EP0376874A2 - Fabrication or repair technique for integrally bladed rotor assembly - Google Patents

Fabrication or repair technique for integrally bladed rotor assembly Download PDF

Info

Publication number
EP0376874A2
EP0376874A2 EP89630224A EP89630224A EP0376874A2 EP 0376874 A2 EP0376874 A2 EP 0376874A2 EP 89630224 A EP89630224 A EP 89630224A EP 89630224 A EP89630224 A EP 89630224A EP 0376874 A2 EP0376874 A2 EP 0376874A2
Authority
EP
European Patent Office
Prior art keywords
blade
stub
collar
disk
bond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP89630224A
Other languages
German (de)
French (fr)
Other versions
EP0376874B1 (en
EP0376874A3 (en
Inventor
Raymond Michael Walker
Robert Walter Baumgarten
Donald Paul Achor
Ralph Bromley Bogard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raytheon Technologies Corp
Original Assignee
United Technologies Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by United Technologies Corp filed Critical United Technologies Corp
Publication of EP0376874A2 publication Critical patent/EP0376874A2/en
Publication of EP0376874A3 publication Critical patent/EP0376874A3/en
Application granted granted Critical
Publication of EP0376874B1 publication Critical patent/EP0376874B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P6/00Restoring or reconditioning objects
    • B23P6/002Repairing turbine components, e.g. moving or stationary blades, rotors
    • B23P6/005Repairing turbine components, e.g. moving or stationary blades, rotors using only replacement pieces of a particular form
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/006Making specific metal objects by operations not covered by a single other subclass or a group in this subclass turbine wheels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/28Supporting or mounting arrangements, e.g. for turbine casing
    • F01D25/285Temporary support structures, e.g. for testing, assembling, installing, repairing; Assembly methods using such structures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2230/00Manufacture
    • F05D2230/60Assembly methods
    • F05D2230/68Assembly methods using auxiliary equipment for lifting or holding
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49316Impeller making
    • Y10T29/49318Repairing or disassembling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49718Repairing
    • Y10T29/49732Repairing by attaching repair preform, e.g., remaking, restoring, or patching
    • Y10T29/49734Repairing by attaching repair preform, e.g., remaking, restoring, or patching and removing damaged material
    • Y10T29/49737Metallurgically attaching preform

Definitions

  • This invention relates to the field of integral bladed rotor fabrication and repair.
  • the invention also relates to the solid state diffusion bonding of superalloys.
  • Gas turbine engines are widely used and well developed generators of power used primarily for aircraft propulsion.
  • An overview of gas turbine engine operation includes the compression of air to a high pressure - high temperature condition in a compressor, injection and combustion of fuel with the compressed air and the expansion of the products of combustion through a turbine section which extracts a substantial amount of the energy present in the products of combustion.
  • the turbine section powers the compressor section and in some instances also provides useable external mechanical power.
  • each stage comprises a disk having plurality of airfoils mounted on its rim.
  • the blades and the disk move, the disk being mounted on a rotating shaft, and the disk - blade assemblies are subject to very severe environments.
  • blade and disk assemblies have been produced from separate components wherein a disk has the blades mechanically attached thereto. While this advantageously permits blade and disk to be of different materials, it adds substantially to the weight of the assembly relative to a unitary, integrally bladed rotor assembly.
  • a disk and blade assembly might typically comprise a single disk with about 100 blades attached thereto.
  • any repair technique must produce repairs which have the strength of the parent metal, usually the blade material.
  • Other requirements of fatigue resistance, resistance to rupture and the like must also be satisfied.
  • a damaged blade is removed by machining leaving a protruding stub on the disk rim.
  • a repair blade assembly is provided having the requisite dimensions.
  • the repair blade assembly also has a circumferential collar adjacent to the portion of the blade which is to be bonded to the stub.
  • the repair process is performed under high vacuum conditions.
  • the repair blade is positioned adjacent to the stub and a mechanical force is applied to force the blade end and the stub together in intimate contact.
  • Force is appl,ied to the blade by a tool which acts on the protruding collar.
  • While force is applied between the blade and stub the joint is locally heated to a relatively high temperature by one of several methods including resistance, induction, radiant, and electron beam heating. Resistance heating is desired for practical and economic reasons.
  • the bonding temperature and force are adjusted and controlled so as to produce a metallurgical bond between the blade and the stub.
  • the collar is machined away from the blade as is any material expelled from the joint during the bonding process.
  • This repair process can also be used to produce integrally bladed rotors ab initio.
  • Figure 1 shows an integrally bladed rotor assembly having a damaged blade 1.
  • Figure 2 is fragmentary view of a portion of Figure 1 including the damaged blade 1.
  • the phantom line 10 in Figure 2 indicates the intended repair bond joint.
  • the repair bond joint is selected to be well away from the damaged area 12, but at the same time should be near the disk surface 14 so as to provide a stub 16.
  • a typical subheight might be 0.1 to 0.2 inch.
  • the removal of the damaged portion of the blade may be done by any conventional technique including mechanical machining, wire EDMing and the like.
  • Figure 3 is an exploded view showing the stub 16 and the repair blade 18, and the blade gripping tool 40.
  • repair blade 18 has a cross section at the bond which is a mirror image of the stub 16 cross section. In a production environment there would undoubtedly be several standard repair blade configurations which would be selected to cover a variety of repair requirements.
  • the shape and location of the collar 30 promotes uniform heating and deformation.
  • the collar 30 (which preferably has straight-line or flat features), working in conjunction with the mating blade gripping tool 40 allows uniform electrical contact (necessary in the case of electrical resistance heating) between the tool 40 and the blade 18 due to the ease of fixturing against the straight and flat collar surface as opposed to attempting uniform contact along a complex contoured airfoil surface. This ensures uniform electrical current flow through the bond zone along the complete width (leading edge to trailing edge) of the airfoil, promoting uniform temperature in spite of the varied thicknesses of the blade.
  • the collar 30 preferably fits into a corresponding relief 42 in the blade gripping tool which, due to the good contact along its length, can act as an efficient heat transfer location adjacent to the bond zone, helping to localize the high temperature region.
  • the dissipation of the heat transferred from the blade collar 30 to the blade gripping tool 40 is accomplished by strategically located water-cooling passages 44 located below (or around) the surfaces of the bond tool in contact with the blade collar 30, designed such that the structural integrity of the blade bond tool is not reduced by excess temperatures. At the same time the tool 40 must be strong enough to resist deformation during bonding.
  • Water cooling maintains the collar 30 portion of the replacement airfoil 18 at a temperature below the point at which the strength of the alloy would permit deformation.
  • the collar thus remains dimensionally accurate and stable throughout the bond cycle.
  • the collar 30, being adjacent to the bond zone, allows effective transmission of the force F necessary for bonding without plastic deformation away from the bond, i.e., bending or buckling of the remaining airfoil. This is a critical feature for applications where the airfoil portion beyond the collar is net-shape (finish machined). This also contributes to the dimensional precision of the process.
  • the collar 30 can provide a transition from the complex, varying thickness of the airfoil shape (which is hard to match from part-to-part) to a simplified shape containing flat surfaces (both in the axial and transverse directions) which are easy to machine during repair blade fabrication and are easy to locate on or against with the blade gripping tool 40 in a reproducible manner during the blade bond set-up.
  • the collar 30, therefore contains accurate locating surfaces 42 which simplify set-up, and these become ideal features in an automated production system for fabrication of new integrally bladed rotors wherein individual blades are sequentially loaded into the blade bond tool during a fabrication operation accomplished under one vacuum cycle.
  • Preparation for bonding includes the treatment of the intended bond surfaces to encourage bonding. This chiefly involves the removal of all foreign materials including dirt, grease, oil, etc. and surface oxides. Such surface preparation can be performed by a variety of techniques typically mechanical surface grinding step followed by a chemical etching step.
  • Bonding typically would be performed in a high vacuum (10 ⁇ 5mm hg) under conditions of temperature and pressure sufficient to cause metal flow. These conditions will vary obviously depending exactly upon the materials involved. However, for typical superalloys the temperatures will be on the order of 1900°F-2100°F and the pressures will be on the order of 15 ksi. In the bonding of typical size blades, having a length for example of between 2 and 3 inches, it would be appropriate to have an upset or a shortening of the repair blade and stub on the order of 0.05 inch during bonding to insure sufficient metal flow to be certain that bonding has occurred. Deformation can also be measured or assessed in terms of the increase of area in the bond joint during the bonding process. In this instance an increase in the bond area of at least 50% and preferably at least 100% will insure that true metallurgical bonding has in fact occurred.
  • the part can be removed from the bonding apparatus and the protruding collar and any upset material expelled from the bond joint can be removed from the blade by conventional machining techniques. Following this machining process that portion of the blade which has been bonded can be locally heat treated to ensure adequate mechanical properties.
  • Figure 4 illustrates the remarkable bond integrity available with the invention process.
  • Figure 4 shows two micro structures taken from a repair block bonded according to the invention.
  • the material is that known as IN100 (nominally 10% Cr, 15% Co, 3% Mo, 5.5% Al, 4.7% Ti, 0.18% C, 0.014% B, 0.06% Zr, 1% V, bal. Ni).
  • Figure 4a shows the microstructure at the repair blade tip (away from the bond zone) while
  • Figure 4b shows the microstructure at the bond zone or bond line.
  • the Figure 4 b material was bonded at 1850°F, 15 ksi and then heat treated at 2065°F one hour (solution treatment), 1400°F one hour (age) and slow cooled to room temperature. Both figures are photomicrographs taken at 1000X and the similarity is striking. Equally significantly, the bond line cannot be discerned in Figure 4b.
  • the microstructural uniformity at the bond line suggests that the repaired part will have properties equivalent to those of an original part and mechanical testing confirms this.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Preliminary Treatment Of Fibers (AREA)

Abstract

Techniques for fabricating or repairing integrally bladed rotors are developed. A new or replacement blade is bonded to a projecting stub. The new blade has a collar through which bonding forces are transmitted. After bonding with heat and pressure, final machining and heat treatment operations are performed.

Description

    Technical Field
  • This invention relates to the field of integral bladed rotor fabrication and repair. The invention also relates to the solid state diffusion bonding of superalloys.
  • Background Art
  • Gas turbine engines are widely used and well developed generators of power used primarily for aircraft propulsion. An overview of gas turbine engine operation includes the compression of air to a high pressure - high temperature condition in a compressor, injection and combustion of fuel with the compressed air and the expansion of the products of combustion through a turbine section which extracts a substantial amount of the energy present in the products of combustion. The turbine section powers the compressor section and in some instances also provides useable external mechanical power.
  • In large gas turbine engines the compressor section and turbine sections are of axial flow design and each stage comprises a disk having plurality of airfoils mounted on its rim. The blades and the disk move, the disk being mounted on a rotating shaft, and the disk - blade assemblies are subject to very severe environments.
  • Historically blade and disk assemblies have been produced from separate components wherein a disk has the blades mechanically attached thereto. While this advantageously permits blade and disk to be of different materials, it adds substantially to the weight of the assembly relative to a unitary, integrally bladed rotor assembly.
  • The increases in the performance requirements for gas turbine engines, particularly military gas turbine engines, are leading to the introduction of integrally bladed rotors wherein the blades are an integral part of the rotor and are either formed integrally with the disk or are metallurgically bonded to the disk. This reduces the weight deficit attributable to the prior art mechanical joining schemes.
  • A disk and blade assembly might typically comprise a single disk with about 100 blades attached thereto. In the prior art method of assembly employing mechanical joining techniques, it was relatively easy and straight forward to replace damaged blades simply by removing the damaged blade and replacing it with an identical undamaged blade. Obviously in the new environment of integrally bladed rotors, such repairs are far from simple. In the compressor and turbine sections of gas turbine engines, the blades and disks are operated at the outer limits of their property capabilities both in terms of stress and temperature. This means that any repair technique must produce repairs which have the strength of the parent metal, usually the blade material. Other requirements of fatigue resistance, resistance to rupture and the like must also be satisfied.
  • The need for repairs can arise both in service and in the initial fabrication of disk and blade assemblies. In service it is obvious that damage can arise from a variety of sources and also during the course of fabrication, the odds are fairly good that out of 100 blades typically assembled to a single disk, one or more will have some defect.
  • There is also a need for a method to initially fabricate integrally bladed rotors by bonding individual blades onto a disk. Consequently, it is an object of the invention to describe a method for repair of integrally bladed rotors. It is another object of the invention to describe a technique which can be used for fabrication of integrally bladed rotors.
  • Disclosure of Invention
  • According to a major aspect of the present invention a damaged blade is removed by machining leaving a protruding stub on the disk rim. A repair blade assembly is provided having the requisite dimensions. The repair blade assembly also has a circumferential collar adjacent to the portion of the blade which is to be bonded to the stub.
  • The repair process is performed under high vacuum conditions. The repair blade is positioned adjacent to the stub and a mechanical force is applied to force the blade end and the stub together in intimate contact. Force is appl,ied to the blade by a tool which acts on the protruding collar. While force is applied between the blade and stub the joint is locally heated to a relatively high temperature by one of several methods including resistance, induction, radiant, and electron beam heating. Resistance heating is desired for practical and economic reasons.
  • The bonding temperature and force are adjusted and controlled so as to produce a metallurgical bond between the blade and the stub. At the conclusion of the bonding process the collar is machined away from the blade as is any material expelled from the joint during the bonding process.
  • This repair process can also be used to produce integrally bladed rotors ab initio.
  • The foregoing and other features and advantages of the present invention will become more apparent from the following description and accompanying drawings.
  • Brief Description of Drawings
    • Fig. 1 shows an integrally bladed rotor with a damaged blade.
    • Fig. 2 shows an enlarged view of the damaged blade.
    • Fig. 3 shows an exploded view of the invention apparatus for blade repair.
    • Fig. 4 a and b are photomicrographs illustrating microstructures relating to the invention process.
    Best Mode for Carrying Out the Invention
  • The invention will be described with reference to the Figures which specifically illustrate the repair embodiment of the invention. Figure 1 shows an integrally bladed rotor assembly having a damaged blade 1. Figure 2 is fragmentary view of a portion of Figure 1 including the damaged blade 1. The phantom line 10 in Figure 2 indicates the intended repair bond joint. The repair bond joint is selected to be well away from the damaged area 12, but at the same time should be near the disk surface 14 so as to provide a stub 16. A typical subheight might be 0.1 to 0.2 inch. The removal of the damaged portion of the blade may be done by any conventional technique including mechanical machining, wire EDMing and the like. Figure 3 is an exploded view showing the stub 16 and the repair blade 18, and the blade gripping tool 40. Notable features of the repair blade 18, are that its cross section generally conforms to the cross section of the damaged blade 1 and that the repair blade 18 has a collar 30 about its circumference, relatively closely adjacent to the intended bond. The repair blade 18 has a cross section at the bond which is a mirror image of the stub 16 cross section. In a production environment there would undoubtedly be several standard repair blade configurations which would be selected to cover a variety of repair requirements.
  • The shape and location of the collar 30 promotes uniform heating and deformation. The collar 30 (which preferably has straight-line or flat features), working in conjunction with the mating blade gripping tool 40 allows uniform electrical contact (necessary in the case of electrical resistance heating) between the tool 40 and the blade 18 due to the ease of fixturing against the straight and flat collar surface as opposed to attempting uniform contact along a complex contoured airfoil surface. This ensures uniform electrical current flow through the bond zone along the complete width (leading edge to trailing edge) of the airfoil, promoting uniform temperature in spite of the varied thicknesses of the blade. The collar 30 preferably fits into a corresponding relief 42 in the blade gripping tool which, due to the good contact along its length, can act as an efficient heat transfer location adjacent to the bond zone, helping to localize the high temperature region. The dissipation of the heat transferred from the blade collar 30 to the blade gripping tool 40 is accomplished by strategically located water-cooling passages 44 located below (or around) the surfaces of the bond tool in contact with the blade collar 30, designed such that the structural integrity of the blade bond tool is not reduced by excess temperatures. At the same time the tool 40 must be strong enough to resist deformation during bonding.
  • Water cooling maintains the collar 30 portion of the replacement airfoil 18 at a temperature below the point at which the strength of the alloy would permit deformation. The collar thus remains dimensionally accurate and stable throughout the bond cycle.
  • The collar 30, being adjacent to the bond zone, allows effective transmission of the force F necessary for bonding without plastic deformation away from the bond, i.e., bending or buckling of the remaining airfoil. This is a critical feature for applications where the airfoil portion beyond the collar is net-shape (finish machined). This also contributes to the dimensional precision of the process.
  • The collar 30 can provide a transition from the complex, varying thickness of the airfoil shape (which is hard to match from part-to-part) to a simplified shape containing flat surfaces (both in the axial and transverse directions) which are easy to machine during repair blade fabrication and are easy to locate on or against with the blade gripping tool 40 in a reproducible manner during the blade bond set-up.
  • The collar 30, therefore contains accurate locating surfaces 42 which simplify set-up, and these become ideal features in an automated production system for fabrication of new integrally bladed rotors wherein individual blades are sequentially loaded into the blade bond tool during a fabrication operation accomplished under one vacuum cycle.
  • Preparation for bonding includes the treatment of the intended bond surfaces to encourage bonding. This chiefly involves the removal of all foreign materials including dirt, grease, oil, etc. and surface oxides. Such surface preparation can be performed by a variety of techniques typically mechanical surface grinding step followed by a chemical etching step.
  • Bonding typically would be performed in a high vacuum (10⁻⁵mm hg) under conditions of temperature and pressure sufficient to cause metal flow. These conditions will vary obviously depending exactly upon the materials involved. However, for typical superalloys the temperatures will be on the order of 1900°F-2100°F and the pressures will be on the order of 15 ksi. In the bonding of typical size blades, having a length for example of between 2 and 3 inches, it would be appropriate to have an upset or a shortening of the repair blade and stub on the order of 0.05 inch during bonding to insure sufficient metal flow to be certain that bonding has occurred. Deformation can also be measured or assessed in terms of the increase of area in the bond joint during the bonding process. In this instance an increase in the bond area of at least 50% and preferably at least 100% will insure that true metallurgical bonding has in fact occurred.
  • Following the bonding process the part can be removed from the bonding apparatus and the protruding collar and any upset material expelled from the bond joint can be removed from the blade by conventional machining techniques. Following this machining process that portion of the blade which has been bonded can be locally heat treated to ensure adequate mechanical properties.
  • Figure 4 illustrates the remarkable bond integrity available with the invention process. Figure 4 shows two micro structures taken from a repair block bonded according to the invention. The material is that known as IN100 (nominally 10% Cr, 15% Co, 3% Mo, 5.5% Al, 4.7% Ti, 0.18% C, 0.014% B, 0.06% Zr, 1% V, bal. Ni). Figure 4a shows the microstructure at the repair blade tip (away from the bond zone) while Figure 4b shows the microstructure at the bond zone or bond line. The Figure 4 b material was bonded at 1850°F, 15 ksi and then heat treated at 2065°F one hour (solution treatment), 1400°F one hour (age) and slow cooled to room temperature. Both figures are photomicrographs taken at 1000X and the similarity is striking. Equally significantly, the bond line cannot be discerned in Figure 4b. The microstructural uniformity at the bond line suggests that the repaired part will have properties equivalent to those of an original part and mechanical testing confirms this.
  • Although this invention has been shown and described with respect to detailed embodiments thereof, it will be understood by those skilled in the art that various changes in form and detail thereof may be made without departing from the spirit and scope of the claimed invention.

Claims (3)

1. A method for replacing a blade on an integrally bladed rotor, which comprises a disk having a plurality of integral blades projecting from the rim of the disk, including the steps of:
a) removing a preexisting blade, leaving a stub, a portion of said preexisting blade, projecting from the disk rim, said blade stub having a face which constitutes a surface to which a replacement blade will be bonded;
b) positioning a replacement blade adjacent to said stub, said replacement blade having a circumferential collar about its periphery adjacent the proposed bond with the adjacent surfaces of said stub and said replacement comprising an intended bond;
c) applying a force between said stub and said replacement blade, with said force being applied to the replacement blade through said collar;
d) locally heating said intended bond, between said stub and said replacement blade, to a temperature which causes softening, metal flow and bonding;
e) removing said collar from said replacement blade by machining.
2. A method for fabricating an integrally bladed rotor, which comprises a disk having a plurality of integral blades projecting from the rim of the disk, including the steps of:
a) providing a disk having a plurality of projecting stubs;
b) providing a plurality of blade preforms, each preform having a circumferential collar about its periphery and orienting said blade preform adjacent a stub;
c) applying a force between said stub and said blade preform, with said force being applied to the blade preform through said collar;
d) locally heating said intended bond, between said stub and said blade preform, to a temperature which causes softening, metal flow and bonding to cause bonding and then allowing the bond to cool;
e) removing said collar from the blade by machining.
f) repeating steps "c" "d" and "e" until all stubs have blades attached thereto.
3. A method as in claim 2 wherein step "e" is performed to multiple blades after said multiple blades have been bonded to stubs.
EP89630224A 1988-12-27 1989-12-14 Fabrication or repair technique for integrally bladed rotor assembly Expired - Lifetime EP0376874B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US07/289,868 US4873751A (en) 1988-12-27 1988-12-27 Fabrication or repair technique for integrally bladed rotor assembly
US289868 1994-08-12

Publications (3)

Publication Number Publication Date
EP0376874A2 true EP0376874A2 (en) 1990-07-04
EP0376874A3 EP0376874A3 (en) 1990-09-05
EP0376874B1 EP0376874B1 (en) 1993-07-28

Family

ID=23113466

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89630224A Expired - Lifetime EP0376874B1 (en) 1988-12-27 1989-12-14 Fabrication or repair technique for integrally bladed rotor assembly

Country Status (11)

Country Link
US (1) US4873751A (en)
EP (1) EP0376874B1 (en)
JP (1) JP2974703B2 (en)
CN (1) CN1027388C (en)
AU (1) AU625036B2 (en)
BR (1) BR8906744A (en)
DE (1) DE68907881T2 (en)
IL (1) IL92723A (en)
MX (1) MX171965B (en)
RU (1) RU1819202C (en)
SA (1) SA89100052B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0887143A1 (en) * 1997-06-25 1998-12-30 ROLLS-ROYCE plc Improvements in or relating to the friction welding of components
WO2000003834A1 (en) * 1998-07-15 2000-01-27 MTU MOTOREN- UND TURBINEN-UNION MüNCHEN GMBH Method for repairing and producing integrally bladed rotors for a hydraulic engine
WO2000037210A1 (en) * 1998-12-18 2000-06-29 MTU MOTOREN- UND TURBINEN-UNION MüNCHEN GMBH Blade and rotor for a gas turbine and method for linking blade parts
EP1306520A1 (en) * 2001-10-29 2003-05-02 United Technologies Corporation Method of joining high temperature, high strength material
WO2003068457A1 (en) * 2002-02-11 2003-08-21 Mtu Aero Engines Gmbh Method and device for holding a metallic component to be connected, especially a gas turbine blade
WO2005024185A1 (en) * 2003-09-03 2005-03-17 Mtu Aero Engines Gmbh Method for the production of gas turbine rotors with integrated blading
WO2006084439A1 (en) * 2005-02-10 2006-08-17 Mtu Aero Engines Gmbh Method for producing and/or repairing an integrally bladed rotor by inductive diffusion welding
US9138834B2 (en) 2009-07-18 2015-09-22 Mtu Aero Engines Gmbh Method for replacing a blade of a rotor having integrated blades and such a rotor

Families Citing this family (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8914273D0 (en) * 1989-06-21 1989-08-09 Rolls Royce Plc Friction bonding apparatus
US5048743A (en) * 1990-04-26 1991-09-17 United Technologies Corporation Rotor blade bonding device
US5188275A (en) * 1990-05-24 1993-02-23 Rolls-Royce Plc Friction bonding clamp for a rotor blade
US5111570A (en) * 1990-08-10 1992-05-12 United Technologies Corporation Forge joining repair technique
US5272809A (en) * 1990-09-04 1993-12-28 United Technologies Corporation Technique for direct bonding cast and wrought materials
US5113583A (en) * 1990-09-14 1992-05-19 United Technologies Corporation Integrally bladed rotor fabrication
US5205465A (en) * 1990-09-19 1993-04-27 United Technologies Corporation Method for replacing worn airseal lands on engine compressor or turbine disks
US5109606A (en) * 1991-03-04 1992-05-05 United Technologies Corporation Integrally bladed rotor fabrication or repair
US5197191A (en) * 1991-03-04 1993-03-30 General Electric Company Repair of airfoil edges
US5197190A (en) * 1991-03-04 1993-03-30 United Technologies Corporation Fabrication of repair method for an integrally bladed rotor
DE4327189C2 (en) * 1993-08-13 1996-02-01 Mtu Muenchen Gmbh Repair method for damaged blades of turbomachinery in the head or edge area
US5560841A (en) * 1994-10-11 1996-10-01 United Technologies Corporation Stator vane extraction
US5553370A (en) * 1995-02-09 1996-09-10 Pepe; John Method for repair of steam turbine blades
US5755031A (en) * 1996-11-12 1998-05-26 United Technologies Corporation Method for attaching a rotor blade to an integrally bladed rotor
US5758416A (en) * 1996-12-05 1998-06-02 General Electric Company Method for repairing a turbine engine vane segment
US6354482B1 (en) * 1998-11-06 2002-03-12 United Technologies Corporation Friction welder
US6244495B1 (en) 1998-11-06 2001-06-12 United Technologies Corporation Gripper
US6339878B1 (en) 2000-03-27 2002-01-22 United Technologies Corporation Method of repairing an airfoil
US6568077B1 (en) * 2000-05-11 2003-05-27 General Electric Company Blisk weld repair
DE10161824B4 (en) * 2001-12-15 2004-02-12 Mtu Aero Engines Gmbh Process for repairing worn or made-to-measure components
US8516674B2 (en) * 2003-11-14 2013-08-27 General Electric Company Solid state resistance welding for airfoil repair and manufacture
US7370787B2 (en) * 2003-12-15 2008-05-13 Pratt & Whitney Canada Corp. Compressor rotor and method for making
US7249412B2 (en) * 2004-05-25 2007-07-31 General Electric Company Method for repairing a damaged blade of a Blisk
GB0412775D0 (en) * 2004-06-09 2004-07-07 Rolls Royce Plc Method of replacing damaged aerofoil
DE102004032461A1 (en) 2004-06-30 2006-02-02 Rolls-Royce Deutschland Ltd & Co Kg Process and repair blade part for BLISK repair or BLISKs new production
DE102004042878A1 (en) * 2004-09-04 2006-03-09 Mtu Aero Engines Gmbh Method of repairing turbomachinery blades
DE102004043746B4 (en) * 2004-09-10 2008-09-25 Mtu Aero Engines Gmbh A method of making a gas turbine rotor integrally bladed with hollow blades
DE102006012674A1 (en) * 2006-03-20 2007-09-27 Mtu Aero Engines Gmbh Method and device for connecting metallic components
DE102006012660A1 (en) * 2006-03-20 2007-09-27 Mtu Aero Engines Gmbh Component and method for connecting metallic components
DE102006031388A1 (en) * 2006-07-07 2008-01-17 Mtu Aero Engines Gmbh Method for the repair and / or replacement of individual elements of a component of a gas turbine
US7858897B2 (en) * 2006-10-27 2010-12-28 United Technologies Corporation Insert weld repair
US7762783B2 (en) * 2007-01-11 2010-07-27 General Electric Company Turbine blade apparatus
US9133720B2 (en) * 2007-12-28 2015-09-15 United Technologies Corporation Integrally bladed rotor with slotted outer rim
US8206121B2 (en) * 2008-03-26 2012-06-26 United Technologies Corporation Method of restoring an airfoil blade
CN102052342B (en) * 2009-10-29 2013-02-13 北京有色金属研究总院 Titanium alloy integral bladed disc and manufacturing method thereof
US8613138B2 (en) * 2009-12-16 2013-12-24 United Technologies Corporation Repair of integrally bladed rotors
US8479391B2 (en) * 2009-12-16 2013-07-09 United Technologies Corporation Consumable collar for linear friction welding of blade replacement for damaged integrally bladed rotors
US9694440B2 (en) 2010-10-22 2017-07-04 United Technologies Corporation Support collar geometry for linear friction welding
US10309232B2 (en) * 2012-02-29 2019-06-04 United Technologies Corporation Gas turbine engine with stage dependent material selection for blades and disk
US20140117007A1 (en) * 2012-10-29 2014-05-01 General Electric Company Local Heat Treatment and Thermal Management System for Engine Components
US20140120483A1 (en) * 2012-10-29 2014-05-01 General Electric Company Local Heat Treatment and Thermal Management System for Engine Components
CN103331515B (en) * 2013-06-21 2015-03-18 中国航空工业集团公司北京航空制造工程研究所 Linear friction welding method for manufacturing blisk
CN103600200B (en) * 2013-10-19 2015-10-21 沈阳黎明航空发动机(集团)有限责任公司 A kind of T300/BMP-316 composite contains casing mount pad replacing repair method outward
CN103817499B (en) * 2013-11-01 2016-03-09 西安航空动力股份有限公司 A kind of turbo blade tenon tooth that solves leaks the method for oozing
CN105328396B (en) * 2015-11-26 2017-09-12 沈阳黎明航空发动机(集团)有限责任公司 A kind of compressor stator blade unit replacement blade restorative procedure
CN105643183B (en) * 2015-12-24 2017-09-12 甘肃银光化学工业集团有限公司 The restorative procedure of liquid-piston compressor impeller fragmentation under a kind of strong acid operating mode
EP3238868A1 (en) * 2016-04-27 2017-11-01 MTU Aero Engines GmbH Method for producing a rotor blade for a fluid flow engine
US10814445B2 (en) 2016-05-09 2020-10-27 Raytheon Technologies Corporation Airfoil machining
US10633731B2 (en) 2018-01-05 2020-04-28 United Technologies Corporation Method for producing enhanced fatigue and tensile properties in integrally bladed rotor forgings
US10935037B2 (en) 2018-01-05 2021-03-02 Raytheon Technologies Corporation Tool for simultaneous local stress relief of each of a multiple of linear friction welds of a rotor forging
DE102020210003A1 (en) 2020-08-06 2022-02-10 MTU Aero Engines AG Method of repairing an integrally bladed rotor
US11828190B2 (en) 2021-11-18 2023-11-28 General Electric Company Airfoil joining apparatus and methods

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4736504A (en) * 1987-08-12 1988-04-12 The United States Of America As Represented By The Secretary Of The Navy Alignment method for pressure welded bladed disk
FR2629133A1 (en) * 1988-03-28 1989-09-29 Gen Electric METHOD AND DEVICE FOR THE BINDING OPERATION OF A GROWING ELEMENT

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3088192A (en) * 1957-04-26 1963-05-07 Int Nickel Co Method of joining turbine blade parts
US3196526A (en) * 1961-06-13 1965-07-27 Bristol Siddeley Engines Ltd Method of making turbine blades
US3653110A (en) * 1970-01-05 1972-04-04 North American Rockwell Method of fabricating hollow blades
BE789029A (en) * 1971-12-20 1973-01-15 Gen Electric FRICTION WELDED METAL ARTICLE AND PROCESS FOR MANUFACTURING SUCH ARTICLE
US3810711A (en) * 1972-09-22 1974-05-14 Gen Motors Corp Cooled turbine blade and its manufacture
US4096614A (en) * 1975-09-02 1978-06-27 General Electric Company Method and apparatus for removing stator vanes
US4285108A (en) * 1979-02-23 1981-08-25 United Technologies Corporation Apparatus and method for refinishing turbine blade airseals
US4364160A (en) * 1980-11-03 1982-12-21 General Electric Company Method of fabricating a hollow article
US4589176A (en) * 1983-11-25 1986-05-20 Rockwell International Corporation Fiber-composite turbine blade and method for its construction
US4594761A (en) * 1984-02-13 1986-06-17 General Electric Company Method of fabricating hollow composite airfoils

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4736504A (en) * 1987-08-12 1988-04-12 The United States Of America As Represented By The Secretary Of The Navy Alignment method for pressure welded bladed disk
FR2629133A1 (en) * 1988-03-28 1989-09-29 Gen Electric METHOD AND DEVICE FOR THE BINDING OPERATION OF A GROWING ELEMENT

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6095402A (en) * 1997-06-25 2000-08-01 Rolls Royce Plc Method for the manufacture or repair of a blisk by linear friction welding
US6524072B1 (en) 1997-06-25 2003-02-25 Rolls Royce Plc Disk for a blisk rotary stage of a gas turbine engine
EP0887143A1 (en) * 1997-06-25 1998-12-30 ROLLS-ROYCE plc Improvements in or relating to the friction welding of components
WO2000003834A1 (en) * 1998-07-15 2000-01-27 MTU MOTOREN- UND TURBINEN-UNION MüNCHEN GMBH Method for repairing and producing integrally bladed rotors for a hydraulic engine
US6616408B1 (en) 1998-12-18 2003-09-09 Mtu Aero Engines Gmbh Blade and rotor for a gas turbine and method for linking blade parts
WO2000037210A1 (en) * 1998-12-18 2000-06-29 MTU MOTOREN- UND TURBINEN-UNION MüNCHEN GMBH Blade and rotor for a gas turbine and method for linking blade parts
US6902096B2 (en) 2001-10-29 2005-06-07 United Technologies Corporation Method of joining material
EP1306520A1 (en) * 2001-10-29 2003-05-02 United Technologies Corporation Method of joining high temperature, high strength material
SG148007A1 (en) * 2001-10-29 2008-12-31 United Technologies Corp Method of joining material
WO2003068457A1 (en) * 2002-02-11 2003-08-21 Mtu Aero Engines Gmbh Method and device for holding a metallic component to be connected, especially a gas turbine blade
WO2005024185A1 (en) * 2003-09-03 2005-03-17 Mtu Aero Engines Gmbh Method for the production of gas turbine rotors with integrated blading
US7900351B2 (en) 2003-09-03 2011-03-08 Mtu Aero Engines Gmbh Method for the production of gas turbine rotors having integrated blading
WO2006084439A1 (en) * 2005-02-10 2006-08-17 Mtu Aero Engines Gmbh Method for producing and/or repairing an integrally bladed rotor by inductive diffusion welding
US8375582B2 (en) 2005-02-10 2013-02-19 Mtu Aero Engines Gmbh Method and apparatus for producing and/or repairing an integrally bladed rotor by inductive diffusion welding
US9138834B2 (en) 2009-07-18 2015-09-22 Mtu Aero Engines Gmbh Method for replacing a blade of a rotor having integrated blades and such a rotor

Also Published As

Publication number Publication date
RU1819202C (en) 1993-05-30
JPH02271001A (en) 1990-11-06
EP0376874B1 (en) 1993-07-28
CN1027388C (en) 1995-01-11
JP2974703B2 (en) 1999-11-10
MX171965B (en) 1993-11-25
IL92723A (en) 1992-07-15
DE68907881T2 (en) 1993-11-18
DE68907881D1 (en) 1993-09-02
IL92723A0 (en) 1990-09-17
AU625036B2 (en) 1992-06-25
BR8906744A (en) 1990-08-21
SA89100052B1 (en) 1999-03-15
CN1043974A (en) 1990-07-18
EP0376874A3 (en) 1990-09-05
AU4616089A (en) 1990-07-05
US4873751A (en) 1989-10-17

Similar Documents

Publication Publication Date Title
US4873751A (en) Fabrication or repair technique for integrally bladed rotor assembly
US6494677B1 (en) Turbine nozzle segment and method of repairing same
US7000306B2 (en) Spun metal form used to manufacture dual alloy turbine wheel
US5197190A (en) Fabrication of repair method for an integrally bladed rotor
EP0171344A1 (en) Method for fabricating an integrally bladed rotor
US5205465A (en) Method for replacing worn airseal lands on engine compressor or turbine disks
US4536932A (en) Method for eliminating low cycle fatigue cracking in integrally bladed disks
US20180216464A1 (en) Method of repairing a blisk
JPH05169323A (en) Method for joining and repairing of forged article
US5272809A (en) Technique for direct bonding cast and wrought materials
EP1319802A2 (en) Turbine nozzle segment and method of repairing same
US11925985B2 (en) Method of making a radial turbine wheel using additive manufacturing
EP3822457A1 (en) Friction welded composite turbine disc rotor for a turbomachine
KR0149851B1 (en) Fabrication or repair technique for integrally bladed rotor assembly
JP3217401B2 (en) How to repair van lag
EP4375482A1 (en) Systems and methods of blade leading edge repair using field assisted sintering technology
US11814979B1 (en) Systems and methods of hybrid blade tip repair
EP4350121A2 (en) Systems and methods of blade tip repair and manufacutring using field assisted sintering
JP2000054091A (en) Manufacture of plate-like frm preform and composite body
IL112083A (en) Vane lug repair technique

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): BE DE FR GB IT SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): BE DE FR GB IT SE

17P Request for examination filed

Effective date: 19901211

17Q First examination report despatched

Effective date: 19920330

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE FR GB IT SE

ET Fr: translation filed
REF Corresponds to:

Ref document number: 68907881

Country of ref document: DE

Date of ref document: 19930902

ITF It: translation for a ep patent filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EAL Se: european patent in force in sweden

Ref document number: 89630224.7

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20061106

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20061201

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20061204

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20061229

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20061231

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20070109

Year of fee payment: 18

BERE Be: lapsed

Owner name: *UNITED TECHNOLOGIES CORP.

Effective date: 20071231

EUG Se: european patent has lapsed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20071214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071215

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080701

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20081020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071214