DE739026C - Emergency circuit for electrical systems - Google Patents

Emergency circuit for electrical systems

Info

Publication number
DE739026C
DE739026C DES132217D DES0132217D DE739026C DE 739026 C DE739026 C DE 739026C DE S132217 D DES132217 D DE S132217D DE S0132217 D DES0132217 D DE S0132217D DE 739026 C DE739026 C DE 739026C
Authority
DE
Germany
Prior art keywords
power supply
relay
machine
electrical systems
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DES132217D
Other languages
German (de)
Inventor
Werner Vogel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VEM Sachsenwerk GmbH
Original Assignee
Sachsenwerk Licht und Kraft AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sachsenwerk Licht und Kraft AG filed Critical Sachsenwerk Licht und Kraft AG
Priority to DES132217D priority Critical patent/DE739026C/en
Application granted granted Critical
Publication of DE739026C publication Critical patent/DE739026C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/06Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for dynamo-electric generators; for synchronous capacitors
    • H02H7/062Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for dynamo-electric generators; for synchronous capacitors for parallel connected generators

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Stand-By Power Supply Arrangements (AREA)

Description

Notbetriebsschaltung für elektrische Anlagen Es sind bereits Sicherheitseinrichtungen für :elektrische Kraftanlagen mit mehreren Stromerzeugermaschinen bekanntgeworden, welche eine Anzahl von Verteilerstromkreisen speisen und bei denen bei Ausfall einer Prämärmasch.ine durch eine Hilfsschaltvorrichtung ein oder mehrere Verteilerstromkreise abgeschaltet werden und damit eine Überlastung der restlichen Primärmaschinen verhindert wird. Diese bekannten Sicherheitseinrichtungen haben den Nachteil, daß jede Abschaltung einer Primärmaschine zu der erwähnten Abschaltung eines oder mehrerer Verteilerstromkreise führt, unabhängig davon, ab die weiterhin in Betrieb befindlichen, Stromerzeu:germaschinen den Strombedarf hätten, decken können oder nicht. Darüber hinaus sind auch schon Sicherheitseinrichtungen belcanntgeworden,. bei denen der von jeder Stromversorgermaschine jeweils gelieferte Strom dauernd von j e einem Überstromrelais oder je einem Generatorschtztzrelais überwacht wird und jede unzulässige Stromentnahme die Abschaltung eines Teils des Verbrauchers: bewirkt. Es sind auch schon weitergehende Schutzschaltungen zur Entlastung der Eigengeneratoren von Betrieben bei zu hohem Stromverbrauch zur Anwendung gekommen, die die selbsttätige Abschaltung weniger wichtiger Stromverbrauc er nacheinander herbeiführen. Die Abschaltung erfolgt in -der Weise, daß jedem Stromerzeuger ein Überwachungsrelais zugeordnet ist, die in Reihe mit einer Anzahl Zeitrelais mit unterschiedlicher Zeitstaffelung geschaltet sind. Die Zeitrelais liegen in Abzweigen, die zu für ,die Aufrechterhaltung des Betriebes nicht unbedingt notwendigen Verbrauchern führen, während -die Verbraucher, die dauernd eingeschaltet sein müssen, nicht in die Schutzschaltung einbezogen sind. Entsteht eine Überlastung etwa durch Ausbleiben. der noch vorgesehenen Fremdzuspcisunig durch: ein Netz, dann sprechen. die GeneratorschutzreIais an. Um einen der entbehrlichen Verbraucher abzuschalten, muß auch das im entsprechenden Abzweig liegende und mit dem Generator in Reihe geschaltete Zeitrelais seine Kontakte schließen. Das Relais schaltet aber nur dann ein, wenn der Verbraucher mindestens bis zu dem eingestellten Ansprechwert des Relais belastet ist. Ist das nicht der Fall, dann wird keiner der entbehrlichen Verbraucher abgeschaltet, auch wenn durch die nicht von der Schutzschaltung erfaßten Abzweige, also z. B. die betriebswichtigen Verbraucher, eine unzulässige hohe Stromentnahme erfolgt. Es tritt in dieseln. Falle also keine Entlastung der Stromerzeuger ein.Emergency operation circuit for electrical systems There are already safety devices for: electrical power plants with several power generating machines become known, which feed a number of distribution circuits and in which one Prämärmasch.ine one or more distribution circuits through an auxiliary switching device switched off, thus preventing the remaining primary machines from being overloaded will. These known safety devices have the disadvantage that each shutdown a primary machine for the aforementioned disconnection of one or more distribution circuits leads, regardless of this, from the power generating machines that are still in operation could or could not have met the electricity demand. In addition, are already Security devices have been scanned. at those of any electric utility machine Each current supplied by an overcurrent relay or a generator protection relay is monitored and any inadmissible current draw will result in the shutdown of part of the Consumer: causes. There are already more extensive protective circuits for relief the in-house generators of companies are used when the electricity consumption is too high, the automatic shutdown of less important power consumers one after the other bring about. The shutdown takes place in a way that every power generator has a Monitoring relay is assigned, which are in series with a number of timing relays with different time graduation are switched. The timing relays are in branches, the consumers that are not absolutely necessary for the maintenance of operations lead, while -the consumers, which must be switched on continuously, not in the protective circuit are included. If there is an overload caused by absenteeism, for example. the planned external support: a network, then talk. the generator protection relay at. In order to switch off one of the dispensable consumers, this must also be done in the corresponding Branch time relays connected in series with the generator close their contacts. The relay only switches on when the consumer has at least up to the set response value of the relay is loaded. If not, then none of the expendable consumers are switched off, even if they do not branches detected by the protective circuit, so z. B. the essential consumers, an impermissibly high current draw occurs. It occurs in diesels. So don't fall Relief of the electricity generator.

Die Erfindung erzielt dadurch eine weitere Verbesserung dieser zuletzt erwähnten Gattung bekannter Notbetriebsschaltungen, daß mit dem Stromüberwachungsrelais jeder Versorgermaschine eine eigene Gruppe von mehreren Zeitrelais mit gegeneinander abgestuften Verzögerungszeiten verbunden ist. Es führt` also nicht schon jede kurzzeitige Überlastung der Stroinversorgermaschine zur Herbeiführung des Notbetriebes. Vielmehr wird durch die Zuordnung einer Anzahl von Zeitrelais zu jedem Gberstrom- oder Generatorschutzrelais bei jeder Betriebsstörung die Abschaltung der Verbraucher schrittweise und nur so lange vorgenommen, bis die von den noch in Betrieb befindlichen Stromversorgermaschinen gelieferten Ströme zulässige Beträge angenommen haben. Maßgebend für das Wirksamwerden der Schutzschaltung ist der Gesamtverbrauch der Anlage und durch die jedem Generatorüberwachungsrelais zugeordnete eigene Gruppe von Zeitrelais wird erreicht, .daß die schrittweise Abschaltung von für die Aufrechterhaltung des Betriebes nicht unbedingt notwendigen Verbrauchern erfolgt ohne Rücksicht darauf, wo die Ursache der der Generatoren liegt, so daß die Stromzufuhr zu Verbrauchern, die eingeschaltet bleiben müssen, ,gesichert ist.The invention thereby achieves a further improvement in this last mentioned type of known emergency operation circuits that with the current monitoring relay each supply machine has its own group of several timing relays with one another graduated delay times is connected. So it doesn’t lead to every short term Overload of the power supply machine to bring about emergency operation. Much more is achieved by assigning a number of timing relays to each Gber current or generator protection relay with every malfunction, the consumers are switched off gradually and only in this way long made up of the power supply machines that are still in operation supplied flows have accepted permissible amounts. Decisive for the coming into effect the protection circuit is the total consumption of the system and by each generator monitoring relay assigned own group of time relays is achieved, that the gradual switch-off from consumers that are not absolutely necessary for maintaining operations takes place regardless of where the cause of the generators lies, so that the power supply to loads that must remain switched on is secured.

Zur Erläuterung der Erfindung wird auf das in der Zeichnung dargestellte Ausführungsbeispiel Bezug genommen. Die Stromversorgermaschinen sind darin mit G,, G. und. G3 bezeichnet. Sie liefern ihren Strom über die Stromwandler TI',,. TV, und L-1"3 auf die Hauptsammelschiene S. Zwischen den Wandlern llr,, LT". und LT', und .der Sammelschiene S sind die Maschinenschalter L",, C". und L'3 vorgesehen.To explain the invention, reference is made to the embodiment shown in the drawing. The power supply machines are in it with G ,, G. and. G3 called. They supply their current via the current transformers TI ',,. TV, and L-1 "3 on the main busbar S. Between the converters llr" LT ". and LT ', and. of the busbar S are the machine switches L "" C ". and L'3 provided.

Von der HauptsammelschieneS führt je eine der Verbindungsleitungen L',, 1'.2 und I`3 bzw. h4 zu den Verbrauchergruppen 11,, 1-1;,, ;i13 bzw. 114. Um den durch die Erfindung geschaffenen Notbetrieb zu ermöglichen, ist in den Leitungen h, bis V4 j e ein Schütz Sch, bis Sch4 vorgesehen.One of the connecting lines each leads from the main busbar L ',, 1'.2 and I`3 or h4 to consumer groups 11 ,, 1-1; ,,; i13 or 114. Um To enable the emergency operation created by the invention is in the pipeline h, up to V4 j e a contactor Sch, provided up to Sch4.

Zur L`berwachung der Stromentnahme sind mit den Stromversorgermaschinen G,, G2 und G3 je eines der Überstromrelais R,, R_ bzw. R3 verbunden. Diese lüberstromrelais geben über die Zeitrelaisgruppen Z,, 7_, und "I_3 sowie über die Hilfsleitungen H ihre Befehle zu den Schützen S'ch, bis Sch, Die Wirkungsweise der beschriebenen Anordnung ist nun folgende: Bei normalem Betrieb speisen die drei Stromversorgungsmaschinen G1 bis G3 die vier Verbrauchergruppen 11, bis 11,, gemeinsam. , Fällt nun infolge irgendeiner Betriebsstörung die Stromversorgermaschine G.; aus, so kann sich dieser Ausfall durch einen .unzulässgen Anstieg der den Stromversorgermaschinen G, und G. entnommenen Ströme bemerkbar machen. Die unzulässig hohen Ströme beeinflussen. die Cberstromrelais R, und R. sowie zunächst das erste Zeitrelais der Zeitrelaisgruppen Z, und 7_.. Sofern die Betriebsstörung bei der Strornversorgermaschine G3 nicht innerhalb der Verzögerungs7eit .dieses Zeitrelais behoben: ist, erfolgt -die Kontaktschließung an diesem Zeitrelais, wodurch das Schütz Schi in Tätigkeit tritt und die Verbrauchergruppe 11, abschaltet. Das zweite Zeitrelais der Zeitrelaisgruppen Z, bzw. Z. tritt nur in Tätigkeit, weim .die Abschaltung der Verbrauchergruppe _Il, nicht genügt hat, um die Stromentnahme der Stromversorgermaschinen G, bzw. G.. auf zulässige Werte zu verringern. Die Abschaltung der Stromv ersorgergruppe 11., .113 usw. spi;it sich dann in. derselben Weise ab, wie es für den Fall der Betätigung des Schützes Schi beschrieben worden ist.The electricity supply machines are used to monitor the consumption of electricity G ,, G2 and G3 each one of the overcurrent relays R ,, R_ or R3 connected. These overcurrent relays output via the timing relay groups Z ,, 7_, and "I_3 as well as via the auxiliary lines H their commands to the shooters S'ch, to Sch, The mode of action of the described The arrangement is as follows: In normal operation, the three power supply machines feed G1 to G3 the four consumer groups 11 to 11, together. , Now falls as a result any malfunction the power supply machine G .; off, so this can Failure due to an impermissible increase in the power supply machines G, and G. make drawn currents noticeable. Influence the impermissibly high currents. the overcurrent relays R, and R. and initially the first timing relay of the timing relay groups Z, and 7_ .. Unless the malfunction in the electricity supply machine G3 This time relay is remedied within the delay time: the contact closes on this time relay, whereby the contactor Schi comes into operation and the consumer group 11, turns off. The second timing relay of the timing relay groups Z or Z. only occurs in action when the disconnection of consumer group _Il was not sufficient, around the current consumption of the power supply machines G or G .. to permissible values to reduce. The disconnection of the electricity supplier group 11., .113 etc. is a mystery then in the same way as in the case of actuation of the contactor Schi has been described.

Es ist ein besonderer Vorzug der Notbetriebsschaltung nach der Erfindung, daß Betriebsgefährdungen durch unsachgemäße Behandlung bzw. Voreinstellung der während des Notbetriebes in Tätigkeit bleibenden Verbraucher ausgeschlossen sind, weil Vorbereitungsschaltungen für den Notbetrieb gar nicht getroffen zu werden brauchen, sondern ein vollständig selbsttätiger Betrieb vorliegt.It is a particular advantage of the emergency operation circuit according to the invention, that operational hazards due to improper handling or presetting of the during of the emergency operation remaining active consumers are excluded because preparatory circuits need not be taken for emergency operation, but a complete one automatic operation is present.

Die Notbetriebsschaltung nach der Erfindung eignet sich nicht nur für Kraftanlagen, sondern auch für Industrieanlagen sowie für elektrische Betriebe aller Art. Insbesondere geeignet ist sie für die Antriebsanlagen von Kunstfas,erstoffabriken, bei denen die zuverlässige Aufrechterhaltung eines Notbetriebes im Falle einer Betriebsstörung im Stromversot-gerteil von großer Wichtigkeit ist.The emergency operation circuit according to the invention is not only suitable for power plants, but also for industrial plants as well as for electrical companies of all kinds. It is particularly suitable for the drive systems of plastic, material factories, where the reliable maintenance of emergency operation in the event of a breakdown is of great importance in the power supply part.

Claims (1)

PATENTANSPRUCH: Notbetriebsschaltun:g für elektrische Anlagen, die aus mindestens zwei Stroinversorgermaschinen und zahlreichen voa diesen gespeisten .einzelnen Verbrauchern bestehen und bei denen jeder Stromversorgerm.aschine ein tberstromrelaisoller ein Generatorschutirelais zugeordnet ist, das bei Ausfall einer Stromversorgermaschine eine Überlastung :der übrigen selbsttätig verhindert, indem es über eine Gruppe von mehreren Zeitrelais mit gegeneinander abgestuften Verzögerungszeiten in Abhängigkeit von der jeweiligen Dauer,der überströme mehr oder weniger viele Verbrauchergruppen entsprechend ihrer Wichtigkeit nacheinander von der Stromversorgung .abschaltet, dadurch gekennzeichnet, daß mit dem Stromüberwachungsrelais jeder Versorgermaschine eine eigene Gruppe von mehreren Zeitrelais mit gegeneinander abgestuften Verzögerungszeiten verbunden; ist.PATENT CLAIM: Emergency operation circuit: g for electrical systems that from at least two power supply machines and numerous voa these fed .individual consumers exist and for which each electricity supplier. machine a Overcurrent relay a generator protection relay is assigned that if one power supply machine fails, an overload: the others automatically prevented by using a group of several timing relays with one another Graduated delay times depending on the respective duration of the overcurrents more or less many consumer groups according to their importance one after the other from the power supply .disables, characterized in that with the current monitoring relay each supply machine has its own group of several timing relays with one another graduated delay times connected; is.
DES132217D 1938-05-24 1938-05-24 Emergency circuit for electrical systems Expired DE739026C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DES132217D DE739026C (en) 1938-05-24 1938-05-24 Emergency circuit for electrical systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DES132217D DE739026C (en) 1938-05-24 1938-05-24 Emergency circuit for electrical systems

Publications (1)

Publication Number Publication Date
DE739026C true DE739026C (en) 1943-09-09

Family

ID=7539000

Family Applications (1)

Application Number Title Priority Date Filing Date
DES132217D Expired DE739026C (en) 1938-05-24 1938-05-24 Emergency circuit for electrical systems

Country Status (1)

Country Link
DE (1) DE739026C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GR1002684B (en) * 1996-05-08 1997-05-02 Board for the inspection of the parallel arrangement of a pair of transformers with a use of a power transformer and an anti-electrocution switch.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GR1002684B (en) * 1996-05-08 1997-05-02 Board for the inspection of the parallel arrangement of a pair of transformers with a use of a power transformer and an anti-electrocution switch.

Similar Documents

Publication Publication Date Title
DE1144395B (en) Device for detecting uneven loading and overloading of several rectifier units connected in parallel
DE739026C (en) Emergency circuit for electrical systems
DE3738493C2 (en) Fault location device
DE686970C (en) Safety device for electrical power plants
DE758169C (en) Electrical network structure of high operational reliability for great overall performance
DE967624C (en) Fault protection device working with converter current release
DE592378C (en) Selective protection system for distribution networks
DE412866C (en) Switching arrangement to protect against overcurrent in power lines and switchgear
DE599892C (en) Arrangement for the protection of electrical power networks
DE710704C (en) Contact protection circuit for alternating current networks
DE420571C (en) Safety circuit for accumulator batteries
DE452142C (en) Device for automatic shutdown of faulty lines
DE672129C (en) Safety device for electrical power plants
DE400411C (en) Switching of transformer stations
DE624147C (en) Alternating current low voltage mesh network
DE927939C (en) Excitation device for selective protection relays in networks with a directly earthed star point
DE269160C (en)
DE637435C (en) Device for switching off short circuits in electrical distribution networks
DE615731C (en) Safety device for electrical power plants
DE527523C (en) Device for the selective protection of the feeder network from a power station or substation
DE505098C (en) Procedure for short-circuit shutdown in an electrical network
DE928780C (en) Device for the connection of power plants in pipeline systems
DE926800C (en) Length differential protection device
DE516973C (en) Protection arrangement for electrical control centers or substations
DE385304C (en) Circuit arrangement for the selective disconnection of parallel cables that connect a substation with a control center