DE8912044U1 - Holding rail for cutting charges - Google Patents

Holding rail for cutting charges

Info

Publication number
DE8912044U1
DE8912044U1 DE8912044U DE8912044U DE8912044U1 DE 8912044 U1 DE8912044 U1 DE 8912044U1 DE 8912044 U DE8912044 U DE 8912044U DE 8912044 U DE8912044 U DE 8912044U DE 8912044 U1 DE8912044 U1 DE 8912044U1
Authority
DE
Germany
Prior art keywords
profile
holding rail
cutting
rail
cutting charges
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE8912044U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bundesministerium der Verteidigung
Original Assignee
Bundesministerium der Verteidigung
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bundesministerium der Verteidigung filed Critical Bundesministerium der Verteidigung
Priority to DE8912044U priority Critical patent/DE8912044U1/en
Publication of DE8912044U1 publication Critical patent/DE8912044U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

QE 88/20 SKB 22.08.89QE 88/20 SKB 22.08.89

Halteschiene» far ScfineidladungenHolding rail» for cutting charges

Oie Neuerung bezieht sich auf eine Halteschiene für Schneidiadungen dem Oberbegriff des Anspruchs i.The innovation relates to a holding rail for cutting loads the generic term of claim i.

Min, unsMin, us

m üiHHmmm üiHHmm

k^refiii ei« ein t@t?.k^refiii ei« a t@t?.

Ii iiiö tust) stnitnsn feifctnfit. ui§ gifIi iiiö tust) stnitnsn feifctnfit. ui§ gif

Die Rsntage soIetier Heitesenisnen «n eeueerttn ist umit mqen der hdfteren Aflföfäsfung an die elnxufaÄltendsn T©leran2en baw. eegen der is anderen Fall 2usAt2licn notaendigtn Art»itssc^ritte zeitraubend und lÄStÄnäliefi, e©£«i auch die Form dieses Profils «Ihrend des Vorgangs des Aflörtngens bezüglich der Handhabung erhebliche Nachteile mit sich bringt.The repair of such heat sources is time-consuming and tedious due to the frequent attachment to the individual components. In contrast to the other necessary steps, the shape of this profile also brings with it considerable disadvantages in terms of handling during the attachment process.

"nl:"nl:

• ··

;&idigr;&idigr;· ······... OE SB/20;&idigr;&idigr;· ······... OE SB/20

BWB £'.08.89BWB £'.08.89

-Z--Z-

Die Länge der bekannten Halteschienen ist mit (500 bzw. 600) um zu kurz üb die normal an Bauwerken vorhandenen Unebenheiten ausgleichen zu können. Auch genügen die Widerst, und Trägheitsmomente den Anforderungen oeist nicht.The length of the known support rails is too short (500 or 600) to compensate for the unevenness normally found on buildings. The resistance and moments of inertia also often do not meet the requirements.

ÜSt4 ttt^Si^i lügt die M#tös zugrunde« eint il^igM m mmttm, die %i& Mn üt gUidi» M**&Urf #i-ÜSt 4 ttt^Si^i lies to the M#tös« united il^igM m mmttm, the %i& Mn üt gUidi» M**&Urf #i-

OMf trfttöiien güttiigtftft Trig-OMf trfttöiien validftt Trig-

die li^tiehitn »tr-fygt und Itieht 10the litiehitn »tr-fygt and Itieht 10

Ttii äii Anipfuefus 1Ttii äii Anipfuefus 1

Hiiüigiileflt miti tin f»rofil Auf, MIcAm au* giäfthten 1» Profilen, die tint nmiMm fiiii.i ist, «lie fiftigüßgsttctuiiicn tin U-ProfU, dtsstn Seittn in gieiefwr Mtist in eint £ötnt 2yf W^Pröfi iöliii gttefnftfifct sind.Hiiiiigileflt with a profile that is based on the 1" profiles that are tinted in the middle, "the fifty-fifth degree in U-profile, the sides of which are in one open 2yf W^profile.

ergiöt sich ösi irmlicfisn fUuMrfordernisstn ein deutlich gtsteigertes Trignsits» und Hiderstanösaefflent, «eiches bei lotrechter Belastung einer seitlichen Auslegung besser standftllt als das bisher vorliegend genutzte einfache"L -Profil.This results in a significantly increased strength and resistance effect, which withstands vertical loads from a lateral design better than the simple "L" profile used up to now.

Um den Aufwand zur Montage von Halteschienen zu ainiaieren weist erfindungsgemäße Halteschiene in ihrer Basis eine Anzahl gestanzter Langlöcher auf, die es gestatten, die Abstands/oleranzen der Befestigungspun&ts zueinander großzügig iss" ,legen. In order to reduce the effort required to install retaining rails, the retaining rail according to the invention has a number of punched slots in its base, which allow the spacing/tolerances of the fastening points to be set generously.

Diese Einrichtung ermöglicht es auch in den «eisten Amendungsfallen s€&ss &a des Eä45#erfesf} ysrhaadei?€s H4i*eQs4i*n rwr e#f«ti gung dfef Svnieireii Zu nützen.This facility also makes it possible to use the powers of the State Secretary for Economic Affairs in the most recent amendments to the W €45#erfesf} ysrhaadei?€s H4i*eQs4i*n rwr e#f«ti gung dfef Svnieireii.

88/2088/20

22.08.8$22.08.8$

Durch die zwei <:ur Profiinocnacnse synssetnscn rechtwinklig aDgeoogenen U-Profilschensceienden ergiot sicn zur ftontage von QuerstreOen die gunstige Gelegenheu, aus ssenreren naltescnienen em ieitersystem zu bauen, welches durch seme Querhaitescmenen den gewünschten Abstand der zur Anbringung der Schneidladung erforderten ist, voneinander einhält, während die längsnaltescnienen onne Desondere Vergabe für die Lage ihrer ßefejitigungspunxte den Halt der Konstruktion an einen) Bau- -( werk herstellen,. Auch ermöglicht die Geometrie eine günstigere Hand- \ The two profiled U-sections, which are arranged at right angles to one another, provide the ideal opportunity to build a support system from the outer sections for the installation of cross beams, which, thanks to their cross-sections, maintains the desired distance from one another for the attachment of the cutting charge, while the longitudinal sections, without special allocation for the position of their attachment points, ensure that the construction is held to a building . The geometry also enables more convenient handling .

fe

Is foi§S!K2sn wirt3 der Erfindungsgeg?nstand afjhand der Zeichnungen näher IIs foi§S!K2sn the subject matter of the invention is described in more detail with the aid of the drawings I

i erläutert. Es z«igt | i explained. It shows |

Fig. 1 eine Darstellung der HalteschieneFig. 1 a representation of the retaining rail Fig. 2 einen ZuüancenCiau von Halteschienen zu emea LeitersystemFig. 2 a connection of support rails to the ladder system Fig. 3 die Befestigung einer Halteschiene mittels einer Haanerkopf-Fig. 3 the fastening of a retaining rail using a Haanerkopf

scnrauße an eines Halfeneisen &iacgr;&ogr; Detail
20
screw on a half-iron &iacgr;&ogr; Detail
20

Die in Fig. 1 dargestellte Halteschiene für Sehneidladimgen 1 bestellt aus eines Profil Z, welches einem ü-Profil gleicht dessen Schenkelenden nach außen geklappt sind.The holding rail for Sehneidladimgen 1 shown in Fig. 1 consists of a profile Z, which resembles a ü-profile whose leg ends are folded outwards.

Dieses Profil bietet eine große Sicherheit gegen seitliche Verbiegung ia Vergleich zu bisher bekannten Profilen, auch bei den die bekannten SchneidledungsgiröBen gewichtsaißig übersteigenden modernen bzw. zukünftigen Sciineidladungen.This profile offers a high level of protection against lateral bending compared to previously known profiles, even with modern or future cutting charges that exceed the known cutting load sizes in terms of weight.

OE 88/20 BWB 22.08.89OE 88/20 BWB 22.08.89

Zur Befestigung der Schneidladung an einem Bauwerk ist die U-Basis des Profils 2 mit Langlochausstan jngen 3 verser ■■~To attach the cutting charge to a structure, the U-base of the profile 2 is provided with slotted holes 3 ■■~

Bei einer als optimal angesehener Länge für eine Halteschiene 1 von 1 OQC s&trade;. Si??d 26 t_*nQ[nrriAi_int&r\7unaen 3 mit den A&ssssunasn (9 &khgr; 26) esa iffl Abstand von 12 Qm in der Schiene vorgesehen.For a length considered optimal for a support rail 1 of 1 OQC s&trade;. Si??d 26 t_*nQ[nrriAi_int&r\7unaen 3 with the A&ssssunasn (9 x 26) esa iffl spacing of 12 Qm in the rail is provided.

Zur Erfüllung besonderer Erfordernisse ist es selbstverständlich möglich, diese Vorgaben ebenso zu variieren wie die euer vorgesenenen Profiiraße von 31 as für die Profilbasis (4). je 21 can für die Länge der abgeklappten U-Profiiscnenkeiender- 7 die 8 &agr;» tfon der ü-Prof ilöasis 4 beafesteiKlet sind.To meet special requirements, it is of course possible to vary these specifications as well as the previously specified profile dimensions of 31 cm for the profile base (4). 21 cm each for the length of the folded-down U-profiles (7) which are attached to the U-profile base (4).

Als festigkeitseäßlg überlegener Werkstoff zur Herstellung der erftndungsge&ä&en utird Stahl vorgeschlagen, «ras Jedoch nicnt ausschließt for besondere Zwecke andere Materialien zu w2füen.Steel is suggested as a material with superior strength for the manufacture of the inventive material, but this does not exclude the use of other materials for special purposes.

Fig. 2 zeigt einen Halteschienenzusajaeenbau zu einem sogenannten Leitersystea 8.
20
Fig. 2 shows a support rail assembly for a so-called ladder system 8.
20

Dank des vorteilhaften Profils^ ist es leicht oogiich, dieses 8Ut zuü Bau-Merk zeigenden y-Profil schenkel enden 7 zu aontieren.Thanks to the advantageous profile^ it is easy to mount this 8 Ut toü construction feature showing y-profile leg ends 7 .

Dabei spielen große Toleranzen der Sefestigungsorte in ihrer Lage zueinander keine wesentlich« Rolle.Large tolerances between the sea fortification sites in their position relative to one another do not play a significant role.

Auf die so mtierttn Mtlttschitntn «irden in gtafinsent« Atetaod die eigentlich oft tragen einer Schoeidladuns bestiflften Halteschiene» 1 guar bef*4tigt. öi# durcft W«rröck*n in den LanglisciUüSitaniyilQen 3 tusreicnend genau parallel zueinander einjvstiert »erden taauut. The retaining rails 1, which actually often carry a shotgun shell, are securely fastened to the centers thus arranged. The rollers must be inserted into the long rails 3 so that they are sufficiently parallel to one another .

&bull; · C ·· C ·

&bull; f
&bull; · t
&bull; f
· t
rl
t 0
rl
t0
OE 88/20OE 88/20
&bull; Il
&bull; ti
&bull; Il
&bull; ti
t t
t
tt
t
IWB 22.08.89IWB 22.08.89
IIII S IS I

Die Fig. 3 zeigt die Befestigung einer Halteschiene fQr SchneidUdungen 1 an einem in ein Bauwerk 12 einbetoniertes Halfeneisen 9.Fig. 3 shows the fastening of a holding rail for cutting holes 1 to a Halfen iron 9 cast into a structure 12.

Zur Verbindung beider Elemente dient eine Hanmerkopfschraube 10.A hammer head screw 10 is used to connect both elements.

de 88/20de 88/20

I · &diams; ·I · &diams; ·

" " BWB 22.08.89" " BWB 22.08.89

Haltschiene für Schneidladungen zur Hontage von BauwerkenHolding rail for cutting charges for honing structures ZusammenfassungSummary

Es wird eine Halteschiene for Schneidladungen vorgeschlagen, die aufgrund ihres ieiitunysfönigcn Prüfiis bei gieitfssra RaiaoerföisA holding rail for cutting charges is proposed, which due to its impedance of testing in the case of flammable liquids

ht/köflinlicher Halteschienen eine höhere Tragkraft aufweist und die, weil sie mit einer großen Anzahl von Befestigungsdurchbrochen versehen ist, keine große Toleranzforderung an die Abstände der Befestigungspunkte untereinander stellt. ht/copper support rails have a higher load-bearing capacity and, because they are provided with a large number of fastening holes, do not require a large tolerance for the distances between the fastening points.

DE 88/20EN 88/20

22.08,8322.08,83

Haltesciiiene fur Schneidladungen zur Montage an eine« Bauwerk Bezugszeichefiliste 1 Halteschiene für Sdmeidladungen Holding rail for cutting charges for mounting on a structure Reference list 1 Holding rail for cutting charges

4 U=PPOfi1641ii4 U=PPOfi1641ii

5 Zur Prof ilt>Uis Auigtricfitttt flkf»n ml tfHM UMf5 To the profile>Uis Auigtricfitttt flkf»n ml tfHM UMf

7 u-Pfotilscntfllttltndtn 6 Laitersjstt· 9 Hilfeneisen to HMBsrfcopf schraufc*7 u-Pfotilscntfllttltndtn 6 Laitersjstt· 9 Hilfeneisen to HMBsrfcopf schraufc*

11 Aufhängung einer Schneidladung11 Suspension of a cutting charge

12 Bauwerk12 Building

Claims (3)

SU»£SS£?«IUK BEUTSCHU»SU»£SS£?«IUK BEUTSCHU» vertreten durch den BUNKSKHISTiOt OER KRTEiDMUNS dieser vertreten deren denrepresented by the BUNKSKHISTiOt OER KRTEiDMUNS they represent their PRT SIDOiTEM OES 8UNDESAKTES FORPR T SIDOiTEM OES 8UNDESACTES FOR WtHRTECHKIK UMD IESCHAfFUNSWtHRTECHKIK AND IESCHAfFUNS OE 86/20
22.08.83
OE 86/20
22.08.83
#&idiagr;&rgr;|»&#&eegr;#&idiagr;&rgr;|»&#&eegr; dsiüAiiisiut ü»dsiüAiiisiut ü»
2. HAittschiefii men Anipr-uen t und 2.2. HAittschiefii men Anipr-uen t and 2. didufcftdidufcft daß die ProfilUnge 1 000 HD betrag* und in der U-Profilbasis (4) 26 Langlochdusstanzungen (3) mit den Maöen (9 &khgr; 26) m in eine« Abstand von 12 ran vorfanden sind.that the profile thickness is 1 000 HD* and in the U-profile base (4) there are 26 slotted holes (3) with the dimensions (9 x 26) m at a distance of 12 m. CE 88/20 BWB 22.08.SdCE 88/20 BWB 22.08.Sd 3. Halteschiene nach Anspruch 1 bis 3,3. Holding rail according to claim 1 to 3, dadurch gekennzeichnet, characterized , daS die U-Profiloasis (4) die zur Montage des Profils an eines Bau-HPK ISHIt* SI Mi »rat* in ■* «ie peieiiei em ihr tefintticäefl»that the U-Profiloasis (4) which is used to mount the profile on a construction HPK ISHIt* SI Mi »rat* in ■* «the peieiiei em ihr tefintticäefl» ui &igr; ü H^ d» §»taHtniii ti) am lim iniü titi n ä ui &igr; ü H^ d» §»taHtniii ti) am lim iniü titi n ä
DE8912044U 1989-10-10 1989-10-10 Holding rail for cutting charges Expired - Lifetime DE8912044U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE8912044U DE8912044U1 (en) 1989-10-10 1989-10-10 Holding rail for cutting charges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE8912044U DE8912044U1 (en) 1989-10-10 1989-10-10 Holding rail for cutting charges

Publications (1)

Publication Number Publication Date
DE8912044U1 true DE8912044U1 (en) 1989-12-21

Family

ID=6843584

Family Applications (1)

Application Number Title Priority Date Filing Date
DE8912044U Expired - Lifetime DE8912044U1 (en) 1989-10-10 1989-10-10 Holding rail for cutting charges

Country Status (1)

Country Link
DE (1) DE8912044U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998031982A1 (en) * 1997-01-16 1998-07-23 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Method for dismantling technical objects, and the appropriate technical object for the application of same
DE19919041A1 (en) * 1999-04-27 2000-11-09 Daimler Chrysler Ag Device for penetrating brickwork comprises housing containing two or more even-symmetrical hollow charges of explosive which produce cutting effect

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1872369U (en) * 1963-03-13 1963-05-16 Rinker Fa R PROFILE RAIL FOR LINKABLE CUTTING LOADS.
DE8118006U1 (en) * 1981-06-20 1981-11-19 Große-Benne, Wilhelm HOLDING RAIL FOR CUTTING LOADS

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1872369U (en) * 1963-03-13 1963-05-16 Rinker Fa R PROFILE RAIL FOR LINKABLE CUTTING LOADS.
DE8118006U1 (en) * 1981-06-20 1981-11-19 Große-Benne, Wilhelm HOLDING RAIL FOR CUTTING LOADS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998031982A1 (en) * 1997-01-16 1998-07-23 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Method for dismantling technical objects, and the appropriate technical object for the application of same
DE19919041A1 (en) * 1999-04-27 2000-11-09 Daimler Chrysler Ag Device for penetrating brickwork comprises housing containing two or more even-symmetrical hollow charges of explosive which produce cutting effect

Similar Documents

Publication Publication Date Title
DE68913983T2 (en) SUPPORT ELEMENTS FOR LINES AND ANALOG.
DE3390404T1 (en) A method of building load-bearing paneling and profile member for use in such a method
DE202016003860U1 (en) Disc railings
DE102010017803A1 (en) Scaffolding support for gabion-bracket scaffold for workers, has angular shaped bearing element arranged at wire mesh of gabion, and receiver provided with connection unit and hook, which are hung into wire of gabion
DE102013005470B4 (en) Formwork system
DE8912044U1 (en) Holding rail for cutting charges
DE3122593C2 (en)
DE3211404C2 (en)
EP2522787A2 (en) Fastening element
DE202009015319U1 (en) Cable holder for a mounting rail
DE2510946B1 (en) Under-ceiling carrier framework rail cruciform connecting piece - with downwards bent fishplates at plate sides edge-slotted for rail bends
EP2440721A1 (en) Wall covering
DE102015112039A1 (en) Frame for emergency batteries
DE2837153B1 (en) Building construction from profiles, especially for roofs
AT518245B1 (en) Length-adjustable hanger for anchoring a suspended false ceiling
DE202005012080U1 (en) Shelf bracket has horizontal section which supports shelf and vertical section, to which resilient horizontal clip is attached, hook on opposite side which curves upwards fitting into profiled support rail
DE20210076U1 (en) Method, for assembling air ducts, has U-shaped brackets to clamp duct ends together and incorporating elastic dampers in the pendant supports
DE2806940C3 (en) Surface cable grate
DE2405388C3 (en) Cross profile clamp for suspended ceilings
EP2157674B1 (en) Device for guiding cables
DE1947312C3 (en) Grate arrangement for holding waveguides and waveguide components
DE2501349A1 (en) Shop interior fitting stand and support - uses readily mass-produced connecting plates for connecting different stands
EP3757305A1 (en) Steel construction system
DE102022129273A1 (en) Arrangement of scaffolding components for a scaffold
DE1753068B2 (en) Drawer cabinet with drawers carried by two support rails and guided in running rails