EA201390784A1 - Способ уменьшения времени моделирования природного резервуара углеводородов - Google Patents
Способ уменьшения времени моделирования природного резервуара углеводородовInfo
- Publication number
- EA201390784A1 EA201390784A1 EA201390784A EA201390784A EA201390784A1 EA 201390784 A1 EA201390784 A1 EA 201390784A1 EA 201390784 A EA201390784 A EA 201390784A EA 201390784 A EA201390784 A EA 201390784A EA 201390784 A1 EA201390784 A1 EA 201390784A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- reducing
- modeling
- hydrocarbons
- time
- natural
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/22—Fuzzy logic, artificial intelligence, neural networks or the like
Abstract
Система и способ уменьшения времени моделирования природного резервуара углеводородов с использованием заменяющей модели (англ. proxy model), основанной на нейронной сети.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2010/058441 WO2012074516A1 (en) | 2010-11-30 | 2010-11-30 | Systems and methods for reducing reservoir simulator model run time |
Publications (1)
Publication Number | Publication Date |
---|---|
EA201390784A1 true EA201390784A1 (ru) | 2013-12-30 |
Family
ID=46172191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201390784A EA201390784A1 (ru) | 2010-11-30 | 2010-11-30 | Способ уменьшения времени моделирования природного резервуара углеводородов |
Country Status (9)
Country | Link |
---|---|
US (1) | US10409616B2 (ru) |
EP (1) | EP2646927A4 (ru) |
CN (1) | CN103329116A (ru) |
AU (1) | AU2010364957B2 (ru) |
BR (1) | BR112013013422A2 (ru) |
CA (1) | CA2819334A1 (ru) |
EA (1) | EA201390784A1 (ru) |
MX (1) | MX2013006155A (ru) |
WO (1) | WO2012074516A1 (ru) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR112012025995A2 (pt) | 2010-04-30 | 2016-06-28 | Exxonmobil Upstream Res Co | método e sistema para simulação de fluxo de volume finito |
WO2012015521A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
EP2599029A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION |
US9058446B2 (en) | 2010-09-20 | 2015-06-16 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
US8994549B2 (en) * | 2011-01-28 | 2015-03-31 | Schlumberger Technology Corporation | System and method of facilitating oilfield operations utilizing auditory information |
EP2756382A4 (en) | 2011-09-15 | 2015-07-29 | Exxonmobil Upstream Res Co | MATRIX AND VECTOR OPERATIONS OPTIMIZED IN LIMITED INSTRUCTION ALGORITHMS THAT COMPLETE EOS CALCULATIONS |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
CA2909170C (en) | 2013-06-10 | 2020-02-18 | Exxonmobil Upstream Research Company | Determining well parameters for optimization of well performance |
WO2016004137A1 (en) * | 2014-06-30 | 2016-01-07 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
AU2015298233B2 (en) | 2014-07-30 | 2018-02-22 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
EP3213126A1 (en) | 2014-10-31 | 2017-09-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
WO2016115004A1 (en) * | 2015-01-12 | 2016-07-21 | Schlumberger Canada Limited | Automatic timestep adjustment for reservoir simulation |
US20160370772A1 (en) * | 2015-06-22 | 2016-12-22 | Invensys Systems, Inc. | Process optimization using mixed integer nonlinear programming |
CA3043231C (en) | 2016-12-23 | 2022-06-14 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US20210019189A1 (en) * | 2018-04-18 | 2021-01-21 | Landmark Graphics Corporation | Methods and systems to determine and optimize reservoir simulator performance in a cloud computing environment |
US20210131260A1 (en) * | 2019-10-31 | 2021-05-06 | Landmark Graphics Corporation | Model parameter reductions and model parameter selection to optimize execution time of reservoir management workflows |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
US8352226B2 (en) * | 2006-01-31 | 2013-01-08 | Landmark Graphics Corporation | Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator |
CN101379498B (zh) * | 2006-01-31 | 2012-05-30 | 兰德马克绘图公司 | 使用物理和代理仿真器的用于快速更新油气田生产模型的方法和系统 |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US7716029B2 (en) | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
WO2008083004A2 (en) | 2006-12-28 | 2008-07-10 | Chevron U.S.A. Inc. | History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions |
CA2738637A1 (en) * | 2008-09-26 | 2010-04-01 | Ciris Energy, Inc. | Method for evaluation, design and optimization of in-situ bioconversion processes |
US8280709B2 (en) * | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
-
2010
- 2010-11-30 WO PCT/US2010/058441 patent/WO2012074516A1/en active Application Filing
- 2010-11-30 BR BR112013013422A patent/BR112013013422A2/pt not_active IP Right Cessation
- 2010-11-30 EP EP10860155.0A patent/EP2646927A4/en not_active Withdrawn
- 2010-11-30 MX MX2013006155A patent/MX2013006155A/es active IP Right Grant
- 2010-11-30 CN CN201080070418XA patent/CN103329116A/zh active Pending
- 2010-11-30 US US13/990,753 patent/US10409616B2/en active Active
- 2010-11-30 CA CA2819334A patent/CA2819334A1/en not_active Abandoned
- 2010-11-30 AU AU2010364957A patent/AU2010364957B2/en not_active Ceased
- 2010-11-30 EA EA201390784A patent/EA201390784A1/ru unknown
Also Published As
Publication number | Publication date |
---|---|
EP2646927A1 (en) | 2013-10-09 |
MX2013006155A (es) | 2014-10-24 |
US20130338985A1 (en) | 2013-12-19 |
CA2819334A1 (en) | 2012-06-07 |
AU2010364957B2 (en) | 2015-04-23 |
WO2012074516A1 (en) | 2012-06-07 |
US10409616B2 (en) | 2019-09-10 |
BR112013013422A2 (pt) | 2016-10-11 |
CN103329116A (zh) | 2013-09-25 |
EP2646927A4 (en) | 2016-06-15 |
AU2010364957A1 (en) | 2013-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201390784A1 (ru) | Способ уменьшения времени моделирования природного резервуара углеводородов | |
MY170916A (en) | Method for production of hydrocarbons using caverns | |
EA201270432A1 (ru) | Компьютерно-реализуемые системы и способы регулирования выноса песка в геомеханической системе пластового резервуара | |
EA201391111A1 (ru) | Система и способ для использования искусственной нейронной сети для моделирования гидравлики трубопроводов в имитаторе пластов | |
BRPI0923807A2 (pt) | Método para produzir hidrocarbonetos a partir de um reservatório subterrâneo, e, sistema para produzir gás natural a partir de um reservatório subterrâneo | |
WO2011091368A3 (en) | System and method for performing an adaptive drilling operation | |
EP2838036A3 (en) | System and method for incrementally replicating investigative analysis data | |
MX352126B (es) | Sistema de telemetria para un sistema de sincronizacion de nube. | |
MX2012003380A (es) | Sistemas y metodos para la estimacion cuantitativa de incertidumbre de pronostico de produccion. | |
EA201390853A1 (ru) | Система и способ декомпозиции двухмерной области при параллельном моделировании природного резервуара углеводородов | |
IN2015DN02657A (ru) | ||
WO2013019879A3 (en) | Asset model import connector | |
MX338923B (es) | Sistemas y metodos para desarrollar dinamicamente planos de pozo de perforacion con un simulador de deposito. | |
MX341271B (es) | Metodos y sistemas de modelado de flujo de hidrocarburos a partir de querogenos en una formacion que tiene hidrocarburos. | |
MX2013007804A (es) | Sistema y metodo para mejora de datos. | |
GB201217271D0 (en) | Traffic sensor management | |
WO2014160464A3 (en) | A computer-implemented method, a device, and a computer-readable medium for data-driven modeling of oil, gas, and water | |
BR112013000890A2 (pt) | método para reduzir a quantidade de sulfeto de hidrogênio em um fluido de hidrocarboneto | |
EA201390084A1 (ru) | Системы и способы создания поверхности в пространстве разлома | |
BRPI0911801A2 (pt) | método para regular escoamento em um poço de hidrocarbonetos. | |
TW200943087A (en) | Methods and systems for generating a media program | |
EA201391309A1 (ru) | Системы и способы мониторинга эксплуатационных данных для многочисленных скважин в реальном времени | |
EA201391035A1 (ru) | Способ и система для обновления геоячеечной модели | |
WO2014004615A3 (en) | System and method for hosting and sharing a live event | |
BRPI0922409A2 (pt) | métodos para modelar um reservatório de hidrocarbonetos, e para extrair hidrocarbonetos de um reservatório de hidrocarbonetos, e, produtos de programa de computador |