EP1149950A1 - Load bearing structure for a railway - Google Patents

Load bearing structure for a railway Download PDF

Info

Publication number
EP1149950A1
EP1149950A1 EP01109706A EP01109706A EP1149950A1 EP 1149950 A1 EP1149950 A1 EP 1149950A1 EP 01109706 A EP01109706 A EP 01109706A EP 01109706 A EP01109706 A EP 01109706A EP 1149950 A1 EP1149950 A1 EP 1149950A1
Authority
EP
European Patent Office
Prior art keywords
ballast
load bearing
coagulant
bearing structure
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP01109706A
Other languages
German (de)
French (fr)
Inventor
Barry Puckey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Transportation Germany GmbH
Original Assignee
Bombardier Transportation GmbH
DaimlerChrysler Rail Systems GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB0010260A external-priority patent/GB0010260D0/en
Application filed by Bombardier Transportation GmbH, DaimlerChrysler Rail Systems GmbH filed Critical Bombardier Transportation GmbH
Publication of EP1149950A1 publication Critical patent/EP1149950A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers

Definitions

  • the invention relates to a load bearing structure for railways comprising ballast and a coagulant for binding the ballast to form a cohesive mass.
  • rail systems typically comprise a track supported on a ballast bed together with various trackside equipment such as signals, location boxes, trackside buildings and the like.
  • various trackside equipment such as signals, location boxes, trackside buildings and the like.
  • various communication cables will run buried underground adjacent to the tracks.
  • CAT scan is required to see if there is a cable present which might be damaged.
  • the industry standard requires that a fresh CAT scan be made every 15cm of depth, so that several separate scans are required at each location.
  • the present invention seeks to provide a load bearing structure and a method for making this, which is quicker and cheaper to install than the presently used methods.
  • a load bearing structure for railways comprising ballast and a coagulant adapted to bind the ballast, wherein the coagulant is an elastomeric dispersion, which dispersion is added to the ballast in situ, such that the ballast and coagulant form a cohesive mass.
  • the coagulant is added to ballast adjacent to a railway track. In an alternative embodiment, the coagulant is added to the ballast in the region of a set of points.
  • the cohesive mass preferably has a load bearing capacity of 0.5 tons per square foot or more.
  • the coagulant is a polyurethane foam.
  • the invention provides the advantage over the known solutions that it is quick and easy to install as the coagulant can cure typically in less than 30 minutes.
  • the ballast can be poured over the existing trackside, if it is not already present, the need to dig foundations and hence carry out CAT scans is obviated.
  • Figure 1 shows a pair of rails 1,2 supported on a sleeper 2 on a ballast bed 3. Adjacent to the track at a typical distance of 2 m are a plurality of handrails separating the trackside equipment from the rails. Adjacent to the rails on the side remote from the track is shown by way of example some cable routing 4, location case 5 on a firm standage 6 and a signal 7. In general the standage will be made from a combination of pre-cast concrete and site poured concrete as outlined above.
  • FIG 2a and 2b show a schematic longitudinal cross-section through a track bed for a jointed rail and a continuous rail respective.
  • the standard ballast 10 arrangement for each type of bed is shown in solid profile.
  • additional ballast 11 is the spread adjacent to the conventional ballast 10, which is protected by shutters 12 and 13.
  • this is shown as having a level which is substantially parallel to the conventional track bed, whereas in figure 2b, it is slightly below the raised edge of the ballast.
  • the amount of additional ballast used is dependent on the requirements of the trackside equipment to be supported but in general no excavations will be necessary.
  • a coagulant such as polyurethane foam
  • polyurethane foam is then poured over the additional ballast 11 in the area to form the load bearing structure.
  • polyurethane foam is then poured over the additional ballast 11 in the area to form the load bearing structure.
  • about 25kg of polyurethane is poured over an area of 4 square feet, to a depth of 2 feet such as would used to support a signal.
  • the polyurethane has a curing time of about one hour, so that the signal can be installed shortly after the load bearing structure has been prepared and formed.
  • any coagulating foam which when combined with the ballast achieves a load bearing capacity of in the region of 1 ⁇ 2 ton per square foot would be suitable.
  • Figure 3 shows a particularly preferred embodiment of the load bearing structure for supporting a signal in which first and second cantilevers 20, 21 are fixed to sleepers 22,23.
  • the first and second cantilevers 20, 21 meet a point remote from the original track bed.
  • the space between and around the cantilevers is covered with additional ballast and then coagulant is poured over the additional ballast to form the load bearing structure.
  • the signal is then installed at the point where the cantilevers meet.
  • a single cantilever extending parallel from a sleeper could be used. This particular embodiment has the additional advantage that the track will be stabilised by the load bearing structure.
  • Figure 4 shows a schematic plan view of a set of points 30 on a bed of ballast.
  • a particular problem with points on curved section of track is that the momentum of the train will tend to try to bend the track straight leading to slight warping of the rails. Over time this leads to a points failure as the points are gradually shifted out of position with respect to the other rails.
  • Coagulant foam is poured over the ballast in the region of points and allowed to cure. Due to the elasticity provided by the elastomeric polyurethane coagulant, the track will be stabilised and the load bearing structure will provide a damping effect on vibrations and any rail movements. To minimise the drainage problems that the coagulant will cause, a small channel can be left in the centre of the ballast bed so that water can drain away.
  • Suitable polyurethane foams include foams formed from a mixture of polyether polyols and polyether/polyester polyols using amine catalysts, such as those sold under the Eviromould and Envirofoam trade marks.
  • Other possible foams include diphenylmethane diisocyanate based foams.
  • the structure has been described as suitable for providing support for railway trackside equipment, it is envisaged that the structure could also be used for certain conventional building foundations.
  • the structure can act as a vibration dampener for certain bridge and gantry foundation systems, in particular for metal beam type structures.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)

Abstract

A load bearing structure for railways comprising ballast and a coagulant adapted to bind the ballast, wherein the coagulant is an elastomeric dispersion, such as polyurethane foam, which dispersion is added to the ballast in situ, such that the ballast and coagulant form a cohesive mass.

Description

  • The invention relates to a load bearing structure for railways comprising ballast and a coagulant for binding the ballast to form a cohesive mass.
  • As is generally well known, rail systems typically comprise a track supported on a ballast bed together with various trackside equipment such as signals, location boxes, trackside buildings and the like. Typically various communication cables will run buried underground adjacent to the tracks. As such communication cables are vital to running the railway, before any digging can be carried out a CAT scan is required to see if there is a cable present which might be damaged. The industry standard requires that a fresh CAT scan be made every 15cm of depth, so that several separate scans are required at each location.
  • The most commonly used system for installing signals and other trackside equipment involves building solid foundations using pre-cast concrete, which is sectionalised and assembled on site and then pouring concrete prepared on site onto this pre-cast concrete. Whilst this approach has proved satisfactory over many decades, it is slow as it requires a great deal of manpower and expensive as it can also cause disruption to railway operations. A return visit must be made to complete the installation once the concrete has cured after 7 to 14 days.
  • Various alternative proposals have been made involving the use of special preformed substructures but these are impractical for most existing rail systems on cost grounds alone and only really suitable for new routes.
  • The present invention seeks to provide a load bearing structure and a method for making this, which is quicker and cheaper to install than the presently used methods.
  • According to the invention there is provided a load bearing structure for railways comprising ballast and a coagulant adapted to bind the ballast, wherein the coagulant is an elastomeric dispersion, which dispersion is added to the ballast in situ, such that the ballast and coagulant form a cohesive mass.
  • In a preferred embodiment, the coagulant is added to ballast adjacent to a railway track. In an alternative embodiment, the coagulant is added to the ballast in the region of a set of points. The cohesive mass preferably has a load bearing capacity of 0.5 tons per square foot or more. Preferably the coagulant is a polyurethane foam.
  • The invention provides the advantage over the known solutions that it is quick and easy to install as the coagulant can cure typically in less than 30 minutes. As the ballast can be poured over the existing trackside, if it is not already present, the need to dig foundations and hence carry out CAT scans is obviated. By overcoming the requirement to dig conventional foundations, it also becomes possible to install new signals in places where previously land owners permission would have been required.
  • Exemplary embodiments of the invention will now be described in greater detail with reference to the drawings in which:
  • Figure 1 shows a typical layout for trackside equipment;
  • Figure 2a shows a schematic longitudinal cross-section through a part of a railway track bed for jointed track;
  • Figure 2b shows a schematic longitudinal cross-section through a part of a railway track bed for a continuous rail track;
  • Figure 3 shows a schematic plan view of a part of railway track;
  • Figure 4 shows a schematic plan view of a set of points;
  • Figure 1 shows a pair of rails 1,2 supported on a sleeper 2 on a ballast bed 3. Adjacent to the track at a typical distance of 2 m are a plurality of handrails separating the trackside equipment from the rails. Adjacent to the rails on the side remote from the track is shown by way of example some cable routing 4, location case 5 on a firm standage 6 and a signal 7. In general the standage will be made from a combination of pre-cast concrete and site poured concrete as outlined above.
  • Figure 2a and 2b show a schematic longitudinal cross-section through a track bed for a jointed rail and a continuous rail respective. The standard ballast 10 arrangement for each type of bed is shown in solid profile. According to an aspect of the invention, additional ballast 11 is the spread adjacent to the conventional ballast 10, which is protected by shutters 12 and 13. In figure 2a this is shown as having a level which is substantially parallel to the conventional track bed, whereas in figure 2b, it is slightly below the raised edge of the ballast. The amount of additional ballast used is dependent on the requirements of the trackside equipment to be supported but in general no excavations will be necessary.
  • A coagulant, such as polyurethane foam, is then poured over the additional ballast 11 in the area to form the load bearing structure. In an exemplary embodiment, about 25kg of polyurethane is poured over an area of 4 square feet, to a depth of 2 feet such as would used to support a signal. The polyurethane has a curing time of about one hour, so that the signal can be installed shortly after the load bearing structure has been prepared and formed. Although polyurethane has shown to be suitable, any coagulating foam, which when combined with the ballast achieves a load bearing capacity of in the region of ½ ton per square foot would be suitable. Once the load bearing structure has cured the shutters 12 and 13 can be removed for re-use if necessary.
  • Although it is possible to have the load bearing structure separate from the conventional ballast 10, it is preferable to have the structure linked to the original ballast track 10. In its simplest form this can be achieved simply by pouring the coagulant foam over the original ballast 10 as well as the additional ballast 11.
  • Figure 3 shows a particularly preferred embodiment of the load bearing structure for supporting a signal in which first and second cantilevers 20, 21 are fixed to sleepers 22,23. The first and second cantilevers 20, 21 meet a point remote from the original track bed. The space between and around the cantilevers is covered with additional ballast and then coagulant is poured over the additional ballast to form the load bearing structure. The signal is then installed at the point where the cantilevers meet. In an alternative embodiment, a single cantilever extending parallel from a sleeper could be used. This particular embodiment has the additional advantage that the track will be stabilised by the load bearing structure.
  • Figure 4 shows a schematic plan view of a set of points 30 on a bed of ballast. A particular problem with points on curved section of track is that the momentum of the train will tend to try to bend the track straight leading to slight warping of the rails. Over time this leads to a points failure as the points are gradually shifted out of position with respect to the other rails. Coagulant foam is poured over the ballast in the region of points and allowed to cure. Due to the elasticity provided by the elastomeric polyurethane coagulant, the track will be stabilised and the load bearing structure will provide a damping effect on vibrations and any rail movements. To minimise the drainage problems that the coagulant will cause, a small channel can be left in the centre of the ballast bed so that water can drain away.
  • Suitable polyurethane foams include foams formed from a mixture of polyether polyols and polyether/polyester polyols using amine catalysts, such as those sold under the Eviromould and Envirofoam trade marks. Other possible foams include diphenylmethane diisocyanate based foams.
  • Although the structure has been described as suitable for providing support for railway trackside equipment, it is envisaged that the structure could also be used for certain conventional building foundations. In a further application the structure can act as a vibration dampener for certain bridge and gantry foundation systems, in particular for metal beam type structures.

Claims (5)

  1. A load bearing structure for railways comprising ballast and a coagulant adapted to bind the ballast, wherein the coagulant is an elastomeric dispersion, which dispersion is added to the ballast in situ, such that the ballast and coagulant form a cohesive mass.
  2. A load bearing structure according to Claim 1, wherein the coagulant is added to ballast adjacent to a railway track.
  3. A load bearing structure according to Claim 1, wherein the coagulant is added to the ballast in the region of a set of points.
  4. A load bearing structure according to any one of Claims 1 to 3, wherein the cohesive mass has a load bearing capacity of 0.5 tons per square foot or more.
  5. A load bearing structure according to any one of Claims 1 to 4, wherein the coagulant is a polyurethane foam.
EP01109706A 2000-04-27 2001-04-19 Load bearing structure for a railway Withdrawn EP1149950A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
GB0010260A GB0010260D0 (en) 2000-04-27 2000-04-27 Load bearing structure for a railway
GB0010260 2000-04-27
GB0020078 2000-08-15
GB0020078A GB2361731A (en) 2000-04-27 2000-08-15 Load bearing structure

Publications (1)

Publication Number Publication Date
EP1149950A1 true EP1149950A1 (en) 2001-10-31

Family

ID=26244179

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01109706A Withdrawn EP1149950A1 (en) 2000-04-27 2001-04-19 Load bearing structure for a railway

Country Status (1)

Country Link
EP (1) EP1149950A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7896255B2 (en) * 2007-01-18 2011-03-01 Msb-Management Gmbh Partly foamed railroad track support arrangement
WO2020109267A1 (en) * 2018-11-27 2020-06-04 Covestro Deutschland Ag Method for preparing track bed

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2063727A1 (en) * 1970-12-24 1972-08-24 Michelfelder, Gerhard, 8000 München Method for stabilizing a ballast bed
FR2553445A1 (en) * 1983-10-14 1985-04-19 Wellington Bv Method for obtaining ballast supporting a railway track and ballast thus obtained.
JPH0754301A (en) * 1993-08-11 1995-02-28 Inoac Corp Preventive method of scattering of ballast crushed stone in track
DE19755602A1 (en) * 1996-12-18 1998-06-25 Heitkamp Gmbh Bau Surface for a high speed railway track
EP0969148A1 (en) * 1995-10-10 2000-01-05 Harald Müller Railroad security fence

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2063727A1 (en) * 1970-12-24 1972-08-24 Michelfelder, Gerhard, 8000 München Method for stabilizing a ballast bed
FR2553445A1 (en) * 1983-10-14 1985-04-19 Wellington Bv Method for obtaining ballast supporting a railway track and ballast thus obtained.
JPH0754301A (en) * 1993-08-11 1995-02-28 Inoac Corp Preventive method of scattering of ballast crushed stone in track
EP0969148A1 (en) * 1995-10-10 2000-01-05 Harald Müller Railroad security fence
DE19755602A1 (en) * 1996-12-18 1998-06-25 Heitkamp Gmbh Bau Surface for a high speed railway track

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 1995, no. 05 30 June 1995 (1995-06-30) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7896255B2 (en) * 2007-01-18 2011-03-01 Msb-Management Gmbh Partly foamed railroad track support arrangement
WO2020109267A1 (en) * 2018-11-27 2020-06-04 Covestro Deutschland Ag Method for preparing track bed

Similar Documents

Publication Publication Date Title
EP0170631B1 (en) Components for railway lines on pre-fabricated reinforced concrete slabs without ballast
Michas Slab track systems for high-speed railways.
KR102200955B1 (en) Road way construction method for mountain railway
KR20110089991A (en) Anti-vibration track for railway and construction method
CN105525541A (en) Novel prefabricated plate type damping track structure for rail traffic
ZA200705820B (en) Concrete track for rail vehicles
US4911360A (en) Precast railway crossing slab
RU2377361C2 (en) Hard railway bed for railed vehicles
US5163614A (en) Railway roadbeds with rail slabs, and method for preparing
CZ319492A3 (en) Load-bearing structure of a permanent way and a prefabricated platform thereof
JP4689272B2 (en) Construction method of fixed track for railway transportation
EP1700954A2 (en) Prefabricated modular member, permanent railway for tramways and subways including said member, and process for laying the same
US20050252985A1 (en) Rail sleeper and ballast-free track structure
EP0881332A1 (en) Bearing element for supporting infrastructure such as roads, railways, runways and airports, and a method for the manufacture thereof
CA2637208A1 (en) Method for producing a ballastless track
EP1149950A1 (en) Load bearing structure for a railway
JP5230012B2 (en) Mud prevention structure in orbit
JP2604476B2 (en) How to build a slab track
KR100603901B1 (en) Structure and construction method of plate girder bridge using part of existing girder
JP4162291B2 (en) Railway work girder cradle and rail work girder cradle construction method
GB2361731A (en) Load bearing structure
GB2272011A (en) Apparatus and method for securing in position a tramway rail.
EP0997581A1 (en) Construction of trackside platforms
EP1121489B1 (en) Improvements in or relating to tracks for railway type vehicles
CN111270570A (en) Overhead soilless roadbed structure, roadbed assembly, roadbed system and construction method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BOMBARDIER TRANSPORTATION GMBH

17P Request for examination filed

Effective date: 20020426

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

17Q First examination report despatched

Effective date: 20031208

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20031101