EP0640213A1 - Process for the non-destructive testing of steel reinforcements in structures - Google Patents

Process for the non-destructive testing of steel reinforcements in structures

Info

Publication number
EP0640213A1
EP0640213A1 EP93909777A EP93909777A EP0640213A1 EP 0640213 A1 EP0640213 A1 EP 0640213A1 EP 93909777 A EP93909777 A EP 93909777A EP 93909777 A EP93909777 A EP 93909777A EP 0640213 A1 EP0640213 A1 EP 0640213A1
Authority
EP
European Patent Office
Prior art keywords
field
measuring head
pick
coil
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP93909777A
Other languages
German (de)
French (fr)
Inventor
Herbert Bousack
Yi Zhang
Gottfried Sawade
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Forschungs- und Materialpruefungsanstalt Baden-Wuerttemberg
Forschungszentrum Juelich GmbH
Original Assignee
Forschungs- und Materialpruefungsanstalt Baden-Wuerttemberg
Forschungszentrum Juelich GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Forschungs- und Materialpruefungsanstalt Baden-Wuerttemberg, Forschungszentrum Juelich GmbH filed Critical Forschungs- und Materialpruefungsanstalt Baden-Wuerttemberg
Publication of EP0640213A1 publication Critical patent/EP0640213A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N27/00Investigating or analysing materials by the use of electric, electrochemical, or magnetic means
    • G01N27/72Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables
    • G01N27/82Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws
    • G01N27/83Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws by investigating stray magnetic fields
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N27/00Investigating or analysing materials by the use of electric, electrochemical, or magnetic means
    • G01N27/72Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables
    • G01N27/82Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws

Definitions

  • the invention relates to a method for the non-destructive testing of steel reinforcements in structures according to the preamble of claim 1. Furthermore, the invention relates to a device for the non-destructive testing of steel reinforcements in structures according to the preamble of claim 10.
  • the prestress is achieved by steel bundles cast with the concrete under tensile stress.
  • the steel bundle can be located in a metallic tube, and the free interior space can be filled with a molding compound. If one or more chips break in such bundles, e.g.
  • the mechanical stability of the component may be endangered by overloading, corrosion, etc. Since in the initial stage of the damage the fracture effect due to concrete cracks is generally not visible from the outside, a non-destructive test method is required, the position of the steel reinforcements, in particular the steel bundle or the individual prestressing steel, or individual fractures of such prestressing steel detect.
  • a measuring head is made up from an electrical yoke magnet and a sensor array (Hall probes) moved long ago to a carrier to be examined.
  • the possible magnetization is checked when the field magnet is switched off.
  • the stray field is measured with active field magnets.
  • the remanent magnetic field now present is recorded when the field magnet is not activated.
  • the signal differences between the measurement in the active field (step 2) and the residual field measurement (step 3) can be used to make statements about iron parts such as brackets, wires etc. arranged transversely to the prestressing steel. Fractures in prestressing steel, on the other hand, are indicated by constant, characteristic signals in measurement steps 2 and 3.
  • the change in permeability of the steel structures present in the concrete is determined as the measured variable.
  • material-related changes in permeability which in this case could represent an interference signal
  • breaks and ends of steel structures lead to particularly clear field changes due to strong pole formation.
  • the natural, remanent field which results from the orientation of the steel structures in the earth field, is sufficient to carry out a check of the reinforcement.
  • the field to be measured can also be an external one, e.g. a field wash applied direct or alternating field, a break in the prestressing steel causing a field change in comparison to undisturbed areas of the prestressing steel.
  • a pick-up coil in the measuring head records the field change over time and passes it on to the coupling coil SQUID's.
  • the temporal change of the field to be measured at the location of the pick-up coil, which the SQUID requires as an input signal can, in the case of a stationary field, ie a remanent, in particular natural or constant field, be caused by a uniformly moving field Measuring head are generated.
  • a stationary field ie a remanent, in particular natural or constant field
  • Measuring head are generated.
  • the movement of the measuring head can be stopped, that is to say in these cases the measuring head can be moved to a location to be tested in order to measure there in a stationary manner.
  • the method according to the invention allows the position of individual prestressing steels or other structures with magnetic anomaly to be determined without prior knowledge of the orientation of such components.
  • the method according to the invention allows the testing of individual prestressing steels, even in the event that such steels are embedded together with others in a, in particular metallic, cladding tube, for example in concrete.
  • the method according to the invention makes it possible to test non-destructively without prior magnetization of the steel reinforcements to be examined, in particular the individual prestressing steel, in particular determining the position and / or determining cracks in the prestressing steel structure without prior magnetization.
  • the method according to the invention is directed to one that enables the non-destructive testing of Steel reinforcements are permitted in buildings, but the method according to the invention is just as good for determining the position of pipes or for determining break points in pipes made of materials which have magnetic anomalies, such as steel, in concrete, as well as in other buildings, for example in masonry or buried in the ground, applicable. Furthermore, it is conceivable that the method according to the invention can also be used in the field of environmental technology, for example for checking leaks in pipe systems and in plant construction, for example for determining the condition of safety-relevant components, as well as in landfill technology and contamination testing.
  • a first possibility is to move the measuring head connected to the respective coil relative to the steel reinforcement to be examined, preferably at a linear constant speed.
  • the coil is excited to vibrate at a defined frequency on a stationary measuring head.
  • the pick-up coil should preferably vibrate parallel to the direction of the prestressing steel to be examined. If one selects the frequency of an excitation vibration outside the frequency range of interference signals, then ambient interference can be largely configured by appropriate filtering.
  • Another alternative variant of the method according to the invention is that the coil and the Measuring head arranged stationary close to a steel reinforcement to be examined, with the help of, for example, a field coil of the steel reinforcement to be examined, an alternating field is exposed.
  • the steel reinforcement to be examined in particular the individual chip steel, is first completely demagnetized before the field change over time.
  • the high sensitivity of the method according to the invention is sufficient for the detection of the still existing pole formation at break points in the earth's field.
  • the method may erfindu ⁇ gsdorfe as Meßergeb ⁇ is result in the course of a field size as a function of the measurement path, 'wherein a break, for example, in a single chip by a strong steel Aus ⁇ noticeable impact makes the curve. Further information can be obtained in that a parallel arrangement of several pick-up coils (both a single one Arrangement as well as a gradiometer arrangement) can be obtained perpendicular to the measuring path. With a suitable further processing of the measurement results, taking into account the additional recording of the field changes perpendicular to the measurement path, a two-dimensional image of the field distribution can be determined, which, for example, can make the interpretation of a defect considerably easier under certain circumstances.
  • the evaluation electronics may include a control unit, a unit with data storage, analysis and display character, and possibly a field generator for a field coil arranged on the measuring head.
  • a control unit a unit with data storage, analysis and display character, and possibly a field generator for a field coil arranged on the measuring head.
  • An expert system is also conceivable for electronics.
  • this can be a SQUID based on a conventional superconductor such as niobium, but also a SQUID based on a modern high-temperature superconducting material (for example from DE-PS 40 28 301 known).
  • a modern high-temperature superconducting material for example from DE-PS 40 28 301 known.
  • the latter HTSL-SQUID has the advantage that liquid nitrogen can now be selected in the cryostat instead of the liquid helium.
  • FIG 1 Schematic representation of the device according to the invention with a movable measuring head with pick-up coil and field coil
  • Figure 2 block diagram for processing the signal recorded on a measuring head
  • FIG. 1 shows a schematic representation of the device according to the invention with a movable measuring head with pick-up coil and field coil. It can be one or more pick-up coils connected to the stationary SQUID system.
  • the measuring head is located on a processing unit which allows the measuring head to be positioned, for example, with up to three degrees of freedom.
  • the processing unit can be moved along the measuring path via stepper motors.
  • the stationary SQUID is shielded in a cryostat.
  • Corresponding evaluation electronics are also provided.
  • a field generator which can supply the field coil with a DC field or an AC field with freely adjustable frequency and field strength, - a transfer of all measured variables, ie the measurement signals from the SQUID, the coordinates and speeds of the measuring head, and possibly field sizes of the field coil to the data processing,
  • the stationary SQUID is shielded in a cryogen with the corresponding evaluation electronics. It can be a SQUID based on high-temperature superconducting materials, in particular of the RF-SQUID type.
  • FIG. 3 shows a single pick-up coil, a gradiometer arrangement of two pick-up coils with opposing turns, or a multiple gradiometer arrangement.
  • the change in the magnetic field over time is measured, with spatially constant signals from the environment, for example the 50 Hz oscillation from transformers or electric motors, occurring as a disturbance during the measurement and removed from the measurement by filtering have to.
  • This disadvantage avoids a gradiometer arrangement of two pick-up coils with opposing turns, since in both coils the same recorded interference signals can be removed from the measurement by forming a difference.
  • the course of a field size as a function of the measuring path can be obtained as the measurement result. For example, a break or other discontinuity in the prestressing steel or in the material to be examined is noticeable by a more or less pronounced deflection in the course of the curve. Additional information can be obtained by arranging several pick-up coils in parallel perpendicular to the measuring path. As a result, a two-dimensional image of the field distribution can be determined and the interpretation of a defect can be made considerably easier.
  • FIGS. 4a-c there are measurement results on a bundle with 16 flat bars, each 5 ⁇ 10 mm, which are located in a cladding tube with a diameter of 70 mm.
  • the signals obtained with the aid of a pick-up coil and a HTSL-RF-SQUID by moving along the bundle at a distance of 100 mm or 190 mm from the pick-up coil to the cladding tube axis were obtained by the in Figure 4a or Figure 4b received signals recorded.
  • the bundle with the flat bars in the cladding tube was now demagnetized for comparison and examined at a measuring distance of 190 mm. The signals then recorded are shown in FIG. 4c.
  • the signals obtained with the aid of the device according to the invention are shown in volt units as a function of the bundle coordinate in mm in FIGS. 4a-4c.
  • the two ends of the to be examined are shown in volt units as a function of the bundle coordinate in mm in FIGS. 4a-4c.
  • Bundles essentially agree with the extreme values of the bundle coordinates in FIGS. 4a-c.
  • the investigated model bundle of a prestressing steel bundle located in a cladding tube was obtained by removing it from a partial area of a prestressed concrete component that had been under tensile stress for years.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

The invention relates to a process and a device for the non-destructive testing of steel reinforcements in structures, especially to determine the position of individual prestressing reinforcements of unknown orientation and/or cracking in individual stressed reinforcements. The purpose of the invention is to provide a process and device of the aforementioned kind which makes it possible to determine with improved accuracy of measurement and sensitivity the position of steel reinforcements in structures and check for cracking in individual prestressed reinforcements in cases where individual prestressed reinforcements are fitted inside the structure with several others in a metal tube. This aim is achieved by a process in which a measuring head fitted with a pick-up coil detects a periodic change in field caused by the permeability of the steel reinforcement to be examined without any active previous magnetisation of the latter. The signal received at the measuring head is transmitted to a SQUID system behind which is connected an electronic evaluation system. Here, in the case of a stationary field, especially in the case of the natural remanent field of the steel reinforcement, the field alteration in time can be generated by the relative movement of the measuring head.

Description

B e s c h r e i b u n gDescription
Verfahren zur zerstörungsfreien Prüfung von Stahlarmie¬ rungen in BauwerkenProcess for the non-destructive testing of steel reinforcements in buildings
Die Erfindung betrifft ein Verfahren zur zerstörungs¬ freien Prüfung von Stahlarmierungen in Bauwerken gemäß dem Oberbegriff des Anspruchs 1. Desweiteren betrifft die Erfindung eine Vorrichtung zur zerstörungsfreien Prüfung von Stahlarmierungen in Bauwerken gemäß dem Oberbegriff des Anspruchs 10.The invention relates to a method for the non-destructive testing of steel reinforcements in structures according to the preamble of claim 1. Furthermore, the invention relates to a device for the non-destructive testing of steel reinforcements in structures according to the preamble of claim 10.
Bei vorgespannten Betonbauteilen wird die Vorspannung durch unter Zugspannung mit dem Beton vergossene Stahl- bündel erreicht. Das Stahlbündel kann sich dabei in einem metallischen Rohr befinden, wobei der freie In¬ nenraum mit einer Verpreßmasse aufgefüllt sein kann. Wenn in solchen Bündeln eine oder mehrere Spanstähle brechen, z.B. durch Überbelastung, Korrosion etc., kann die mechanische Stabilität des Bauteils unter Umstän¬ den gefährdet sein. Da im Anfangsstadium des Schadens im allgemeinen die Bruchauswirkung durch Betonrisse von außen nicht sichtbar ist, bedarf es eines zerstö¬ rungsfreien Prüfverfahrens, die Lage der Stahlarmie- rungen, insbesondere des Stahlbündels bzw. des einzel¬ nen Spannstahls oder einzelne Brüche eines solchen Spannstahls sicher zu detektieren.In the case of prestressed concrete components, the prestress is achieved by steel bundles cast with the concrete under tensile stress. The steel bundle can be located in a metallic tube, and the free interior space can be filled with a molding compound. If one or more chips break in such bundles, e.g. The mechanical stability of the component may be endangered by overloading, corrosion, etc. Since in the initial stage of the damage the fracture effect due to concrete cracks is generally not visible from the outside, a non-destructive test method is required, the position of the steel reinforcements, in particular the steel bundle or the individual prestressing steel, or individual fractures of such prestressing steel detect.
Als Stand der Technik ist bekannt, Spannbetonträger mit sofortigem Verbund, daß heißt mit unmittelbar im Beton liegenden Spannstählen ohne ferromagnetisches Hüllrohr abgeschirmt, mit Hilfe von Streuflußmessungen zu prüfen. (z.B. Deutsche Patentschrift DE 39 23 377, US-PT 363 343). Zunächst wird ein Meßkopf, bestehend aus einem elektrischen Jochmagneten und einem Sensor- array (Hall-Sonden) längst eines zu untersuchenden Trägers bewegt. In einem ersten Schritt wird die mög¬ liche vorhandene Magnetisierung bei ausgeschaltetem Feldmagneten geprüft. In einem zweiten Schritt wird die Messung des Streufeldes mit aktiven Feldmagneten vorgenommen. Schließlich wird im dritten Meßschritt das nunmehr vorhandene remanente Magnetfeld bei nicht- aktiviertem Feldmagneten aufgenommen. Im Ergebnis las¬ sen sich aus den Signalunterschieden zwischen der Mes- suπg im aktiven Feld (2. Schritt) und der Restfeldmes¬ sung (3. Schritt) Aussagen über quer zum Spannstahl angeordnete Eisenteile wie Bügel, Drähte etc. machen. Brüche im Spannstahl werden hingegen durch gleichblei bende, charakteristische Signale bei den Meßschritten 2 und 3 angezeigt.It is known as prior art to test prestressed concrete beams with an immediate bond, that is to say shielded with prestressing steels lying directly in the concrete without a ferromagnetic cladding tube, with the aid of leakage flux measurements. (e.g. German Patent DE 39 23 377, US-PT 363 343). First, a measuring head is made up from an electrical yoke magnet and a sensor array (Hall probes) moved long ago to a carrier to be examined. In a first step, the possible magnetization is checked when the field magnet is switched off. In a second step, the stray field is measured with active field magnets. Finally, in the third measuring step, the remanent magnetic field now present is recorded when the field magnet is not activated. As a result, the signal differences between the measurement in the active field (step 2) and the residual field measurement (step 3) can be used to make statements about iron parts such as brackets, wires etc. arranged transversely to the prestressing steel. Fractures in prestressing steel, on the other hand, are indicated by constant, characteristic signals in measurement steps 2 and 3.
Solche Verfahren erlauben es Brüche in Stählen von Trägern in sofortigem Verbund bis zu einer Rißweite von ca. 0,01 mm bis zu einem Abstand von 60 - 80 mm zu detektieren. Aufgrund der Signalformen von Brüchen im Spannstahl werden diese über einen relativ großen Bereich von ca. 100 mm angezeigt. Differenzfeldmessun¬ gen mit kleineren Abständen der Meßsonden sind deshalb nicht sinnvoll. Insbesamt zeigen die bekannten Verfah- ren eine sehr begrenzte Nachweisgenauigkeit.Such methods make it possible to detect breaks in the steel of beams in an immediate bond up to a crack width of approx. 0.01 mm up to a distance of 60 - 80 mm. Due to the signal shapes of breaks in prestressing steel, these are displayed over a relatively large area of approx. 100 mm. Differential field measurements with smaller distances between the measuring probes are therefore not useful. Overall, the known methods show a very limited accuracy of detection.
Es ist deshalb Aufgabe der Erfindung, ein Verfahren der Eingangs bezeichneten Art zu schaffen, das es er¬ laubt die Lage von Stahlarmierungen in Bauwerken zu bestimmen sowie eine Prüfung von Rißbildungen in ein¬ zelnen Spannstählen sogar für den Fall, das sich diese einzelnen Spannstähle mit mehreren in einem metalli¬ schen Hüllrohr innerhalb des Bauwerkes befinden, mit gegenüber bekannten Verfahren erhöhter Meßgenauigkeit und Empfindlichkeit zu detektieren. Desweiteren ist es Aufgabe der vorliegenden Erfindung eine Vorrichtung zur Durchführung eines solchen Verfahrens zu schaffen.It is therefore an object of the invention to provide a method of the type described at the outset which allows the position of steel reinforcements in structures to be determined, and an examination of cracks in individual prestressing steels even in the event that these individual prestressing steels are involved several are located in a metallic cladding tube within the building, with increased measuring accuracy compared to known methods and to detect sensitivity. Furthermore, it is an object of the present invention to provide an apparatus for performing such a method.
Die erfindungsgemäße Aufgabe wird gelöst durch ein Ver¬ fahren mit dem Merkmal des Anspruchs 1. Weitere vorteil¬ hafte oder zweckmäßige Varianten des erfindungsgemäßen Verfahrens finden sich in den Ansprüchen 2 - 9.The object of the invention is achieved by a method having the feature of claim 1. Further advantageous or expedient variants of the method according to the invention can be found in claims 2-9.
Die erfindungsgemäße Aufgabe wird desweiteren gelöst durch eine Vorrichtung mit den Merkmalen des Anspruchs 10. In den Ansprüchen 11 - 14 finden sich weitere vor¬ teilhafte oder zweckmäßige Ausführungsformen der er¬ findungsgemäßen Vorrichtung.The object according to the invention is further achieved by a device having the features of claim 10. Claims 11-14 contain further advantageous or expedient embodiments of the device according to the invention.
Verfahreπs äßig wird als Meßgröße die Permeabilitäts¬ änderung der im Beton vorhandenen Stahlstrukturen er¬ mittelt. Neben werkstoffbedingten Permeabilitätsände¬ rungen, die in diesem Falle ein Störsignal darstellen könnten, führen Brüche und Enden von Stahlstrukturen wegen einer starken Polbilduπg zu besonders deutlichen Feldänderungen. Bei dem zu vermessenden Feld reicht das natürliche, remanente Feld, welches durch die Orientierung der Stahlstrukturen im Erdfeld entsteht, aus eine Prüfung der Armierung vorzunehmen.The change in permeability of the steel structures present in the concrete is determined as the measured variable. In addition to material-related changes in permeability, which in this case could represent an interference signal, breaks and ends of steel structures lead to particularly clear field changes due to strong pole formation. For the field to be measured, the natural, remanent field, which results from the orientation of the steel structures in the earth field, is sufficient to carry out a check of the reinforcement.
Desweiteren kann es sich bei dem zu vermessenden Feld auch um ein von außen durch z.B. eine Feldspühle auf¬ gebrachtes Gleich- oder Wechselfeld handeln, wobei eine Bruchstelle im Spannstahl im Vergleich zu unge¬ störten Bereichen des Spannstahls eine Feldänderung hervorruft.Furthermore, the field to be measured can also be an external one, e.g. a field wash applied direct or alternating field, a break in the prestressing steel causing a field change in comparison to undisturbed areas of the prestressing steel.
Eine Pick-Up-Spule im Meßkopf nimmt die zeitliche Feld¬ änderung auf und übergibt sie an die Koppelspule eines SQUID's. Die zeitliche Änderung des zu messenden Fel¬ des am Ort der Pick-Up-Spule, die der SQUID als Ein- gangssigπal benötigt, kann bei einem stationären Feld, d.h. ein remanentes, insbesonderen natürliches Feld oder Gleichfeld, durch einen sich gleichmäßig bewegen¬ den Meßkopf erzeugt werden. Bei einem Wechselfeld in der Feldspule kann die Bewegung des Meßkopfes unter¬ bleiben, daß heißt in diesen Fällen kann der Meßkopf an eine zu prüfende Stelle gefahren werden um dort stationär zu messen.A pick-up coil in the measuring head records the field change over time and passes it on to the coupling coil SQUID's. The temporal change of the field to be measured at the location of the pick-up coil, which the SQUID requires as an input signal, can, in the case of a stationary field, ie a remanent, in particular natural or constant field, be caused by a uniformly moving field Measuring head are generated. In the case of an alternating field in the field coil, the movement of the measuring head can be stopped, that is to say in these cases the measuring head can be moved to a location to be tested in order to measure there in a stationary manner.
Bekannten Verfahren gegenüber sind beim erfindungsge¬ mäßen Verfahren folgende Vorteile hervorzuheben:In comparison with known methods, the following advantages are to be emphasized in the method according to the invention:
- Das erfindungsgemäße Verfahren erlaubt eine Lagebe¬ stimmung einzelner Spannstähle oder sonstige Struk¬ turen mit magnetischer Anomalie ohne vorherigen Kenntnis der Orientierung solcher Komponenten.The method according to the invention allows the position of individual prestressing steels or other structures with magnetic anomaly to be determined without prior knowledge of the orientation of such components.
- Das erfindungsgemäße Verfahren erlaubt die Prüfung einzelner Spannstähle, sogar für die Fälle, daß solche Stähle mit anderen zusammen in einem, insbesondere metallischen Hüllrohr, beispielsweise im Beton, eingebettet sind.- The method according to the invention allows the testing of individual prestressing steels, even in the event that such steels are embedded together with others in a, in particular metallic, cladding tube, for example in concrete.
- Das erfindungsgemäße Verfahren erlaubt es ohne vor¬ herige Magnetisierung der zu untersuchenden Stahlar¬ mierungen, insbesondere des einzelnen Spannstahls zerstörungsfrei zu prüfen, insbesondere eine Lage- bestimmung und/oder eine Bestimmung von Rissen in der Spannstahlstruktur ohne vorherige Magnetisierung vorzunehmen.The method according to the invention makes it possible to test non-destructively without prior magnetization of the steel reinforcements to be examined, in particular the individual prestressing steel, in particular determining the position and / or determining cracks in the prestressing steel structure without prior magnetization.
- Zwar richtet sich das erfindungsgemäße Verfahren auf ein solches, das die zerstörungsfreie Prüfung von Stahlarmierungen in Bauwerken erlaubt, das erfindungs¬ gemäße Verfahren ist jedoch genauso gut zu Lagebe¬ stimmung von Rohrleitungen oder zur Ermittlung von Bruchstellen in Rohrleitungen aus Materialien die magnetische Anomalien aufweisen, wie z.B. Stahl, in Beton als auch in anderen Bauwerken, z.B. in einem Mauerwerk oder im Erdboden vergraben, anwendbar. Desweiteren ist es vorstellbar das erfindungsgemäße Verfahren auch im Bereich der Umwelttechnik, beispiels¬ weise zur Prüfung von Leckagen in Rohrsystemen als auch im Anlagebau z.B. zur Zustandsermittlung von sicherheitsrelevanten Bauteilen wie auch in der De¬ ponietechnik und Altlastenerkundung einsetzbar.- Although the method according to the invention is directed to one that enables the non-destructive testing of Steel reinforcements are permitted in buildings, but the method according to the invention is just as good for determining the position of pipes or for determining break points in pipes made of materials which have magnetic anomalies, such as steel, in concrete, as well as in other buildings, for example in masonry or buried in the ground, applicable. Furthermore, it is conceivable that the method according to the invention can also be used in the field of environmental technology, for example for checking leaks in pipe systems and in plant construction, for example for determining the condition of safety-relevant components, as well as in landfill technology and contamination testing.
Die zeitliche Feldänderung die wenigstens von einerThe temporal field change that of at least one
Pick-Up-Spule aufgenommen werden soll, kann durch alter¬ native Verfahrensweise erzeugt werden.Pick-up coil to be picked up can be generated by alternative procedures.
Eine erste Möglichkeit besteht darin, den mit der je- weiligen Spule verbundene Meßkopf relativ zur zu unter¬ suchenden Stahlarmierungen zu bewegen, bevorzugt mit einer linearen konstanten Geschwindigkeit.A first possibility is to move the measuring head connected to the respective coil relative to the steel reinforcement to be examined, preferably at a linear constant speed.
Bei einer weiteren Varianten des erfindungsgemäßen Ver- fahrens wird die Spule an einem stationären Meßkopf zu Schwingungen mit einer definierten Frequenz angeregt. Dabei soll bevorzugt die Schwingung der Pick-Up-Spule parallel zur Richtung des zu untersuchenden Spannstahls erfolgen. Wählt man dabei die Frequenz einer Erreger- Schwingung außerhalb der Frequenzbreite von Störsigπa- len, dann können durch entsprechende Filterung Umgebungs¬ störungen weitgehend ausgestaltet werden.In a further variant of the method according to the invention, the coil is excited to vibrate at a defined frequency on a stationary measuring head. The pick-up coil should preferably vibrate parallel to the direction of the prestressing steel to be examined. If one selects the frequency of an excitation vibration outside the frequency range of interference signals, then ambient interference can be largely configured by appropriate filtering.
Eine weitere alternative Variante des erfindungsgemäßen Verfahrens besteht darin, daß die Spule als auch der Meßkopf stationär nahe an einer zu untersuchenden Stahlarmierung angeordnet, mit Hilfe beispielsweise einer Feldspule der zu untersuchenden Stahlarmierung ein Wechselfeld ausgesetzt wird.Another alternative variant of the method according to the invention is that the coil and the Measuring head arranged stationary close to a steel reinforcement to be examined, with the help of, for example, a field coil of the steel reinforcement to be examined, an alternating field is exposed.
Desweiteren kann eine besondere Reproduzierbarkeit dadurch erreicht werden, daß die zu untersuchende Stahlarmierung, insbesondere der einzelne Spaπnstahl, vor Aufnahme der zeitlichen Feldänderung zunächst vollständig entmagnetisiert wird. Zur Detektion von Rissen in einem solchen entmagnetisierten Spannstahl reicht die hohe Empfindlichkeit des erfindungsgemäßen Verfahrens zur Detektion der immer noch vorhandenen Polbildung an Bruchstellen im Erdfeld aus.Furthermore, a particular reproducibility can be achieved in that the steel reinforcement to be examined, in particular the individual chip steel, is first completely demagnetized before the field change over time. To detect cracks in such a demagnetized prestressing steel, the high sensitivity of the method according to the invention is sufficient for the detection of the still existing pole formation at break points in the earth's field.
Wenn auch bei Verwendung einer Pick-Up-Spule die zeit¬ liche Änderung des Felds gemessen, dabei allerdings räumlich konstante Signale der Umgebung wie z.B. die 50 Hz-Schwingung eines Trafos oder Elektromotors ge- stört wird, kann dieser Nachteil durch eine vorteil¬ hafte Variante des erfindungsgemäßen Verfahrens besei¬ tigt werden, in dem wenigstens eine Gradiometeranord- nuπg von 2 Pick-Up-Spulen mit gegenläufigen Windungen gewählt wird. Eine solche Gradiometeranordnung von wenigstens 2 Spulen erlaubt die Eliminierung von gleich aufgenommenen Störsignalen durch eine Differenzbilduπg bei der Messung.If the temporal change in the field is measured even when a pick-up coil is used, but spatially constant signals from the environment such as e.g. the 50 Hz oscillation of a transformer or electric motor is disturbed, this disadvantage can be eliminated by an advantageous variant of the method according to the invention, in which at least one gradiometer arrangement of 2 pick-up coils with opposing turns is selected . Such a gradiometer arrangement of at least 2 coils allows the elimination of interfering signals that have been recorded in the same way by a difference formation during the measurement.
Das erfinduπgsgemäße Verfahren kann als Meßergebπis den Verlauf einer Feldgröße als Funktion des Meßweges ergeben, 'wobei sich ein Bruch beispielsweise in einem einzelnen Spannstahl durch einen ausgeprägten Aus¬ schlag im Kurvenverlauf bemerkbar macht. Weitere Infor¬ mationen können erhalten werden in dem eine parallele Anordnung mehrere Pick-Up-Spulen (sowohl eine einzelne Anordnung als auch eine Gradiometeranordnung) senkrecht zum Meßweg erhalten werden. Bei geeigneter Weiterver¬ arbeitung der Meßergebnisse unter Berücksichtigung der zusätzlichen Aufnahme der Feldänderungen senkrecht zum Meßweg kann ein zweidi ensionales Bild der Feldvertei¬ lung ermittelt werden, was beispielsweise die Deutung einer Fehlstelle unter Umständen erheblich erleichtern kann.The method may erfinduπgsgemäße as Meßergebπis result in the course of a field size as a function of the measurement path, 'wherein a break, for example, in a single chip by a strong steel Aus¬ noticeable impact makes the curve. Further information can be obtained in that a parallel arrangement of several pick-up coils (both a single one Arrangement as well as a gradiometer arrangement) can be obtained perpendicular to the measuring path. With a suitable further processing of the measurement results, taking into account the additional recording of the field changes perpendicular to the measurement path, a two-dimensional image of the field distribution can be determined, which, for example, can make the interpretation of a defect considerably easier under certain circumstances.
Die Auswerteelektronik umfaßt neben der SQUID-Elektro- nik unter Umständen eine Steuerungseinheit, eine Ein¬ heit mit Datenspeicherung, Analyse und Darstellungs¬ charakter, sowie ggfs. ein Feldgenerator für eine am Meßkopf angeordnete Feldspule. Bei der Elektronik ist auch ein Experten-System denkbar.In addition to the SQUID electronics, the evaluation electronics may include a control unit, a unit with data storage, analysis and display character, and possibly a field generator for a field coil arranged on the measuring head. An expert system is also conceivable for electronics.
Bei Einsatz des SQUID-Systems mit geeignetem Kryosta- ten kann es sich dabei um ein SQUID auf der Basis eines herkömmlichen Supraleiters wie beispielsweise Niob aber auch um einen SQUID auf der Basis eines modernen hochtemperatursupraleitenden Materials handeln (bei¬ spielsweise aus DE-PS 40 28 301 bekannt) . Letzterer HTSL-SQUID zeigt den Vorteil, daß im Kryostaten an¬ stelle des flüssigen Heliums nunmehr flüssiges Stick- stoff gewählt werden kann.When using the SQUID system with a suitable cryostat, this can be a SQUID based on a conventional superconductor such as niobium, but also a SQUID based on a modern high-temperature superconducting material (for example from DE-PS 40 28 301 known). The latter HTSL-SQUID has the advantage that liquid nitrogen can now be selected in the cryostat instead of the liquid helium.
Es sind im folgenden in den Figuren zum erfindungsge¬ mäßen Verfahren, bzw. zur erfindungsgemäßen Vorrichtung dargestellt:The following shows the figures relating to the method according to the invention and the device according to the invention:
Figur 1 Schematische Darstellung der erfindungs¬ gemäßen Vorrichtung mit verfahrbarem Meßkopf mit Pick-Up-Spule und Feld¬ spule Figur 2 Prinzipschaltbild zur Verarbeitung des an einem Meßkopf aufgenommenen SignalsFigure 1 Schematic representation of the device according to the invention with a movable measuring head with pick-up coil and field coil Figure 2 block diagram for processing the signal recorded on a measuring head
Figur 3 Drei mögliche Varianten zur Aufnahme der gemessenen zeitlichen Feldänderung mit3 shows three possible variants for recording the measured temporal field change with
Hilfe einer einzelnen Spule, einer ein¬ fachen bzw. mehrfachen Gradiometeranord¬ nungWith the help of a single coil, a simple or multiple gradiometer arrangement
Figur 4a-c Meßergebnisse an einem in einem Hüllrohr befindlichen Bündel mit 16 Flachstäben.4a-c measurement results on a bundle with 16 flat bars located in a cladding tube.
In der Figur 1 ist eine schematische Darstellung der erfindungsgemäßen Vorrichtung mit verfahrbarem Meßkopf mit Pick-Up-Spule und Feldspule gezeigt. Es kann sich dabei um eine oder mehrere, an das stationäre SQUID-Sy- stem angeschlossene Pick-Up-Spulen handeln. Der Meßkopf befindet sich auf einer Verfahrenseinheit, die es er¬ laubt, den Meßkopf beispielsweise mit bis zu drei Freiheitsgraden zu positionieren. Über Schrittmotoren kann die Verfahrenseinheit entlang des Meßweges bewegt werden. Der stationäre SQUID befindet sich abgeschirmt in einem Kryostaten. Des weiteren ist eine entspre¬ chende Auswerteelektronik vorgesehen.FIG. 1 shows a schematic representation of the device according to the invention with a movable measuring head with pick-up coil and field coil. It can be one or more pick-up coils connected to the stationary SQUID system. The measuring head is located on a processing unit which allows the measuring head to be positioned, for example, with up to three degrees of freedom. The processing unit can be moved along the measuring path via stepper motors. The stationary SQUID is shielded in a cryostat. Corresponding evaluation electronics are also provided.
Eine Steuerung erlaubtControl permits
- die Vorgabe der Bewegung des Meßkopfes nach oordi- naten und Geschwindigkeit,- the specification of the movement of the measuring head according to coordinates and speed,
- eine-Ansteuerung eines Feldgenerators, der die Feld¬ spule mit einem Gleichfeld oder einem Wechselfeld mit frei einstellbarer Frequenz und Feldstärke ver¬ sorgen kann,* - eine Weitergabe aller Meßgrößen, d.h. die Meßsignale vom SQUID, der Koordinaten und Geschwindigkeiten des Meßkopfes, ggf. Feldgrößen der Feldspule an die Datenverarbeitung,activation of a field generator which can supply the field coil with a DC field or an AC field with freely adjustable frequency and field strength, - a transfer of all measured variables, ie the measurement signals from the SQUID, the coordinates and speeds of the measuring head, and possibly field sizes of the field coil to the data processing,
- eine Datenverarbeitung, die alle signifikanten Daten speichert, analysiert und entsprechend dokumentiert.- Data processing that stores, analyzes and documents all significant data.
Ausführlicher dargestellt in der Figur 2 ist abge- schirmt der stationäre SQUID in einem Kryos aten mit der entsprechenden Auswerteelektronik. Es kann dabei ein SQUID auf der Basis hochtemperatur-supraleitender Materialien sein, insbesondere vom Typ RF-SQUID.Shown in more detail in FIG. 2, the stationary SQUID is shielded in a cryogen with the corresponding evaluation electronics. It can be a SQUID based on high-temperature superconducting materials, in particular of the RF-SQUID type.
Bei der Anordnung der Pick-Up-Spulen im Meßkopf sind verschiedene Varianten möglich. Aus der Figur 3 ergeben sich dabei als Alternative eine einzige Pick-Up-Spule, eine Gradiometeranordnung von zwei Pick-Up-Spulen mit gegenläufigen Windungen oder eine Mehrfach- gradiometeranordnung.Different variants are possible in the arrangement of the pick-up coils in the measuring head. As an alternative, FIG. 3 shows a single pick-up coil, a gradiometer arrangement of two pick-up coils with opposing turns, or a multiple gradiometer arrangement.
Bei Verwendung einer Pick-Up-Spule wird die zeitliche Änderung des Magnetfeldes gemessen, wobei räumlich kon¬ stante Signale der Umgebung, z.B. die 50 Hz-Schwingung durch Trafos oder Elektromotoren, bei der Messung als Störung anfallen und aus der Messung durch Filterung entfernt werden müssen. Dieser Nachteil umgeht eine Gradiometeranordnung von zwei Pick-Up-Spulen mit gegen¬ läufigen Windungen, da in beiden Spulen gleich aufge- nommene- Störsignale durch eine Differenzbildung aus der Messung entfernt werden können. Bei diesen beschriebenen Anordnungen kann man als Me߬ ergebnis den Verlauf einer Feldgröße als Funktion des Meßweges erhalten. Dabei macht sich z.B. ein Bruch oder eine sonstige Diskontinuität im Spannstahl oder im zu untersuchenden Material durch einen mehr oder weniger ausgeprägten Ausschlag im Kurvenverlauf bemerkbar. Da¬ bei kann man zusätzlich Informationen erhalten durch eine parallele Anordnung mehrerer Pick-Up-Spulen senk¬ recht zum Meßweg. Im Ergebnis kann man damit ein zwei- dimensionales Bild der Feldverteilung ermitteln und die Deutung einer Fehlstelle erheblich erleichtern.When a pick-up coil is used, the change in the magnetic field over time is measured, with spatially constant signals from the environment, for example the 50 Hz oscillation from transformers or electric motors, occurring as a disturbance during the measurement and removed from the measurement by filtering have to. This disadvantage avoids a gradiometer arrangement of two pick-up coils with opposing turns, since in both coils the same recorded interference signals can be removed from the measurement by forming a difference. With these arrangements described, the course of a field size as a function of the measuring path can be obtained as the measurement result. For example, a break or other discontinuity in the prestressing steel or in the material to be examined is noticeable by a more or less pronounced deflection in the course of the curve. Additional information can be obtained by arranging several pick-up coils in parallel perpendicular to the measuring path. As a result, a two-dimensional image of the field distribution can be determined and the interpretation of a defect can be made considerably easier.
In den Figuren 4a - c finden sich Meßergebnisse an einem Bündel mit 16 Flachstäben zu je 5 x 10 mm, die sich in einem Hüllrohr mit einem Durchmesser von 70 mm befinden. Die mit Hilfe einer Pick-Up-Spule und einem HTSL-RF-SQUID erhaltenen Signale durch Entlangfahren an dem Bündel in einer Entfernung von 100 mm bzw. 190 mm Meßabstand von der Pick-Up-Spule bis zur Hüllrohrachse wurden durch die in Figur 4a bzw. Figur 4b erhaltenen Signale aufgenommen. In einem weiteren Meßzyklus wurde zum Vergleich nunmehr das Bündel mit den Flachstäben im Hüllrohr entmagnetisiert und in einem Meßabstand von 190 mm untersucht. Die dann aufgenommenen Signale sind in der Figur 4c dargestellt.In FIGS. 4a-c there are measurement results on a bundle with 16 flat bars, each 5 × 10 mm, which are located in a cladding tube with a diameter of 70 mm. The signals obtained with the aid of a pick-up coil and a HTSL-RF-SQUID by moving along the bundle at a distance of 100 mm or 190 mm from the pick-up coil to the cladding tube axis were obtained by the in Figure 4a or Figure 4b received signals recorded. In a further measuring cycle, the bundle with the flat bars in the cladding tube was now demagnetized for comparison and examined at a measuring distance of 190 mm. The signals then recorded are shown in FIG. 4c.
Aufgetragen in den Figuren 4a - 4c sind die mit Hilfe der erfindungsgemäßen Vorrichtung erhaltenen Signale in Volt-Einheiten als Funktion der Bündelkoordinate in mm dargestellt. Die beiden Enden des zu untersuchendenThe signals obtained with the aid of the device according to the invention are shown in volt units as a function of the bundle coordinate in mm in FIGS. 4a-4c. The two ends of the to be examined
Bündels stimmen mit den Extremwerten der Bündelkoordi¬ naten in den Figuren 4a - c im wesentlichen überein. Durch Vergleich der erzielten Meßergebnisse in den Fi¬ guren 4a - c ergibt sich bei der Bündelkoordi¬ nate = 2140 mm ein reproduzierbares Signal, das auch bei Entmagnetisierung des Bündels gemäß dem Meßlauf zu Figur 4c eindeutig auf eine Diskontinuität im Bündel hinweist.Bundles essentially agree with the extreme values of the bundle coordinates in FIGS. 4a-c. A comparison of the measurement results obtained in FIGS. 4a-c results in a reproducible signal for the bundle coordinate = 2140 mm, which clearly indicates a discontinuity in the bundle even when the bundle is demagnetized according to the measurement run for FIG. 4c.
Das untersuchte Modell-Bündel eines in einem Hüllrohr befindlichen Spannstahlbündels wurde erhalten durch Ausbau aus einem Teilbereich eines über Jahre unter Zugbelastung gestandenen Spannbetonbauteils. The investigated model bundle of a prestressing steel bundle located in a cladding tube was obtained by removing it from a partial area of a prestressed concrete component that had been under tensile stress for years.

Claims

P a t e n t a n s p r ü c h e Patent claims
1. Verfahren zur zerstörungsfreien Prüfung von Stahlar¬ mierungen in Bauwerken, insbesondere zur Lagebestim¬ mung einzelner Spannstähle mit unbekannter Orientie¬ rung und/oder Bestimmung von Rissen einzelner Spann- stähle, insbesondere für den Fall, daß sich der ein¬ zelne Spannstahl mit mehreren in einem metallischen Hüllrohr im Inneren eines Spannbetonbauteils befindet, d a d u r c h g e k e n n z e i c h n e t , daß - ein mit wenigstens einer Pick-Up-Spule vorgesehe¬ ner Meßkopf eine von den Permeabilitätseigen¬ schaften der zu untersuchenden Stahlarmierung hervorgerufene, zeitliche Feldänderung ohne ak¬ tive, vorherige Magnetisierung der Stahlarmierung aufnimmt, das am Meßkopf erhaltene Signal an ein SQUID-Sy- stem weitergegeben wird und - diesem SQUID-Syste eine Auswerte-Elektronik nachgeschaltet ist.1. A method for the non-destructive testing of steel reinforcements in buildings, in particular for determining the position of individual prestressing steels with unknown orientation and / or determining cracks in individual prestressing steels, in particular in the event that the individual prestressing steel contains several in a metallic cladding tube inside a prestressed concrete component, characterized in that - a measuring head provided with at least one pick-up coil detects a time-related field change caused by the permeability properties of the steel reinforcement to be examined without active, previous magnetization of the steel reinforcement records, the signal received at the measuring head is passed on to a SQUID system and - evaluation electronics are connected downstream of this SQUID system.
2. Verfahren nach Anspruch 1, d a d u r c h g e k e n n z e i c h n e t , daß im Fall eines stationären Feldes die zeitliche Feldänderung durch eine zur zu untersuchenden Stahlar- mierung relative, insbesondere gleichmäßige Bewegung des Meßkopfs erzeugt wird. 2. The method according to claim 1, characterized in that in the case of a stationary field, the temporal field change is generated by a relative, in particular uniform, movement of the measuring head to the steel reinforcement to be examined.
3. Verfahren nach Anspruch 2, d a d u r c h g e k e n n z e i c h n e t , daß als stationäres Feld der Stahlarmierung ihr natür¬ liches, remanentes Feld oder ein von aussen an die Stahlarmierung angelegtes Gleichfeld gewählt wird.3. The method of claim 2, d a d u r c h g e k e n n z e i c h n e t that their natural, remanent field or a constant field applied to the steel reinforcement from the outside is selected as the stationary field of the steel reinforcement.
4. Verfahren nach Anspruch 1 , 2 oder 3 , d a d u r c h g e k e n n z e i c h n e t , daß im Fall eines von aussen an der Stahlarmierung an- gelegten Wechselfeldes die zeitliche Feldänderung mit Hilfe eines relativ zur zu untersuchenden Stahlarmie¬ rung stationär angeordneten Meßkopfs aufgenommen wird.4. The method of claim 1, 2 or 3, so that in the case of an alternating field applied to the steel reinforcement from outside, the temporal field change is recorded with the aid of a measuring head that is stationary relative to the steel reinforcement to be examined.
5. Verfahren nach Anspruch 4, d a d u r c h g e k e n n z e i c h n e t , daß das Wechselfeld von einer am Meßkopf verbundenen Feldspule erzeugt wird.5. The method of claim 4, d a d u r c h g e k e n n z e i c h n e t that the alternating field is generated by a field coil connected to the measuring head.
6. Verfahren nach einem der Ansprüche 1 bis 5, d a d u r c h g e k e n n z e i c h n e t , daß die zu untersuchende Stahlarmierung vor Aufnahme der Feldänderung am Meßkopf entmagnetisiert wird.6. The method according to any one of claims 1 to 5, that the steel reinforcement to be examined is demagnetized before recording the field change on the measuring head.
7. Verfahren nach einem der vorhergehenden Ansprüche , d a d u r c h g e k e n n z e i c h n e t , daß die zeitliche Feldänderung vom Meßkopf mit einer aus wenigstens einer weiteren Pick-Up-Spule mit zur ersteren Spule gegenläufigen Windungen bestehenden Gradiometeranordnung aufgenommen wird.7. The method according to any one of the preceding claims, that the temporal field change is recorded by the measuring head with a gradiometer arrangement consisting of at least one further pick-up coil with windings which run in opposite directions to the former coil.
8. Verfahren nach einem der vorhergehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , daß wenigstens ein Array von Pick-Up-Spulen, ggfs. in wenigstens einer Anordnung von mehreren Gradiometeran- Ordnungen derart vorgesehen ist, daß eine zweidimen- sionale Information der zu untersuchenden Stahlarmie¬ rung erhalten wird.8. The method according to any one of the preceding claims, characterized in that at least one array of pick-up coils, possibly in at least one arrangement of several gradiometer arrangements is provided such that a two-dimensional regional information of the steel reinforcement to be examined is obtained.
Verfahren nach einem der vorhergehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , daß die eine oder mehrere mit dem Meßkopf verbundenen Pick-Up-Spulen in einer oder jeweils mehreren ausge¬ wählten Richtungen mit jeweils definiert eingestellter Frequenz zu Schwingen erregbar sind.Method according to one of the preceding claims, that the one or more pick-up coils connected to the measuring head can be excited to vibrate in one or more selected directions with a defined frequency in each case.
10. Vorrichtung zur zerstörungsfreien Prüfung von Stahlar¬ mierungen in Bauwerken, insbesondere zur Lagebestim¬ mung einzelner Spannstähle mit unbekannter Orientie¬ rung und/oder Bestimmung von Rissen einzelner Spann- stähle, insbesondere für den Fall, daß sich der ein¬ zelne Spannstahl mit mehreren in einem metallischen Hüllrohr im Inneren eines Spannbetonbauteils befindet, g e k e n n z e i c h n e t d u r c h10. Device for the non-destructive testing of steel reinforcements in buildings, in particular for determining the position of individual prestressing steels with unknown orientation and / or determining cracks in individual prestressing steels, in particular in the event that the individual prestressing steel contains several located in a metallic cladding tube inside a prestressed concrete component, characterized by
- einen Meßkopf mit wenigstens einer zur Aufnahme von Magnetfeldänderungen vorgesehene Pick-Up- Spule, ein SQUID-system mit Koppelspule zur Aufnahme des Signals der Pick-Up-Spule und- a measuring head with at least one intended to receive v on changes in magnetic field pick-up coil, a SQUID system with coupling coil for receiving the signal of the pick-up coil and
- eine Auswerte-Elektronik zur Weiterverarbeitung des SQUID-signals.- Evaluation electronics for further processing of the SQUID signal.
11. Vorrichtung nach Anspruch 10, g e k e n n z e i c h n e t d u r c h wenigstens einer weiteren Pick-Up-Spule mit zur erste- ren gegenläufigen Windungen zur Bildung einer Gradio¬ meteranordnung oder wenigstens ein aus mehreren Pick- Up-Spulen bestehendes Array. 11. The device according to claim 10, characterized by at least one further pick-up coil with turns opposite to the first to form a gradiometer arrangement or at least one array consisting of several pick-up coils.
12. Vorrichtung nach Anspruch 10 oder 11, g e k e n n z e i c h n e t d u r c h mehrere mit dem Meßkopf verbundenen Pick-Up-Spulen, die jeweils einzeln oder zu mehreren in einer oder mehreren ausgewählten Richtungen mit jeweils definier¬ ter Frequenz schwingbar angeordnet sind.12. Apparatus according to claim 10 or 11, g e k e n n z e i c h n e t d u r c h a plurality of pick-up coils connected to the measuring head, each of which is arranged to be oscillatable individually or in a plurality in one or more selected directions, each with a defined frequency.
13. Vorrichtung nach Anspruch 10, 11 oder 12, g e k e n n z e i c h n e t d u r c h eine mit dem Meßkopf verbundene Feldspule.13. The apparatus of claim 10, 11 or 12, g e k e n n z e i c h n e t d u r c h a field coil connected to the measuring head.
14. Vorrichtung nach einem der Ansprüche 10 bis 13, g e k e n n z e i c h n e t d u r c h einen in bis zu drei von einander unabhängigen Orien- tierungen bewegbaren Meßkopf. 14. Device according to one of claims 10 to 13, g e k e n n z e i c h n e t d u r c h a measuring head movable in up to three mutually independent orientations.
EP93909777A 1992-05-14 1993-05-14 Process for the non-destructive testing of steel reinforcements in structures Withdrawn EP0640213A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE4215358 1992-05-14
DE19924215358 DE4215358A1 (en) 1992-05-14 1992-05-14 Process for the non-destructive testing of steel reinforcements in buildings
PCT/DE1993/000437 WO1993023750A1 (en) 1992-05-14 1993-05-14 Process for the non-destructive testing of steel reinforcements in structures

Publications (1)

Publication Number Publication Date
EP0640213A1 true EP0640213A1 (en) 1995-03-01

Family

ID=6458519

Family Applications (1)

Application Number Title Priority Date Filing Date
EP93909777A Withdrawn EP0640213A1 (en) 1992-05-14 1993-05-14 Process for the non-destructive testing of steel reinforcements in structures

Country Status (3)

Country Link
EP (1) EP0640213A1 (en)
DE (1) DE4215358A1 (en)
WO (1) WO1993023750A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08211022A (en) * 1994-12-05 1996-08-20 Hitachi Ltd Material inspection device
DE19631490C2 (en) * 1996-08-03 1998-06-10 Forschungszentrum Juelich Gmbh Device and method for suppressing signals of the crossbar when examining prestressed concrete components using the method of magnetic residual field measurement
DE19746000C2 (en) 1997-10-20 2002-05-16 Forschungszentrum Juelich Gmbh Process for determining defects in workpieces and magnetic field measuring device for carrying out this process
DE102006006468A1 (en) * 2006-02-10 2007-08-16 Rwe Power Ag Method for monitoring and / or non-destructive testing of a transmission element and measuring arrangement for carrying out the method
DE202015004751U1 (en) 2015-07-01 2015-08-13 IAB - Institut für Angewandte Bauforschung Weimar gemeinnützige GmbH Device for detecting and measuring steel reinforcement in concrete sleepers
CZ2022521A3 (en) * 2022-12-12 2024-01-31 České vysoké učení technické v Praze Diagnostic apparatus for dispersed reinforcement in cementitious composite

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6918432A (en) * 1969-01-09 1970-07-13
US4573013A (en) * 1982-03-29 1986-02-25 The United States Of America As Represented By The Secretary Of Transportation Magnetic inspection of reinforcing steel rods in prestressed concrete
US4982158A (en) * 1988-06-23 1991-01-01 Electric Power Research Institute, Inc. Method and apparatus for magnetic detection of flaws
DE3923377C1 (en) * 1988-12-29 1990-07-26 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen, De

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9323750A1 *

Also Published As

Publication number Publication date
DE4215358A1 (en) 1993-11-18
WO1993023750A1 (en) 1993-11-25

Similar Documents

Publication Publication Date Title
EP0365622B1 (en) Process and apparatus for non-destructive measurement of the magnetic properties of a test object
DE69003141T2 (en) Stress determination method in a steel material using magnetostriction.
EP0100009B1 (en) Device for non destructive measuring of the case hardening depth of a material
EP0287873B1 (en) Process for measuring and exactly localizing the strain in hardened areas of structural elements
DE19601707C2 (en) Method and device for non-destructive testing of a wire rope
EP2893336B1 (en) Differentail sensor, investigation apparatus and method of detecting defects in electrically conducting materials
EP0220457B1 (en) Method and apparatus for investigating ferromagnetic objects deposited in non-magnetic materials
DE10000845B4 (en) Method and device for non-contact flatness measurement of metal strips made of ferromagnetic materials
EP2108112B1 (en) Method for determining the remaining service life and/or fatigue state of components
EP0640213A1 (en) Process for the non-destructive testing of steel reinforcements in structures
EP0376116B1 (en) Method for identifying the position of a crack in reinforcing steel
EP2783206A1 (en) Method and device for detecting mechanical changes in a component by means of a magnetoelastic sensor
EP0170690B1 (en) Non destructive test of materials for ferromagnetic substances
DE3821070A1 (en) DEVICE FOR THE NON-DESTRUCTIVE EXAMINATION OF LONG STRETCHED, MAGNETICALLY CONDUCTING ELEMENTS
DE19726513C2 (en) Device and method for eddy current testing
EP1767932B1 (en) Device and method for non-destructive testing of components
EP3581916A1 (en) Device and method for magnetic particle determination
EP0831323A1 (en) Method for the non-destructive testing of an object with a weld-joint of magnetizable material
DE3518161C2 (en)
DE19631490C2 (en) Device and method for suppressing signals of the crossbar when examining prestressed concrete components using the method of magnetic residual field measurement
EP1216414A1 (en) Method and device for carrying out the nondestructive material characterization of ferromagnetic substances
DE1498973A1 (en) Method of analyzing a mixture
DE3723360A1 (en) METHOD AND DEVICE FOR DESTRUCTION-FREE TESTING OF FERROMAGNETIC BODIES BY MEANS OF MAGNETIZATION
DE102013209774A1 (en) Test method and test device for eddy current testing with premagnetization
EP0739438A1 (en) Reinforcement for building elements under tension and installations provided therewith

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19941114

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE DK ES FR GB IT NL SE

17Q First examination report despatched

Effective date: 19980331

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 19980720