DE7403620U - Power distribution system - Google Patents

Power distribution system

Info

Publication number
DE7403620U
DE7403620U DE7403620U DE7403620U DE7403620U DE 7403620 U DE7403620 U DE 7403620U DE 7403620 U DE7403620 U DE 7403620U DE 7403620 U DE7403620 U DE 7403620U DE 7403620 U DE7403620 U DE 7403620U
Authority
DE
Germany
Prior art keywords
sections
rails
distribution system
boxes
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE7403620U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEEF ELEKTROTECHNIK NEEF G VDE
Original Assignee
NEEF ELEKTROTECHNIK NEEF G VDE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEEF ELEKTROTECHNIK NEEF G VDE filed Critical NEEF ELEKTROTECHNIK NEEF G VDE
Priority to DE7403620U priority Critical patent/DE7403620U/en
Publication of DE7403620U publication Critical patent/DE7403620U/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/002Joints between bus-bars for compensating thermal expansion
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/06Totally-enclosed installations, e.g. in metal casings

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)

Description

Dr.-lng. Herbert Moser ■ ·'; Dr.-lng. Herbert Moser ■ · ';

Patentanwalt ■Patent attorney ■
Karlsruhe,Nowackanlago 15Karlsruhe, Nowackanlago 15

A 678A 678

Anatldtrin: 9ESF Elektrotechnik, Gerhard Neef VDB, Karlsrah·Anatldtrin: 9ESF Elektrotechnik, Gerhard Neef VDB, Karlsrah EnergieTerteilungeeysteaEnergy distribution eystea

Die Erfindung betrifft tin EnergieTerteilungasysie» far hob· Dauerströae, insbesondere für Hoohbeuten, wobei durch dit tiajselntn Gtwhoi·· Ttrtikal amfit«ig«ad· Saa-■•ltehira·!! geführt end ait den StoekwerkeTtrttilerkäattn sovi· alt dea Endtiaipeiiungikaittn Y«rbuod«a lind.The invention relates to energy distribution analysis hob · continuous currents, especially for high hives, whereby by dit tiajselntn Gtwhoi ·· Ttrtikal amfit «ig« ad · Saa- ■ • ltehira · !! run end ait the StoekwerkeTtrttilerkäattn soi · old dea Endtiaipeiiungikaittn Y «rbuod« a lind.

Bti d«r EntrgifTtreorguag Ton Hochbauttn, inabteondere bti Hoohhätisara, verdtn iog«nannt· LD-Sjitwee (lint-duot-Sjst«a·) ait Ttrtikal aufsttig«nd«n Saaatlsohlenea τβΓ-weiidet. Derartig· Saaatlechitntn gehen aeiat τοη tinta ia Ktllerraua aufgestellten Endeinepeieungskaeten aas und werden, aus Torgefertigten Abechnittiteilen zusaaaenge-■et«t, durch entsprechende Schiitse in den Geschoßdecken nach oben geführt. Der Jachteil der Torbekannten Systeme liegt einerseits in dar hohen Geviehtsbelastung des Fußpunktes und andererseits in der schwierigen und zeitraubenden Herstellung der Verdrahtung wischen den Abschnitten der Saaaelfchienea und den einzelnen Steckwerks-Verteilerkästen, Di· Yorbekanntea Syateae erfordernBti d «r EntrgifTtreorguag Ton Hochbauttn, inabte special bti Hoohhätisara, verdtn iog «called · LD-Sjitwee (lint-duot-Sjst« a ·) ait Ttrtikal aufsttig «nd« n Saaatlsohlenea τβΓ-Weiidet. Such · Saaatlechitntn go aeiat τοη tinta ia Ktllerraua established Endeinepeieungskaeten aas and are put together from gate-made billing parts, through corresponding shutters in the storey ceilings led up. The minor part of the well-known systems lies on the one hand in the high level of exposure to livestock at the foot point and on the other hand in the difficult and time-consuming production of the wiring between the sections of the Saaaelfchienea and the individual connector boxes, Di · Yorbekanntea Syateae require

«2-«2-

außerdem tint aaßgenaue Ausrichtung dtr Einetlteile und Ytrursaehta daait lusätsliehe Kosten·also tint aaßgenaue alignment dtr Einetlteile and Ytrursaehta daait attractive costs

Dit Erfindung gtht ton dtr Aufgabenstellung au· tin SnergieTerteilungssystea für höht Dauerströae, insbtsondtrt für Hochbauten anzugeben, welches dit Meatsge der Gesaatanlagt wesentlich Ttreinfacht und dadurch dtn Aufwand an ■Juwelier ffcntagearbeit entscheidend vermindert. Das Kentts«iefeaend« dtr Erfindung ist darin su sehen, daß dit Abschnitte der Sam«el«chienen Bit den einzelnen Stoekwerkt«Terteilerkäet»n eine Baueinheit bilden, und daß diese Baueinheiten tür Schaffung der durchgehenden Saroelachiene wenigstens stoekwerkveise rerbiadbar sind· Buren die Kombination der Abschnitte der Sejuelsehienen alt den Stockwerks-Yerteilerkästen ergibt sieh die Möglichkeit wesentlicher Vereinfachungen bei der Montage und in der StockwerksTerdrahtung. Auöerdea ist dit ungünstige höht Belastung SM Fußpuakt der Saaaelschienen dadurch Termieden, daß deren einseine Abschnitte an den Sioekwerks-Yerttlltrkästen befestigt und mit diesen auf der Bodenfläche des Stockwerks abgestütit sind.The invention gives the task of specifying a power distribution system for high permanent currents, especially for high-rise buildings, which significantly reduces the size of the seeding system and thus significantly reduces the expenditure on day-to-day work in the jeweler. The Kentts "iefeaend" dtr invention is to be seen in the fact that the sections of the Sam "el" chienen bit form the individual Stoekwerkt "Tteilerkäet" n a structural unit, and that these structural units for the creation of the continuous Saroelachiene are at least stoekwerkvere rerbiadable Buren the combination The sections of the Sejuelsehienen old the floor divider boxes result in the possibility of significant simplifications in the assembly and floor wiring. Auöerdea is the unfavorable high load SM footpuakt the Saaaelschienen termied, that one of its sections are attached to the Sioekwerk-Yerttlltrkästen and are supported with these on the floor surface of the story.

Is kann dabei besonders sweekmäßig aein, die Abschnitte der Samelsohienen innerhalb der Stoekwerks-Yerteilerkasten ansu^rdnen· Dadurch ergibt sieh ein geschlossener Aufbau und die erforderliehen Absweigungen lassen sieh in einfacher Weise herstellen und siehem.Is can be particularly sweeping, the sections the Samelso rails within the Stoekwerk distribution box ansu ^ rdnen · This results in a closed structure and the required diversions make it easier to see Make way and see.

Sin weiterer Tor teil kann gegebenenfalls dadurch erreichtA further part of the goal can be achieved as a result

-3--3-

warden, daß dia Stockwerks-Yer teilerkäs ten aus einem Grundbauelenent und aus eine» Aufsetsbauelement bestehen. Dabei können die Abschnitte der Sawaelschienen zweckmäßig in den Grundbou«l®tenten fertig montiert und die in den Aufsetsbauelememten lösbar, inabesondere herausnehabar oder staekbar angeordnet sein« Die Höhe der Grundbauelemente ist dabei vorteilhaft so zu wählen, daß ein einwandfreier Transport, insbesondere durch fertige Türöffnungen des Gebäudes Möglich ist· Ia allgemeinen erscheint die Höhe der Grundbauelemente τοη etwa 1,50 β und eine Höhe der Anifsetsbaueleaente entsprechend der Differenx sur Deekemnöhe sweckmäßig. FUr bestimmte Anwendungsfälle könnem j«doch auch andere Größenabmessungen anwendbar sein· Die Höh* des Aufsetsbauelementes kann vorteilhaft dem auszugleichenden Abstand swinchen der Oberkante des Grundbauelementes und der Unterkante der Decke entsprechen·that the floor dividers come from one Basic components and consist of a »add-on component. The sections of the Sawael rails can be useful fully assembled in the basic bou «l®tents and the Detachable in the mounting elements, especially removable or stackable «The height of the Basic structural elements are advantageously to be selected so that they can be transported properly, especially through finished ones Door openings of the building are possible · Ia general appears the height of the basic elements τοη about 1.50 β and a height of the Anifsetsbaueleaente corresponding to the Differenx sur Deekemnöhe crosswise. For certain applications, other sizes can also be used be applicable · The height * of the mounting element can advantageously match the distance to be compensated Upper edge of the basic building element and the lower edge of the To match ceiling

Is kann feimer vorteilhaft sein, die Abschnitt« der Sammelse hi tuen in den Stockwerkβverteilerkasten in einem abgedeckten Führungskanal aufbringen. DabeJL können die Stoekwerka-Yerteilerkästen sweckmäßig weiter» Kanäle für Steuerleitungen und dergl· einschließen. Dturoh eine solche Ausbildung wird eine Kompaktbauweise erreicht, welche einen optisch ansprechenden Gesamteindruck der Anlage mit übersichtlicher und kostengünstiger Leituagsführung verbindet. It can be more advantageous to put the sections of the manifold into the floor distribution box in one Apply covered guide channel. DabeJL can do the Stoekwerka divider boxes in terms of width continue »Channels for Include control lines and the like. Dturoh one such Training a compact design is achieved, which has a visually appealing overall impression of the system clearer and more cost-effective lead guide connects.

Eine sweokmäßige Aueführungsform kann in der Weise aufgebaut sein, daß der Führungskanal für die Abschnitte de?A sweeping embodiment can be constructed in this way be that the guide channel for the sections de?

-4--4-

7403120 H, ι. 747403120 H, ι. 74

Stmmelsohienen und der Kanal für die »Heuerleitungen an ^ gegenüberliegenden Seitenflächen des Stoekwerke-Verteilnrkastens vorgesehen sind. In allgeiieinen kann die
Inge des Führungskanal! für die Abschnitte der Sammelsoniene nach der geforderten Verdrahtung und der Lage der Abgänge in verschiedener Weise zweckmäßig gewählt werden. So ist beispielsweise auch eine stirnseitige Anordnung eines zentral liegenden Sammelsohienea-Kanals oit beidseitigen Abgängen innerhalb des Stockwerks-Verteilerkastens möglich und Torteilhaft·
Stmmelsohienen and the channel for the "Heuer ^ lines to opposite side surfaces of Stoekwerke-Verteilnrkastens are provided. In general, the
Inge the guide channel! for the sections of the collective rail according to the required wiring and the position of the outlets in various ways are expediently selected. For example, a centrally located Sammelsohienea canal with outlets on both sides within the floor distribution box is also possible

Ss kann ferner zweckmäßig sein, die in den Stoekwerks-Verteilerkästen liegenden Abschnitte der Sammelsehienen ▼on fester Länge durch längenausgleiohende Verbindungsstücke Ttrbindbar auszubilden. Damit ergibt sich die Möglichkeit des einfachen Ausgleichs von Differenzen innerhalb der Bodenhöhen bzw· der Geschoßhöhen, und es wird keine genaue Vermessung der Torliegenden Abmessungen
notwendig. Vorteilhaft wird die Länge der Abschnitte der in den Grundbauelenenten liegenden Sammelsehienea kürzer bemessen als die Höhe dieser Elemente, während die Abschnitte der Samaeischienen in den Aufsetzbauelementen über diese hinausragen.
It can also be expedient to make the sections of the collecting rails located in the Stoekwerk distribution boxes of a fixed length so that they can be bonded by length-adjustable connecting pieces. This results in the possibility of simply compensating for differences within the floor heights or the storey heights, and there is no exact measurement of the dimensions of the door
necessary. Advantageously, the length of the sections of the collecting rails a lying in the basic components is dimensioned to be shorter than the height of these elements, while the sections of the railing rails in the mounting components protrude beyond them.

Der Stockwerks-Verteilerkasten kann in verschiedener Weise, zweckmäßig jedoch auf der Grundlage eines Bahmengestells mit entsprechenden Abdeckplatten aufgebaut sein. Dabei lassen sich entsprechende Bereiohe für unterzubringende Schaltgeräte und Kleameßfeider abgrenzen.The floor distribution box can be used in various ways, expediently, however, be built on the basis of a frame with corresponding cover plates. Included Corresponding areas can be defined for switching devices and Kleameßfeider to be accommodated.

Durch daa angegebene SiiergieTerteiluagiiiystem gemäß dar Brfindung warden vertikal autataigemde Samaalachianan und gegebenenfalls suaätiliohe Stauarlaitungan la dia Stockwerka-Verteilerkäaten inttgriart. Ia ergeben eich einfach aontierbare Baueinheiten, waloha dia Geaalt« kosten dar Stcckwerkeinatallntion vaaantlieh aankaa*Through the specified safety sub-division system according to FIG Findings are vertically autataigemde Samaalachianan and possibly suaätiliohe stauarlaitungan la dia Stockwerka distributor käaten inttgriart. Yeah, surrender easily removable units, waloha dia Geaalt « cost of piece assembly vaaantlieh aankaa *

Iu dar Zeichnung ist ein Auaführungabaiapitl daa ataadaa dar Erfindung achamtiaoh dargaatallt, aus daa •ich vaitara Srfindungamarknala argaban; aa seigan:Iu dar drawing is an execution abaiapitl daa ataadaa dar invention achamtiaoh dargaatallt, from daa • i vaitara Srfindungamarknala argaban; aa seigan:

Figus« 1 eint iaeaatriaeha iuaaolraittadaratellung eines Snergl eTerteilungisyateMs gaaaJ dar Srfindung,Figus «1 at iaeaatriaeha iuaaolraittadaratstellung of a Snergl eDistributionateM gaaaJ the invention,

Figur 2 ein Grundbaueleaent far ein Snargie» Terteilungssyste« geaäß Fig· I9 FIG. 2 a basic building element for a snargy "partition system" according to FIG. 9

Figur 3 ein Aufeetsbaualeaent für eia Saargia-▼arteiluugeayataa gemäß Fig. 1»Figure 3 an Aufeetsbaualeaent for eia Saargia- ▼ arteiluugeayataa according to Fig. 1 »

In Figur 1 wird daa Ener£ieverteilungisyste» in dar Anwendung auf ein Geschoß ainaa Hochhauses näher erläutert. Man erkennt zwei Geechoßdeken 1,2, waloha entsprechende Sohliteauseparungen 3t4 aufweisen.In FIG. 1, the energy distribution system is used explained in more detail on one floor of ainaa high-rise building. You can see two Geechoßdeken 1,2, waloha corresponding Have sole openings 3t4.

Par Stockwerks-Verteilerkasten 5 baataht aus ainaa Grundbauelement 6, in dem ein aratar Abschnitt 7 einer Sammelschiene angeordnet ist. Sin zweiter Abschnitt 8 dieserPar floor distribution box 5 baataht made of ainaa basic building element 6, in which an aratar section 7 of a busbar is arranged. Sin second section 8 of this

-6--6-

7401120 m.7401120 m.

Sameliehiene liegt in einen Aufsetsbaueleaent 9, welches auf da« Grundbaueleaeitt 6 aufgesetzt und alt die» sen durch laaehenTerbindungen vereinigt wird. Die Abschnitte 7 und 6 der Saaaalsehiene liegen in entsprechenden Führungekanälen, wobei ein Führungskanal 11 in dem Aufsetsbgueleaent 9 dargestellt ist (Fig. 3) Sin gleichartiger Führungskanal 10 liegt i* Innenraun des GrundbaueleBeates 6·Sameliehiene is in a Aufsetsbaueleaent 9, which on the «Grundbaueleaeitt 6 put on and old the» sen is united by laaehen connections. The sections 7 and 6 of the Saaaalsehiene lie in corresponding guide channels, with a guide channel 11 in the Aufsetsbgueleaent 9 is shown (Fig. 3) Sin similar guide channel 10 is i * Innenraun des Basic componentsBeates 6 ·

ItLr susätsliohe Steuerleitnngen 12 sind in de Grundbauelement 6 und in des Aufaetsbaueleaent 9 Kanäle 15» 14 vorgesehen.ItLr susätsliohe control lines 12 are in the basic component 6 and in the construction team 9 channels 15 »14 intended.

Sie Verbindung der beiden Abschnitte 7,8 erfolgt über längenausgleichende Verbindungsstücke 15 in Fora einer Ik«ehenYerbindung. Auf diese Weise lassen sich üblicher* weise auftretende GesohoBdeckendifferensen ohne genaues Versessen ausgleichen· Die Führungekanäle 1O911 für die Saaaelschienen und/oder die Kanäle (13»14) für die Steuerleitungen 12 werden zweckmäßig brandheaaend bzw. als Feuerbarrieren gestaltet·The connection of the two sections 7, 8 takes place via length-compensating connecting pieces 15 in the form of a single connection. In this way, the usual * be occurring GesohoBdeckendifferensen without exact obsession balance · The Führungekanäle 1O 9 11 for the Saaaelschienen and / or channels (13 "14) for the control lines 12 are designed appropriately brandheaaend or as fire barriers ·

-7--7-

- XO -- XO -

KennziffernIndicators 1,21.2 GeschoßdeckenCeilings 3,43.4 SchlitzaussparungenSlot recesses 55 Stoekwerke-VerteilerkastenStoekwerke distribution box 66th GrundbauelenentBasic elements 7,87.8 Abschnitte der SaaaeleehieneSections of the Saaaeleehiene 99 AufaetzbauelementAufaetzbauelement 10,1110.11 FührungskanäleGuide channels 1212th SteuerleitungenControl lines 13,1413.14 Kanälechannels 1515th VerbindungsstückeConnectors

7463120 21.«.7463120 21. «.

Claims (8)

Anspruch·Claim· 1. SaergieYerteilungssystra für höh· Basaeretröae. insbesondere für Hochbauten, wobei dureh di· oinielnen Geschosse vertikal aufsteigende Saualsohienen geftthrt und alt den Stoekwerks^Terteilerkästen sowie alt dm Sadeinspeisungskastw Ttrbundta find, dadurch gekennzeichnet, daß dl· Abschnitt· (7,8) der Saioielschienen mit den einaelnen Stockwerks-Verteilerkäeten (5) «ine Baueinheit bilden, und dafi dl··· Baueinheiten zur Schaffung der durchgehenden Sammelschiene wenigstens stockwerkweise verbindbar sind·1. Saergie distribution system for high Basaeretröae. in particular for high-rise buildings, with thin lines Floors vertically ascending Saualso rails Guided and old the Stoekwerks ^ divider boxes as well as old dm Sadeinspeisungskastw Ttrbundta find, characterized in that dl · section · (7,8) of the Saioiel rails with the Single floor distribution boxes (5) in a structural unit form, and dafi dl · ·· building units to create the continuous busbar can be connected at least one floor at a time 2« SnergieTerteilungssyetea für hohe Dauerströme nach Anspruch 1, dadurch gekennselchnet, daß die Abschnitte (7,3) der Saaaelschienen Innerhalb der Stockwerks-Verteilerkästen (5) aontiert sind.2 «Energy distribution system for high continuous currents according to Claim 1, characterized in that the sections (7,3) of the Saaael rails Aontiert within the floor distribution boxes (5) are. 3« EnergieTerteilungssysten nach Anspruch 1 oder 2, dadurch gekeunseichnet, daß dl· Stockwerka-Verteilirkäeten (5) aus einea Grundbaueleaent (6) und aus einea Aufeetibaueleaent (9) bestehen3 «energy distribution systems according to claim 1 or 2, indicated by the fact that dl · Stockwerka distribution units (5) from a Grundbaueleaent (6) and from a Aufeetibaueleaent (9) exist 4. EnergieTerteiluBgiiystea aaoh Anspruch 1, da« durch gekennseichnetv daß in4. EnergieTteiluBgiiystea aaoh claim 1, because «by gekennseichnet v that in -8--8th- 7«H2On.«.K7 "H2On.". K die Abschnitt« (7,8) dar Sanclsehienen in den Grundbsuieleienten (6) fertig montiert und in dtn Aufsetsbaueleaenten (9) lösbar angeordnet sind·the section "(7,8) dar Sanclsehienen in the Grundbsuieleienten (6) fully assembled and in German Aufsetzbaueleaenten (9) are detachably arranged 5· SnergiSTftrtsilungssystaB. nach Anspruch I9 dadurch g « k ι α η ζ e i e h Q s t( daß die Abschnitt· (7,8) der Saraclsehienen in dtn Stookverks-Verteilerkäston (5) in einen Fütarnngskttnal <1af11> liegen.5 · Energy supply system. according to claim I 9 characterized in that the sections (7, 8) of the Saraclse rails in the stookverks distribution box (5) are in a feed section <1a f 11>. 6» Bnergieverteilungssystea nach Anspruch 1, d a d u r e h g ι k t ι κ s ι i c b β ι t, daß in den Steckwerks-Yerteilerkästen (5) weiter· Kanal· (13,14) für Stetitrleituagtn (12) eingeschlossen sind«6 »Energy distribution system according to claim 1, d a d u r e h g ι k t ι κ s ι i c b β ι t that in continue with the plug-in divider boxes (5) channel (13,14) for Stetitrleituagtn (12) are included « 7. SnergitTerteilungssystsB nach Anspruch 6, deiuroh g · k fj η β ζ · i c b ». * tf SaS die Führungskanal· (to,11) für die Abschniits (7,8) der Sanelsehiemen and die Kanäle (13,14) für die Stenerleitungen (12) am gegea&berliegeudem Seitenflächen des 3trj*kv'irk»»¥erteilerk»eten8 (5) vorgesehen sind. 7. SnergitTteilungssystsB according to claim 6, deiuroh g · k fj η β ζ · icb ». * t f SaS the guide channel · (to, 11) for the sections (7,8) of the Sanelsehiemen and the channels (13,14) for the star lines (12) on the opposite side surfaces of the 3trj * kv'irk »» ¥ distributors » eten8 (5) are provided. 8. ]sn*rgieT©rteiluügssyst#a nach Anspruch 1, dadurch gekennzeichnet, daß die in den Sieckwerks-fertcilerkasten (5) liegenden Abschnitte der Saieaelsehienen von fester Länge durch längenausgleiehende Verbindungsstücke (15) Tcrbindft&r sinde8.] sn * rgieT © rteiluügssyst # a according to claim 1, characterized in that the Sections of the saieaelsehienen of fixed length lying in the Sieckwerk fertciler box (5) length equalizing connectors (15) Tcrbindft & r are 7««»20ni.K7 «« »20ni.K 9· Energieverteilungssysteii nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß dit führungskanal β (10,11) für die Saontlschitnsn und/oder dit Kanal« (13,14) für dit Steuerleitungen (12) brandheanond bsw« als Feuerbarrieren gestaltet sind·9 · Energy distribution system according to claim 5 or 6, characterized in that the guide channel β (10, 11) for the Saontlschitnsn and / or dit Channel «(13,14) for the control lines (12) brandheanond bsw «are designed as fire barriers ·
DE7403620U 1974-02-02 1974-02-02 Power distribution system Expired DE7403620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE7403620U DE7403620U (en) 1974-02-02 1974-02-02 Power distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE7403620U DE7403620U (en) 1974-02-02 1974-02-02 Power distribution system

Publications (1)

Publication Number Publication Date
DE7403620U true DE7403620U (en) 1974-08-29

Family

ID=6643578

Family Applications (1)

Application Number Title Priority Date Filing Date
DE7403620U Expired DE7403620U (en) 1974-02-02 1974-02-02 Power distribution system

Country Status (1)

Country Link
DE (1) DE7403620U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19511350A1 (en) * 1995-03-28 1996-10-02 Kloeckner Moeller Gmbh Rail channel system of a low-voltage switchgear

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19511350A1 (en) * 1995-03-28 1996-10-02 Kloeckner Moeller Gmbh Rail channel system of a low-voltage switchgear

Similar Documents

Publication Publication Date Title
AT395668B (en) FRAME SYSTEM FOR LOW-CURRENT PLANT CONSTRUCTION, ESPECIALLY FOR DISTRIBUTION PLANTS
EP0440104B1 (en) Partition wall for the subdivision of spaces
DE2545478A1 (en) PANELED DOOR
DE7403620U (en) Power distribution system
DE2324224A1 (en) SKYSCRAPER
EP1287798A1 (en) Device for manufacturing hygiene products
DE1437931C3 (en)
EP0594157A1 (en) Log cabin
DE29818218U1 (en) Open-air cattle barn with cubicles
DE3637063A1 (en) Covering for discharge channels
DE2405049A1 (en) High power DC distribution system for tall buildings - has vertical line-ducts connected to junction boxes on each floor
DE19538366A1 (en) Balcony structure for attachment to existing wall of building
DE19945288A1 (en) Hoist tower with hoist rails for cabin centers round two-dimensional main frame having crossbar-linked corner columns and bracket arms taking adjoining cabin rails.
DE913071C (en) Junction or distribution box made up of standard components
DE8900372U1 (en) Cable duct, especially small cable duct
DE9412167U1 (en) Wall distributor
DE2448983A1 (en) PARTITION WALL SYSTEM
DE2142606C3 (en) Double-shell sound-absorbing interior partition and method for producing the same
DE3406388A1 (en) Change-over frame for individual panels of concealed precast floors
Kleeberg Memorandum zur Durchführung von Pilot-Projekten und Therapieoptimierungsvergleichen in der Palliativtherapie inkurabel Krebskranker
DE1896263U (en) LARGE-SURFACE BIMS CONCRETE ELEMENT AS A BUILDING WALL PART.
DE1928723C (en) Prefabricated cable duct made of reinforced concrete
DE1484015C (en) Dismantled and relocatable building in a braced construction
CH475440A (en) Construction element set for the production of non-load-bearing walls from prefabricated elements
DE1784596A1 (en) Storey stairs