Prior art keywords
steam
turbine
feed water
gas turbine
heat recovery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP99810389A
Other languages
German (de)
French (fr)
Inventor
Rolf Bachmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Asea Brown Boveri Ltd
ABB AB
Original Assignee
ABB Asea Brown Boveri Ltd
Asea Brown Boveri AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Asea Brown Boveri Ltd, Asea Brown Boveri AB filed Critical ABB Asea Brown Boveri Ltd
Priority to EP99810389A priority Critical patent/EP1050667A1/en
Publication of EP1050667A1 publication Critical patent/EP1050667A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/103Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler

Definitions

  • the present invention relates to a combination system consisting of at least one gas turbine, at least one steam turbine, and at least a heat recovery steam generator. It will continue to operate of such a system.
  • gas turbine of a combination plant to operate temporarily with increased performance.
  • has a short-term Increasing the hot gas temperatures for example, a sustainable one negative effect on the life of the machine components.
  • Increase in performance by introducing water or steam into the Combustion chamber or the hot gas path of the gas turbine is not unproblematic. In addition, these measures will soon reach theirs quantitative limits.
  • Additional firing can also be of interest to the delivery to increase electrical power in times of peak demand. If high prices for top performance that can be provided quickly are increased electricity generation costs due to the lower efficiency acceptable, especially when providing peak performance with low capital investment.
  • the additional firing reaches its limits when the exhaust gas from the Gas turbine is already at a temperature level that is little below the permissible maximum temperature of the boiler.
  • a case is given, for example, when gas turbines of the type ABB GT24 / GT26 can be used in the combination process.
  • the Exhaust gas temperature already well above 600 ° C.
  • a bigger one Increasing the temperature through additional firing requires a redesign of the Boilers using expensive and complex to process High temperature materials.
  • the core of the invention is therefore, in a combination system, the exhaust gas from the gas turbine first cool in the superheater from the originally high temperature, by a larger distance up to the maximum when using the additional firing permissible temperature of a waste heat boiler, and thus the Water-steam circuit to supply additional heat to the steam turbine to increase the power output of the steam turbine.
  • the additional firing is therefore not at the inlet of the exhaust gas arranged in the boiler, but downstream of at least one superheater.
  • the exhaust gas of the gas turbine when the The boiler has already cooled down considerably, up to the boiling point of the Feed water.
  • the temperature difference by which the exhaust gas in the superheater cooled, can now be fired without the To have to design waste heat boilers for higher temperatures.
  • Another advantage of the invention is - in addition to the larger to be fired Performance - that the additional firing acts on the evaporator pipe instead on a superheater. This will prevent the superheater surfaces with the radiant heat of the additional firing and at the same time the high Hot gas temperatures applied.
  • the heat recovery steam generator of a combination system according to the invention can be used as conventional drum kettle or as a single-pipe kettle. Also if in the latter type there is no sharp dividing line between the superheater part and the evaporator of the heat recovery steam generator is more, that It should be clear to the specialist where the additional firing according to the Claims to be arranged, just in the flow direction of the relaxed Working medium of the gas turbine downstream of the live steam superheater on the one hand, that the gas turbine exhaust gas has already cooled down, on the other hand, so that the additional firing on heat exchanger surfaces acts from which the heat - especially the radiant heat of Additional firing - discharged by a liquid in all operating states becomes.
  • a preferred operating mode for such a combination system is the following:
  • the gas turbine operates at full load in nominal full load operation.
  • the exhaust of the Gas turbine flows through one after the other in the heat recovery steam generator Superheater, an evaporator and an economizer.
  • the amount of steam results in this operating state so that the temperature of the exhaust gas on Leaves from the evaporator just above the boiling point of the Feed water lies.
  • the auxiliary firing is switched on, which increases steam production.
  • the thermal output of the additional firing can be increased up to the maximum Temperature of the gas turbine exhaust gas at the outlet from the superheater only is still slightly above the boiling point of the feed water, or the maximum permissible temperature of the additional firing for the boiler is reached.
  • the execution of the combination system according to the invention without Reheating is a preferred variant in cases where a The greatest possible potential for providing peak load at low Investment costs should be used.
  • the conventional arrangement of a Reheater at the same position in the heat recovery steam generator as that Live steam reheater is only useful if this is the case caloric potential of the gas turbine exhaust gas is sufficiently high to between the entry temperature of the hot gas into the boiler and the Boiling temperature of the feed water to provide enough energy to also a greatly increased amount of steam due to the additional firing on the Fresh steam temperature to overheat and this amount of steam at the same time reheat.
  • the partial flow led through the feed water preheater is in the Dimension and preheated to the first partial flow so that the total mass flow when leaving the economizer is almost on the Boiling temperature is.
  • the circuit variant in which a first partial flow is fed directly into the economizer, compared to the preheating of the Total mass flow is preferred because the temperature of the coldest in the Economizer inflowing water pretends to be the lowest temperature which uses the calorific potential of the gas turbine exhaust gas can.
  • the feed water preheaters are operated with steam, which is more suitable Place of the steam turbine is removed.
  • This initially disturbing loss Working fluid of the steam turbine can be increased when operating Steam mass flow can even be an advantage.
  • the flash floods can therefore built smaller and better for normal operation, i.e. combination operation without Additional firing and with a lower amount of steam.
  • Depending on System design can possibly be due to expensive additional floods in the Low pressure part of the steam turbine can be dispensed with.
  • Each branch of the feed water line is expediently equipped with a shut-off and regulating device.
  • the shut-off device in the branch that leads directly to the economizer are closed, and another feed water partial stream is expediently heated to above the dew point temperature of sulfuric acid, to avoid corrosion damage to the boiler tubing.
  • the arrangement according to the invention is the Additional firing between superheater and evaporator is an advantage if the exhaust gas temperature of the gas turbine is only slightly below the maximum permissible boiler temperature, which is particularly the case is when gas turbines with reheating the partially relaxed working medium be used.
  • gas turbines are from EP 0 620 362 B1 or the US 5,577,378 and US 5,454,220 known which fonts are integral Represent part of the present description.
  • the inventive design of a heat recovery steam generator with Additional firing compared to the prior art also has other advantages for the operation and construction of the boiler and steam turbine. Since the Superheater arranged in the direction of the exhaust gas flow before the additional firing is, as already mentioned, the superheater is not subject to changing influences Heat radiation exposed to the auxiliary firing, and therefore can comparatively inexpensive as a finned tube heat exchanger. In addition, the live steam data of the steam turbine vary significantly to a lesser extent with the operation of the auxiliary firing than if it were on the live steam superheater would work.
  • Fig. 1 shows a preferred embodiment of a Combination system according to the invention, as characterized in the claims is.
  • Fig. 2 shows a development of the combination system shown in Fig. 1, at the bleed steam from the steam turbine into the combustion chambers of the gas turbine is injected.
  • Fig. 3 shows a further circuit variant with a Steam injection into the gas turbine, in which the steam is extracted from the Water / steam cycle very flexible to the swallowing ability of different Components in the water / steam cycle is designed to be adaptable 4 and 5 finally show two variants with an intermediate overheating of partially relaxed steam.
  • a gas turbine 1 shows a first example of the embodiment of a Combination system.
  • a gas turbine 1 is connected to a generator 2, and drives this.
  • the generator 2 is still an automatically acting Coupling 3 connected to a steam turbine 4.
  • the gas turbine sucks one Fresh air amount 51, which in the compressor 101 to a working pressure is compressed.
  • the compressed air is in a first combustion chamber 102 a strongly sub-stoichiometric amount of fuel 42 is supplied, and burned.
  • the high-tension working medium is in a first turbine 103 partially relaxed.
  • Working medium through the combustion of a further quantity of fuel 43 reheated, and in a turbine 105 approximately to ambient pressure relaxed.
  • the relaxed working medium 52 is still on a high temperature of, for example, 600 ° C, which is sufficient Amount of steam 74, 75 to be sufficiently overheated; also can be found in the Exhaust gas from the gas turbine still contains a high proportion of oxygen.
  • the relaxed Working medium 52 is passed through a heat recovery steam generator 6, wherein Heat to at least one inflow of feed water 71.72 what amount of feed water is emitted in the heat recovery steam generator is evaporated and overheated.
  • the superheated steam 75 thus generated is in the Steam turbine 4 relaxed.
  • Relaxed steam 76 is in the condenser 7 liquefied and up again by the condensate and feed pumps 8 and 9 brought the live steam pressure.
  • the feed water 77 is expediently led a first feed water preheater 10, where it by means of one of the Steam turbine removed steam amount 78, for example, to 60 ° C. is preheated.
  • the temperature in the feed water preheater is regulated by the control member 21 controlling the bleed steam amount 78.
  • the design of the Gas turbine as a gas turbine with sequential combustion is not essential to the invention, still the single-shaft arrangement, with steam turbine and Gas turbine working on a common generator.
  • These characteristics correspond to the latest technology and are related to the To implement invention with advantage. So the illustrated ensures Gas turbine design is inherently high efficiency, and is due to the high exhaust gas temperatures particularly good for use in a Combination system suitable.
  • the single-shaft design enables a combination system create confined space; in connection with that only one generator and only a generator foundation is necessary, the system performance is included low investment costs provided.
  • the invention can, however, without further can also be realized when the steam turbine and the Gas turbine each act on a generator. Likewise, that of steam generated in several gas turbines via heat recovery steam generator Steam turbine act.
  • a quantity of feed water 71 flows out of the Feed water preheater 10 into a first part 601 and from this into one second part 602 of the economizer.
  • water 73 is at boiling temperature or only little below, and is fed into the drum 603.
  • Boiling water flows from drum 603 into evaporator 604, absorbs further heat there, and flows back into the drum 603. There the water becomes that Part to which the absorbed heat is insufficient for evaporation; deposited; the separated liquid is again through the Evaporator 604 passed.
  • Saturated steam 74 flows out of the drum 603 into the Live steam superheater 606, and finally flows as superheated Live steam 75, ideally almost at the temperature of the relaxed Working medium 52 of the gas turbine, in the steam turbine 4.
  • the relaxed Working medium of the gas turbine flows through the components mentioned Heat recovery steam generator in reverse order, and cools continuously from.
  • the economizer is equipped with a second one Inflow connection provided over the between the first and the second Part of the economizer another preheated amount of feed water 72 in the economizer is introduced.
  • this is a stronger one Preheating the feed water quantity 71 in the feed water preheater 10 uneconomical because the temperature of the water at the entrance to the first part 601 of the economizer specifies the lower temperature level, except for which heat can be extracted from the exhaust gas 53.
  • the feed water line points therefore downstream of the feed water preheater 10 a branch at which the second quantity of feed water 72 is branched off and via at least one further - in the present example three - feed water preheaters 11, 12, 13 to be led.
  • the steam turbine is used to heat the feed water Tapped steam mass flows 79, 80 and 81 are taken, which via the shut-off and control elements 22, 23 and 24 are set, and thus the Determine the temperature of the preheated feed water 72.
  • About these Temperature and the shut-off and control elements 14 and 15 can be the water 73 can be set to the boiling point after the economizer.
  • the additional firing 605 becomes a fuel 44 fed and burned, which adds further heat to the process. Because of the arrangement of the additional firing in the heat recovery steam generator acts Additional firing directly affects steam production. So it will be Steam production and thus the water / steam mass flow of the Water / steam cycle increased by operating the auxiliary firing. The water / steam mass flow can be increased until the Exhaust gas from the gas turbine as soon as it flows through the superheater Boiling temperature of the feed water reached.
  • the Temperature and / or the mass flow of the preheated Increase the amount of feed water 72 so that the water 73 exits the second part 602 of the economizer approximately at the boiling point is.
  • the bleed steam mass flows 79, 80, 81 increased. This steam is no longer available to the steam turbine Labor turnover in the final stages is available, which is also an advantage has that especially with an increase in the steam mass flow Low pressure levels of the steam turbine are relieved. This eliminates the Need the low pressure stages and the flash floods for the full Dimension steam mass flow, which is significant investment saves.
  • a the first fuel 41 which is supplied, is gas, so this is expedient Feed water introduced into the economizer at a temperature that the Water vapor contained in the exhaust gas is not condensed on the pipes.
  • the first quantity of feed water 71 is then, for example, the one above 60 ° C quoted in the first part of the economizer. If as Fuel 41 is now supplied with oil, the temperature in the economizer be raised to the precipitation of organic components or of Sulfuric acid and therefore corrosion damage to the boiler pipes avoid. According to the higher feed water temperature is now a smaller heat exchanger area in the economizer is also necessary.
  • the shutoff and control member 14 is closed in oil firing, and the total amount of feed water flows through the preheaters 11, 12 and 13, which Amount of feed water 72 is now at a temperature of, for example Preheat 130 ° C.
  • the Feed water preheater 10 operated with steam 78 which is relatively strongly expanded and does not have to be excessively large.
  • the Feedwater preheaters 11, 12 and 13 can be a larger one if necessary Use a driving temperature gradient for preheating the feed water.
  • FIG. 2 is one Another preferred embodiment of the combination system according to the invention shown.
  • the boiler 6 is designed as a single-tube boiler. At a Single-tube boilers are live steam superheaters and evaporators not so accurate separately, we in the drum kettle shown in Fig. 1. The expert will nonetheless recognize the position where the additional firing in the Heat recovery steam generator is to be arranged to take advantage of the invention to take full advantage of. It is advantageous to choose a position downstream of which - seen in the direction of flow of the gas turbine exhaust gas - in all Operating states working medium of the steam turbine in liquid Physical state inside the boiler tubes.
  • a first tap of appropriate pressure on the Steam turbine is connected via a connecting line 28, in which a shut-off and control element 26, with the first combustion chamber 102 of the gas turbine connected is. Furthermore, a line 27 leads from a tap lower pressure via a shut-off and control element 25 to the second Combustion chamber 104 of the gas turbine.
  • steam can be in different places in the water-steam cycle be removed.
  • saturated steam is suitable downstream of the evaporator 604, especially if one Steam cooling of the gas turbine components can be realized.
  • This Tapping the water / steam cycle can still make sense if in the live steam superheater 606 not the total amount of steam generated can be overheated sufficiently high.
  • the excess amount of saturated steam can then be expanded in the gas turbine, and the steam injection relieves the live steam superheater and the entire steam turbine.
  • superheated live steam for injection into the gas turbine Find use.
  • FIG. 3 shows a circuit of the combination system with additional firing, which a particularly flexible adaptation of the mass flows to the Swallowing ability of various components and the possible ones Enthalpy flows in the heat recovery steam generator enabled.
  • a first Operating condition without additional firing, are the shut-off and control elements 16, 26, 33 and 34 closed, and the shut-off and control elements 15, 22, 23, 24 are at least strongly throttled.
  • the additional combustion 605 increases the output by a quantity of fuel 44 fed and burned.
  • steam production increases Amount of feed water, and the amount of live steam.
  • too Shut-off and control element 15 opened further to the preheated To increase feed water mass flow 72.
  • the steam turbine To the bigger one To preheat the amount of feed water, the steam turbine must be larger Tapping mass flows 79, 80 are removed, which relieves the last stages of the steam turbine leads to the corresponding amount of steam.
  • An increase in the feed water mass flow can occur that from a certain mass flow, the preheating of the partial flow 72 in the Preheaters 11 and 12 are no longer sufficient to exit the economizer To get water close to the boiling point.
  • Feed water partial stream 72 is in turn divided into partial streams 721 and 722. This division is primarily controlled by the shut-off and control element 16. Its opening determines the partial flow 722, which is almost open in the preheater 13 Boiling temperature is heated, and therefore immediately in the embodiment is fed into the boiler drum 603. In the case of a single-tube boiler, the Partial flow 722 the remaining feed water mass flow, 71 and 721, are mixed upstream of the evaporator tube 604.
  • FIGS. 4 and 5 also show two circuit variants reheating 607.
  • the steam turbine 4 is in a high pressure part 401 and a low pressure part 402 divided. a partially released steam quantity 82 from the high pressure part is in each case Intermediate superheater 607 led, from where reheated steam 83 in the Low-pressure part 402 of the steam turbine flows and is fully expanded there becomes.
  • the heat recovery steam generator 6 is shown as a drum boiler, in Fig. 5 as a single-tube boiler.
  • the design of the heat recovery steam generator can be in the both figures can be exchanged for each other without the essence touch the invention in the slightest, as well as the different Place the feed of the preheated feed water 72 in the two Examples - once in the economizer and once in the boiler tubing immediately upstream of the evaporator - design variants that are in the Examples chosen to illustrate different possibilities were.
  • the arrangement of the reheaters is in both Examples completely different.
  • the reheater 607 is parallel to the live steam superheater 606 led.
  • this circuit results in the best possible System efficiency in nominal full load operation, on the other hand the Amount of steam at a limited within the superheater section of the Heat recovery steam generator usable heat to the design temperature can be overheated, limited. For this limitation of steam production results in a lower achievable increase in performance.
  • the reheater 607 in FIG. 5 is parallel to the evaporator 604 arranged in the steam generator, such that the additional firing also on the reheater works.
  • the steam is in nominal operation only slightly reheated without additional firing, and the nominal Efficiency is lower than in the circuit shown in Fig. 4.
  • the additional firing acts on the reheater pipe, more fuel can be sensibly fired.
  • the one with additional firing increased reheat temperature is also equal Efficiency losses that occur with the additional firing, at least partially out.
  • the piping of the reheater so to arrange that the evaporator pipe between the additional firing and the pipe of the reheater, and the heat transfer to the is driven purely by convection to superheating steam.
  • wet operated heat exchanger tubes from the radiant heat of the auxiliary firing is a much less expensive construction of the boiler possible.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The combination installation comprises at least one gas turbine (1), at least one steam turbine (4) and at least one waste h steam producer (6) containing at least one evaporator (604) and a fresh steam overheater (606). The waste heat steam producer ha flowing through it a tension-relaxed work medium (52,53) of the gas turbine and a work medium (71-75) of the steam turbine in counterflow. In the waste heat steam producer is arranged additional heating (605) in the flow direction of the tension-relaxed work med of the gas turbine downstream of the fresh steam overheater of the waste heat steam producer.

Description

Technisches GebietTechnical field

Die vorliegende Erfindung betrifft eine Kombianlage, bestehend aus wenigstens einer Gasturbine, wenigstens einer Dampfturbine, und wenigstens einem Abhitzedampferzeuger. Es wird weiterhin ein Verfahren zum Betrieb einer solchen Anlage beschrieben.The present invention relates to a combination system consisting of at least one gas turbine, at least one steam turbine, and at least a heat recovery steam generator. It will continue to operate of such a system.

Stand der TechnikState of the art

Im Sinne einer effizienten Energieumsetzung in Kraftwerken werden diese häufig als Kombianlagen ausgeführt. Dabei wird in einem Abhitzekessel das Abgas einer Gasturbine, welches unmittelbar nach dem Austritt aus der Turbine noch eine sehr hohe Temperatur hat, dazu benutzt, hochgespannten überhitzten Dampf für den Betrieb einer Dampfturbine zu erzeugen. Mit Hilfe ausgeklügelter Schaltungen des Wasser-Dampf-Kreislaufes wird die Abgaswärme der Gasturbine zu einem erheblichen Teil im nachgeschalteten Dampfturbinenprozess genutzt. Derartig optimierte Anlagen, arbeiten beispielsweise mit mehrfacher Überhitzung des Dampfes bei unterschiedlichen Drücken im Kessel. Sie sind damit in der Lage, anfallende Wärme auf nahezu jedem Temperaturniveau oberhalb der Umgebungstemperatur auszunutzen. Im Gegenzug sind solcherart optimierte Anlagen sehr komplex, und damit auch teuer.In terms of efficient energy conversion in power plants, these are often designed as a combination system. This is done in a waste heat boiler Exhaust gas from a gas turbine, which immediately after exiting the Turbine still has a very high temperature, used for high tension to generate superheated steam for the operation of a steam turbine. With help sophisticated circuits of the water-steam cycle Exhaust heat of the gas turbine to a large extent in the downstream Steam turbine process used. Such optimized systems, work for example with multiple overheating of the steam at different Press in the boiler. You are thus able to heat up almost to take advantage of any temperature level above the ambient temperature. in the In return, systems optimized in this way are very complex, and therefore also expensive.

Im Gegenzug werden die - mit hohem Kapitaleinsatz optimierten - Anlagen oft nicht voll ausgenutzt. Liberalisierte Strommärkte nämlich fordern nicht nur eine effiziente Energieumsetzung, sondern auch eine hohe Flexibilität bei der Stromerzeugung. Obschon die Margen bei der Erzeugung von Grundlast aufgrund des Wettbewerbs gering sind, kann für die Abdeckung von Lastspitzen oft ein vielfach höherer Preis erzielt werden. Ein grosser Anteil des erwirtschafteten Gewinns kann mit einigen wenigen Prozent der erzeugten elektrischen Energie, oder in einem Bruchteil der Betriebsdauer einer Kraftwerksanlage, erwirtschaftet werden.In return, the plants - which are optimized with high capital investment - are often not fully used. Liberalized electricity markets don't just demand one efficient energy implementation, but also high flexibility in the Power generation. Although the margins in the generation of base load due to competition are low, can be used to cover Peak loads can often be achieved at a much higher price. A large proportion of the generated profit can be generated with a few percent of the electrical energy, or in a fraction of the life of one Power plant, be generated.

Daher ist es für in liberalisierten Strommärkten engagierte privatwirtschaftlich organisierte Versorger fast zwingend, Reservekapazitäten vorzuhalten. In begrenztem Umfang können zu Deckung von Spitzenlast Leistungsreserven aus Fallwasserkraftwerken mobilisiert werden. Techniken wie Luftspeicherturbinen muss bis heute und nach allem technischen Ermessen zumindest auf mittlere Sicht ein Exotenstatus zuerkannt werden. Die Errichtung von Spitzenlast-Gasturbinenkraftwerken ist wirtschaftlich unter dem Strich meist weniger attraktiv.Therefore, it is for the private sector engaged in liberalized electricity markets organized utilities almost imperatively to have reserve capacities. In A limited amount can cover peak power reserves be mobilized from hydropower plants. Techniques like Air storage turbines still have to be used today and according to all technical discretion an exotic status can be awarded at least in the medium term. The establishment of peak load gas turbine power plants is economically the bottom line mostly less attractive.

Daher werden beispielsweise Grundlastanlagen nur mit 90 oder 95% ihrer maximalen Leistung betrieben und somit Leistungsreserven vorgehalten.Dabei handelt es sich häufig Anlagen, die, wie eingangs beschrieben, mit hohem Kapitaleinsatz auf beste Wirkungsgrade getrimmt sind. Bei einer solchen Betriebsart subsummieren sich zwei kontraproduktive Effekte: Einerseits wird ein hoher Einsatz an Kapital und Resourcen über grosse Zeiträume nicht vollständig genutzt. Andereseits läuft eine so betriebene Anlage nicht auf ihrem Auslegungsbetriebspunkt, und somit mit einem Wirkungsgrad, der kleiner als der eigentlich erzielbare - und teuer erkaufte! - ist. For this reason, for example, base load systems only use 90 or 95% of their operated at maximum power and thus reserves power it is often plants that, as described at the beginning, with high Capital expenditure is trimmed to the best levels of efficiency. With one Operating mode, there are two counterproductive effects: On the one hand, a high investment in capital and resources over long periods of time fully used. On the other hand, a system operated in this way does not run on yours Design operating point, and thus with an efficiency that is less than the actually achievable - and expensive bought! - is.

Eine weitere Möglichkeit besteht darin, die Gasturbine einer Kombianlage temporär mit erhöhter Leistung zu betreiben. Jedoch hat eine kurzzeitige Erhöhung der Heissgastemperaturen beispielsweise einen nachhaltigen negativen Effekt auf die Lebendauer der Maschinenkomponenten. Auch die Leistungserhöhung durch Einbringen von Wasser oder Dampf in die Brennkammer oder den Heissgaspfad der Gasturbine ist nicht unproblematisch. Zudem stossen diese Massnahmen recht bald an ihre quantitativen Grenzen.Another option is the gas turbine of a combination plant to operate temporarily with increased performance. However, has a short-term Increasing the hot gas temperatures, for example, a sustainable one negative effect on the life of the machine components. Also the Increase in performance by introducing water or steam into the Combustion chamber or the hot gas path of the gas turbine is not unproblematic. In addition, these measures will soon reach theirs quantitative limits.

Seit langem ist weiterhin bekannt, in Abhitzedampfkesseln eine Zusatzfeuerung zu implementieren. Dabei wird dem Gasturbinenabgas, das noch viel Sauerstoff enthält, Brennstoff zugesetzt und dieser verbrannt. Diese Methode wurde bislang insbesondere benutzt, um einerseits den Frischdampf über die Temperatur des Gasturbinenabgases hinaus zu überhitzen. Bei der Stromerzeugung ist ein grosser Nachteil dieser Technik, dass die zusätzlich eingebrachte Brennstoffmenge nur mit dem Dampfturbinenwirkungsgrad umgesetzt wird, anstatt mit dem deutlich höheren Kombi-Wirkungsgrad. Aus betriebstechnischen Gründen ist die Zusatzfeuerung dennoch interessant, beispielsweise, wenn in dem Abhitzedampferzeuger Prozessdampf erzeugt werden soll, und die Dampferzeugung von der Stromerzeugung der Gasturbine zu entkoppeln ist.It has long been known that additional firing in waste heat boilers to implement. The gas turbine exhaust, which is still a lot Contains oxygen, added fuel and burned it. This method has so far been used in particular to supply fresh steam via the To overheat the temperature of the gas turbine exhaust gas. In the Electricity generation is a big disadvantage of this technology that the additional amount of fuel introduced only with steam turbine efficiency is implemented instead of with the significantly higher combination efficiency. Out The additional firing is still interesting for operational reasons, for example, if process steam is generated in the waste heat steam generator and steam generation from the power generation of the gas turbine to be decoupled.

Eine Zusatzfeuerung kann weiterhin auch interessant sein, um die Abgabe an elektrischer Leistung in Zeiten des Spitzenbedarfs zu erhöhen. Wenn hohe Preise für schnell bereitzustellende Spitzenleistung zu erzielen sind, sind erhöhte Stromerzeugungskosten aufgrund des sinkenden Wirkungsgrades akzeptabel, insbesondere, wenn die Bereitstellung der Spitzenleistung mit einem geringen Kapitaleinsatz erfolgt.Additional firing can also be of interest to the delivery to increase electrical power in times of peak demand. If high Prices for top performance that can be provided quickly are increased electricity generation costs due to the lower efficiency acceptable, especially when providing peak performance with low capital investment.

Die Zusatzfeuerung stösst jedoch dann an Grenzen, wenn sich das Abgas der Gasturbine bereits auf einem Temperaturniveau befindet, das nur wenig unterhalb der zulässigen Maximaltemperatur des Kessels liegt. Ein solcher Fall ist beispielsweise dann gegeben, wenn Gasturbinen der Typen ABB GT24/GT26 im Kombi-Prozess eingesetzt werden. Hier liegt die Abgastemperatur bereits deutlich oberhalb von 600°C. Eine grössere Temperaturerhöhung durch Zusatzfeuerung erfordert eine Neukonstruktion des Kessels unter Verwendung teurer und aufwendig zu verarbeitender Hochtemperaturwerkstoffe.However, the additional firing reaches its limits when the exhaust gas from the Gas turbine is already at a temperature level that is little below the permissible maximum temperature of the boiler. Such a case is given, for example, when gas turbines of the type ABB GT24 / GT26 can be used in the combination process. Here is the Exhaust gas temperature already well above 600 ° C. A bigger one Increasing the temperature through additional firing requires a redesign of the Boilers using expensive and complex to process High temperature materials.

Zusammenfassend ist also festzustellen, dass es vorteilhaft ist, eine Kombianlage so zu bauen, dass ein akzeptables Verhältnis von apparativem Aufwand und Wirkungsgrad resultiert. Hier bietet eine Anlage, bestehend aus Gasturbinen mit Zwischenerhitzung des teilentspannten Mediums, wie sie in EP 0 620 362 B1 oder US 5,577378 beschrieben sind, und einer Dampfturbinenanlage, gute Voraussetzungen. Bei Einsatz einer Dampfturbine ohne Zwischenüberhitzung wird zwar der Wirkungsgrad gesenkt, andererseits verlangt der dann einzusetzende Eindruckkessel wesentlich geringere Investitionskosten. Weiterhin ist von Vorteil, grosse Leistungsreserven über den Nenn-Vollastbetrieb hinaus bereitzuhalten. Eine solche Anlage könnte im Grundlastbetrieb auf Nenn-Vollast, mit ihrem besten Wirkungsgrad betrieben werden, wodurch der gegenüber einer ausgereizten Kombi-Anlage nominell reduzierte Wirkungsgrad zumindest teilweise kompensiert wird.In summary, it can be said that it is advantageous to have one To build a combination system so that an acceptable ratio of equipment Effort and efficiency result. Here offers a facility consisting of Gas turbines with reheating of the partially relaxed medium as described in EP 0 620 362 B1 or US 5,577378 are described, and one Steam turbine plant, good conditions. When using a steam turbine without reheating, the efficiency is reduced, on the other hand the impression boiler to be used then requires much less Investment costs. It is also an advantage to have large power reserves to keep the nominal full load operation ready. Such a facility could in Base load operation at nominal full load, operated at its best efficiency be, which is the nominal compared to an exhausted combination system reduced efficiency is at least partially compensated.

Es böte sich an, den Spitzenlastbetrieb zu realisieren, indem durch eine Zusatzfeuerung eine Leistungserhöhung der Dampfturbine realisiert wird. Wie oben dargelegt, kann bei einem solchen Betrieb der schlechtere Wirkungsgrad, mit dem der zusätzliche Brennstoff umgesetzt wird, akzeptiert werden. Für den als Spitzenlast erzeugten Strom kann ein sehr hoher Preis am Markt erzielt werden, so, dass ein höherer spezifischer Brennstoffverbrauch wirtschaftlich akzeptabel ist. Eine nach dem Stand der Technik übliche Zusatzfeuerung für den Spitzenlastbetrieb bringt jedoch aus den oben beschriebenen Gründen mit modernsten Gasturbinen kaum eine grosse Leistungssteigerung, und ist auch bei Gasturbinen mit eher moderaten Abgastemperaturen recht früh durch die maximal zulässige Temperatur im Abhitzedampferzeuger beschränkt. It would make sense to realize the peak load operation by using a Additional firing a performance increase of the steam turbine is realized. How set out above, the poorer efficiency, with which the additional fuel is used. For the Electricity generated as a peak load can achieve a very high price on the market be such that a higher specific fuel consumption is economical is acceptable. A conventional additional firing for the state of the art however, brings the peak load operation for the reasons described above state-of-the-art gas turbines hardly a big increase in performance, and it is for gas turbines with rather moderate exhaust gas temperatures, through the maximum permitted temperature in the heat recovery steam generator is limited.

Darstellung der ErfindungPresentation of the invention

Hier greift die Erfindung. Bei einer Kombianlage der eingangs beschriebenen Art ist eine Möglichkeit zu schaffen, mittels einer Zusatzfeuerung im Kessel eine möglichst grosse Zusatzleistung aktivieren zu können. Dabei ist eine aufwendige Neukonstruktion des Kessels unter allen Umständen zu vermeiden.This is where the invention comes into play. In a combination system of the type described at the beginning Art is a way to create an additional firing in the boiler to be able to activate the largest possible additional service. There is one avoid elaborate redesign of the boiler under all circumstances.

Erfindungsgemäss wird dies erreicht, indem die Zusatzfeuerung in Strömungsrichtung des entspannten Arbeitsmediums der Gasturbine stromab des Frischdampf-Überhitzers des Abhitzedampferzeugers angeordnet ist.This is achieved according to the invention by the additional firing in Flow direction of the relaxed working medium of the gas turbine downstream the live steam superheater of the heat recovery steam generator is arranged.

Kern der Erfindung ist also, in einer Kombianlage das Abgas der Gasturbine zunächst im Überhitzer von der ursprünglich hohen Temperatur abzukühlen, um beim Einsatz der Zusatzfeuerung einen grösseren Abstand bis zur maximal zulässigen Temperatur eines Abhitzekessels zu haben, und somit dem Wasser-Dampf-Kreislauf der Dampfturbine zusätzliche Wärme zuzuführen und die Leistungsabgabe der Dampfturbine zu erhöhen.The core of the invention is therefore, in a combination system, the exhaust gas from the gas turbine first cool in the superheater from the originally high temperature, by a larger distance up to the maximum when using the additional firing permissible temperature of a waste heat boiler, and thus the Water-steam circuit to supply additional heat to the steam turbine to increase the power output of the steam turbine.

Erfindungsgemäss wird die Zusatzfeuerung also nicht am Eintritt des Abgases in den Kessel angeordnet, sondern stromab mindestens eines Überhitzers. An dieser Stelle ist das Abgas der Gasturbine bei zweckmässiger Auslegung des Kessels bereits erheblich abgekühlt, maximal bis zur Siedetemperatur des Speisewassers. Die Temperaturdifferenz, um die das Abgas im Überhitzer abgekühlt ist, kann nunmehr zusätzlich gefeuert werden, ohne den Abhitzekessel für höhere Temperaturen auslegen zu müssen.According to the invention, the additional firing is therefore not at the inlet of the exhaust gas arranged in the boiler, but downstream of at least one superheater. On this point is the exhaust gas of the gas turbine when the The boiler has already cooled down considerably, up to the boiling point of the Feed water. The temperature difference by which the exhaust gas in the superheater cooled, can now be fired without the To have to design waste heat boilers for higher temperatures.

Ein weiterer Vorteil der Erfindung ist - neben der grösseren zuzufeuernden Leistung - dass die Zusatzfeuerung auf die Verdampferberohrung wirkt anstatt auf einen Überhitzer. Dadurch werden die Oberflächen des Überhitzers nicht mit der Strahlungswärme der Zusatzfeuerung und gleichzeitig den hohen Heissgastemperaturen beaufschlagt.Another advantage of the invention is - in addition to the larger to be fired Performance - that the additional firing acts on the evaporator pipe instead on a superheater. This will prevent the superheater surfaces with the radiant heat of the additional firing and at the same time the high Hot gas temperatures applied.

Der Abhitzedampferzeuger einer erfindungsgemässen Kombianlage kann als herkömmlicher Trommelkessel oder als Einrohrkessel ausgeführt werden. Auch wenn bei letzterer Bauart keine scharfe Trennlinie zwischen dem Überhitzerteil und dem Verdampfer des Abhitzedampferzeugers mehr besteht, wird dem Fachmann ohne weiteres klar sein, wo die Zusatzfeuerung gemäss den Ansprüchen anzuordnen ist, eben in Strömungsrichtung des entspannten Arbeitsmediums der Gasturbine stromab des Frischdampf-Überhitzers, um einerseits bereits eine Abkühlung des Gasturbinen-Abgases erreicht zu haben, andererseits aber auch, damit die Zusatzfeuerung auf Wärmetauscherflächen wirkt, aus denen die Wärme - insbesondere auch die Strahlungswärme der Zusatzfeuerung - in allen Betriebszuständen durch eine Flüssigkeit abgeführt wird.The heat recovery steam generator of a combination system according to the invention can be used as conventional drum kettle or as a single-pipe kettle. Also if in the latter type there is no sharp dividing line between the superheater part and the evaporator of the heat recovery steam generator is more, that It should be clear to the specialist where the additional firing according to the Claims to be arranged, just in the flow direction of the relaxed Working medium of the gas turbine downstream of the live steam superheater on the one hand, that the gas turbine exhaust gas has already cooled down, on the other hand, so that the additional firing on heat exchanger surfaces acts from which the heat - especially the radiant heat of Additional firing - discharged by a liquid in all operating states becomes.

Zusammenfassend ist also festzustellen, dass ein grosser Vorteil der erfindungsgemässen Ausführung einer Kombianlage mit Zusatzfeuerung neben der Vermeidung allfälliger extremer Temperaturspitzen der ist, dass keine Überhitzerflächen mit Strahlungswärme beaufschlagt werden, was letztlich eine einfache und kostengünstige Bauart des Überhitzers, beispielsweise als Rippen-Rohrwärmetauscher, ermöglicht.In summary, it can be said that a great advantage of the Execution of a combination system according to the invention with additional firing in addition Avoiding any extreme temperature peaks is that none Radiant heat is applied to superheater surfaces, which is ultimately a problem simple and inexpensive design of the superheater, for example as Finned tube heat exchanger, enables.

Eine bevorzugte Betriebsart für eine derartige Kombianlage ist die folgende: Im nominalen Volllastbetrieb arbeitet die Gasturbine mit Vollast. Das Abgas der Gasturbine durchströmt im Abhitzedampferzeuger nacheinander einen Überhitzer, einen Verdampfer und einen Economizer. Die Dampfmenge ergibt sich in diesem Betriebszustand so, dass die Temperatur des Abgases am Austritt aus dem Verdampfer noch wenig oberhalb der Siedetemperatur des Speisewassers liegt. Im Falle, es werde Spitzenlast angefordert, wird nunmehr die Zusatzfeuerung eingeschaltet, wodurch die Dampfproduktion ansteigt. Die thermische Leistung der Zusatzfeuerung kann maximal erhöht werden, bis die Temperatur des Gasturbinen-Abgases am Austritt aus dem Überhitzer nur noch unwesentlich oberhalb der Siedetemperatur des Speisewassers liegt, oder die für den Kessel maximal zulässige Temperatur der Zusatzfeuerung erreicht ist.A preferred operating mode for such a combination system is the following: In The gas turbine operates at full load in nominal full load operation. The exhaust of the Gas turbine flows through one after the other in the heat recovery steam generator Superheater, an evaporator and an economizer. The amount of steam results in this operating state so that the temperature of the exhaust gas on Leaves from the evaporator just above the boiling point of the Feed water lies. In the event that a peak load is requested, is now the auxiliary firing is switched on, which increases steam production. The thermal output of the additional firing can be increased up to the maximum Temperature of the gas turbine exhaust gas at the outlet from the superheater only is still slightly above the boiling point of the feed water, or the maximum permissible temperature of the additional firing for the boiler is reached.

Wichtig zur effizienten Durchführung des Verfahrens ist, dass die Wärmeaustauschflächen im Kessel für den erhöhten Wasser/Dampf-Massenstrom hinreichend gross dimensioniert sind. Es werden jedoch keine höheren Anforderungen an die Hochtemperatur-Einsatzfähigkeit der Kesselkomponenten gestellt, als bei einer Kombianlage ohne Zusatzfeuerung.It is important for the process to be carried out efficiently that the Heat exchange surfaces in the boiler for the increased water / steam mass flow are sufficiently large. However, none will higher requirements for the high temperature usability of the Boiler components provided as in a combination system without additional firing.

Die Ausführung der erfindungsgemässen Kombianlage ohne Zwischenüberhitzung ist eine bevorzugte Variante in Fällen, in denen ein möglichst grosses Potential zur Bereitstellung von Spitzenlast bei geringen Investitionskosten genutzt werden soll. Die konventionelle Anordnung eines Zwischenüberhitzers an der selben Position im Abhitzedampferzeuger wie der Frischdampf-Zwischenüberhitzer ist allenfalls nur dann sinnvoll, wenn das kalorische Potential des Gasturbinen-Abgases hinreichend hoch ist, um zwischen der Eintrittstemperatur des Heissgases in den Kessel und der Siedetemperatur des Speisewassers genug Energie bereitzustellen, um auch eine durch die Zusatzfeuerung stark erhöhte Dampfmenge auf die Frischdampftemperatur zu überhitzen und diese Dampfmenge gleichzeitig zwischenzuüberhitzen. Hingegen kann es sich als zweckmässig erweisen - in Abhängigkeit von den Enthalpieströmen im Abhitzedampferzeuger - einen Zwischenüberhitzer in Richtung der Heissgasströmung stromab der Zusatzfeuerung anzuordnen. Bei einer solchen Anordnung wirkt die Zusatzfeuerung auch auf den Zwischenüberhitzer, weshalb in der Zusatzfeuerung eine grössere Leistung zugefeuert werden kann. Dabei ist es weiterhin von Vorteil, die Berohrung des Zwischenüberhitzers an der gleichen Position im Kessel anzuordnen wie die Berohrung des Verdampfers, und dabei Verdampferrohre zwischen der Zusatzfeuerung und der Berohrung des Zwischenüberhitzers anzuordnen. Auf diese Weise wird der Überhitzer durch den nass betriebenen Verdampfer von der Wärmestrahlung der Zusatzfeuerung abgeschirmt, und kann somit in einer wesentlich einfacheren Bauweise ausgeführt werden.The execution of the combination system according to the invention without Reheating is a preferred variant in cases where a The greatest possible potential for providing peak load at low Investment costs should be used. The conventional arrangement of a Reheater at the same position in the heat recovery steam generator as that Live steam reheater is only useful if this is the case caloric potential of the gas turbine exhaust gas is sufficiently high to between the entry temperature of the hot gas into the boiler and the Boiling temperature of the feed water to provide enough energy to also a greatly increased amount of steam due to the additional firing on the Fresh steam temperature to overheat and this amount of steam at the same time reheat. On the other hand, it can prove expedient - in Dependence on the enthalpy flows in the heat recovery steam generator - one Reheater in the direction of the hot gas flow downstream of the To arrange additional firing. With such an arrangement Additional firing also on the reheater, which is why in the Additional firing can be fired a greater performance. It is still advantageous, the piping of the reheater on the same Position in the boiler like the pipes of the evaporator, and thereby Evaporator tubes between the additional firing and the pipes of the To arrange reheater. This way the superheater will go through the wet operated evaporator from the heat radiation of the Additional firing shielded, and can therefore be much simpler Construction can be carried out.

Zweckmässig ist es auch, die Speisewasserleitung zu splitten. Dabei wird ein Teil des Speisewassers über eine erste Leitung unmittelbar zu einem Economizer geführt und an einer Stelle, die innerhalb des Abhitzedampferzeugers am weitesten von der Gasturbine entfernt ist, das heisst, in bezug auf die Strömungsrichtung des Gasturbinen-Abgases am weitesten stromab liegt, in den Economizer oder den Verdampfer eingebracht. Ein anderer Teil des Speisewassers wird über einen oder mehrere Speisewasservorwärmer geleitet, und vorerwärmt dem ersten Teilstrom an einer weiter stromauf des Abgasweges gelegenen Stelle des Economizers, gegebenenfalls auch unmittelbar in der Kesseltrommel oder der Verdampferberohrung, zugemischt. Gerade beim Betrieb mit einem erhöhten Speisewasser/Frischdampfmassenstrom sind diese Speisewasservorwärmer in Verbindung mit der parallelen Führung zweier Speisewasser-Teilströme vorteilhaft. Der über die Speisewasservorwärmer geführte Teilstrom wird im Verhältnis zu dem ersten Teilstrom so bemessen und vorgewärmt, dass sich der Gesamtmassenstrom beim Austritt aus dem Economizer nahezu auf der Siedetemperatur befindet. Die Schaltungsvariante, bei der ein erster Teilstrom unmittelbar in den Economizer geführt wird, ist gegenüber der Vorwärmung des Gesamtmassenstroms zu bevorzugen, da die Temperatur des kältesten in den Economizer einströmenden Wassers die niedrigste Temperatur vorgibt, bis zu welcher das kalorische Potential des Gasturbinenabgases genutzt werden kann.It is also advisable to split the feed water line. In doing so, a Part of the feed water via a first line directly to one Economizer run and at a point within the Heat recovery steam generator is farthest from the gas turbine, that means in relation to the direction of flow of the gas turbine exhaust gas farthest downstream, introduced into the economizer or the evaporator. Another part of the feed water is over one or more Feed water preheater directed, and preheated the first partial flow a further upstream point of the economizer, if necessary, also directly in the boiler drum or Evaporator tube, mixed. Especially when operating with an elevated Feed water / live steam mass flow are these feed water preheaters in Connection with the parallel routing of two feed water partial flows advantageous. The partial flow led through the feed water preheater is in the Dimension and preheated to the first partial flow so that the total mass flow when leaving the economizer is almost on the Boiling temperature is. The circuit variant in which a first partial flow is fed directly into the economizer, compared to the preheating of the Total mass flow is preferred because the temperature of the coldest in the Economizer inflowing water pretends to be the lowest temperature which uses the calorific potential of the gas turbine exhaust gas can.

Die Speisewasservorwärmer werden mit Dampf betrieben, der an geeigneter Stelle der Dampfturbine entnommen wird. Dieser zunächst störende Verlust an Arbeitsfluid der Dampfturbine kann beim Betrieb mit einem erhöhten Dampfmassenstrom sogar von Vorteil sein. Dadurch, dass gerade im Betrieb mit erhöhtem Fluidmassenstrom teilentspannter Dampf entnommen und dessen Enthalpie an anderer Stelle dem Kreislauf zugeführt wird, werden die letzten Stufen der Dampfturbine entlastet. Die Abdampffluten können daher kleiner gebaut und besser für den Normalbetrieb, also Kombi-Betrieb ohne Zusatzfeuerung und mit geringerer Dampfmenge, ausgelegt werden. Je nach Anlagenauslegung kann unter Umständen auf teure zusätzliche Fluten im Niederdruckteil der Dampfturbine verzichtet werden.The feed water preheaters are operated with steam, which is more suitable Place of the steam turbine is removed. This initially disturbing loss Working fluid of the steam turbine can be increased when operating Steam mass flow can even be an advantage. Because just in operation partially expanded steam with increased fluid mass flow and whose enthalpy is fed to the cycle at another point, the relieved last stages of the steam turbine. The flash floods can therefore built smaller and better for normal operation, i.e. combination operation without Additional firing and with a lower amount of steam. Depending on System design can possibly be due to expensive additional floods in the Low pressure part of the steam turbine can be dispensed with.

Jeder Zweig der Speisewasserleitung, wird zweckmässig mit einem Absperr- und Regelorgan versehen. Beim Betrieb der Kombianlage mit Öl als Brennstoff kann das Absperrorgan in dem Zweig, der unmittelbar zum Economizer führt, geschlossen werden, und ein weiterer Speisewasser-Teilstrom wird zweckmässig bis über die Taupunktstemperatur von Schwefelsäure erwärmt, um Korrosionschäden an der Kesselberohrung zu vermeiden.Each branch of the feed water line is expediently equipped with a shut-off and regulating device. When operating the combi system with oil as fuel the shut-off device in the branch that leads directly to the economizer, are closed, and another feed water partial stream is expediently heated to above the dew point temperature of sulfuric acid, to avoid corrosion damage to the boiler tubing.

Mit Vorteil werden in einer erfindungsgemässen Kombianlage Kondensat- und Speisewasserpumpe zusammengefasst, und die für den Spitzenlastbetrieb notwendige Pumpenleistung auf zwei identische parallelgeschaltete Pumpen aufgeteilt. Im Nominalbetrieb genügt der Betrieb einer einzigen Pumpe; die zweite Pumpe muss nur im Spitzenlastbetrieb die zusätzliche Speisewassermenge fördern. Dies hebt die Verfügbarkeit, da die Anlage beim Ausfall einer Pumpe immer noch mit Vollast ohne Zusatzfeuerung betrieben werden kann.In a combination system according to the invention, condensate and Feed water pump summarized, and that for peak load operation required pump output on two identical pumps connected in parallel divided up. In nominal operation, the operation of a single pump is sufficient; the second pump only needs the additional one during peak load operation Promote the amount of feed water. This increases availability, since the system at Pump failure still operated at full load without additional firing can be.

Es ist oben bereits angedeutet, dass die starke Erhöhung der Dampfproduktion zu Problemen mit dem Schluckvermögen der Dampfturbine führen kann. In diesem Zusammenhang kann es sich als zweckmässig erweisen, weitere Anzapfstellen im Wasser-Dampf-Kreislauf vorzusehen, von denen Dampf in das gespannte Arbeitsmedium der Gasturbine geführt wird. Dieser Dampf kann einerseits in die Brennkammern eingebracht werden, wo dann eine höhere Brennstoffmenge zugeführt werden kann, andererseits kann der Dampf auch zur Kühlung von thermisch hochbelasteten Komponenten der Gasturbine eingesetzt werden. It has already been indicated above that the sharp increase in steam production can lead to problems with the swallowing capacity of the steam turbine. In In this context, it may prove useful to do more Tap points in the water-steam cycle, of which steam is to be provided the stressed working medium of the gas turbine is guided. This steam can on the one hand, are introduced into the combustion chambers, where a higher one Amount of fuel can be supplied, on the other hand, the steam can for cooling thermally highly stressed components of the gas turbine be used.

Wie bereits einleitend angemerkt, ist die erfindungsgemässe Anordnung der Zusatzfeuerung zwischen Überhitzer und Verdampfer gerade dann von Vorteil, wenn die Abgastemperatur der Gasturbine nur noch wenig unterhalb der maximal zulässigen Kesseltemperatur liegt, was insbesondere dann der Fall ist, wenn Gasturbinen mit Nacherhitzung des teilentspannten Arbeitsmediums eingesetzt werden. Derartige Turbinen sind aus der EP 0 620 362 B1 oder der US 5,577,378 und US 5,454,220 bekannt, welche Schriften einen integralen Bestandteil der vorliegenden Beschreibung darstellen.As already mentioned in the introduction, the arrangement according to the invention is the Additional firing between superheater and evaporator is an advantage if the exhaust gas temperature of the gas turbine is only slightly below the maximum permissible boiler temperature, which is particularly the case is when gas turbines with reheating the partially relaxed working medium be used. Such turbines are from EP 0 620 362 B1 or the US 5,577,378 and US 5,454,220 known which fonts are integral Represent part of the present description.

Die Investitionskosten werden weiterhin gesenkt, wenn die Anlage in der einwelligen Bauart errichtet wird, bei der eine Gasturbine und eine Dampfturbine auf eine gemeinsamen Generator wirken. Andererseits bietet die erfindungsgemässe Ausführung der Kombianlage auch dann betriebstechnische Vorteile, wenn mehrere Gasturbinen über jeweils einen Abhitzedampferzeuger Dampf für eine Dampfturbine liefern. Hier kann beim Ausfall einer Gasturbine die Zusatzfeuerung in den Dampferzeugern der noch im Betrieb befindlichen Gasturbinen den Leistungsverlust zumindest teilweise kompensieren.The investment costs will continue to be reduced if the plant in the single-shaft design is built, in which a gas turbine and a Steam turbine act on a common generator. On the other hand, the Execution of the combination system according to the invention also then operational advantages if several gas turbines each have one Heat recovery steam generator deliver steam for a steam turbine. Here at Failure of a gas turbine the additional firing in the steam generators of the the gas turbines in operation at least partially lost power compensate.

Neben den oben diskutierten Vorteilen für die Spitzenlastverfügbarkeit bietet die erfindungsgemässe Ausführung eines Abhitzedampferzeugers mit Zusatzfeuerung gegenüber dem Stand der Technik auch weitere Vorteile für den Betrieb und die Konstruktion des Kessels und der Dampfturbine. Da der Überhitzer in Richtung der Abgasströmung vor der Zusatzfeuerung angeordnet ist, ist der Überhitzer wie bereits erwähnt keinen wechselnden Einflüssen der Wärmestrahlung der Zusatzfeuerung ausgesetzt, und kann daher vergleichsweise preiswert als Rippenrohrwärmetauscher ausgeführt werden. Zudem variieren die Frischdampfdaten der Dampfturbine in wesentlich geringerem Ausmasse mit dem Betrieb der Zusatzfeuerung, als wenn diese auf den Frischdampfüberhitzer wirken würde. In addition to the advantages for peak load availability discussed above the inventive design of a heat recovery steam generator with Additional firing compared to the prior art also has other advantages for the operation and construction of the boiler and steam turbine. Since the Superheater arranged in the direction of the exhaust gas flow before the additional firing is, as already mentioned, the superheater is not subject to changing influences Heat radiation exposed to the auxiliary firing, and therefore can comparatively inexpensive as a finned tube heat exchanger. In addition, the live steam data of the steam turbine vary significantly to a lesser extent with the operation of the auxiliary firing than if it were on the live steam superheater would work.

Kurze Beschreibung der ZeichnungBrief description of the drawing

Die Erfindung wird nachfolgend anhand der in der Zeichnung dargestellten Ausführungsbeispiele erläutert. Fig. 1 zeigt eine bevorzugte Ausführung einer erfindungsgemässen Kombianlage, wie sie in den Ansprüchen gekennzeichnet ist. Fig. 2 zeigt eine Weiterbildung der in Fig. 1 dargestellten Kombianlage, bei der Anzapfdampf aus der Dampfturbine in die Brennkammern der Gasturbine eingespritzt wird. Fig. 3 zeigt eine weitere Schaltungsvariante mit einer Dampfeinspritzung in die Gasturbine, bei der die Dampfentnahme aus dem Wasser/Dampfkreislauf sehr flexibel an das Schluckvermögen verschiedener Komponenten im Wasser/Dampf-Kreislauf anpassbar gestaltet ist.Die Figuren 4 und 5 zeigen schliesslich zwei Varianten mit einer Zwischenüberhitzung von teilentspanntem Dampf.The invention is described below with reference to the drawing Exemplary embodiments explained. Fig. 1 shows a preferred embodiment of a Combination system according to the invention, as characterized in the claims is. Fig. 2 shows a development of the combination system shown in Fig. 1, at the bleed steam from the steam turbine into the combustion chambers of the gas turbine is injected. Fig. 3 shows a further circuit variant with a Steam injection into the gas turbine, in which the steam is extracted from the Water / steam cycle very flexible to the swallowing ability of different Components in the water / steam cycle is designed to be adaptable 4 and 5 finally show two variants with an intermediate overheating of partially relaxed steam.

Die Strömungsrichtung aller beteiligten Medien, sofern erfindungsrelevant, ist durch Pfeile gekennzeichnet. Weiterhin erheben die Ausführungsbeispiele keinen Anspruch darauf, vollständig zu sein, oder eine Kombianlage in allen Details darzustellen. Hingegen sind alle Komponenten und Funktionsgruppen dargestellt, die zum Verständnis der Erfindung notwendig sind.The direction of flow of all media involved, if relevant to the invention, is indicated by arrows. The exemplary embodiments also raise no claim to be complete, or a combination system in all To present details. On the other hand, all components and functional groups are shown that are necessary for understanding the invention.

Weg zur Ausführung der ErfindungWay of carrying out the invention

Fig. 1 zeigt eine erstes Beispiel für die erfindungsgemässe Ausführung einer Kombianlage. Eine Gasturbine 1 ist mit einem Generator 2 verbunden, und treibt diesen an. Der Generator 2 ist weiterhin über eine selbsttätig wirkende Kupplung 3 mit einer Dampfturbine 4 verbunden. Die Gasturbine saugt eine Frischluftmenge 51 an, die im Verdichter 101 auf einen Arbeitsdruck komprimiert wird. In einer ersten Brennkammer 102 wird der verdichteten Luft eine stark unterstöchiometrische erste Brennstoffmenge 42 zugeführt, und verbrannt. In einer ersten Turbine 103 wird das hochgespannte Arbeitsmedium teilweise entspannt. In einer zweiten Brennkammer 104 wird das Arbeitsmedium durch die Verbrennung einer weiteren Brennstoffmenge 43 nacherhitzt, und in einer Turbine 105 näherungsweise auf Umgebungsdruck entspannt. Das entspannte Arbeitsmedium 52 befindet sich immer noch auf einer hohen Temperatur von beispielsweise 600°C, die ausreicht, eine Dampfmenge 74, 75 hinreichend stark zu überhitzen; ausserdem findet sich im Abgas der Gasturbine immer noch ein hoher Sauerstoffanteil. Das entspannte Arbeitsmedium 52 wird durch einen Abhitzedampferzeuger 6 geleitet, wobei Wärme an wenigstens eine einströmende Speisewassermenge 71,72 abgegeben wird, welche Speisewassermenge im Abhitzedampferzeuger verdampft und überhitzt wird. Der so erzeugte überhitzte Dampf 75 wird in der Dampfturbine 4 entspannt. Entspannter Dampf 76 wird im Kondensator 7 verflüssigt und durch die Kondensat- und Speisepumpen 8 und 9 wieder auf den Frischdampfdruck gebracht. Das Speisewasser 77 wird zweckmässig über einen ersten Speisewasservorwärmer 10 geführt, wo es mittels einer der Dampfturbine entnommenen Dampfmenge 78 beispielsweise auf 60°C vorgewärmt wird. Die Temperatur im Speisewasservorwärmer wird geregelt, indem das Regelorgan 21 die Anzapfdampfmenge 78 steuert. Durch diese Vorwärmung wird beispielsweise bei Betrieb der Kombianlage mit Erdgas als Brennstoff der Niederschlag von Feuchtigkeit in der Kesselberohrung in einem ersten Teil des Economizers 601 verhindert, wodurch langfristige Korrosionschäden vermieden werden.1 shows a first example of the embodiment of a Combination system. A gas turbine 1 is connected to a generator 2, and drives this. The generator 2 is still an automatically acting Coupling 3 connected to a steam turbine 4. The gas turbine sucks one Fresh air amount 51, which in the compressor 101 to a working pressure is compressed. The compressed air is in a first combustion chamber 102 a strongly sub-stoichiometric amount of fuel 42 is supplied, and burned. The high-tension working medium is in a first turbine 103 partially relaxed. In a second combustion chamber 104 Working medium through the combustion of a further quantity of fuel 43 reheated, and in a turbine 105 approximately to ambient pressure relaxed. The relaxed working medium 52 is still on a high temperature of, for example, 600 ° C, which is sufficient Amount of steam 74, 75 to be sufficiently overheated; also can be found in the Exhaust gas from the gas turbine still contains a high proportion of oxygen. The relaxed Working medium 52 is passed through a heat recovery steam generator 6, wherein Heat to at least one inflow of feed water 71.72 what amount of feed water is emitted in the heat recovery steam generator is evaporated and overheated. The superheated steam 75 thus generated is in the Steam turbine 4 relaxed. Relaxed steam 76 is in the condenser 7 liquefied and up again by the condensate and feed pumps 8 and 9 brought the live steam pressure. The feed water 77 is expediently led a first feed water preheater 10, where it by means of one of the Steam turbine removed steam amount 78, for example, to 60 ° C. is preheated. The temperature in the feed water preheater is regulated by the control member 21 controlling the bleed steam amount 78. Through this Preheating is used, for example, when operating the combined system with natural gas Fuel the precipitation of moisture in the boiler tubing in one first part of the Economizer 601 prevents long-term Corrosion damage can be avoided.

An der als Beispiel dargestellten Kombianlage ist insbesondere die Bauart der Gasturbine als Gasturbine mit sequentieller Verbrennung nicht erfindungswesentlich, noch die einwellige Anordnung, wobei Dampfturbine und Gasturbine auf einen gemeinsamen Generator arbeiten. Diese Merkmale entsprechen jedoch modernster Technik und sind im Zusammenhang mit der Erfindung mit Vorteil zu implementieren. So gewährleistet die dargestellte Gasturbinenbauart schon von sich aus einen hohen Wirkungsgrad, und ist aufgrund der hohen Abgastemperaturen besonders gut für den Einsatz in einer Kombianlage geeignet. Die einwellige Bauart ermöglicht, eine Kombianlage auf engstem Raum zu erstellen; in Verbindung damit, dass nur ein Generator und nur ein Generator-Fundament notwendig sind, wird die Anlagenleistung mit geringen Investitionskosten bereitgestellt. Die Erfindung kann jedoch ohne weiteres auch dann realisiert werden, wenn die Dampfturbine und die Gasturbine jeweils auf einen Generator wirken. Ebenso könnte auch der von mehreren Gasturbinen über Abhitzedampferzeuger erzeugte Dampf auf eine Dampfturbine wirken.In the combination system shown as an example, the design of the Gas turbine as a gas turbine with sequential combustion is not essential to the invention, still the single-shaft arrangement, with steam turbine and Gas turbine working on a common generator. These characteristics However, they correspond to the latest technology and are related to the To implement invention with advantage. So the illustrated ensures Gas turbine design is inherently high efficiency, and is due to the high exhaust gas temperatures particularly good for use in a Combination system suitable. The single-shaft design enables a combination system create confined space; in connection with that only one generator and only a generator foundation is necessary, the system performance is included low investment costs provided. The invention can, however, without further can also be realized when the steam turbine and the Gas turbine each act on a generator. Likewise, that of steam generated in several gas turbines via heat recovery steam generator Steam turbine act.

In einem ersten Betriebsfall strömt eine Speisewassermenge 71 aus dem Speisewasservorwärmer 10 in einen ersten Teil 601 und von diesem in einen zweiten Teil 602 des Economizers. Am Austritt aus dem zweiten Teil des Economizer 602 liegt Wasser 73 idealerweise auf Siedetemperatur oder nur wenig darunter vor, und wird in die Trommel 603 geführt. Siedewasser strömt aus der Trommel 603 in den Verdampfer 604, nimmt dort weitere Wärme auf, und strömt wieder in die Trommel 603 zurück. Dort wird das Wasser zu dem Teil, zu dem die aufgenommene Wärme für die Verdampfung nicht ausreicht; abgeschieden; die abgeschiedene Flüssigkeit wird wieder durch den Verdampfer 604 geleitet. Sattdampf 74 strömt aus der Trommel 603 in den Frischdampf-Überhitzer 606, und strömt schliesslich als überhitzter Frischdampf 75, idealerweise nahezu auf der Temperatur des entspannten Arbeitsmediums 52 der Gasturbine, in die Dampfturbine 4 ein. Das entspannte Arbeitsmedium der Gasturbine durchströmt die genannten Komponenten des Abhitzedampferzeugers in umgekehrter Reihenfolge, und kühlt sich dabei stetig ab.In a first operating case, a quantity of feed water 71 flows out of the Feed water preheater 10 into a first part 601 and from this into one second part 602 of the economizer. At the exit from the second part of the Economizer 602 ideally water 73 is at boiling temperature or only little below, and is fed into the drum 603. Boiling water flows from drum 603 into evaporator 604, absorbs further heat there, and flows back into the drum 603. There the water becomes that Part to which the absorbed heat is insufficient for evaporation; deposited; the separated liquid is again through the Evaporator 604 passed. Saturated steam 74 flows out of the drum 603 into the Live steam superheater 606, and finally flows as superheated Live steam 75, ideally almost at the temperature of the relaxed Working medium 52 of the gas turbine, in the steam turbine 4. The relaxed Working medium of the gas turbine flows through the components mentioned Heat recovery steam generator in reverse order, and cools continuously from.

Vorteilhaft für die Funktion der Kombianlage ist weiterhin, wenn das aus dem Economizer ausströmende Wasser eine Temperatur nahe der Siedetemperatur aufweist. Um dies zu gewährleisten, ist der Economizer mit einem zweiten Zuströmanschluss versehen, über den zwischen dem ersten und dem zweiten Teil des Economizers eine weitere vorgewärmte Speisewassermenge 72 in den Economizer eingebracht wird. Im Vergleich dazu ist eine stärkere Vorwärmung der Speisewassermenge 71 im Speisewasservorwärmer 10 unwirtschaftlich, da die Temperatur des Wassers am Eintritt in den ersten Teil 601 des Economizers das untere Temperaturniveau vorgibt, bis auf welches dem Abgas 53 Wärme entzogen werden kann. Die Speisewasserleitung weist daher stromab des Speisewasservorwärmers 10 eine Verzweigung auf, an der die zweite Speisewassermenge 72 abgezweigt und über wenigstens einen weiteren - im vorliegenden Beispiel drei - Speisewasservorwärmer 11, 12, 13 geführt wird. Zur Erwärmung des Speisewassers werden der Dampfturbine die Anzapfdampfmassenströme 79, 80 und 81 entnommen, die über die Absperr- und Regelorgane 22, 23 und 24 eingestellt werden, und die somit die Temperatur des vorgewärmten Speisewassers 72 bestimmen. Über diese Temperatur sowie die Absperr- und Regelorgane 14 und 15 kann das Wasser 73 nach dem Economizer auf den Siedepunkt eingestellt werden.It is also advantageous for the function of the combination system, if that from the Economizer outflowing water a temperature close to the boiling point having. To ensure this, the economizer is equipped with a second one Inflow connection provided over the between the first and the second Part of the economizer another preheated amount of feed water 72 in the economizer is introduced. In comparison, this is a stronger one Preheating the feed water quantity 71 in the feed water preheater 10 uneconomical because the temperature of the water at the entrance to the first part 601 of the economizer specifies the lower temperature level, except for which heat can be extracted from the exhaust gas 53. The feed water line points therefore downstream of the feed water preheater 10 a branch at which the second quantity of feed water 72 is branched off and via at least one further - in the present example three - feed water preheaters 11, 12, 13 to be led. The steam turbine is used to heat the feed water Tapped steam mass flows 79, 80 and 81 are taken, which via the shut-off and control elements 22, 23 and 24 are set, and thus the Determine the temperature of the preheated feed water 72. About these Temperature and the shut-off and control elements 14 and 15 can be the water 73 can be set to the boiling point after the economizer.

In einem weiteren Betriebsfall wird der Zusatzfeuerung 605 ein Brennstoff 44 zugeführt und verbrannt, was dem Prozess weitere Wärme zuführt. Aufgrund der Anordnung der Zusatzfeuerung im Abhitzedampferzeuger wirkt die Zusatzfeuerung unmittelbar auf die Dampfproduktion ein. Es wird also die Dampfproduktion und damit der Wasser/Dampfmassenstrom des Wasser/Dampfkreislaufs durch den Betrieb der Zusatzfeuerung gesteigert. Der Wasser/Dampfmassenstrom kann so lange gesteigert werden, bis das Abgas der Gasturbine bereits nach dem Durchströmen des Überhitzers die Siedetemperatur des Speisewassers erreicht.In a further operating case, the additional firing 605 becomes a fuel 44 fed and burned, which adds further heat to the process. Because of the arrangement of the additional firing in the heat recovery steam generator acts Additional firing directly affects steam production. So it will be Steam production and thus the water / steam mass flow of the Water / steam cycle increased by operating the auxiliary firing. The water / steam mass flow can be increased until the Exhaust gas from the gas turbine as soon as it flows through the superheater Boiling temperature of the feed water reached.

Bei einer Steigerung des Frischdampfmassenstroms ist weiterhin die Temperatur und/oder der Massenstrom der vorgewärmten Speisewassermenge 72 zu erhöhen, damit das Wasser 73 beim Austritt aus dem zweiten Teil 602 des Economizers näherungsweise auf dem Siedepunkt ist. Dadurch werden auch die Anzapfdampfmassenströme 79, 80, 81 gesteigert. Dieser Dampf steht zwar der Dampfturbine nicht mehr zum Arbeitsumsatz in den letzten Stufen zur Verfügung, was aber auch den Vorteil hat, dass gerade bei einer Steigerung des Dampfmassenstroms die Niederdruckstufen der Dampfturbine entlastet werden. Damit entfällt die Notwendigkeit, die Niederdruckstufen und die Abdampffluten für den vollen Dampfmassenstrom zu dimensionieren, was erhebliche Investitionskosten spart.With an increase in the live steam mass flow, the Temperature and / or the mass flow of the preheated Increase the amount of feed water 72 so that the water 73 exits the second part 602 of the economizer approximately at the boiling point is. As a result, the bleed steam mass flows 79, 80, 81 increased. This steam is no longer available to the steam turbine Labor turnover in the final stages is available, which is also an advantage has that especially with an increase in the steam mass flow Low pressure levels of the steam turbine are relieved. This eliminates the Need the low pressure stages and the flash floods for the full Dimension steam mass flow, which is significant investment saves.

Ein weiterer Betriebsfall ergibt sich, wenn die Kombianlage optional mit zwei Brennstoffen, beispielsweise mit Gas und Öl, betrieben werden kann. Wenn ein erster Brennstoff 41, der zugeführt wird, Gas ist, so wird zweckmässig das Speisewasser auf einer Temperatur in den Economizer eingebracht, dass der im Abgas enthaltene Wasserdampf gerade nicht an den Rohren kondensiert. Die erste Speisewassermenge 71 wird dann beispielsweise mit den oben zitierten 60° C in den ersten Teil des Economizers eingebracht. Wenn als Brennstoff 41 nunmehr Öl zugeführt wird, muss die Temperatur im Economizer angehoben werden, um den Niederschlag organischer Komponenten oder von Schwefelsäure und damit Korrosionsschäden an der Kesselberohrung zu vermeiden. Entsprechend der höheren Speisewassertemperatur ist nunmehr auch eine kleinere Wärmetauscherfläche im Economizer notwendig. Daher wird bei Ölfeuerung das Absperr- und Regelorgan 14 geschlossen, und die gesamte Speisewassermenge fliesst über die Vorwärmer 11, 12 und 13, die die Speisewassermenge 72 nunmehr auf eine Temperatur von beispielsweise 130°C vorwärmen. Durch den Einsatz der Vorwärmer 11, 12 und 13 kann der Speisewasservorwärmer 10 mit relativ stark entspanntem Dampf 78 betrieben werden, und muss nicht übermässig gross dimensioniert werden. Die Speisewasservorwärmer 11, 12 und 13 können dafür bei Bedarf ein grösseres treibendes Temperaturgefälle für die Speisewasservorwärmung nutzen.Another operating case arises when the combination system is optionally available with two Fuels, for example with gas and oil, can be operated. When a the first fuel 41, which is supplied, is gas, so this is expedient Feed water introduced into the economizer at a temperature that the Water vapor contained in the exhaust gas is not condensed on the pipes. The first quantity of feed water 71 is then, for example, the one above 60 ° C quoted in the first part of the economizer. If as Fuel 41 is now supplied with oil, the temperature in the economizer be raised to the precipitation of organic components or of Sulfuric acid and therefore corrosion damage to the boiler pipes avoid. According to the higher feed water temperature is now a smaller heat exchanger area in the economizer is also necessary. Therefore the shutoff and control member 14 is closed in oil firing, and the total amount of feed water flows through the preheaters 11, 12 and 13, which Amount of feed water 72 is now at a temperature of, for example Preheat 130 ° C. By using the preheaters 11, 12 and 13, the Feed water preheater 10 operated with steam 78 which is relatively strongly expanded and does not have to be excessively large. The Feedwater preheaters 11, 12 and 13 can be a larger one if necessary Use a driving temperature gradient for preheating the feed water.

Im Übrigen muss gerade bei sehr stark vorgewärmtem Speisewasser dafür Sorge getragen werden, dass im Economizer keine Erwärmung über den Siedepunkt eintritt. Daraus gewinnt der Konstrukteur ein wichtiges Auslegungskriterium für die Aufteilung der Wärmetauscherfläche des Economizers in den ersten Teil 601 und den zweiten Teil 602. Incidentally, this has to be done with very strongly preheated feed water Care is taken to ensure that the economizer does not heat up above the Boiling point occurs. From this, the designer gains an important one Design criterion for the division of the heat exchanger surface of the Economizers in the first part 601 and the second part 602.

Weiteres Leistungssteigerungspotential ist durch Wasser- oder Dampfeinspritzung in das Heissgas der Gasturbine gegeben. In Fig. 2 ist eine weitere bevorzugte Ausführungsform der erfindungsgemässen Kombianlage dargestellt. Der Kessel 6 ist dabei als Einrohrkessel ausgeführt. Bei einem Einrohrkessel sind Frischdampf-Überhitzer und Verdampfer nicht so genau getrennt, wir bei dem in Fig. 1 dargestellten Trommelkessel. Der Fachmann wird dennoch zweifelsfrei die Position erkennen, an der die Zusatzfeuerung im Abhitzedampferzeuger anzuordnen ist, um die Vorteile der Erfindung vollkommen auszunutzen. Mit Vorteil wird eine Stelle gewählt, stromab derer - in Strömungsrichtung des Gasturbinen-Abgases gesehen - in allen Betriebszuständen Arbeitmedium der Dampfturbine in flüssigem Aggregatzustand im Inneren der Kesselrohre vorliegt.Further performance enhancement potential is through water or Steam injection into the hot gas of the gas turbine. 2 is one Another preferred embodiment of the combination system according to the invention shown. The boiler 6 is designed as a single-tube boiler. At a Single-tube boilers are live steam superheaters and evaporators not so accurate separately, we in the drum kettle shown in Fig. 1. The expert will nonetheless recognize the position where the additional firing in the Heat recovery steam generator is to be arranged to take advantage of the invention to take full advantage of. It is advantageous to choose a position downstream of which - seen in the direction of flow of the gas turbine exhaust gas - in all Operating states working medium of the steam turbine in liquid Physical state inside the boiler tubes.

Bei der hier dargestellten Ausführungsform eröffnet sich weiters Potential zur Leistungssteigerung. Eine erste Anzapfstelle geeigneten Drucks an der Dampfturbine ist über eine Verbindungsleitung 28, in welcher sich ein Absperr- und Regelorgan 26 befindet, mit der ersten Brennkammer 102 der Gasturbine verbunden ist. Weiterhin führt eine Leitung 27 von einer Anzapfstelle niedrigeren Drucks über ein Absperr- und Regelorgan 25 zur zweiten Brennkammer 104 der Gasturbine. Durch Einbringung von Dampf in die Gasturbine kann insbesondere mehr Brennstoff 42, 43 mit hohem Kombi-Wirkungsgrad umgesetzt werde. Weiterhin erhöht sich der Massenstrom des expandierten Arbeitmediums 52 der Gasturbine, wodurch die Dampfproduktion nochmals erhöht wird. Weiterhin werden die Niederdruckstufen der Dampfturbine 4 entlastet.In the embodiment shown here, there is further potential for Performance increase. A first tap of appropriate pressure on the Steam turbine is connected via a connecting line 28, in which a shut-off and control element 26, with the first combustion chamber 102 of the gas turbine connected is. Furthermore, a line 27 leads from a tap lower pressure via a shut-off and control element 25 to the second Combustion chamber 104 of the gas turbine. By introducing steam into the In particular, gas turbine can use more fuel 42, 43 with a high combined efficiency will be implemented. Furthermore, the mass flow of the expanded working medium 52 of the gas turbine, thereby reducing the steam production is increased again. Furthermore, the low pressure stages of the Steam turbine 4 relieved.

Selbstverständlich kann Dampf an unterschiedlichen Stellen dem Wasser-Dampf-Kreislauf entnommen werden. So eignet sich Sattdampf, der unmittelbar stromab des Verdampfers 604 entnommen wurde, vorzüglich, wenn eine Dampfkühlung der Gasturbinenkomponenten zu realisieren ist. Diese Anzapfung des Wasser/Dampfkreislaufs kann weiterhin dann sinnvoll sein, wenn im Frischdampfüberhitzer 606 nicht die gesamte erzeugte Dampfmenge hinreichend hoch überhitzt werden kann. Die überschüssige Sattdampfmenge kann dann in der Gasturbine expandiert werden, und die Dampfeinspritzung entlastet den Frischdampf-Überhitzer und die gesamte Dampfturbine. Ebenso kann aber auch überhitzter Frischdampf zur Einspritzung in die Gasturbine Verwendung finden.Of course, steam can be in different places in the water-steam cycle be removed. So saturated steam is suitable downstream of the evaporator 604, especially if one Steam cooling of the gas turbine components can be realized. This Tapping the water / steam cycle can still make sense if in the live steam superheater 606 not the total amount of steam generated can be overheated sufficiently high. The excess amount of saturated steam can then be expanded in the gas turbine, and the steam injection relieves the live steam superheater and the entire steam turbine. As well can also use superheated live steam for injection into the gas turbine Find use.

In Fig. 3 ist eine Schaltung der Kombianlage mit Zusatzfeuerung dargestellt, die eine besonders flexible Anpassung der Massenströme an das Schluckvermögen verschiedener Komponenten und die möglichen Enthalpieströme im Abhitzedampferzeuger ermöglicht. In einem ersten Betriebszustand, ohne Zusatzfeuerung, sind die Absperr- und Regelorgane 16, 26, 33 und 34 geschlossen, und die Absperr- und Regelorgane 15, 22, 23, 24 sind zumindest stark angedrosselt. Der grösste Anteil 71 des Speisewassers durchströmt beide Abschnitte 601 und 602 des Economizers, während ein kleinerer Anteil 72 in den Speisewasservorwärmern 11 und 12 so vorgewärmt wird, dass die Temperatur nahezu mit derjenigen der ersten Speisewassermenge 71 beim Austritt aus dem ersten Abschnitt des Economizers 601 identisch ist. Mittels des Regelorgans 15 wird der Anteil des vorgewärmten Speisewassers 72 so bemessen, dass die Temperatur des gesamten Speisewasserstroms beim Austritt aus dem zweiten Teil des Economizers 602 wenig unterhalb der Siedetemperatur liegt. Das erwärmte Speisewasser wird im Verdampfer 604 verdampft, im Frischdampf-Überhitzer 606 überhitzt, und der gesamte Frischdampf 75 wird schliesslich der Dampfturbine 4 zugeführt und vollständig entspannt, wobei nur kleine AnzapfMassenströme 78, 79, 80 über die Absperr- und Regelorgane 21, 22 und 23 aus der Dampfturbine entnommen werden, um im Speisewasservorwärmer 10 das Speisewasser 77 soweit vorzuwärmen, dass sich an der Economizerberohrung 601 kein Feuchtigkeitsniederschlag bildet, respektive wie oben beschrieben den Speisewasserteilstrom 72 in den Speisewasservorwärmern 11, 12 geeignet vorzuwärmen. Zur Leistungssteigerung wird der Zusatzfeuerung 605 eine Brennstoffmenge 44 zugeführt und verbrannt. In Folge steigen die Dampfproduktion, die Speisewassermenge, und die Frischdampfmenge. In Folge wird auch das Absperr- und Regelorgan 15 weiter geöffnet, um den vorgewärmten Speisewassermassenstrom 72 zu erhöhen. Um die grössere Speisewassermenge vorzuwärmen, müssen der Dampfturbine grössere Anzapfmassenströme 79, 80 entnommen werden, was zu einer Entlastung der letzten Stufen der Dampfturbine um die entsprechende Dampfmenge führt. Bei einer Steigerung des Speisewassermassenstroms kann der Fall eintreten, dass ab einem bestimmten Massenstrom die Vorwärmung des Teilstroms 72 in den Vorwärmern 11 und 12 nicht mehr ausreicht, um am Economizeraustritt Wasser nahe der Siedetemperatur zu erhalten. In diesem Falle wird der Speisewasser-Teilstrom 72 wiederum in die Teilströme 721 und 722 aufgeteilt. Diese Aufteilung wird primär durch das Absperr- und Regelorgan 16 gesteuert. Dessen Öffnung bestimmt den Teilstrom 722, der im Vorwärmer 13 nahezu auf Siedetemperatur erwärmt wird, und daher im Ausführungsbeispiel unmittelbar in die Kesseltrommel 603 eingespeist wird. Bei einem Einrohrkessel kann der Teilstrom 722 dem restlichen Speisewassermassenstrom, 71 und 721, unmittelbar stromauf der Verdampferberohrung 604 zugemischt werden. Bei weiter steigender Dampfproduktion können in einem nächsten Schritt die Dampfeinspritz-Regelventile 25 und 26 der Gasturbine geöffnet werden, wobei die Dreiwegeventile 29, 30 so gestellt sind, dass über die Leitungen 27, 28 Dampf zugeführt wird, der als teilexpandierter Dampf an geeigneter Stele der Dampfturbine entnommen wird, was zu einer weiteren Entlastung der Dampfturbinen-Niederdruckstufen führt. Durch diese Massnahme können die Brennstoffmengen 42 und 43, die in den Gasturbinenbrennkammern 102 und 104 verbrannt werden, erhöht werden, ohne die Eintrittstemperaturen in die Turbinen 103 und 105 zu erhöhen. In Folge steigen die Gasturbinenleistung und der Abgasmassenstrom 52 der Gasturbine. Mit einer weiteren Steigerung der Dampfmenge wäre es vorstellbar, dass auch das Schluckvermögen des Hochdruckteils der Dampfturbine ausgeschöpft wird. In diesem Fall wird das Absperr- und Regelorgan 34 geöffnet, und die Dreiwegeventile 29 und 30 werden umgeschaltet. Damit wird der Gasturbine nunmehr über die Leitung 32 Frischdampf ab dem Überhitzeraustritt zugeführt. Damit kann die Frischdampfproduktion selbst über das Schluckvermögen des Dampfturbinen-Hochdruckteils hinaus gesteigert werden. Bei einer weiter gesteigerten Brennstoffmenge 44, die der Zusatzfeuerung 605 zugeführt wird, reicht die im Überhitzer 606 zu übertragende Wärmemenge nicht mehr aus, um den gesamten erzeugten Dampf auf die geforderte Frischdampftemperatur zu überhitzen. In diesem Fall wird schliesslich das Absperr- und Regelorgan 34 geschlossen, und das Absperr- und Regelorgan 33 geöffnet. In die Gasturbinen-Brennkammern 102 und 104 wird Sattdampf aus der Leitung 31 eingespritzt, und bereits der Frischdampf-Überhitzer von dieser Dampfmenge entlastet. Dieses Ausführungsbeispiel zeigt, wie flexibel sich die erfindungsgemässe Schaltung einer Kombianlage gestalten lässt.3 shows a circuit of the combination system with additional firing, which a particularly flexible adaptation of the mass flows to the Swallowing ability of various components and the possible ones Enthalpy flows in the heat recovery steam generator enabled. In a first Operating condition, without additional firing, are the shut-off and control elements 16, 26, 33 and 34 closed, and the shut-off and control elements 15, 22, 23, 24 are at least strongly throttled. Most of the feed water 71 flows through both sections 601 and 602 of the economizer while one smaller portion 72 preheated in the feed water preheaters 11 and 12 is that the temperature is almost the same as that of the first Amount of feed water 71 exiting the first section of the Economizers 601 is identical. The proportion of the preheated feed water 72 so that the temperature of the total feed water flow at the exit from the second part of the Economizers 602 is slightly below the boiling temperature. That warmed up Feed water is evaporated in the evaporator 604, in the live steam superheater 606 overheats, and the entire live steam 75 finally becomes the Steam turbine 4 fed and completely relaxed, with only small tapping mass flows 78, 79, 80 via the shut-off and control elements 21, 22 and 23 be removed from the steam turbine to be in the feedwater preheater 10 preheat the feed water 77 to such an extent that the Economizer tubing 601 does not form moisture, respectively as described above, the feed water partial stream 72 in the Suitable preheating feed water preheaters 11, 12. For The additional combustion 605 increases the output by a quantity of fuel 44 fed and burned. As a result, steam production increases Amount of feed water, and the amount of live steam. As a result, that too Shut-off and control element 15 opened further to the preheated To increase feed water mass flow 72. To the bigger one To preheat the amount of feed water, the steam turbine must be larger Tapping mass flows 79, 80 are removed, which relieves the last stages of the steam turbine leads to the corresponding amount of steam. At An increase in the feed water mass flow can occur that from a certain mass flow, the preheating of the partial flow 72 in the Preheaters 11 and 12 are no longer sufficient to exit the economizer To get water close to the boiling point. In this case the Feed water partial stream 72 is in turn divided into partial streams 721 and 722. This division is primarily controlled by the shut-off and control element 16. Its opening determines the partial flow 722, which is almost open in the preheater 13 Boiling temperature is heated, and therefore immediately in the embodiment is fed into the boiler drum 603. In the case of a single-tube boiler, the Partial flow 722 the remaining feed water mass flow, 71 and 721, are mixed upstream of the evaporator tube 604. At Steam production can continue to rise in a next step Steam injection control valves 25 and 26 of the gas turbine are opened, wherein the three-way valves 29, 30 are set such that the lines 27, 28 Steam is supplied as the partially expanded steam at a suitable stele Steam turbine is removed, which further relieves the Steam turbine low pressure stages leads. Through this measure, the Amounts of fuel 42 and 43 that are in gas turbine combustors 102 and 104 can be burned, increased without entering the temperature Turbines 103 and 105 increase. As a result, the gas turbine output increases and the exhaust gas mass flow 52 of the gas turbine. With a further increase the amount of steam it would be conceivable that the swallowing capacity of the High pressure part of the steam turbine is exhausted. In this case Shut-off and control element 34 opened, and the three-way valves 29 and 30 are switched. The gas turbine is thus now connected via line 32 Live steam supplied from the superheater outlet. So that Live steam production itself via the swallowing capacity of the steam turbine high-pressure part be increased. With a further increased Amount of fuel 44 that is supplied to the additional firing 605 is sufficient in Superheater 606 is no longer sufficient to transfer the amount of heat total steam generated to the required fresh steam temperature overheat. In this case, the shut-off and regulating element 34 finally becomes closed, and the shut-off and control member 33 opened. In the Gas turbine combustors 102 and 104 become saturated steam from line 31 injected, and already the live steam superheater from this amount of steam relieved. This embodiment shows how flexible the can design circuit of a combination system according to the invention.

Die Leistungssteigerung der Gasturbine und die Möglichkeit die Brennstoffmengen 42 und 43 zu erhöhen, ergibt sich natürlich auch, wenn statt Dampf Wasser in die Brennkammern eingebracht wird. Auch in diesem Fall erhöht sich der Massenstrom des entspannten Arbeitsmediums 52 der Gasturbine und damit die Dampfproduktion im Abhitzekessel 6. Diese Leistungserhöhung geht allerdings in grösserem Masse zu Lasten der Wirtschaftlichkeit, da die Verdampfungswärme, die ja mit dem abgekühlten Abgas 53 verloren geht, erst durch zusätzlich zugeführten Brennstoff bereitgestellt werden muss, anstatt, wie es bei der Dampfeinspritzung der Fall ist, aus der Abgaswärme entnommen zu werden.The performance increase of the gas turbine and the possibility that Of course, increasing fuel quantities 42 and 43 also results if instead of Steam water is introduced into the combustion chambers. In this case, too the mass flow of the relaxed working medium 52 increases Gas turbine and thus the steam production in the waste heat boiler 6. This However, increased performance is at the expense of Profitability, since the heat of vaporization, which yes with the cooled Exhaust gas 53 is lost only through additional fuel supplied must be provided instead of, as is the case with steam injection is to be taken from the exhaust heat.

In den Figuren 4 und 5 schliesslich sind noch zwei Schaltungsvarianten mit einer Zwischenüberhitzung 607 dargestellt. Die Dampfturbine 4 ist dabei in einen Hochdruckteil 401 und einen Niederdruckteil 402 unterteilt. eine teilentspannte Dampfmenge 82 aus dem Hochdruckteil ist jeweils in einen Zwischenüberhitzer 607 geführt, von wo zwischenüberhitzter Dampf 83 in den Niederdruckteil 402 der Dampfturbine strömt und dort vollständig expandiert wird. In Fig. 4 ist der Abhitzedampferzeuger 6 als Trommelkessel dargestellt, in Fig. 5 als Einrohrkessel. Die Bauart des Abhitzedampferzeugers kann in den beiden Figuren beliebig gegeneinander ausgetauscht werden, ohne das Wesen der Erfindung im Geringsten zu berühren, ebenso wie die unterschiedliche Stelle der Einspeisung des vorgewärmten Speisewassers 72 in den beiden Beispielen - einmal in den Economizer und einmal in die Kesselberohrung unmittelbar stromauf des Verdampfers - Auslegungsvarianten sind, die in den Beispielen nur zur Illustration unterschiedlicher Möglichkeiten so gewählt wurden. Hingegen ist die Anordnung der Zwischenüberhitzer in beiden Beispielen grundverschieden.Finally, FIGS. 4 and 5 also show two circuit variants reheating 607. The steam turbine 4 is in a high pressure part 401 and a low pressure part 402 divided. a partially released steam quantity 82 from the high pressure part is in each case Intermediate superheater 607 led, from where reheated steam 83 in the Low-pressure part 402 of the steam turbine flows and is fully expanded there becomes. 4, the heat recovery steam generator 6 is shown as a drum boiler, in Fig. 5 as a single-tube boiler. The design of the heat recovery steam generator can be in the both figures can be exchanged for each other without the essence touch the invention in the slightest, as well as the different Place the feed of the preheated feed water 72 in the two Examples - once in the economizer and once in the boiler tubing immediately upstream of the evaporator - design variants that are in the Examples chosen to illustrate different possibilities were. On the other hand, the arrangement of the reheaters is in both Examples completely different.

In Fig. 4 ist der Zwischenüberhitzer 607 parallel zum Frischdampf-Überhitzer 606 geführt. Diese Schaltung resultiert einerseits in einem bestmöglichen Anlagenwirkungsgrad im nominalen Volllastbetrieb, andererseits ist die Dampfmenge, die bei einer begrenzten innerhalb des Überhitzerabschnitts des Abhitzedampferzeugers nutzbaren Wärme auf die Auslegungstemperatur überhitzt werden kann, begrenzt. Aus dieser Begrenzung der Dampfproduktion resultiert eine geringere erzielbare Leistungssteigerung.4, the reheater 607 is parallel to the live steam superheater 606 led. On the one hand, this circuit results in the best possible System efficiency in nominal full load operation, on the other hand the Amount of steam at a limited within the superheater section of the Heat recovery steam generator usable heat to the design temperature can be overheated, limited. For this limitation of steam production results in a lower achievable increase in performance.

Hingegen ist der Zwischenüberhitzer 607 in Fig. 5 parallel zum Verdampfer 604 im Dampferzeuger angeordnet, dergestalt, dass die Zusatzfeuerung auch auf den Zwischenüberhitzer wirkt. Als Resultat wird der Dampf im Nominalbetrieb ohne Zusatzfeuerung nur gering zwischenüberhitzt, und der nominale Wirkungsgrad ist geringer als bei der in Fig. 4 dargestellten Schaltung. Da nunmehr aber die Zusatzfeuerung auf die Zwischenüberhitzerberohrung wirkt, kann mehr Brennstoff sinnvoll zugefeuert werden. Die mit Zusatzfeuerung erhöhte Zwischenüberhitzungstemperatur gleicht zusätzlich Wirkungsgradeinbusen, die mit der Zusatzfeuerung auftreten, zumindest teilweise aus. Bei dieser Anordnung des Zwischenüberhitzers ist eine konstruktive Vorzugsvariante, die Berohrung des Zwischenüberhitzers so anzuordnen, dass die Verdampferberohrung zwischen der Zusatzfeuerung und der Berohrung des Zwischenüberhitzers liegt, und der Wärmeübergang zu dem zu überhitzenden Dampf rein konvektiv getrieben ist. Dadurch, dass nur nass betriebene Wärmetauscherrohre von der Strahlungswärme der Zusatzfeuerung beaufschlagt werden, ist eine wesentlich weniger kostenintensive Bauweise des Kessels möglich.In contrast, the reheater 607 in FIG. 5 is parallel to the evaporator 604 arranged in the steam generator, such that the additional firing also on the reheater works. As a result, the steam is in nominal operation only slightly reheated without additional firing, and the nominal Efficiency is lower than in the circuit shown in Fig. 4. There but now the additional firing acts on the reheater pipe, more fuel can be sensibly fired. The one with additional firing increased reheat temperature is also equal Efficiency losses that occur with the additional firing, at least partially out. In this arrangement of the reheater is one constructive preferred variant, the piping of the reheater so to arrange that the evaporator pipe between the additional firing and the pipe of the reheater, and the heat transfer to the is driven purely by convection to superheating steam. By just being wet operated heat exchanger tubes from the radiant heat of the auxiliary firing is a much less expensive construction of the boiler possible.

Anhand der Ausführungsbeispiele wird ein kleiner Ausschnitt aus dem breiten Spektrum der Bauformen beleuchtet, in denen die in den Ansprüchen gekennzeichnete Erfindung realisiert werden kann. Die Auslegung des Wasser/Dampf-Kreislaufs mit oder ohne Zwischenüberhitzung, die Anordnung des Zwischenüberhitzers im Abhitzedampferzeuger und vieles mehr werden von spezifischen Anforderungen an den Betrieb der Anlage, von Gegebenheiten wie dem Abgasmassenstrom und der Abgastemperatur der Gasturbine, und nicht zuletzt auch durch den Kostenrahmen bestimmt, wobei all die dargestellten Ausführungsformen problemangepasste Vorzugsvarianten der im Hauptanspruch gekennzeichneten Erfindung darstellen.Ebensowenig wie die Darstellung der Gasturbine als Gasturbine mit sequentieller Verbrennung, in einwelliger Anordnung mit der Dampfturbine, darf einschränkend ausgelegt werden, dass in dem Ausführungsbeispiel der Dampfturbinenprozess als Wasser-Dampf-Prozess beschrieben ist. Es kann hier auch ein anderes für die Realisierung des Zweiphasenprozesses geeignetes Arbeitsmedium verwendet werden. Ebenso könnte es sich auch bei dem Gasturbinenprozess um einen geschlossenen Prozess handeln.Based on the exemplary embodiments, a small section of the broad Spectrum of designs in which the in the claims characterized invention can be realized. The interpretation of the Water / steam cycle with or without reheating, the arrangement of the reheater in the heat recovery steam generator and much more of specific requirements for the operation of the plant, of Conditions such as the exhaust gas mass flow and the exhaust gas temperature of the Gas turbine, and not least determined by the budget, whereby all the illustrated embodiments preferred variants adapted to the problem of the invention characterized in the main claim like the representation of the gas turbine as a gas turbine with sequential Combustion, in a single-shaft arrangement with the steam turbine, is allowed be interpreted restrictively that in the embodiment of Steam turbine process is described as a water-steam process. It can here also another one for the realization of the two-phase process suitable working medium can be used. It could also be the same with the gas turbine process is a closed process.

In dieser Weise werden dem Durchschnittsfachmann in Abhängigkeit von der spezifischen Aufgabe eine Vielzahl weiterer Schaltungs- und Anordnungsvarianten zur konkreten Ausführung des in den Ansprüchen gekennzeichneten Erfindungsgegenstandes nahegelegt, die darzustellen den Rahmen dieser Offenbarung bei weitem sprengt.In this way, the average person skilled in the art depending on the specific task a variety of other circuit and Arrangement variants for the concrete execution of the in the claims marked subject of the invention suggests to represent the This disclosure is far beyond the scope of this disclosure.

BezugszeichenlisteReference list

11
GasturbineGas turbine
22nd
Generator generator
33rd
Kupplungclutch
44th
DampfturbineSteam turbine
66
AbhitzedampferzeugerHeat recovery steam generator
77
Kondensatorcapacitor
88th
Kondensat- und SpeisepumpeCondensate and feed pump
99
Kondensat- und SpeisepumpeCondensate and feed pump
1010th
SpeisewasservorwärmerFeed water preheater
1111
SpeisewasservorwärmerFeed water preheater
1212th
SpeisewasservorwärmerFeed water preheater
1313
SpeisewasservorwärmerFeed water preheater
1414
Absperr- und RegelorganShut-off and control device
1515
Absperr- und RegelorganShut-off and control device
1616
Absperr- und RegelorganShut-off and control device
2121
Absperr- und RegelorganShut-off and control device
2222
Absperr- und RegelorganShut-off and control device
2323
Absperr- und RegelorganShut-off and control device
2424th
Absperr- und RegelorganShut-off and control device
2525th
Absperr- und Regelorgan, Dampfeinspritz-RegelventilShut-off and control element, steam injection control valve
2626
Absperr- und Regelorgan, Dampfeinspritz-RegelventilShut-off and control element, steam injection control valve
2727
VerbindungsleitungConnecting line
2828
VerbindungsleitungConnecting line
2929
DreiwegeventilThree-way valve
3030th
DreiwegeventilThree-way valve
3131
VerbindungsleitungConnecting line
3232
VerbindungsleitungConnecting line
3333
Absperr- und RegelorganShut-off and control device
3434
Absperr- und RegelorganShut-off and control device
4141
Brennstofffuel
4242
erste Brennstoffmengefirst amount of fuel
4343
zweite Brennstoffmengesecond amount of fuel
4444
Brennstoffmenge für die NachfeuerungAmount of fuel for re-firing
5151
Ansaugluft der Gasturbine Intake air of the gas turbine
5252
entspanntes Arbeitsmedium der Gasturbinerelaxed working medium of the gas turbine
5353
abgekühltes Abgascooled exhaust gas
7171
Speisewassermenge, SpeisewasserleitungFeed water quantity, feed water pipe
7272
Speisewassermenge, SpeisewasserleitungFeed water quantity, feed water pipe
7373
Erwärmtes (Siede-)WasserHeated (boiling) water
7474
Sattdampf, DampfleitungSaturated steam, steam pipe
7575
(überhitzter) Frischdampf, Dampfleitung(superheated) live steam, steam pipe
7676
entspannter Dampfrelaxed steam
7777
Speisewasser, HauptspeisewassermengeFeed water, main feed water volume
7878
AnzapfdampfmengeDraw steam quantity
7979
AnzapfdampfmengeDraw steam quantity
8080
AnzapfdampfmengeDraw steam quantity
8181
AnzapfdampfmengeDraw steam quantity
8282
teilentspannter Dampfpartially relaxed steam
8383
zwischenüberhitzter Teilentspannter Dampfpartially overheated steam
101101
Verdichtercompressor
102102
erste Brennkammerfirst combustion chamber
103103
erste Turbinefirst turbine
104104
zweite Brennkammersecond combustion chamber
105105
zweite Turbinesecond turbine
401401
Hochdruckteil der DampfturbineHigh pressure part of the steam turbine
402402
Niederdruckteil der DampfturbineLow pressure part of the steam turbine
601601
erster Teil des Economizersfirst part of the economizer
602602
zweiter Teil des Economizerssecond part of the economizer
603603
KesseltrommelBoiler drum
604604
Verdampfer, VerdampferberohrungEvaporator, evaporator tubing
605605
ZusatzfeuerungAdditional firing
606606
Frischdampf-ÜberhitzerLive steam superheater
607607
ZwischenüberhitzerReheater
721721
Speisewasser-TeilstromFeed water partial flow
722722
Speisewasser-TeilstromFeed water partial flow

Claims (21)

Kombianlage, bestehend aus wenigstens einer Gasturbine (1), wenigstens einer Dampfturbine (4), und wenigstens einem Abhitzedampferzeuger (6), welcher Abhitzedampferzeuger wenigstens einen Verdampfer (604) und einen Frischdampfüberhitzer (606) beinhaltet, und welcher Abhitzedampferzeuger im Betrieb von einem entspannten Arbeitsmedium (52, 53) der Gasturbine und von einem Arbeitsmedium (71, 72, 73, 74, 75)der Dampfturbine im Gegenstrom durchströmt wird, dadurch gekennzeichnet, dass in dem Abhitzedampferzeuger eine Zusatzfeuerung (605) in Strömungsrichtung des entspannten Arbeitsmediums der Gasturbine stromab des Frischdampf-Überhitzers des Abhitzedampferzeugers angeordnet ist.Combined system, consisting of at least one gas turbine (1), at least a steam turbine (4) and at least one heat recovery steam generator (6), which heat recovery steam generator has at least one evaporator (604) and includes a live steam superheater (606), and which one Heat recovery steam generator in operation from a relaxed working medium (52, 53) of the gas turbine and from a working medium (71, 72, 73, 74, 75) the steam turbine is flowed through in counterflow, thereby characterized in that an additional firing in the heat recovery steam generator (605) in the flow direction of the relaxed working medium Gas turbine downstream of the live steam superheater of the Heat recovery steam generator is arranged. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass der Abhitzedampferzeuger als Einrohrkessel ausgeführt ist.Combined system according to claim 1, characterized in that the Heat recovery steam generator is designed as a single-tube boiler. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass der Abhitzedampferzeuger als Trommelkessel ausgeführt ist.Combined system according to claim 1, characterized in that the Heat recovery steam generator is designed as a drum boiler. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass die Zusatzfeuerung zwischen dem Frischdampf-Überhitzer und einem Verdampfer (604) des Abhitzedampferzeugers angeordnet ist.Combined system according to claim 1, characterized in that the Additional firing between the live steam superheater and one Evaporator (604) of the heat recovery steam generator is arranged. Kombianlage nach Anspruch 1, wobei in dem Abhitzedampferzeuger ein Economizer angeordnet ist, dadurch gekennzeichnet, dass im Wasser-Dampf-Kreislauf stromab der Speisepumpe (8,9) ein erster Speisewasservorwärmer (10) angeordnet ist, stromab dessen die Speisewasserleitung verzweigt ist, von welcher Verzweigung ausgehend eine erste Speisewasserleitung (71) zu dem am weitesten stromab der Strömung des entspannten Arbeitsmediums der Gasturbine gelegenen Teil des Economizers (601) führt, und wenigstens eine weitere Speisewasserleitung (72) über wenigstens einen weiteren Speisewasservorwärmer (11,12,13) zu einem weiter stromauf gelegenen Abschnitt (602) des Economizers, und/oder unmittelbar in eine Kesseltrommel (603) oder einen Verdampfer (604) geführt ist.Combined system according to claim 1, wherein in the heat recovery steam generator Economizer is arranged, characterized in that in the water-steam cycle a first downstream of the feed pump (8.9) Feed water preheater (10) is arranged, downstream of which the Feed water pipe is branched, from which branch starting a first feed water line (71) to the most downstream of the Flow of the relaxed working medium of the part located in the gas turbine des Economizers (601), and at least one more Feed water line (72) via at least one other Feed water preheater (11, 12, 13) to a further upstream Section (602) of the economizer, and / or immediately into one Boiler drum (603) or an evaporator (604) is guided. Kombianlage nach Anspruch 5, dadurch gekennzeichnet, dass jeder Speisewasservorwärmer (10,11, 12, 13) mit einer Entnahmestelle der Dampfturbine verbunden ist.Combined system according to claim 5, characterized in that everyone Feed water preheater (10, 11, 12, 13) with a tapping point of the Steam turbine is connected. Kombianlage nach Anspruch 5, dadurch gekennzeichnet, dass jede Speisewasserleitung (71, 72) mit jeweils wenigstens einem Absperr- und Regelorgan (14, 15, 16) versehen ist.Combined system according to claim 5, characterized in that each Feed water line (71, 72) each with at least one shut-off and Control element (14, 15, 16) is provided. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass in dem Kreislauf des Arbeitsmedium der Dampfturbine stromab eines Kondensators (7) zwei Pumpen gleicher Leistung (8, 9) angeordnet sind, von denen jeweils eine zum Betrieb der Kombianlage ohne Zusatzfeuerung genügt.Combined system according to claim 1, characterized in that in the Circuit of the working medium of the steam turbine downstream of one Condenser (7) two pumps of the same power (8, 9) are arranged, one of which is used to operate the combination system without additional firing enough. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass ein Zwischenüberhitzer (607) für ein teilentspanntes Arbeitsmedium der Dampfturbine im Abhitzedampferzeuger angeordnet ist.Combined system according to claim 1, characterized in that a Reheater (607) for a partially relaxed working medium Steam turbine is arranged in the heat recovery steam generator. Kombianlage nach Anspruch 9, dadurch gekennzeichnet, dass die zum Abhitzedampferzeuger gehörende Berohrung des Zwischenüberhitzers (607) und die zum Abhitzedampferzeuger gehörende Berohrung des Verdampfers (604) an identischer Position im Abhitzedampferzeuger angeordnet sind. Combined system according to claim 9, characterized in that the for Tubing of the reheater belonging to the heat recovery steam generator (607) and the pipe belonging to the heat recovery steam generator Evaporator (604) at an identical position in the heat recovery steam generator are arranged. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass eine Welle einer Gasturbine (1) mit einem Generator (2) zur Stromerzeugung verbunden ist, und der selbe Generator über eine selbstätig wirkende Kupplung (3) mit einer Welle einer Dampfturbine (4) verbunden ist.Combined system according to claim 1, characterized in that a shaft a gas turbine (1) with a generator (2) for generating electricity is connected, and the same generator via an automatically acting Coupling (3) is connected to a shaft of a steam turbine (4). Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass wenigstens eine Verbindungsleitung (27, 28) von einer Anzapfstelle der Dampfturbine in eine Brennkammer (102, 104) und/oder eine Turbine (103, 105) der Gasturbine führt, und dass diese Verbindungsleitung mit einem Absperr- und Regelorgan (25, 26) versehen ist.Combined system according to claim 1, characterized in that at least a connecting line (27, 28) from a tap of the steam turbine in a combustion chamber (102, 104) and / or a turbine (103, 105) of the Leads gas turbine, and that this connecting line with a shut-off and control element (25, 26) is provided. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass wenigstens eine Verbindungsleitung (31,32) vom Kessel (6) und/oder einer Dampfleitung (74,75,82,83) in eine Brennkammer (102, 104) und/oder eine Turbine (103, 105) der Gasturbine führt, und dass diese Verbindungsleitung mit einem Absperr- und Regelorgan (33,34) versehen ist.Combined system according to claim 1, characterized in that at least a connecting line (31, 32) from the boiler (6) and / or one Steam line (74,75,82,83) into a combustion chamber (102, 104) and / or Turbine (103, 105) of the gas turbine leads, and that this connecting line is provided with a shut-off and control element (33, 34). Kombianlage nach den Ansprüchen 12 und 13, wobei Dampf sowohl von Anzapfstellen der Dampfturbine wie auch von Anzapfstellen am Kessel und/oder den Dampfleitungen der Gasturbine zuführbar ist, dadurch gekennzeichnet, dass zur Umschaltung der Zufuhr von Dampf aus den verschiedenen Zweigen der Dampfversorgung Dreiwegeventile (29,30) in den Verbindungsleitungen eingebaut sind.Combined system according to claims 12 and 13, wherein steam from both Tapping points of the steam turbine as well as tapping points on the boiler and / or the steam lines of the gas turbine can be fed, thereby characterized in that to switch the supply of steam from the various branches of the steam supply three-way valves (29.30) in the connecting lines are installed. Kombianlage nach einem der Ansprüche 12 bis 14, dadurch gekennzeichnet, dass Dampf zur Kühlung thermisch hochbelasteter Gasturbinenkomponenten verwendet wird.Combined system according to one of claims 12 to 14, characterized characterized that steam for cooling is thermally highly stressed Gas turbine components is used. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass die Gasturbine über wenigstens zwei bezüglich der Strömung des Arbeitsmediums in Reihe geschaltete Brennkammern (102, 104) verfügt, wobei zwischen jeweils zwei Brennkammern eine Turbine (103) angeordnet ist, und wobei eine letzte Turbine (105) stromab einer letzten Brennkammer angeordnet ist.Combined system according to claim 1, characterized in that the Gas turbine over at least two with respect to the flow of the Working medium in series-connected combustion chambers (102, 104), a turbine (103) being arranged between each two combustion chambers and a last turbine (105) downstream of a last combustor is arranged. Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass die Temperatur des entspannten Arbeitsmediums (52) der Gasturbine beim Vollastbetrieb der Gasturbine über 580°C liegt.Combined system according to claim 1, characterized in that the Temperature of the relaxed working medium (52) of the gas turbine at Full load operation of the gas turbine is above 580 ° C. Verfahren zum Betrieb einer Kombianlage nach Anspruch 1, dadurch gekennzeichnet, dass in einem ersten Betriebspunkt die Gasturbine in ihrem Vollastbestriebspunkt arbeitet, und den Abhitzekessel mit einem Nennmassenstrom von Abgas beaufschlagt, wobei der Wasser/Dampfmassenstrom derart bemessen ist, dass die Temperatur des Abgases beim Austritt aus dem Verdampfer (604) näherungsweise der Siedetemperatur des Speisewassers entspricht, und dass zur Erhöhung der Leistungsabgabe der Dampfturbine die Zusatzfeuerung in Betrieb genommen wird, welche unmittelbar auf den Verdampfer wirkt, dergestalt, dass die Dampfproduktion ansteigt.Method for operating a combination system according to claim 1, characterized characterized in that the gas turbine in a first operating point their full load operating point works, and the waste heat boiler with one Nominal mass flow of exhaust gas, the Water / steam mass flow is dimensioned such that the temperature of the Exhaust gas when leaving the evaporator (604) approximately the Boiling temperature of the feed water corresponds, and that to increase the Power output of the steam turbine the additional firing in operation is taken, which acts directly on the evaporator, in such a way that the steam production increases. Verfahren nach Anspruch 18, dadurch gekennzeichnet, dass eine Hauptspeisewassermenge (77) in zwei Teilströme (71, 72) aufgeteilt wird, dass ein erster Teilstrom (71) über eine erste Speisewasserleitung unmittelbar einem ersten Abschnitt (601) eines Economizers zugeführt wird, und dass wenigstens ein weiterer Teilstrom, welcher im Economizer oder in der Kesseltrommel oder dem Verdampfer des Abhitzedampferzeugers dem ersten Teilstrom zugemischt wird, in wenigstens einem Vorwärmer (11, 12, 13) soweit erwärmt wird, dass die Temperatur des gesamten Wassermassenstroms (73) beim Eintritt in den Verdampferbereich (603, 604) näherungsweise der Siedetemperatur des Speisewassers entspricht.A method according to claim 18, characterized in that a Main feed water quantity (77) is divided into two partial flows (71, 72), that a first partial flow (71) via a first feed water line is fed directly to a first section (601) of an economizer, and that at least one further partial flow, which in the economizer or in the boiler drum or the evaporator of the heat recovery steam generator first partial stream is mixed in at least one preheater (11, 12, 13) is heated so that the temperature of the whole Water mass flow (73) when entering the evaporator area (603, 604) approximately corresponds to the boiling temperature of the feed water. Verfahren nach Anspruch 18, dadurch gekennzeichnet, dass zur Vorwärmung des Speisewassers der Dampfturbine mindestens eine Dampfmenge (79, 80, 81) an mindestens einer Zwischenentnahmestelle entnommen wird.A method according to claim 18, characterized in that for Preheating the steam turbine feed water at least one Steam quantity (79, 80, 81) at at least one intermediate tapping point is removed. Verfahren nach Anspruch 18, wobei Öl als Brennstoff (41) eingesetzt wird, dadurch gekennzeichnet, dass die erste Speisewasserleitung abgesperrt wird, und, dass ein weiterer Teilstrom auf eine Temperatur vorgewärmt wird, die über der Taupunkttemperatur von Schwefelsäure liegt.The method of claim 18, wherein oil is used as fuel (41), characterized in that the first feed water line is shut off is, and that another partial stream is preheated to a temperature which is above the dew point temperature of sulfuric acid.
EP99810389A 1999-05-05 1999-05-05 Combined power plant with auxiliary burner Withdrawn EP1050667A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP99810389A EP1050667A1 (en) 1999-05-05 1999-05-05 Combined power plant with auxiliary burner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP99810389A EP1050667A1 (en) 1999-05-05 1999-05-05 Combined power plant with auxiliary burner

Publications (1)

Publication Number Publication Date
EP1050667A1 true EP1050667A1 (en) 2000-11-08

Family

ID=8242808

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99810389A Withdrawn EP1050667A1 (en) 1999-05-05 1999-05-05 Combined power plant with auxiliary burner

Country Status (1)

Country Link
EP (1) EP1050667A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002077420A1 (en) 2001-03-27 2002-10-03 Alstom (Switzerland) Ltd Method for immediately, rapidly and temporarily increasing the output of a combined power station
WO2002101205A1 (en) * 2001-05-19 2002-12-19 Alstom (Switzerland) Ltd Method for the operation of a combined power station
EP1462632A2 (en) 2003-03-28 2004-09-29 Alstom Technology Ltd Method and arrangement for adapting the parameters of the hot gas of a hot-gas generator having a downstream technological process
US6813888B2 (en) 2000-12-29 2004-11-09 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
US6951106B2 (en) 2000-12-29 2005-10-04 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
DE10124492B4 (en) * 2001-05-19 2007-07-19 Alstom Technology Ltd. Method for operating a combined cycle power plant with different network requirements
WO2012052276A1 (en) * 2010-10-19 2012-04-26 Alstom Technology Ltd Method for operation of a combined-cycle power plant with cogeneration, and a combined-cycle power plant for carrying out the method
WO2013105071A1 (en) * 2012-01-13 2013-07-18 Alstom Technology Ltd A supercritical heat recovery steam generator reheater and supercritical evaporator arrangement
DE102012218542A1 (en) * 2012-10-11 2014-04-17 Siemens Aktiengesellschaft Method for the flexible operation of a power plant
US9677430B2 (en) 2011-03-01 2017-06-13 General Electric Technology Gmbh Combined cycle power plant

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2023748A1 (en) * 1969-05-14 1971-02-18 Stein Industrie Process for improving the mode of operation of a combined cycle gas and steam turbine system with a downstream steam boiler and system for carrying out the process
FR2257786A1 (en) * 1974-01-15 1975-08-08 Sulzer Ag
EP0582898A1 (en) * 1992-08-10 1994-02-16 Siemens Aktiengesellschaft Method of operating a steam and gas turbine system and system for carrying out the method
EP0620362A1 (en) 1993-04-08 1994-10-19 ABB Management AG Gasturbine
GB2277965A (en) * 1993-05-12 1994-11-16 British Gas Plc Steam turbine
EP0674099A1 (en) * 1994-03-21 1995-09-27 ABB Management AG Cooling method for the thermically charged components of a gasturbine powerplant
DE19615911A1 (en) * 1996-04-22 1997-10-23 Asea Brown Boveri Method for operating a combination system
DE19734862A1 (en) * 1997-08-12 1999-02-18 Bernd Gericke Steam pressure system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2023748A1 (en) * 1969-05-14 1971-02-18 Stein Industrie Process for improving the mode of operation of a combined cycle gas and steam turbine system with a downstream steam boiler and system for carrying out the process
FR2257786A1 (en) * 1974-01-15 1975-08-08 Sulzer Ag
EP0582898A1 (en) * 1992-08-10 1994-02-16 Siemens Aktiengesellschaft Method of operating a steam and gas turbine system and system for carrying out the method
EP0620362A1 (en) 1993-04-08 1994-10-19 ABB Management AG Gasturbine
US5454220A (en) 1993-04-08 1995-10-03 Abb Management Ag Method of operating gas turbine group with reheat combustor
US5577378A (en) 1993-04-08 1996-11-26 Abb Management Ag Gas turbine group with reheat combustor
GB2277965A (en) * 1993-05-12 1994-11-16 British Gas Plc Steam turbine
EP0674099A1 (en) * 1994-03-21 1995-09-27 ABB Management AG Cooling method for the thermically charged components of a gasturbine powerplant
DE19615911A1 (en) * 1996-04-22 1997-10-23 Asea Brown Boveri Method for operating a combination system
DE19734862A1 (en) * 1997-08-12 1999-02-18 Bernd Gericke Steam pressure system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GERICKE B: "KOMBI-ANLAGEN FUER INDUSTRIE UND KOMMUNEN. TEIL 2: ZUSATZBEFEUERTEREINDRUCKPROZESS MIT REKU UND ZUSATZBEFEUERTER MEHRDRUCKPROZESS MIT ZUE", VGB KRAFTWERKSTECHNIK, vol. 77, no. 11, 1 November 1997 (1997-11-01), pages 912 - 919, XP000724054, ISSN: 0372-5715 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6813888B2 (en) 2000-12-29 2004-11-09 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
US6951106B2 (en) 2000-12-29 2005-10-04 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
WO2002077420A1 (en) 2001-03-27 2002-10-03 Alstom (Switzerland) Ltd Method for immediately, rapidly and temporarily increasing the output of a combined power station
US6810675B2 (en) 2001-03-27 2004-11-02 Alstom Technology Ltd Method for operating a combined-cycle power station
WO2002101205A1 (en) * 2001-05-19 2002-12-19 Alstom (Switzerland) Ltd Method for the operation of a combined power station
DE10124492B4 (en) * 2001-05-19 2007-07-19 Alstom Technology Ltd. Method for operating a combined cycle power plant with different network requirements
EP1462632A2 (en) 2003-03-28 2004-09-29 Alstom Technology Ltd Method and arrangement for adapting the parameters of the hot gas of a hot-gas generator having a downstream technological process
US7260938B2 (en) 2003-03-28 2007-08-28 Alstom Technology, Ltd. Method and arrangement for adapting a parameter of a hot gas of a hot-gas generator having a downstream technological process
CN103154446B (en) * 2010-10-19 2015-05-27 阿尔斯通技术有限公司 Method for operation of combined-cycle power plant with cogeneration, and combined-cycle power plant for carrying out the method
CN103154446A (en) * 2010-10-19 2013-06-12 阿尔斯通技术有限公司 Method for operation of combined-cycle power plant with cogeneration, and combined-cycle power plant for carrying out the method
US8984894B2 (en) 2010-10-19 2015-03-24 Alstom Technology Ltd Method for operating a combined-cycle power plant with cogeneration, and a combined-cycle power plant for carrying out the method
WO2012052276A1 (en) * 2010-10-19 2012-04-26 Alstom Technology Ltd Method for operation of a combined-cycle power plant with cogeneration, and a combined-cycle power plant for carrying out the method
US9677430B2 (en) 2011-03-01 2017-06-13 General Electric Technology Gmbh Combined cycle power plant
US9429044B2 (en) 2012-01-13 2016-08-30 Alstom Technology Ltd Supercritical heat recovery steam generator reheater and supercritical evaporator arrangement
WO2013105071A1 (en) * 2012-01-13 2013-07-18 Alstom Technology Ltd A supercritical heat recovery steam generator reheater and supercritical evaporator arrangement
CN103477034A (en) * 2012-01-13 2013-12-25 阿尔斯通技术有限公司 A supercritical heat recovery steam generator reheater and supercritical evaporator arrangement
CN103477034B (en) * 2012-01-13 2015-08-12 阿尔斯通技术有限公司 The reheater of supercritical heat recovery steam generator and Supercritical Evaporation device are arranged
DE102012218542A1 (en) * 2012-10-11 2014-04-17 Siemens Aktiengesellschaft Method for the flexible operation of a power plant
DE102012218542B4 (en) * 2012-10-11 2016-07-07 Siemens Aktiengesellschaft Method for the flexible operation of a power plant
JP2015534633A (en) * 2012-10-11 2015-12-03 シーメンス アクチエンゲゼルシヤフトSiemens Aktiengesellschaft Flexible operation of power plants
WO2014056772A1 (en) 2012-10-11 2014-04-17 Siemens Aktiengesellschaft Method for flexibly operating a nuclear power plant
US10487696B2 (en) 2012-10-11 2019-11-26 Siemens Aktiengesellschaft Method for the flexible operation of a power plant

Similar Documents

Publication Publication Date Title
EP2462378B1 (en) Method for operating a forced-flow steam generator operating at a steam temperature above 650°c and forced-flow steam generator
EP0778397B1 (en) Method of operating a combined power plant with a waste heat boiler and a steam user
EP0591163B2 (en) Combined gas and steam turbine plant
DE2632777C2 (en) Steam power plant with equipment to cover peak loads
CH697959A2 (en) Combined process using supercritical vapor and procedures.
WO1996010124A1 (en) Method of operating a gas and steam turbine plant and plant operating according to this method
DE1170423B (en) Method and arrangement for regulating the steam temperatures in a once-through steam generator with two intermediate superheaters arranged in the flue gas duct
EP0773349A1 (en) Cooling-air cooling unit for power plants
EP1390606B2 (en) Device for cooling coolant in a gas turbine and gas and steam turbine with said device
WO2008067855A2 (en) Method and apparatus for increasing the performance and efficiency of an orc power plant process
EP0515911B1 (en) Method of operating a gas and steam turbine plant and corresponding plant
DE10260993A1 (en) Current generation involves operating power station with heat storage device(s) so process heat stored during low demand periods is sufficient to supply current required during high demand periods
EP0789134B1 (en) Process for operating a power plant
EP1584798B1 (en) Method and apparatus for generating power and heat
EP1050667A1 (en) Combined power plant with auxiliary burner
EP3420202B1 (en) Condensate recirculation
EP1801363A1 (en) Power plant
EP0709561B1 (en) Power plant
DE10155508C2 (en) Method and device for generating electrical energy
DD296733A5 (en) DEHUIT STEAM GENERATORS FOR A GAS AND STEAM TURBINE POWER PLANT
EP3810907B1 (en) Exhaust gas recirculation in gas and steam turbines plants
DE102012110579B4 (en) Plant and process for generating process steam
EP0037845A1 (en) Combined gas-turbines and steam-power plant
DE3815993A1 (en) Binary-vapour turbine plant
WO2012062708A2 (en) Fossil fueled steam generator

Legal Events

Date Code Title Description
GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19990604

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

AKX Designation fees paid

Free format text: DE

18W Application withdrawn

Withdrawal date: 20010705