EP0959202B1 - Crusher - Google Patents

Crusher Download PDF

Info

Publication number
EP0959202B1
EP0959202B1 EP98109026A EP98109026A EP0959202B1 EP 0959202 B1 EP0959202 B1 EP 0959202B1 EP 98109026 A EP98109026 A EP 98109026A EP 98109026 A EP98109026 A EP 98109026A EP 0959202 B1 EP0959202 B1 EP 0959202B1
Authority
EP
European Patent Office
Prior art keywords
permanent magnet
hydraulic cylinder
frame
magnet assembly
movable jaw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98109026A
Other languages
German (de)
French (fr)
Other versions
EP0959202A1 (en
Inventor
Takashi Okumura
Hiroshi Okada
Yoshifumi Itoh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Pneumatic Manufacturing Co Ltd
Original Assignee
Nippon Pneumatic Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Pneumatic Manufacturing Co Ltd filed Critical Nippon Pneumatic Manufacturing Co Ltd
Priority to DE69806342T priority Critical patent/DE69806342T2/en
Priority to ES98109026T priority patent/ES2179399T3/en
Priority to EP98109026A priority patent/EP0959202B1/en
Publication of EP0959202A1 publication Critical patent/EP0959202A1/en
Application granted granted Critical
Publication of EP0959202B1 publication Critical patent/EP0959202B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/96Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
    • E02F3/965Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements of metal-cutting or concrete-crushing implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Definitions

  • This invention relates to a crusher used to dismantle buildings and other structures according to the preamble of the claim.
  • a crusher is mounted on an arm tip of a civil engineering machine such as a backhoe to dismantle buildings.
  • the crusher has a fixed jaw secured to the crusher main frame, and a movable jaw provided pivotally opposite the fixed jaw.
  • the movable jaw is opened and closed by a hydraulic cylinder to dismantle a building and break dismantled material into smaller pieces in cooperation with the fixed jaw.
  • Cutting blades provided on the fixed and movable jaws cut iron material, such as iron bars, exposed from the building being dismantled.
  • the closest prior art is a metallic waste disposal device (DE-A-195 24 226, US-A-5 628 611), wherein a working unit attached to the distal end of a movable arm of a construction machine is provided with a permanent magnet assembly which attracts and disposes of metallic wastes produced when tearing down a building.
  • Iron material thus cut is recovered from the dismantled wastes. Manually recovering such iron material is extremely troublesome and also dangerous because the dismantled remains of a building may collapse.
  • crushers disclosed in unexamined Japanese patent publications JP-A-813815 and JP-A-4 155068 have a permanent magnet mounted in the main body having the fixed jaw to recover iron material from among dismantled remains by magnetically attracting such iron material with the permanent magnet.
  • a permanent magnet is slid in a composite frame comprising a nonmagnetic frame and a magnetic frame.
  • iron material is attracted, and the attraction force is released by sliding the permanent magnet into the magnetic frame.
  • a force greater than the attraction force applied to the magnetic frame has to be applied to the permanent magnet.
  • a large load is applied to a link mechanism for converting the opening/closing movement of the movable jaw into sliding motion of the permanent magnet. The link mechanism thus tends to become shaky soon and its life is short.
  • the composite frame is provided in a relatively small space in the crusher body. Only the bottom of the nonmagnetic frame of the composite frame is used as the surface for attracting iron material. Thus, the attracting surface area is thus small, so that it is impossible to recover iron material with high efficiency.
  • a permanent magnet is slidably mounted in a nonmagnetic casing to define front and rear chambers in the casing.
  • Pressure oil is alternately supplied into one of the chambers to move the permanent magnet.
  • the permanent magnet which corresponds to a piston of a hydraulic cylinder, tends to be influenced by water contained in pressure oil.
  • An object of this invention is to provide a crusher with a permanent magnet which is simple in structure and inexpensive.
  • a crusher comprising a frame having a pair of side plates, a fixed jaw fixed to the frame, a movable jaw pivotally supported on the frame at a position opposite the fixed jaw, a first hydraulic cylinder for opening and closing the movable jaw relative to the fixed jaw, a magnet case mounted between the pair of side plates of the frame, a permanent magnet assembly slidably mounted in the magnet case, and a second hydraulic cylinder connected to the permanent magnet assembly for sliding the permanent magnet assembly, the first and second hydraulic cylinders being operatively associated with each other.
  • on-off valves are provided in an oil feed line communicating with the front chamber of the second hydraulic cylinder and in an oil feed line communicating with the rear chamber of the second hydraulic cylinder.
  • pressurized oil can be sealed in the front or rear chamber of the hydraulic cylinder.
  • the permanent magnet can be moved only when collecting the iron bars and can be held in an inoperative position when breaking the dismantled material and cutting the iron bars.
  • a throttle is provided between one of the on-off valves and the front chamber of the second hydraulic cylinder, and a check valve is provided in a bypass line having one end thereof communicating with the inlet end of the throttle and the other end with the outlet end of the throttle. This prevents oil in the front chamber of the second hydraulic cylinder from flowing through the bypass line. This assures that the permanent magnet moves quickly away from the bottom plate of the magnet case and moves slowly toward the bottom plate.
  • a main frame 10 has a pair of side plates 11 each formed with a pair of pin holes 12, 13 at the upper portion thereof.
  • the frame 10 is pivotally mounted on the tip of an arm 1 of a civil engineering machine by a pin 14 inserted through the holes 12.
  • a two-joint link 2 has one end thereof coupled to the tip of the arm 1 and the other end to the frame 10 by a pin 15 inserted through the holes 13.
  • a cylinder 3 is coupled to the connecting portion of the joints of the link 2. By activating the cylinder 3, the frame 10 is pivoted about the pin 14.
  • a fixed jaw 16 is provided at one side of the lower portion of the frame 10. Opposite the jaw 16, a movable jaw 17 is pivotally supported on a shaft 18 extending between the pair of side plates 11.
  • the movable jaw 17 is opened and closed relative to the fixed jaw 16 by a hydraulic cylinder 19 provided between the pair of side plates 11.
  • the movable jaw 17 has crushing teeth 20 at its tip.
  • the fixed jaw 16 and the movable jaw 17 carry cutting blades 21, 22, respectively, opposite each other to cut iron members.
  • An open-bottomed housing 23 is provided at the bottom of the frame 10.
  • a hollow magnet case 24 is mounted in the housing 23.
  • the magnet case 24 is made from a nonmagnetizable material, and as shown in Fig. 2A, has a bottom plate 25 fixed by tightening bolts 27 against supports 26 fixed to the inner surface of the housing 23 near its bottom.
  • a permanent magnet assembly 29 is vertically slidably supported between vertical guides 28.
  • the permanent magnet assembly 29 comprises an open-bottomed, box-shaped yoke 30 made from a magnetizable material, and a permanent magnet 31 mounted in the yoke 30.
  • the yoke 30 has at its top a coupling piece 32 coupled to a piston rod 34 of a hydraulic cylinder 33 for sliding the magnet 31.
  • the cylinder 33 is bolted to a top plate 35 of the magnet case 24.
  • Cushioning members 36 are provided on the top plate 35 to absorb shocks when the permanent magnet assembly 29 collides against the top plate 35.
  • Fig. 3 shows a hydraulic circuit.
  • Oil feed lines 37a and 37b are connected to a cylinder front chamber 19a and a cylinder rear chamber 19b of the hydraulic cylinder 19 to open and close the movable jaw 17, respectively.
  • On-off valves 39a and 39b are provided in the lines 38a and 38b, respectively, to selectively supply pressure oil to the hydraulic cylinder 33.
  • the line 38a communicating with the front chamber 33a has a throttle 40 disposed between the on-off valve 39a and the front chamber 33a.
  • the hydraulic circuit further includes a bypass line 41 having one and the other ends thereof communicating with the inlet and outlet ends of the throttle 40, respectively.
  • a check valve 42 is provided in the bypass line 41 to prevent oil in the front chamber 33a from flowing through the bypass line 41 toward the on-off valve 39a.
  • the movable jaw 17 is opened and closed about the shaft 18 by supplying pressure oil to the hydraulic cylinder 19 to dismantle a building with the movable jaw 17 and the fixed jaw 16, and to break dismantled material into smaller pieces and to cut e.g. iron bars.
  • the on-off valves 39a, 39b are open, pressure oil is supplied into the hydraulic cylinder 33.
  • the permanent magnet assembly 29 will thus be unnecessarily moved up and down as the movable jaw 17 is opened and closed.
  • the on-off valves 39a, 39b are closed to keep the permanent magnet assembly 29 at the elevated position under the pressure of oil sealed in the front chamber 33a.
  • the on-off valves 39a, 39b shown in Fig. 3 are opened to lower the permanent magnet assembly 29 by supplying pressure oil to the rear chamber 33b of the hydraulic cylinder 33. Iron material is thus attracted to the bottom surface of the bottom plate 25 of the magnet case 24 by a magnetic flux flowing through the bottom plate 25.
  • the throttle 40 restricts the flow of oil from the front cylinder chamber 33a through the line 38a.
  • the assembly 29 is thus lowered slowly, making it possible for the assembly 29 to soft-land on the bottom plate 25.
  • Iron material attracted to the bottom 25 of the magnet case 24 is moved to a predetermined position e.g. by turning the arm, and pressure oil is supplied to the front chamber 33a of the hydraulic cylinder 33 to raise the permanent magnet assembly 29. This weakens the magnetic force, so that the iron material drops by gravity.
  • the hydraulic cylinder 19 for opening and closing the movable jaw 17 is operatively associated with the hydraulic cylinder 33 so that when the movable jaw 17 is opened, the permanent magnet assembly 29 is raised simultaneously.
  • the oil line may be arranged such that the on-off valve 39a communicates with the rear cylinder chamber 33b and the on-off valve 39b communicates with the front cylinder chamber 33a to raise the permanent magnet assembly 29 when the movable jaw 17 is closed.
  • the lines 38a, 38b branching from the lines 37a, 37b leading to the cylinder for opening and closing the movable jaw are connected to the hydraulic cylinder 33, so that the opening and closing of the movable jaw 17 can be operatively associated with the sliding movement of the permanent magnet assembly 29.
  • the structure is thus simple, and the hydraulic circuit can be constructed easily.
  • the changeover between ordinary operations of dismantling and breakage of material into smaller pieces and iron recovery operations is done easily by opening and closing the on-off valves 39a, 39b provided in the lines 38a, 38b.
  • the mounting position of the magnet case 24 is not limited to the bottom of the frame 10. It may be mounted on the other side, i.e. the side on which the fixed jaw 16 is not formed.
  • the structure is simple. No accurate machining of the magnet case and the permanent magnet assembly is required. The entire crusher can thus be manufactured at a low cost. Since the permanent magnet assembly is slid toward and away from the iron attracting surface, it is possible to provide a larger iron attracting surface compared with an arrangement in which the permanent magnet is slid parallel to the iron attracting surface.
  • the permanent magnet assembly is stopped and held at a slide position, so that during crushing of a building, in which the crushing jaws are opened and closed, it is possible to prevent unnecessary movement of the permanent magnet.
  • the permanent magnet assembly can be moved quickly away from the bottom plate of the magnet case, so that the attraction of iron material can be released instantly. Also, the permanent magnet assembly can be slowly moved toward the bottom plate, so that it is possible to prevent breakage of the bottom plate by colliding with the permanent magnet assembly.

Description

  • This invention relates to a crusher used to dismantle buildings and other structures according to the preamble of the claim.
  • A crusher is mounted on an arm tip of a civil engineering machine such as a backhoe to dismantle buildings.
  • The crusher has a fixed jaw secured to the crusher main frame, and a movable jaw provided pivotally opposite the fixed jaw. The movable jaw is opened and closed by a hydraulic cylinder to dismantle a building and break dismantled material into smaller pieces in cooperation with the fixed jaw.
  • Cutting blades provided on the fixed and movable jaws cut iron material, such as iron bars, exposed from the building being dismantled.
  • The closest prior art is a metallic waste disposal device (DE-A-195 24 226, US-A-5 628 611), wherein a working unit attached to the distal end of a movable arm of a construction machine is provided with a permanent magnet assembly which attracts and disposes of metallic wastes produced when tearing down a building.
  • Iron material thus cut is recovered from the dismantled wastes. Manually recovering such iron material is extremely troublesome and also dangerous because the dismantled remains of a building may collapse.
  • In order to solve this problem, crushers disclosed in unexamined Japanese patent publications JP-A-813815 and JP-A-4 155068 have a permanent magnet mounted in the main body having the fixed jaw to recover iron material from among dismantled remains by magnetically attracting such iron material with the permanent magnet.
  • In the case of the crusher disclosed in unexamined Japanese patent publication JP-A-813815, a permanent magnet is slid in a composite frame comprising a nonmagnetic frame and a magnetic frame. With the permanent magnet in the nonmagnetic frame, iron material is attracted, and the attraction force is released by sliding the permanent magnet into the magnetic frame. To slide the permanent magnet, a force greater than the attraction force applied to the magnetic frame has to be applied to the permanent magnet. Thus, a large load is applied to a link mechanism for converting the opening/closing movement of the movable jaw into sliding motion of the permanent magnet. The link mechanism thus tends to become shaky soon and its life is short.
  • In this arrangement, the composite frame is provided in a relatively small space in the crusher body. Only the bottom of the nonmagnetic frame of the composite frame is used as the surface for attracting iron material. Thus, the attracting surface area is thus small, so that it is impossible to recover iron material with high efficiency.
  • In the case of the crusher disclosed in unexamined Japanese patent publication JP-A-4155068, a permanent magnet is slidably mounted in a nonmagnetic casing to define front and rear chambers in the casing. Pressure oil is alternately supplied into one of the chambers to move the permanent magnet. Thus, the permanent magnet, which corresponds to a piston of a hydraulic cylinder, tends to be influenced by water contained in pressure oil.
  • Further, it is necessary to seal the front and rear chambers from each other by mounting a seal member on the outer periphery of the permanent magnet. Since the permanent magnet with the seal member is slid along the inner surface of the casing, the inner surface of the casing has to be finished with extremely high accuracy. Thus, machining is extremely troublesome and costly.
  • An object of this invention is to provide a crusher with a permanent magnet which is simple in structure and inexpensive.
  • SUMMARY OF THE INVENTION
  • According to this invention, there is provided a crusher comprising a frame having a pair of side plates, a fixed jaw fixed to the frame, a movable jaw pivotally supported on the frame at a position opposite the fixed jaw, a first hydraulic cylinder for opening and closing the movable jaw relative to the fixed jaw, a magnet case mounted between the pair of side plates of the frame, a permanent magnet assembly slidably mounted in the magnet case, and a second hydraulic cylinder connected to the permanent magnet assembly for sliding the permanent magnet assembly, the first and second hydraulic cylinders being operatively associated with each other.
  • According to the present invention, on-off valves are provided in an oil feed line communicating with the front chamber of the second hydraulic cylinder and in an oil feed line communicating with the rear chamber of the second hydraulic cylinder. By actuating the on-off valves, pressurized oil can be sealed in the front or rear chamber of the hydraulic cylinder. Thus the permanent magnet can be moved only when collecting the iron bars and can be held in an inoperative position when breaking the dismantled material and cutting the iron bars.
  • Also, according to the present invention, a throttle is provided between one of the on-off valves and the front chamber of the second hydraulic cylinder, and a check valve is provided in a bypass line having one end thereof communicating with the inlet end of the throttle and the other end with the outlet end of the throttle. This prevents oil in the front chamber of the second hydraulic cylinder from flowing through the bypass line. This assures that the permanent magnet moves quickly away from the bottom plate of the magnet case and moves slowly toward the bottom plate.
  • Other features and objects of the present invention will become apparent from the following description made with reference to the accompanying drawings, in which:
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Fig. 1 is a partially cutaway front view of a crusher embodying this invention;
  • Fig. 2A is an enlarged sectional view of an iron attracting portion of the crusher of Fig. 1;
  • Fig. 2B is a section taken along line II-II of Fig. 2A; and
  • Fig. 3 shows a hydraulic circuit of the crusher of Fig. 1.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • Now an embodiment of this invention is described with reference to the attached drawings.
  • As shown in Fig. 1, a main frame 10 has a pair of side plates 11 each formed with a pair of pin holes 12, 13 at the upper portion thereof.
  • The frame 10 is pivotally mounted on the tip of an arm 1 of a civil engineering machine by a pin 14 inserted through the holes 12. A two-joint link 2 has one end thereof coupled to the tip of the arm 1 and the other end to the frame 10 by a pin 15 inserted through the holes 13.
  • A cylinder 3 is coupled to the connecting portion of the joints of the link 2. By activating the cylinder 3, the frame 10 is pivoted about the pin 14.
  • A fixed jaw 16 is provided at one side of the lower portion of the frame 10. Opposite the jaw 16, a movable jaw 17 is pivotally supported on a shaft 18 extending between the pair of side plates 11.
  • The movable jaw 17 is opened and closed relative to the fixed jaw 16 by a hydraulic cylinder 19 provided between the pair of side plates 11.
  • The movable jaw 17 has crushing teeth 20 at its tip. The fixed jaw 16 and the movable jaw 17 carry cutting blades 21, 22, respectively, opposite each other to cut iron members.
  • An open-bottomed housing 23 is provided at the bottom of the frame 10. A hollow magnet case 24 is mounted in the housing 23.
  • The magnet case 24 is made from a nonmagnetizable material, and as shown in Fig. 2A, has a bottom plate 25 fixed by tightening bolts 27 against supports 26 fixed to the inner surface of the housing 23 near its bottom.
  • In the case 24, a permanent magnet assembly 29 is vertically slidably supported between vertical guides 28. The permanent magnet assembly 29 comprises an open-bottomed, box-shaped yoke 30 made from a magnetizable material, and a permanent magnet 31 mounted in the yoke 30. The yoke 30 has at its top a coupling piece 32 coupled to a piston rod 34 of a hydraulic cylinder 33 for sliding the magnet 31. The cylinder 33 is bolted to a top plate 35 of the magnet case 24. Cushioning members 36 are provided on the top plate 35 to absorb shocks when the permanent magnet assembly 29 collides against the top plate 35.
  • Fig. 3 shows a hydraulic circuit. Oil feed lines 37a and 37b are connected to a cylinder front chamber 19a and a cylinder rear chamber 19b of the hydraulic cylinder 19 to open and close the movable jaw 17, respectively.
  • From a hydraulic pressure generating unit (not shown) mounted on the civil engineering machine, pressure oil is supplied to the oil feed lines 37a, 37b through a changeover valve. Lines 38a and 38b branch from the lines 37a and 37b, respectively. The line 38a is connected to a front chamber 33a of the cylinder 33, while the other line 38b is connected to its rear chamber 33b.
  • Thus, when pressure oil is supplied into the line 37a to open the movable jaw 17, pressure oil in the line partially flows into the front chamber 33a of the cylinder 33, thus raising the permanent magnet assembly 29. When the movable jaw 17 is closed, the permanent magnet assembly 29 is lowered.
  • On-off valves 39a and 39b are provided in the lines 38a and 38b, respectively, to selectively supply pressure oil to the hydraulic cylinder 33. The line 38a communicating with the front chamber 33a has a throttle 40 disposed between the on-off valve 39a and the front chamber 33a. The hydraulic circuit further includes a bypass line 41 having one and the other ends thereof communicating with the inlet and outlet ends of the throttle 40, respectively. A check valve 42 is provided in the bypass line 41 to prevent oil in the front chamber 33a from flowing through the bypass line 41 toward the on-off valve 39a.
  • In operation, the movable jaw 17 is opened and closed about the shaft 18 by supplying pressure oil to the hydraulic cylinder 19 to dismantle a building with the movable jaw 17 and the fixed jaw 16, and to break dismantled material into smaller pieces and to cut e.g. iron bars.
  • If, during dismantling operations, the on-off valves 39a, 39b are open, pressure oil is supplied into the hydraulic cylinder 33. The permanent magnet assembly 29 will thus be unnecessarily moved up and down as the movable jaw 17 is opened and closed. In order to prevent this problem, the on-off valves 39a, 39b are closed to keep the permanent magnet assembly 29 at the elevated position under the pressure of oil sealed in the front chamber 33a.
  • To recover iron material such as iron bars from among dismantled wastes, the on-off valves 39a, 39b shown in Fig. 3 are opened to lower the permanent magnet assembly 29 by supplying pressure oil to the rear chamber 33b of the hydraulic cylinder 33. Iron material is thus attracted to the bottom surface of the bottom plate 25 of the magnet case 24 by a magnetic flux flowing through the bottom plate 25.
  • When the permanent magnet assembly 29 is lowered, the throttle 40 restricts the flow of oil from the front cylinder chamber 33a through the line 38a. The assembly 29 is thus lowered slowly, making it possible for the assembly 29 to soft-land on the bottom plate 25.
  • Iron material attracted to the bottom 25 of the magnet case 24 is moved to a predetermined position e.g. by turning the arm, and pressure oil is supplied to the front chamber 33a of the hydraulic cylinder 33 to raise the permanent magnet assembly 29. This weakens the magnetic force, so that the iron material drops by gravity.
  • As the permanent magnet assembly 29 is raised, pressure oil flowing through the branch line 38a flows into the front cylinder chamber 33a from both the throttle 40 and the check valve 42. This permits the permanent magnet assembly 29 to quickly rise, so that iron material attracted thereto is instantly released and dropped.
  • In the embodiment, the hydraulic cylinder 19 for opening and closing the movable jaw 17 is operatively associated with the hydraulic cylinder 33 so that when the movable jaw 17 is opened, the permanent magnet assembly 29 is raised simultaneously. But instead, the oil line may be arranged such that the on-off valve 39a communicates with the rear cylinder chamber 33b and the on-off valve 39b communicates with the front cylinder chamber 33a to raise the permanent magnet assembly 29 when the movable jaw 17 is closed.
  • As described above, the lines 38a, 38b branching from the lines 37a, 37b leading to the cylinder for opening and closing the movable jaw are connected to the hydraulic cylinder 33, so that the opening and closing of the movable jaw 17 can be operatively associated with the sliding movement of the permanent magnet assembly 29. The structure is thus simple, and the hydraulic circuit can be constructed easily. The changeover between ordinary operations of dismantling and breakage of material into smaller pieces and iron recovery operations is done easily by opening and closing the on-off valves 39a, 39b provided in the lines 38a, 38b.
  • The mounting position of the magnet case 24 is not limited to the bottom of the frame 10. It may be mounted on the other side, i.e. the side on which the fixed jaw 16 is not formed.
  • As described above, according to this invention, the structure is simple. No accurate machining of the magnet case and the permanent magnet assembly is required. The entire crusher can thus be manufactured at a low cost. Since the permanent magnet assembly is slid toward and away from the iron attracting surface, it is possible to provide a larger iron attracting surface compared with an arrangement in which the permanent magnet is slid parallel to the iron attracting surface.
  • By closing the on-off valves, the permanent magnet assembly is stopped and held at a slide position, so that during crushing of a building, in which the crushing jaws are opened and closed, it is possible to prevent unnecessary movement of the permanent magnet.
  • The permanent magnet assembly can be moved quickly away from the bottom plate of the magnet case, so that the attraction of iron material can be released instantly. Also, the permanent magnet assembly can be slowly moved toward the bottom plate, so that it is possible to prevent breakage of the bottom plate by colliding with the permanent magnet assembly.

Claims (1)

  1. A crusher comprising a frame (10) having a pair of side plates (11), a fixed jaw (16) fixed to said frame (10), a movable jaw (17) pivotally supported on said frame (10) at a position opposite said fixed jaw (16), a first hydraulic cylinder (19) for opening and closing said movable jaw (17) relative to said fixed jaw (16), a magnet case (24) mounted between said pair of side plates (11) of said frame (10), a permanent magnet assembly (29) slidably mounted in said magnet case (24), and a second hydraulic cylinder (33) connected to said permanent magnet assembly (29) for sliding said permanent magnet assembly (29), said first and second hydraulic cylinders (19, 33) being operatively associated with each other, characterized in that a first on-off valve (39a) is provided in an oil feed line (37a) communicating with a front chamber (33a) of said second hydraulic cylinder (33) and a second on-off valve (39b) is provided in an oil feed line (37b) communicating with a rear chamber (33b) of said second hydraulic cylinder (33) and further characterized by a throttle means (40) provided between said first on-off valve (39a) and said front chamber (33a) of said second hydraulic cylinder (33), a bypass line (41) having one end thereof communicating with the inlet end of said throttle means (40) and the other end with the outlet end of said throttle means (40), and a check valve (42) provided in said bypass line (41) for preventing oil in said front chamber (33a) of said second hydraulic cylinder (33) from flowing through said bypass line (41).
EP98109026A 1998-05-18 1998-05-18 Crusher Expired - Lifetime EP0959202B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE69806342T DE69806342T2 (en) 1998-05-18 1998-05-18 breaker
ES98109026T ES2179399T3 (en) 1998-05-18 1998-05-18 CRUSHER.
EP98109026A EP0959202B1 (en) 1998-05-18 1998-05-18 Crusher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP98109026A EP0959202B1 (en) 1998-05-18 1998-05-18 Crusher

Publications (2)

Publication Number Publication Date
EP0959202A1 EP0959202A1 (en) 1999-11-24
EP0959202B1 true EP0959202B1 (en) 2002-07-03

Family

ID=8231955

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98109026A Expired - Lifetime EP0959202B1 (en) 1998-05-18 1998-05-18 Crusher

Country Status (3)

Country Link
EP (1) EP0959202B1 (en)
DE (1) DE69806342T2 (en)
ES (1) ES2179399T3 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2563850B2 (en) 1990-10-18 1996-12-18 株式会社エス・テー・ケー商会 Crusher with magnet
JP2650854B2 (en) 1994-07-04 1997-09-10 有限会社 エス・ケー工業 Attachments for construction machinery
FI99266C (en) * 1996-03-15 1998-02-10 Tamrock Oy Arrangement in a pressure medium cylinder

Also Published As

Publication number Publication date
ES2179399T3 (en) 2003-01-16
DE69806342D1 (en) 2002-08-08
EP0959202A1 (en) 1999-11-24
DE69806342T2 (en) 2003-03-27

Similar Documents

Publication Publication Date Title
US9297141B2 (en) Coupler
US4890798A (en) Structure crushing equipment
US5802747A (en) Crusher
JPH10266587A (en) Hydraulic equipment
US6015108A (en) Crusher
KR101955676B1 (en) Quick coupler with straight moving hook
US5628611A (en) Metallic waste disposal device for industrial machinery
EP0959202B1 (en) Crusher
JPH01501327A (en) Impact ripper control system
JP3917756B2 (en) Crusher
CN107191636A (en) Hammer protection system and method
JPS6283504A (en) Hydraulic circuit of structure wrecking machine
JP2011012458A (en) Hydraulic device for crusher
JP3571025B2 (en) Attachment with electromagnet for construction machinery
JP3039456U (en) Jaw crusher
JP3986646B2 (en) Crusher with magnet
JPS60227001A (en) Intensifying cylinder device
JP3570983B2 (en) Demolition machine attachment for construction machinery
JP2010248858A (en) Hydraulic device for crusher
JP4087308B2 (en) Concrete crusher
US11578474B2 (en) Hydraulic cylinder, for example for use with a hydraulic tool
CN208965622U (en) A kind of scrapers perching knife protection system
JP2537242Y2 (en) Clog removal device for rough stone in crusher
JPH11311030A (en) Magnet device for demolition work machine
JP4176260B2 (en) Crusher magnet device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE ES FR GB IT NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20000124

AKX Designation fees paid

Free format text: DE ES FR GB IT NL

17Q First examination report despatched

Effective date: 20010219

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE ES FR GB IT NL

REF Corresponds to:

Ref document number: 69806342

Country of ref document: DE

Date of ref document: 20020808

ET Fr: translation filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2179399

Country of ref document: ES

Kind code of ref document: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20030404

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20100324

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20100608

Year of fee payment: 13

Ref country code: ES

Payment date: 20100520

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20100520

Year of fee payment: 13

Ref country code: IT

Payment date: 20100526

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20100729

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69806342

Country of ref document: DE

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69806342

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20111201

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20110518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20120131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110518

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110519