EA201070362A1 - METHOD OF USING PRESSURE CHARACTERISTICS FOR PREDICTING ANOMALIES OF SUPPLY WELLS - Google Patents
METHOD OF USING PRESSURE CHARACTERISTICS FOR PREDICTING ANOMALIES OF SUPPLY WELLSInfo
- Publication number
- EA201070362A1 EA201070362A1 EA201070362A EA201070362A EA201070362A1 EA 201070362 A1 EA201070362 A1 EA 201070362A1 EA 201070362 A EA201070362 A EA 201070362A EA 201070362 A EA201070362 A EA 201070362A EA 201070362 A1 EA201070362 A1 EA 201070362A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- hydraulic fracturing
- period
- flow
- pressure characteristics
- time
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000000243 solution Substances 0.000 abstract 3
- 238000005520 cutting process Methods 0.000 abstract 2
- 238000002347 injection Methods 0.000 abstract 2
- 239000007924 injection Substances 0.000 abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
- E21B21/065—Separating solids from drilling fluids
- E21B21/066—Separating solids from drilling fluids with further treatment of the solids, e.g. for disposal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Создан способ разработки ответной реакции на протекание гидроразрыва пласта во время обратной закачки бурового шлама в пласт, включающий в себя получение характеристики давления за период времени, интерпретацию характеристики давления за период времени для определения протекания гидроразрыва пласта, определение решения на основе протекания гидроразрыва пласта и реализацию решения. Также создан способ оценки подземного риска операции обратной закачки бурового шлама, включающий в себя получение характеристики давления за период времени, интерпретацию характеристик давления для определения протекания гидроразрыва пласта, характеристику риска, связанного с определенным протеканием гидроразрыва пласта, и реализацию решения на основе охарактеризованного риска.A method for developing a response to the flow of hydraulic fracturing during the re-injection of drill cuttings into the formation has been created, which includes obtaining a pressure characteristic over a period of time, interpreting the pressure characteristic for a period of time to determine the flow of hydraulic fracturing, determining a solution based on the flow of hydraulic fracturing, and implementing the solution. ... A method for assessing the subsurface risk of a drilling cuttings re-injection operation has also been created, including obtaining a pressure characteristic over a period of time, interpreting the pressure characteristics to determine the course of hydraulic fracturing, characterizing the risk associated with a certain course of hydraulic fracturing, and implementing a solution based on the characterized risk.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US97209207P | 2007-09-13 | 2007-09-13 | |
PCT/US2008/075087 WO2009035884A1 (en) | 2007-09-13 | 2008-09-03 | Method of using pressure signatures to predict injection well anomalies |
Publications (2)
Publication Number | Publication Date |
---|---|
EA201070362A1 true EA201070362A1 (en) | 2010-10-29 |
EA021727B1 EA021727B1 (en) | 2015-08-31 |
Family
ID=40452407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201070362A EA021727B1 (en) | 2007-09-13 | 2008-09-03 | Method of using pressure signatures to predict injection well anomalies |
Country Status (12)
Country | Link |
---|---|
US (1) | US20100314104A1 (en) |
EP (1) | EP2198115B1 (en) |
CN (2) | CN104265211A (en) |
AR (1) | AR068426A1 (en) |
AU (1) | AU2008299195B2 (en) |
BR (1) | BRPI0816851A2 (en) |
CA (1) | CA2699503C (en) |
CO (1) | CO6270163A2 (en) |
EA (1) | EA021727B1 (en) |
MX (1) | MX343973B (en) |
NO (1) | NO2198115T3 (en) |
WO (1) | WO2009035884A1 (en) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009105330A2 (en) * | 2008-02-22 | 2009-08-27 | M-I L.L.C. | Method of estimating well disposal capacity |
US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
CN103733091A (en) * | 2011-06-24 | 2014-04-16 | 德州系统大学董事会 | Method for determining spacing of hydraulic fractures in a rock formation |
CN103649463B (en) * | 2011-07-11 | 2017-07-28 | 普拉德研究及开发股份有限公司 | System and method for performing well stimulation job |
WO2013070315A1 (en) * | 2011-11-09 | 2013-05-16 | Exxonmobil Upstream Research Company | Drill cuttings re-injection |
US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
WO2015095557A1 (en) | 2013-12-18 | 2015-06-25 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
US10633953B2 (en) | 2014-06-30 | 2020-04-28 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
US10385670B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
US10385686B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
AU2015408182A1 (en) * | 2015-08-31 | 2018-02-08 | Halliburton Energy Services, Inc. | Integrated workflow for feasibility study of cuttings reinjection based on 3-D geomechanics analysis |
CN106371989A (en) * | 2016-05-06 | 2017-02-01 | 北京中电华大电子设计有限责任公司 | Efficient and secure attack fault injection method adopting batch processing mode |
GB2562752B (en) * | 2017-05-24 | 2021-11-24 | Geomec Eng Ltd | Improvements in or relating to injection wells |
CA3149290A1 (en) | 2017-06-16 | 2018-12-20 | Advantek Waste Management Services, Llc | Optimizing waste slurry disposal in fractured injection operations |
US11500114B2 (en) | 2018-05-09 | 2022-11-15 | Conocophillips Company | Ubiquitous real-time fracture monitoring |
CN108952700B (en) * | 2018-08-21 | 2022-03-25 | 西南石油大学 | Method for determining anisotropic stratum well wall fracture pressure |
CN112211622B (en) * | 2019-07-11 | 2023-02-07 | 中国石油天然气股份有限公司 | Method and device for dividing oil reservoir pressure field |
US11781418B2 (en) | 2019-11-21 | 2023-10-10 | Conocophillips Company | Well annulus pressure monitoring |
US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US6002063A (en) * | 1996-09-13 | 1999-12-14 | Terralog Technologies Inc. | Apparatus and method for subterranean injection of slurried wastes |
US6076046A (en) | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
US8091625B2 (en) * | 2006-02-21 | 2012-01-10 | World Energy Systems Incorporated | Method for producing viscous hydrocarbon using steam and carbon dioxide |
MX350756B (en) * | 2010-12-30 | 2017-09-18 | Schlumberger Technology Bv | System and method for performing downhole stimulation operations. |
-
2008
- 2008-09-03 EA EA201070362A patent/EA021727B1/en not_active IP Right Cessation
- 2008-09-03 CN CN201410356336.1A patent/CN104265211A/en active Pending
- 2008-09-03 CN CN200880107170A patent/CN101849080A/en active Pending
- 2008-09-03 BR BRPI0816851 patent/BRPI0816851A2/en active Search and Examination
- 2008-09-03 AU AU2008299195A patent/AU2008299195B2/en not_active Ceased
- 2008-09-03 EP EP08799094.1A patent/EP2198115B1/en active Active
- 2008-09-03 NO NO08799094A patent/NO2198115T3/no unknown
- 2008-09-03 US US12/677,719 patent/US20100314104A1/en not_active Abandoned
- 2008-09-03 WO PCT/US2008/075087 patent/WO2009035884A1/en active Application Filing
- 2008-09-03 CA CA2699503A patent/CA2699503C/en active Active
- 2008-09-03 MX MX2010002779A patent/MX343973B/en active IP Right Grant
- 2008-09-12 AR ARP080103969A patent/AR068426A1/en not_active Application Discontinuation
-
2010
- 2010-03-12 CO CO10029656A patent/CO6270163A2/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
AU2008299195A1 (en) | 2009-03-19 |
EP2198115B1 (en) | 2017-08-02 |
BRPI0816851A2 (en) | 2015-03-17 |
CA2699503A1 (en) | 2009-03-19 |
EP2198115A4 (en) | 2015-12-02 |
EP2198115A1 (en) | 2010-06-23 |
CN104265211A (en) | 2015-01-07 |
CO6270163A2 (en) | 2011-04-20 |
EA021727B1 (en) | 2015-08-31 |
CA2699503C (en) | 2015-05-05 |
NO2198115T3 (en) | 2017-12-30 |
MX2010002779A (en) | 2010-04-07 |
MX343973B (en) | 2016-11-30 |
CN101849080A (en) | 2010-09-29 |
AR068426A1 (en) | 2009-11-18 |
AU2008299195B2 (en) | 2012-08-23 |
US20100314104A1 (en) | 2010-12-16 |
WO2009035884A1 (en) | 2009-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201070362A1 (en) | METHOD OF USING PRESSURE CHARACTERISTICS FOR PREDICTING ANOMALIES OF SUPPLY WELLS | |
NO20074526L (en) | Drilling system comprising annular pressure control | |
MX2014013334A (en) | Method of drilling a subterranean borehole. | |
MX346613B (en) | Method and system for pore pressure prediction. | |
GB2490451A (en) | Reverse circulation apparatus and methods for using same | |
WO2014049369A3 (en) | Drilling method for drilling a subterranean borehole | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
EA200801403A1 (en) | METHODS OF MONITORING THE PROPERTIES OF A FLOW MEDIUM | |
EA201071257A1 (en) | METHOD AND TEST SYSTEM OF OIL WELLS BY FUELING WITH MIXING | |
MX356660B (en) | Downhole fluid communication apparatus and method . | |
MX2012004168A (en) | Formation testing planning and monitoring. | |
GB2486106A (en) | Method of drilling and running casing in large diameter wellbore | |
NO20062183L (en) | Apparatus and method for obtaining wellbore samples | |
MY168844A (en) | Method of drilling a subterranean borehole | |
GB201120916D0 (en) | Method for assessing the performance of a drill bit configuration, and for comparing the performance of different drill bit configurations for drilling | |
EA200702476A1 (en) | DEVICE AND METHODS FOR OBTAINING MEASUREMENTS UNDER THE LOWER ELEMENTS OF A DOUBLE SEALING UNIT | |
MY167133A (en) | Well completion | |
EA201391547A1 (en) | DETERMINATION OF WELL INTEGRITY | |
MX2009011422A (en) | Active seismic monitoring of fracturing operations. | |
EA201070047A1 (en) | METHOD OF COMPLETING WELLS WITH SAND FILTERS | |
MX2016003565A (en) | Use of downhole isolation valve to sense annulus pressure. | |
ATE541109T1 (en) | COMMUNICATION TOOL FOR A BELOW-SURFACE SAFETY VALVE | |
EA201992246A1 (en) | METHOD FOR DRILLING BOREHOLES OF A WELL WITH THE USE OF THE LAYOUT OF A DRILLING CORE OPTIMIZED TO INTERRUPTED VIBRATION MODES | |
MX2012003213A (en) | Offshore casing drilling method. | |
MX2013010240A (en) | Method and system of drilling laterals in shale formations. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM BY KG MD TJ TM |
|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): KZ |