EP0725205A1 - Devices and method to stop water inflow to an underground pipe laying work area - Google Patents
Devices and method to stop water inflow to an underground pipe laying work area Download PDFInfo
- Publication number
- EP0725205A1 EP0725205A1 EP95113016A EP95113016A EP0725205A1 EP 0725205 A1 EP0725205 A1 EP 0725205A1 EP 95113016 A EP95113016 A EP 95113016A EP 95113016 A EP95113016 A EP 95113016A EP 0725205 A1 EP0725205 A1 EP 0725205A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- sleeve
- liner
- main body
- opening
- piping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 55
- 238000000034 method Methods 0.000 title claims description 21
- 238000012856 packing Methods 0.000 claims description 42
- 238000007789 sealing Methods 0.000 claims description 37
- 239000000463 material Substances 0.000 claims description 24
- 238000004891 communication Methods 0.000 claims description 10
- 230000004888 barrier function Effects 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 4
- 230000000903 blocking effect Effects 0.000 claims description 2
- 239000003795 chemical substances by application Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 description 14
- 229920001971 elastomer Polymers 0.000 description 13
- 238000010276 construction Methods 0.000 description 9
- 239000000126 substance Substances 0.000 description 7
- 125000006850 spacer group Chemical group 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 239000002274 desiccant Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000000701 coagulant Substances 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
- E21B7/201—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means
Definitions
- the present invention relates to sealing devices and sealing method and, more particularly, to devices and method used for sealing an opening in an underground work space wherein an operation for laying underground piping is being carried out to prevent underground source water from flowing into the work space, underground piping construction in which an oil-hydraulic propulsion machine for propelling a horizontal pipe line is arranged in a vertical excavated hole being exemplary of use of the devices and method.
- a vertical hole for installing a propulsion machine is excavated.
- a metal liner plate or casing is then arranged on walls of the vertical hole, and the propulsion machine is arranged at a prescribed position in the vertical hole to define a work area.
- a hole, generally of circular configuration is cut in a wall of the liner so pipe can be propelled therethrough in a horizontal course through the underground region exterior of the work area.
- a small-diameter lead will first be propelled blindly into the area where piping is planned.
- This lead pipe guides an auger screw and the piping. Thereafter, the service pipe line will be propelled, all thus far described being known in the art.
- Another method of laying down piping involves propelling an auger screw and piping without the use of a lead pipe. The axis of the auger screw is propelled blindly just as in a similar manner as a guide screw.
- Another object is to provide devices that can become a permanent part of a manhole structure to insure that such space will be kept water free.
- the work area hole in which a pipe laying operation is being carried out and has the pass through opening by which pipe lengths being laid are passed through to the pipe line course is sealed against water inflow through that opening with a seal unit encircling the pipe exterior to seal it.
- This seal unit in turn is inserted in a sleeve fixed to the inside of a hole liner and passing radially therefrom a distance from the liner, the degree of watertightness of the seals being effective to prevent water inflow to the work area.
- a sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from within the excavated hole through the pipe pass through opening in a piping course, such sealing being to prevent water incursion to a liner enclosed work area from an underground water source exteriorly of the work area.
- the sealing assembly comprises a seal part having a hollow elongated main body with openings at opposite body ends, means for fixing the position of said main body end openings relative to said pass through opening when said main body has been inserted through the pass through opening with one of the body ends in communication with the work area and an opposite end in communication with the underground water source.
- Means carried on the main body extend radially relatively inwardly therefrom and are operable to tightly conformably engage an external surface of a pipe passing through said seal part thereby to establish a sealing condition around said pipe external surface effective to obstruct a passage of any water present in said underground water source to said work area.
- a sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course, the sealing being to prevent water incursion to the work area from an underground water source exteriorly of the work area.
- the sealing assembly comprises a sleeve having a radially outwardly directed flange at an end of the sleeve, the sleeve being insertable into the pass through opening from within the work area to engage the said end flange against portions of the liner adjacent the pass through opening.
- a seal unit including a hollow cylindrical main body, a radially outwardly directed flange carried at an end of said main body is provided. A section of said main body adjacent an opposite main body end tapers radially inwardly toward the main body opposite end.
- the seal unit is insertable, tapered end first in said sleeve with the tapered main body with the main body flange end in following position so said flange can be caused to engage with a radially inwardly directed abutment or stop on the sleeve thereby to effect an insertion stopping of the seal unit.
- the said opposite main body end is in communication with the underground water source and the flange carrying end of the main body is in communication with the work area
- the ring of flexible waterproof packing material carried in said sleeve having a normal ring inner dimension smaller than an external dimension of the seal unit main body so that when the seal unit is inserted in the sleeve, the ring of waterproof material deforms in close conforming ring course encircling contact with the external surface of the main body effective to obstruct a passage of water from one to an opposite side of the encircling ring course.
- Seal means are carried internally in the main body and extend radially inwardly therein and engage tightly conformably with an external surface of a pipe passing centrally through the seal unit to establish a seal condition about the external surface of the pipe effective to obstruct a passage of any water present in said underground water source along said pipe external surface to said work area.
- a method for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course without there occurring water incursion to the work area from an underground water source exteriorly of the work area.
- This method comprises inserting a sleeve having a radially outwardly directed annular flange at a sleeve end and having a flange diameter greater than a largest pass through opening dimension, outwardly from the work area through the pass through opening until the annular flange engages liner surface portions adjacent the pass through opening.
- the sleeve further has a diametrically disposed barrier of flexible material therein blocking communication between the sleeve flange end and an opposite sleeve end.
- a ring of a flexible waterproof packing material is carried in the sleeve proximal said sleeve opposite end, this packing material having a normal ring inner dimension of a predetermined value.
- the sleeve flange is watertightly fixedly secured to the liner surface portions, for example by weldment.
- An opening is cut in the flexible material in a size slightly smaller than an external dimension of piping to be propelled through the liner opening so that when said piping passes through the said liner opening, the flexible material of the barrier tightly sealingly engages external surface of the piping to prevent any water passage from the water source to the liner space.
- a seal unit which includes a hollow cylindrical main body, a radially outwardly directed flange carried at an end of the body, and a tapered section at an opposite body end is then inserted into the sleeve tapered section first and concentrically encircling piping present in the sleeve and until the flange on the seal unit body engages a stop on the sleeve.
- the seal unit also carries an internal packing ring of flexible material which tightly sealingly engages the external surface of the piping to effect watertight sealing therebetween.
- the seal unit body flange is then watertightly secured to the said stop of the sleeve as by welding.
- the present invention is intended particularly but not exclusively for use in underground piping construction wherein a small-diameter lead pipe is propelled preliminary to lay down of service piping.
- the following is a summary description of this type of underground piping construction.
- a vertical hole 2 for installing a propulsion machine 1 is excavated incident the work of laying a pipe line.
- the walls of vertical hole 2 are covered with metal liner plates or casing 3 (hereinafter, the description of the embodiments will describe only liner plates). It is understood that the lined hole constitutes a work area.
- the liner prevents surrounding dirt from falling into vertical hole 2 and prevents silt with high water content from flowing in.
- a circular hole 4 is cut in liner plate 3 at a position where the service piping is to be installed.
- a lead pipe 5 will be guided blindly into the earth from hole 4 to establish a properly aligned pipe course along which service piping 6 is to be propelled.
- a lead pipe may be dispensed with in favor of direct installation of the service pipe where assured guidance is not a problem.
- Lead pipe 5 or piping 6 is propelled up to an already laid-down pipe 7, which, e.g., could be a sewer main.
- the pipe line will be directed to a destination hole 8, arranged in a similar manner as vertical hole 2.
- circular hole 4 is arranged to be large enough so that pipe 6 can adequately pass through it while being propelled.
- the orientation of lead pipe 5 or piping 6 should be toward laid-down pipe 7 or destination hole 8. Piping construction is complete when the piping is propelled up to the destination, laid-down pipe 7 or destination hole 8.
- propulsion machine 1 propels lead pipe 5 or piping 6 and comprises a base 10, gear rails 11 arranged parallel to each other, sliding members 12a, 12b, which slide along the gear rails, and a main unit 13 of the propulsion machine connected to one of the sliding members.
- An oil hydraulic cylinder 14 is arranged between sliding members 12a, 12b. Hydraulic cylinder 14 is connected via a hose 16 to an oil hydraulic pressure supply device 15 (Fig. 1). By adjusting oil flow, the interval between sliding members 12a, 12b can be adjusted.
- a support member 17 is arranged on propulsion machine main unit 13 so that it supports piping 6.
- Piping 6 is propelled according to the movement of propulsion machine main unit 13.
- a transit 18 is arranged on the opposite side of supporting member 17 so that the position of the fore tip end of the lead pipe can be measured via the inside of hollow, cylindrical lead pipe 5. This allows confirmation that lead pipe 5 is moving in a linear fashion.
- a direction correcting means 19 is connected to the tip of lead pipe 5 so that the orientation of the propulsion of lead pipe 5 can be corrected. By checking the orientation of the propulsion using the transit and by operating the direction correcting means at the tip, it is possible to control lead pipe 5 direction to the intended destination position.
- a water-stopping plug can be used to seal the tip of piping 6, thus preventing the earth from flowing into piping 6.
- screw 9 would not be used.
- lead pipe 5 described above would not be used.
- Direction correcting means 19 would be connected to the tip of screw 9 and piping 6 would be propelled while the direction correction is performed. The procedure of removing lead pipes 5 is not required as in the case when the piping is to reach destination hole 8, and screw 9 is brought back to vertical hole 2 after the propulsion of piping 6.
- the present invention provides devices for use in underground piping construction as described above with a device to prevent water and earth from flowing into vertical hole 2 from hole 4 arranged On liner plate 3 as well as a method for achieving the same.
- the water-stopping device of this embodiment comprises a first water-stopping means or sleeve, and a second water-stopping means or seal unit.
- the first water-stopping means 20 includes has a main unit 21 or sleeve of generally cylindrical shape whose outer diameter is smaller than the diameter of hole 4 so that it can pass through hole 4.
- a ring-shaped connecting section 23 is arranged on a rim 22 on one end of main unit or sleeve 21 of the first water-stopping means. Connecting section 23 is arranged so that it projects outward radially. Connecting section 23 serves to connect liner plate 3 (Fig. 1), which is arranged in the inside surface of the vertical hole excavated in a circular cross-section, and first water-stopping means main unit 20.
- a ring-shaped support plate 25 projecting inward radially of the sleeve is connected thereto and is arranged on an end rim 24 at the end opposite from connecting section 23 on first water-stopping means main unit 21.
- a ring-shaped fixing plate 26 is connected opposite to support plate 25 with a bolt 27 and a nut 28.
- Ring-shaped rubber packing 29 is interposed between support plate 25 and fixing plate 26 and is supported by bolt 27, which passes through it.
- Reinforcement packing elements 30, 31 are supported in a similar manner by bolt 28.
- One of these two, reinforcement packing 30 has a ring shape and has an inner diameter that matches or is slightly smaller than the outer diameter of piping 6 (Fig. 1).
- the other packing, reinforcement packing 31, is formed in a circular plate shape.
- Both reinforcement packing 30, 31 are thin enough to be cut easily with a blade. During construction, these are cut bit by bit. Rubber packing 29 and reinforcement packing 30, 31 are all squeezed tightly between support plate 25 and fixing plate 26 by bolt 27 and nut 28.
- second water-stopping means or seal unit 40 has a main unit 41 formed in a cylindrical shape. Its outer diameter is slightly smaller than the inner diameter of support plate 25 (Fig. 3) arranged on first water-stopping means 20, and is larger than the inner diameter of rubber packing 29 (Fig. 3), so that it can be fit into first water-stopping means 20.
- a fitting fore section or tip 42 of second water-stopping means main unit 41 has a tapered section 43 that is connected to main unit 41.
- Tapered section 43 is hollow and of conical or truncated conical and has an outer surface that is formed with a sharp taper. Tapered section 43 is made to fit easily into the first water-stopping means sleeve 20.
- Connecting section 43 projects radially outward at opposite end rim 44.
- the outer diameter of connecting section 43 is formed slightly larger than the inner diameter of support plate 25 (Fig. 3) of first water-stopping means 20.
- Ring-shaped support plate 46 projects inward radially at an appropriate position inside second water-stopping means main unit 40.
- a pressure piece 47 is arranged inside tapered section 43 so that it projects radially.
- Rubber packings 48, 49 is arranged between support plate 46 and pressure piece 47. Rubber packings 48,49 are fixed after they are positioned at the appropriate position by pushing in a ring-shaped elastic piece 50 at the gap between rubber packing 48, 49 and pressure piece 47. Rubber packings 48, 49 are pressed firmly by support plate 46 so their position is fixed.
- first water-stopping means 20 and second water-stopping means 40 provide adequate water stoppage when second water-stopping means 40 is fit into first water-stopping means 20. Furthermore, when connecting section 45 of second water-stopping means 40 is pressed against support plate 25 of first water supporting means 20, then an open space having a diameter larger than that of piping 6 is formed inside first water-stopping means 21. This permits support member 17 (Fig. 2) of propulsion device 1 to be used in this open space, and allows the rear end of piping 6 to be pushed into a position in front of the rear end of first water-stopping means 20 (to the left in the drawing). Thus, since piping 6 does not project inward in vertical hole 2 (Fig. 1) after it has been laid down, the space in vertical hole 2 can be used effectively.
- FIG. 6-14 the following is a description of the water-stopping method using the water-stopping device described above.
- vertical hole 2 is excavated to install propulsion machine 1.
- a metal liner plate 3 is arranged on the walls of the hole.
- Hole 4 is made in liner plate 3, and this hole 4 is cut at a position corresponding to the propulsion orientation of lead pipe 5 and piping 6.
- Planned hole B is the area where the hole is planned, and has a larger diameter than circle A, which is the area where piping 6 will pass through.
- the injection of the chemicals solidifies the earth, thus preventing earth from flowing in even when planned hole B is opened.
- the injection of the chemicals can be performed by injecting the chemicals over a wide area initially when vertical hole 2 is being excavated.
- the chemicals can also be injected through a small hole that is punched in liner plate 3 when hole 4 is being made. While the earth is dried out from the drying agent, hole 4 is made by cutting away the planned hole area in liner plate 3.
- Hole 4 is formed to pass through piping 6 (Fig. 1), and it is formed with a circular shape.
- the center of hole 4 is arranged so that it matches the center of the axis of the piping propelled by propulsion machine 1.
- first water-stopping means 20 is attached to hole 4. Since first water-stopping means 20 is attached so that it projects into the earth from liner plate 3, the earth that is in the area of this projection is removed before attachment. First water-stopping means 20 is attached by putting connection section 23 on main unit 21 into contact with liner plate 3 and welding the two together. Since reinforcement packing 31 is in a circular plate shape as described above, it acts as a flow block and hole 4 is kept sealed. Thus, even if the effectiveness of the chemicals injected around hole 4 decreases, earth would not flow into vertical hole 2.
- reinforcement packing 31 is cut where lead pipe 5 will pass through, and a lead pipe propulsion hole 32 is made. At this point lead pipe propulsion hole 32 is the only section that is open.
- lead pipe 5 is attached to propulsion machine 1, and lead pipe 5 is passed through lead pipe propulsion hole 32 and propelled blindly into the earth.
- first water-stopping means 20 since reinforcement packing 30, 31 are pressed against the outer surface of piping 6, while rubber packing 29 is not pressed against piping 6. Thin reinforcement packing 30, 31 are pressed against piping 6 when it is propelled because it is necessary to maintain low friction with the outer surface of piping 6 while maintaining appropriate water blockage. Thus, water can not be blocked over a long period of time in this state. Therefore, second water-stopping means 40 is fitted between piping 6 and rubber packing 29.
- second water-stopping means 40 is arranged so that tapered section 43 is oriented toward the propulsion and so that piping 6 is passed through the hollow area inside second water-stopping means main unit 41, which is cylindrical in shape.
- second water-stopping means 41 is propelled slowly in the propulsion direction.
- propulsion machine 1 is used for this propulsion.
- Propulsion machine 1 is dedicated to the propulsion of lead pipe 5 and piping 6, so support member 17 (Fig. 2) is made to match the size of piping 6. Since second water-stopping means main unit 41 is larger than piping 6, it is necessary to replace the standard support member 17 (Fig. 2) with a dedicated support member 51.
- either reinforcement packing 30, 31 are removed or ring-shaped rubber packing 29 is cut so that it forms a diameter that is larger than the inner diameter.
- second water-stopping means 40 is propelled and is fitted inside first water-stopping means 20.
- tapered section 42 arranged on second water-stopping means main unit 41 is able to be propelled while pushing rubber packing 29 of first water-stopping means 20 wider. This allows easy fitting of second water-stopping means 40.
- a rear or rearmost end 6a of piping 6 projects greatly from the inside surface of liner plate 3 inward into vertical hole 2. Piping 6 is propelled so that rear end 6a of piping 6 is positioned further underground than the inner surface of liner plate 3.
- a dedicated spacer 52 is attached between support member 17 of propulsion machine 1 and piping rear end 6a.
- Dedicated spacer 52 is formed in a cylindrical shape and has a diameter the same size as the diameter of piping 6. The rear end of spacer 52 engages with supporting member 17 of propulsion machine 1, while the front end engages with piping 6. Therefore, when propulsion machine main unit 13 is moved forward, propulsion can take place without any contact with first water-stopping means 20 or second water-stopping means 40. This results in no projection inward into vertical hole 2 and allows free use of the space in vertical hole 2.
- piping 6 is propelled in a fixed direction from vertical hole 2, and it is also can propel another pipe in the opposite direction.
- the direction of propulsion machine 1 has to be reversed, but since rear end 6a of the piping (which has already been propelled) does not project into vertical hole 2, it is possible to easily change direction.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The work area hole in which a pipe laying operation is being carried out has the pass through opening by which pipe lengths being laid are passed through to the pipe line course, is sealed against water inflow through that opening with a seal unit encircling the pipe exterior to seal it, the sleeve in turn being inserted in a sleeve fixed to the inside of a hole liner and passing radially therefrom a distance from the liner, the degree of watertightness of the seals being effective to prevent water inflow to the work area.
Description
- The present invention relates to sealing devices and sealing method and, more particularly, to devices and method used for sealing an opening in an underground work space wherein an operation for laying underground piping is being carried out to prevent underground source water from flowing into the work space, underground piping construction in which an oil-hydraulic propulsion machine for propelling a horizontal pipe line is arranged in a vertical excavated hole being exemplary of use of the devices and method.
- Conventionally in underground pipe laying, a vertical hole for installing a propulsion machine is excavated. A metal liner plate or casing is then arranged on walls of the vertical hole, and the propulsion machine is arranged at a prescribed position in the vertical hole to define a work area. A hole, generally of circular configuration is cut in a wall of the liner so pipe can be propelled therethrough in a horizontal course through the underground region exterior of the work area. Commonly a small-diameter lead will first be propelled blindly into the area where piping is planned. This lead pipe guides an auger screw and the piping. Thereafter, the service pipe line will be propelled, all thus far described being known in the art. Another method of laying down piping involves propelling an auger screw and piping without the use of a lead pipe. The axis of the auger screw is propelled blindly just as in a similar manner as a guide screw.
- With the above methods for laying down piping, it is necessary to propel the piping at a depth that allows the laying down of water and sewage pipes. Therefore, in order to install the propulsion machine, it is, of course, necessary to excavate a vertical hole having an appropriate depth. Since a hole must be made horizontally from the vertical hole, it is possible for water saturated in the earth to flow into work area where it interferes with the operation.
- Accordingly, it is an object of the invention to provide devices and method for stopping water entry to an underground pipe laying operation work area which overcomes the drawbacks of the prior art.
- It is a further object of the invention to provide devices for stopping water entry to underground pipe laying work areas which are highly effective to that purpose, simple to employ and readily handled in the work area.
- Another object is to provide devices that can become a permanent part of a manhole structure to insure that such space will be kept water free.
- It is a still further object of the invention to provide a method for stopping water entry to an underground pipe laying operation work area that provides a safe and comfortable environment for those working therein.
- Briefly stated, there is provided that the work area hole in which a pipe laying operation is being carried out and has the pass through opening by which pipe lengths being laid are passed through to the pipe line course, is sealed against water inflow through that opening with a seal unit encircling the pipe exterior to seal it. This seal unit in turn is inserted in a sleeve fixed to the inside of a hole liner and passing radially therefrom a distance from the liner, the degree of watertightness of the seals being effective to prevent water inflow to the work area.
- In accordance with these and other objects of the invention, there is provided a sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from within the excavated hole through the pipe pass through opening in a piping course, such sealing being to prevent water incursion to a liner enclosed work area from an underground water source exteriorly of the work area. The sealing assembly comprises a seal part having a hollow elongated main body with openings at opposite body ends, means for fixing the position of said main body end openings relative to said pass through opening when said main body has been inserted through the pass through opening with one of the body ends in communication with the work area and an opposite end in communication with the underground water source. Means carried on the main body extend radially relatively inwardly therefrom and are operable to tightly conformably engage an external surface of a pipe passing through said seal part thereby to establish a sealing condition around said pipe external surface effective to obstruct a passage of any water present in said underground water source to said work area.
- According to feature of the invention, there is further provided a sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course, the sealing being to prevent water incursion to the work area from an underground water source exteriorly of the work area. The sealing assembly comprises a sleeve having a radially outwardly directed flange at an end of the sleeve, the sleeve being insertable into the pass through opening from within the work area to engage the said end flange against portions of the liner adjacent the pass through opening. The sleeve carrying a radially inwardly directed ring of a flexible waterproof packing material proximal a sleeve opposite end, there being means securing the said sleeve flange to said liner portions. A seal unit including a hollow cylindrical main body, a radially outwardly directed flange carried at an end of said main body is provided. A section of said main body adjacent an opposite main body end tapers radially inwardly toward the main body opposite end. The seal unit is insertable, tapered end first in said sleeve with the tapered main body with the main body flange end in following position so said flange can be caused to engage with a radially inwardly directed abutment or stop on the sleeve thereby to effect an insertion stopping of the seal unit. In this position, the said opposite main body end is in communication with the underground water source and the flange carrying end of the main body is in communication with the work area, the ring of flexible waterproof packing material carried in said sleeve having a normal ring inner dimension smaller than an external dimension of the seal unit main body so that when the seal unit is inserted in the sleeve, the ring of waterproof material deforms in close conforming ring course encircling contact with the external surface of the main body effective to obstruct a passage of water from one to an opposite side of the encircling ring course. Seal means are carried internally in the main body and extend radially inwardly therein and engage tightly conformably with an external surface of a pipe passing centrally through the seal unit to establish a seal condition about the external surface of the pipe effective to obstruct a passage of any water present in said underground water source along said pipe external surface to said work area.
- According to a still further feature of the invention, there is still further provided a method for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course without there occurring water incursion to the work area from an underground water source exteriorly of the work area. This method comprises inserting a sleeve having a radially outwardly directed annular flange at a sleeve end and having a flange diameter greater than a largest pass through opening dimension, outwardly from the work area through the pass through opening until the annular flange engages liner surface portions adjacent the pass through opening. The sleeve further has a diametrically disposed barrier of flexible material therein blocking communication between the sleeve flange end and an opposite sleeve end. A ring of a flexible waterproof packing material is carried in the sleeve proximal said sleeve opposite end, this packing material having a normal ring inner dimension of a predetermined value. The sleeve flange is watertightly fixedly secured to the liner surface portions, for example by weldment. An opening is cut in the flexible material in a size slightly smaller than an external dimension of piping to be propelled through the liner opening so that when said piping passes through the said liner opening, the flexible material of the barrier tightly sealingly engages external surface of the piping to prevent any water passage from the water source to the liner space. A seal unit which includes a hollow cylindrical main body, a radially outwardly directed flange carried at an end of the body, and a tapered section at an opposite body end is then inserted into the sleeve tapered section first and concentrically encircling piping present in the sleeve and until the flange on the seal unit body engages a stop on the sleeve. An external surface of the seal unit is tightly sealingly engaged by the packing material ring of the sleeve to effect a watertight sealing therebetween, the flexible material barrier cut opening having been further enlarged prior to seal unit insertion to allow such insertion of the seal unit in the sleeve to be effected. The seal unit also carries an internal packing ring of flexible material which tightly sealingly engages the external surface of the piping to effect watertight sealing therebetween. The seal unit body flange is then watertightly secured to the said stop of the sleeve as by welding.
- The above, and other objects, features and advantages of the present invention will become apparent from the following description read in conjunction with the accompanying drawings, in which like reference numerals designate the same elements.
-
- FIGURE 1 is a diagrammatic depiction showing apparatus with which underground piping construction can be carried out and the setting in which same operates, use of such apparatus involving in accordance with the invention, employment of a sealing assembly and procedure for stopping water entry to a construction site hole wherein pipe laying is effected;
- FIGURE 2 is a perspective view of a propulsion machine part of the Figure 1 apparatus shown in Figure 1 illustrating the several parts of the propulsion machine.
- FIGURE 3a is a front elevational view of a first seal unit part of the sealing assembly;
- FIGURE 3b is a plan view of the seal unit shown in Figure 3a;
- FIGURE 3c is a side elevational view partly in section of the Figure 3a seal unit;
- FIGURE 4a is a front elevational view of a second seal unit part of the seal assembly, this second seal unit part being receivable in the first seal unit part;
- FIGURE 4b is a side elevational view partly in section of the Figure 4a seal unit;
- FIGURE 5 is a vertical sectional view on enlarged scale depicting the reception of the second seal unit part within the first seal unit part and as such are used in sealing a pipe laying access hole cut in the side of a excavation hole against water incursion into the liner structure wherein a pipe propulsion machine is operating;
- FIGURES 6a and 6b are respective side elevational and top plan showings of the setting up of the propulsion machine in an underground positioning within an excavated, liner-lined hole preliminary to commencing piping lay down;
- FIGURE 7 is a view similar to Figure 6a but after an access hole has been cut out in the liner and a Figure 3a first seal unit part fitted in the hole cut out but before piping lay down operations have been started;
- FIGURE 8 is a fragmentary view on enlarged scale depicting the first seal unit part in the Figure 7 positioning thereof after a lead pipe propulsion hole has been cut in a reinforced packing barrier sheet in the first seal unit part;
- FIGURE 9 is a view similar to Figure 7 but after both a lead pipe run and a run of pipe being laid down have been propelled through the first seal unit part in a piping run course directed away from the excavated hole toward a destination hole;
- FIGURE 10 is a fragmentary elevational view on enlarged scale showing a rear end of a laid down piping run disposed at the first seal unit part and projecting radially inwardly into the working space enclosed by the casing or liner that was erected in the excavated hole;
- FIGURES 11a and 11b, are respectively, showings of initial and intermediate positionings of the second seal unit part when same is received within the first seal unit part;
- FIGURE 12 is a view similar to Figure 9 depicting how the second seal unit part is engaged with a support member to propel the said second unit to a final seated assembly positioning within the first seal unit part;
- FIGURE 13 is a view like Figure 12 but showing the second seal unit part in fully seated positioning in the first, there additionally being shown a spacer member engaged with the rear end of a last laid down pipe length so said last laid pipe length can be propelled radially to a clearing or homed location exterior of the liner; and
- FIGURE 14 is a top plan view showing of the Figure 12 depiction but with the rear end of the last laid pipe length having being propelled to its homed location.
- The present invention is intended particularly but not exclusively for use in underground piping construction wherein a small-diameter lead pipe is propelled preliminary to lay down of service piping. The following is a summary description of this type of underground piping construction.
- Referring to Fig. 1, a
vertical hole 2 for installing apropulsion machine 1 is excavated incident the work of laying a pipe line. The walls ofvertical hole 2 are covered with metal liner plates or casing 3 (hereinafter, the description of the embodiments will describe only liner plates). It is understood that the lined hole constitutes a work area. The liner prevents surrounding dirt from falling intovertical hole 2 and prevents silt with high water content from flowing in. - A
circular hole 4 is cut inliner plate 3 at a position where the service piping is to be installed. In many instances, alead pipe 5 will be guided blindly into the earth fromhole 4 to establish a properly aligned pipe course along whichservice piping 6 is to be propelled. In certain instances a lead pipe may be dispensed with in favor of direct installation of the service pipe where assured guidance is not a problem. Leadpipe 5 orpiping 6 is propelled up to an already laid-down pipe 7, which, e.g., could be a sewer main. - In an other arrangement the pipe line will be directed to a destination hole 8, arranged in a similar manner as
vertical hole 2. Thus,circular hole 4 is arranged to be large enough so thatpipe 6 can adequately pass through it while being propelled. The orientation oflead pipe 5 orpiping 6 should be toward laid-down pipe 7 or destination hole 8. Piping construction is complete when the piping is propelled up to the destination, laid-down pipe 7 or destination hole 8. - Referring to Fig. 2,
propulsion machine 1 propelslead pipe 5 orpiping 6 and comprises abase 10, gear rails 11 arranged parallel to each other, slidingmembers main unit 13 of the propulsion machine connected to one of the sliding members. - An oil hydraulic cylinder 14 is arranged between sliding
members hose 16 to an oil hydraulic pressure supply device 15 (Fig. 1). By adjusting oil flow, the interval between slidingmembers support member 17 is arranged on propulsion machinemain unit 13 so that it supports piping 6. - Piping 6 is propelled according to the movement of propulsion machine
main unit 13. Atransit 18 is arranged on the opposite side of supportingmember 17 so that the position of the fore tip end of the lead pipe can be measured via the inside of hollow,cylindrical lead pipe 5. This allows confirmation that leadpipe 5 is moving in a linear fashion. - A direction correcting means 19 is connected to the tip of
lead pipe 5 so that the orientation of the propulsion oflead pipe 5 can be corrected. By checking the orientation of the propulsion using the transit and by operating the direction correcting means at the tip, it is possible to controllead pipe 5 direction to the intended destination position. - As described above, it is possible to blindly guide
lead pipe 5 at a prescribed orientation and positioning fromvertical hole 2 toward destination hole 8, and thus, it is possible to propelpiping 6 to a planned configuration under the guidance oflead pipe 5. A screw 9 is connected to the rear end oflead pipe 5. Piping 6 is arranged so that it covers screw 9. By rotating screw 9 while it is propelled, piping 6 is propelled as well along the path oflead pipe 5. Leadpipes 5, which has reached destination hole 8, are removed one after another at destination hole 8. While piping 6 is being propelled, the earth wherepipe 6 is embedded is passed throughpiping 6 via screw 9 and is transported toward the rear. - When piping 6 has been propelled to the prescribed position, screw 9 is removed and
piping 6 is emptied of any dirt therein resultant from the auger operation and pipe propelling. In this way, piping 6 is laid down underground. - If the earth has a high water content, a water-stopping plug can be used to seal the tip of
piping 6, thus preventing the earth from flowing intopiping 6. In cases such as these, screw 9 would not be used. Also, when piping is to be laid to connect to laid-down pipe 7,lead pipe 5 described above would not be used. Direction correcting means 19 would be connected to the tip of screw 9 andpiping 6 would be propelled while the direction correction is performed. The procedure of removinglead pipes 5 is not required as in the case when the piping is to reach destination hole 8, and screw 9 is brought back tovertical hole 2 after the propulsion ofpiping 6. - The present invention provides devices for use in underground piping construction as described above with a device to prevent water and earth from flowing into
vertical hole 2 fromhole 4 arranged Onliner plate 3 as well as a method for achieving the same. - Referring to Figs 3-5, the following is a description of an embodiment of the water-stopping device. The water-stopping device of this embodiment comprises a first water-stopping means or sleeve, and a second water-stopping means or seal unit.
- The first water-stopping
means 20 includes has amain unit 21 or sleeve of generally cylindrical shape whose outer diameter is smaller than the diameter ofhole 4 so that it can pass throughhole 4. A ring-shaped connectingsection 23 is arranged on arim 22 on one end of main unit orsleeve 21 of the first water-stopping means. Connectingsection 23 is arranged so that it projects outward radially. Connectingsection 23 serves to connect liner plate 3 (Fig. 1), which is arranged in the inside surface of the vertical hole excavated in a circular cross-section, and first water-stopping meansmain unit 20. - Thus, it is shaped in a ring-shape, viewed from the front (Fig. 3a), in an arc shape viewed from the top (Fig. 3b), and in a bow shape viewed from the side (Fig. 3c) so that same conforms to the inner surfaces of the liner portions
adjacent hole 4. This allows the surface of connectingsection 23 to be in firm contact with the surface ofliner plate 3 when first water-stopping meansmain unit 21 is passed throughhole 4. - A ring-shaped
support plate 25 projecting inward radially of the sleeve is connected thereto and is arranged on anend rim 24 at the end opposite from connectingsection 23 on first water-stopping meansmain unit 21. - A ring-shaped
fixing plate 26 is connected opposite to supportplate 25 with abolt 27 and anut 28. Ring-shaped rubber packing 29 is interposed betweensupport plate 25 and fixingplate 26 and is supported bybolt 27, which passes through it.Reinforcement packing elements bolt 28. One of these two, reinforcement packing 30 has a ring shape and has an inner diameter that matches or is slightly smaller than the outer diameter of piping 6 (Fig. 1). The other packing, reinforcement packing 31, is formed in a circular plate shape. - Both reinforcement packing 30, 31 are thin enough to be cut easily with a blade. During construction, these are cut bit by bit. Rubber packing 29 and reinforcement packing 30, 31 are all squeezed tightly between
support plate 25 and fixingplate 26 bybolt 27 andnut 28. - The following is a description of the second water-stopping means. Referring to Fig. 4, second water-stopping means or seal
unit 40 has amain unit 41 formed in a cylindrical shape. Its outer diameter is slightly smaller than the inner diameter of support plate 25 (Fig. 3) arranged on first water-stoppingmeans 20, and is larger than the inner diameter of rubber packing 29 (Fig. 3), so that it can be fit into first water-stoppingmeans 20. - A fitting fore section or
tip 42 of second water-stopping meansmain unit 41 has a taperedsection 43 that is connected tomain unit 41.Tapered section 43 is hollow and of conical or truncated conical and has an outer surface that is formed with a sharp taper.Tapered section 43 is made to fit easily into the first water-stoppingmeans sleeve 20. - Connecting
section 43 projects radially outward atopposite end rim 44. The outer diameter of connectingsection 43 is formed slightly larger than the inner diameter of support plate 25 (Fig. 3) of first water-stoppingmeans 20. Thus, when second water-stoppingmeans 40 is fit into first water-stoppingmeans 20 via taperedsection 43, connectingsection 45 of second water-stoppingmeans 40 presses againstsupport plate 25 of first water-stoppingmeans 20. - Ring-shaped
support plate 46 projects inward radially at an appropriate position inside second water-stopping meansmain unit 40. Apressure piece 47 is arranged inside taperedsection 43 so that it projects radially. - Rubber packings 48, 49 is arranged between
support plate 46 andpressure piece 47. Rubber packings 48,49 are fixed after they are positioned at the appropriate position by pushing in a ring-shapedelastic piece 50 at the gap between rubber packing 48, 49 andpressure piece 47. Rubber packings 48, 49 are pressed firmly bysupport plate 46 so their position is fixed. - Referring to Fig. 5, first water-stopping
means 20 and second water-stoppingmeans 40 provide adequate water stoppage when second water-stoppingmeans 40 is fit into first water-stoppingmeans 20. Furthermore, when connectingsection 45 of second water-stoppingmeans 40 is pressed againstsupport plate 25 of first water supporting means 20, then an open space having a diameter larger than that of piping 6 is formed inside first water-stoppingmeans 21. This permits support member 17 (Fig. 2) ofpropulsion device 1 to be used in this open space, and allows the rear end of piping 6 to be pushed into a position in front of the rear end of first water-stopping means 20 (to the left in the drawing). Thus, since piping 6 does not project inward in vertical hole 2 (Fig. 1) after it has been laid down, the space invertical hole 2 can be used effectively. - Referring to Figs. 6-14, the following is a description of the water-stopping method using the water-stopping device described above. As described above, in underground piping construction,
vertical hole 2 is excavated to installpropulsion machine 1. Ametal liner plate 3 is arranged on the walls of the hole.Hole 4 is made inliner plate 3, and thishole 4 is cut at a position corresponding to the propulsion orientation oflead pipe 5 andpiping 6. - Referring to Fig. 6, chemicals such as drying agents or coagulating agents are injected into the earth as ground solidifying components at an area containing planned hole B. Planned hole B is the area where the hole is planned, and has a larger diameter than circle A, which is the area where piping 6 will pass through.
- The injection of the chemicals solidifies the earth, thus preventing earth from flowing in even when planned hole B is opened. The injection of the chemicals can be performed by injecting the chemicals over a wide area initially when
vertical hole 2 is being excavated. The chemicals can also be injected through a small hole that is punched inliner plate 3 whenhole 4 is being made. While the earth is dried out from the drying agent,hole 4 is made by cutting away the planned hole area inliner plate 3. -
Hole 4 is formed to pass through piping 6 (Fig. 1), and it is formed with a circular shape. The center ofhole 4 is arranged so that it matches the center of the axis of the piping propelled bypropulsion machine 1. - Referring to Fig. 7, while the earth is in a dried-out state due to the chemical injection, first water-stopping
means 20 is attached tohole 4. Since first water-stoppingmeans 20 is attached so that it projects into the earth fromliner plate 3, the earth that is in the area of this projection is removed before attachment. First water-stoppingmeans 20 is attached by puttingconnection section 23 onmain unit 21 into contact withliner plate 3 and welding the two together. Since reinforcement packing 31 is in a circular plate shape as described above, it acts as a flow block andhole 4 is kept sealed. Thus, even if the effectiveness of the chemicals injected aroundhole 4 decreases, earth would not flow intovertical hole 2. - Referring to Figs. 8 and 9, reinforcement packing 31 is cut where
lead pipe 5 will pass through, and a leadpipe propulsion hole 32 is made. At this point leadpipe propulsion hole 32 is the only section that is open. Next,lead pipe 5 is attached topropulsion machine 1, andlead pipe 5 is passed through leadpipe propulsion hole 32 and propelled blindly into the earth. - The procedure by which this blind propulsion occurs is as follows. Lead
pipe propulsion hole 32 is sealed and prevents earth from flowing intovertical hole 2 whilelead pipe 5 is being inserted. Once the blind propulsion oflead pipe 5 is complete, the section in reinforcement packing 31 where piping 6 passes through is removed andpipe propulsion hole 33 is made. Piping 6 is attached topropulsion machine 1 and the propulsion of piping 6 begins. At this point, pipingpropulsion hole 33 of reinforcement packing 31 is open, but while piping 6 is inserted into pipingpropulsion hole 33 the remaining parts of reinforcement packing 31 and the surface of piping 6 are in contact, and earth is prevented from flowing intovertical hole 2. - When screw 9 is used as described above (Fig. 2), earth is passed through the opening at the leading
piping 6 so that the piping can move forward. When propulsion of piping 6 is completed by havingpiping 6 propelled up to laid-down pipe 8 or destination hole 9 (Fig. 1), then screw 9 withinpiping 6 is pulled back intovertical hole 2, thus emptying the insides ofpiping 6. This completes the process of laying down the piping. - Referring to Fig. 10, water is prevented from flowing into the vertical hole by first water-stopping
means 20, since reinforcement packing 30, 31 are pressed against the outer surface of piping 6, while rubber packing 29 is not pressed againstpiping 6. Thin reinforcement packing 30, 31 are pressed againstpiping 6 when it is propelled because it is necessary to maintain low friction with the outer surface of piping 6 while maintaining appropriate water blockage. Thus, water can not be blocked over a long period of time in this state. Therefore, second water-stoppingmeans 40 is fitted betweenpiping 6 and rubber packing 29. - The following is a description of the fitting of the second water-stopping means. Referring to Fig. 11a, second water-stopping
means 40 is arranged so that taperedsection 43 is oriented toward the propulsion and so that piping 6 is passed through the hollow area inside second water-stopping meansmain unit 41, which is cylindrical in shape. Referring to Fig. 11b, second water-stoppingmeans 41 is propelled slowly in the propulsion direction. Referring to Fig. 12,propulsion machine 1 is used for this propulsion. -
Propulsion machine 1 is dedicated to the propulsion oflead pipe 5 andpiping 6, so support member 17 (Fig. 2) is made to match the size ofpiping 6. Since second water-stopping meansmain unit 41 is larger than piping 6, it is necessary to replace the standard support member 17 (Fig. 2) with adedicated support member 51. When preparations for propelling second water-stopping meansmain unit 41 is complete, either reinforcement packing 30, 31 are removed or ring-shaped rubber packing 29 is cut so that it forms a diameter that is larger than the inner diameter. At the same time as reinforcement packing 30, 31 is cut, second water-stoppingmeans 40 is propelled and is fitted inside first water-stoppingmeans 20. - Referring to Fig. 12, at this time tapered
section 42 arranged on second water-stopping meansmain unit 41 is able to be propelled while pushing rubber packing 29 of first water-stoppingmeans 20 wider. This allows easy fitting of second water-stoppingmeans 40. - Referring to Fig. 13, it is seen that by propelling second water-stopping
means 40, it is possible to press the connecting section of second water-stopping meansmain unit 41 to supportplate 25 of first waterstopping means 20. In this state rubber packing 29 of first water-stoppingmeans 20 presses against the outer surface of second water-stoppingmeans 41 so that water is adequately prevented from coming in between them. Also, rubber packing 48, 49 of second water-stoppingmeans 40 presses against the outer surface of piping 6 so that water is adequately prevented from coming in between them. Then, while this state is maintained, the connecting section of second water-stopping meansmain unit 41 andsupport plate 25 of first water-stoppingmeans 20 are welded together and fixed. This formsliner plate 3 and first water-stoppingmeans 20 and second water-stoppingmeans 40 into an integral unit, and it allows the entirevertical hole 2 to be used later as a manhole. - Referring to Fig. 14, finally, a rear or rearmost end 6a of piping 6 projects greatly from the inside surface of
liner plate 3 inward intovertical hole 2. Piping 6 is propelled so that rear end 6a ofpiping 6 is positioned further underground than the inner surface ofliner plate 3. Adedicated spacer 52 is attached betweensupport member 17 ofpropulsion machine 1 and piping rear end 6a.Dedicated spacer 52 is formed in a cylindrical shape and has a diameter the same size as the diameter ofpiping 6. The rear end ofspacer 52 engages with supportingmember 17 ofpropulsion machine 1, while the front end engages withpiping 6. Therefore, when propulsion machinemain unit 13 is moved forward, propulsion can take place without any contact with first water-stoppingmeans 20 or second water-stoppingmeans 40. This results in no projection inward intovertical hole 2 and allows free use of the space invertical hole 2. - As described above, piping 6 is propelled in a fixed direction from
vertical hole 2, and it is also can propel another pipe in the opposite direction. In this case, since the direction ofpropulsion machine 1 has to be reversed, but since rear end 6a of the piping (which has already been propelled) does not project intovertical hole 2, it is possible to easily change direction. - Having described preferred embodiments of the invention with reference to the accompanying drawings, it is to be understood that the invention is not limited to those precise embodiments, and that various changes and modifications may be effected therein by one skilled in the art without departing from the scope or spirit of the invention as defined in the appended claims. For example, the shape of the vertical hole and the installation of the liner plate are generally determined. Modifications in these aspects do not change the present invention.
Claims (12)
- A sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from within the excavated hole through the pipe pass through opening in a piping course, such sealing being to prevent water incursion to a liner enclosed work area from an underground water source exteriorly of the work area, said sealing assembly comprising
a seal part having a hollow elongated main body with openings at opposite body ends, means for fixing the position of said main body end openings relative to said pass through opening when said main body has been inserted through the pass through opening with one of the body ends in communication with the work area and an opposite end in communication with the underground water source, and
means carried on the main body extending radially relatively inwardly therefrom and operable to tightly conformably engage an external surface of a pipe passing through said seal part thereby to establish a sealing condition around said pipe external surface effective to obstruct a passage of any water present in said underground water source to said work area. - A sealing assembly in accordance with claim 1 in which the main body openings position fixing means comprises a flange on said main body extending radially outwardly from an end thereof, said flange when the main body is inserted through the pass through opening engaging in stopped abutment with portions of the liner adjacent the pass through opening at locations where said flange can be secured to said liner portions.
- A sealing assembly in accordance with claim 2 in which the sealing establishing means comprises a flexible waterproof packing material.
- A sealing assembly in accordance with claim 1 in which the main body openings position fixing means comprises a sleeve insertable in the pass through opening and having a flange extending radially outwardly of the sleeve at an end thereof for engaging in stopped abutment with portions of the liner adjacent the pass through opening, the sleeve carrying at least one flexible resilient radially inwardly extending packing element defining a socket for reception of the seal part main body, the packing element closely tightly conformingly encircling an external surface of the said seal part main body in a seal course contact therewith effective to obstruct a passage of water from one to an opposite side of the seal course, the sleeve including radially inwardly directed structure presenting a stopping abutment to a radially outwardly directed flange carried at an end of said seal part main body.
- A sealing assembly in accordance with claim 4 in which a length section of said seal part main body adjacent a main body opposite end tapers inwardly of a remainder length of said seal part main body.
- A sealing assembly for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course, such sealing being to prevent water incursion to the work area from an underground water source exteriorly of the work area, said sealing assembly comprising
a sleeve having a radially outwardly directed flange at an end of the sleeve, the sleeve being insertable into the pass through opening from within the work area to engage the said end flange against portions of the liner adjacent the pass through opening, the sleeve carrying a radially inwardly directed ring of a flexible waterproof material proximal a sleeve opposite end, there being means securing the said sleeve flange to said liner portions,
a seal unit including a hollow cylindrical main body, a radially outwardly directed flange carried at an end of said main body, a section of said main body adjacent an opposite main body end tapering radially inwardly toward said main body opposite end, said seal unit being insertable in said sleeve with the tapered main body end in a leading position with the main body flange end in following position so said flange can be caused to engage with a radially inwardly directed abutment on the sleeve thereby to effect an insertion stopping of the seal unit wherein the said opposite main body end is in communication with the underground water source and the flange carrying end of the main body is in communication with the work area, the ring of flexible waterproof material carried in said sleeve having a normal ring inner dimension smaller than an external dimension of the seal unit main body so that when the seal unit is inserted in the sleeve, the ring of waterproof material deforms in close conforming ring course encircling contact with the external surface of the main body effective to obstruct a passage of water from one to an opposite side of the encircling ring course, and
seal means carried internally in said main body extending radially inwardly therein and engageable tightly conformably with an external surface of a pipe passing centrally through the seal unit for establishing a seal condition about the external surface of the pipe effective to obstruct a passage of any water present in said underground water source along said pipe external surface to said work area. - A sealing assembly in accordance with claim 6 in which the sleeve and the evacuated hole liner are metal components, the sleeve flange securing means comprises a weldment securing the said sleeve flange to the liner portions at an inner side of the liner.
- A sealing assembly in accordance with claim 7 in which the weldment extends in an endless course so that the securement of the said sleeve flange to the liner portions is along a watertight joinder therebetween.
- A method for sealing a pipe pass through opening cut in an excavated hole liner so that piping can be propelled from a liner enclosed work area through the pipe pass through opening in a piping course without there occurring water incursion to the work area from an underground water source exteriorly of the work area, said method comprising
inserting a sleeve having a radially outwardly directed annular flange at a sleeve end and having a flange diameter greater than a largest pass through opening dimension, outwardly from the work area through the pass through opening until the annular flange engages liner surface portions adjacent the pass through opening, the sleeve further having a diametrically disposed barrier of flexible material blocking communication between the sleeve flange end and an opposite sleeve end, there being additionally a ring of a flexible waterproof packing material carried in the sleeve proximal said sleeve opposite end, the said packing material having a normal ring inner dimension of a predetermined value,
watertightly fixedly securing the sleeve flange to the liner surface portions,
cutting an opening in the flexible material barrier of a size slightly smaller than an external dimension of piping to be propelled through the liner opening so that when said piping passes through the said liner opening, the flexible material of the barrier tightly sealingly engages external surface of the piping to prevent any water passage from the water source to the liner space as,
inserting a seal unit which includes a hollow cylindrical main body, a radially outwardly directed flange carried at an end of the body, and a tapered section at an opposite body end into the sleeve tapered section first and concentrically encircling piping present in the sleeve and until the flange on the seal unit body engages a stop on the sleeve, an external surface of the seal unit being tightly sealingly engaged by the packing material ring of the sleeve to effect a watertight sealing therebetween, the flexible material barrier cut opening having been further enlarged prior to seal unit insertion to allow such insertion of the seal unit in the sleeve to be effected, the seal unit carrying an internal packing ring of flexible material which tightly sealingly engages the external surface of the piping to effect watertight sealing therebetween, and
watertightly fixedly securing the seal unit body flange to the said stop. - The method of claim 9 in which the liner, sleeve and seal unit are metallic components and the fixed securement of the sleeve to the liner and the seal unit to the sleeve comprises weldments.
- The method of claim 9 in which prior to inserting the sleeve through the liner opening, ground solidifying agents are injected into ground exterior of the liner at least in ground regions proximal the location of the opening in the liner thereby to inhibit passage of ground material through the said opening an into the work area.
- The method of claim 9 further comprising recessing a terminal end of propelled piping at a location radially outwardly of an inner surface of the liner.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15658/95 | 1995-02-02 | ||
JP1565895A JPH08210083A (en) | 1995-02-02 | 1995-02-02 | Cutoff method and device for pit mouth in underground piping work |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0725205A1 true EP0725205A1 (en) | 1996-08-07 |
Family
ID=11894842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95113016A Withdrawn EP0725205A1 (en) | 1995-02-02 | 1995-08-18 | Devices and method to stop water inflow to an underground pipe laying work area |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0725205A1 (en) |
JP (1) | JPH08210083A (en) |
CN (1) | CN1046981C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0922851A2 (en) | 1997-12-12 | 1999-06-16 | C.R.F. Società Consortile per Azioni | LPG reservoir for an internal combustion engine adapted to be operated selectively with gasoline and LPG |
EP1288602A2 (en) | 2001-08-30 | 2003-03-05 | Vogel & Noot Wärmetechnik Aktiengesellschaft | Panel for plate radiator / cooler and process for making same |
EP1471302A2 (en) | 2003-03-27 | 2004-10-27 | C.R.F. Società Consortile per Azioni | Connector member for electrical connections through a wall of a fuel tank, particulary for the lpg fuel of a motor vehicle |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103857165B (en) * | 2012-11-30 | 2016-12-21 | 艾默生过程控制流量技术有限公司 | Ground loop and production and preparation method thereof, electromagnetic flowmeter and measuring instruments |
JP7389698B2 (en) * | 2020-03-30 | 2023-11-30 | 株式会社奥村組 | Formation method of starting port and starting port structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3912024A (en) * | 1970-10-30 | 1975-10-14 | Richmond Mfg Co | Power train for horizontal earth boring machine |
US3958648A (en) * | 1974-02-18 | 1976-05-25 | Bpa Byggproduktion Ab | Drilling equipment |
EP0305834A2 (en) * | 1987-09-04 | 1989-03-08 | MTS Minitunnelsysteme GmbH | Process and apparatus for making a duct in an underground borehole |
EP0451683A2 (en) * | 1990-04-05 | 1991-10-16 | Kidoh Technical Ins, Co., Ltd. | Propulsion process of buried pipe |
-
1995
- 1995-02-02 JP JP1565895A patent/JPH08210083A/en active Pending
- 1995-08-18 EP EP95113016A patent/EP0725205A1/en not_active Withdrawn
-
1996
- 1996-02-02 CN CN 96101493 patent/CN1046981C/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3912024A (en) * | 1970-10-30 | 1975-10-14 | Richmond Mfg Co | Power train for horizontal earth boring machine |
US3958648A (en) * | 1974-02-18 | 1976-05-25 | Bpa Byggproduktion Ab | Drilling equipment |
EP0305834A2 (en) * | 1987-09-04 | 1989-03-08 | MTS Minitunnelsysteme GmbH | Process and apparatus for making a duct in an underground borehole |
EP0451683A2 (en) * | 1990-04-05 | 1991-10-16 | Kidoh Technical Ins, Co., Ltd. | Propulsion process of buried pipe |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0922851A2 (en) | 1997-12-12 | 1999-06-16 | C.R.F. Società Consortile per Azioni | LPG reservoir for an internal combustion engine adapted to be operated selectively with gasoline and LPG |
EP1288602A2 (en) | 2001-08-30 | 2003-03-05 | Vogel & Noot Wärmetechnik Aktiengesellschaft | Panel for plate radiator / cooler and process for making same |
EP1471302A2 (en) | 2003-03-27 | 2004-10-27 | C.R.F. Società Consortile per Azioni | Connector member for electrical connections through a wall of a fuel tank, particulary for the lpg fuel of a motor vehicle |
Also Published As
Publication number | Publication date |
---|---|
JPH08210083A (en) | 1996-08-13 |
CN1046981C (en) | 1999-12-01 |
CN1133926A (en) | 1996-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5615976A (en) | Double walled pipe, jacking method and pipe end structure of leading pipe | |
EP0725205A1 (en) | Devices and method to stop water inflow to an underground pipe laying work area | |
EP0076283B1 (en) | Improvements in and relating to the lining of sewers, pipes, or the like | |
EP0082223A1 (en) | Lining underground conduits | |
US11603760B2 (en) | Shield method | |
JP2649426B2 (en) | Non-stop water installation method such as fluid control valve and hermetic connection device | |
JP2002004769A (en) | Permeable-pipe laying construction method by pipe jacking method and its cutoff device | |
JPH0412147Y2 (en) | ||
JP3574323B2 (en) | Middle push pipe for propulsion method | |
JP3863888B2 (en) | Two-stage propulsion method and coupler | |
TW200303955A (en) | Method and device for drilling holes | |
JP2645984B2 (en) | Installation method of water stop device and water stop device in propulsion method | |
JPH09273667A (en) | Wall piercing structure of buried pipe | |
JP4377048B2 (en) | Connection structure of muddy water pipes in a muddy water shield machine | |
JP6132672B2 (en) | Existing pipe renewal method | |
JP2001173085A (en) | Pipeline regenerating construction method | |
JP3488277B2 (en) | Duplex steel pipe underground joining method | |
JP2006152680A (en) | Joining construction method for shield tunnel and structure of shield tunnel by its construction method | |
EP1041204B1 (en) | A method for anchoring a wall in the ground by means of pull anchors | |
JP2979304B2 (en) | Prependers | |
JP2746866B2 (en) | Drilling device for propulsion method and propulsion method | |
JPH06241380A (en) | New pipes connecting method | |
JPH0480196B2 (en) | ||
JPH07216862A (en) | Preventer device | |
JPH0534474B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19970208 |