing orders is called sorting.
- the order sorting mechanism allows for modeling order groups and sorting criteria in such a way that the highest priority orders get processed first. If two orders have the same priority, they may be processed in the sequence returned by the database.
- FIG. 3B which is a flow process 320 for prioritizing orders.
- At step 322 organize orders into order groups.
- At step 324 define each group by a SAD group.
- At step 326 prioritize each SAD group by, for example, sequential numbers. A sequence number is used to model the relative priority of these order SAD groups. Lower sequence numbers are associated with higher priority.
- orders may be sorted, ascending or descending, based on one or more attributes.
- sort orders within each group by a user defined criterion.
- the criteria may be different for each group. For example, orders within one group may be sorted by need dates while orders for another group may be by a pre-defined priority number.
- orders within one group may be sorted by need dates while orders for another group may be by a pre-defined priority number.
- a car manufacturer makes model X cars and accepts orders for fleet, retails and stock sales.
- the manufacturer has three distinct groups of orders: fleet orders, retail orders and stock orders.
- the relative priority of these three groups may be modeled.
- the fleet orders are the most important, followed by retail orders and finally, stock orders.
- a separate priority criterion for sorting the various orders within that group may also be defined.
- orders in the retail group may be sorted, ascending, by need date where as the order in the fleet group may be sorted, descending, by revenue (a user defined attribute).
- the retrieval of order groups and sorting within the groups may be accomplished using an extensible interface.
- the ABP system 100 may support a base implementation for this interface that works as follows.
- SAD groups may be used to define order groups.
- Sequence numbers may be used to model the relative priority of these order groups. Lower sequence numbers are associated with higher priority.
- order may be sorted ascending or descending, by a single attribute. For example,
- the above table shows that fleet orders are more important than retail orders, which in turn, are more important than stock orders.
- the higher revenue orders are more important than lower revenue orders.
- orders may be sorted on a different basis. For example, for the group of retail orders, orders from dealers with a higher category number may be made to be more important than orders from dealers with a lower category number.
- the manufacturer may define three tiers of dealers: category number '3' is top tier, '2' is middle tier and '1' is the bottom tier. As a result, those dealers belonging to the top tier may have their orders processed first.
- the manufacturer is concern about on-time delivery.
- orders within a SAD group may be sorted by need date.
- a need date attribute may be defined in the orders and used to set the relative priority of each order within the SAD group.
- the ABP system 100 may use two other mechanisms that help ensure that orders of the highest significance are fulfilled satisfactorily.
- the two mechanisms are capacity allocation and material allocation.
- the capacity allocation mechanism help temper the greedy behavior of the system in the event that undesirable orders get processed first (despite order sorting).
- the system constraint models may be created that may be used to allocate capacity based on meaningful attributes. For instance, capacity of a particular resource may be designated for certain customers.
- the third mechanism for assuring that the highest priority orders be satisfactorily processed first is called material allocation.
- the ABP system 100 uses an order window[s], which can display an unscheduled orders list.
- the unscheduled orders list ensures that the same order is not scheduled twice because it may match multiple criteria in the SAD Groups. For example, suppose that a SAD Group with priority 1 (e.g., high priority) was all the red cars and a SAD Group with priority 2 was all the cars with ABS brakes. A red car with ABS brakes would be planned in the first group. We would also encounter it in the second group but since it was not in the unscheduled orders list, it would be skipped.
- priority 1 e.g., high priority
- the ABP system 100 may follow certain rules while loading and unloading entities into and out of memory.
- the order window provides a way to view and process orders.
- the size of the order window depends on the hardware configuration and the size of the model and is set by a user. Only unscheduled orders will be processed, these are kept on the temporary list in the unscheduled order table.
- the following rules apply when loading information into memory: the orders in the order window, for orders requesting specific SKUs, the SKUs are loaded into memory; for orders that are defined by items only (not SKUs), the items and all SKUs associated with the items are loaded; BOM relationships for the SAD groups that apply to the loaded SKUs and items; substitute SKU information for the SAD groups that apply to the loaded SKUs and items; only SKUs which are hard constrained (from a material perspective) wiU be loaded; and material availability information for the inventory related to the loaded SKUs and items.
- each SKU will have a flag to determine whether it will ever be unloaded from memory once it has been loaded, SKUs with this flag set will not be unloaded; a parameter may be set on the algorithm to provide window memory. This parameter will give the number of order windows that use of a SKU will be remembered, i.e., if a SKU has been modified or considered in the last N windows, it will not be unloaded; BOM configuration will not be unloaded unless the present SKU is unloaded; and SKUs which are unloaded from memory shall have their availability state updated in the persistent store.
- a sorted list of orders is as follows:
- 01 is the highest priority order and 04 is the lowest priority order.
- the routine will load into memory the orders with IDs 01, 03, and 02.
- the routine will load into memory the orders with the foHowing IDs: 06, 05 and 04.
- the order window loader is generally invoked only after all the orders in the current order window have been processed.
- the manner in which an order is processed may depend on whether the order is frozen or not.
- An order may be frozen if it belongs to a SAD group in a freeze groups table. This table contains a collection of SAD group names. Orders described by one of the SAD groups are preferably scheduled on their need dates.
- Initial assignments are essentiaUy orders that were "frozen” after a previous run of the planning process 200. After making necessary adjustments to the ABP output, a system user may freeze orders that the user does not want moved during a subsequent ABP run. Initial assignments may have an assigned date, location and resource. However, “Frozen Orders” are typically used to force "certain” orders to be assigned to a particular date and/or location. For example, an auto manufacturer may have a business rule that states, "fleet orders must get their need dates.” In order to model this business rule, a frozen SAD group "order type
- the need bucket is the bucket that contains the need date (in this case, the need date of the frozen SAD group). If a location is not specified, then the first feasible location may be used. Referring to FIG. 3C, which is a block diagram 350 that depicts the relationship between a SAD group 352, orders 354 to 358 and a freeze group table
- Each of the orders 354 to 358 has an attribute for order type, "fleet.” Based on this attribute, the orders 354 to 358 are associated with the SAD group 352.
- the freeze group table 360 is associated with three SAD groups 352, 362 and 364. Because the SAD group 352 is associated with the freeze group table 360, each order associated with the SAD group 352 will be frozen and thus, orders 354 to
- 358 will be assigned to the specified time (e.g., 5 weeks).
- the ABP systemlOO may implement a prioritized greedy algorithm.
- FIG. 4 is a flow process 400 for resource planning in order to fulfill demand as defined by order[s] and generally represents step 228 of FIG. 2B. In particular, this is an attribute based planning process.
- the process 400 processes the orders that were prioritized and generates a plan for fulfilling the orders by optimal utilization of resources. A brief description of each of the steps depicted in FIG. 4 is provided below followed by a more detailed description of the steps.
- step 402 an order is selected for processing.
- the process step 402 may also include the step of defining parameters for planning the order.
- select a configuration and prioritize admissible locations Every order has an item and it may have a location preference. If it has both, the finished good SKU has been identified. If it only has an item, then the system will preferably generate a prioritized list of SKUs (the item with a feasible location) identify the finished goods associated with the selected order and create a collection of finished goods SKUs (herein "FG SKU") from the order.
- Step 404 results in the determination of admissible locations for each FG SKU in the collection since an SKU will typicaUy define a location[s].
- One or more configurations may be associated with each SKU.
- a configuration is selected (permissible configurations were loaded previously - see flow process 220, FIG. 2B, step 224).
- a SKU from the collection of FG SKUs is selected for planning.
- the FG SKU selected will generally be the SKU having the highest priority in the coUection that is yet to be planned.
- initiaHze FG SKU so that the FG SKU will have all the attributes of the corresponding order and/or item.
- a Hst of admissible resources may have been loaded and/or determined when the slice of orders together with associated date were loaded into the window at step 224 of FIG. 2B.
- a material feasibility determination is made to determine whether the location/resource has sufficient materials to satisfy demand as defined by the order and if not, whether the material is replenishable.
- a constraint feasibility assessment is made on the resource.
- a material capacity compatibility check is made at step 416.
- the bucket/resource opportunities for the FG SKU are evaluated and the best opportunity is selected as the "best one" for the location.
- step 418 After evaluating the bucket/resource opportunity for a specific location at step 418, determine whether there are any more resources to be checked at step 420. If there are other acceptable resources for the same location then return to step 411 and select another resource for evaluation. If there are no more acceptable resources at the same location than select and memorize the best bucket/resource opportunity at step 422. At step 424, determine whether there are any more acceptable locations. If so, then return to step 406 and select another location. If there are no more acceptable locations, then select the best location/resource/bucket at step 426. At step 428, assign the order to the best location/resource/bucket. At step 430 determine whether any more orders need to be planned. If there are other orders need to be planned then the process 400 restarts from step 402, otherwise the process ends.
- FIG. 5A illustrates how the process 400 for planning the utiHzation of resources for fulfilHng demand.
- an order Oi 502 has been selected for planning as shown in FIG. 5A.
- the order Oi 502 was selected from a list of prioritized orders (not shown).
- a list of FG SKU and hence admissible locations, Loci, Loc2 and Loc3 can be determined.
- the admissible locations are determined to be Loci 504, Loc2 506 and
- the admissible locations may also be sorted by preference.
- Loci 504 is above Loc2 506 because Loci 504 is more preferable than Loc2 506 and Loc2 506 is above Loc3 508 because Loc2 506 is more preferable than Loc3 508.
- This first step generally corresponds to step 404 of FIG. 4.
- the order-location pair (Oi, Loci) is reviewed and a determination of the list of admissible resources for manufacturing the order Oi at Loci is made.
- the list is sorted by preference as shown in FIG. 5B.
- Resource RS ⁇ 510 is above Resource RS1.2 512 because Resource RS11 510 is of higher preference than Resource RS12512. This step generally corresponds to step 410 of FIG. 4.
- an attempt is made to schedule the order at the first resource RSn 510 on which the order can potentiaUy be manufactured at location Loci 504.
- the scheduling opportunity for the combination (Oi - Loci - RSn) is then scheduled, evaluated and graded (this step generally corresponds to step 414) as shown in FIG. 5C.
- the last two steps are repeated for resource RS12 514 as shown in FIG. 5D.
- the grade for the scheduling opportunity for (Oi - Loci - RS12) is found to be better than the one calculated for (Oi - Loci - RS ⁇ ), thus the scheduling opportunity on (Oi - Loci - RS1.2) is the best scheduling opportunity found so far and is memorized as the best for Loci 504.
- the next location (location Loc2 516) in the Hst of admissible locations is examined as depicted in FIG. 5E.
- An attempt to schedule on resource RS21 516 is made as shown in FIG. 5F and the results evaluated. If successful, the scheduling opportunity for (Oi - Loc2 - RS1.2) is compared to the scheduling opportunity for (Oi - Loci - RS12) to determine the best order/location/resource combination.
- a comparison may be made to compare the fitness computed with the "best so far” and save the current scheduling opportunity as the "best scheduHng opportunity found so far” if its fitness exceeds the best fitness found so far. In this case, the scheduling opportunity for (Oi - Loc2 - RS12) is found to be the "best so far.”
- step 402 the next or the first priority order (i.e., from the sorted order list) is selected for processing.
- constraints and/or rules may be defined providing parameters for planning the order. The constraints and/or rules will generally be based on the information associated with the order selected. Note that this step and all subsequent steps may be repeated in a loop until aU the orders in the current priority group are processed. Also note that the feasibility for aU configurations and all resources need not be checked. Once a good enough result has been obtained, the process may be stopped.
- an auto manufacturer accepts orders having three attributes: item name, location and need date.
- the item name could be the name of the model of an automobile built by the manufacturer.
- the location is the plant location or any delivery location such as the customer's location.
- the need date indicates the completion date of the auto.
- FIG. 51 which is a block diagram 540 showing the various combinations of order attribute values possible for orders for auto model "Sedan.”
- uadrantl 542 represents an order that specifies both the need date and location from which the order has to be fulfilled.
- the ABP systemlOO may solve for a suitable bucket/resource opportunity for the order, subject to certain conditions.
- the bucket wiU fall in the acceptable scheduling interval for the order.
- the acceptable scheduling interval is, for instance, between [need date - maximum earHness allowed] and [need date + maximum lateness allowed].
- the resource is preferably at the location specified on the order (implied by the SKU specified on the order).
- the assignment is preferably feasible with respect to both material and other appHcable hard constraints.
- the bucket/resource opportunity should preferably be the best across all potential opportunities or be one where the grade corresponding to every objective in the objective function is below a specified threshold.
- a multilevel objective function is used to assess the best bucket/resource opportunity.
- the ABP system 100 may allow for a number of metrics, each having a level.
- a user may choose from a predefined, extensible list of metrics and assigns SAD Groups (to teU which orders are applicable) and levels of the metrics.
- the user can also specify a tolerance that teHs how close two metrics need to be before the values are considered equal. For example, if the difference is .1 then two metrics having values 2.01 and 2.02 are considered as having the same value.
- levels in the metric are checked from highest priority to lowest priority. The first level that is different within the tolerance tells which opportunity is better.
- Quadrant2 544 represents an order that specifies a need date but no location is specified.
- the order specifies the item as sedan and need date as week 5.
- the ABP system 100 solves for a suitable bucket/resource opportunity for the order, subject to certain conditions.
- the bucket fall in the acceptable scheduling interval for the order.
- the resource can be at any location.
- the assignment must be feasible with respect to both material and all applicable constraints.
- the bucket/resource opportunity preferably is either the best across all potential opportunities or is one where the grade corresponding to every objective in the objective function is below a specified threshold.
- Quadrant3 546 represents an order that does not specify either a need date or location.
- the order specifies just the item, Sedan.
- the ABP system 100 solves for a suitable time bucket/resource opportunity for the order, subject to certain conditions.
- the time bucket can be anywhere in the planning horizon.
- the resource may be at any location.
- the assignment will preferably be feasible with respect to both material and all applicable constraints.
- the bucket/resource opportunity wiU preferably be either the best across all potential opportunities or be one where the grade corresponding to every objective in the objective function is below a specified threshold.
- uadrant4 548 represents an order that does not specify a need date but does specify a location.
- the order may specify an item, Sedan, and a location, Atlanta.
- the ABP system 100 may solve for a suitable bucket/resource opportunity for the order based on certain constraints.
- the bucket may be anywhere in the planning horizon.
- the resource is preferably at the location specified on the order.
- the assignment is preferably feasible with respect to both material and all applicable constraints.
- the bucket/resource opportunity is preferably either the best across all potential opportunities or is one where the grade corresponding to every objective in the objective function is below specified threshold.
- a configuration is selected for the order that was selected in step 492 admissible locations are determined and prioritized based on the order attributes.
- a collection of finished good SKUs for the order may be determined.
- the FG SKU may have been loaded into the orders window in step 224 of FIG. 2B.
- the collection may be determined based on certain criteria. For example, if a SKU has been specified on the order, that SKU is the only finished good SKU in the collection. To illustrate, suppose an order is for a sedan in Atlanta, then only that FG SKU may be included in the collection. On the other hand, if the order specifies an item, then all SKUs for that item are possible finished good SKUs regardless of location.
- any SKU having Sedan as the item regardless of location i.e., Atlanta or any other city
- these FG SKUs may be sorted using an extensible interface. Sorting is done to guide the ABP systemlOO to plan the order using the most preferred SKUs (and therefore, at the most preferable locations) before planning for the SKUs with a lower preference.
- the ABP system 100 may support a base implementation of the interface that sorts the SKU collection according to transportation costs from the SKU location to the destination location on the order. These costs may be modeled using a location-by- location transportation matrix. For instance, a table may be created that allows the user to specify that Atlanta > Denver costs 1.0 per unit, Atlanta >_Dallas costs .75 per unit, etc. If no entry is present, then the finished goods may not be moved between the given locations,
- the collection of FG SKU may be sorted by preference. That is, certain FG SKU may have a higher priority than other FG SKUs based on, for example, location preference. This location preference may be due to customer preference or manufacturer's preference or some third party's preference.
- step 406 select an admissible location for planning with the highest priority. GeneraUy this will be a location-based preference. Therefore, the FG SKU with the most preferable location will be selected first for planning.
- At Step 406 initialize the FG SKUs specific to a single finished goods SKU-Order combination whereby attributes are copied to the order not to the SKU.
- Attributes associated with various entities e.g., orders, SKUs, items and the like
- Production, design or marketing related attributes that are specific to an item (and have a bearing on planning) may be modeled at an item level.
- Attributes modeled at the item level generally apply to all SKUs (regardless of location) for the given item.
- Attributes that are specific to an item at a given location and that apply to all orders planned at that location is preferably modeled at the SKU level.
- Attributes that are specific to an order may be modeled at the Order level. If an order has a value for an attribute it is used. If an order does not have a value for an attribute but its associated SKU does, then the SKU value is used. If neither the order nor the SKU have a value for an attribute and the item does, then the item value is used. If the order, the SKU, and the item do not have a value for an attribute, no value is used for the order.
- a determination of all applicable SAD groups may be made. All the SAD groups that describe the FG SKU Object are determined. This may be done by matching the attributes (Boolean combination of name-value pairs) on the SAD group against the attributes (name-value pairs) on the FG SKU Object. In doing this, determine which SAD groups are location (and thus resource) dependent. This step may be undertaken so that multiple checks on SAD group applicability will not be done twice for the same order, or for the same order/resource combination (for location-dependent SAD groups). The initiaHzation step may also include the step of calculating the effective need date of the order.
- the effective need date is the actual date when the finished goods are needed when taking into account the transportation time for delivering the goods to the requested location.
- the initialization step may include the step of calculating the vaHd scheduling interval for the FG SKU object. If there is an effective need date, preferably use the maximum earliness and lateness parameters to calculate the valid scheduling interval. If there is no effective need date, the valid scheduling interval is the planning interval.
- An early/late table may be created and defines by SAD group, how late or how early orders may be scheduled relative to their effective need dates. If the order has no need date, this table has no effect. Sequence numbers that determines priority may be assigned to the SAD groups of this table. If multiple SAD groups in this table apply to the FG SKU object, then the sequence numbers can be used to determine the SAD Group (and therefore the maximum earHness and maximum lateness parameters) that has the highest priority.
- the ABP system 100 determines which resources are acceptable or admissible resources for the FG SKU and creates a list of potential resources. These admissible resources may then be sorted so that those resources that have higher priority or preference than resources with lower priority will be checked first before the lower priority resources are checked to determine scheduling opportunity.
- the determination of admissible resources will generally depend upon several factors. For example, only those resources located at an available location wiH typically be considered as possible resources. Other factors may prevent specific resources from being considered. For instance, conceptually, there are at least two factors that may limit this set of resources, resource location and dedicated resource groups.
- the resource location factor is when a resource is not at a location defined for the finished good SKU object. Such a resource would be excluded from being considered as a potential resource.
- the dedicated resource groups factor is when a resource is associated with a dedicated resource group.
- Object is a SUV.
- admissible resources When admissible resources are identified, they may be sorted such that the most preferred resources are checked first for scheduling opportunities before less preferred resources are checked.
- step 411 select the resource with the highest priority if the resources have been sorted. If the collection of admissible resources have not been sorted by priority than the system may select randomly or by any other selection methods defined by system users.
- step 412 the material feasibility of FG SKU Object is assessed. This step determines whether the resource [s] previously selected wiU have sufficient "material” supplies to provide the needed quantity of the FG SKU object within the acceptable time period. "Material" may be component parts or materials or the finished goods itself for the requested finished good. Based on the FG SKU Object determined previously, the ABP system 100 may search multiple configurations (in the order of preference) at each level in the Bill of Material ("BOM"). The search may allow for substitutions in order to find the best material configuration for the finished good SKU.
- BOM Bill of Material
- the ABP system 100 is preferably a bucketed planning system. That means that the system attempts to plan orders into buckets. Buckets may be created for each constraint. Buckets for a constraint may be defined by a combination of a calendar, the model horizon and properties of the constraint. A calendar may be created and used to define the number of buckets and the duration of each bucket available. The model start is used to determine the actual start date and end date of each bucket The plan horizon + the constraint start delta determines where the first bucket start will be. This is because the ABP system 100 needs to roll from period to period.
- the plan horizon start will be Monday the 8th and the constraints will typically have a zero offset so that the first bucket for all of the constraints will be Monday the 8th.
- the user wiU be planning on Monday the 8th for Monday the 15th and the user's plan horizon will be set to Monday the 15t. Since my offsets are zero, my bucket starts wiU be Monday the 15th. Note that by changing the plan horizon start causes the entire system to adjust. Obviously if there were a constraint that started one week after the horizon start, when planning for Monday the 8h, the first bucket would be Monday the 15h.
- Each bucket may comprise of one or more components including time (the width or duration of the bucket), maximum capacity (the desired maximum number of orders that should be placed in the bucket), relaxed maximum capacity (the absolute maximum number of orders that can be placed in the bucket), and minimum capacity (the minimum number of orders that should be placed in the bucket).
- the capacity of each bucket may be controlled by constraint rules.
- Constraint rules essentiaUy restrict the capacity of each bucket or a group of buckets.
- at least three types of constraint rules are possible, value, percent and smooth.
- the value constraint rule provides a mechanism for defining an incremental change of a capacity from one bucket to the next.
- the percent constraint rule is similar to the value rule except that the value defined on the constraint is interpreted as a percentage rather than some set amount.
- the incremental change from one bucket to the next is a percentage of the constraints' capacity.
- the smooth constraint rule interprets the value defined on the constraint rule as a percentage of the total potential load against the constraint.
- This percentage of the load is distributed among the planning buckets defined by the bucket range columns, prorated among the buckets based on the total available time in the bucket.
- the number of orders that the constraint appHes to is divided by the number of buckets to get the maximum capacity for each bucket.
- the remainder may be spread among the buckets according to some round off rule (randomly, forward from the first bucket or backwards from the last bucket, or by incrementing aU buckets).
- the smoothing rule handles telescoping buckets by computing the amount of load per unit available time and multiplying this ratio by the amount of available time for each bucket.
- the output of the process 600 is information relating to the feasibility of the material needed and may be highly useful for the overall planning process. Such information may include, for example, material available date, material available quantity, feasibiHty flag, and the Hke. The output may be in a form of graphical, text or quantitative report.
- the feasibility flag indicates whether the process 600 was successful in finding the material supply needed for the selected resource [s]. If the feasibiHty flag indicates that the process has been successful then the quantity available will generally be equal to the quantity needed, and the quantity wiU be available before or on the last day that is acceptable (need date + maximum lateness).
- the feasibility flag wiU indicate that the process has been unsuccessful.
- an attempt is made to find the earliest available supply on or before the maximum earliest date that satisfies the need quantity.
- retrieve order data At step 602 retrieve order data.
- the ABP system 100 may generate an output relating to the availability date of the inventory and the inventory quantity that will be available.
- the availabiHty date of the inventory will be the date when the inventory will be available for use.
- the available inventory quantity may be, for example, the inventory and scheduled receipts amounts by the available date.
- step 612 determine whether the replenishment step 610 was sufficient to satisfy the need quantity.
- step 608 If so, then an output is generated at step 608. If the replenishment step 610 was insufficient, then attempt to make up the difference with an alternative [s] at step 614.
- the substitution step 614 is discussed in greater detail below.
- step 616 determine whether the substitution step 614 was successful in making up the shortfall of the replenishment step 610. If the substitution step 614 was successful then generate an output. If the substitution step 614 was not successful then generate an output at step 618. Note that the outputs generated by steps 608 and 618 wiU be different.
- the output generated at step 608 will preferably contain the available quantity (which should be the same as the need quantity), available date and an indication such as the feasibility flag indicating a "yes" that the need quantity was satisfied before or on the last acceptable date (Need date + Maximum Lateness).
- the output generated at step 618 wiU preferably contain the available quantity (which will be less than the need quantity), available date and an indication such as the feasibiHty flag indicating a "no" that the need quantity was not satisfied before or on the last acceptable date (Need date + Maximum Lateness).
- the check inventory step 604 wiU generally require that the there be an exact match between the attributes of the FG SKU object and the inventory attributes.
- an exact match of certain attributes may not be required for certain attributes caUed reserve attributes.
- each of these attributes must exactly match.
- an additional attribute for "customer,” which is a reserve attribute is included.
- FIGS. 7A to 7D are exemplary timelines depicting inventory levels and need quantity over a period of time.
- FIG. 7A depicts inventory levels 702 rising during the early part of the timeline 700.
- the need date is depicting as vertical Hne 704.
- the earliest acceptable date is indicated by the vertical Hne 906, which is equal to the need date minus maximum earliness.
- the latest acceptable date is indicated by vertical line 708, which is equal to the need date plus maximum lateness.
- the time interval between vertical lines 706 and 708 is the acceptable time period.
- the need quantity is indicated by horizontal line 710.
- the inventory available date Dl 710 is before the earliest acceptable date 706.
- the inventory available date 712 is the date in which the inventory is at its maximum or the first date in which the inventory level exceeds or equals the need quantity. Therefore, in this timeline 700, the inventory needed is available from the earHest acceptable date 706.
- the inventory level 722 rises much slower than the inventory level 702 of FIG. 7A.
- the inventory available date 724 is after the earHest acceptable date 726 but before the need date 728.
- FIG. 7C which is another exemplary timeline 740.
- FIG. 7D is exemplary timeHne when the inventory level 762 remains zero throughout the acceptable time period 764 and does not rise to the need quantity 766 until after the latest acceptable date 770 as indicated by the inventory available date D4 772.
- BOM bill of material
- Configurations include bill of material (herein "BOM") and Configurations.
- BOMs bill of material
- SAD groups configurations and the like.
- the ABP system 100 plans the use of resources based on orders received. Orders may represent customer demand, forecasted customer demand and/or a safety stock (to provide a hedge against unforeseen demand). Each order wfll have attributes. There may be more than one order for the same SKU. For example, suppose there is a SKU with the attributes sedan@Atlanta.
- SAD groups are separate from the orders and may be used to group the orders.
- One way to view a SAD group is to view it as a filter.
- SAD groups are used in multiple places. For example, they are used to define the processing sequence as well as determining which orders can be made on which resources.
- a configuration may be viewed as a way to or a road map to building an item. It wiU typically Hst all the materials needed to fully build the item being sought.
- a configuration for the above sedan@Atlanta would list the materials (i.e., components) needed to build the sedan. There may be more than one configuration for each item because some materials may be substituted.
- the BOM defines or identifies all the configurations for the item being sought.
- the BOM also defines parent-child relationships. SAD Groups are used by the BOM in two ways. Each parent child relationship has a parent item and a child item. If one replaces the parent item with a SAD group one has an additional level of control. For example, one might say that the relationship appHes to aU orders for item sedan but only if they have an attribute for power windows. If desired, one could say that a relationship applies to all orders that have an attribute of power window regardless of the item.
- Each substitution has a parent and a child item.
- the user may substitute a SAD group for the either item and have a finer level of control of the substitutions.
- the order rather than the associated SAD groups will have all the attributes necessary to identify all the materials (and configurations) that will be needed for the item being sought.
- the BOM used by the ABP system 100 is attribute based. Unlike the BOM in traditional planning systems, the BOM used according to the present invention permits the modeling of option and rule based material requirements.
- the following example is provided to introduce concepts relating to BOMs. It is very common to find the following rules in, for example, today's automotive industries: all Sedans must have (regardless of what other options are present) a base set of common sub- assemblies A, B and C.
- Sedan models having sunroofs require a sun roof assembly and a 10 W motor per car; Sedan models having Power Windows (but not sun roofs) require a power window assembly and a 10 W motor; and Sedan models having both Power Windows and sun roofs require a power window assembly, a sun roof assembly and a 15 W motor, a motor of higher wattage is required because of the additional load.
- the presence or absence of options drives the requirements for materials. Also, material requirements may depend on the combinations of options that are present.
- SAD groups are preferably included in the BOM.
- the SAD groups may be a SKU along with a Boolean combination of attributes.
- a BOM plays an important role in determining material configurations for each order planned.
- a BOM table is preferably created.
- the ABP system 100 attempts to find a feasible configuration of materials for each order by looking at the inventory of the finished good of the order, and exploding the BOM as necessary, checking each defined recipe.
- the necessary subordinates for a material are determined as follows, for each SAD group that describes the order, and for the item requested by the order, at least one recipe defined in the BOM table is generally necessary to manufacture the order.
- the item and applicable SAD groups may be determined for the subordinate material and at least one recipe for each of these must be used to manufacture the subordinate materials.
- the SAD groups referred here are SAD groups related to materials rather than orders.
- Offset can be defined for any item in the BOM. This offset defines the amount of time after production of the finished good SKU begins that this item is needed. The ABP system 100 may ensure that the lead time for starting production of the finished good SKU will always be at least as long as the longest offset of any item in the BOM for that finished good SKU.
- a configuration is essentially a Hst of subordinates that are required in order to manufacture the parent item, which may be, for example, the object of the order or an intermediate item used to manufacture other items. .
- the parent can be replenished feasibly as long as at least one configuration can be replenished feasibly.
- the ABP system 100 provides two mechanisms for search and optimization when there are multiple configurations, greedy feasibility and best-fit. In greedy feasible, once the system finds a configuration that works, it stops searching for an acceptable configuration.
- An acceptable configuration may be defined as one that fulfills the need quantity for the SAD group within the planning interval [(need date - maximum earliness) or plan horizon start if there is no maximum earliness, (need date + maximum lateness) plan horizon end if there is no maximum lateness].
- the system search through aU the configurations for the SAD group and selects the best configuration with respect to the scheduling goal.
- the ABP systemlOO uses SAD groups in the BOM to model attribute based material requirements. Referring to FIG. 8A to 8C, which are visual representations of exemplary relationships between SAD groups and SKUs in the BOM.
- FIG. 8A is a block diagram of a BOM that shows the "base" bill of materials for a Sedan in Denver.
- the BOM comprises of a relationships (which can use SAD groups), which defines the base material (e.g., parent item) and the associated subordinate SKUs.
- a SAD group 802 is defined by two SKU attributes, Sedan and Denver. Each Sedan manufactured in Denver requires certain materials regardless of other options or features that may be present. In this case, these required materials include subordinate SKUs 804 to 808 such as assembly A at Denver 804, assembly B at Denver 806 and assembly C at Denver 808.
- the relationship illustrated between the SAD group 802 and its subordinate SKUs 804 to 808 can be thought of as a level one BOM for a Sedan at Denver.
- FIG. 8B is a block diagram representing another BOM.
- the BOM depicted here shows the components that are "additionaUy" required (above the three assembly components required by the level one BOM depicted in FIG. 8A) if a sunroof is configured as an option but not power windows.
- the SAD group 810 is associated with subordinate SKUs 812 and 814 for Sunroof Assembly at Denver and 10 W Motor at Denver.
- the subordinate SKUs 812 and 814 are the additional materials that will be needed if the Sunroof option is requested.
- FIG. 8C is a block diagram of another BOM.
- This BOM shows the components that are "additionally” required if both a Sunroof and Power Windows are selected as options.
- the SAD group 820 is associated with three subordinate SKUs 822 to 826, Power Window Assembly at Denver, Sunroof Assembly at Denver and 15 W Motor at Denver. Notice that a more powerful motor is required in this BOM than the BOM depicted in FIG. 8B (where only a 10 W motor was needed).
- a key ingredient in planning is a concept caUed "configuration.”
- a configuration is essentiaUy a list of subordinate SKUs that must be used in order to manufacture a parent SKU.
- the concept of configuration may be understood with the foUowing example.
- For each SKU there is a corresponding BOM that has a Hst of recipes, which shows ways that it can be manufactured. An entire recipe is needed much as it would be needed when baking a cake. Also, as in baking, if there is a shortage of an ingredient, one may be able to substitute an ingredient with an alternative ingredient.
- the SAD Groups in the BOM records wiU determine when a subordinate is appHcable.
- Sedan For example, suppose a Sedan requires a 10W motor, but a Sedan with a sunroof requires a 20W motor.
- the Parent SKU Sedan would have two BOM records, each with a SAD Group either specifying sunroof or no sunroof and 20W or 10W motor respectively.
- a configuration teUs us which material needs to be used in which quantities. One would take a recipe + replenishments + substitutions to get something that is buildable.
- netting is done against on-hand and future supplies of materials. For example, suppose a 10 W motor is needed and there is one on-hand. An order for a single car could come along and use it. The next order that comes along may also need a 10W motor.
- the motor In order to supply the needed 10W motor, the motor must be either replenished (purchased), substituted, or not plan the order at all because not all of the material we need wiU be available. If it is manufactured, it is typically a subassembly and the subassembly has a set of material in various quantities that are needed.
- An order is material feasible if at least one configuration can be replenished within the planning interval. Different configurations may have different material dates since they have different material and/or quantities in them. At least two mechanisms may be used for search and optimization when there are multiple configurations, "greedy feasible" and "best fit.” In greedy feasible, the ABP system 100 selects the first configuration that is feasible rather than search through all alternative configurations for the best configuration. In contrast, in "best fit,” the system searches through aU the configurations for the corresponding order and selects the best configuration with respect to the scheduling goal.
- a configuration for an Order (Config 1, Config 2, and the like.) is essentiaUy a set of subordinate relationships.
- the Order,- 900 has two configurations: CONFIG A 902 and CONFIG B 904. Each configuration is a set of subordinate SKUs 906 to 920.
- CONFIG A 902 is a set of subordinate SKUs 906 to 912 whue CONFIG B 904 is a set of subordinate SKUs 914 to 920.
- the Orderj 900 is feasible if at least one of its configurations is feasible by the end of the planning interval.
- Configj should be read as the "j th " configuration of the order.
- the Avaflable Quantity of the order wiU be the same across both configurations
- a configuration Config j is feasible only if aU the subordinates (e.g., component materials) in the configuration are feasible.
- Need Quantity (Subordinate SKUjk), 1 ⁇ k ⁇ n, whereby 'n' is the number of immediate materials.
- the Avaflable Quantities and Dates for each configuration may be calculated as foUows.
- the Available Quantity (Config j)
- each subordinate SKUs i.e., component material
- each subordinate SKUs must be feasible in terms of availability of the needed subordinate SKU by the time that the subordinate is needed and there is sufficient quantity in stock on that date or if not sufficient supply then the supply is fully replenished to meet the demand by manufacturing, purchasing and/or substitution.
- Flow process 1000 is a flow process for material replenishment by manufacture.
- certain data will preferably be inputted as shown at Step 1002.
- Such data may include data relating to the SKU, the orders, replenish need date, ME (maximum-earliness), ML (maximum-lateness) parameters and replenish need quantity and the soonest replenishment start (the soonest replenishment start is a date that may occur before the planning horizon start. For example, suppose planning is being performed on Monday the 1 st for Monday the 8 th .
- the planner releases the schedule on Wed 3 rd and starts counting the replenishment start on Thursday the 4 th , instead of Mon the 8 th .
- the replenishment start would be set at to Thur 4 th instead of Mon 8 th .
- the process as depicted in FIGS. 10A and 10B, generates an output that shows the quantity that could be replenished through manufacturing ("replenish avaUable quantity") on or before the latest acceptable date (Need Date + ML), the date on which the replenish available quantity is available and a flag indicating whether 100% of the replenish need quantity could be satisfied through manufacturing on or before the latest acceptable date (Need date + ML).
- a list of applicable SAD groups is generated based on the data relating to the order being planned.
- the ABP system 100 reviews aU the SAD groups in the BOM that applies to the order and selects only those SAD groups that are applicable.
- FIG. 10C shows a "base” one level BOM for Sedan @ ATL.
- FIG. 10E is a third BOM set that shows the components that are additionaUy required if a Power Window is configured as an option, but not a sunroof.
- the last BOM set, as depicted in FIG. 10, shows the components that are additionally required if both Sunroof and
- a list of quaUfying SAD groups may be generated.
- the list generated at step 1005, in this example, would only include the first and fourth SAD groups.
- the total number of SAD groups in the SAD group list is P and 1 ⁇ i ⁇ P.
- step 1010 the ABP system 100 retrieves the first (or next) SAD group in the list for processing. Therefore, the index 'i' in the list of SAD groups is advanced by one( i.e., i -> i +l).
- the ABP system 100 retrieves aU the BOM configurations for the selected SAD group based on the order being planned in step 1015. This is because the SAD group will not contain all the attributes of the order. Thus, in order to obtain the proper BOMs, the ABP system 100 looks to the originating order.
- 'Config _/ is defined as the jth configuration in the list of configurations for 'SAD group' and the total number of the configurations in the list is Q, in which 1 ⁇ j ⁇ Q.
- Configurations are always specific to an order because the order has attributes that may not exist in the SKU/Item or the order attributes may override those that are present in the SKU/Item.
- the system retrieves the next configuration in the list of configurations for 'Parent SAD Groupi' for further processing.
- index 'j' the list of configuration is advanced by one (i.e., j ⁇ - j+1).
- each configuration is essentially a list of subordinates that are required in order to manufacture the parent.
- the parent can be replenished feasibly as long as at least one configuration can be replenished feasibly. Therefore, the ABP system 100, in stepl025 generates a collection of subordinates for Config jj, and in step 1030, retrieves the next subordinate in the list of subordinates for 'Config . for further processing.
- it denotes an index 'k' on the list of configurations. That is, 'Subordinate SKU yk' indicates the kth subordinate in the list of subordinates for 'Config ij'.
- the total number of subordinates in the Hst is R and 1 ⁇ k ⁇ R.
- the index 'k' on the list of configuration is advanced by one (i.e., k ⁇ - k+1).
- the ABP system 100 then prepares the subordinate SKU by copying attributes of the order [Preferably, subordinates are copied to the order. Subordinates SKUs, as included in the configuration, can temporarily add attributes to the order. When the next configuration comes along, the attributes have to be restored on the order.] and calculating the Need Date and the Need Quantity for the subordinate in step 1035.
- This step may require that the ABP system 100 first extract the Draw Quantity the Offset and the Copy Instructions associated with the BOM relationship between the order' and the 'Subordinate SKU jk'.
- the draw quantity is the amount of component materials (e.g., subordinate SKU) needed per unit item sought (e.g., parent unit).
- the Need Date (subordinate SKUjk)
- Need Date Replenish Need Date - Lead time (Parent SAD Groupj)
- the Need Quantity may be calculated as foUow:
- Need Quantity (Subordinate SKUijk) Replenish Need Quantity * Draw Quantity (Subordinate SKUijk)
- Select attributes of the order and/or the input SKU with attributes and/or item corresponding to input SKU with attributes is preferably copied to the Subordinate SKU yk using copy instructions on the BOM table. Copy instructions are used to propagate relevant attributes of the order/parent SKU/parent item to the subordinate SKUs. Copy instructions tell what attributes need to be copied. After the process of step 1035, the ABP system 100 outputs
- Subordinate SKUijk with relevant attributes (denoted by SubSKUwithATtribsijk).
- the Need Qty and Need Date are also known by the above calculation.
- Copy instructions may be used in order to propagate the appropriate attributes to subordinates as exploding the biU of materials. Propagation of the appropriate attributes to the lower level subordinates is needed to find inventory of and replenish the right subordinate materials.
- FIG. 10G which iUustrates a BOM, in which the item names are shown within parentheses.
- the biU is an attribute- based biU. Not aU the parent-child relationships shown are applicable for every order of Router-A.
- the BOM relationship denoted by "A" between ROUTER-A and 4P-IMOD
- is valid only if the customer has selected "Interface Type 4-port".
- Finding supply can be done either by netting available inventory or by manufacturing these parts. They are described by the followings: (1) Finding supply from Group G: Group G is a standard assembly that is there in the router irrespective of options configured on the router. Therefore, there is no need to know order specific attributes for this group while looking for inventory or replenishing ASSY-MAIN. From table II, it is known that the parent SAD group with subordinate ASSY-MAIN has 50 units in inventory, which is sufficient to cover the demand of 25 units. Therefore, the subordinate ASSY-MAIN is feasibly by Week 9.
- the interpretation of the copy instructions is "carrying the Memory attribute to the Subordinate SKU and copying the value on the Memory attribute on the order to the Memory Attribute on the Subordinate SKU".
- the output of this operation is a subordinate object, i.e., a "Subordinate SKU with attribute”.
- the inventory check is done against the Subordinate Object, by matching attributes on the inventory against the attributes on the Subordinate Object.
- the ABP system 100 gets supply for subordinate SKU and calls a Get Supply Method for SubSKUwithATTribsijk, in step 1040.
- the outputs of step 1040 are available Quantity (SubSKUwith Attribsijk) and avaUable Date (SubSKU with attribsijk).
- the ABP system 100 then updates the avaUable Date and- availably Quantity by the outputs determined by the above step, as shown in step 1045.
- the feasible flag is determined by:
- step 1050 the ABP system 100 checks if the configuration available Quantity equals to zero. If so, the system wUl not look at any more subordinates in this configuration and the process goes back to step 1020 to get next configuration list. If not, the system continues to check if there are more subordinates in this list, in step 1055.
- the process goes to step 1030 to retrieve next subordinate (k ⁇ - k+1) from the list, otherwise goes to step 1060 to determine the configuration search mechanism.
- the ABP system 100 provides two mechanisms for search and optimization when there are multiple configurations. One mechanism is called “greedy feasible” and the other is called “best-fit.” In greedy feasible, the process (of FIGS. 10A and 10B) selects the first configuration that is feasible (defined as the Need Quantity for the parent SAD group can be fulfiUed on or before the Need Date).
- the ABP system 100 will not stop searching even if the system finds a feasible configuration. Instead, the ABP system 100 search through all the configurations for the parent SAD group and selects the best configuration with respect to the scheduling goal. If the search mechanism is the greedy feasible type, the process determines, in step 1065, if the configuration feasible flag indicates that the configuration is feasible. If, however, the search mechanism is the best- fit type, the process goes to step 1070, where the ABP system 100 remembers the best configuration that has been found so far. In step 1090 determine whether there is more configurations for the current parent SAD group. If there are more configurations then the process returns to step 1020 to get the next configuration.
- step 1065 a determination is made as to whether a feasible configuration has been found [as indicated by a feasible flag (Config ij)]. If the feasible flag indicates that a feasible configuration has been found then at step 1075, the ABP system 100 selects the current configuration as the best configuration based on the greedy-feasible-type mechanism, and then goes to step 1080. If there is no feasible flag, which means no feasible configuration has been found so far (under the greedy mechanism), the ABP system 100 then goes to step 1070 and remembers the best configuration so far (however, since the greedy mechanism is selected, none of the configuration checked so far should be feasible). The process then moves to step 1090 to check if there are more configurations on the Hst.
- a feasible flag Config ij
- step 1020 If there are more configurations on the Hst then the process returns to step 1020 to evaluate and process the next configuration on the list. Otherwise, if there are no more configurations on the list then the process moves to step 1080 as well, where the system calculates and updates the avaUable date and available quantity for the current configuration.
- the avaUable date of the current parent SAD group is the available date of the best configuration and the avaUable quantity is the available quantity of the best configuration.
- the ABP system 100 then updates replenish available date and replenish avaUable quantity in step 1085.
- the Replenish Available Date is the larger one between the available date for the current parent SAD group and the current Replenish AvaUable Date.
- the Replenish Available Quantity is the smaller one between the Available Quantity for the current parent SAD group and the current Replenish AvaUable Quantity.
- step 1092 determine if the calculated Replenish AvaUable Quantity after step 1085 equals to zero. If it is not zero, there is no need to process any more SKUs for the current configuration and the process moves to step 1096 where the ABP system 100 returns (i.e.., outputs) the Replenish AvaUable Date, Replenish Available Quantity and Replenish Feasible Flag and ending the replenishment by manufacture process at step 1098. If the replenish available Quantity is determined to be zero at step 1092, then the ABP system 100 checks if there are more recipes on the BOM 1094. If there are more, then the system at step 1010 retrieves the next parent recipe (i.e., SAD group) for processing. Otherwise, the system exits the BOM recipe and returns a Replenish AvaUable Date, Replenish Available Qty and the Replenish Feasible Flag at step 1096. The process 1000 then ends at 1098.
- the ABP system 100 checks if there are more recipes on the
- FIG. 11 is a general flow process 1094 for replenishment by purchase (as represented by step 610 of FIG. 6).
- the process generates outputs by attempting to plan replenishment need quantities into available time buckets along a timeline.
- the outputs may be in the form of quantitative and/or qualitative reports.
- Relevant data may include, for instance, data relating to attributes of an order object and timing information such as replenish need quantity, replenish need date, maximum earliness ("ME”), maximum lateness "ML”), length of time buckets, period maximums, and the like.
- a purchase lead-time (“PLT”) that depends on order attributes for purchasing "replenish need quantity” is defined at step 1104.
- the PLT is the lag time required to replenish after a purchase order (“PO”) has been placed. Given the time needed to obtain the materials, the PLT may be used to determine when the order needs to be placed. In the ABP system 100, this is constrained by the replenishment start parameter. RecaU that there is a planning horizon start/end, thus no orders will be planned before the horizon start or after the horizon end. Note also that a "replenishment start” determines the earliest time of any replenishment. The soonest any replenishment can occur is [replenishment start time + PLT]. The date on which the PO must be submitted (called a "purchase order placement date” or "POPD”) in order to receive the "replenish need quantity" on the "replenish need date” may then be calculated:
- the timeHne is a timeline that defines the sequence of relevant events. These time events, as depicted in FIGS. 12A to 12D, includes for example, purchase order placement date ("POPD"), replenish start date (“RSD”), purchase order placement date plus maximum lateness date (“POPD + ML”), replenish need date minus maximum earHness (“RND - ME”), replenish need date (“RND”), replenish start date plus PLT (“RSD + PLT”), replenish need date plus maximum earliness (“RND + ME”), and the like. Based on the timeline created in step 1108, at least four general types of scenarios are possible. At step 1110, determine the applicable scenario. Based on the applicable scenario, an output is generated.
- FIGS. 12A is a timeline 1200 that depicts time events, which help define these scenarios. These events include the purchase order placement date (“POPD”) 1202, purchase order placement date plus maximum lateness (“POPD + ML”) 1204, replenish start date (“RSD”) 1206, replenish need date minus maximum earliness (“RND — ME”) 1208, replenish need date (“RND”) 1210, and replenish need date plus maximum lateness ( "RND + ML”) 1212. Note that these time events do not necessarily have to faU according to the timeline 1200 of FIG.
- a purchase order placement date (“POPD”) 1202 is the date that a PO must be placed for the PO to be fulfiUed precisely on the replenishment need date 1210.
- the replenish start date or RSD at 1206 is the actual or contemplated purchase order date.
- the timeline may be divided into buckets 1216.
- the timeHne 1200 is shown to be divided into time intervals representing buckets 1216 that are time dependent. In addition to being time dependent, these buckets may be defined by other factors such as quantity or qualitative factors. Note also that the term
- date is broadly used here so that it may be interpreted to cover precise points in time including, for instance, down to the seconds of a day.
- capacity limitations are preferably represented in the replenishment by a purchase model.
- One approach is to model by defining "capacity maximums" based on time. These maximums are caUed “period maximums.” These period maximums may be used to restrict the amount of materials or items that a resource, such as a supplier, can produce or sell at any given time interval. Other rules may also be included such as the concept of "carry-overs,” which allows models of suppliers to carry over any excess products, produced over an earHer time period, to be available for use in succeeding time periods.
- the three basic cases are when the replenishment of the full quantity is on time, when replenishment of the full quantity is late, and when replenishment is infeasible.
- Case 2 The replenishment is marked feasible, the amount available on the need date is recorded and the soonest avaUable date is recorded. The user can set a flag that allows the system to look for one or more substitutes to improve the timeHness.
- Case 3 The replenishment is marked infeasible and the amounts avaUable on the need date and the need date + maximum lateness are recorded. In this case, the ABP system 100 wUl try to substitute as in case 2 to try to make up the difference at the need date + maximum lateness. The user may set a flag that allows the ABP system 100 to look for additional quantity for one or more substitutes to improve the timeHness. If substitutes cannot be found to make the configuration feasible, the configuration is marked infeasible and skipped.
- Period maximums are used when a user cannot get all of the material the user wants in a given time frame. This can occur with commodity products such as iron ore or components in high demand such as computer CPUs.
- the user may get an allocation of no more than 10 tons in a week, or 50 CPUs in a month. In this case, the user needs to determine how to use these parts to make the most money.
- the ABP system 100 may ensure that the minimum amount of substitute is used. This can occur in Case 2 or Case 3.
- the first general scenario is the situation when POPD + ML ⁇ RSD.
- the replenish start date (“RSD") is the date when the actual replenishment purchase order is submitted.
- FIG. 12B which is a timeline 1220 depicting the first scenario.
- the POPD + ML date at 1222 precedes the RSD date at 1224. Therefore, the completion date at 1226 of the order is after the RND + ME date at 1228 based on the PLT 1230.
- the materials or items being purchase will not be avaUable until after the latest acceptable date.
- an output (Output 1.1) may be generated.
- the second scenario is the situation whereby the POPD date is earlier than or the same as the RSD date which is earher than or the same as the sum of POPD and ML dates: POPD ⁇ RSD ⁇ POPD + ML.
- FIG. 12C which is a timeline 1240 depicting the second scenario.
- the interval between the POPD date at 1242 and the RND date at 1244 defines the PLT at 1246.
- the RSD at 1248 precedes the POPD + ML date at 1250.
- the interval between the RSD date at 1248 and POPD + ML date at 1250 is a potential interval for placing the PO. This interval is called "potential PO placement interval" 1252.
- An available date interval 1254 corresponding to this potential PO placement interval 1252 is located between the RSD + PLT date at 1256 and RND + ML date at 1258. This interval is checked from left to right (starting at RSD + PLT at 1256) to find buckets that do not violate period maximum on the purchase. If necessary, splitting of quantities may be done across multiple buckets. If it is determined that this scenario is applicable then a determination is made to see which sub-scenarios under the second scenario is applicable. There are three sub-scenarios under the second scenario resulting in three possible outputs, Outputs 2.1, 2.2 and 2.3.
- the first sub-scenario for the second scenario is when 100 percent of the replenish need quantity can be placed in buckets that span the end points of the interval (RSD + PLT at 1156, RND + ML at 1258), the foUowing output may be generated:
- the second sub-scenario for the second scenario is when a quantity X, which is greater than zero but less than one hundred percent of the replenish need quantity, can be placed in buckets that span the end points of the interval (Replenish Start Date + PLT, Replenish Need Date + ML), the following output may be generated:
- the RAD equals Replenish Need Date + ML.
- the third sub-scenario for the second scenario is when nothing can be placed in the buckets that span the end points of the interval (Replenish Start Date + PLT, Replenish Need Date + ML) due to violations of period. If the third sub-scenario apples then the following output may be generated:
- the third scenario is when the POPD - ME date is earlier than or equal to the RSD date, which is earlier than or equal to the POPD date, which is earher than or equal to the POPD + ML date: POPD - ME ⁇ Replenish Start Date ⁇ POPD ⁇ POPD + ML.
- This scenario is essentially identical to the third sub-scenario of second scenario above.
- the interval (Replenish Start Date + PLT, Replenish Need Date + PLT) may be checked to determine whether the buckets in the interval will be sufficient.
- the outputs for the third scenario will be the same as the outputs for the third sub-scenario of the second scenario.
- the fourth scenario occurs when the replenish start date is less than or equal to the purchase order placement date minus the maximum earliness, which is less than or equal to the purchase order placement date, which is less than or equal to purchase order placement date plus maximum lateness: RSD
- FIG. 12D which is a timeline 1260 depicting the fourth scenario.
- the timeline 1260 is divided into buckets 1261.
- the buckets 1261 are defined by increments of time and capacity.
- the fourth scenario requires that the RSD date at 1262 is earlier or the same as the POPD - ME date at 1264, which is earlier or the same as the POPD date at 1266, which is earher or the same as the POPD + ML date at 1268: RSD ⁇ POPD - ME ⁇ POPD ⁇ POPD + ML.
- this timeHne 1260 depicts that the RSD + PLT date at 1270 precedes the RND - ME and RND dates at 1272 and 1274.
- FIG. 13 is a flow process 1300 for generating outputs for the fourth scenario.
- the process 1300 begins when a determination is made whether the replenishment need quantity can be fully accommodated by the bucket that contains the [RND - ME] date at step 1304. If successful, the following output is generated at step 1306:
- Replenish AvaUable Quantity Replenish Need Quantity
- Replenish AvaUable Date Replenish Need Date - ME
- Replenish Feasible Flag feasible
- Case 4.2 The replenish need quantity has been completely placed but are not in the bucket containing (Replenish Start Date + PLT).
- Case 4.3 The replenish need quantity have been placed completely in the bucket containing (Replenish Start Date + PLT).
- FIG. 14A is a flow process 1400 for generating an output for case 4.1 (represented as step 1316 in FIG. 13). Multiple successive buckets in the forward direction may be checked starting with the bucket 1276 (in FIG. 12D) that is after the bucket 1274 in which (RND — ME) occurs, placing as much as possible in each bucket without violating period maximums. Moving backward (e.g., towards earlier time buckets), one bucket at a time, until one of the following three conditions are met:
- Case 4.11 The replenish need quantity is not completely in the bucket containing (replenish need date + ML).
- Case 4.12 The replenish need quantity have been completely been placed in one or more buckets but is not in the bucket containing (replenish need date + ML)
- Case 4.13 The replenish need quantity have been completely placed and is in the bucket containing (replenish need date + ML)
- the process 1400 begins at step 1402 by going to bucket 1276, which is before the bucket 1274 in which (replenish need date — ML) occurs, placing as much as possible in each bucket without violating period maximums. This means that an attempt is made to try to fill each bucket forward in time beyond the bucket 1474 in which (replenish need date - ML) occurs and up to the bucket before the bucket that contains the (replenish need date + ML) date or the bucket 1278 that ends on the (replenish need date + ML) date (bucket 1378 in FIG. 12D).
- review timeline review timeline and determine whether it is a 4.11 case scenario. If so, then generate the following output at step 1408:
- Replenish Available Qty Total Quantity that could be placed
- Replenish Feasible Flag Not Feasible If it is not a 4.11 case, then at step 1410, determine whether it is a 4.12 case. If it is a 4.12 case, then at step 1412, generate an output as follows::
- step 1404 If it is not a 4.13 case, then return to step 1404 and move backward one bucket to start the process over again.
- step 1312 If it is not a 4.3 case situation then return to step 1312 and move backward one bucket to restart the process again until an output has been produced.
- the ABP system 100 may attempt to make up the difference between the needed replenishment quantity and the total quantity available by manufacture and/or purchase by substitution.
- Substitution may be used for any type of SKUs including FG SKUs, SKU with attributes, subordinate SKUs, and the like.
- a substitution model may be created to facilitate the substitution of SKU with attributes. Whenever substitutes are needed for SKUs with attributes, the ABP system 100 may attempt to substitute for missing SKUs after it attempts to manufacture a child item using one of the defined BOM configurations.
- substitutions are processed in priority order, and either aU substitutions are tested for existing inventory before any manufactured configurations are tried on the substitutes, or else the higher priority substitutes' manufactured configurations are tried first.
- Substitutes may be modeled by creating a substitute table. Substitutions may be defined for aU child items [a child item is a subordinate item to a parent item, for example, a car would be a parent item and the car seats would be the child items]but not generally for finished goods. Multilevel substitutes may also be allowed such as substitutes for substitutes.
- FIG. 14B is a flow process 1450 for replenishment by substitution.
- the process begins when certain data/parameters are retrieved and defined.
- the data that is retrieved may include information relating to parent SKU with attributes (the parent SKU with attributes, this may be optional), subordinate SKU, original need quantity (subordinate need quantity), substitute need quantity and date, maximum earliness (ME), maximum lateness (ML), and the like.
- the ABP system 100 uses this information, along with any substitution preferences, to fulfill the amount of substitutes needed called "substitute need quantity" or "SNQ."
- the SNQ is for substitute SKU with attributes that are available on or before the latest acceptable date (substitute need date + ML).
- the output of the substitution function (as depicted in step 614 of FIG. 6) includes substitute available quantity, substitute avaUability date, and substitute feasibUity flag.
- acceptable substitutes may be determined at step 1454. If more than one acceptable substitute exists then determine the priorities of each substitutes at step 1456. Typically, some substitutes wUl be more preferable than others. Thus, it is preferable that the acceptable substitutes be prioritized.
- step 1458 select one of the acceptable substitutes for determining feasibiHty.
- a check of the inventory is first done at step 1460. Determine if the inventory can fully satisfy the need amount by the need date at step 1462. If not, then attempt to fulfill any inventory shortfall by either manufacture or purchase at step 1464. The process of replenishment by manufacturing and/or purchasing substitutes may be accomphshed using the processes described above for replenishment by manufacture or purchase. If there are any more acceptable substitutes then return to step 1458 to determine feasibUity of the next acceptable substitute at step 1466.
- select substitution preferences This may be accomplished by the use of flags, which are described below.
- select one or more substitutes based on substitute priority, feasibiHty and substitute preferences.
- Replenishment by substitution may be modeled by creating a substitution table.
- This table may have one or more columns, which govern the manner in which the ABP system 100 may implement substitutions.
- the table may be used to define a number of items.
- substitution rule defined by the row is valid for all subordinate SKU with attributes, which are described by the Subordinate SAD Group.
- the substitution can be globally appHcable for a SKU regardless of the parent (when the parent column is blank) or it can be applicable only to certain parent child relationships. In doing so, the user is allowed to use a SAD Group to further constrain when a substitute is allowed.
- a column in the substitution table may define a subordinate SAD group.
- the subordinate SAD group describes the subordinate SKU that is to be substituted.
- Another column may define a substitute SKU.
- This column (may be implemented as two separate columns: Substitute Item and Substitute SKU) describes the SKU that is an acceptable substitute for subordinate SKU with attributes.
- Copy Instructions may be defined. This column contains a reference to the Copy Instructions table that specifies the attributes that have to be copied over to the Subordinate SKU.
- substitution relationship modeled above may translate to the foUowing exemplary business rule:
- a 4-port interface module is always substitutable with an 8-port interface module.
- the user can specify additional attributes to be copied to the Subordinate SKU using the copy instructions.
- Priority may be defined by one of the columns.
- a given subordinate SKU with attribute (assuming that this is just a SKU) can have several substitutes.
- This column models the relative priority of each of these substitutes.
- the subordinate SKU "Y' may have three different substitutes (each substitute being a different record in the table), SKU "A,” SKU “B” and SKU “C.”
- a column may be designated for an Effective Date.
- the Effective Date is the earHest point in time at which the substitution relationship is valid.
- a column may be designated for Discontinue Date.
- the Discontinue Date is the latest point in time at which a substitution relationship is vahd.
- a column for draw quantity may be created.
- the substitution feature may aUow a user to model a different BOM draw quantity when a substitute is used. By specifying a draw quantity in this column, the user can override the BOM draw quantity between the parent and the subordinate (which is being substituted) when the substitute is used.
- the parent may be SKU "X”
- the subordinate may be SKU "Y'
- the draw qty on the BOM relationship may be 4. If subordinate SKU Y is being substituted by substitute SKU Z, the user can specify a different draw quantity (say 5) to be used. This feature is especiaUy useful in chemical industry applications.
- a column may be created and designated for sequence number[s].
- Multiple parent SAD Group - subordinate SAD Group combinations (modeling different substitution options/ rules) in the substitution table may apply to the parent SKU with attribute - subordinate SKU with attribute' combination that is in memory.
- the substitution option / rule with the lowest sequence number is preferably used.
- There are also factors that are specific to a parent SAD group - subordinate SAD group Combination (as opposed to Parent SAD Group - Subordinate SAD Group - Substitute SKU combination) that may be modeled in the substitution table note that the rows in the substitution table may be specific to parent SAD group - subordinate SAD group - substitute SKU combination, factors which are often difficult to model in the substitution table.
- the BOM table may be a better table to model these factors.
- the ABP system 100 allows for several types of "flags," which aUows users to easily implement predefined business rules . These flags include, for example, a "partial fulfillment" flag, a "fulfillment mode” flag, a “use untU exhaust” flag and a "multi-level substitution” flag. If the partial fulfillment flag indicates that only partial fulfillment has been achieved, this indicates that a substitute can be used only if the original need quantity (before netting out/ manufacturing / purchasing the original subordinate) can be fully satisfied from inventory/ replenishment of that substitute alone. If the original need quantity is not fully nettable / replenishable using the substitute, this substitute wiU not be used. If no substitute can be found for the subordinate SKU that can fully satisfy the original need quantity (subordinate need quantity) even after trying multi-level substitution, the substitution is not feasible.
- the fulfillment mode flag provides fulfillment functionaHty and governs the netting / replenishment behavior as the substitution function searches across multiple substitutes. There are two allowable settings for this flag: "net across all substitutes before replenishing any" and "net and replenish according to the priority of the substitutes.”
- the manner in which the fulfillment mode flag influences the behavior of the planning process may be explained by the foUowing example.
- SKUs A, B and C are configured as substitutes for subordinate SKU ⁇ . A is preferred over B and B is preferred over C.
- the substitute need quantity is 50 and the original need quantity is 80 (indicating that 30 units were fulfiUed using inventory/ replenishment of subordinate SKU 'X'.
- the on-hand inventory positions for SKUs A, B and C is as follows:
- SKU C 10 units Further, there are no more scheduled receipts anywhere in the horizon for SKUs A, B and C and that the partial fulfiUment flag is set to YES. Based on the above example, if the fulfillment mode flag is set to "net across all substitutes before replenishing any," the manner in which the substitution function fulfils the substitute need quantity may be as follows:
- the manner in which the substitution function fulfils the substitute need quantity may be as follows:
- the "use until exhaust” flag may be used to determine which source the replenishment may be sourced from. If this flag is set to ES', no new planned order will be created for the primary (subordinate) before exhausting aU the substitution options. This flag is set to YES if there is a desire to minimize the tendency to make any new replenishments for the subordinate. In other words, if this flag is set to YES', the behavior of the algorithm may be as follows:
- substitution process will attempt to fulfill this need by exhausting aU possible substitutes for the subordinate (including multi-level substitutes, if configured).
- the substitution process cannot completely fulfill the remaining quantity, attempt to replenish the subordinate by creating a planned order for the subordinate for the quantity that was stiU left after substitution.
- the "multi-level substitution" flag directs the substitution process to use recursive techniques. If the multi-level substitution flag is set to YES', the ABP system may try to fulfill the substitute need quantity by caUing the substitution process in a recursive fashion. If this flag is configured (i.e., set), the substitution process may look for substitutes of substitutes, or substitutes of substitutes, which are substitutes of other substitutes, and so forth.
- the ABP system 100 may seek out potential scheduling opportunity for each resource on the list of admissible resources generated in Step 410 of FIG. 4. As discussed above, the system 100 may iterate through the list of locations for a given order. At every location, the system 100 may iterate through the Hst of admissible resources, evaluating potential scheduling opportunities as the list is being iterated. An order may be finally scheduled using the best scheduHng opportunity across all the resource-location combinations that the system 100 has iterated through.
- the system 100 wUl preferably first identify a potential scheduling opportunity on the resource.
- a potential scheduling opportunity may be defined as a bucket in time that satisfies all the constraints applicable to the order. In other words, the order can be scheduled in that bucket without violating any constraint.
- the potential scheduling opportunity on any given resource is a function of three different entities, material availability, resource capacity constraints and auxiliary constraints.
- the primary resource determines whether there is enough capacity to make or not to make the needed quantity. This is modeled at the finest granularity (for example at the day level).
- the auxiliary resources may also be required. These cannot be modeled at a lower level of granularity than the primary resource. All resources and material associated with an order must be simultaneously feasible.
- the resource capacity constraint is generaUy the most fundamental constraint associated with resources. Typically, every resource wiU expHcitly have a capacity constraint associated with it. Any order that is scheduled on a resource will be checked against the resource capacity constraint. Also, it may be assumed that the time buckets on the capacity constraint have the finest granularity.
- a capacity calendar may be created and associated with a resource or several resources via, for example, a resource group.
- auxUiary constraints are "abstract" constraints that may or may not apply to a given order.
- auxiliary constraints may be implemented with Boolean triggers, which define the applicability of the constraint to the order.
- orders are checked for feasibiHty with respect to other constraints.
- auxUiary constraints are triggered by presence or absence of attributes (or combination of attributes).
- An example of an auxiliary constraint is: Number of Red Cars with Sunroofs ⁇ 100
- specified entities may be "tied" together.
- the three entities are a SAD group, a resource or a resource group and a calendar of maximums.
- the three entities are a SAD group, a resource or a resource group and a calendar of maximums.
- the three entities are a SAD group, a resource or a resource group and a calendar of maximums.
- An auxUiary constraint can be specific to a resource, specific to a resource group or global. If the constraint is specific to a resource, the constraint applies only when an attempt is made to schedule the order on that resource. If the constraint is global, the constraint appHes regardless of which resource the order is being scheduled on. In the example above, the constraint is specific to aU resources based at Atlanta. In implementing an auxUiary constraint, a calendar that is associated with a constraint may be created.
- Each constraint may have a mechanism for specifying how much of the capacity of one of its states (buckets) will be used by an order if that order is scheduled in that state (bucket).
- Buckets states
- Case 1 (qty) Decrement the capacity of the bucket by the required quantity on the order. In this case, always decrement the quantity of the order. For instance, if five cars are needed, then decrement by five. Used for the constraints concerning the number of aUowable units.
- Case2 (1) Decrement the capacity of the bucket by one unit for each order. In this case, always decrement 1 for an order. Used for constraints limiting the total number of orders allowed as opposed to the quantity being produced.
- Case 3 (UDA) Lookup a configured numerically valued attribute of the order / item / SKU and decrement the capacity of the bucket by the value of the order / item / SKU attribute. In this case, use the value in a User Defined Attribute ("UDA") to determine how much to decrement.
- UDA User Defined Attribute
- a user wants to constrain the total order quantity and another attribute modeled externaUy at the same time. For example, assume that a shipping company is Hmited to how units can be shipped on a vehicle, and also desires to constrain the total weight of the shipment. In this case, one could put the total weight of the order in a UDA.
- Case 4 (UDA*qty) Lookup an order/ item / SKU attribute value and decrementing zero against the capacity if the value is distinct from the values for that attribute on orders previously scheduled in the state, and decrementing one otherwise.
- a factory that is limited to how many vehicles can be produced in a day, and also constraining on the number of hours it takes to make a car.
- Case 5 (set) Lookup an order attribute value and determining if this value was present in orders in the previous (or next) states; decrement one unit if the attribute value is not present in the previous (or next) state and decrement zero otherwise. Decrement 1 if the SKU/attribute value is not in the bucket already, otherwise decrement 0. Typically used to limit the number of types of things that can be done in a bucket.
- Case 7 (offs) Decrement 1 if the SKU/attribute value is in the previous bucket but is not in the current bucket and decrement 0 otherwise. Typically used to constrain how many types of things can be removed when moving from bucket to bucket.
- FIG. 15A is a flow process 1500 for determining constraint feasibUity (generally represented by step 414 of FIG. 4).
- the constraint feasibUity flow process 1500 attempts to find a bucket on the capacity constraint in which the order is feasible across all constraints (capacity and auxUiary) that apply to it.
- the process 1500 is based on the fact that several parameters are known prior to implementing the process. For instance, the required quantity of the order to be manufactured and the material available date for the order are assumed to be available from previous steps. Also, as a result of the previous steps, the scheduling interval for the order is known.
- the process 1500 begins at step 1502 when a set of constraints that apply to the order being planned is determined.
- the set of constraints that apply to the order include the capacity and auxUiary constraints for the resource[s].
- determine the effective scheduling interval In other words, narrow the valid scheduling interval using the earHest material availabUity of the configuration.
- placed is used because the order is not scheduled yet.
- the resource on which the current attempt to place the order into is just one of the resources in the set of admissible resources.
- an order placement evaluation process which is described below, is used to evaluate the scheduling opportunity (placement) on the current resource. The order is scheduled only after the best scheduling opportunity is found.
- the process skips the rest of the steps in the constraint feasibUity process 1500 and goes directly to the order placement evaluation step at step 421. If there is no frozen SAD group that describes the order then determine the scheduling control for the order at step 1512.
- search for a feasible bucket At step 1514, search for a feasible bucket. In step 1504 of FIG. 15A, a determination was made to determine the effective scheduling interval.
- the scheduling interval may be defined by the intersection of one or more time intervals.
- the time intervals will depend upon various factors associated with the order. At least four types of effective scheduling intervals are possible. Referring to FIG. 15B, which is a process for determining an effective scheduling interval based on certain parameters.
- step 1522 determine whether there is an effective need date. For example, did the step 402 (of FIG. 4) yield a non- NULL effective need date? If so, then an effective need date is present and the process moves to step 1524.
- step 1524 determine whether maximum earliness ("ME") and maximum lateness ("ML”) are NULL. If both are NULL then the effective scheduling interval is intersection A. Intersection A is defined as the intersection of the following intervals:
- Intersection B is defined as the intersection of the following intervals:
- Intersection C is defined as the intersection of the following intervals:
- Intersection D is defined as the intersection of the following intervals:
- step 1512 the scheduling control for the order is determined.
- Scheduling controls affect the manner in which the search for a feasible bucket is conducted by the process.
- Four types of scheduling controls or goals may be supported by the process, forward, backward, just-in-time (“JIT”), and "do not schedule.”
- JIT just-in-time
- FIG. 15C which is a timeline 1550 iUustrating the forward scheduling control concept.
- the relevant points of time are start date of the effective scheduling interval ("SDESI") 1552, the effective need date 1554 and the end date of the effective scheduling interval ("EDESI").
- SDESI effective scheduling interval
- EDESI end date of the effective scheduling interval
- the timeline moves from the left side (earHer time periods) to the right side (later time periods).
- FIG. 15D is a timeline 1560 that Ulustrates the backward control concept.
- FIGS. 15E and 15F are timelines 1570 and 1580 that iUustrate two different cases of JIT scheduHng control concept. In the first case FIG. 15E, the order has an effective need date 1574.
- FIG. 15F is a timeHne 1580 that illustrates the second JIT case in which the order has no effective need date.
- the system begins looking for a feasible bucket by looking first at the bucket on the capacity constraint in which the SDESI 1582 falls and proceeds to search for a feasible bucket (that satisfies the capacity constraint and all applicable auxUiary constraints) in the forward direction.
- the order is placed in the first bucket that satisfies aU the constraints. If a feasible bucket is not found in the interval between the SDESI 1582 and EDESI 1584, then the order fails to schedule.
- the determination of the scheduling control to be applied to the order will typically be based on user preferences. For example, to reduce storage costs, many manufacturers prefer JIT approaches. Alternatively, some users may use more than one type of control depending upon the situation.
- a search is made for a feasible bucket.
- a feasible bucket which the order can be placed, may be determined based on the scheduHng control and other factors described above such as resource constraints.
- the ABP system 100 places the order in a bucket only after ensuring feasibility across all constraints (capacity and applicable auxiliary).
- the search behavior may be guided by te4h scheduling control applicable to the order. While there are several mechanisms available for searching across all the buckets in the scheduling interval, the mechanism adopted should lavishUy emphasize speed.
- the basic principles behind this approach are as follows.
- the resource capacity constraint is used as the "anchor constraint" in the search mechanism. It may be assumed that the capacity constraint has the finest granularity among all constraints.
- the process may begin by checking for capacity in a desired bucket on the capacity constraint. Several rules may determine which buckets will be the desired buckets.
- the first auxUiary constraint may be reviewed to check for feasibility (such a movement across constraint may be termed a "vertical move"). If sufficient capacity is available for the first auxiliary constraint, a "vertical move" may be made to the second auxiliary constraint. SimUarly, if sufficient capacity is available for the second auxiliary constraint, a vertical move may be made to a third auxiliary constraint. These vertical move steps may then, of course, continue repeat with other auxiliary constraints.
- a search may be made either backward or forward (depending on the scheduling control and the bucket that is being looked at) across multiple buckets on the constraint. This may be done until a bucket on the constraint that satisfies the required quantity on the order is found. Such a movement across multiple buckets on a single constraint is called a "lateral move.” There are various rules that may apply to both lateral and vertical moves.
- the capacity constraint Whenever there is a lateral move on an auxiliary constraint, in order to find a feasible bucket, the capacity constraint must be rechecked again. For example, whenever there is a "lateral move" on an auxUiary constraint in order to find a feasible bucket , the capacity constraint is preferably rechecked again.
- the system "vertically move” to the capacity constraint, “laterally move” on the capacity constraint if necessary, vertically move to the first "auxiliary constraint”, laterally move on the first auxUiary constraint if necessary, “verticaUy move” to the capacity constraint again if there was a "lateral movement" on the first auxUiary, and so forth.
- the search generally comprises a combination of "vertical moves” across constraints and “lateral moves” across buckets on a constraint. The search continues until one of the two conditions are satisfied:
- a feasible bucket on the capacity constraint that satisfies aU the auxiliary constraints is found.
- the order may be placed in the feasible bucket that was found and proceed to the order placement evaluation step.
- the following example is provided illustrating the above concepts.
- an attempt is made to schedule an order on resource RI.
- the order has the following characteristics: ⁇ Effective Need Date : Day 3 of Week 6
- FIG. 16 is a block diagram 1600 that is a visual representation of an exemplary search process for finding a satisfactory time bucket based on the characteristics and constraints listed above.
- the diagram 1600 consists of three rows 1602 to 1606 of constraints divided into weekly time periods represented by boxes.
- the three constraints represented are capacity constraint 1602, and two auxUiary constraints, constraint A 1604 and constraint B 1606.
- the weekly time periods 1607 represents buckets.
- the top row 1602 represents the available quantities (i.e., capacities) under capacity constraint for each week (as represented by the number within each box).
- the middle row 1604 represents the avaUable quantities (i.e., capacities) under constraint A for each week.
- the bottom row 1606 represents the available quantities (i.e., capacities) under constraint B for each week.
- the need date faUs in the middle of week 6 as indicated by 1608.
- Box 1622 represents the capacity of constraint A in week 6.
- the vertical move is made to determine whether the capacity of constraint A is sufficient. In this case, the capacity of box 1622 is zero. Therefore, the capacity of constraint A is not satisfactory and the system "horizontally moves" to earlier buckets to locate a bucket having sufficient capacity.
- the time bucket for week 5 is also not satisfactory since the capacity for constraint A in week five, as indicated in box 1623, is zero. In this example, the system finds that the capacity of box 1624, which represents the capacity of constraint A in week four, is sufficient.
- the system must return to the base constraint (i.e., capacity constraint) and review the capacity for week four of the capacity constraint.
- the system vertically moves to fox 1626 to determine whether the capacity of the capacity constraint in week four is sufficient. In this case, there is sufficient capacity in box 1626 (as indicated by quantity "1" in box 1626). Therefore, the system goes through box 1624 to recheck and see if the capacity for constraint A in week 4 is sufficient (which it estabhshed earlier). Alternatively, the step of rechecking the capacity of box 1624 may be disregarded since the capacity of box 1624 was already determined to be satisfactory.
- the system then vertically moves on to box 1628 to determine if the capacity of constraint B in week four is sufficient. Since, the capacity of week four for constraint B is zero, the system must move to another bucket in the bottom row. However, because the effective scheduling interval 1610 ends on week 4, the system may not move to an earlier bucket. Therefore, it must move to the right or to later time buckets.
- the system then skips weeks five and six (boxes 1630 and 1632) since it found that the capacities for constraint A in those weeks were insufficient (as shown in boxes 1622 and 1623). Week 7's capacity for constraint B, however, is sufficient as indicated by box 1634. The system then moves back to capacity constraint to determine if the capacity for capacity constraint in week 7 is sufficient.
- Box 1636 which is the capacity for capacity constraint in week seven, indicates that there is zero capacity for capacity constraint for that bucket. Therefore, the system moves to the next (later) bucket.
- the system determines that the capacity of capacity constraint for week eight is satisfactory. Therefore, the system moves down to box 1640, which represents the capacity of constraint A for week 8 and determines that that capacity has also been satisfied.
- the system then moves down to box 1650, which represents capacity of constraint B for week 8, and finds that that capacity is also satisfactory.
- all three constraints 1602 to 1606 are satisfactory in week 8 and the search ends.
- a desired bucket is the bucket that is most desirable. Therefore, in most situations, it is the first bucket to be checked for feasibility (in the above example, it was the bucket for week 6).
- the identity of the desired bucket will depend upon several factors such as scheduling control.
- the desired bucket wiU be the bucket containing the effective need date of the order if the scheduling control is JIT and if the order has a non- NULL effective need date as demonstrated above.
- the desired bucket will be the bucket containing the start date of the effective scheduling date if the scheduling control is set at "forward" or if the scheduling control is Jit and the order has no effective need date.
- the desired bucket will be the bucket containing the end date of the effective scheduling interval if the scheduling control is backward.
- the ABP system 100 checks the material capacity compatibility. This means that the system 100 rechecks the feasibUity of the configuration/resource bucket opportunity by recursively creating any necessary scheduled receipts for the finished good SKUs and its subordinates.
- the receipts are use to order material for the replenishment steps of the planning process.
- the receipts for the finished good SKU should preferably be created at the beginning of the bucket for which manufacturing capacity is found. For subordinate
- the scheduled receipts should be pushed backward based on the lead-time of the parent SKUs. If, for any SKU, more quantity needs to be ordered in a bucket than the period maximum for the SKU, scheduled receipts are created for the previous bucket. There should be at least one period or set of periods where the material can be ordered because of the period maximum check performed during the material feasibUity step. If the minimum/increment/maximum rules cause material to be non-feasible here then the configuration/resource/bucket combination wUl also be non-feasible. In such a case, the system 100 will continue to the next configuration.
- the configuration is non-feasible.
- the process may then continue to the next configuration.
- the ABP system 100 evaluates each bucket/resource opportunity for the FG SKU and selects the best bucket/resource combination (as depicted in step 422). This may be generally accomplished by grading each opportunity and selecting the opportunity with the best grade.
- the multi-level objective function wUl be defined.
- An objective function computes a vector (or a grade) whose entries are the grades for each level of the objective. At each level, the grade is a weighted sum of grades given by the metrics.
- a metric table may be created and used to define each of the metrics. The table may further define thresholds for each level of the objective, and tolerances to determine whether two different grades at a given level should be considered equal. Once the table has been established, the resource/bucket opportunity may be graded using the multi-level objective function.
- the ABP system 100 preferably incorporates a multi-level objective function to determine the best placement for an order. If the ABP system 100 finds multiple opportunities for planning an order, the objective function is used to measure each opportunity and choose the best one. Each opportunity may be graded based on each object of the multilevel object function.
- An objective function is made up of a set of metrics. At least three metrics are available, Lateness (a measure of where the order was planned versus the effective need date for the order), total use (a measure of how full the bucket on the capacity constraint in which the order is planned), and transportation (the transportation cost between the location of the resource on which the order is manufactured and the customer location on the order).
- the metrics that make up an objective may be grouped into tiers, or levels.
- Each metric within a level may be weighted.
- An objective may use one or more metrics. For example, to model a business practice of minimizing the number of late orders, an objective made up of just the lateness metric would be appropriate. The lateness metric would be a level one metric with a weight of one. A more sophisticated object might be to minimize the number of late orders and if an order can be made on more than one resource and the lateness metric is the same for each resource, pick the resource that minimizes the transportation cost to the customer location. To model this business practice, an objective with two metrics and two levels can be created. The lateness metric is a level one metric. The transportation metric is a level two metric.
- a tolerance can be defined for each level of the objective. The tolerance for a level is used when comparing objectives. If the difference of the two numbers being compared is less than the tolerance, the numbers are considered to be equal. For instance, the primary metric of an objective is transportation cost, but if the cost of producing an order at one location versus another is within ten dollars, use a lateness metric to choose the best location.
- a grade which is a vector, is computed by the objective.
- Each element of the vector is a weighted-sum of the grades computed by the metrics for a single tier.
- Two vector grades are compared element-by-element. The first pair of elements is compared. If they are equal (within a defined tolerance for that tier) the next pair of elements is compared. And so forth. If they are not equal, the element that is lower is considered better and the subsequent tiers are not checked.
- the process 400 may repeat the steps of evaluating each bucket/resource opportunities at each of the other acceptable locations if there are any at step 424. If there are no more acceptable locations then the process selects the best location/resource/bucket opportunity at step 426 and assigns the order to that opportunity at step 428. The process 400 then determines whether there is any more unscheduled order at step 430. If there are more unscheduled orders, then the next highest priority unscheduled order is selected and the process of evaluating and selecting the best location/resource/bucket opportunity for that order is repeated. If, however, there are no more orders to plan then the process 400 ends.
- FIG. 17 is a block diagram depicting the
- the system 1700 may include a computer device such as personal computers, workstations, servers or any other devices having a microprocessor.
- the system 1700 may include a database 1701 which may comprise of a number of tables including a temporary table for unplanned orders, BOMs, configurations, orders, and the like, and may include a transportation matrix.
- the system 1700 receives inputs from user[s] 1702 and generates planning outputs.
- the system 1700 may comprise a number of modules 1704 to 1722 to provide a number of functionalities.
- the system 1700 may include a window manager module 1704 for managing an order window.
- the module 1704 may be use to organize and manage the order window.
- window manager module 1704 may select the orders that are to be placed in to a window and prioritize those orders in the window. It may then be used to select the highest priority order for planning purposes.
- the SKU module 1706 may be used to organize, maintain, process and manage SKUs.
- the BOM, configuration and SAD group modules 1708 to 1712 are used to create, process and manage BOMs, configurations and SAD groups.
- the model module 1714 is used to create and manage models, which may be defined by the network resources, constraints and business rules,, time buckets, and the like.
- the time/sequencing module 1716 may be used to create timehnes and determine, process and manage timing events and time items.
- the evaluation module 1718 is used to evaluate and selecting various alternatives that may arise during the process according to the present invention. For example, the module 1718 may evaluate alternative opportunities, to evaluate alternative configurations, and the like.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Applications Claiming Priority (13)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US287775 | 1994-08-09 | ||
US34240401P | 2001-12-27 | 2001-12-27 | |
US342404P | 2001-12-27 | ||
US37724302P | 2002-05-03 | 2002-05-03 | |
US377243P | 2002-05-03 | ||
US10/287,773 US20030149631A1 (en) | 2001-12-27 | 2002-11-05 | System and method for order planning with attribute based planning |
US10/287,775 US7539630B2 (en) | 2001-12-27 | 2002-11-05 | System, method, and computer program for replenishment by manufacture with attribute based planning |
US287805 | 2002-11-05 | ||
US10/287,788 US6898472B2 (en) | 2001-12-27 | 2002-11-05 | System and method for order group planning with attribute based planning |
US287788 | 2002-11-05 | ||
US287773 | 2002-11-05 | ||
US10/287,805 US6885902B2 (en) | 2001-12-27 | 2002-11-05 | System and method for replenishment by purchase with attribute based planning |
PCT/US2002/041508 WO2003058541A1 (en) | 2001-12-27 | 2002-12-27 | System and method for order group planning |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1468390A1 true EP1468390A1 (en) | 2004-10-20 |
EP1468390A4 EP1468390A4 (en) | 2005-10-26 |
Family
ID=27559592
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP02806241A Withdrawn EP1468391A4 (en) | 2001-12-27 | 2002-12-27 | System and method for order planning |
EP02806238A Withdrawn EP1468390A4 (en) | 2001-12-27 | 2002-12-27 | System and method for order group planning |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP02806241A Withdrawn EP1468391A4 (en) | 2001-12-27 | 2002-12-27 | System and method for order planning |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP1468391A4 (en) |
AU (2) | AU2002357385A1 (en) |
TW (1) | TW200305088A (en) |
WO (2) | WO2003058541A1 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7539630B2 (en) | 2001-12-27 | 2009-05-26 | Jda Software Group | System, method, and computer program for replenishment by manufacture with attribute based planning |
US7516095B1 (en) | 2007-10-12 | 2009-04-07 | Advisor Software, Inc. | Stochastic control system and method for multi-period consumption |
US10325063B2 (en) | 2016-01-19 | 2019-06-18 | Ford Motor Company | Multi-valued decision diagram feature state determination |
CN111582781B (en) * | 2020-04-24 | 2023-04-28 | 清华大学深圳国际研究生院 | Method for distributing goods shelves according to replenishment orders and computer readable storage medium |
CN113298336B (en) * | 2020-08-21 | 2024-09-13 | 阿里巴巴(中国)网络技术有限公司 | Resource scheduling information determining method and device |
TWI776711B (en) * | 2021-10-18 | 2022-09-01 | 樂樂國際資訊有限公司 | System, method, and computer program product for managing group-purchase orders |
CN115187180B (en) * | 2022-09-09 | 2023-01-20 | 荣耀终端有限公司 | Material data processing method and electronic equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0282697A2 (en) * | 1987-01-20 | 1988-09-21 | R.J. Reynolds Tobacco Company | Computer integrated manufacturing system |
US5233533A (en) * | 1989-12-19 | 1993-08-03 | Symmetrix, Inc. | Scheduling method and apparatus |
EP0770967A2 (en) * | 1995-10-26 | 1997-05-02 | Koninklijke Philips Electronics N.V. | Decision support system for the management of an agile supply chain |
EP1107147A2 (en) * | 1999-12-06 | 2001-06-13 | Toyota Jidosha Kabushiki Kaisha | Demand-production scheme planning apparatus and storage medium |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5369570A (en) * | 1991-11-14 | 1994-11-29 | Parad; Harvey A. | Method and system for continuous integrated resource management |
US5787000A (en) * | 1994-05-27 | 1998-07-28 | Lilly Software Associates, Inc. | Method and apparatus for scheduling work orders in a manufacturing process |
US5819232A (en) * | 1996-03-22 | 1998-10-06 | E. I. Du Pont De Nemours And Company | Method and apparatus for inventory control of a manufacturing or distribution process |
US6064982A (en) * | 1997-11-12 | 2000-05-16 | Netscape Communication Corporation | Smart configurator |
-
2002
- 2002-12-27 AU AU2002357385A patent/AU2002357385A1/en not_active Abandoned
- 2002-12-27 EP EP02806241A patent/EP1468391A4/en not_active Withdrawn
- 2002-12-27 WO PCT/US2002/041508 patent/WO2003058541A1/en not_active Application Discontinuation
- 2002-12-27 TW TW091137686A patent/TW200305088A/en unknown
- 2002-12-27 AU AU2002367254A patent/AU2002367254A1/en not_active Abandoned
- 2002-12-27 WO PCT/US2002/041573 patent/WO2003058542A1/en not_active Application Discontinuation
- 2002-12-27 EP EP02806238A patent/EP1468390A4/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0282697A2 (en) * | 1987-01-20 | 1988-09-21 | R.J. Reynolds Tobacco Company | Computer integrated manufacturing system |
US5233533A (en) * | 1989-12-19 | 1993-08-03 | Symmetrix, Inc. | Scheduling method and apparatus |
EP0770967A2 (en) * | 1995-10-26 | 1997-05-02 | Koninklijke Philips Electronics N.V. | Decision support system for the management of an agile supply chain |
EP1107147A2 (en) * | 1999-12-06 | 2001-06-13 | Toyota Jidosha Kabushiki Kaisha | Demand-production scheme planning apparatus and storage medium |
Non-Patent Citations (2)
Title |
---|
LINNER A: "RECHNEREINSATZ IN DER PRODUKTIONSPLANUNG UND -STEUERUNG. COMPUTER APPLICATION IN PRODUCTION PLANING AND PRODUCTION CONTROL" ELEKTRONISCHE RECHENANLAGEN - MIT COMPUTER PRAXIS, OLDENBOURG VERLAG. MUNCHEN, DE, vol. 27, no. 3, June 1985 (1985-06), pages 148-152,154, XP000715987 * |
See also references of WO03058541A1 * |
Also Published As
Publication number | Publication date |
---|---|
EP1468391A4 (en) | 2005-10-26 |
AU2002357385A1 (en) | 2003-07-24 |
EP1468390A4 (en) | 2005-10-26 |
TW200305088A (en) | 2003-10-16 |
EP1468391A1 (en) | 2004-10-20 |
AU2002367254A1 (en) | 2003-07-24 |
WO2003058541A1 (en) | 2003-07-17 |
WO2003058542A1 (en) | 2003-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6898472B2 (en) | System and method for order group planning with attribute based planning | |
US6885902B2 (en) | System and method for replenishment by purchase with attribute based planning | |
US7539630B2 (en) | System, method, and computer program for replenishment by manufacture with attribute based planning | |
US20030149631A1 (en) | System and method for order planning with attribute based planning | |
US7668761B2 (en) | System and method for ensuring order fulfillment | |
US7058587B1 (en) | System and method for allocating the supply of critical material components and manufacturing capacity | |
Ball et al. | Available to promise | |
US5963919A (en) | Inventory management strategy evaluation system and method | |
US20030229550A1 (en) | System and method for planning and ordering components for a configure-to-order manufacturing process | |
Baker et al. | The effect of commonality on safety stock in a simple inventory model | |
Swaminathan et al. | Modeling supply chain dynamics: A multiagent approach | |
US20040030428A1 (en) | System and method for scheduling and sequencing supply chain resources | |
US6934594B2 (en) | System for determining carrier service using logistics considerations | |
US20060277086A1 (en) | System and method for optimization-based production capability planning | |
US20030233264A1 (en) | Manufacturing order scheduling and materials replenishment system | |
Gagliardi et al. | Space allocation and stock replenishment synchronization in a distribution center | |
JP2004537772A (en) | System and method for allocating supply of critical material components and manufacturing capacity | |
Shaw et al. | A case study of integrating knowledge management into the supply chain management process | |
US20050015288A1 (en) | Dynamic logistics routing system | |
WO2003058541A1 (en) | System and method for order group planning | |
Van Wingerden | System-focused spare parts management for capital goods | |
US20240353820A1 (en) | System and Method of Managing Complexity in Factory Planning | |
Umeda et al. | Integrated supply chain simulation system (ISSS)-modeling requirements and design issues | |
Nataraja et al. | Simulation of allocation policies for a serial inventory system under advance demand information | |
Glaeser et al. | Multi-resource balancing: a case of a German kitchen manufacturer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20040726 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1065872 Country of ref document: HK |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: SOMAN, SUNIL Inventor name: CRAMPTON, MYRICK |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20050914 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: 7G 06F 17/60 A |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20051208 |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: WD Ref document number: 1065872 Country of ref document: HK |