GB0900348D0
(en)
*
|
2009-01-09 |
2009-02-11 |
Sensor Developments As |
Pressure management system for well casing annuli
|
GB0900446D0
(en)
*
|
2009-01-12 |
2009-02-11 |
Sensor Developments As |
Method and apparatus for in-situ wellbore measurements
|
GB2475910A
(en)
|
2009-12-04 |
2011-06-08 |
Sensor Developments As |
Wellbore measurement and control with inductive connectivity
|
GB201012176D0
(en)
*
|
2010-07-20 |
2010-09-01 |
Metrol Tech Ltd |
Well
|
GB201012175D0
(en)
|
2010-07-20 |
2010-09-01 |
Metrol Tech Ltd |
Procedure and mechanisms
|
US9274038B2
(en)
|
2012-02-23 |
2016-03-01 |
Halliburton Energy Services, Inc. |
Apparatus and method for constant shear rate and oscillatory rheology measurements
|
WO2013142484A2
(en)
*
|
2012-03-19 |
2013-09-26 |
Battelle Memorial Institute |
Apparatus and method for remotely determining the structural intergrity of a well or similar structure
|
NO20120331A1
(no)
|
2012-03-20 |
2013-05-13 |
Sensor Developments As |
Fremgangsmåte og system for å rette inn en brønnkomplettering
|
US10175385B2
(en)
|
2012-05-23 |
2019-01-08 |
Halliburton Energy Services, Inc. |
Optimization visualization using normalized achievement variables
|
MX359317B
(es)
*
|
2012-09-26 |
2018-09-25 |
Halliburton Energy Services Inc |
Metodo de colocacion de manometros distribuidos a traves de filtros.
|
US9249657B2
(en)
*
|
2012-10-31 |
2016-02-02 |
General Electric Company |
System and method for monitoring a subsea well
|
US9557434B2
(en)
|
2012-12-19 |
2017-01-31 |
Exxonmobil Upstream Research Company |
Apparatus and method for detecting fracture geometry using acoustic telemetry
|
US20150300159A1
(en)
|
2012-12-19 |
2015-10-22 |
David A. Stiles |
Apparatus and Method for Evaluating Cement Integrity in a Wellbore Using Acoustic Telemetry
|
WO2014100275A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Wired and wireless downhole telemetry using a logging tool
|
WO2014100272A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Apparatus and method for monitoring fluid flow in a wellbore using acoustic signals
|
WO2014100276A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Electro-acoustic transmission of data along a wellbore
|
US20150292319A1
(en)
|
2012-12-19 |
2015-10-15 |
Exxon-Mobil Upstream Research Company |
Telemetry for Wireless Electro-Acoustical Transmission of Data Along a Wellbore
|
EA035019B1
(ru)
|
2013-01-04 |
2020-04-17 |
Карбо Керамикс, Инк. |
Электропроводящий расклинивающий агент и способы обнаружения, определения местоположения и определения характеристик электропроводящего расклинивающего агента
|
US11008505B2
(en)
|
2013-01-04 |
2021-05-18 |
Carbo Ceramics Inc. |
Electrically conductive proppant
|
NO340917B1
(no)
*
|
2013-07-08 |
2017-07-10 |
Sensor Developments As |
System og fremgangsmåte for in-situ bestemmelse av et brønnformasjonstrykk gjennom et sementlag
|
US11554969B2
(en)
|
2013-08-09 |
2023-01-17 |
Aquablok Ltd. |
Reactive treatment cell and systems for environmental remediation
|
WO2015069999A1
(en)
|
2013-11-08 |
2015-05-14 |
Schlumberger Canada Limited |
Slide-on inductive coupler system
|
WO2015080754A1
(en)
|
2013-11-26 |
2015-06-04 |
Exxonmobil Upstream Research Company |
Remotely actuated screenout relief valves and systems and methods including the same
|
US9593574B2
(en)
|
2014-03-14 |
2017-03-14 |
Saudi Arabian Oil Company |
Well completion sliding sleeve valve based sampling system and method
|
EP3129587B1
(en)
|
2014-04-10 |
2023-08-30 |
Halliburton Energy Services, Inc. |
Multi-string monitoring using electro-magnetic (em) corrosion detection tool
|
MX2016014273A
(es)
|
2014-05-01 |
2017-02-06 |
Halliburton Energy Services Inc |
Metodos y sistemas de tomografia entre pozos que utilizan un segmento de tuberia de revestimiento con al menos un arreglo de cruce de transmision.
|
GB2540095B
(en)
|
2014-05-01 |
2020-09-09 |
Halliburton Energy Services Inc |
Casing segment having at least one transmission crossover arrangement
|
CN106460490B
(zh)
|
2014-05-01 |
2020-06-26 |
哈利伯顿能源服务公司 |
采用具有至少一个传输交叉布置的套管段的多边生产控制方法和系统
|
CN106232936B
(zh)
|
2014-05-01 |
2020-03-24 |
哈里伯顿能源服务公司 |
采用具有至少一个传输交叉布置的套管段的导向钻井方法和系统
|
FR3021992B1
(fr)
*
|
2014-06-04 |
2019-08-16 |
Gdf Suez |
Procede et systeme d'exploitation et de surveillance d'un puits d'extraction ou de stockage de fluide
|
WO2015187908A1
(en)
|
2014-06-05 |
2015-12-10 |
Schlumberger Canada Limited |
Well integrity monitoring system with wireless coupler
|
US20150361757A1
(en)
*
|
2014-06-17 |
2015-12-17 |
Baker Hughes Incoporated |
Borehole shut-in system with pressure interrogation for non-penetrated borehole barriers
|
WO2016039900A1
(en)
|
2014-09-12 |
2016-03-17 |
Exxonmobil Upstream Research Comapny |
Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
|
US10400536B2
(en)
|
2014-09-18 |
2019-09-03 |
Halliburton Energy Services, Inc. |
Model-based pump-down of wireline tools
|
EP3198115A1
(en)
|
2014-09-26 |
2017-08-02 |
Exxonmobil Upstream Research Company |
Systems and methods for monitoring a condition of a tubular configured to convey a hydrocarbon fluid
|
WO2016068866A1
(en)
|
2014-10-28 |
2016-05-06 |
Halliburton Energy Services, Inc. |
Downhole state-machine-based monitoring of vibration
|
NO343193B1
(en)
*
|
2015-01-08 |
2018-11-26 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
US9970286B2
(en)
*
|
2015-01-08 |
2018-05-15 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
WO2016111629A1
(en)
*
|
2015-01-08 |
2016-07-14 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
US9863222B2
(en)
|
2015-01-19 |
2018-01-09 |
Exxonmobil Upstream Research Company |
System and method for monitoring fluid flow in a wellbore using acoustic telemetry
|
US10408047B2
(en)
|
2015-01-26 |
2019-09-10 |
Exxonmobil Upstream Research Company |
Real-time well surveillance using a wireless network and an in-wellbore tool
|
WO2016159776A1
(en)
|
2015-03-27 |
2016-10-06 |
Sensor Developments As |
Borehole stress meter system and method for determining wellbore formation instability
|
NO343542B1
(en)
*
|
2015-03-27 |
2019-04-01 |
Sensor Developments As |
Borehole stress meter system and method for determining wellbore formation instability
|
US10053980B2
(en)
|
2015-03-27 |
2018-08-21 |
Halliburton As |
Borehole stress meter system and method for determining wellbore formation instability
|
RU2601347C2
(ru)
*
|
2015-04-01 |
2016-11-10 |
Общество с ограниченной ответственностью "Научно-производственная фирма Завод "Измерон" |
Интеграционная конструкция для скважинного датчика
|
US9708905B2
(en)
|
2015-06-05 |
2017-07-18 |
Sensor Developments As |
Wellbore wireless thermal conductivity quartz transducer with waste-heat management system
|
NO342722B1
(en)
*
|
2015-06-05 |
2018-07-30 |
Sensor Developments As |
Wellbore wireless thermal conductivity quartz transducer with waste-heat management system
|
NO341832B1
(en)
*
|
2015-06-05 |
2018-01-29 |
Probe Holdings |
A thermal conductivity quartz transducer with waste-heat management system
|
US10132164B2
(en)
*
|
2015-12-18 |
2018-11-20 |
Schlumberger Technology Corporation |
Systems and methods for in-situ measurements of mixed formation fluids
|
US11105198B2
(en)
|
2016-03-31 |
2021-08-31 |
Schlumberger Technology Corporation |
Methods for in-situ multi-temperature measurements using downhole acquisition tool
|
US10344583B2
(en)
*
|
2016-08-30 |
2019-07-09 |
Exxonmobil Upstream Research Company |
Acoustic housing for tubulars
|
US10465505B2
(en)
|
2016-08-30 |
2019-11-05 |
Exxonmobil Upstream Research Company |
Reservoir formation characterization using a downhole wireless network
|
US11828172B2
(en)
|
2016-08-30 |
2023-11-28 |
ExxonMobil Technology and Engineering Company |
Communication networks, relay nodes for communication networks, and methods of transmitting data among a plurality of relay nodes
|
US10415376B2
(en)
|
2016-08-30 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Dual transducer communications node for downhole acoustic wireless networks and method employing same
|
US10697287B2
(en)
|
2016-08-30 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Plunger lift monitoring via a downhole wireless network field
|
US10526888B2
(en)
|
2016-08-30 |
2020-01-07 |
Exxonmobil Upstream Research Company |
Downhole multiphase flow sensing methods
|
US10364669B2
(en)
|
2016-08-30 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
WO2018044473A1
(en)
*
|
2016-08-30 |
2018-03-08 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10590759B2
(en)
|
2016-08-30 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
|
US10167716B2
(en)
|
2016-08-30 |
2019-01-01 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10190410B2
(en)
|
2016-08-30 |
2019-01-29 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
WO2019074656A1
(en)
|
2017-10-13 |
2019-04-18 |
Exxonmobil Upstream Research Company |
METHOD AND SYSTEM FOR ENABLING COMMUNICATIONS USING FOLDING
|
CN111201727B
(zh)
|
2017-10-13 |
2021-09-03 |
埃克森美孚上游研究公司 |
利用混合通信网络进行烃操作的方法和系统
|
US10837276B2
(en)
|
2017-10-13 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along a drilling string
|
US10697288B2
(en)
|
2017-10-13 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
|
CN111201454B
(zh)
|
2017-10-13 |
2022-09-09 |
埃克森美孚上游研究公司 |
用于利用通信执行操作的方法和系统
|
CA3078686C
(en)
|
2017-10-13 |
2022-12-06 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications
|
GB2581042B
(en)
|
2017-11-16 |
2022-06-15 |
Halliburton Energy Services Inc |
Multiple tubing-side antennas or casing-side antennas for maintaining communication in a wellbore
|
US12000273B2
(en)
|
2017-11-17 |
2024-06-04 |
ExxonMobil Technology and Engineering Company |
Method and system for performing hydrocarbon operations using communications associated with completions
|
CA3081792C
(en)
|
2017-11-17 |
2022-06-21 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along tubular members
|
US10690794B2
(en)
|
2017-11-17 |
2020-06-23 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications for a hydrocarbon system
|
US10844708B2
(en)
|
2017-12-20 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Energy efficient method of retrieving wireless networked sensor data
|
BR112020010485B1
(pt)
|
2017-12-26 |
2023-04-25 |
Halliburton Energy Services, Inc |
Sistema de antenas e método
|
MX2020005766A
(es)
|
2017-12-29 |
2020-08-20 |
Exxonmobil Upstream Res Co |
Metodos y sistemas para monitorear y optimizar las operaciones de estimulacion de yacimientos.
|
US11156081B2
(en)
|
2017-12-29 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Methods and systems for operating and maintaining a downhole wireless network
|
US10711600B2
(en)
|
2018-02-08 |
2020-07-14 |
Exxonmobil Upstream Research Company |
Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods
|
US11268378B2
(en)
|
2018-02-09 |
2022-03-08 |
Exxonmobil Upstream Research Company |
Downhole wireless communication node and sensor/tools interface
|
CN108825218A
(zh)
*
|
2018-04-27 |
2018-11-16 |
中国石油天然气股份有限公司 |
地层温度测试方法及装置
|
CN109142172B
(zh)
*
|
2018-07-16 |
2019-07-02 |
中国海洋大学 |
一种深海底浊流多参数综合监测装置
|
WO2020050815A1
(en)
*
|
2018-09-04 |
2020-03-12 |
Halliburton Energy Services, Inc. |
Position sensing for downhole electronics
|
CN112640235B
(zh)
*
|
2018-09-11 |
2023-08-15 |
Abb瑞士股份有限公司 |
具有集成式传感器的线缆管道
|
WO2020052984A1
(en)
|
2018-09-11 |
2020-03-19 |
Abb Schweiz Ag |
Cable conduit with integrated sensors
|
RU2694984C1
(ru)
*
|
2018-10-26 |
2019-07-18 |
Акционерное общество "Ижевский радиозавод" |
Способ коммутации блоков датчиков телеметрической системы передачи информации
|
US11293280B2
(en)
|
2018-12-19 |
2022-04-05 |
Exxonmobil Upstream Research Company |
Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
|
US11952886B2
(en)
|
2018-12-19 |
2024-04-09 |
ExxonMobil Technology and Engineering Company |
Method and system for monitoring sand production through acoustic wireless sensor network
|
US11876398B1
(en)
*
|
2019-03-01 |
2024-01-16 |
National Technology & Engineering Solutions Of Sandia, Llc |
Systems, methods and computer program products for charging autonomous wireless sensors in subsurface environments
|
WO2021240195A1
(en)
*
|
2020-05-26 |
2021-12-02 |
Saudi Arabian Oil Company |
Instrumented mandrel for coiled tubing drilling
|
US11735958B2
(en)
|
2020-12-17 |
2023-08-22 |
Halliburton Energy Services, Inc. |
Multiphase power transfer in inductive couplers
|
US11713676B2
(en)
|
2021-08-06 |
2023-08-01 |
Saudi Arabian Oil Company |
Sensor node device, sensor node system, and method for mapping hydraulic fractures using the same
|
WO2023191781A1
(en)
|
2022-03-30 |
2023-10-05 |
Halliburton Energy Services, Inc. |
Sensor assembly for wireless transfer of data and power in a wellbore
|
CN114778686B
(zh)
*
|
2022-06-23 |
2022-09-13 |
西安石油大学 |
一种智能完井预埋套管损伤检测系统
|
US20240192398A1
(en)
*
|
2022-12-08 |
2024-06-13 |
Halliburton Energy Services, Inc. |
Wirelessly powered and activated electromagnetic transmitters behind casing for reservoir monitoring
|