EP0770726A1 - Multi-strand steel cord - Google Patents

Multi-strand steel cord Download PDF

Info

Publication number
EP0770726A1
EP0770726A1 EP96202786A EP96202786A EP0770726A1 EP 0770726 A1 EP0770726 A1 EP 0770726A1 EP 96202786 A EP96202786 A EP 96202786A EP 96202786 A EP96202786 A EP 96202786A EP 0770726 A1 EP0770726 A1 EP 0770726A1
Authority
EP
European Patent Office
Prior art keywords
strands
strand
cord
steel cord
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP96202786A
Other languages
German (de)
French (fr)
Other versions
EP0770726B1 (en
Inventor
Luc Bourgois
Paul Soenen
Frans Van Giel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bekaert NV SA
Original Assignee
Bekaert NV SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bekaert NV SA filed Critical Bekaert NV SA
Priority to EP19960202786 priority Critical patent/EP0770726B1/en
Publication of EP0770726A1 publication Critical patent/EP0770726A1/en
Application granted granted Critical
Publication of EP0770726B1 publication Critical patent/EP0770726B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B1/00Constructional features of ropes or cables
    • D07B1/06Ropes or cables built-up from metal wires, e.g. of section wires around a hemp core
    • D07B1/0606Reinforcing cords for rubber or plastic articles
    • D07B1/0613Reinforcing cords for rubber or plastic articles the reinforcing cords being characterised by the rope configuration
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B3/00General-purpose machines or apparatus for producing twisted ropes or cables from component strands of the same or different material
    • D07B3/08General-purpose machines or apparatus for producing twisted ropes or cables from component strands of the same or different material in which the take-up reel rotates about the axis of the rope or cable or in which a guide member rotates about the axis of the rope or cable to guide the rope or cable on the take-up reel in fixed position and the supply reels are fixed in position
    • D07B3/10General-purpose machines or apparatus for producing twisted ropes or cables from component strands of the same or different material in which the take-up reel rotates about the axis of the rope or cable or in which a guide member rotates about the axis of the rope or cable to guide the rope or cable on the take-up reel in fixed position and the supply reels are fixed in position with provision for imparting more than one complete twist to the ropes or cables for each revolution of the take-up reel or of the guide member
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2207/00Rope or cable making machines
    • D07B2207/20Type of machine
    • D07B2207/204Double twist winding
    • D07B2207/205Double twist winding comprising flyer
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2207/00Rope or cable making machines
    • D07B2207/20Type of machine
    • D07B2207/207Sequential double twisting devices

Definitions

  • the present invention relates to a steel cord comprising a number of strands twisted together, which is a so-called multi-strand steel cord.
  • multi-strand steel cords were the standard cords for reinforcing elastomeric products such as rubber tires, conveyor belts, transmission belts.
  • multi-strand steel cords are still common in reinforcing heavy tires such as off-the-road tires, conveyor belts, timing belts and transmission belts.
  • Most multi-strand steel cords are manufactured in an expensive way the last steps of which may be summarized as follows :
  • a steel cord which comprises eight or more strands twisted together.
  • Each of the strands has a substantially same cord twisting direction and a substantially same cord twisting pitch.
  • Each of said strands consists of two to five individual filaments twisted together.
  • the terms "cord twisting pitch" refer to the axial distance required to make a 360 degree revolution of a strand in the final cord.
  • the fact that the strands have the same cord twisting direction and the same cord twisting pitch allows the multi-strand steel cord to be made in an economical and highly efficient way.
  • the fact that each of the strands consists of only two to five individual filaments and, as a consequence, comprises no core filament allows to make the multi-strand steel cord without experiencing problems of core filament migration in the individual strands.
  • the individual steel filaments of every strand have the same strand twisting direction and substantially the same strand twisting pitch.
  • strand twisting pitch refer to the axial distance required to make a 360 degree revolution of a filament in a strand of the final cord.
  • the number of strands in the multi-strand steel cord according to the invention is at least eight, and can be nine, twelve,fifteen... in order to provide for a suitable alternative for the prior art cord constructions 7x7, 7x19, 7x31.
  • Preferable configurations comprise twelve, nineteen or twenty-seven strands and are respectively designated by 12xn-, 19xn- and 27xn-cords, where n is the number of filaments in each strand and ranges from two to five.
  • a 12xn-cord has three center strands and nine outer strands.
  • a 19xn-cord has one center strand, six intermediate strands and twelve outer strands.
  • a 27xn-cord has three center strands, nine intermediate strands and fifteen outer strands.
  • the center strand or center strands In order to prevent the center strand or center strands from migrating out of the cord under the influence of repeated external bending forces, it is preferable that the center strand or center strands have a larger diameter than the diameter of the outer strands and/or intermediate strands.
  • the strand twisting direction may be equal to or opposite to the cord twisting direction.
  • the strand twisting pitch may be equal to or different from the cord twisting pitch.
  • the multi-strand steel cord is preferably adapted to reinforce elastomeric products, which means that it has either alone or in combination one or more of following properties :
  • the multi-strand cord according to the invention may have been covered with a synthetic material such as polyamide.
  • FIGURE 1 shows a transversal cross-section of a 12x2 multi-strand steel cord 10.
  • the cord 10 comprises three center strands 12 and nine outer strands 14.
  • Each of the center strands 12 and each of the outer strands 14 consists of only two filaments 16.
  • Each of the the center 12 and each of the outer strands 14 have the same cord twisting pitch and same cord twisting direction in the final cord 10, for example :
  • FIGURE 2 shows a transversal cross-section of a 12x3 multi-strand steel cord.
  • Steel cord 10 comprises three center strrands 12 and nine outer strands 14.
  • the diameter of the center strands 12 is somewhat larger than the diameter of the outer strands 14 because the filaments 18 of the center strands have a filament diameter that is larger than the filaments 16 of the outer strands.
  • An example is as follows :
  • FIGURE 3 shows a cross-section of another embodiment cord which comprises also three center strands 12 and nine outer strands 14.
  • the center strands 18 have a diameter larger than the diameter of the outer strands 18 by the fact that they consist of three filaments 18 while the outer strands 14 consist only of two filaments 16.
  • the filaments 18 of the center strands and the filaments 16 of the outer strands have an equal diameter.
  • An example is :
  • FIGURE 4 shows a cross-section of a 19x4 multi-strand steel cord 10.
  • the cord comprises one center strand 12, six intermediate strands 20 and twelve outer strands 14.
  • Each of the strands consists of four filaments.
  • the four filaments of the center strand 12 have a diameter that is somewhat larger than the diameter of the filaments of the intermediate strands 20 and outer strands 14.
  • FIGURE 5 shows a cross-section of a 27x2 multi-strand steel cord 10.
  • the cord comprises three center strands 12, nine intermediate strands 20 and fifteen outer strands 14.
  • Each of the strands consists of two filaments.
  • the two filaments 18 of the center strand 12 have a diameter that is somewhat larger than the diameter of the filaments 16 of the intermediate strands 20 and outer strands 14.
  • the multi-strand steel cords according to the invention may be used to replace the common multi-strand steel cords without loss in breaking load or in other mechanical properties.
  • FIGURE 6 illustrates how a 12x3 multi-strand steel cord according to the invention can be made in one single cord making step, thus avoiding the multiple steps of making the individual strands.
  • three individual filaments 16 are drawn from one supply spool 22 or from three separate supply spools 22.
  • the filaments 16 are guided via a reversing pulley 23, over a flyer 24 to a guiding pulley 25.
  • Flyer 24 rotates at a rotational speed n RAD and gives to the filaments 16 two twists per rotation so that a (provisional) strand 14 is made. This is done twelve times simultaneously.
  • the whole set of twelve supply spools 22 and the corresponding flyers 24 form a so-called rotating pay-off installation.
  • the twelve provisional strands are brought together at an assembly point 26 and are guided to a false twister 28 which rotates at twice the rotational speed n B of a downstream double-twister.
  • the function of this false twister 28 is to draw the exact lengths of the strands they need in the final cord since at the level of false twister 28 the cord temporarily reaches its final cord twisting pitch.
  • the assembled strands are led via a guiding pulley 30, over a flyer 32 and a reversing pulley 34 and are eventually wound on a spool 36.
  • Flyer 32 rotates at a rotational speed n B , gives two twists per rotation to the assembled strands and lays down the final cord twisting pitch of multi-strand cord 10 and also (together with rotating flyers 24) the final strand twisting pitch.
  • This second example illustrates an advantageous embodiment of the multi-strand cord according to the invention. If the cord twisting direction and the strand twisting direction are equal, the twists given by the flyers of the rotating pay-off installation are added to the twists given by the flyer of the double-twister so that the final twists are obtained with a minimum of twisting energy (compare the much higher rotational speeds of the first example with the rotational speeds of the second example !).
  • the rotational speed n RAD of the flyers of the rotating pay-off installation is in any way different from the rotational speed n B of the flyer of the double-twister in order to avoid a situation where the twists given by the flyers of the rotating pay-off installation would be hundred per cent compensated by the twists given by the flyer of the double-twister, which would result in steel cords where the difference between the strands would disappear and result in so-called compact steel cords consisting only of filaments having the same cord twisting pitch and cord twisting direction which are equal to the strand twisting pitch and strand twisting direction.

Abstract

A steel cord (10) comprises eight or more strands (12, 14) twisted together. Each of the strands has a substantially same cord twisting direction and a substantially same cord twisting pitch in the steel cord, and each of the strands consists of two to five individual filaments (16, 18) twisted together. Such a multi-strand steel cord can be manufactured without having to twist the individual strands separately and beforehand.

Description

    Field of the invention.
  • The present invention relates to a steel cord comprising a number of strands twisted together, which is a so-called multi-strand steel cord.
  • Background of the invention.
  • One to two decades ago, multi-strand steel cords were the standard cords for reinforcing elastomeric products such as rubber tires, conveyor belts, transmission belts.
    A general trend towards simpler constructions comprising less filaments with larger filament diameters, however, has superseded the multi-strand steel cords except for those areas where multi-strand steel cords were really necessary because of their relatively thin filaments and the resulting high level of fatigue resistance or because of their high breaking load. Nowadays, multi-strand steel cords are still common in reinforcing heavy tires such as off-the-road tires, conveyor belts, timing belts and transmission belts.
    Most multi-strand steel cords are manufactured in an expensive way the last steps of which may be summarized as follows :
    • (a) unwinding filaments, wet drawing the filaments until their final filament diameter and winding the thus drawn filaments ;
    • (b) unwinding the drawn filaments, twisting the filaments into individual strands and winding the twisted strands ;
    • (c) unwinding the strands, twisting the strands into a final cord and winding the twisted cord.
    Especially step (b), which must be carried out for each individual strand of the final cord, e.g. seven times in case of a 7x19-cord, is disadvantageous to the productivity and efficiency of the multi-strand steel cord making process. Summary of the invention.
  • It is an object of the invention to provide for a new range of multi-strand steel cords which allows to skip the separate steps (b) of making the individual strands and which allows to replace the commonly used multi-strand steel cords such as 7x7-cord, 7x19-cord, 7x31-cord.
  • According to the invention there is provided for a steel cord which comprises eight or more strands twisted together. Each of the strands has a substantially same cord twisting direction and a substantially same cord twisting pitch. Each of said strands consists of two to five individual filaments twisted together.
    The terms "cord twisting pitch" refer to the axial distance required to make a 360 degree revolution of a strand in the final cord.
    As will be explained hereinafter, the fact that the strands have the same cord twisting direction and the same cord twisting pitch, allows the multi-strand steel cord to be made in an economical and highly efficient way. The fact that each of the strands consists of only two to five individual filaments and, as a consequence, comprises no core filament allows to make the multi-strand steel cord without experiencing problems of core filament migration in the individual strands.
  • In a preferable embodiment of the invention, the individual steel filaments of every strand have the same strand twisting direction and substantially the same strand twisting pitch.
    The terms "strand twisting pitch" refer to the axial distance required to make a 360 degree revolution of a filament in a strand of the final cord.
  • The number of strands in the multi-strand steel cord according to the invention is at least eight, and can be nine, twelve,fifteen... in order to provide for a suitable alternative for the prior art cord constructions 7x7, 7x19, 7x31.
    Preferable configurations, however, comprise twelve, nineteen or twenty-seven strands and are respectively designated by 12xn-, 19xn- and 27xn-cords, where n is the number of filaments in each strand and ranges from two to five.
    A 12xn-cord has three center strands and nine outer strands.
    A 19xn-cord has one center strand, six intermediate strands and twelve outer strands.
    A 27xn-cord has three center strands, nine intermediate strands and fifteen outer strands.
  • In order to prevent the center strand or center strands from migrating out of the cord under the influence of repeated external bending forces, it is preferable that the center strand or center strands have a larger diameter than the diameter of the outer strands and/or intermediate strands.
  • The strand twisting direction may be equal to or opposite to the cord twisting direction. As will be made clear hereinafter, a multi-strand steel cord where the strand twisting direction is equal to the cord twisting direction can be made in a highly efficient way.
    The strand twisting pitch may be equal to or different from the cord twisting pitch.
  • The multi-strand steel cord is preferably adapted to reinforce elastomeric products, which means that it has either alone or in combination one or more of following properties :
    • the filament diameters range from 0.04 mm (e.g. for timing belt reinforcement) to 1.1 mm (e.g. for conveyor belts) ;
    • the steel composition generally comprises a minimum carbon content of 0.60 %, a manganese content ranging from 0.20 to 0.90 % and a silicon content ranging from 0.10 to 0.90 % ; the sulphur and phosphorous contents are preferably kept below 0.03 % ; additional elements such as chromium, boron, cobalt, nickel ... may be added to the composition ;
    • the filaments are conveniently covered with a corrosion resistant coating such as zinc or with a coating that promotes the adhesion to the elastomeric material such as brass or bronze.
  • Other applications of the multi-strand cord outside the field of elastomer reinforcement are not excluded. In this way the multi-strand cord according to the invention may have been covered with a synthetic material such as polyamide.
  • Brief description of the drawings.
  • The invention will now be described into more detail with reference to the accompanying drawings wherein
    • FIGURES 1, 2 and 3 show transversal cross-sections of 12xn-cords according to the present invention ;
    • FIGURE 4 shows a transversal cross-section of a 19xn-cord according to the present invention ;
    • FIGURE 5 shows a transversal cross-section of a 27xn-cord according to the present invention ;
    • FIGURE 6 shows schematically how a multi-strand cord according to the invention can be made.
    Description of the preferred embodiments of the invention.
  • FIGURE 1 shows a transversal cross-section of a 12x2 multi-strand steel cord 10. The cord 10 comprises three center strands 12 and nine outer strands 14. Each of the center strands 12 and each of the outer strands 14 consists of only two filaments 16. Each of the the center 12 and each of the outer strands 14 have the same cord twisting pitch and same cord twisting direction in the final cord 10, for example :
  • 12 x 2 x 0.20
    cord twisting pitch = 10 mm
    cord twisting direction = Z
    strand twisting pitch = 10 mm
    strand twisting direction = S
    12 x 2 x 0.20
    cord twisting pitch = 20 mm
    cord twisting direction = S
    strand twisting pitch = 10 mm
    strand twisting direction = S.
  • FIGURE 2 shows a transversal cross-section of a 12x3 multi-strand steel cord. Steel cord 10 comprises three center strrands 12 and nine outer strands 14. The diameter of the center strands 12 is somewhat larger than the diameter of the outer strands 14 because the filaments 18 of the center strands have a filament diameter that is larger than the filaments 16 of the outer strands.
    An example is as follows :
    • 3 x 3 x 0.175 | 9 x 3 x 0.15
      • cord twisting pitch and direction = 8Z
      • strand twisting pitch and direction = 8S.
  • FIGURE 3 shows a cross-section of another embodiment cord which comprises also three center strands 12 and nine outer strands 14. The center strands 18 have a diameter larger than the diameter of the outer strands 18 by the fact that they consist of three filaments 18 while the outer strands 14 consist only of two filaments 16. The filaments 18 of the center strands and the filaments 16 of the outer strands have an equal diameter.
    An example is :
    • 3 x 3 x 0.15 | 9 x 2 x 0.15
      • cord twisting pitch and direction = 16S
      • strand twisting pitch and direction = 8S.
  • FIGURE 4 shows a cross-section of a 19x4 multi-strand steel cord 10. The cord comprises one center strand 12, six intermediate strands 20 and twelve outer strands 14. Each of the strands consists of four filaments. The four filaments of the center strand 12, however, have a diameter that is somewhat larger than the diameter of the filaments of the intermediate strands 20 and outer strands 14.
  • FIGURE 5 shows a cross-section of a 27x2 multi-strand steel cord 10. The cord comprises three center strands 12, nine intermediate strands 20 and fifteen outer strands 14. Each of the strands consists of two filaments. The two filaments 18 of the center strand 12, however, have a diameter that is somewhat larger than the diameter of the filaments 16 of the intermediate strands 20 and outer strands 14.
  • The multi-strand steel cords according to the invention may be used to replace the common multi-strand steel cords without loss in breaking load or in other mechanical properties.
    Some examples :
    • a 7x7xd cord has 49 filaments and may be replaced by a 19x2xd1 cord (38 filaments) with d1 greater than d or by a 19x3xd2 (57 filaments) with d2 smaller than d ;
    • a 19x7xd cord has 133 filaments and may be replaced by a 27x5xd cord (135 filaments).
  • FIGURE 6 illustrates how a 12x3 multi-strand steel cord according to the invention can be made in one single cord making step, thus avoiding the multiple steps of making the individual strands.
    Starting from the left side of FIGURE 5, three individual filaments 16 are drawn from one supply spool 22 or from three separate supply spools 22. The filaments 16 are guided via a reversing pulley 23, over a flyer 24 to a guiding pulley 25. Flyer 24 rotates at a rotational speed nRAD and gives to the filaments 16 two twists per rotation so that a (provisional) strand 14 is made. This is done twelve times simultaneously. The whole set of twelve supply spools 22 and the corresponding flyers 24 form a so-called rotating pay-off installation. The twelve provisional strands are brought together at an assembly point 26 and are guided to a false twister 28 which rotates at twice the rotational speed nB of a downstream double-twister. The function of this false twister 28 is to draw the exact lengths of the strands they need in the final cord since at the level of false twister 28 the cord temporarily reaches its final cord twisting pitch. After leaving false twister 28, the assembled strands are led via a guiding pulley 30, over a flyer 32 and a reversing pulley 34 and are eventually wound on a spool 36. Flyer 32 rotates at a rotational speed nB, gives two twists per rotation to the assembled strands and lays down the final cord twisting pitch of multi-strand cord 10 and also (together with rotating flyers 24) the final strand twisting pitch.
  • Suppose as a matter of a first example the following situation :
    • flyer 32 of the double-twister rotates at a rotational speed nB of 2000 rpm in the sense of arrow 38 as indicated in FIGURE 6 (gives Z-twisting) ;
    • flyers 24 of the rotating pay-off installation rotate at a rotational speed nRAD of 4000 rpm (= 2 x nB) in the sense of arrow 40 (gives S-twisting).
  • This results in 12x3 multi-strand cord with following characteristics :
    • cord twisting pitch and direction = X mm S
    • strand twisting pitch and direction = X mm Z, since half of the twists given to the strands by means of flyers 24 have been compensated by means of downstream flyer 32 in the final cord making step.
  • Suppose as a matter of a second example the following situation :
    • flyer 32 of the double-twister rotates at a rotational speed nB of
    • 1000 rpm in the opposite sense of arrow 38 as indicated in FIGURE 6 (gives S-twisting) ;
    • flyers 24 of the rotating pay-off installation rotate at a rotational speed nRAD of 1000 rpm (= 2 x nB) in the sense of arrow 40 (gives also S-twisting).
  • This results in 12x3 multi-strand cord with following characteristics :
    • cord twisting pitch and direction = 2X mm S, since flyer 32 rotates at half the speed of flyer 32 in the first example ;
    • strand twisting pitch and direction = X mm S, since the twists given by flyers 24 of the rotating pay-off installation and the twists given by flyer 32 of the double-twister are now added.
  • This second example illustrates an advantageous embodiment of the multi-strand cord according to the invention. If the cord twisting direction and the strand twisting direction are equal, the twists given by the flyers of the rotating pay-off installation are added to the twists given by the flyer of the double-twister so that the final twists are obtained with a minimum of twisting energy (compare the much higher rotational speeds of the first example with the rotational speeds of the second example !).
  • The rotational speed nRAD of the flyers of the rotating pay-off installation is in any way different from the rotational speed nB of the flyer of the double-twister in order to avoid a situation where the twists given by the flyers of the rotating pay-off installation would be hundred per cent compensated by the twists given by the flyer of the double-twister, which would result in steel cords where the difference between the strands would disappear and result in so-called compact steel cords consisting only of filaments having the same cord twisting pitch and cord twisting direction which are equal to the strand twisting pitch and strand twisting direction.

Claims (15)

  1. A steel cord (10) comprising eight or more strands (12, 14) twisted together, each of said strands having a substantially same cord twisting direction and a substantially same cord twisting pitch in said steel cord, each of said strands consisting of two to five individual filaments (16, 18) twisted together.
  2. A steel cord according to claim 1 wherein the individual filaments of every of said strands have been twisted in a same strand twisting direction and with a same strand twisting pitch.
  3. A steel cord according to claim 1 or 2 wherein the number of strands in the steel cord is twelve : three center strands and nine outer strands.
  4. A steel cord according to claim 3, all of said outer strands having a substantially same outer strand diameter and at least one of said center strands having a strand diameter being greater than the strand diameter of the outer strands.
  5. A steel cord according to claim 4, all of said outer strands having filaments with substantially a same filament diameter, said at least one center strand comprising filaments having a diameter which is larger than the filament diameter of the filaments of the outer strands.
  6. A steel cord according to claim 4 or 5, all of said outer strands having a same number of filaments, said at least one center strand comprising more filaments than said outer strands.
  7. A steel cord according to claim 1 or 2 wherein the number of strands in the steel cord is nineteen, one center strand, six intermediate strands and twelve outer strands.
  8. A steel cord according to claim 7, all of said intermediate strands having substantially a same diameter and all of said outer strands having substantially a same diameter, the center strand having a diameter which is larger than the diameter of the intermediate strands and larger than the diameter of the outer strands.
  9. A steel cord according to claim 1 or 2 wherein the number of strands in the steel cord is twenty-seven, three center strands, nine intermediate strands and fifteen outer strands.
  10. A steel cord according to claim 9, all of said intermediate strands having substantially a same diameter and all of said outer strands having substantially a same diameter, at least one of said center strands having a diameter which is larger than the diameter of the intermediate strands and larger than the diameter of the outer strands.
  11. A steel cord according to any of claims 2 to 10 wherein said cord twisting direction is equal to said strand twisting direction.
  12. A steel cord according to any of claims 2 to 10 wherein said cord twisting direction is opposite to said strand twisting direction.
  13. A steel cord according to any of claims 2 to 12 wherein said cord twisting pitch is substantially equal to said strand twisting pitch.
  14. A steel cord according to any of claims 2 to 12 wherein said cord twisting pitch is different from said strand twisting pitch.
  15. A steel cord according to claim 1 wherein the individual filaments of some of said strands have been twisted in a strand twisting direction or with a strand twisting pitch different from the strand twisting direction or strand twisting pitch of the other strands.
EP19960202786 1995-10-27 1996-10-07 Multi-strand steel cord Expired - Lifetime EP0770726B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP19960202786 EP0770726B1 (en) 1995-10-27 1996-10-07 Multi-strand steel cord

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP95202911 1995-10-27
EP95202911 1995-10-27
EP19960202786 EP0770726B1 (en) 1995-10-27 1996-10-07 Multi-strand steel cord

Publications (2)

Publication Number Publication Date
EP0770726A1 true EP0770726A1 (en) 1997-05-02
EP0770726B1 EP0770726B1 (en) 2000-12-06

Family

ID=26139745

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19960202786 Expired - Lifetime EP0770726B1 (en) 1995-10-27 1996-10-07 Multi-strand steel cord

Country Status (1)

Country Link
EP (1) EP0770726B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3090703A1 (en) * 2018-12-19 2020-06-26 Compagnie Generale Des Etablissements Michelin Method for manufacturing a two-layer multi-strand cable
FR3090704A1 (en) * 2018-12-19 2020-06-26 Compagnie Generale Des Etablissements Michelin Method for manufacturing a two-layer multi-strand cable

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR837683A (en) * 1937-03-11 1939-02-15 Michelin & Cie Improvement to casings for pneumatic tires
FR997343A (en) * 1945-07-13 1952-01-04 Dunlop Sa Improvements to cables applicable in particular to pneumatic tire casings
GB1209438A (en) * 1968-02-12 1970-10-21 Pirelli Improvements in or relating to articles reinforced by metal cords
EP0373595A1 (en) * 1988-12-16 1990-06-20 Sumitomo Electric Industries, Ltd. Steel cord fo reinforcing rubber

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR837683A (en) * 1937-03-11 1939-02-15 Michelin & Cie Improvement to casings for pneumatic tires
FR997343A (en) * 1945-07-13 1952-01-04 Dunlop Sa Improvements to cables applicable in particular to pneumatic tire casings
GB1209438A (en) * 1968-02-12 1970-10-21 Pirelli Improvements in or relating to articles reinforced by metal cords
EP0373595A1 (en) * 1988-12-16 1990-06-20 Sumitomo Electric Industries, Ltd. Steel cord fo reinforcing rubber

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
327118: "Steel cord constructions made in one step", RESEARCH DISCLOSURE, no. 327, July 1991 (1991-07-01), EMSWORTH GB, pages 552 - 558, XP000258783 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3090703A1 (en) * 2018-12-19 2020-06-26 Compagnie Generale Des Etablissements Michelin Method for manufacturing a two-layer multi-strand cable
FR3090704A1 (en) * 2018-12-19 2020-06-26 Compagnie Generale Des Etablissements Michelin Method for manufacturing a two-layer multi-strand cable

Also Published As

Publication number Publication date
EP0770726B1 (en) 2000-12-06

Similar Documents

Publication Publication Date Title
US5768874A (en) Multi-strand steel cord
KR950005438B1 (en) Compact steel cord structure
US5784874A (en) Multi-strand cord for timing belts
EP0143732B1 (en) Apparatus and process of manufacturing a metal cord
US4608817A (en) Single strand metal cord and method of making
CN1202942A (en) Process for producing a steel cord
US5968651A (en) Steel cord with differently waved filaments
CN1119230A (en) Stranded wire rope or cable having multiple stranded rope elements and method of its manufacture
EP1381730B1 (en) Steel cord for reinforcing rubber articles
EP0247663B1 (en) Production of steel cord
US5592806A (en) Non-wrapped non-sleeving compact cord
EP0770726B1 (en) Multi-strand steel cord
US5512380A (en) Steel cord construction
IE914457A1 (en) Reinforced transmission belt
EP0675223A1 (en) Layered steel cord construction
EP0627520B1 (en) Compact steel cord with no wrapping filament
EP0635597A1 (en) Steel cord construction
JP2906018B2 (en) Steel cord for rubber reinforcement and method for producing the same
MXPA96005124A (en) Ac cable
EP0811786B1 (en) Multi-strand cord for timing belts
EP0841430B1 (en) Steel cord with differently waved filaments
KR100279565B1 (en) Steel cords for rubber reinforcement having different twist densities and twisting directions, and apparatus for manufacturing same
EP0040877A1 (en) Metal wire cord having strands with parallel filaments
WO2023117589A1 (en) Steel cord for the reinforcement of an elastomer product
JP2920469B2 (en) Radial tire

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE DE ES FI FR GB IE IT LU NL

17P Request for examination filed

Effective date: 19971022

17Q First examination report despatched

Effective date: 19980917

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE DE ES FI FR GB IE IT LU NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20001206

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20001206

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20001206

REF Corresponds to:

Ref document number: 197972

Country of ref document: AT

Date of ref document: 20001215

Kind code of ref document: T

REF Corresponds to:

Ref document number: 69611149

Country of ref document: DE

Date of ref document: 20010111

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

ET Fr: translation filed
ITF It: translation for a ep patent filed

Owner name: SOCIETA' ITALIANA BREVETTI S.P.A.

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2154383

Country of ref document: ES

Kind code of ref document: T3

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011007

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011007

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20011008

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20011007

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060630

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20061013

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20060630

REG Reference to a national code

Ref country code: FR

Ref legal event code: D3

BERE Be: lapsed

Owner name: S.A. *BEKAERT N.V.

Effective date: 20071031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071031

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20091026

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20101027

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20101028

Year of fee payment: 15

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20111118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101008

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20111028

Year of fee payment: 16

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20130628

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130501

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69611149

Country of ref document: DE

Effective date: 20130501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121007

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121031