EP0164936B2 - Brückenkonstruktion - Google Patents

Brückenkonstruktion Download PDF

Info

Publication number
EP0164936B2
EP0164936B2 EP19850303530 EP85303530A EP0164936B2 EP 0164936 B2 EP0164936 B2 EP 0164936B2 EP 19850303530 EP19850303530 EP 19850303530 EP 85303530 A EP85303530 A EP 85303530A EP 0164936 B2 EP0164936 B2 EP 0164936B2
Authority
EP
European Patent Office
Prior art keywords
bridge
trestle
launching
rollers
launching rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP19850303530
Other languages
English (en)
French (fr)
Other versions
EP0164936A3 (en
EP0164936B1 (de
EP0164936A2 (de
Inventor
Thomas Stuart Parramore
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WFEL Ltd
Original Assignee
Williams Fairey Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=10562406&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP0164936(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Williams Fairey Engineering Ltd filed Critical Williams Fairey Engineering Ltd
Publication of EP0164936A2 publication Critical patent/EP0164936A2/de
Publication of EP0164936A3 publication Critical patent/EP0164936A3/en
Publication of EP0164936B1 publication Critical patent/EP0164936B1/de
Application granted granted Critical
Publication of EP0164936B2 publication Critical patent/EP0164936B2/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/124Folding or telescopic bridges; Bridges built up from folding or telescopic sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/005Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges

Definitions

  • This invention relates to a trestle for use in constructing a modular bridge assembly.
  • EP-A-0081388 discloses a modular bridge comprising at least one intermediate bridge module and two end bridge modules, each of the bridge modules comprising two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable from an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use to a closed position in which the main girder structures are folded beneath the deck, the main girder structures of the end bridge modules being longitudinally tapered in depth when seen from a side of the module in its operative position, the main girder structures of the intermediate module(s) not being so tapered, wherein each of the end bridge modules and the intermediate bridge module(s), are connected to form a bridge.
  • EP-A-0081388 discloses the construction of such bridge by putting up a building frame, having upwardly facing rollers, on the first bank of the span to be crossed.
  • a preliminary beam is assembled on the frame and pushed outwards towards the bank.
  • the bridge assembly is assembled progressively on the frame, behind the preliminary beam, with the beam being attached to the leading module.
  • the preliminary beam has at its outer end a jacking unit with support rollers so that, when the jacking unit reaches the far bank of the span, it may rest on it and allow the assembly of beam and bridge to roll across the span, the bridge assembly is then lowered onto the bank and the beam withdrawn back through the bridge assembly. This procedure is illustrated in Figures 23A to 23F of EP-A-0081388.
  • EP-A-0075671 discloses a demountable non-opening bridge comprising discrete channel-section modules and an H-section launching girder, wherein modules comprise a central part and two wing parts, the wing parts comprise box-section track girders, the two wing parts are downwardly hinging below the central part for transportation, in the laying of the bridge the launching girders are assembled and made first, whereafter the various modules are coupled together and pushed over the launching girder and the launching girder remains in the bridge as a bearing element.
  • EP-A-0075671 discloses the construction of such a bridge by the joint use of a laying vehicle having a cantilever arm and a four-tonne crane.
  • the laying vehicle moves to the bank of the span to be crossed with a launching girder ramp (or end) member already in position on guide rollers of the cantilever arm.
  • the cantilever arm comprises a pinion to advance the ramp member over the span by means of a co-operating rack.
  • the crane delivers launching girder inner sections which are coupled up and advanced. Once the launching girder has reached the required length, a second launching girder ramp (end) member is coupled up.
  • the cantilever arm of the laying vehicle is lowered so that the launching girder is then supported by its own hydraulically deployable feet.
  • a ramp (end) bridge module is now lifted by the crane onto the launching girder.
  • Inner (intermediate) bridge modules are coupled up and drawn over the launching girder by means of a block and tackle and reversing roller.
  • the final module is a further ramp (end) module.
  • the hydraulic feet are then retracted.
  • EP-A-0075671 also discloses the use of a single layer vehicle combining the capabilities of the laying vehicle and crane described above. It is equipped both with a cantilever arm and with a four-tonne crane.
  • CH-A-495468 discloses another method of constructing a modular bridge across a span.
  • a crane or a specialised vehicle is required to lay the bridge, and to provide a counter-balancing weight on the dome bank side of the launching trestle, to prevent the bridge and launching nose from toppling over as the launching proceeds.
  • the present invention enables the construction of a modular bridge across a span without the requirement for specialist vehicles. Furthermore, it is desirable for bridges of this type to be capable of being built quickly, even at night, by few men.
  • the trestle preferably has one or more rollers for supporting the launching rail, the rollers desirably being drivable to move the launching rail over the beam of the first trestle.
  • the trestle also preferably comprises one or more rollers for supporting the bridge modules.
  • the launching rail is preferably of inverted-T shaped configuration. This configuration allows the effective use of lateral guide means, for the launching rail, to be positioned on the trestle.
  • the lateral guide means for the launching rail may comprise retractable pinch wheels. Because of the use of a trestle it is a simple matter also to provide lateral guide means for the bridge modules, which may comprise one or more vertically mounted guide rollers.
  • the trestle may comprise means for selectively restraining the launching rail during construction: the selective restraining means desirably comprise retractable hooks.
  • a second trestle may be placed on the home bank to take a proportion of the load of the modules.
  • the second trestle will desirably be of similar construction to the first trestle, except that it is not necessary for it to be provided with retaining means such as hooks or means for moving the rail over the beam, such as powered rollers.
  • Each bridge module is preferably substantially described in EP-A-0081388 in that it comprises two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable between an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use and a closed position in which the main girder structures are folded beneath the deck.
  • a bridge formed of such modules will normally comprise two end modules, in each of which the main girder structures are longitudinally tapered in depth when seen from the side of the module and at least one intermediate module in which the main girder structures are not so tapered.
  • FIGs 1A to 1E given an overall view of a bridge 131 after construction, suitable for use with the trestles of the present invention.
  • the bridge comprises three intermediate bridge modules 31 and two end bridge modules 75. These can clearly be seen in the side and plan views of Figures 1A and 1B. Underneath the deck of the bridge 131 can be seen (in dotted lines in Figure 1B) a launching rail 133, which is itself formed of intermediate modules 1 and end modules 13. A bracing frame 115 can be seen in position in Figure 1D.
  • FIGs 1A and 1B show how the bridge 131 would be configured when spanning a gap between substantially level banks. Both bridge and modules are fully articulated. On the other hand, in Figure 1E, the end module 75 is not articulated. This reduces the ramp slope at the end of the bridge and renders it more suitable for use on a sloping bank.
  • FIG. 2 shows a trestle 135 comprising a first embodiment of the present invention.
  • the trestle 135 comprises a pair of upright guide posts 137 and 139 of rectangular section, between which is movably and lockably mounted a support beam 141.
  • the support beam 141 is constructed of two support beam members 143 and 145, interconnected by a number of spacers 147.
  • Each guide post 137 or 139 is mounted on a respective base plate 153 or 155. Sloping tie rods or braces 150 and 152 are pivotally attached at their upper ends each to a respective one of the guide posts 137 and 139 and at their lower ends each to a respective one of the base plates 153 and 155. The length of each of the tie rods 150 and 152 can be adjusted in a similar fashion to a turnbuckle, as will be described later, with reference to Figure 3.
  • the support beam 141 moves and is locked with respect to the guide posts 137 and 139 by means of hydraulic piston and cylinder arrangements 159 and 161, one associated with each guide post. Hydraulic fluid for the piston and cylinder arrangements 159 and 161 are supplied from a trestle hydraulic power pack supply (not shown).
  • rollers 163 and 165 are launching rail support rollers powered by the trestle hydraulic power pack supply. They are flanged and have a surface with a high coefficient of friction so that they can drive the launching rail 133 shown in discontinuous lines in Figure 2 in the direction of the arrow 167, which is the direction of launching the launching rail 133, and eventually, the bridge 131.
  • the launching rail support rollers 163 and 165 are centrally disposed along the support beam 141.
  • each of the launching rail support rollers 163 and 165 is a respective retractable pinch wheel 167 or 169 mounted, like the launching rail support rollers, for rotation about a horizontal axis.
  • the rotatable pinch wheels 167 and 169 bear upon the upper surfaces of flanges on each of the launching rail modules.
  • the pinch wheels 167 and 169 can be retracted by hydraulic piston and cylinder arrangements 171 and 173, respectively.
  • Either side of the launching rail support rollers is a pair of bridge support rollers 175 and 177. They are again mounted for horizontal rotation. The pairs of bridge support rollers 175 and 177 support the lower surfaces of the main girder structures of the bridge 131, but are not powered. They are therefore passive, low-friction supports. Lateral guide rollers 179, mounted for vertical non-powered rotation, are position one either side of the path of the main girder structures of the bridge 131 during launching.
  • Two hydraulically retractable launching rail hooks 181 are mounted on the support beam 141 and extend in a downstream direction (as far as the direction of launch is concerned). They terminate in upwardly curved hooked portions. The hooks can pivot about horizontal axes to bring them out of and into engagement with protrusions of a tapered end module of the launching rail 133.
  • a second trestle 183 is shown in Figure 3. Two of these second trestles 183 are used in the preferred method of construction.
  • the second trestle 183 is broadly similar to the first trestle 135 except that (a) the second trestle 183 does not have to be of such heavy construction as the first trestle 135 because, in use, it does not have to withstand such heavy loading, and (b) the only interaction between the second trestle 183 and the launching girder 133 is such that the launching girder 133 is supported by non-powered rollers.
  • the second trestle 183 comprises a pair of vertical guide posts 185 and 187 which movably and lockably support a support beam 189 composed of two parallel girders 191 and 193 between which extend spacing members 195.
  • Each of the guide posts 185 and 187 terminates at its lower end on a respective base plate 201, 203.
  • a flanged roller 207 or 209 Either side of the centre of the length of the support beam 189 is a flanged roller 207 or 209, both of which act as launching rail support rollers.
  • Pairs of bridge support rollers 211 and 213 are provided, as for the first trestle, as are lateral guide rollers 215, which are rotatable about a vertical axis and which limit lateral movement of the bridge modules 131 during construction of the bridge.
  • the vertical movement of the support beam 189 towards and away from the ground is provided by a pair of hydraulic piston and cylinder arrangements 217 and 219, each mounted on a respective guide post 185 or 187.
  • Sloping tie rods or braces 198 and 200 pivotally attached at their upper ends each to a respective one of the guide posts 185 and 187 and at their lower ends each to a respective one of the baseplates 201 and 203.
  • the length of each of the tie rods 198 and 200 can be adjusted in a similar fashion to a turnbuckle. This is achieved, as illustrated by way of example for the tie rod 198, by each tie rod (198 in this case) comprising an upper tie rod end 198A and a lower tie rod end 198B, which are formed at the ends that are not pivotally attached to the guide post 185 or the base plate 201 with left and right hand screw threads, respectively.
  • the threaded ends of the upper and lower tie rod ends 198A and 198B both engage female-threaded ends of a central tube 198C, which carries a handwheel 198D.
  • the central tube 198C lies along the central axis of the handwheel 198D.
  • levelling mens which comprises a tie rod of adjustable length extending between and pivotally attached to a guide post and a base plate
  • a levelling mens which comprises a tie rod of adjustable length extending between and pivotally attached to a guide post and a base plate
  • the support beam 189 can be lowered further than is the case in other types of trestle. This is significant when jacking down the home bank end of the bridge, because the minimum height to which the roller beam can be lowered determines the amount of upward articulation required on the tapered end ramps of the bridge in order to lower the launching rail to the ground. The articulation provided on the bridge end ramp can therefore be significantly reduced by using this trestle.
  • a bridge by the preferred method it is particularly appropriate to use two hydraulic power packs.
  • One would be positioned on the bridge under construction and would be used for articulating the bridge end modules by means of the piston and cylinder arrangements.
  • the other power pack would be located on the home bank and would be for raising and lowering the support beams 141 and 189 of the first and second trestles 135 and 183 and also for powering the friction drive rollers 163 and 165 of the first trestle, for moving the retractable pinch wheels 167 and 169 into and out of position and for moving the launching rail hooks 181 into and out of position.
  • Each portable hydraulic power pack can be powered by an air-cooled diesel engine of about 7.5 kiloWatts (10 horsepower) driving a variable displacement pump working at a pressure of 20.6 MN/m2 (300 psi).
  • the engine would be provided with hand or inertia start to obviate the need for batteries.
  • Spare power units could be provided as a precaution against breakdown.
  • an emergency hand pump could be provided to enable the bridge to be jacked down in the event of power failure. Recovery, however, would hardly be feasible with a manual pump, due to the height to which the bridge has to be jacked.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Claims (5)

  1. Stützbock zum Zusammenbau eines aus Elementen zusammengesetzten Brückenbausatzes, der eine Brücke und eine Vorschubstange aufweist, wobei der Stützbock einen Stützbalken (141), der an einem oder mehreren, jeweils auf einer Grundplatte montierten Führungspfeilern (137,139) befestigt ist, eine Stützvorrichtung (163,165) zum Abstützen einer Brückenvorschubstange auf dem Stützbalken (141), so daß sich die Vorschubstange über dem Balken bewegen kann, und eine Stützvorrichtung (175,177) zum Abstützen eines Brückenelements, so daß sich das Brückenelement über den den Stützbalken bewegen kann, aufweist, und wobei der Stützbalken (141) an dem oder den Führungspfeilern (137,139) feststellbar ist und in Richtung auf die Unterlage, auf die der Stützbock gesetzt ist, und in die dazu entgegengesetzte Richtung bewegt werden kann, gekennzeichnet durch eine einstellbare Zugstange (150,198), die sich zwischen einem Führungspfeiler und einer jeweiligen Grundplatte erstreckt und an ihnen schwenkbar befestigt ist, zur Bewirkung einer Einstellung des Winkels zwischen dem oder den Führungspfeilern (137,139) und der Unterlage.
  2. Stützbock nach Anspruch 1, gekennzeichnet durch mindestens zwei Führungspfeiler (137,139) zur Halterung des Stützbalkens (141).
  3. Stützbock nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Stützvorrichtung zum Abstützen der Brückenvorschubstange eine oder mehrere Antriebsrollen (163,165) aufweist.
  4. Stützbock nach Anspruch 1,2 oder 3, dadurch gekennzeichnet, daß die Stützvorrichtung zum Abstützen des Brückenelements eine oder mehrere Rollen (175,177) aufweist.
  5. Stützbock nach einem der vorhergehenden Ansprüche, gekennzeichnet durch zurückschiebbare Klemmrollen (167,169) zur Führung der Vorschubstange.
EP19850303530 1984-06-14 1985-05-20 Brückenkonstruktion Expired - Lifetime EP0164936B2 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8415136 1984-06-14
GB8415136 1984-06-14

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP90201084.2 Division-Into 1990-05-01

Publications (4)

Publication Number Publication Date
EP0164936A2 EP0164936A2 (de) 1985-12-18
EP0164936A3 EP0164936A3 (en) 1987-01-28
EP0164936B1 EP0164936B1 (de) 1992-04-15
EP0164936B2 true EP0164936B2 (de) 1995-08-09

Family

ID=10562406

Family Applications (2)

Application Number Title Priority Date Filing Date
EP19850303530 Expired - Lifetime EP0164936B2 (de) 1984-06-14 1985-05-20 Brückenkonstruktion
EP90201084A Withdrawn EP0392641A1 (de) 1984-06-14 1985-05-20 Brückenkonstruktion

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP90201084A Withdrawn EP0392641A1 (de) 1984-06-14 1985-05-20 Brückenkonstruktion

Country Status (2)

Country Link
EP (2) EP0164936B2 (de)
DE (1) DE3585848D1 (de)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IL79874A0 (en) * 1986-08-28 1986-11-30 Israel State Rapid deployment stationary bridge
FR2619134B1 (fr) * 1987-08-04 1990-11-23 Mediterranee Const Ind Pont modulaire a mise en oeuvre rapide
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US6895623B2 (en) 2003-09-09 2005-05-24 James D. Zimmerlee Pier system and method of construction
CN103215889B (zh) * 2013-04-24 2015-12-02 中铁工程设计咨询集团有限公司 一种用于较差地质条件的拱桥基础及其施工方法
KR101630312B1 (ko) * 2015-11-17 2016-06-24 한국도로공사 교량복구용 거더를 이용한 긴급교량복구방법
CN112411348A (zh) * 2020-11-27 2021-02-26 上海金鹿建设(集团)有限公司 一种施工栈桥

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1246008B (de) * 1965-04-09 1967-08-03 Beteiligungs & Patentverw Gmbh Haupttraeger fuer zerlegbare Bruecken
CH495468A (de) * 1969-11-21 1970-08-31 Ferriere Cattaneo Sa Notbrücke
DE2641807C2 (de) * 1976-09-17 1986-08-14 Iveco Magirus AG, 7900 Ulm Fahrzeug zum Transport und Verlegen von Brückenteilen
DE3138853C2 (de) * 1981-09-30 1984-12-20 Dornier System Gmbh, 7990 Friedrichshafen Zerlegbare Brücke
DE3275210D1 (en) * 1981-10-05 1987-02-26 Secr Defence Brit Bridge module for use in a crane assisted method of building a transportable girder bridge
US4521932A (en) * 1981-12-08 1985-06-11 Fairey Engineering Limited Transportable bridge structure

Also Published As

Publication number Publication date
EP0164936A3 (en) 1987-01-28
EP0164936B1 (de) 1992-04-15
EP0392641A1 (de) 1990-10-17
EP0164936A2 (de) 1985-12-18
DE3585848D1 (en) 1992-05-21

Similar Documents

Publication Publication Date Title
US4920595A (en) Solid bridge kit
US5511268A (en) Construction of large structures by robotic crane placement of modular bridge sections
US8763185B2 (en) Temporary bridge
US5549176A (en) Bridge construction machinery and method for constructing bridges
CA2391170A1 (en) Methods and apparatus for forming concrete structures
WO1996005375A9 (en) Construction of large structures by robotic crane placement of modular bridge sections
US3021544A (en) Self propelling sectional floating bridge
EP0796373B1 (de) Brückenbauherstellungssystem in kontinuierlicher bauweise
US20140026335A1 (en) System and method for bridge replacement
EP0164936B2 (de) Brückenkonstruktion
US5940916A (en) Bridge span-by-span construction apparatus and method
ZA200600955B (en) Modular metal bridge and method for production thereof
US4873738A (en) Apparatus for stripping concrete forms from bridge structures
US4665577A (en) Methods of constructing modular bridges
US4663793A (en) Methods of deploying a bridge of a particular construction
US5107561A (en) Bridge laying device
US3863771A (en) Gantry cranes
US4062081A (en) Transportable bridge and method
EP0165712B1 (de) Brückenkonstruktion
EP1762657B1 (de) Mobiles militärisches Brückensystem
DE3247326A1 (de) Verfahren und lehrgeruest zur herstellung von stahlbetonbruecken
EP0541619B1 (de) Brückenbausystem
DE3836568C2 (de) Lehrgerüst für Stahlbetonbrücken für universellen Einsatz als stationäres und Verschiebegerüst
CN217325012U (zh) 可用于大跨度钢箱梁施工的支墩支架
RU2385980C1 (ru) Мостовой механизированный комплекс

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): DE FR GB

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): DE FR GB

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WILLIAMS FAIREY ENGINEERING LTD.

17P Request for examination filed

Effective date: 19870708

17Q First examination report despatched

Effective date: 19880603

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WILLIAMS FAIREY ENGINEERING LTD

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB

XX Miscellaneous (additional remarks)

Free format text: TEILANMELDUNG 90201084.2 EINGEREICHT AM 20/05/85.

REF Corresponds to:

Ref document number: 3585848

Country of ref document: DE

Date of ref document: 19920521

ET Fr: translation filed
PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: KRUPP INDUSTRIETECHNIK GMBH, PATENTABTEILUNG

Effective date: 19930114

PUAH Patent maintained in amended form

Free format text: ORIGINAL CODE: 0009272

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT MAINTAINED AS AMENDED

27A Patent maintained in amended form

Effective date: 19950809

AK Designated contracting states

Kind code of ref document: B2

Designated state(s): DE FR GB

ET3 Fr: translation filed ** decision concerning opposition
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20040510

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20040519

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040527

Year of fee payment: 20

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20050519

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20