DE8138172U1 - Frame for a training device - Google Patents

Frame for a training device

Info

Publication number
DE8138172U1
DE8138172U1 DE8138172U DE8138172DU DE8138172U1 DE 8138172 U1 DE8138172 U1 DE 8138172U1 DE 8138172 U DE8138172 U DE 8138172U DE 8138172D U DE8138172D U DE 8138172DU DE 8138172 U1 DE8138172 U1 DE 8138172U1
Authority
DE
Germany
Prior art keywords
frame
boom
frame according
upright
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE8138172U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Publication date
Publication of DE8138172U1 publication Critical patent/DE8138172U1/en
Expired legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/06User-manipulated weights
    • A63B21/062User-manipulated weights including guide for vertical or non-vertical weights or array of weights to move against gravity forces
    • A63B21/0626User-manipulated weights including guide for vertical or non-vertical weights or array of weights to move against gravity forces with substantially vertical guiding means
    • A63B21/0628User-manipulated weights including guide for vertical or non-vertical weights or array of weights to move against gravity forces with substantially vertical guiding means for vertical array of weights
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/06User-manipulated weights
    • A63B21/078Devices for bench press exercises, e.g. supports, guiding means
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/15Arrangements for force transmissions
    • A63B21/151Using flexible elements for reciprocating movements, e.g. ropes or chains
    • A63B21/154Using flexible elements for reciprocating movements, e.g. ropes or chains using special pulley-assemblies

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biophysics (AREA)
  • Orthopedic Medicine & Surgery (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Emergency Lowering Means (AREA)

Description

Patentanwalt 0. Glflaer, Sudotonatr. 6, BO76 Ebenhausen-Werk D. Ingolstadt/D. ^n.„.„nJ Patent attorney 0. Glflaer, Sudotonatr. 6, BO76 Ebenhausen-Werk D. Ingolstadt / D. ^ n. "." nJ

Anmelder: Josef Schnell, Sportweg 9,
889 8 PeutenhauFen
Registrant: Josef Schnell, Sportweg 9,
889 8 PeutenhauFen

Gestell für ein TrainingsgerätFrame for a training device

Die Neuerung bezieht sich auf ein Gestell für ein Trainingsgerät, das an einem aufrechten Ständerteil einenThe innovation relates to a frame for a training device that is attached to an upright stand part

i oberen Ausleger aufweist, der als Widerlager für Seil- | rollen dient, über die ein Zugseil läuft, das ar einem
zwischen Ausleger und einer Bodenkonstruktion senkrecht geführten Schlitten angreift, der z.B. mit Gewichtspaketen belastbar ist.
i has upper boom that acts as an abutment for rope | Rolls are used, over which a pull rope runs that ar a
Attacks a vertically guided slide between the boom and a floor structure, which can be loaded with weight packages, for example.

Derartige Gestelle sind seit langem bekannt und sie erfreuen sich als Trainingsgerät großer Beliebtheit. Dies bedeutet nicht, daß die bekannten Gestelle nicht mehr
verbesserungsfähig sind, so daß die Aufgabe der Neuerung darin besteht, die bekannten Gestelle zu verbessern und für die Praxis noch geeigneter zu machen.
15
Such frames have long been known and they are very popular as training equipment. This does not mean that the known racks are no longer
can be improved, so that the task of the innovation is to improve the known frames and make them even more suitable for practice.
15th

Dieses Ziel wird nach der Neuerung dadurch erreicht, daß das Gestell eine Profilrohrkonstruktion darstellt, dessen oberer Ausleger aus einem nach unten offenen Kasten besteht und das Gestell bzw. der hochgezogene Ständerteil für eine Wandbefestigung oder für eine Reihen- und/oder Kreuzanordnung hergerichtet ist. Der besondere Ausleger dieses neuen Gestelles kapselt wesentliche Teile des Bewegungsmechanismuses ein, was nicht nur ein gutes Aussehen bewirkt, sondern auch Unfallgefahren ausschließt.This goal is achieved according to the innovation in that the frame is a profile tube construction, its The upper arm consists of a box that is open at the bottom and the frame or the raised stand part is prepared for wall mounting or for a row and / or cross arrangement. The special boom this new frame encapsulates essential parts of the movement mechanism, which is not just good looking causes, but also eliminates the risk of accidents.

k » I t t I · · *■ «I· ·k »I t t I · · * ■« I · ·

Besonders vorteilhaft erscheint es aber, daß das neue Gestell variabel einsetzbar ist, d.h., es kann als Einzelgerät an die Wand geschraubt oder auf den Boden gestellt werden, ohne die Möglichkeit zu verbauen, gewissermaßen eine Trainingsreihe oder ein Trainingsbündel zu schaffen. However, it appears to be particularly advantageous that the new frame can be used variably, i.e. it can be used as a single device screwed to the wall or placed on the floor without the possibility of obstructions, so to speak create a training series or bundle of training.

Eine für die Praxis günstige Ausführungsform nach der Neuerung besteht darin, daß der aufrechte Ständerteil aus einem Vierkantrohr besteht, das oben vom Ausleger kappenartig übergriffen ist und unten in eine Art Fuß übergeht, welcher der Senkrechtführung für den Belastungsschlitten , gfSi den Belastungsgewichten und einer vorderen aufrechten Stütze des Auslegers als Widerlager dient.An embodiment which is favorable in practice according to the innovation is that the upright stand part consists of a square tube, which is overlapped in a cap-like manner by the boom at the top and in a kind of foot at the bottom passes over which of the vertical guidance for the loading slide, gfSi the loading weights and one front upright support of the boom serves as an abutment.

Eine weitere Besonderheit der Neuerung ist darin zu sehen, daß bei einer Einzelanordnung und einer Reihenanordnung des Gestells im unteren Bereich Ständbügel vorgesehen sind. Durch die Standbügel ergibt sich eine ausreichende Standstabilität, die besonders wertvoll erscheint, wenn man bedenkt, daß ein umkippendes Gerät erheblichen Schaden anrichten kann.Another special feature of the innovation can be seen in the fact that with a single arrangement and a row arrangement of the frame are provided in the lower area of upright brackets. The stand bracket results in a Adequate stability, which seems particularly valuable when you consider that a device will tip over can cause considerable damage.

5 Bei einer Kreuzanordnung empfiehlt es sich, ein zentrales gemeinsames Widerlager vorzusehen, das einen quadratischen oder dreieckförmigen Querschnitt aufweist.5 In the case of a cross arrangement, it is advisable to provide a central joint abutment, which is a square one or triangular cross-section.

Für gewöhnlich bzw. häufig wird das Zugseil am BeIastungsschlitten durch Verknoten befestigt. Dies bedeutet, daß das Kräfteverhältnis zwischen Zugkraft am Seil und Belastung am Schlitten 1 : 1 ist. Strebt man geänderte Verhältnisse an, ist es nach der Neuerung zweckmäßig, daß der senkrecht geführte BelastungsSchlitten eine 5 Rolle nach Art einer Flaschenzugsrolle für das ZugseilUsually or often the pull rope is attached to the load carriage fastened by knotting. This means that the balance of forces between the tensile force on the rope and Load on the slide is 1: 1. If one strives for changed conditions, it is useful after the innovation, that the vertically guided loading slide has a 5 role in the manner of a pulley for the pull rope

• * 1 · «I• * 1 · «I.

enthält und das Seil über Querstege des Auslegers geführt ist, Um schließlich zwei im Abstand voneinander a;:i aufrechten Ständerteil vorgesehenen Aufwickelhaken zuzustreben. Diese Bauart hat auch noch den Vorteil, daß man das aufgewickelte Zugseilende bequem von der Verankerung lösen kann, was bei einer Verknotung nicht der Fall ist.contains and the rope is guided over crossbars of the boom, in order to finally two at a distance from each other a;: i upright stand part provided winding hook to strive for. This design also has the advantage that you can easily remove the wound pull rope end from the Anchoring can loosen, which is not the case with a knot.

Für den Trainierenden ist es ferner von Vorteil, wenn auf die vordere aufrechte Stütze für den Ausleger ein seitenverschwenkbarer Lagerbock für eine Umlenkrolle höhenverstellbar aufgesetzt ist. Ähnliches gilt für den Fall, daß die im vorderen Bereich des Auslegers vorgesehene Seilrolle nach unten pendelnd aufgehängt ist. Diese schwenkbaren Rollen erweitern die Trainingsmöglichkeiten, ganz abgesehen davon, daß "KräfteVerkantungen" ausgeschlossen sind, die zu unrichtigen Beurteilungen des Trainingserfolges führen könnten.For the trainee, it is also advantageous if the front upright support for the boom is on laterally pivotable bearing block for a deflection pulley is attached in a height-adjustable manner. The same applies to the In the event that the rope pulley provided in the front area of the boom is suspended swinging downwards. These swivel castors expand the training possibilities, quite apart from the fact that "forces canting" excluded, which could lead to incorrect assessments of the training success.

In der Zeichnung ist die Neuerung beispielsweise veranschaulicht; es zeigen:In the drawing, the innovation is illustrated for example; show it:

Fig. 1 das neuerungsgemäße Gestell in Seitenansicht ;1 shows the frame according to the invention in side view;

5 Fig. 2 das gleiche Gestell in Oberansicht und die5 Fig. 2 the same frame in top view and the

Fig. 3 bis 5 Variationsmöglichkeiten des Gestells im Einsatz.Fig. 3 to 5 possible variations of the frame in use.

Den Fig. 1 und 2 ist zu entnehmen, daß das Gestell 1 im wesentlichen aus einem aufrechten Vierkantrohr 2, einem Fuß 3 und einem oberen Ausleger H besteht. Diese Teile sind miteinander verschraubt, was aber nicht ausschließt, daß sie verschweißt sein könnten. Im vorderen Bereich des Gestelles 2 ist eine Stütze 5 vorgesehen, welche die 5 Belastbarkeit des Auslegers 4 ganz wesentlich erhöht.1 and 2 it can be seen that the frame 1 consists essentially of an upright square tube 2, a foot 3 and an upper arm H. These parts are screwed together, but this does not rule out the possibility that they could be welded. In the front area of the frame 2, a support 5 is provided, which increases the load capacity of the boom 4 quite significantly.

i Ii I

ι »ι »

I II I

I II I

-/■- / ■

Außerdem weist das Gestell 1 Führungsstangen 6, 7 für einen Belastungsschlitten 8 auf. Dieser Belastungsschlitten 8 geht in eine Lochstange 9 über, die in ein Gewichtsbelastungspaket 10 eintaucht. Je nach der Lage des Vor-Steckers 11 werden die Einzelgewichte aufgenommen.In addition, the frame 1 has guide rods 6, 7 for a loading slide 8. This loading sled 8 merges into a perforated rod 9 which is immersed in a weight load package 10. Depending on the position of the front connector 11 the individual weights are recorded.

Beim Ausführungsbeispiel ist ein Zugseil 12 über Rollen 13, 14, 15 geführt und am Schlitten 8 befestigt. Das Seil 12 könnte aber auch über eine Art Flaschenzugrolle 16 laufen, wie dies durch gestrichelte Linien 17 angedeutet ist. In diesem Fall stützt sich das Seil 12 auf Querstegen bzw. Querbolzen 18 ab und wird dann zugfest auf im Abstand voneinander vorgesehene Haken 19, 20 aufgewickelt. In the exemplary embodiment, a pull rope 12 is on rollers 13, 14, 15 guided and attached to the carriage 8. The rope 12 could, however, also use a type of pulley block 16 run, as indicated by dashed lines 17. In this case, the rope 12 is supported on transverse webs or cross bolt 18 and is then wound on hooks 19, 20 provided at a distance from one another in a tensile manner.

Die Seilrolle 13 ist in einem Lagerbock 21 gelagert, der scharniergelenkig mit einer höhenverstellbaren Führung 2 2 verbunden ist. Die Höhenverstellbarkeit ist dadurch gegeben, daß ein Vorsteher 2 3 in entsprechende Bohrungen 24 der Stange 5 eingesteckt wird. Für die Höhenverstellung könnte aber auch ein federnder Rastbolzen vorgesehen sein. Die Seilrolle 14 ist ähnlich gelagert, d.h., sie ist nach unten pendelnd aufgehängt.The rope pulley 13 is mounted in a bearing block 21, which is hingedly connected to a height-adjustable guide 2 2 connected is. The height adjustability is given by the fact that a protrusion 2 3 in corresponding bores 24 the rod 5 is inserted. However, a resilient locking bolt could also be provided for the height adjustment. The rope pulley 14 is mounted similarly, i.e. it is suspended in a pendulous manner.

5 Wenn das Gestell 1 für sich allein aufgestellt werden soll, ist noch ein Standbügel 25 vorgesehen, wie sich dies besonders gut aus Fig. 2 ergibt. Auch in Fig. 4 ist die Einzelaufstellung mit dem Bügel 25 veranschaulicht. Gleichzeitig ist jedoch die Reihenanordnung durch gestrichelte Linien angedeutet, die naturgemäß einen längeren Bügel 25 erfordert.5 If the frame 1 is to be set up on its own, a stand bracket 25 is also provided, as is particularly the case well from Fig. 2 results. The individual installation with the bracket 25 is also illustrated in FIG. 4. Simultaneously however, the row arrangement is indicated by dashed lines, which naturally have a longer bracket 25 requires.

Nach Fig. 3 ist das Vierkantrohr 2 an eine Wand 2 6 angeschraubt. Nach Fig. 5 sind vier Gestelle 1 an ein zentrales Mittelstück 27 angesetzt. Wenn das Mittelstück 27 dreieckförmig wäre, käme eine Dreierkombination zustande.According to FIG. 3, the square tube 2 is screwed to a wall 26. According to Fig. 5, four frames 1 are attached to a central one Middle piece 27 attached. If the center piece 27 were triangular, a three-way combination would result.

Claims (7)

SchutzansprücheProtection claims 1. Gestell für ein Trainingsgerät, das an einem aufrechten Ständerteil einen oberen Ausleger aufweist, der als Widerlager für Seilrollen dient, über die ein Zugseil läuft, das an einem zwischen Ausleger und einer Bodenkonstruktion senkrecht geführten Schlitten angreift, der z.B, mit Gewichtspaketen belastbar ist, dadurch gekennzeichnet, daß das Gestell (1) eine Profilrohrkonstruktion darstellt, dessen oberer Ausleger (4) aus einem nach unten offenen Kasten besteht und das Gestell CD bzw. der hochgezogene Ständerteil (2) für eine Wandbefestigung (vgl. 26) oder für eine Reihen- und/oder Kreuzanordnung (vgl. 27) hergerichtet ist.1. Frame for a training device that has an upper arm on an upright stand part, which as Abutment for rope pulleys is used, over which a pull rope runs, which is attached to one between the boom and a floor structure attacks vertically guided slide, which e.g. can be loaded with weight packages, thereby characterized in that the frame (1) is a profile tube construction, the upper arm (4) of which from a downwardly open box and the frame CD or the raised stand part (2) for a Wall mounting (see 26) or for a row and / or Cross arrangement (see. 27) is prepared. 2. Gestell nach Anspruch 1, dadurch gekennzeichnet, daß der aufrechte Ständerteil (2) aus einem Vierkantrohr besteht, das oben vom Ausleger (4) kappenartig übergriffen ist und unten in eine Art Fuß (3) übergeht, welcher der Senkrechtführung (6, 7) für den Belastungsschlitten (8), gfs. den Belastungsgewichten (vgl. 10) und einer vorderen aufrechten Stütze (5) des Auslegers (4) als Widerlager dient.2. Frame according to claim 1, characterized in that the upright stand part (2) consists of a square tube consists, which is overlapped in a cap-like manner by the boom (4) at the top and merges into a kind of foot (3) at the bottom, which of the vertical guides (6, 7) for the loading slide (8), gfs. the load weights (cf. 10) and a front upright support (5) of the boom (4) serves as an abutment. 3. Gestell nach den Ansprüchen 1 und 2, dadurch gekennzeichnet , daß bei einer Einzelanordnung und einer Reihenanordnung des Gestells (1) im unteren Bereich Standbügel (25) vorgesehen sind.3. Frame according to claims 1 and 2, characterized that with a single arrangement and a row arrangement of the frame (1) in the lower area Stand bracket (25) are provided. 4. Gestell nach den Ansprüchen 1 und 2, dadurch gekennzeichnet , daß bei einer Kreuzanordnung ein zentrales gsmeinsames Widerlager (27) vorgesehen ist, das einen quadratischen oder dreieckförmigen Querschnitt aufweist. 4. Frame according to claims 1 and 2, characterized in that, in the case of a cross arrangement, a central joint abutment (27) is provided which has a square or triangular cross-section. 5. Gestell nach den Ansprüchen 1 bis 4, dadurch gekennzeichnet, daß der senkrecht geführte Belastungsschlitten (8) eine Rolle (16) nach Art einer Flaschenzugsrolle für das Zugseil (12) enthält und das Seil (12) über Querstege (18) des Auslegers (4) geführt ist, um schließlich zwei im Anstand voneinander am aufrechten Ständerteil (2) vorgesehenen Aufwickelhaken (19, 20) zuzustreben.5. Frame according to claims 1 to 4, characterized in that the vertically guided loading slide (8) contains a pulley (16) in the manner of a pulley pulley for the pull rope (12) and the rope (12) is guided over cross webs (18) of the boom (4) to finally two at a distance from each other on the upright Upright part (2) provided winding hooks (19, 20) to strive. 6. Gestell nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, daß auf die vordere aufrechte Stütze (5) für den Ausleger (4) ein seitenverschwenkbarer Lagerbock (21) für eine Umlenkrolle (13) höhenverstellbar (vgl. 22, 23, 24) aufgesetzt ist.6. Frame according to claims 1 to 5, characterized in that on the front upright support (5) for the boom (4) a laterally pivotable bearing block (21) for a deflection roller (13) adjustable in height (cf. 22, 23, 24) is attached. 7. Gestell nach den Ansprüchen 1 bis 6, dadurch gekennzeichnet, daß die im vorderen Bereich des Auslegers (4) vorgesehene Seilrolle (14) nach unten pendelnd aufgehängt ist.7. Frame according to claims 1 to 6, characterized in that the in the front region of the boom (4) provided rope pulley (14) is suspended swinging downwards.
DE8138172U Frame for a training device Expired DE8138172U1 (en)

Publications (1)

Publication Number Publication Date
DE8138172U1 true DE8138172U1 (en) 1982-06-16

Family

ID=1329540

Family Applications (1)

Application Number Title Priority Date Filing Date
DE8138172U Expired DE8138172U1 (en) Frame for a training device

Country Status (1)

Country Link
DE (1) DE8138172U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3205581A1 (en) * 1982-02-17 1983-08-25 Josef 8899 Gachenbach Schnell Apparatus on training equipment
CN112973000A (en) * 2019-12-12 2021-06-18 清河国际股份有限公司 Weight piece gap adjusting module of weight training equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3205581A1 (en) * 1982-02-17 1983-08-25 Josef 8899 Gachenbach Schnell Apparatus on training equipment
CN112973000A (en) * 2019-12-12 2021-06-18 清河国际股份有限公司 Weight piece gap adjusting module of weight training equipment

Similar Documents

Publication Publication Date Title
DE3690532C2 (en)
DE9001637U1 (en) Holding device for a freely movable barbell with weights
DE9007597U1 (en) Lying box housing
DE3636459A1 (en) DEVICE FOR GUIDING A LOAD ON A CONVEYOR
DE8138172U1 (en) Frame for a training device
EP0765677B1 (en) Trampoline
DE2256828B2 (en) SELF-LEVELING STORAGE AND OUTPUT DEVICE
DE4114328C2 (en) Device for hanging a bracket frame element
DE2533334B2 (en) Mobile agricultural atomization * or sprayer
DE2849073C2 (en)
DE8405132U1 (en) WORKING STAGE
DE965020C (en) Ring frame for gymnastics
DE2205887C2 (en) Cattle tie-up device in stalls - has neck frame with side struts and closable connecting elements
DE3733496C2 (en)
DE215816C (en)
DE2227942C2 (en) Cattle tie-up device in stalls - has neck frame with side struts and closable connecting elements
AT291169B (en) Carpet knockers
DE8123156U1 (en) CHARGER FOR SQUARE OBJECTS
DE3122628A1 (en) Curtain hanging device
DE300464C (en)
DE1786535U (en) DRAWING TABLE.
DE9100258U1 (en) Lunging device for gymnasts
DE2331317A1 (en) Height adjustable suspended gymnastic rings - ceiling mounted spacer arms carrying horizontal spreader bar
DE1230381B (en) Lifting rope arrangement for swiveling drilling rigs
DE1944421U (en) ADJUSTABLE TABLE.