EP0459034A1 - Method for constructing a pumping installation and pumping installation manufactured according to the method - Google Patents

Method for constructing a pumping installation and pumping installation manufactured according to the method Download PDF

Info

Publication number
EP0459034A1
EP0459034A1 EP90201371A EP90201371A EP0459034A1 EP 0459034 A1 EP0459034 A1 EP 0459034A1 EP 90201371 A EP90201371 A EP 90201371A EP 90201371 A EP90201371 A EP 90201371A EP 0459034 A1 EP0459034 A1 EP 0459034A1
Authority
EP
European Patent Office
Prior art keywords
portions
pump
casing
pumping installation
suction box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP90201371A
Other languages
German (de)
French (fr)
Inventor
Matheus Albertus Maria Bouwman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stork Pompen BV
Original Assignee
Stork Pompen BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stork Pompen BV filed Critical Stork Pompen BV
Publication of EP0459034A1 publication Critical patent/EP0459034A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D13/00Pumping installations or systems
    • F04D13/02Units comprising pumps and their driving means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/40Casings; Connections of working fluid
    • F04D29/52Casings; Connections of working fluid for axial pumps
    • F04D29/528Casings; Connections of working fluid for axial pumps especially adapted for liquid pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/40Casings; Connections of working fluid
    • F04D29/52Casings; Connections of working fluid for axial pumps
    • F04D29/54Fluid-guiding means, e.g. diffusers
    • F04D29/548Specially adapted for liquid pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/60Mounting; Assembling; Disassembling
    • F04D29/64Mounting; Assembling; Disassembling of axial pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/60Mounting; Assembling; Disassembling
    • F04D29/64Mounting; Assembling; Disassembling of axial pumps
    • F04D29/648Mounting; Assembling; Disassembling of axial pumps especially adapted for liquid pumps

Definitions

  • Pumping installations should require the least possible degree of maintenance. Furthermore, it is important that as little installation work as possible need be carried out at the place of use.
  • pumps or at least the pump house and the adjoining parts, be manufactured from concrete. This is preferably carried out in a prefab construction method wherein the pump house amongst other things is manufactured in concrete portions which are attached to each other at the place of use.
  • this is a considerable improvement compared to the classical method, that is, the complete manufacture at the place of use of the housing of both the pump and the remaining parts of the installation, the number of operations to be performed at the place of use was still undesirably large.
  • Another drawback is that the flexibility of design is not optimal. The aim is to provide a pumping installation which can be modularly constructed, which ensures a great degree of flexibility and requires a minimum number of operations at the building site itself.
  • this is achieved with a method for constructing a pumping installation by manufacturing from concrete in a prefabricated manner and with chosen dimensions a pump block comprising at least one pump house and a suction box, manufacturing a workfloor at the building site and by then placing and coupling on the workfloor the suction box and the pump house and subsequently installing the pump.
  • a pump house provided with a volute can be manufactured by fitting a casing consisting of separate portions, casting the concrete and removing portions of the casing, for example those of the volute, while the other portions remain behind as permanent casing.
  • the casing portions are of metal.
  • the casing wall of the pump house is constructed in a vertical direction from at least three portions. After the casting and setting of the concrete these portions are detached and removed successively in vertical direction.
  • the casing wall of the volute can be assembled from at least three portions. After casting and setting of the concrete these portions are detached from the remaining casing and removed to the inside, that is, towards the pump area.
  • the bottom side is closed off with a casing wall.
  • the distance corresponding with the thickness of the bottom wall of the casing has to be bridged in order to be able to centre the pump block on the remaining portions.
  • this can be done with plastic plates the thickness of the casing wall.
  • the pumping installation is built up of the pump block 1, the culvert body 2, the accessories area 32 and the suction box 3.
  • the different modules are disposed on a workfloor 4 which is manufactured in the work.
  • the whole is built into for example the body of a dike 5.
  • the pump block contains the pump area 6 which is bounded by the pump house 7.
  • the actual pump that is, the impeller body 9 and the associated drive motor 10, are mounted on a foundation ring 8 which is cast into the concrete of the housing 7.
  • a control box 12 with signalling units, control units and power supply.
  • a duckweed grating cleaning installation 13 Next to the housing can be disposed a duckweed grating cleaning installation 13.
  • the different modules are anchored to each other using bolts and cast-in screwed sleeves (see for instance fig. 3) 15.
  • For the desired height adjustment plastic plates 16 can be used which are placed under the pump block in order to enable centering on the suction box.
  • the casing for the cylindrical pump area consists of four portions 17, 17A, 18, 18A which are mutually connected in lengthwise direction. Arranged around this casing 17, 17A, 18, 18A are three casing portions for the volute 19, 20 and 21. Also arranged are the casing 22 A to D and 23 for the discharge as well as an annular portion 24 serving as foundation ring. This foundation ring can be cast directly into the pump house or arranged later in the finished pump house and cast into a recess.
  • the underside of the pump block is bounded by the portions 25 and 26 which can be coupled by the elements 27. Of the drawn portions, the portions 23, 24 and 25 are portions which are to be regarded as permanent casing.
  • the portions 17, 17A, 18, 18A, 19, 20, 21, 22 A to D and 26 are removed after the setting of the concrete.
  • the portions 17A and 18A are first detached and successively removed in vertical direction.
  • the portion 22 then follows which is taken out via the pump area and subsequently in vertical direction.
  • the portion 26 is removed in downward direction.
  • manufacture of the separate modules these can be carried using normal transportation, for example a truck, trailer or the like, to the place of use and there arranged on the intended location with simple hoisting devices.
  • suction box 3 (fig. 1) can be modularly constructed.
  • a cover plate 27, a guiding plate 28, both side plates, whereof one 29 is visible, an anti-rotation partition 30, the end plate 31 and bottom plate 4A are then prefabricated. These portions are then assembled on the building site.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The disclosure discloses a method for constructing a pumping installation which includes a prefabricated concrete pump house (7) and a prefabricated concrete suction box (3). The pump house (7) and suction box (3) are then placed on and coupled to a workfloor (4) manufactured at the building site. A pump is then installed in the pump house (7).

Description

  • Pumping installations, particularly as used in pumping stations in open country, should require the least possible degree of maintenance. Furthermore, it is important that as little installation work as possible need be carried out at the place of use. To this end it has already been proposed that pumps, or at least the pump house and the adjoining parts, be manufactured from concrete. This is preferably carried out in a prefab construction method wherein the pump house amongst other things is manufactured in concrete portions which are attached to each other at the place of use. Although this is a considerable improvement compared to the classical method, that is, the complete manufacture at the place of use of the housing of both the pump and the remaining parts of the installation, the number of operations to be performed at the place of use was still undesirably large. Another drawback is that the flexibility of design is not optimal. The aim is to provide a pumping installation which can be modularly constructed, which ensures a great degree of flexibility and requires a minimum number of operations at the building site itself.
  • According to the invention this is achieved with a method for constructing a pumping installation by manufacturing from concrete in a prefabricated manner and with chosen dimensions a pump block comprising at least one pump house and a suction box, manufacturing a workfloor at the building site and by then placing and coupling on the workfloor the suction box and the pump house and subsequently installing the pump.
  • On the building site it will suffice according to the invention to carry out the ground work, to manufacture a workfloor from concrete or other foundation material such as slag material, gravel and the like and thereafter to place as desired the prefabricated modules, for example with a hoisting device, and finally to install the pump itself, that is, the drive mechanism and the impeller part. With a pump block according to the invention a very high degree of protection against corrosion is achieved which can in addition be easily integrated into the whole pumping or draining installation and imposes no restrictions on the architect designing an optional superstructure. Because the installation is modularly constructed, different dimensions can be chosen for each of the modules, namely the pump house and the suction box, subject to the requirements at the place of use.
  • A pump house provided with a volute can be manufactured by fitting a casing consisting of separate portions, casting the concrete and removing portions of the casing, for example those of the volute, while the other portions remain behind as permanent casing. The casing portions are of metal.
  • In order to be able to remove the casing portions from the finished pump block the casing wall of the pump house is constructed in a vertical direction from at least three portions. After the casting and setting of the concrete these portions are detached and removed successively in vertical direction. The casing wall of the volute can be assembled from at least three portions. After casting and setting of the concrete these portions are detached from the remaining casing and removed to the inside, that is, towards the pump area.
  • For pouring the concrete of the pump house the bottom side is closed off with a casing wall. After removal of the casing the distance corresponding with the thickness of the bottom wall of the casing has to be bridged in order to be able to centre the pump block on the remaining portions. In practice this can be done with plastic plates the thickness of the casing wall.
  • The invention will be further elucidated with reference to the drawings.
    • Fig. 1 shows a cross sectional view through a pumping installation according to the invention,
    • fig. 2 shows the modules of the installation according to fig. 1 in dismantled state,
    • fig. 3 shows a perspective view of the pump block,
    • fig. 4 shows the different casing portions in dismantled state,
    • fig. 5 shows the pumping installation in assembled state, and
    • fig. 6, 7 and 8 show different possible combinations of the modules of the pumping installation.
  • The pumping installation is built up of the pump block 1, the culvert body 2, the accessories area 32 and the suction box 3. The different modules are disposed on a workfloor 4 which is manufactured in the work. The whole is built into for example the body of a dike 5.
  • The pump block contains the pump area 6 which is bounded by the pump house 7. The actual pump, that is, the impeller body 9 and the associated drive motor 10, are mounted on a foundation ring 8 which is cast into the concrete of the housing 7. In the surrounding housing 11 can be arranged a control box 12 with signalling units, control units and power supply. Next to the housing can be disposed a duckweed grating cleaning installation 13.
  • The figures 6, 7 and 8 show different possible combinations of the installation formed from modules.
  • The different modules are anchored to each other using bolts and cast-in screwed sleeves (see for instance fig. 3) 15. For the desired height adjustment plastic plates 16 can be used which are placed under the pump block in order to enable centering on the suction box.
  • For manufacturing the pump house use is made of a casing consisting of portions. The casing for the cylindrical pump area consists of four portions 17, 17A, 18, 18A which are mutually connected in lengthwise direction. Arranged around this casing 17, 17A, 18, 18A are three casing portions for the volute 19, 20 and 21. Also arranged are the casing 22 A to D and 23 for the discharge as well as an annular portion 24 serving as foundation ring. This foundation ring can be cast directly into the pump house or arranged later in the finished pump house and cast into a recess. The underside of the pump block is bounded by the portions 25 and 26 which can be coupled by the elements 27. Of the drawn portions, the portions 23, 24 and 25 are portions which are to be regarded as permanent casing. These remain behind cast in the concrete. On the other hand, the portions 17, 17A, 18, 18A, 19, 20, 21, 22 A to D and 26 are removed after the setting of the concrete. To this end the portions 17A and 18A are first detached and successively removed in vertical direction. After detaching of the portions 19, 20 and 21 these are removed one by one inward to the pump area and subsequently in vertical direction. The portion 22 then follows which is taken out via the pump area and subsequently in vertical direction. Finally, the portion 26 is removed in downward direction. After manufacture of the separate modules these can be carried using normal transportation, for example a truck, trailer or the like, to the place of use and there arranged on the intended location with simple hoisting devices.
  • It is noted that the suction box 3 (fig. 1) can be modularly constructed. A cover plate 27, a guiding plate 28, both side plates, whereof one 29 is visible, an anti-rotation partition 30, the end plate 31 and bottom plate 4A are then prefabricated. These portions are then assembled on the building site.
  • It is also possible to construct other added elements modularly. This applies for example to the accessories area 32.

Claims (9)

  1. Method for constructing a pumping installation by manufacturing from concrete in a prefabricated manner and with chosen dimensions a pump block comprising at least one pump house (7), and a suction box (3), manufacturing a workfloor on the building site, subsequent placing and coupling on said workfloor of said suction box (3) and said pump house (7) and thereafter installing the pump in said pump house (7).
  2. Method as claimed in claim 1, characterized in that the suction box is modularly constructed (fig. 1).
  3. Method as claimed in claim 2, characterized in that the suction box (3) is built up from a guiding plate (28), two side plates (29), a cover plate (27), an anti-rotation partition (30), a bottom plate (4A) and an end plate (31).
  4. Method as claimed in claims 1-3, characterized in that an accessory area (32) is added to the pumping installation in a modular manner.
  5. Method as claimed in claims 1-4, characterized in that a modularly constructed culvert is added to the pumping installation.
  6. Method for manufacturing a pumping house provided with a volute by fitting a casing consisting of portions, the casting of concrete and removing of portions of said casing, for example those of said volute, while the other portions remain behind as permanent casing.
  7. Method as claimed in claim 6, characterized in that the casing wall of the pump house is constructed in vertical direction from at least three portions (fig. 4).
  8. Method as claimed in claims 6-7, characterized in that the casing wall of the volute is assembled from at least three portions.
  9. Pumping installation constructed according to the method as claimed in one or more of the claims 1-8.
EP90201371A 1989-02-02 1990-05-29 Method for constructing a pumping installation and pumping installation manufactured according to the method Withdrawn EP0459034A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL8900260A NL193699B (en) 1989-02-02 1989-02-02 Method for building up a pump installation and formwork used in the method.

Publications (1)

Publication Number Publication Date
EP0459034A1 true EP0459034A1 (en) 1991-12-04

Family

ID=19854063

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90201371A Withdrawn EP0459034A1 (en) 1989-02-02 1990-05-29 Method for constructing a pumping installation and pumping installation manufactured according to the method

Country Status (2)

Country Link
EP (1) EP0459034A1 (en)
NL (1) NL193699B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001951A1 (en) * 1998-07-06 2000-01-13 Ksb Aktiengesellschaft Inlet structure for pump installations
WO2001055560A2 (en) * 2000-01-27 2001-08-02 Siemens Aktiengesellschaft Plant building for an installation and method for operating a plant building
CN100342099C (en) * 2002-04-30 2007-10-10 邱则有 Reinforced concrete three-dimensional bearing structure floor
CN100348809C (en) * 2002-10-05 2007-11-14 邱则有 Thin wall pipe for filling concrete
CN100356011C (en) * 2002-04-30 2007-12-19 邱则有 Foundation plate structural member for formwork of reinforced concrete

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2555253A1 (en) * 1975-12-09 1977-06-16 Balcke Duerr Ag Axial or semi-axial pump - has intake designed as curve to reduce turbulence
EP0101628A1 (en) * 1982-08-12 1984-02-29 Stork Pompen B.V. Pump station and method of manufacturing the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2555253A1 (en) * 1975-12-09 1977-06-16 Balcke Duerr Ag Axial or semi-axial pump - has intake designed as curve to reduce turbulence
EP0101628A1 (en) * 1982-08-12 1984-02-29 Stork Pompen B.V. Pump station and method of manufacturing the same

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
KSB TECHNISCHE BERICHTE, no. 17, 1977, pages 28-36; M. SIEKMANN: "Einfluss von Bauwerk und Zulaufbedingungen auf die Kühlwasserpumpen und die verschiedenen Kühlwasserpumpenbauarten für Kühltürme", paragraphs 4.1.,4.2,4.3. *
KSB TECHNISCHE BERICHTE, no. 17, 1977, pages 36-41; M. SIEKMANN: "Einfluss von Bauwerk und Zulaufbedingungen auf die Kühlwasserpumpen", pages 39,40, paragraph 6.3. *
WORLD PUMPS, no. 1, January 1990, pages 10-13, Oxford, GB; J.H. BUNJES: "Pumps with concrete housings", page 12, right-hand column, lines 1-9; figures. *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001951A1 (en) * 1998-07-06 2000-01-13 Ksb Aktiengesellschaft Inlet structure for pump installations
US6561754B1 (en) 1998-07-06 2003-05-13 Ksb Aktiengesellschaft Inlet structure for pump installations
WO2001055560A2 (en) * 2000-01-27 2001-08-02 Siemens Aktiengesellschaft Plant building for an installation and method for operating a plant building
WO2001055560A3 (en) * 2000-01-27 2001-12-20 Siemens Ag Plant building for an installation and method for operating a plant building
CN100342099C (en) * 2002-04-30 2007-10-10 邱则有 Reinforced concrete three-dimensional bearing structure floor
CN100356011C (en) * 2002-04-30 2007-12-19 邱则有 Foundation plate structural member for formwork of reinforced concrete
CN100348809C (en) * 2002-10-05 2007-11-14 邱则有 Thin wall pipe for filling concrete

Also Published As

Publication number Publication date
NL8900260A (en) 1990-09-03
NL193699B (en) 2000-03-01

Similar Documents

Publication Publication Date Title
US5304034A (en) Method for constructing a pumping installation
EP0459034A1 (en) Method for constructing a pumping installation and pumping installation manufactured according to the method
WO1994020341A1 (en) Fuel station and method for assembling of the same
KR102045189B1 (en) Construction method of sedimentation tank using buried formwork
CA2895732C (en) Prefab lift station
US4869643A (en) Pump housing, mould parts of a mould wall for a pump housing and method of manufacturing a pump housing
JP3974457B2 (en) Caisson and caisson construction method
RU169917U1 (en) BASE FOR CAR SCALES
JPH0441993A (en) Method of constructing pump facility and pump facility constructed by said method
KR200233297Y1 (en) Manhole assembly
EP0442840B1 (en) Apparatus for constructing manholes
WO2001009465A1 (en) Vehicle washing hall
KR20070095695A (en) Half assembly-typed construction system and method of common duct
KR200315928Y1 (en) form for manhole
KR200417545Y1 (en) Half assembly-typed construction system of common duct
JP2949341B1 (en) Underwater girder construction method
JP3143623B2 (en) Buried pump room and construction method thereof
US3393644A (en) Concrete pumping station with a ballast trough
KR200289325Y1 (en) facing panel type columbarium unit
NL7908250A (en) WASTEWATER PUMPING INSTALLATION.
CN207794676U (en) A kind of prefabricated assembled project management department's construction system
KR100195787B1 (en) Construction method of pit for vacuum valve
JPH10227194A (en) Construction method of shaft
GB2401380A (en) Base for a communications tower
RU1813148C (en) Panel assembing device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE

RBV Designated contracting states (corrected)

Designated state(s): BE DE FR GB IT SE

17P Request for examination filed

Effective date: 19920602

17Q First examination report despatched

Effective date: 19930630

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19940607