DK144220B - Boiler for fluid-bed combustion - Google Patents

Boiler for fluid-bed combustion Download PDF

Info

Publication number
DK144220B
DK144220B DK412979A DK412979A DK144220B DK 144220 B DK144220 B DK 144220B DK 412979 A DK412979 A DK 412979A DK 412979 A DK412979 A DK 412979A DK 144220 B DK144220 B DK 144220B
Authority
DK
Denmark
Prior art keywords
chamber
air
combustion
boiler
air chamber
Prior art date
Application number
DK412979A
Other languages
Danish (da)
Other versions
DK412979A (en
DK144220C (en
Inventor
V Kollerup
Original Assignee
Burmeister & Wain Enrgi A S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Burmeister & Wain Enrgi A S filed Critical Burmeister & Wain Enrgi A S
Priority to DK412979A priority Critical patent/DK144220C/en
Priority to DE19803034100 priority patent/DE3034100A1/en
Publication of DK412979A publication Critical patent/DK412979A/en
Publication of DK144220B publication Critical patent/DK144220B/en
Application granted granted Critical
Publication of DK144220C publication Critical patent/DK144220C/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/0015Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
    • B01J8/0035Periodical feeding or evacuation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • B01J8/0015Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
    • B01J8/003Feeding of the particles in the reactor; Evacuation of the particles out of the reactor in a downward flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/005Fluidised bed combustion apparatus comprising two or more beds

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Description

i 144220in 144220

Opfindelsen angår en kedel til fluid-bed forbrænding i et hvirvellag af inert materiale, som under kedlens drift opretholdes i kedlens forbrændingskammer ved indblæsning af forbrændings- og fluidiserings-5 luft gennem kammerets bund fra et underliggende luftkammer, hvori der udmunder en ledning for tilførsel af forbrændings- og fluidiseringsluft, hvilken kedel har mindst én kanal for udtagning af hvirvellagsmateriale fra forbrændingskammeret.BACKGROUND OF THE INVENTION The invention relates to a fluid-bed combustion boiler in an inert material vortex layer which is maintained in the boiler's combustion chamber during operation of the combustion and fluidization air through the bottom of the chamber from an underlying air chamber, in which a conduit for supplying combustion and fluidization air, which boiler has at least one duct for removing fluidized material from the combustion chamber.

10 Som bekendt indebærer fluid-bed forbrænding, at forbrændingen foregår i et fluidiseret lag eller hvirvellag af et inert materiale, eksempelvis sand, aske, kalksten eller dolomit, som ved hjælp af den indblæste luft opretholdes i den nedre del af for-15 brændingskammeret. Blandt denne tekniks væsentlige fordele kan nævnes den i forhold til forbrænding direkte i en omgivende luftmasse lavere forbrændingstemperatur, hvorved røggassernes indhold af visse skadelige stoffer, såsom nitrogenoxider, reduceres.10 As is well known, fluid-bed combustion involves combustion in a fluidized bed or fluidized bed of an inert material, such as sand, ash, limestone or dolomite, which is maintained in the lower part of the combustion chamber by means of the blown air. Among the significant advantages of this technique are the lower combustion temperature in relation to combustion directly in an ambient air mass, thereby reducing the flue gas content of certain harmful substances, such as nitrogen oxides.

20 Ved valg af et inert materiale, som reagerer kemisk med svovl, kan stærkt svovlholdigt fast eller flydende brændsel forbrændes med minimal emission af svovlforbindelser, således at man kan spare bekostelige anlæg til afsvovling af røggasserne.20 When selecting an inert material that reacts chemically with sulfur, highly sulfur-containing solid or liquid fuel can be combusted with minimal emissions of sulfur compounds, thus saving costly plants for desulphurizing the flue gases.

25 Den askemængde, som bliver tilbage efter brændslets forbrænding, vil for en stor dels vedkommende akkumuleres i hvirvellaget og derved forøge dettes volumen. Ved intermitterende aftapning af materiale fra hvirvellaget gennem den eller de nævn-30 te udtagningskanaler kan lagets højde holdes stort set konstant eller i hvert fald inden for givne øvre og nedre grænser, hvilket er en forudsætning for korrekt drift af kedlen, I kendte kedler af den omhandlede art fjernes 35 det aftappede materiale ved hjælp af en snegletransportør, som af hensyn til materialets høje temperatur, 144220 2 typisk 700-900°C, må være vandkølet. Da materialet som følge af sin kornede struktur er dårligt varme-ledende, må transportøren have en betydelig længde, . for at materialet under transporten kan blive grundigt 5 omrørt, så at stort set alle dets enkelte partikler kommer i direkte kontakt med kølede flader, inden det afgives til videre håndtering. De kendte anlæg til borttransport af hvirvellagsmaterialet er derfor både pladskrævende og bekostelige.25 The amount of ash remaining after combustion of the fuel will, to a large extent, accumulate in the fluidized bed, thereby increasing its volume. By intermittently tapping material from the fluidized bed through the said withdrawal channel (s), the height of the layer can be kept substantially constant or at least within given upper and lower limits, which is a prerequisite for proper operation of the boiler. In this case, the bottled material is removed by means of a screw conveyor which, for the high temperature of the material, typically 700-900 ° C, must be water-cooled. As the material due to its grainy structure is poorly heat conducting, the conveyor must have a considerable length,. to allow the material to be thoroughly stirred during transport so that virtually all of its individual particles come into direct contact with chilled surfaces before being released for further handling. The known plants for transporting the fluidised bed material are therefore both space consuming and expensive.

10 En kedel ifølge nærværende opfindelse er ejen dommelig ved, at udtagningskanalen udmunder i luftkammeret, at luftkammerets bund er perforeret, at der findes midler til indføring af en sekundær luftstrøm i luftkammeret gennem dettes bund, og at en 15 afgangsledning, som indeholder et afspærringsorgan, udmunder i luftkammeret mellem dettes bund og lufttilførselsledningens munding til periodisk fjernelse af hvirvellagsmateriale. Med opfindelsen er der opnået væsentlige besparelser i såvel anlægs- som drifts-20 omkostningerne for kedlen og en reduktion af kedelanlæggets totale pladsbehov. Dette skyldes, at det varme materiale, som aftappes fra hvirvellaget, bliver afkølet i det under forbrændingskammeret beliggende luftkammer, hvor materialet under påvirkning af 25 den sekundære luftstrøm danner et sekundært hvirvellag. Som følge af den intense turbulens i det sekundære hvirvellag afkøles materialet hurtigt og effektivt til en så lav temperatur, at det derefter kan fjernes fra luftkammeret gennem en simpel ukølet 30 afgangsledning. Hele den varmemængde, som er bundet i det aftappede materiale, genvindes i sekundærluften, som sammen med primærluften, der indføres i kammeret over det sekundære hvirvellag, strømmer ind i forbrændingskammeret gennem dettes perforerede bund.A boiler according to the present invention is not condemned in that the outlet duct opens into the air chamber, that the bottom of the air chamber is perforated, that means for introducing a secondary air flow into the air chamber through its bottom, and that a discharge line containing a shut-off means, opens into the air chamber between the bottom of it and the mouth of the air supply line for periodic removal of fluidized bed material. With the invention, significant savings have been achieved in both the installation and operating costs of the boiler and a reduction of the boiler system's total space requirements. This is because the hot material discharged from the vortex layer is cooled in the air chamber located below the combustion chamber, where the material, under the influence of the secondary air flow, forms a secondary vortex layer. Due to the intense turbulence of the secondary vortex, the material is cooled quickly and efficiently to such a low temperature that it can then be removed from the air chamber through a simple uncooled discharge line. The entire amount of heat bound in the bottled material is recovered in the secondary air, which, together with the primary air introduced into the chamber over the secondary vortex layer, flows into the combustion chamber through its perforated bottom.

35 Uforbrændte rester af brændslet, som følger med det aftappede hvirvellagsmateriale ned i luftkammeret, 3 144220 vil blive forbrændt her, hvorved varmeøkonomien yderligere forbedres. Efter åbning af afspærringsorganet i afgangsledningen kan det afkølede materiale transporteres ud af luftkammeret alene ved hjælp af se-5 kundærluftstrømmen, dvs. uden mekaniske transportorganer. Idet asken og det egentlige inerte hvirvellagsmateriale ofte har forskellig partikelstørrelse, kan den pneumatiske borttransport af materialeblandingen fra luftkammeret udnyttes til at frembringe en vis 10 separering af blandingens bestanddele ved vindsigtning, hvorved en væsentlig del af det inerte materiale med lille bekostning kan genvindes, f.eks. til fornyet indføring i forbrændingskammeret eller til anden anvendelse, dersom materialet ved kemisk reaktion med 15 bestanddele i brændslet er blevet uegnet til fornyet anvendelse i hvirvellaget.35 Unburned residue of the fuel, which accompanies the bottled vortex material down into the air chamber, will be incinerated here, further improving the heat economy. After opening the shut-off member in the outlet line, the cooled material can be transported out of the air chamber by the secondary air flow alone, i.e. without mechanical transport means. Since the ash and the actual inert vortex material often have different particle sizes, the pneumatic removal of the material mixture from the air chamber can be utilized to produce some separation of the constituents of the mixture by wind sieving, whereby a substantial portion of the inert material at low cost can be recovered. eg. for re-introduction into the combustion chamber or for other use if the material has been unsuitable for re-use in the fluidised bed by chemical reaction with 15 components in the fuel.

For at opretholde en passende højde af det sekundære hvirvellag i luftkammeret, er det hensigtsmæssigt, at arealet af luftkammerets perforerede bund 20 er mindre end arealet af forbrændingskammerets bund.In order to maintain a suitable height of the secondary vortex layer in the air chamber, it is desirable that the area of the perforated bottom 20 of the air chamber be smaller than the area of the combustion chamber bottom.

Udtagningskanalens munding i luftkammeret kan med fordel være afskærmet mod den i kammeret udmundende lufttilførselsledning. Herved begrænses en uønsket medrivning af det aftappede materiale med den opadgåen-25 de luftstrøm gennem forbrændingskammerets bund.Advantageously, the outlet of the outlet duct in the air chamber may be shielded from the air supply conduit opening in the chamber. Hereby, an undesirable entrainment of the tapped material is limited by the upward flow of air through the bottom of the combustion chamber.

Når udtagningskanalen går gennem forbrændingskammerets bund, kan der i kanalen være indbygget et perforeret skydespjæld tæt under kammerbunden. Herved kan der også i driftperioderne mellem intermitterende ud-30 tagninger af hvirvellagsmateriale opretholdes en i alt væsentligt ensartet luftgennemstrømning gennem hele forbrændingskammerets bundareal.When the removal duct passes through the combustion chamber bottom, a perforated slider may be built into the duct just below the chamber bottom. Hereby, a substantially uniform air flow through the entire area of the combustion chamber can also be maintained during the operating periods between intermittent swirl layer withdrawals.

Midlerne til indføring af den sekundære luftstrøm kan omfatte en grenledning, som udgår fra den 35 til kammeret førende hovedlufttilførselsledning, og et afspærringsorgan i grenledningen,og hovedledningen kan indeholde et indstilleligt drøvleorgan mellem 4 144220 grenledningen og luftkammeret. Ved drøvling af primær-luftstrømmen, når afspærringsorganet i grenledningen er åbent, kan man på enkel måde tilvejebringe et passende overtryk i sekundærluftstrømmen til fluidi-5 sering af det sekundære hvirvellag og samtidig opretholde en stort set uændret total mængdestrøm af den gennem forbrændingskammerets bund strømmende luft.The means for introducing the secondary air flow may comprise a branch line starting from the main air supply line leading to the chamber, and a shut-off member in the branch line, and the main line may contain an adjustable throttle between the branch line and the air chamber. By throttling the primary air flow when the shut-off member of the branch line is open, a simple overpressure in the secondary air stream can be provided to fluidize the secondary vortex, while maintaining a substantially unchanged total flow of air through the bottom of the combustion chamber. .

Alternativt kan midlerne til indføring af den sekundære luftstrøm i luftkammeret være en separat 10 blæser. I denne udførelsesform er det muligt at styre mængdestrømmen af sekundærluften og dens overtryk i forhold til trykket i luftkammeret helt uafhængigt af primærluftstrømmen.Alternatively, the means for introducing the secondary air stream into the air chamber may be a separate fan. In this embodiment, it is possible to control the quantity flow of the secondary air and its overpressure relative to the pressure in the air chamber completely independent of the primary air flow.

• Afspærringsorganet i afgangsledningen kan være 15 styret af entemperaturføler i luftkammeret mellem dettes bund og hovedlufttilførselsledningens udmunding i kammeret. Herved kan den intermitterende fjernelse af materialet fra luftkammeret indledes, når temperaturføleren, som ved lukket afspærringsorgan 20 befinder sig i det sekundære hvirvellag, angiver, at materialet er passende afkølet.• The shut-off means in the outlet line may be controlled by an air temperature sensor in the air chamber between its bottom and the main air supply line outlet in the chamber. In this way, the intermittent removal of the material from the air chamber can be initiated when the temperature sensor, which is closed by the closed shut-off member 20 in the secondary vortex layer, indicates that the material is suitably cooled.

Luftkammerets bund kan være aftrappet med mindst to i forskellige højder beliggende sektioner adskilt af mellemvægge, som kan åbnes og lukkes, og udtagnings-25 kanalen fra forbrændingskammeret udmunder da over den højest beliggende sektion, medens afgangsledningen udgår fra kammeret over den lavest beliggende bundsektion. Ved åbning og lukning af mellemvæggene i takt med aftapning af materiale fra det primære hvir-30 vellag og fjernelse af afkølet materiale fra luftkammeret kan de i dette kammer forløbende processer, henholdsvis efterforbrænding af brændbare dele i hvirvellagsmaterialet og afkøling af materialet, bringes til at foregå stort set i hver sin zone af 35 luftkammeret over de tilsvarende sektioner af kammerbunden.The bottom of the air chamber may be stepped by at least two sections located at different heights separated by openable and closed intermediate walls, and the discharge duct from the combustion chamber then opens over the highest section, while the discharge line exits from the chamber above the lowest bottom section. By opening and closing the partition walls as the material is drained from the primary fluidized bed and the removal of cooled material from the air chamber, the processes running in this chamber, respectively, after combustion of combustible parts in the fluidised bed material and cooling of the material, can take place. roughly in each zone of the 35 chamber of the corresponding sections of the chamber floor.

Opfindelsen forklares i det følgende nærmere under henvisning til den skematiske tegning, på hvilken 5 144220 fig. 1 er et lodret længdesnit gennem den ne-derste del af en første udførelsesform for en kedel ifølge opfindelsen, fig. 2 et snit efter linien II-II i fig. 1, og 5 fig. 3 et til fig. 2 svarende snit gennem en ændret udførelsesform for kedlen.The invention will now be explained in more detail with reference to the schematic drawing, in which FIG. 1 is a vertical longitudinal section through the lower part of a first embodiment of a boiler according to the invention; FIG. 2 is a sectional view taken along line II-II of FIG. 1 and 5 in FIG. 3 is a view of FIG. 2 corresponding section through a changed embodiment of the boiler.

Den i fig. 1 Og 2 stærkt forenklet illustrerede kedel har et forbrændingskammer 1, som afgrænses af fire lodrette sidevægge 2, en perforeret bundvæg 10 3 og en ikke vist topvæg, hvori en afgangsåbning for røggasserne kan være udformet. Et luftkammer 4 med to modstående, nedefter konvergerende sidevægge 5 og 6 er placeret under forbrændingskammerets bundvæg 3. Luftkammerets bundvæg 7 er perforeret ana-15 logt med bundvæggen 3, og under væggen 7 findes der et sekundært luftkammer 8.The FIG. 1 and 2, a highly simplified illustrated boiler has a combustion chamber 1, which is defined by four vertical side walls 2, a perforated bottom wall 10 3 and a top wall not shown, in which a discharge opening for the flue gases can be formed. An air chamber 4 with two opposing downwardly converging side walls 5 and 6 is located below the combustion chamber bottom wall 3. The air chamber bottom wall 7 is perforated analogously to the bottom wall 3, and below the wall 7 there is a secondary air chamber 8.

En hovedledning 9 for tilførsel af forbrændings- og fluidiseringsluft udmunder i luftkammeret 4 gennem dennes sidevæg 5. Fra ledningen 9 udgår 20 en grenledning 10, som udmunder i det sekundære luftkammer 8. Individuelt aktiverbare afspærrings- og drøvleorganer 11 og 12, der på tegningen er vist som drejespjæld, er anbragt henholdsvis i ledningen 9 mellem grenledningen 10's tilslutning og udmun- 25 dingen i luftkammeret 4 og i grenledningen.A main conduit 9 for supply of combustion and fluidizing air opens into the air chamber 4 through its sidewall 5. From the conduit 9, a branch line 10 is discharged, which opens into the secondary air chamber 8. Individually activatable shut-off and throttle means 11 and 12 shown in the drawing shown as rotary dampers, are respectively located in the conduit 9 between the connection of the branch conduit 10 and the opening in the air chamber 4 and in the branch conduit.

Et lodret rør 13 strækker sig gennem forbrændingskammerets bundvæg 3 ned i luftkammeret 4, hvor det udmunder over dette kammers bundvæg 7 på et lavere niveau end mundingen af luftledningen 9. Røret 13 inde-3q holder tæt under bundvæggen 3 et afspærringsorgan 15, vist som et skydespjæld, der er gennembrudt af åbninger svarende til åbningerne i den perforerede væg 3.Fra den nedre del af luftkammeret 4 tæt over dettes bundvæg 7 udgår et afgangsrør 16, der ligeledes indeholder 35 et afspærringsorgan 17, vist som et skydespjæld.A vertical tube 13 extends through the bottom wall 3 of the combustion chamber into the air chamber 4, where it opens above the bottom wall 7 of this chamber at a lower level than the mouth of the air conduit 9. The tube 13 inside-3 holds close to the bottom wall 3 a shut-off member 15, shown as a slider pierced by openings corresponding to the openings in the perforated wall 3. From the lower part of the air chamber 4 close to its bottom wall 7, a discharge pipe 16, which also contains a locking member 17, is shown as a slider.

Som ovenfor forklaret foregår forbrændingen i et hvirvellag af et egnet partikelformet materiale, 6 144220 som holdes fluidiseret ved gennemblæsning nedefra med luft, som tilføres gennem ledningen 9 og via luftkammeret 4 strømmer op gennem åbningerne i bundvæggen 3 og åbningerne i spjældet 15, når dette er lukket. I 5 fig. 1 og 2 er det fluidiserede hvirvellag blot markeret ved dets uregelmæssige - og under drift stadig skiftende - overflade 18.As explained above, the combustion takes place in a fluidized bed of a suitable particulate material, which is kept fluidized by blowing from below with air supplied through the conduit 9 and via the air chamber 4 flowing through the openings in the bottom wall 3 and the openings in the damper 15 when closed. In FIG. 1 and 2, the fluidized fluidized bed is merely marked by its irregular - and still changing - surface 18.

Tilførslen af brændsel til forbrændingskammeret 1 kan ske på vilkårlig egnet måde, enten direkte ind 10 i det fluidiserede lag eller ovenfra ned i laget. Til styring af forbrændingstemperaturen kan der i den del af forbrændingskammeret, som optages af det flui-diserede lag, være indbygget en eller flere rørslanger, som gennemstrømmes af en regulerbar mængdestrøm 15 af vand. I øvrigt kan den i kedlen udviklede varmeenergi nyttiggøres på enhver egnet måde, f.eks. til produktion af damp eller hedtvand i rør, hvoraf kedlens sidevægge 2 er opbygget, eller til produktion af varm røggas, f.eks. til et tørringsanlæg.The supply of fuel to the combustion chamber 1 can be effected in any suitable manner, either directly into the fluidized layer or from above into the layer. In order to control the combustion temperature, one or more pipe hoses may be incorporated in the part of the combustion chamber occupied by the fluidized layer which is flowed by an adjustable flow of water 15. Moreover, the heat energy developed in the boiler can be utilized in any suitable way, e.g. for the production of steam or hot water in pipes, of which the boiler side walls 2 are constructed, or for the production of hot flue gas, e.g. for a drying plant.

20 Det ovenfor omtalte lodrette rør 13 tjener til periodisk udtagning af materiale fra hvirvellaget i forbrændingskammeret 1, når dette lags højde som forklaret ovenfor vokser under kedlens drift.The vertical tube 13 mentioned above serves to periodically remove material from the fluidized bed in the combustion chamber 1 as the height of this layer as explained above increases during boiler operation.

Hertil åbnes afspærringsorganet 15 i en periode af 25 passende længde, hvorved materiale strømmer gennem røret ned i luftkammeret 4. Samtidig åbnes det under normal drift afspærrede spjæld 12 i grenledningen 10, og spjældet 11 i hovedledningen 9 indstilles til passende drøvling af hovedluftstrømmen. Fra gren-30 ledningen 10 strømmer luft nu ind i det sekundære luftkammer 8 og op gennem det primære luftkammer 4's perforerede bundvæg 7, hvorved det i kammeret 4 indstrømmende materiale bringes til at danne et sekundært hvirvellag, som i fig. 1 og 2 er antydet 35 ved sin overflade 19. Spjældet 17 er foreløbig lukket.To this end, the shut-off member 15 is opened for a period of 25 suitable length, whereby material flows through the pipe into the air chamber 4. At the same time, the shut-off damper 12 in the branch line 10 is opened during normal operation and the damper 11 in the main line 9 is adjusted to suitably throttle the main air flow. From the branch line 10, air now flows into the secondary air chamber 8 and up through the perforated bottom wall 7 of the primary air chamber 4, thereby causing the material flowing into the chamber 4 to form a secondary vortex layer, as in FIG. 1 and 2 are indicated 35 at its surface 19. The damper 17 is provisionally closed.

Som indledningsvis forklaret bevirker den gennem 7 144220 bundvæggen 7 strømmende sekundærluftmængde en afkøling af det sekundære hvirvellag og samtidig en efterforbrænding af eventuelle rester af brændbart materiale, som er fulgt med det fra forbrændingskam-5 meret gennem røret 13 aftappede materiale. Den herved afgivne varmemængde overføres til sekundærluftstrømmen, som sammen med primærluftstrømmen fra ledningen 9 fortsætter ind i forbrændingskammeret 1 som forvarmet forbrændings- og fluidiseringsluft, 10 og genvindes på denne måde i forbrændingsprocessen.As initially explained, the secondary air flow flowing through the bottom wall 7 causes a cooling of the secondary fluidized bed and at the same time a post-combustion of any residual combustible material followed by the material discharged from the combustion chamber through the pipe 13. The amount of heat thus delivered is transferred to the secondary air flow which, together with the primary air flow from the conduit 9, continues into the combustion chamber 1 as preheated combustion and fluidization air, 10 and is thus recovered in the combustion process.

Når den eventuelle efterforbrænding er afsluttet, og afkølingen af materialet i det sekundære hvirvellag i luftkammeret 4 er tilstrækkelig fremskredet, hvilket kan registreres afen i hvirvellaget 15 placeret temperaturføler 20, åbner man spjældet 17, og herved blæses materialet fra det sekundære hvirvellag ud gennem afgangsrøret 16 som følge af det overtryk, der hersker i luftkammeret 4. Når luftkammeret 4 er tømt, lukkes spjældet 12, og 20 spjældet 11 åbnes helt, hvorefter driften fortsætter, indtil spjældet 15 næste gang skal åbnes for aftapning af materiale fra det primære hvirvellag i forbrændingskammeret.When any post-combustion has been completed and the cooling of the material in the secondary vortex layer in the air chamber 4 is sufficiently advanced, which can be detected by the temperature sensor 20 located in the vortex layer 15, the damper 17 is opened, and the material from the secondary vortex layer is blown out through the outlet pipe 16 as a result of the overpressure prevailing in the air chamber 4. When the air chamber 4 is emptied, the damper 12 is closed and the damper 11 is fully opened, after which the operation continues until the damper 15 is next opened to drain material from the primary fluidized bed in the combustion chamber. .

De komponenter i den i fig. 3 anskueliggjorte 25 udførelsesform, som kan være identiske med de i fig.The components of the embodiment shown in FIG. 3 illustrates 25 embodiments which may be identical to those of FIG.

1 og 2 viste, er betegnet med samme henvisningstal.1 and 2 are denoted by the same reference numerals.

Den væsentlige afvigelse fra den først beskrevne udførelsesform ligger i udformningen af det primære luftkammer 21's perforerede bundvæg 22, der er 30 opbygget trappeformet med tre sektioner 23, 24 og 25, som strækker sig tværs over kammeret i successivt aftagende højde fra bundvæggen af det sekundære luftkammer 26 under væggen. Ved overgangen mellem de enkelte sektioner er der anbragt tværgående mellemvæg-35 ge 27, som fra den på tegningen viste stilling kan svinges i urviserretningen og derved tillade passage 8 144220 af materiale fra en højere liggende sektion af bundvæggen 22 til en lavere liggende sektion.The major departure from the first described embodiment lies in the design of the perforated bottom wall 22 of the primary air chamber 21, which is constructed of staircase with three sections 23, 24 and 25 extending across the chamber at successively decreasing height from the bottom wall of the secondary air chamber. 26 under the wall. At the transition between the individual sections, transverse intermediate walls 27 are arranged, which from the position shown in the drawing can be pivoted in a clockwise direction, thereby permitting passage 8 of material from a higher section of the bottom wall 22 to a lower lying section.

Udtagningsrøret 13 fra forbrændingskammeret 1 udmunder over den højest placerede sektion 23 5 med en skrå mundingsflade 14 i kort afstand fra den ene skrå sidevæg af kammeret 21. Afgangsrøret 16 for det afkølede materiale udmunder over den lavest placerede sektion 25. Tilgangen 28 for sekundærluft til kammeret 26, som er vist udmundende i bun-10 den af kammeret, kan som vist i fig. 1 være afgrenet fra hovedluftledningen 9, men den kunne også være tilsluttet tryksiden af en ikke vist, separat blæser. Denne tilslutningsmulighed foreligger selvsagt også ved udførelsesformen i fig. 1 og 2.The discharge tube 13 from the combustion chamber 1 opens over the highest positioned section 23 5 with a sloping orifice 14 at a short distance from one oblique side wall of the chamber 21. The outlet pipe 16 for the cooled material opens over the lowest positioned section 25. The supply air 28 for the secondary chamber 26 shown in the bottom of the chamber, as shown in FIG. 1 may be branched from the main air line 9, but it could also be connected to the pressure side of a separate fan not shown. This connection option is of course also available in the embodiment of FIG. 1 and 2.

15 Udførelsesformen i fig. 3 kan drives på den måde, at efterforbrændingen af brændbare dele i det materiale, som udtages fra forbrændingskammeret 1, helt eller i alt væsentligt foregår på sektionen 23, medens der i de følgende sektioner 24 og 25 stort 20 set kun foregår en køling af materialet ned til en passende afgangstemperatur. Under efterforbrændingen og kølingen holdes mellemvæggene 27 i de viste lukkestillinger, og når det ikke viste spjæld i røret 13 åbnes for at aftappe materiale fra forbrændingskam-25 meret, åbnes samtidig væggene 27, så at det på bundvæggen 22 liggende materiale successivt forskydes ned på de lavere liggende bundsektioner, indtil materialet til slut fjernes gennem afgangsrøret 16.15 The embodiment of FIG. 3 can be operated in such a way that the post-combustion of combustible parts in the material taken out of the combustion chamber 1 takes place wholly or substantially on the section 23, while in the following sections 24 and 25 there is substantially only a cooling of the material. down to a suitable outlet temperature. During the post-combustion and cooling, the intermediate walls 27 are held in the closed positions shown, and when the damper not shown in the pipe 13 is opened to drain material from the combustion chamber 25, the walls 27 are simultaneously opened so that the material lying on the bottom wall 22 is successively displaced on the lower bottom sections until the material is finally removed through the outlet pipe 16.

Det vil forstås, at antallet af udtagningsrør 30 13 fra forbrændingskammeret og rørenes placering i planbillede kan variere med størrelsen af bundvæggen 3's areal og med den generelle udformning af det primære luftkammer og dettes tilslutning for forbrændingsluften. De perforerede bundvægge i for-35 brændingskammeret og det primære luftkammer kan spe- 144220 9 cielt være udformet som beskrevet i den sideløbende danske patentansøgning nr. 3611/79, men kan også være mere konventionelle. Udtagningsrøret eller -rørene fra forbrændingskammeret kunne også være placeret uden 5 på kedlen med indstrømnings- og udstrømningsmundinger i væggene af henholdsvis forbrændingskammeret og det primære luftkammer.It will be appreciated that the number of take-out pipes 30 13 from the combustion chamber and the position of the pipes in plan view may vary with the size of the area of the bottom wall 3 and with the general design of the primary air chamber and its connection for the combustion air. The perforated bottom walls of the combustion chamber and primary air chamber may be specifically designed as described in the parallel Danish patent application No. 3611/79, but may also be more conventional. The discharge tube or tubes from the combustion chamber could also be located without 5 on the boiler with inlet and outlet nozzles in the walls of the combustion chamber and the primary air chamber, respectively.

De ovenfor omtalte spjæld og eventuelle andre aktiveringsorganer, som kommer i funktion i forbin-10 delse med en periodisk materialefjernelse fra hvirvellaget i forbrændingskammeret, kan være styret automatisk, hvorved operationsfølgen f.eks. kan igangsættes af et signal fra en føler, som måler trykfaldet gennem det primære hvirvellag, der afhænger af 15 lagets højde. Tilsvarende kan afspærringsorganet i afgangsledningen fra det primære luftkammer åbnes af et signal fra temperaturføleren i det sekundære hvirvellag.The dampers mentioned above and any other actuating means which come into operation in connection with a periodic material removal from the fluid bed in the combustion chamber can be controlled automatically, whereby, for example, the operation sequence. may be triggered by a signal from a sensor measuring the pressure drop through the primary fluidized bed, which depends on the height of the bed. Similarly, the shut-off means in the discharge line from the primary air chamber can be opened by a signal from the temperature sensor in the secondary vortex layer.

Claims (5)

144220 ίο144220 ίο 1. Kedel til fluid-bed forbrænding i et hvirvellag af inert materiale, som under kedlens drift opretholdes i kedlens forbrændingskammer (1) ved indblæs-ning af forbrændings- og fluidiseringsluft gennem kam- 5 merets bund (3) fra et underliggende luftkammer (4, 21) , hvori der udmunder en ledning (9) for tilførsel af forbrændings- og fluidiseringsluft, hvilken kedel har mindst én kanal (13) for udtagning af hvirvellagsmateriale fra forbrændingskammeret, kendete g- 10 net ved, at udtagningskanalen (13) udmunder i luftkainmeret (4, 21) , at luftkammerets bund (7, 22) er perforeret, at der findes midler (10, 28) til indføring af en sekundær luftstrøm i luftkainmeret gennem dettes bund, og at en afgangsledning (16), som 15 indeholder et afspærringsorgan (17), udmunder i luftkammeret mellem dettes bund og lufttilførselsledningens (9) munding til periodisk fjernelse af hvirvellagsmateriale .A fluid-bed combustion boiler in an inert fluid vortex layer which is maintained during boiler operation in the boiler's combustion chamber (1) by injecting combustion and fluidization air through the bottom (3) of the chamber from an underlying air chamber (4) , 21), wherein a conduit (9) for supplying combustion and fluidizing air, which boiler has at least one duct (13) for removing fluidized material from the combustion chamber, known as the discharge duct (13) the air chamber (4, 21), the bottom chamber of the air chamber (7, 22) being perforated, the means (10, 28) for introducing a secondary air flow into the air chamber through its bottom, and an outlet line (16) containing 15 a shut-off member (17) opens into the air chamber between its bottom and the mouth of the air supply line (9) for the periodic removal of fluidized bed material. 2. Kedel ifølge krav 1, kendetegnet 20 ved, at arealet af luftkammerets perforerede bund (7, 22. er mindre end arealet af forbrændingskammerets bund (3).Boiler according to claim 1, characterized in that the area of the perforated bottom of the air chamber (7, 22.) is smaller than the area of the bottom (3) of the combustion chamber. 3. Kedel ifølge krav 1 eller 2, kendetegnet ved, at udtagningskanalens (13) munding 25 (14) i Inftkammeret er afskærmet mod den i kammeret udmundende lufttilførselsledning (9).Boiler according to claim 1 or 2, characterized in that the opening 25 (14) in the inlet chamber (13) of the outlet duct (13) is shielded from the air supply line (9) opening in the chamber. 4. Kedel ifølge ethvert af kravene 1-3, og hvor udtagningskanalen (13) går gennem forbrændingskammerets bund (3), kendetegnet ved, at der i 30 kanalen (13) tæt under kammerbunden (3) er indbygget et perforeret skydespjæld (15) .Boiler according to any one of claims 1-3, wherein the removal duct (13) passes through the bottom (3) of the combustion chamber, characterized in that a perforated slider (15) is built into the duct (13) near the chamber bottom (3). . 5. Kedel ifølge ethvert af kravene 1-4, kendetegnet ved, at midlerne til indføring af den sekundære luftstrøm omfatter en grenledning (10), 35 som udgår fra den til kammeret (4) førende hovedluft-Boiler according to any one of claims 1 to 4, characterized in that the means for introducing the secondary air flow comprise a branch line (10), which starts from the main air leading to the chamber (4).
DK412979A 1979-10-02 1979-10-02 Boiler for fluid-bed combustion DK144220C (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK412979A DK144220C (en) 1979-10-02 1979-10-02 Boiler for fluid-bed combustion
DE19803034100 DE3034100A1 (en) 1979-10-02 1980-09-10 Boiler for fluidised-bed firing - has bed material extraction duct discharging into air-feed chamber with perforated floor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DK412979 1979-10-02
DK412979A DK144220C (en) 1979-10-02 1979-10-02 Boiler for fluid-bed combustion

Publications (3)

Publication Number Publication Date
DK412979A DK412979A (en) 1981-04-03
DK144220B true DK144220B (en) 1982-01-18
DK144220C DK144220C (en) 1982-06-21

Family

ID=8130513

Family Applications (1)

Application Number Title Priority Date Filing Date
DK412979A DK144220C (en) 1979-10-02 1979-10-02 Boiler for fluid-bed combustion

Country Status (2)

Country Link
DE (1) DE3034100A1 (en)
DK (1) DK144220C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60184815U (en) * 1984-05-17 1985-12-07 麒麟麦酒株式会社 Connectable synthetic resin bottle box

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2356060C3 (en) * 1973-11-09 1985-08-29 Thyssen Industrie Ag, 4300 Essen Fluidized bed furnace for the incineration of partially dewatered sludge
US4023280A (en) * 1976-05-12 1977-05-17 Institute Of Gas Technology Valve for ash agglomeration device
DK144219C (en) * 1979-08-29 1982-06-21 Burmeister & Wains Energi Boiler for fluid-bed combustion

Also Published As

Publication number Publication date
DK412979A (en) 1981-04-03
DK144220C (en) 1982-06-21
DE3034100C2 (en) 1988-11-24
DE3034100A1 (en) 1981-04-16

Similar Documents

Publication Publication Date Title
US4165717A (en) Process for burning carbonaceous materials
US4051791A (en) Coal burning arrangement
US4716856A (en) Integral fluidized bed heat exchanger in an energy producing plant
US4539188A (en) Process of afterburning and purifying process exhaust gases
RU2459659C1 (en) Boiler with circulating fluid bed
EP0703412B1 (en) Method for reducing gaseous emission of halogen compounds in a fluidized bed reactor
DK168499B1 (en) Method and apparatus for combustion or gasification of fuel in a fluidized bed
JPH01500251A (en) How to reduce NOx in flue gas
CN102177406A (en) Closed loop drying system and method
JPH0650678A (en) Fluidized-bed reactor device and method having heat exchanger
DK160330B (en) FLUIDIZATION OVEN AND METHOD OF COMBUSTION IN ANY OVEN
US5269263A (en) Fluidized bed reactor system and method of operating same
JPS61143616A (en) Fibrous fuel combustion apparatus
US7658167B2 (en) Fluidized-bed device with oxygen-enriched oxidizer
JPH08503291A (en) Heat recovery method and device in fluidized bed reactor
US20120125759A1 (en) Vertical Calcined Petroleum Coke Incinerator
DK144220B (en) Boiler for fluid-bed combustion
JPS62163742A (en) Method and apparatus for operation control of fluidized bed reaction apparatus
NO301807B1 (en) Method of combustion and combustion apparatus for reducing sulfur dioxide content in flue gases
JPS632215B2 (en)
SE505629C2 (en) Chemical constituents recovery system and / or thermal energy when heated in circulating fluidized bed
CZ283961B6 (en) Flue boiler
SU1781509A1 (en) Boiler
US4335663A (en) Thermal processing system
KR960010317B1 (en) Combustion process in a fluidised bed and installation for carrying-out the process

Legal Events

Date Code Title Description
PBP Patent lapsed