EP0404991A1 - Laying rail sleepers - Google Patents

Laying rail sleepers Download PDF

Info

Publication number
EP0404991A1
EP0404991A1 EP89111944A EP89111944A EP0404991A1 EP 0404991 A1 EP0404991 A1 EP 0404991A1 EP 89111944 A EP89111944 A EP 89111944A EP 89111944 A EP89111944 A EP 89111944A EP 0404991 A1 EP0404991 A1 EP 0404991A1
Authority
EP
European Patent Office
Prior art keywords
sleeper
tray
ballast
bag
filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP89111944A
Other languages
German (de)
French (fr)
Inventor
William H Hodgson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Steel PLC
Original Assignee
British Steel PLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Steel PLC filed Critical British Steel PLC
Publication of EP0404991A1 publication Critical patent/EP0404991A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/02Ballast bags

Definitions

  • This invention relates to the laying of sleepers e.g. laying steel sleepers as replacements for those in wood or concrete. Hitherto, such references have involved the need for special tamping arrangements for ensuring that the additional ballast adequately 'fills' around and within the (channel-section) steel sleeper. It is an object of this invention to mitigate this need.
  • this invention comprises a method of laying channel-section rail sleepers, in which one or more tubular ballast-filled bags are disposed so as to nest within the channelled section and are sandwiched between the sleeper and an elongated tray, and in which the whole assembly is dragged beneath the track on said tray to replace a sleeper previously withdrawn, the tray then being withdrawn from under the ballast-filled sleeper whereby to minimise any infill ballasting and subsequent tamping.
  • ballast-filled bags are used to minimise the risk of level irregularities and the bags are preferably laid on the tray with the sleeper, e.g. a steel sleeper, laid on top of it.
  • the bag filling may be effected on site, and this may be achieved by drawing the bag, sealed at one end, over a firm tube, introducing ballast into the tube whilst upstanding on the tray and then withdrawing the tube from the bag and sealing the head of the bag.
  • Two adjacent bags may be filled in this way in the manner of 'sausages' i.e. they may be interconnected by a tie instead of being separate entities.
  • ballast-filled bags 1 are laid on a steel tray or sledge 2 having upstanding edges on its sides and at one end from which a hook 3 extends.
  • the bags may be of plastic netting and may conveniently have been filled on site by the method described above using a withdrawable tube.
  • a channel section steel sleeper 4 is then laid over the bags ( Figure 2) such that they nest in the channel.
  • This assembly is now ready for use in replacing old sleepers.
  • the old wooden sleeper say
  • the new assembly is then dragged through the opening thus created, the new steel sleeper is bolted to the rail and the sledge is then pulled out from beneath, leaving the bagged ballast in situ.
  • the track With the bags having been filled with sufficient ballast to fill the steel sleeper and make up any difference in height between the wood and the steel sleepers, the track only requires 'boxing-in' with loose fill ballast. Any future tamping will be regular and not special for steel sleepers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Packages (AREA)

Abstract

In a method of laying channel-section rail sleepers one or more tubular ballast-filled bags (1) are disposed so as to nest within the channelled section and are sandwiched between the sleeper and an elongated tray (2). The whole assembly is dragged beneath the track on the tray to replace a sleeper previously withdrawn, the tray then being withdrawn from under the ballast-filled sleeper whereby to minimise any infill ballasting and subsequent tamping.

Description

  • This invention relates to the laying of sleepers e.g. laying steel sleepers as replacements for those in wood or concrete. Hitherto, such references have involved the need for special tamping arrangements for ensuring that the additional ballast adequately 'fills' around and within the (channel-section) steel sleeper. It is an object of this invention to mitigate this need.
  • From one aspect this invention comprises a method of laying channel-section rail sleepers, in which one or more tubular ballast-filled bags are disposed so as to nest within the channelled section and are sandwiched between the sleeper and an elongated tray, and in which the whole assembly is dragged beneath the track on said tray to replace a sleeper previously withdrawn, the tray then being withdrawn from under the ballast-filled sleeper whereby to minimise any infill ballasting and subsequent tamping.
  • Preferably, two ballast-filled bags are used to minimise the risk of level irregularities and the bags are preferably laid on the tray with the sleeper, e.g. a steel sleeper, laid on top of it. The bag filling may be effected on site, and this may be achieved by drawing the bag, sealed at one end, over a firm tube, introducing ballast into the tube whilst upstanding on the tray and then withdrawing the tube from the bag and sealing the head of the bag. Two adjacent bags may be filled in this way in the manner of 'sausages' i.e. they may be interconnected by a tie instead of being separate entities.
  • In order that the invention may be fully understood one embodiment thereof will now be described, by way of example, with reference to the accompanying drawings, in which:-
    • Figure 1 is a perspective view of the tray on which two ballast-filled bags have been sited; and
    • Figure 2 shows the channel-section sleeper laid over the bags ready for insertion in the track.
  • Referring to the drawings two ballast-filled bags 1 are laid on a steel tray or sledge 2 having upstanding edges on its sides and at one end from which a hook 3 extends. The bags may be of plastic netting and may conveniently have been filled on site by the method described above using a withdrawable tube.
  • A channel section steel sleeper 4 is then laid over the bags (Figure 2) such that they nest in the channel.
  • This assembly is now ready for use in replacing old sleepers. In particular, the old wooden sleeper (say) is unbolted from the rails and pulled out sideways. The new assembly is then dragged through the opening thus created, the new steel sleeper is bolted to the rail and the sledge is then pulled out from beneath, leaving the bagged ballast in situ. With the bags having been filled with sufficient ballast to fill the steel sleeper and make up any difference in height between the wood and the steel sleepers, the track only requires 'boxing-in' with loose fill ballast. Any future tamping will be regular and not special for steel sleepers.

Claims (7)

1. A method of laying channel-section rail sleepers, characterised in that one or more tubular ballast-filled bags (1) are disposed so as to nest within the channelled section and are sandwiched between the sleeper (4) and an elongated tray (2) and in which the whole assembly is dragged beneath the track on said tray to replace a sleeper previously withdrawn, the tray then being withdrawn from under the ballast-filled sleeper whereby to minimise any infill ballasting and subsequent tamping.
2. A method according to Claim 1, characterised in that two ballast-filled bags are equidistantly spaced along the length of the sleeper.
3. A method according to Claim 1 or Claim 2, characterised in that the bag or bags are laid on the tray, the sleeper then being laid on top.
4. A method according to Claim 1 or Claim 2 characterised in that the bag or bags are laid in the channel or trough of the sleeper, the tray is then laid on top and the assembly inverted before introduction under the track.
5. A method according to any one of Claims 1 to 4, characterised in that each bag is filled by drawing said bag over a firm tube, introducing the ballast into the tube and withdrawing the tube from the bag and sealing same.
6. A method according to any one of Claims 1 to 5, characterised in that each bag is made from plastics netting.
7. A method according to any one of Claims 1 to 6, characterised in that the tray has upstanding edges on its sides and at one end.
EP89111944A 1987-11-06 1989-06-29 Laying rail sleepers Withdrawn EP0404991A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB8726029A GB2211876A (en) 1987-11-06 1987-11-06 Method of laying channel-section rail sleepers

Publications (1)

Publication Number Publication Date
EP0404991A1 true EP0404991A1 (en) 1991-01-02

Family

ID=10626541

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89111944A Withdrawn EP0404991A1 (en) 1987-11-06 1989-06-29 Laying rail sleepers

Country Status (2)

Country Link
EP (1) EP0404991A1 (en)
GB (1) GB2211876A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0839958A2 (en) * 1996-10-29 1998-05-06 GEORG ROBEL GmbH & Co. Sleeper-replacing trough
NL1029008C2 (en) * 2005-05-11 2006-12-18 Movares Nederland Bv Railway sleeper replacement method, involves providing ballast replacement filler in container for placing beneath replacement sleeper
WO2014155302A1 (en) * 2013-03-27 2014-10-02 Societe Nationale Des Chemins De Fer Francais Sncf Adaptive device for supporting a railway rail

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2211876A (en) * 1987-11-06 1989-07-12 British Steel Plc Method of laying channel-section rail sleepers

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0314035A2 (en) * 1987-10-28 1989-05-03 Akzo N.V. Method of making the superstructure of a permanent way
GB2211876A (en) * 1987-11-06 1989-07-12 British Steel Plc Method of laying channel-section rail sleepers

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0314035A2 (en) * 1987-10-28 1989-05-03 Akzo N.V. Method of making the superstructure of a permanent way
GB2211876A (en) * 1987-11-06 1989-07-12 British Steel Plc Method of laying channel-section rail sleepers

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0839958A2 (en) * 1996-10-29 1998-05-06 GEORG ROBEL GmbH & Co. Sleeper-replacing trough
EP0839958A3 (en) * 1996-10-29 1998-09-09 GEORG ROBEL GmbH & Co. Sleeper-replacing trough
NL1029008C2 (en) * 2005-05-11 2006-12-18 Movares Nederland Bv Railway sleeper replacement method, involves providing ballast replacement filler in container for placing beneath replacement sleeper
WO2014155302A1 (en) * 2013-03-27 2014-10-02 Societe Nationale Des Chemins De Fer Francais Sncf Adaptive device for supporting a railway rail
FR3003876A1 (en) * 2013-03-27 2014-10-03 Sncf DEVICE FOR ADAPTIVE SUPPORT OF A RAILWAY RAIL
FR3018833A1 (en) * 2013-03-27 2015-09-25 Sncf DEVICE FOR ADAPTIVE SUPPORT OF AN OBJECT

Also Published As

Publication number Publication date
GB2211876A (en) 1989-07-12
GB8726029D0 (en) 1987-12-09

Similar Documents

Publication Publication Date Title
EP1730352B1 (en) Method for correcting the height of a fixed railway track
US4947756A (en) Laying railway track
CA2059717C (en) Railroad tie
EP0404991A1 (en) Laying rail sleepers
US20070057407A1 (en) Method and device for laying a section of railway
CA1248072A (en) Railway track structure, and a method of building such structure and bags filled with ballast material
US4494694A (en) Support system for a railroad track
EP1644581B1 (en) Method for the construction of a track structure for railborne vehicles, particularly trains
DE2532620A1 (en) PROCEDURE FOR REPLACING SLEEPERS IN RAILWAY TRACKS AND DEVICE FOR A FARM FOR PERFORMING THE PROCEDURE
DE102006002375B3 (en) Method for producing a solid roadway
NL8502169A (en) RAIL, IN WHICH RAILWAYS SUPPORT AGAINST RIGID SUPPORT PLATES THROUGH ELASTIC BRACKETS, AND METHOD FOR LAYING SUCH A RAIL
DE2756047B1 (en) Arrangement for preventing the embankment from sliding off the side of the embankment of an embankment used by vehicles
CN111560800B (en) Railway station turnout strengthening method
US5172858A (en) Process for supporting a railway track installation
DE3803120C2 (en)
DE19529754C2 (en) Device for reducing airborne noise on slab tracks for rail-bound traffic and method for their installation
EP0319546A1 (en) Section for the shoring of mines and tunnels.
DE2914746C2 (en)
US1707245A (en) Railroad grade crossing
DE4204802A1 (en) Stabilising joint filling between rail and road surface - uses concrete grout injected into cavity between rail,bed,and cover plate
DE19834060A1 (en) Permanent way position correction method
US449117A (en) Theodore graham gribble
DE4133661A1 (en) Method to increase bearing capacity of roadbed of railways - uses pre-fabricated reinforced concrete posts, placed into sleeper sections, and filled with concrete
IT201800004163A1 (en) Method of stabilization, by lightening, of a railway or road embankment
US1328002A (en) Rail-support

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE ES FR IT LI NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19910515