EP0242472B1 - Wel bore recompletion - Google Patents
Wel bore recompletion Download PDFInfo
- Publication number
- EP0242472B1 EP0242472B1 EP86303167A EP86303167A EP0242472B1 EP 0242472 B1 EP0242472 B1 EP 0242472B1 EP 86303167 A EP86303167 A EP 86303167A EP 86303167 A EP86303167 A EP 86303167A EP 0242472 B1 EP0242472 B1 EP 0242472B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- permeable
- zone
- well
- region
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000004519 manufacturing process Methods 0.000 claims description 39
- 238000000034 method Methods 0.000 claims description 38
- 230000015572 biosynthetic process Effects 0.000 claims description 29
- 239000000463 material Substances 0.000 claims description 27
- 238000002347 injection Methods 0.000 claims description 22
- 239000007924 injection Substances 0.000 claims description 22
- 239000012530 fluid Substances 0.000 claims description 19
- 239000004568 cement Substances 0.000 claims description 15
- 238000004891 communication Methods 0.000 claims description 11
- 239000011236 particulate material Substances 0.000 claims description 11
- 239000004576 sand Substances 0.000 claims description 11
- 239000002245 particle Substances 0.000 claims description 9
- 238000011084 recovery Methods 0.000 claims description 9
- 239000000853 adhesive Substances 0.000 claims description 8
- 230000001070 adhesive effect Effects 0.000 claims description 8
- 238000002955 isolation Methods 0.000 claims description 7
- 229920001568 phenolic resin Polymers 0.000 claims description 7
- 229920005989 resin Polymers 0.000 claims description 7
- 239000011347 resin Substances 0.000 claims description 7
- 239000011343 solid material Substances 0.000 claims description 7
- KXGFMDJXCMQABM-UHFFFAOYSA-N 2-methoxy-6-methylphenol Chemical compound [CH]OC1=CC=CC([CH])=C1O KXGFMDJXCMQABM-UHFFFAOYSA-N 0.000 claims description 6
- 239000003822 epoxy resin Substances 0.000 claims description 6
- 229920000647 polyepoxide Polymers 0.000 claims description 6
- 239000005011 phenolic resin Substances 0.000 claims description 5
- 229920001187 thermosetting polymer Polymers 0.000 claims description 5
- 230000015556 catabolic process Effects 0.000 claims description 4
- 238000012856 packing Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 2
- 238000005755 formation reaction Methods 0.000 description 26
- 229910002092 carbon dioxide Inorganic materials 0.000 description 8
- 229910052782 aluminium Inorganic materials 0.000 description 7
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 7
- 239000002360 explosive Substances 0.000 description 7
- 238000005553 drilling Methods 0.000 description 6
- 229930195733 hydrocarbon Natural products 0.000 description 6
- 150000002430 hydrocarbons Chemical class 0.000 description 6
- 241000239290 Araneae Species 0.000 description 4
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 4
- 239000001569 carbon dioxide Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- SNIOPGDIGTZGOP-UHFFFAOYSA-N Nitroglycerin Chemical compound [O-][N+](=O)OCC(O[N+]([O-])=O)CO[N+]([O-])=O SNIOPGDIGTZGOP-UHFFFAOYSA-N 0.000 description 2
- 239000000006 Nitroglycerin Substances 0.000 description 2
- 238000005422 blasting Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000005474 detonation Methods 0.000 description 2
- 239000005007 epoxy-phenolic resin Substances 0.000 description 2
- 230000007717 exclusion Effects 0.000 description 2
- 229960003711 glyceryl trinitrate Drugs 0.000 description 2
- 239000003208 petroleum Substances 0.000 description 2
- 239000002243 precursor Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 238000010306 acid treatment Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- PNEYBMLMFCGWSK-UHFFFAOYSA-N aluminium oxide Inorganic materials [O-2].[O-2].[O-2].[Al+3].[Al+3] PNEYBMLMFCGWSK-UHFFFAOYSA-N 0.000 description 1
- 239000011324 bead Substances 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- LNEPOXFFQSENCJ-UHFFFAOYSA-N haloperidol Chemical compound C1CC(O)(C=2C=CC(Cl)=CC=2)CCN1CCCC(=O)C1=CC=C(F)C=C1 LNEPOXFFQSENCJ-UHFFFAOYSA-N 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000010453 quartz Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/025—Consolidation of loose sand or the like round the wells without excessively decreasing the permeability thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/164—Injecting CO2 or carbonated water
Definitions
- the invention relates to completion of bore holes.
- the invention relates to recompletion of an open hole bore hole so as to isolate a permeable zone in a subterranean formation from other permeable zones in the subterranean formation.
- the invention relates to recompletion of an open hole well bore of a production well that had been stimulated by detonation of high explosives so as to make the recompleted well suitable for injection of a fluid in a fluid drive process, for example, in an enhanced oil recovery process involving injection of carbon dioxide (CO 2 ).
- CO 2 carbon dioxide
- An example of a situation in which such recompletion is highly advantageous is in the implementation of an enhanced oil recovery process involving injection of a fluid from an injection well into a permeable subterranean formation containing residual hydrocarbons, so as to cause the hydrocarbons to migrate to a production well, with production of the hydrocarbons or oil to the surface from the production well. More specifically, after depletion by primary production, and even after water flooding, is completed, it is often advantageous to institute an enhanced oil recovery process involving injection of C0 2 into injection wells and production of displaced hydrocarbons from production wells.
- Primary production is often from open hole com- pletions. That is, a casing is set from the surface to near the production horizon, the casing is cemented into place, and then the well is drilled and completed open hole, without casing, to depth.
- high explosives such as nitroglycerin in the well bore at selected sites near subtemanean zones of high permeability that produce hydrocarbons or oil. This is often effected where there are numerous production horizons so as to make sure that all producible zones are opened for production.
- high rates of production are obtained, and there is little chance of missing a zone of potential production, which might be true if a cased hole were perforated at intervals indicated to be productive, as by well logs.
- 3,929,191 is exemplary of a process wherein epoxy resin or phenolic resin coated sand grains are squeezed through perforations in a casing into cavities in a formation, the mixture is allowed to set up into a consolidated permeable synthetic rock-like mass under influence of heat from the subterranean formation, the plug in the wall is drilled out, and the permeable plugs in the cavities are left in place to mitigate sand production.
- An object of the invention is to provide a process for recompleting an open hole well bore having zonal breakdown in the locus of the well bore so as to reconstitute isolation of a permeable zone from other permeable zones in asubterranean formation.
- the invention provides a process for recompleting an open hole well bore having zonal breakdown in the region of the well bore in such a way as to reconstitute isolation of one permeable zone from other permeable zones in a subterranean formation, such process comprising:
- the process of the invention is particularly advantageous for effecting considerable savings by recompleting open hole production wells for conversion to injection wells for use in fluid drive processes.
- a production well having open hole completion and having been blasted by detonation of high explosives in the well bore is recompleted as an injection well for injection of C0 2 into the isolated permeable zone of the formation in a C0 2 drive process.
- the particulate material is coated with a thermosetting resin such as an epoxy resin or a phenolic resin which is partially cured, such material being slurried into place and allowed to set so as to form the permeable synthetic rock-like material in situ by stimulation from the heat from the formation.
- a thermosetting resin such as an epoxy resin or a phenolic resin which is partially cured, such material being slurried into place and allowed to set so as to form the permeable synthetic rock-like material in situ by stimulation from the heat from the formation.
- FIGS 1 through 8 illustrate stages in one presently preferred embodiment of the invention wherein a shot open hole completion production well is recompleted as a cased hole injection well for injection of fluids into a selected permeable subterranean zone.
- the same numbers are used in the various figures to refer to the same items.
- FIG. 1 a shot open hole completion production well 1, to be recompleted according to a presently preferred mode of the invention, is illustrated.
- the well bore has casing 2 cemented in place by cement 3 from the surface to near the production zones.
- the well 4 is completed open hole to depth 5 through overburden 6, first permeable zone 7, first impermeable zone 8, second permeable zone 9, second impermeable zone 10, third permeable zone 11, and underburden 12.
- Cavities 13, 14, and 15 have been blasted in permeable zone 7, 9 and 11 by means of high explosives to enhance the rate of production from the permeable zones.
- the material from the cavities has been circulated out of the well.
- a tubing string 16 having break away section 17 and aluminum tail section 18 has been set through packer 19. It is centralized in the uncased portion of the bore hole 4 by means of centralizing spider 20. Coarse sand coated with a partially cured phenolic resin 21 has been injected down tubing string 16 as a slurry such as to fill bore hole 14 and cavities 13,14, and 15. The fluid from the slurry passes into permeable zones in the formation.
- the coated coarse sand 21 has set up to a solid permeable synthetic rock-like material under the influence of heat from the subterranean formation.
- Tubing 16 has been disconnected from break-away section 17 leaving aluminum tail piece 18 and the centralizing spider 20 in the set up solid permeable rock-like material 21.
- Packer 19 has also been removed, and drill string 22 having cutter head 23 guidable by nose piece 24 (shown in semischematic fashion) has been emplaced.
- drill string 22 has been employed to power cutter head 23 guided by nose piece 24 downward through the consolidated permeable rock-like mass 21 guided and centralized in the bore hole by aluminum tail piece 18 such as to remove consolidated permeable rock-like mass 21, break-away section 17, aluminum tail piece 18, and centralizing spider 20 out of the bore hole by circulation.
- Consolidated permeable synthetic rock-like material 21 remains in the open hole completion portion of the bore hole only in cavities 13, 14, and 15 and in a thin sheath 25 around the bore hole 4.
- Figure 5 illustrates a later stage in the process wherein the drill string 22 and cutting head 23 have been removed, and reaming head 26 has been inserted and expanded radially below the cased portion of the well, ready to cut downward so as to remove the sheath 25 of the consolidated permeable rock-like material 21 and to cut a fresh face on the bore hole as it is powered in rotation downward.
- Figure 6 shows the stage in the process wherein the reaming head 26 has been powered and rotated downward by means of drill string 22 such as to cut the sheath 25 of consolidated permeable rock-like material from around the well bore, and to cut a fresh face on the bore hole particularly in non-permeable zones 8 and 10, while leaving consolidated rock-like permeable material 21 in cavities 13, 14, and 15. Cuttings are circulated out of the well bore.
- reaming head 26 has been contracted and removed from the well bore by means of drill string 22.
- Smaller diameter casing 27 has been lowered into the well bore and is being cemented in place by means of cement 30 being forced down the interior of the smaller diameter casing 27 by means of mud column 28 and wiper plug 29 such as to fill annulus 31.
- the cement 30 is then forced completely to the bottom of the casing 27 and is allowed to set up.
- Mud 28 is circulated from the interior of the casing, and the wiper plug 29 can be removed if desired.
- the cement upon setting, forms a fluid tight seal between the smaller diameter casing 27 and the face of the formations 7, 8, 9, 10, 11, and 12.
- the cement abuts consolidated permeable rock-like material in cavities 13, 14, and 15.
- perforations 32 are made from the interior of casing 27 through casing 27 and cement sheath 31 A into the consolidated permeable rock-like material filling cavity 14, so as to establish fluid communication between the interior of casing 27 and permeable rock-like material 21 in cavity 14 within permeable subterranean formation 9, the fluid being isolated from permeable formations 7 and 11 by means of impermeable formations 8 and 10 and impermeable sheath 31.
- tubing string 33 is set within casing 27, including packer 34 forming annulus 35. Fluid communication is thus effected selectively with permeable subterranean zone 9; from the surface down tubing string 33 and through perforations 32 and permeable rock-like material in cavity 14. Fluid communication with permeable zones 7 and 11 is excluded by impermeable zones 8 and 10 and impermeable cement sheath 31.
- the blasted former open hole completion production well is thus converted to a cased injection well having fluid communication only with the desired permeable subterranean zone.
- the process relates to establishment of fluid communication between a cased and cemented well bore and a permeable zone.
- the communication is isolated from other subterranean permeable zones by reconstituting isolation of the permeable zone of interest from other per meable zones by restoring the impermeability of zones there-between near a well bore.
- the foregoing is effected by packing off the open hole interval including the permeable zone to be isolated and including an impermeable subterranean zone separating the permeable zone to be isolated from other permeable subterranean zones.
- Conventional oil field packers of various types can be employed. Packing procedures and equipment are well known in the oil industry and in the oil field service industry.
- a particulate material is placed in the packed off interval and broken down zone; and the particulates of the particulate material are adhered together with an adhesive to consolidate the particulates and to form a permeable synthetic rock like material.
- the particulates are coated with a solid, fusible resin which is partially cured.
- the resin can be a phenolic resin or a partially cured epoxy resin.
- the particulates are placed at the desired sit, and the adhesive, such as a phenolic resin or an epoxy resin (or precursors thereof) is emplaced within the particulate material mass by injecting a slug of the adhesive or precursors followed by a pusher slug.
- the adhesive such as a phenolic resin or an epoxy resin (or precursors thereof)
- the particles are adhered together to form a permeable synthetic rock-like mass in the packed off interval and extending into broken down zones to reconstitute permeable subterranean zones.
- the synthetic permeable rock-like mass is drilled and/or reamed out to a greater diameter than the original completion so as to leave the permeable synthetic rock-like material in the broken down permeable zone, thus reconstituting the permeable zone, but not adjacent to a nonpermeable isolation zone adjacent to the permeable zone to be isolated.
- a number of permeable zones will exist in subterranean formations which are separated by nonpermeable zones in the formations. This is often true for production wells after primary production from formations having relatively thin production zones wherein open hole completion and blasting with high explosives has been employed to maximize recovery rates.
- a plurality or multiplicity of permeable and nonpermeable zones separated by a plurality or multiplicity of nonpermeable zones may be present, and often is, depending upon the particular reservoir to be operated upon.
- One preferred method of drilling and reaming out the open hole interval involves using an aluminum tail pipe to emplace the particulates prior to setting up to form the permeable synthetic rock-like material, shearing the tubing string so as to leave the aluminum tail pipe in place in the set permeable material, and then employing a drill with a guiding nose piece so as to center the drill and reaming operation so as to more precisely remove the set permeable material, with centering on the original bore hole.
- Such drilling and/or reaming techniques are well known to those skilled in the art, and are well known in the petroleum and oil service industries.
- the tail pipe, spider, and other elements can be fabricated of aluminum or other metal that is readily attacked by acid or the like so that they can be removed by an acid treatment or the like.
- a casing is set over the open hole interval.
- the casing is then cemented in place.
- Ordinary casing setting and cementing procedures which are well known and practiced in the oil and oil service industries, are employed. Often, the casing is set in place, and cement is forced down the casing and up the annulus by means of a wiper plug and mud. The mud is then circulated out of the well bore within the casing after setting of the cement by means of a tubing string or the like.
- Such techniques are also ordinary oil field operating procedure well known in the petroleum and well service industries.
- perforations are formed in the casing and setup cement sheath by means of a conventional perforating technique, for example, with a conventional perforating gun, by means of a high temperature jet, or by means of a high pressure jet of abrasive.
- a conventional perforating technique for example, with a conventional perforating gun, by means of a high temperature jet, or by means of a high pressure jet of abrasive.
- Such techniques are also widely practiced and are well known.
- a plurality of multiplicity of such perforating can be effected to open a plurality or multiplicity of zones if desired.
- the open well bore has been recompleted to a closed well bore, and is suitable for precise injection of a fluid into the desired subterranean horizon.
- a presently preferred application of the process is for recompletion of production wells to injection wells in a C0 2 injection enhanced oil recovery project.
- the C0 2 is injected into primarily depleted, but substantial hydrocarbon or oil-containing formations to mobilize the oil and move the oil to production wells for production to the surface and utilization.
- particulates is used herein. This can include any solid material having sufficient structural and chemical integrity to form the permeable consolidated synthetic rock-like material that is not deteriorated by the reservoir environment. Ordinarily, materials such as course sand, pea gravel, and other graded small gravel of quartz or other rock derived materials are employed because of abundance and low cost. It is also within the scope of the invention to employ other particulates that have resistance to adverse conditions, such as carbon particles, alumina particles, glass beads, ceramic particles, and the like.
- thermosetting resins besides epoxy resins and phenolic resins can also be employed, and inorganic adhesives or cements can also be employed so long as sufficient consolidation of the particulates is effected in the broken down zone in the reservoir to prevent production back into the well bore during operations and so long as the adhesives have resistance to deterioration in the reservoir.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
- The invention relates to completion of bore holes. In one aspect, the invention relates to recompletion of an open hole bore hole so as to isolate a permeable zone in a subterranean formation from other permeable zones in the subterranean formation. In a preferred aspect, the invention relates to recompletion of an open hole well bore of a production well that had been stimulated by detonation of high explosives so as to make the recompleted well suitable for injection of a fluid in a fluid drive process, for example, in an enhanced oil recovery process involving injection of carbon dioxide (CO2).
- There are situations when it is advantageous to recomplete an open hole well bore so as to establish fluid communication between the well bore and a permeable zone of a subterranean formation to the exclusion of communication with other permeable zones in the subterranean formation.
- An example of a situation in which such recompletion is highly advantageous is in the implementation of an enhanced oil recovery process involving injection of a fluid from an injection well into a permeable subterranean formation containing residual hydrocarbons, so as to cause the hydrocarbons to migrate to a production well, with production of the hydrocarbons or oil to the surface from the production well. More specifically, after depletion by primary production, and even after water flooding, is completed, it is often advantageous to institute an enhanced oil recovery process involving injection of C02 into injection wells and production of displaced hydrocarbons from production wells.
- Primary production is often from open hole com- pletions. That is, a casing is set from the surface to near the production horizon, the casing is cemented into place, and then the well is drilled and completed open hole, without casing, to depth. To stimulate production, it is common practice in many reservoirs to detonate high explosives such as nitroglycerin in the well bore at selected sites near subtemanean zones of high permeability that produce hydrocarbons or oil. This is often effected where there are numerous production horizons so as to make sure that all producible zones are opened for production. Thus, high rates of production are obtained, and there is little chance of missing a zone of potential production, which might be true if a cased hole were perforated at intervals indicated to be productive, as by well logs.
- The foregoing procedure works well as long as primary production iasts. However, there comes a time with all reservoirs when primary production becomes uneconomic. When this occurs, very large amounts of unrecovered oil may still be left in the reservoir. At such time, it is often advantageous to institute an enhanced oil recovery process, for example, involving injection of CO2 into injection wells and recovery of displaced oil from production wells.
- in the development of such an enhanced oil recovery process, considerable savings of time, energy, and funds involved with drilling new wells can be realized if open hole well bores having zonal breakdown in the locus of the well bore can be reconstituted so as to isolate permeable zones of interest from other permeable zones in the subterranean formation. This has heretofore not been feasible, particularly when the open zones were blasted with nitroglycerin or other high explosives. Greatly added expenses of drilling new patterns of new injection wells were required.
- It is known in the prior art to form permeable sheaths of "synthetic permeable rock" around well bores so as to mitigate sand production. It is also known to squeeze thermosetting resin and particulate material through perforations into cavities in a formation, and then to drill out the plug in the well, after setup, so as to mitigate sand production problems. Specifically, U.S. 3,929,191 is exemplary of a process wherein epoxy resin or phenolic resin coated sand grains are squeezed through perforations in a casing into cavities in a formation, the mixture is allowed to set up into a consolidated permeable synthetic rock-like mass under influence of heat from the subterranean formation, the plug in the wall is drilled out, and the permeable plugs in the cavities are left in place to mitigate sand production.
- A further earlier proposal described in U.S. 3,918,522 is exemplary of prior art disclosing isolating formations by casing, cementing, and then perforating into the zone of interest.
- It is apparent, however, that this procedure is not feasible when the zone of interest has been broken down by blasting or sand production, since the cement squeezed into the cavity would be difficult or impossible to perforate.
- Further earlier systems are described in U.S. 3,542,132; U.S. 3,999,608, U.S. 3,107,727; U.S. 3,209,823; U.S. 3,336,980; U.S. 3,708,013; U.S. 3,709,298; and U.S. 3,929,191.
- An object of the invention is to provide a process for recompleting an open hole well bore having zonal breakdown in the locus of the well bore so as to reconstitute isolation of a permeable zone from other permeable zones in asubterranean formation.
- Viewed from one aspect 1he invention provides a process for recompleting an open hole well bore having zonal breakdown in the region of the well bore in such a way as to reconstitute isolation of one permeable zone from other permeable zones in a subterranean formation, such process comprising:
- (a) packing off a region of the open hole which includes the permeable zone to.be isolated;
- (b) emplacing a particulate material in. said region, such material extending into a broken down zone therein;
- (c) adhering the particles of the particulate material together with an adhesive to consolidate the particles and to form a permeable synthetic rock-like solid material;
- (d) removing material from said region to form a hole of greater diameter than the original completion in such a way as to leave permeable synthetic rock-like solid material in the broken down zone whilst removing permeable material from the region between an adjacent non-permeable isolation zone and the opened out hole;
- (e) setting a smaller diameter casing over the open hole region;
- (f) injecting cement between the smaller diameter casing and said opened out hole, and
- (g) perforating to the permeable zone to be isolated so as to effect fluid communication between the well and such permeable zone.
- The process of the invention is particularly advantageous for effecting considerable savings by recompleting open hole production wells for conversion to injection wells for use in fluid drive processes.
- Thus, in a preferred process in accordance with the invention a production well having open hole completion and having been blasted by detonation of high explosives in the well bore is recompleted as an injection well for injection of C02 into the isolated permeable zone of the formation in a C02 drive process.
- Advantageously, the particulate material is coated with a thermosetting resin such as an epoxy resin or a phenolic resin which is partially cured, such material being slurried into place and allowed to set so as to form the permeable synthetic rock-like material in situ by stimulation from the heat from the formation.
- A preferred embodiment of the invention will now be described, by way of example only, with reference to the accompanying drawings, wherein:
- Figures 1 to 8 illustrate semi-schematically, a cut- away section of a bore hole penetrating a subterranean formation, wherein a shot open hole production well is converted to a cased and cemented well bore for injection into a specific permeable subterranean zone to the exclusion of other permeable subterranean zones.
- Figure 1 shows a production well that has been completed open hole into a subterranean formation and shot with high explosives at a multiplicity of points to enhance production from permeable subterranean zones.
- Figure 2 shows an embodiment of the process wherein the open hole interval has been packed off and a particulate material coated with a partially cured adherence has been placed in the packed off interval and broken down zones.
- Figure 3 illustrates the process later, wherein the particulates are adhered together to form a permeable synthetic rock-like mass in the packed off interval, with a bit in place ready to drill out the interval to the inside diameter of the cased well bore.
- Figure 4 shows the process still later, wherein drilling out of the synthetic permeable rock-like mass has been completed.
- Figure 5 shows a following later stage of the process wherein a reamer has been expanded in place so as to ream out the open bore interval to a diameter slightly larger than the original well bore.
- Figure 6 illustrates the process after reaming to the bottom of the open hole interval.
- Figure 7 illustrates the process after a smaller diameter casing has been set, at a stage near the end of the cementing procedure to cement the smaller diameter casing in place.
- Figure 8 shows the process after the well has been recompleted for injection of fluid into a selected permeable subterranean zone.
- Figures 1 through 8 illustrate stages in one presently preferred embodiment of the invention wherein a shot open hole completion production well is recompleted as a cased hole injection well for injection of fluids into a selected permeable subterranean zone. The same numbers are used in the various figures to refer to the same items.
- Thus, referring to Figure 1, a shot open hole completion production well 1, to be recompleted according to a presently preferred mode of the invention, is illustrated. The well bore has
casing 2 cemented in place bycement 3 from the surface to near the production zones. From the bottom of the cased hole completion, thewell 4 is completed open hole todepth 5 through overburden 6, first permeable zone 7, firstimpermeable zone 8, second permeable zone 9, second impermeable zone 10, third permeable zone 11, and underburden 12.Cavities - Referring to Figure 2, a
tubing string 16 having break awaysection 17 and aluminum tail section 18 has been set through packer 19. It is centralized in the uncased portion of thebore hole 4 by means of centralizingspider 20. Coarse sand coated with a partially curedphenolic resin 21 has been injected downtubing string 16 as a slurry such as to fillbore hole 14 andcavities - At the stage shown in Figure 3, the coated
coarse sand 21 has set up to a solid permeable synthetic rock-like material under the influence of heat from the subterranean formation. Tubing 16 has been disconnected from break-away section 17 leaving aluminum tail piece 18 and the centralizingspider 20 in the set up solid permeable rock-like material 21. Packer 19 has also been removed, anddrill string 22 havingcutter head 23 guidable by nose piece 24 (shown in semischematic fashion) has been emplaced. - At the stage shown in Figure 4,
drill string 22 has been employed topower cutter head 23 guided bynose piece 24 downward through the consolidated permeable rock-like mass 21 guided and centralized in the bore hole by aluminum tail piece 18 such as to remove consolidated permeable rock-like mass 21, break-away section 17, aluminum tail piece 18, and centralizingspider 20 out of the bore hole by circulation. Consolidated permeable synthetic rock-like material 21 remains in the open hole completion portion of the bore hole only incavities thin sheath 25 around thebore hole 4. - Figure 5 illustrates a later stage in the process wherein the
drill string 22 and cuttinghead 23 have been removed, and reaminghead 26 has been inserted and expanded radially below the cased portion of the well, ready to cut downward so as to remove thesheath 25 of the consolidated permeable rock-like material 21 and to cut a fresh face on the bore hole as it is powered in rotation downward. - Figure 6 shows the stage in the process wherein the
reaming head 26 has been powered and rotated downward by means ofdrill string 22 such as to cut thesheath 25 of consolidated permeable rock-like material from around the well bore, and to cut a fresh face on the bore hole particularly innon-permeable zones 8 and 10, while leaving consolidated rock-likepermeable material 21 incavities - As illustrated in Figure 7, reaming
head 26 has been contracted and removed from the well bore by means ofdrill string 22.Smaller diameter casing 27 has been lowered into the well bore and is being cemented in place by means ofcement 30 being forced down the interior of thesmaller diameter casing 27 by means ofmud column 28 and wiper plug 29 such as to fill annulus 31. Thecement 30 is then forced completely to the bottom of thecasing 27 and is allowed to set up.Mud 28 is circulated from the interior of the casing, and thewiper plug 29 can be removed if desired. It should be noted that the cement, upon setting, forms a fluid tight seal between thesmaller diameter casing 27 and the face of theformations cavities - Prior to the stage illustrated in Figure 8, perforations 32 are made from the interior of casing 27 through
casing 27 andcement sheath 31 A into the consolidated permeable rock-likematerial filling cavity 14, so as to establish fluid communication between the interior ofcasing 27 and permeable rock-like material 21 incavity 14 within permeable subterranean formation 9, the fluid being isolated from permeable formations 7 and 11 by means ofimpermeable formations 8 and 10 and impermeable sheath 31. - As shown in Figure 8,
tubing string 33 is set withincasing 27, includingpacker 34 formingannulus 35. Fluid communication is thus effected selectively with permeable subterranean zone 9; from the surface downtubing string 33 and through perforations 32 and permeable rock-like material incavity 14. Fluid communication with permeable zones 7 and 11 is excluded byimpermeable zones 8 and 10 and impermeable cement sheath 31. - The blasted former open hole completion production well is thus converted to a cased injection well having fluid communication only with the desired permeable subterranean zone.
- A presently preferred embodiment of the invention has been particularly described in the preceding section in connection with the detailed description of the drawings. Other presently preferred modes are hereinafter described and further elaboration is provided.
- In a basic embodiment, the process relates to establishment of fluid communication between a cased and cemented well bore and a permeable zone. The communication is isolated from other subterranean permeable zones by reconstituting isolation of the permeable zone of interest from other per meable zones by restoring the impermeability of zones there-between near a well bore.
- The foregoing is effected by packing off the open hole interval including the permeable zone to be isolated and including an impermeable subterranean zone separating the permeable zone to be isolated from other permeable subterranean zones. Conventional oil field packers of various types can be employed. Packing procedures and equipment are well known in the oil industry and in the oil field service industry.
- Thereupon, a particulate material is placed in the packed off interval and broken down zone; and the particulates of the particulate material are adhered together with an adhesive to consolidate the particulates and to form a permeable synthetic rock like material. In accordance with one presently preferred mode, the particulates are coated with a solid, fusible resin which is partially cured. The resin can be a phenolic resin or a partially cured epoxy resin. U.S. 3,929,191 discloses one suitable method. In accordance with another mode, the particulates are placed at the desired sit, and the adhesive, such as a phenolic resin or an epoxy resin (or precursors thereof) is emplaced within the particulate material mass by injecting a slug of the adhesive or precursors followed by a pusher slug. Such methods are also well known to the industry, and are commerically available. By whichever mode that is used, the particles are adhered together to form a permeable synthetic rock-like mass in the packed off interval and extending into broken down zones to reconstitute permeable subterranean zones.
- Thereupon, the synthetic permeable rock-like mass is drilled and/or reamed out to a greater diameter than the original completion so as to leave the permeable synthetic rock-like material in the broken down permeable zone, thus reconstituting the permeable zone, but not adjacent to a nonpermeable isolation zone adjacent to the permeable zone to be isolated. Usually, a number of permeable zones will exist in subterranean formations which are separated by nonpermeable zones in the formations. This is often true for production wells after primary production from formations having relatively thin production zones wherein open hole completion and blasting with high explosives has been employed to maximize recovery rates. Of course, a plurality or multiplicity of permeable and nonpermeable zones separated by a plurality or multiplicity of nonpermeable zones may be present, and often is, depending upon the particular reservoir to be operated upon.
- One preferred method of drilling and reaming out the open hole interval involves using an aluminum tail pipe to emplace the particulates prior to setting up to form the permeable synthetic rock-like material, shearing the tubing string so as to leave the aluminum tail pipe in place in the set permeable material, and then employing a drill with a guiding nose piece so as to center the drill and reaming operation so as to more precisely remove the set permeable material, with centering on the original bore hole. Such drilling and/or reaming techniques are well known to those skilled in the art, and are well known in the petroleum and oil service industries.
- The tail pipe, spider, and other elements can be fabricated of aluminum or other metal that is readily attacked by acid or the like so that they can be removed by an acid treatment or the like.
- After the drilling and/or reaming operation described hereinabove is completed, a casing is set over the open hole interval. The casing is then cemented in place. Ordinary casing setting and cementing procedures, which are well known and practiced in the oil and oil service industries, are employed. Often, the casing is set in place, and cement is forced down the casing and up the annulus by means of a wiper plug and mud. The mud is then circulated out of the well bore within the casing after setting of the cement by means of a tubing string or the like. Such techniques are also ordinary oil field operating procedure well known in the petroleum and well service industries.
- Thereupon, perforations are formed in the casing and setup cement sheath by means of a conventional perforating technique, for example, with a conventional perforating gun, by means of a high temperature jet, or by means of a high pressure jet of abrasive. Such techniques are also widely practiced and are well known.
- Of course, a plurality of multiplicity of such perforating can be effected to open a plurality or multiplicity of zones if desired.
- Upon perforation to establish fluid communication between the target permeable zone or zones and the well bore, the open well bore has been recompleted to a closed well bore, and is suitable for precise injection of a fluid into the desired subterranean horizon. A presently preferred application of the process is for recompletion of production wells to injection wells in a C02 injection enhanced oil recovery project. The C02 is injected into primarily depleted, but substantial hydrocarbon or oil-containing formations to mobilize the oil and move the oil to production wells for production to the surface and utilization.
- The term particulates is used herein. This can include any solid material having sufficient structural and chemical integrity to form the permeable consolidated synthetic rock-like material that is not deteriorated by the reservoir environment. Ordinarily, materials such as course sand, pea gravel, and other graded small gravel of quartz or other rock derived materials are employed because of abundance and low cost. It is also within the scope of the invention to employ other particulates that have resistance to adverse conditions, such as carbon particles, alumina particles, glass beads, ceramic particles, and the like. Other thermosetting resins besides epoxy resins and phenolic resins can also be employed, and inorganic adhesives or cements can also be employed so long as sufficient consolidation of the particulates is effected in the broken down zone in the reservoir to prevent production back into the well bore during operations and so long as the adhesives have resistance to deterioration in the reservoir.
Claims (5)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US06/669,418 US4589490A (en) | 1984-11-08 | 1984-11-08 | Well bore recompletion |
EP86303167A EP0242472B1 (en) | 1986-04-25 | 1986-04-25 | Wel bore recompletion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP86303167A EP0242472B1 (en) | 1986-04-25 | 1986-04-25 | Wel bore recompletion |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0242472A1 EP0242472A1 (en) | 1987-10-28 |
EP0242472B1 true EP0242472B1 (en) | 1989-12-20 |
Family
ID=8195987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP86303167A Expired EP0242472B1 (en) | 1984-11-08 | 1986-04-25 | Wel bore recompletion |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP0242472B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2668794B1 (en) * | 1990-11-02 | 1993-01-08 | Inst Francais Du Petrole | METHOD AND DEVICE FOR CONSOLIDATING A FORMATION CROSSED BY A DEVIED WELL. |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2288556A (en) * | 1939-06-28 | 1942-06-30 | Gulf Research Development Co | Method of and composition for producing permeable packs in wells |
US3542132A (en) * | 1969-04-21 | 1970-11-24 | Gulf Research Development Co | Method of squeeze cementing a well |
US3559736A (en) * | 1969-09-12 | 1971-02-02 | Exxon Production Research Co | Well completion method |
US3708013A (en) * | 1971-05-03 | 1973-01-02 | Mobil Oil Corp | Method and apparatus for obtaining an improved gravel pack |
US3709298A (en) * | 1971-05-20 | 1973-01-09 | Shell Oil Co | Sand pack-aided formation sand consolidation |
US3929191A (en) * | 1974-08-15 | 1975-12-30 | Exxon Production Research Co | Method for treating subterranean formations |
-
1986
- 1986-04-25 EP EP86303167A patent/EP0242472B1/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
EP0242472A1 (en) | 1987-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4589490A (en) | Well bore recompletion | |
EP0426427B1 (en) | Well completion method | |
US5375661A (en) | Well completion method | |
AU2005224422B2 (en) | Methods of isolating hydrajet stimulated zones | |
US6761218B2 (en) | Methods and apparatus for improving performance of gravel packing systems | |
RU2395667C1 (en) | Method of borehole conditioning with collection of productive intervals | |
US4917188A (en) | Method for setting well casing using a resin coated particulate | |
US20030106689A1 (en) | Method of frac packing through existing gravel packed screens | |
WO1992008035A1 (en) | Method for controlling solids accompanying hydrocarbon production | |
EP1217166B1 (en) | Method and apparatus for drilling and completing a well | |
CA2859384C (en) | Method of fracturing while drilling | |
US7712532B2 (en) | Energized fluids and pressure manipulation for subsurface applications | |
US11047196B2 (en) | Production tubing conversion device and methods of use | |
US3674089A (en) | Method for stimulating hydrocarbon-bearing formations | |
EP2659090B1 (en) | Methods for drilling and stimulating subterranean formations for recovering hydrocarbon and natural gas resources | |
US3743021A (en) | Method for cleaning well perforations | |
EP0242472B1 (en) | Wel bore recompletion | |
CA2884170C (en) | Valve, system and method for completion, stimulation and subsequent re-stimulation of wells for hydrocarbon production | |
CA1246991A (en) | Well bore recompletion | |
US3302718A (en) | Consolidation through lateral channels | |
MXPA03011352A (en) | Downhole systems and methods for removing particulate matter from produced fluids. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): GB NL |
|
17P | Request for examination filed |
Effective date: 19871217 |
|
17Q | First examination report despatched |
Effective date: 19890425 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): GB NL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19920323 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19920430 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19930425 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19931101 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19930425 |