EP0488246A3 - Manufacturing planning system - Google Patents
Manufacturing planning system Download PDFInfo
- Publication number
- EP0488246A3 EP0488246A3 EP19910120315 EP91120315A EP0488246A3 EP 0488246 A3 EP0488246 A3 EP 0488246A3 EP 19910120315 EP19910120315 EP 19910120315 EP 91120315 A EP91120315 A EP 91120315A EP 0488246 A3 EP0488246 A3 EP 0488246A3
- Authority
- EP
- European Patent Office
- Prior art keywords
- planning system
- manufacturing planning
- manufacturing
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Automation & Control Theory (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- Control By Computers (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32230590A JP3447286B2 (en) | 1990-11-28 | 1990-11-28 | Production plan creation system and production plan creation method |
JP322305/90 | 1990-11-28 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0488246A2 EP0488246A2 (en) | 1992-06-03 |
EP0488246A3 true EP0488246A3 (en) | 1993-01-13 |
EP0488246B1 EP0488246B1 (en) | 1998-05-20 |
Family
ID=18142147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP91120315A Expired - Lifetime EP0488246B1 (en) | 1990-11-28 | 1991-11-27 | Manufacturing planning system |
Country Status (4)
Country | Link |
---|---|
US (1) | US5231567A (en) |
EP (1) | EP0488246B1 (en) |
JP (1) | JP3447286B2 (en) |
DE (1) | DE69129440T2 (en) |
Families Citing this family (96)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5351195A (en) * | 1989-07-24 | 1994-09-27 | The George Group | Method for improving manufacturing processes |
JPH05165842A (en) * | 1991-12-13 | 1993-07-02 | Toyota Central Res & Dev Lab Inc | Estimating device for process time |
JPH077431B2 (en) * | 1992-02-14 | 1995-01-30 | 三菱電機株式会社 | Sequential fixed production planning system |
JPH05307556A (en) * | 1992-04-30 | 1993-11-19 | Olympus Optical Co Ltd | Information processor using integrated data base |
JPH0619920A (en) * | 1992-06-30 | 1994-01-28 | Mitsui Eng & Shipbuild Co Ltd | Instruction control module |
JP3230628B2 (en) * | 1993-08-06 | 2001-11-19 | トヨタ自動車株式会社 | Order quantity calculation method and device for it |
JP2964851B2 (en) * | 1993-09-20 | 1999-10-18 | トヨタ自動車株式会社 | Operation planning method for parts delivery service, device therefor, and parts delivery service management method |
US6345259B1 (en) | 1993-09-28 | 2002-02-05 | The Dow Chemical Company | System and method for integrating business and manufacturing environments |
US6141647A (en) * | 1995-10-20 | 2000-10-31 | The Dow Chemical Company | System and method for integrating a business environment, a process control environment, and a laboratory environment |
US5515269A (en) * | 1993-11-08 | 1996-05-07 | Willis; Donald S. | Method of producing a bill of material for a configured product |
GB2289963B (en) * | 1994-05-25 | 1999-05-12 | Matsushita Electric Ind Co Ltd | Production line controller operated in accordance with generated production plans |
US5841659A (en) * | 1994-05-26 | 1998-11-24 | Matsushita Electric Industrial Co., Ltd. | Production plan generating method and apparatus |
US7039595B1 (en) | 1998-10-21 | 2006-05-02 | Infor International Limited | System and method for throughput measurement |
US5523960A (en) * | 1994-08-10 | 1996-06-04 | Samsung Electronics Co., Ltd. | Evaluation method of assembly sequences |
JP3334400B2 (en) * | 1995-02-02 | 2002-10-15 | トヨタ自動車株式会社 | In-process planning equipment |
US5689705A (en) * | 1995-02-13 | 1997-11-18 | Pulte Home Corporation | System for facilitating home construction and sales |
DE69614182T2 (en) * | 1995-04-14 | 2002-04-25 | Nec Corp., Tokio/Tokyo | Order control device for reducing the number of input operations with an input unit |
EP0770967A3 (en) * | 1995-10-26 | 1998-12-30 | Koninklijke Philips Electronics N.V. | Decision support system for the management of an agile supply chain |
US6119102A (en) * | 1996-04-15 | 2000-09-12 | Made2Manage Systems, Inc. | MRP system with viewable master production schedule |
DE69802788T2 (en) * | 1997-03-27 | 2002-06-13 | British Telecommunications P.L.C., London | EQUIPMENT ALLOCATION SYSTEM |
US5884300A (en) * | 1997-05-01 | 1999-03-16 | At&T Wireless Services Inc. | Inventory pipeline management system |
US6415196B1 (en) * | 1997-08-28 | 2002-07-02 | Manugistics, Inc. | Manufacturing scheduling process with improved modeling, scheduling and editing capabilities for solving finite capacity planning problems |
JP3319993B2 (en) * | 1997-09-10 | 2002-09-03 | 東京エレクトロン株式会社 | Method of determining deadlock of object to be processed, method of avoiding deadlock of object to be processed, and processing apparatus |
US6223094B1 (en) | 1998-08-21 | 2001-04-24 | Sap Aktiengesellschaft | Multi-tiered structure for storing and displaying product and process variants |
US6397118B1 (en) | 1999-04-02 | 2002-05-28 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
US6415194B1 (en) | 1999-04-02 | 2002-07-02 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
US6415195B1 (en) | 1999-04-02 | 2002-07-02 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
US6393332B1 (en) | 1999-04-02 | 2002-05-21 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
DE19930446C1 (en) * | 1999-07-02 | 2001-01-04 | Daimler Chrysler Ag | Diagnostic method and diagnostic system for monitoring the available resources in a manufacturing process |
US7571131B1 (en) | 1999-11-05 | 2009-08-04 | Ford Motor Company | Method of conducting online competitive price quoting events |
US7130807B1 (en) * | 1999-11-22 | 2006-10-31 | Accenture Llp | Technology sharing during demand and supply planning in a network-based supply chain environment |
US7716077B1 (en) | 1999-11-22 | 2010-05-11 | Accenture Global Services Gmbh | Scheduling and planning maintenance and service in a network-based supply chain environment |
US8032409B1 (en) | 1999-11-22 | 2011-10-04 | Accenture Global Services Limited | Enhanced visibility during installation management in a network-based supply chain environment |
US7124101B1 (en) | 1999-11-22 | 2006-10-17 | Accenture Llp | Asset tracking in a network-based supply chain environment |
US8271336B2 (en) * | 1999-11-22 | 2012-09-18 | Accenture Global Services Gmbh | Increased visibility during order management in a network-based supply chain environment |
US7546255B2 (en) * | 2000-03-31 | 2009-06-09 | International Business Machines Corporation | Inventory system |
TW539974B (en) * | 2000-09-29 | 2003-07-01 | Nec Corp | Agile information system and management method |
TW581955B (en) * | 2000-10-27 | 2004-04-01 | Manugistics Inc | Supply chain demand forecasting and planning |
US20030033180A1 (en) * | 2000-10-27 | 2003-02-13 | Manugistics, Inc. | System and method for optimizing resource plans |
US7668761B2 (en) * | 2000-10-27 | 2010-02-23 | Jda Software Group | System and method for ensuring order fulfillment |
US7225040B2 (en) * | 2001-11-14 | 2007-05-29 | Exxon Mobil Oil Corporation | Method and system for reducing lead-time in the packaging industry |
SG144734A1 (en) * | 2000-12-05 | 2008-08-28 | Exxonmobil Oil Corp | A method and system for reducing leadtime in the packaging industry |
US6862585B2 (en) | 2000-12-19 | 2005-03-01 | The Procter & Gamble Company | System and method for managing product development |
US6801818B2 (en) | 2001-03-14 | 2004-10-05 | The Procter & Gamble Company | Distributed product development |
US7937280B1 (en) * | 2001-04-02 | 2011-05-03 | I2 Technologies Us, Inc. | Planning and scheduling of maintenance, repair, and overhaul services |
US7043444B2 (en) * | 2001-04-13 | 2006-05-09 | I2 Technologies Us, Inc. | Synchronization of planning information in a high availability planning and scheduling architecture |
US7024371B2 (en) * | 2001-04-13 | 2006-04-04 | I2 Technologies Us, Inc. | High availability planning and scheduling architecture |
US7024379B2 (en) * | 2001-07-05 | 2006-04-04 | International Business Machines Corporation | Real time push of product availability information |
GB2380276A (en) * | 2001-07-11 | 2003-04-02 | Inventec Corp | Method and system for immediately issuing production plan |
EP1316867A3 (en) * | 2001-11-16 | 2005-03-16 | Volkswagen AG | Method and device for determination and supervision of resources in a manufacturing process |
US6813540B2 (en) * | 2001-12-26 | 2004-11-02 | Caterpillar Inc. | System and method for supplying material |
US7539630B2 (en) * | 2001-12-27 | 2009-05-26 | Jda Software Group | System, method, and computer program for replenishment by manufacture with attribute based planning |
US6885902B2 (en) * | 2001-12-27 | 2005-04-26 | Manugistics, Inc. | System and method for replenishment by purchase with attribute based planning |
US6823228B2 (en) | 2002-02-21 | 2004-11-23 | International Business Machines Corporation | Fabricator capacity analysis |
JP3982617B2 (en) * | 2002-05-17 | 2007-09-26 | 日本アイ・ビー・エム株式会社 | Production plan generation system, production plan generation method, program |
US6904440B2 (en) * | 2002-09-23 | 2005-06-07 | United Technologies Corporation | Multi-tier material requirements flowdown generation |
WO2004032530A2 (en) * | 2002-10-01 | 2004-04-15 | Weiss Paul F | Schedule chart for project management |
DE10250313A1 (en) * | 2002-10-29 | 2004-05-19 | Daimlerchrysler Ag | Method for determining a lead time |
US20040148212A1 (en) * | 2003-01-28 | 2004-07-29 | Taiwan Semiconductor Manufacturing Company | Method and apparatus for measuring optimality for master production schedules |
US20060031840A1 (en) * | 2003-08-20 | 2006-02-09 | Abb Inc. | Real time monitoring manufacturing scheduling and control |
DE10343014A1 (en) * | 2003-09-17 | 2005-04-14 | Volkswagen Ag | Implementation of a requirement-capacity calculation for use in production control in a manufacturing environment by summing requirements for each part to be made on a machine and comparison with its total capacity |
US7848946B2 (en) | 2004-01-12 | 2010-12-07 | Jda Software Group, Inc. | Sales history decomposition |
DE102004031931A1 (en) * | 2004-06-23 | 2006-01-12 | Basf Ag | Method and system for computer-implemented processing of data records |
US20060009988A1 (en) * | 2004-07-06 | 2006-01-12 | Strategic Foresight Llc | Method, apparatus, data structure and system for determining lot sizes consistent with an entity's strategic objectives |
US7840449B2 (en) * | 2004-09-07 | 2010-11-23 | International Business Machines Corporation | Total inventory management |
TWI317909B (en) * | 2004-09-10 | 2009-12-01 | Hon Hai Prec Ind Co Ltd | System and method for mould production scheduling |
EP1691328A1 (en) * | 2005-02-11 | 2006-08-16 | Sap Ag | Identifying critical operations of a production process |
US20070005167A1 (en) * | 2005-06-30 | 2007-01-04 | George Roumeliotis | System and method for pro-active manufacturing performance management |
US20070203858A1 (en) * | 2006-01-30 | 2007-08-30 | Omax Corporation | Method and apparatus for enabling use of design software with a price based on design complexity |
JP4982088B2 (en) * | 2006-02-09 | 2012-07-25 | 株式会社日立製作所 | Production planning system |
US20070219929A1 (en) * | 2006-03-14 | 2007-09-20 | Jochen Steinbach | Planning granularity in manufacturing computing systems |
US8027857B2 (en) * | 2006-03-14 | 2011-09-27 | Sap Ag | Rough-cut manufacturing operations for use in planning |
US7412295B2 (en) * | 2006-03-14 | 2008-08-12 | Sap Ag | Modeling manufacturing processes to include defined markers |
US7647130B2 (en) * | 2006-12-05 | 2010-01-12 | International Business Machines Corporation | Real-time predictive time-to-completion for variable configure-to-order manufacturing |
US7551975B2 (en) * | 2006-12-21 | 2009-06-23 | Sap Ag | Consistency checking and repair of manufacturing operation groupings to be aggregated for use in planning |
US7617015B2 (en) * | 2006-12-21 | 2009-11-10 | Sap Ag | Generating planning-level time and capacity requirement formulas for manufacturing processes |
US7894922B2 (en) * | 2006-12-21 | 2011-02-22 | Sap Ag | Structural transformation of execution-level manufacturing process routings into planning-level routings |
WO2008116110A1 (en) * | 2007-03-20 | 2008-09-25 | Accenture Global Services Gmbh | Predictive cost reduction based on a thermodynamic model |
US20100030359A1 (en) * | 2007-06-01 | 2010-02-04 | Thomas Stewart Luhman | Method and apparatus for designing parts using a materials pipeline |
US8412555B2 (en) * | 2008-02-24 | 2013-04-02 | Daniel Thomas Hamling | Methods and systems for planning configurable manufacturing capacity |
US20100076779A1 (en) * | 2008-09-07 | 2010-03-25 | Daniel Thomas Hamling | Methods and systems for recording and managing manufacturing capacity attributes |
US20100076806A1 (en) * | 2008-09-25 | 2010-03-25 | Solar Turbines Incorporated | Inventory management tool using a criticality measure |
EP2199956A1 (en) * | 2008-12-18 | 2010-06-23 | Siemens Aktiengesellschaft | Method and system for managing results of an analysis process on objects handled along a technical process line |
TWI394089B (en) * | 2009-08-11 | 2013-04-21 | Univ Nat Cheng Kung | Virtual production control system and method and computer program product thereof |
DE102009048210A1 (en) * | 2009-10-05 | 2011-04-21 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Method for controlling material and / or information streams |
US20110213715A1 (en) * | 2010-03-01 | 2011-09-01 | Accenture Global Services Gmbh | Lean Analytics |
JP5911831B2 (en) * | 2013-09-06 | 2016-04-27 | 株式会社東芝 | Production management device and production management program |
JP6329038B2 (en) * | 2014-09-16 | 2018-05-23 | 株式会社日立パワーソリューションズ | Information processing apparatus, process buffer calculation method, and program |
US10055703B2 (en) * | 2015-01-13 | 2018-08-21 | Accenture Global Services Limited | Factory management system |
US10725639B1 (en) * | 2015-01-14 | 2020-07-28 | Pma Technoloiges, Llc | Project schedule display with graphical target overlay |
US10614414B1 (en) * | 2016-07-12 | 2020-04-07 | Jda Software Group, Inc. | System and method of an explanation tool for automotive production planning |
US10627808B2 (en) * | 2017-06-24 | 2020-04-21 | Daniel T. Hamling | Managing manufacturing capacity plan performance |
US11366457B1 (en) | 2018-11-16 | 2022-06-21 | On-Time.Ai, Inc. | Controling operation of machine tools using artificial intelligence |
US11256241B1 (en) | 2019-09-12 | 2022-02-22 | Veo Robotics, Inc. | Optimized factory schedule and layout generation |
JP7545310B2 (en) * | 2020-12-14 | 2024-09-04 | 株式会社東芝 | Processing device, processing method, program, and storage medium |
US20220270012A1 (en) * | 2021-02-25 | 2022-08-25 | Siemens Aktiengesellschaft | System and method for providing short-term dispatching decisions for operating a number of resources involved in a number of production processes under consideration of long-term objectives |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4958292A (en) * | 1987-04-22 | 1990-09-18 | Toyota Jidosha Kabushiki Kaisha | Production control system for mixed production line |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4459663A (en) * | 1981-07-02 | 1984-07-10 | American Business Computer | Data processing machine and method of allocating inventory stock for generating work orders for producing manufactured components |
US4887218A (en) * | 1987-12-01 | 1989-12-12 | International Business Machines Corporation | Automated production release system |
US4866628A (en) * | 1987-12-18 | 1989-09-12 | International Business Machines Corp. | Automated production dispatch system with feedback control |
US5101352A (en) * | 1989-06-29 | 1992-03-31 | Carolina Cipher | Material requirements planning system |
US5093794A (en) * | 1989-08-22 | 1992-03-03 | United Technologies Corporation | Job scheduling system |
-
1990
- 1990-11-28 JP JP32230590A patent/JP3447286B2/en not_active Expired - Lifetime
-
1991
- 1991-11-25 US US07/796,850 patent/US5231567A/en not_active Expired - Lifetime
- 1991-11-27 DE DE69129440T patent/DE69129440T2/en not_active Expired - Lifetime
- 1991-11-27 EP EP91120315A patent/EP0488246B1/en not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4958292A (en) * | 1987-04-22 | 1990-09-18 | Toyota Jidosha Kabushiki Kaisha | Production control system for mixed production line |
Non-Patent Citations (3)
Title |
---|
IEEE JOURNAL OF ROBOTICS AND AUTOMATION vol. 4, no. 4, August 1988, NEW YORK US pages 397 - 402 A. KUSIAK & G. FINKE * |
SIEMENS POWER ENGINEERING vol. 6, no. 1, jan-feb 1984, BERLIN DE pages 73 - 75 WALTER ASBECK * |
WERKSTATT UND BETRIEB vol. 122, no. 6, June 1989, MUNCHEN DE pages CA131-CA134 & CA136 & CA138 R. HAASE * |
Also Published As
Publication number | Publication date |
---|---|
DE69129440T2 (en) | 1999-02-18 |
DE69129440D1 (en) | 1998-06-25 |
EP0488246B1 (en) | 1998-05-20 |
JPH04195303A (en) | 1992-07-15 |
US5231567A (en) | 1993-07-27 |
EP0488246A2 (en) | 1992-06-03 |
JP3447286B2 (en) | 2003-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0488246A3 (en) | Manufacturing planning system | |
EP0459626A3 (en) | Knowledge based order planning system | |
GB2243748B (en) | Network-field interface for manufacturing systems | |
GB2239723B (en) | Production management system | |
EP0481784A3 (en) | Form automation system | |
EP0483359A4 (en) | Production system | |
EP0476147A4 (en) | Mini-golf course | |
GB9023433D0 (en) | Peroxoacid manufacture | |
ZA918593B (en) | Automation system | |
EP0440493A3 (en) | Tape-cartridge case | |
GB9117303D0 (en) | System | |
GB2242063B (en) | Method for manufacturing photoconverter | |
GB9009497D0 (en) | Case | |
EP0447873A3 (en) | Communicating system | |
EP0447751A3 (en) | Size-normalisation system | |
GB2240819B (en) | De-sludging systems | |
GB2246551B (en) | Can manufacture | |
GB9002163D0 (en) | Planning aid | |
GB9102470D0 (en) | Planning aid | |
GB9004201D0 (en) | Construction systems | |
CA66527S (en) | Case | |
GB9016213D0 (en) | Construction system | |
GB9009738D0 (en) | Construction system | |
GB9016091D0 (en) | Construction system | |
GB9002083D0 (en) | Whirlpool-and spa-bath systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19911127 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): DE FR GB |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): DE FR GB |
|
17Q | First examination report despatched |
Effective date: 19941019 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB |
|
REF | Corresponds to: |
Ref document number: 69129440 Country of ref document: DE Date of ref document: 19980625 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20101123 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20101124 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20101124 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69129440 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69129440 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20111126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20111126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20111128 |