DE845926C - Clock with rack mechanism and spring winding - Google Patents

Clock with rack mechanism and spring winding

Info

Publication number
DE845926C
DE845926C DED4930A DED0004930A DE845926C DE 845926 C DE845926 C DE 845926C DE D4930 A DED4930 A DE D4930A DE D0004930 A DED0004930 A DE D0004930A DE 845926 C DE845926 C DE 845926C
Authority
DE
Germany
Prior art keywords
bridge
barrels
clock
parts
front plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DED4930A
Other languages
German (de)
Inventor
Ernst Blocher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
METALL
Original Assignee
METALL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by METALL filed Critical METALL
Priority to DED4930A priority Critical patent/DE845926C/en
Application granted granted Critical
Publication of DE845926C publication Critical patent/DE845926C/en
Expired legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B21/00Indicating the time by acoustic means
    • G04B21/02Regular striking mechanisms giving the full hour, half hour or quarter hour
    • G04B21/022Regular striking mechanisms giving the full hour, half hour or quarter hour with saw mechanism

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Toys (AREA)

Description

Bei z. B. mit 8-Tage-\Verk und l-,ederaufzug aus- gerüsteten Uhren sind verhältnismäßig große und breite Federhäuser erforderlich, die sich nur schwer zwischen den Platinen unterbringen lassen. Aus diesem Grund hat malt die Federhäriser bereits unter einer besonderen Brücke gelagert und eilte der beiden Platinen für den Durchtritt der Federhäuser entsprechend ausgeschnitten. Die Erfindung bezieht sich auf eine derartige mit Federliausbrücke versehene Uhr. Nach der Erfin- dung wird vorgeschlagen, die Federhausbrücke gleichzeitig auch zur Lagerung anderer Uhrwerks- e züi benutzen, mid zwar vorzugsweise zur t ile bl Lagerung von Windflügel und den Hammerwellen des Schlagwerks. Insbesondere wird nach der Erfindung vor- geschlagen, die Federhatisbrücke an der Vorderseite der Vorderplatine des Werkes vorzusehen und hierbei die Steuerteile des Schlagwerks iin \vesellt- licheil in dein Rauin zwischen Vorderplatine, Brücke und Federhäuserli unterzubringen. Die Brücke kann nach Art einer Platine ausgebildet und durch mehrere Pfeiler finit der Vorderplatine verbunden seih. Art der Stelle der vorgesehenen Schlagwerkteile titid auch au anderen Stellen kann sie, Ausschnitte aufweisen. Durch die l:rfiildung \\-erden folgende Vorteile erzielt: Das Werk fällt trotz des vorgesehenen Sclilag\Verl:s verhältnismäßig flach aus, so (iaß der mit einem solchen Werk versehenen Uhr ein ge- scliniack\-ollesAussehen gegeben werden kann. Das Schlag\\erk der L'lir kann einen breiten und daher kräftig wirkenden Windflügel erhalten. Auch für die Haminer\\ ollen und den an ihnen befestigten l:iilzelteilen ist reichlich Platz vorhanden. Ein weiterer Vorzug bestellt darin, daß Windflügel uil(1 Hatnuterwellen unabhängig von dem Räderwerk zusammen mit den Federhäusern am Schluß der Werkmontage eingebaut werden können. Eiti Ausführungsbeispiel zu der Erfindung ist in den F ig. i bis d dargestellt. l, 'i". i zeigt ein Werk nach der Lrfin(lung von vorn gesellen; Fig. 2 zeigt da_, gleiche \Verk wie Fig. r Voll oben gesellen Fig. 3 zeigt (las teilweise montierte Werk finit Hinter- und Vorderplatine und (lern dazwischen- liegenden IZ:i(ter\Verk Von Vorn, und 1i'. q zeigt schlielilich noch die Vorderansicht der Brücke allein. Wie aus den t- iguren ersichtlich ist, bestellt (las Werk iin wesentlichen aus der Hinterplatine i, der Vorderplatine 2 und der l',rücke 3 und eitler Reitle nicht näher bezeichneter Pfeiler. Wie aus Fig.3 hervorgeht, sind sämtliche Räder für (Geh- und Schlagwerk zwischen den Platinen i und 2 montiert. Die Platine 2 ist für den Durchtritt der I,'c(lei-li;iuser mit Ausschnitten 4 tiii(1 _l' und für deii Durchtritt der Hammerwellen mit einem Ausschnitt 3 ver- sehen. LTin eineu möglichst breiten \\ilt(1HÜgel für das Schlagwerk \-orsehen zu können, ist die I'latille 2 noch mit einem Ausschnitt 0 versehen. Die \Verkinontage erfolgt in der Weise, (laß, wie aus Fig. 3 ersichtlich, zunächst (las gesamte Räder- werk zwischen den Platinen i mild 2 montiert wird. Anschließeild können die R;ider zum Antrieb des irlit der Stundelistattel8 versellenelt `tundenrohres7, der Auslösehebel y, der Rechen io, (ler Arretier- hebel i i und der Schöpfer 12 inrnitiert werden. Sodann erfolgt (las Einsetzen der l@e(lerliäuser 13 un(t 13', der Hammerwellen i.1 und 1.3, z. B. für ein Birn-Barn-Schlagwerk, und des Windflügels 16 zwischen der Hinterplatine i und der Brücke 3 (Fig. i). Die Brücke 3 ist finit Ausschnitten 17 und 18 versehen (Fig..I), um einerseits die `tetierteile des Schlagwerks bequem zugänglich zti haben und tunandererseits bei der Montage all dieAnkerbrücke ig in der Vorderplatine 2 bequem heran zu können. Wie aus Fig. 2 hervorgeht, liegen die stahfi'>rntigeil Riickholfedern 20 und 21 für die beiden Hammer- wellen 14 und 15 ebenfalls zwischen Flinterplatine 1 und Brücke 3. Mit ihrem vorderen Ende sind sie all der Hammerwelle befestigt, und finit ihrem hinteren Ende liegen sie in einer Öffnung iii der Hinter- platilie t. At z. B. with 8-day \ Verk and 1, eder elevator. armed clocks are relatively large and wide barrels required, which are difficult to move can be accommodated between the boards. the end for this reason has already painted the feather herisers stored a special bridge and hurried the two plates for the passage of the barrels cut out accordingly. The invention relates to such a Federliausbrücke provided clock. According to the invention It is suggested to use the barrel bridge at the same time for storing other watch movements Use e züi, preferably mid to t ile bl Storage of wind blades and hammer shafts of the striking mechanism. In particular, according to the invention, beaten, the Federhatis bridge at the front to be provided on the front plate of the movement and the control parts of the striking mechanism are included licheil in your room between the front plate, bridge and spring houses. The bridge can designed in the manner of a board and through several pillars finitely connected to the front plate be. Type of location of the intended hammer mechanism parts She can titid on other places too, cutouts exhibit. Due to the formation \\ - the following advantages Achieved: The work falls despite the planned Sclilag \ Verl: s relatively flat, so (iaß der watch fitted with such a movement scliniack \ -olles appearance can be given. That Blow \\ Erk the L'lir can be a broad and therefore strong-looking wind blades preserved. Also for the Haminers and the one attached to them There is plenty of space for individual parts. A Another advantage is that wind blades uil (1 Hat nut shafts independent of the gear train together with the barrels at the end of the Factory assembly can be installed. Eiti embodiment of the invention is in the fig. i to d shown. l, 'i ". i shows a work after the painting of front companions; Fig. 2 shows the same as Fig. R Voll companions upstairs Fig. 3 shows (the partially assembled work finite Back and front board and (learn in between- lying IZ: i (ter \ Verk Von Vorn, and 1i '. q finally shows the front view the bridge alone. As can be seen from the figures, ordered (read Work i essentially from the back plate i, the Front plate 2 and the l ', back 3 and vain Reitle unspecified pillar. As from Fig. 3 shows, all wheels for (walking and Striking mechanism mounted between plates i and 2. The plate 2 is for the passage of the I, 'c (lei-li; iuser with cutouts 4 tiii (1 _l 'and for the passage the hammer shafts with a cutout 3 see. LTin as wide a slope as possible (1HILL for To be able to see the striking mechanism is the latille 2 still provided with a cutout 0. The \ Verkinontage takes place in the way, (let, how can be seen from Fig. 3, initially (read the entire wheel factory between the boards i mild 2 is mounted. The wheels for driving the irlit der Stundelistattel8 versellenelt `tundenrohres7, the release lever y, the rake io, (ler locking lever ii and the creator 12 are involved. Then follows (the insertion of the l @ e (lerli houses 13 un (t 13 ', of the hammer shafts i.1 and 1.3, e.g. for a Birn-Barn striking mechanism, and the wind blade 16 between the backplane i and the bridge 3 (Fig. I). The bridge 3 is finite cutouts 17 and 18 provided (Fig..I), on the one hand the `tetierteile of the striking mechanism have easily accessible zti and do, on the other hand, all the anchor bridges during assembly ig in the front plate 2. As can be seen from Fig. 2, the stahfi '> rntigeil Return springs 20 and 21 for the two hammer waves 14 and 15 also between flinter plate 1 and bridge 3. With their front end they are all attached to the hammer shaft, and finite its rear At the end they lie in an opening iii the rear platilie t.

Claims (1)

PATENTANSPRÜCHE:
i. Mit Rechenschlagwerk lind I@e(leratifzug versehene Uhr, bei der die für Gell- und Schlag- werk vorgesehenen Federhäuser gemeinsam unter einer besonderen Brücke gelagert sind, da- durch gekennzeichnet, (lal.l die die Federhäuser tragende Brücke derart ausgebildet ist, (iaß sie gleichzeitig auch zur Lagerung anderer Uhr- werksteile, insbesondere zur Lagerung voll Windflügel und Hartinierwellen benutzbar ist. 2, Uhr nach Anspruch 1, dadurch gekenn- zeichnet, daß die zur Lagerung der Federhäuser dienende Brücke über der Vorderplatine liegt und die Steuerteile des Schlagwerks im \vesent- lichen in (lern Raum z\visclien Vorderplatine, Brücke und Federhäusern vorgesehen sind. 3. Uhr nach Anspruch i und 2, dadurch ge- kennzeichnet, daß die Brücke aii der Stelle der eingebauten Schlagwerksteile ausgeschilitten ist.
PATENT CLAIMS:
i. With hammer mechanism lind I @ e (leratifzug provided clock, in which the for gel and impact spring barrels provided in the factory are stored under a special bridge so that marked by, (lal.l which the barrels load-bearing bridge is designed in such a way (iaß she at the same time for storing other watch factory parts, especially for storage full Wind blades and Hartinierwellen is usable. 2, clock according to claim 1, characterized draws that the storage of the barrels serving bridge is over the front plate and the control parts of the percussion mechanism lichen in (lern room z \ visclien front plate, Bridge and barrels are provided. 3. Clock according to claim i and 2, characterized in that indicates that the bridge aii the place of built-in striking mechanism parts is slipped out.
DED4930A 1950-07-07 1950-07-07 Clock with rack mechanism and spring winding Expired DE845926C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DED4930A DE845926C (en) 1950-07-07 1950-07-07 Clock with rack mechanism and spring winding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DED4930A DE845926C (en) 1950-07-07 1950-07-07 Clock with rack mechanism and spring winding

Publications (1)

Publication Number Publication Date
DE845926C true DE845926C (en) 1952-09-15

Family

ID=7031179

Family Applications (1)

Application Number Title Priority Date Filing Date
DED4930A Expired DE845926C (en) 1950-07-07 1950-07-07 Clock with rack mechanism and spring winding

Country Status (1)

Country Link
DE (1) DE845926C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE921906C (en) * 1952-05-11 1954-12-30 Fritz Werner Ag Drive for the slide of machine tools, especially milling machines

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE921906C (en) * 1952-05-11 1954-12-30 Fritz Werner Ag Drive for the slide of machine tools, especially milling machines

Similar Documents

Publication Publication Date Title
DE2355782A1 (en) TOY CONSISTING OF A VEHICLE AND A STARTING DEVICE FOR IT
DE845926C (en) Clock with rack mechanism and spring winding
DE1784406A1 (en) Snow blower
DE2030715A1 (en) Impact clutch mechanism for a rotating impact device
DE687127C (en) Pendulum protection for clocks with key lift
DE929480C (en) Electric motor driven impact device
DE541676C (en) Loom with multiple bearings on both sides of the drive shafts in the stands of the machine frame
DE879114C (en) Stop bars in trams and other means of transport
DE326088C (en) Piston sand spreader
DE850584C (en) Pay for mining operations
DE878628C (en) Movement with constant force lock
DE1678582A1 (en) Toy vehicle
DE1276556B (en) Bearings for clockworks
DE730103C (en) Striking mechanism for synchronous clocks
DE460552C (en) Nail place for shoemakers
DE674511C (en) Pendulum clockwork
EP3037213A1 (en) Device for manually unscrewing screwed connections
DE842133C (en) Accelerometer
AT200505B (en) Implementation lever
DE69994C (en) Rear loading firearm with drop block lock
DE818625C (en) Self-winding for wristwatches
DE464377C (en) Racing game
DE923119C (en) Children's toys designed as aircraft
DE657650C (en) Alarm clock with facility for turning off the alarm inside and outside of the alarm time
DE1264806B (en) Arrangement for measuring indicator controlled shortening of the uncoupling time in maximum counters