DE490089C - Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace - Google Patents

Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace

Info

Publication number
DE490089C
DE490089C DET33102D DET0033102D DE490089C DE 490089 C DE490089 C DE 490089C DE T33102 D DET33102 D DE T33102D DE T0033102 D DET0033102 D DE T0033102D DE 490089 C DE490089 C DE 490089C
Authority
DE
Germany
Prior art keywords
flame tube
furnace
boiler
air
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DET33102D
Other languages
German (de)
Inventor
Artur Jungk
Dr-Ing Edmund Spindler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Topf J A & Soehne
Original Assignee
Topf J A & Soehne
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Topf J A & Soehne filed Critical Topf J A & Soehne
Priority to DET33102D priority Critical patent/DE490089C/en
Application granted granted Critical
Publication of DE490089C publication Critical patent/DE490089C/en
Expired legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L15/00Heating of air supplied for combustion
    • F23L15/04Arrangements of recuperators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Drying Of Solid Materials (AREA)

Description

Vorfeuerung für Flammrohr- oder Flammrohr-Rauchrohrkessel mit Einführung von in einem Lufterhitzer vorgewärmter Verbrennungsluft in die Feuerung Bei Feuerungen für kurze Flammrohr- oder Flammrohr-Rauchrohrkessel, wie sie fast ausschließlich auf Schiffen verwendet werden, ist es bekannt, Luftvorwärmer am Vorderende des Kessels anzuordnen und durch die Rauchgase zu beheizen. Diese Anordnung läßt sich hier leicht ausführein, da der Rost unter dem Kessel oder in diesem selbst liegt. Trotzdem lassen sich hierbei in der Regel außenliegende und daher Wärmeverluste bedingende Windleitungen für die Einführung der vorgewärmten Luft in den Verbrennungsraum der Feuerung nicht vermeiden.Pre-firing for flame tube or flame tube smoke tube boilers with inlet of combustion air preheated in an air heater into the furnace For furnaces for short flame tube or flame tube smoke tube boilers, as they are almost exclusively Used on ships, it is known to have air preheaters at the front end of the boiler to be arranged and heated by the flue gases. This arrangement can easily be made here because the grate is under the kettle or in it. Still leave In this case, there are usually external wind lines, which therefore cause heat losses for the introduction of the preheated air into the combustion chamber of the furnace avoid.

Bei Feuerungen für andere Flammrohr-oder Flammrohr-Rauchrohrkessel werden die Lufterhitzer bisher in dem Abgasstrom vor oder hinter dem Speisewasservörwärmer am hinteren Kesselende angeordnet. Da diese Kessel sehr lang sind, muß; die vorgewärmte Luft durch lange Rohrleitungen zur Feuerung am vorderen Kesselende geführt werden. Dadurch entstehen Wärme- und Druckverluste und besondere Anschaffungskosten für die gut zu isolierende Rohrleitung. Abgesehen von den Raumverlusten wird hierdurch das Aussehen der Anlage unübersichtlich und unschön. Außerdem verursacht die Anbringung des Lufterhitzers am vorderen Ende solcher langen Kessel Schwierigkeiten, da die Feuerung in der Regel vor den Flammrohren liegt und die Rauchgase freien Zugang zu den Vorderenden der Flammrohre behalten müssen. Von diesen bekannten Feuerungen unterscheidet sich die den Gegenstand der Erfindung bildende Vorfeuerung für solche Dampfkessel dadurch, daß der Lufterhitzer am Stirnende des Flammrohr- oder Flammrohr-Rauchrohrkessels oberhalb der Feuerung in den rückkehrenden Feuerzug eingebaut und durch in den Wänden angeordnete Kanäle unmittelbar mit der Feuerung und dem dieser vorgebauten Trockenschacht verbunden ist. Dadurch werden die oben angegebenen Nachteile beseitigt, indem die erhitzte Luft auf kürzestem Wege ohne außen verlegte Leitungen sowohl zur Verbesserung der Verbrennung als auch zur Trocknung und Vorvergasung des Brennstoffes nutzbar gemacht wird.For furnaces for other flame tube or flame tube smoke tube boilers the air heaters were previously in the exhaust gas flow before or after the feed water preheater arranged at the rear end of the boiler. Since these cauldrons are very long, must; the preheated Air can be fed through long pipes to the furnace at the front end of the boiler. This results in heat and pressure losses and special acquisition costs for the well-insulated pipeline. Apart from the loss of space, this will result the appearance of the system confusing and unattractive. In addition, the attachment causes of the air heater at the front end of such long boiler difficulties as the Firing usually lies in front of the flame tubes and the flue gases have free access must keep to the front ends of the flame tubes. From these well-known firings the pre-firing forming the subject of the invention differs for such Steam boiler in that the air heater at the front end of the flame tube or flame tube smoke tube boiler built into the returning fire train above the furnace and through in the walls arranged channels directly with the furnace and the drying shaft built in front of it connected is. This eliminates the disadvantages indicated above by the Heated air in the shortest possible way without external lines both for improvement can be used for combustion as well as for drying and pre-gasification of the fuel is made.

In der Zeichnung sind zwei Ausführungsbeispiele der neuen Vorfeuerung dargestellt, und zwar zeigt Abb. i einen senkrechten Längsschnitt durch eine Vorfeuerung für einen Zweiflammrohrkessel mit über dem Kessel angeordnetem Lufterhitzer, Abb.2 einen Querschnitt durch den Lufterhitzer, Abb.3 einen waagerechten Längsschnitt durch die Rostwangen, Abb. 4. einen Querschnitt durch die Feuerung und Abb.5 einen Schnitt durch die Trockenluftkanäle und den Trockenschacht.In the drawing are two embodiments of the new pre-firing shown, namely Fig. i shows a vertical longitudinal section through a pre-firing for a two-flame tube boiler with an air heater arranged above the boiler, Fig 2 a cross-section through the air heater, Fig. 3 a horizontal longitudinal section through the grate cheeks, Fig. 4. a cross-section through the furnace and Fig.5 a Section through the drying air ducts and the drying shaft.

Abb.6 und 7 und 8 zeigen als weiteres Ausführungsbeispiel Beine Vorfeuerung für einen Doppelflammrohrkessel im waagerechten Längsschnitt, Querschnitt und senkrechten Längsschnitt durch den Lufterhitzer.Fig. 6 and 7 and 8 show as a further embodiment legs pre-firing for a double flame tube boiler in horizontal longitudinal section, cross-section and vertical Longitudinal section through the air heater.

Bei der Ausführungsform nach Abb. i bis 5 ist vor dem Dampfkessel die Feuerung angeordnet, aus der die Feuergase in die beiden Flammrohre I übertreten. Die Einmauerung des Flammrohrkessels ist so getroffen, daf. durch eine unter der Kesselmitte angeordnete Scheidewand zwei Feuerzüge II und III entstehen, die vorn durch eine mittels einer Klappe d verschließbare Öffnung miteinander in Verbindung stehen. Von den beiden Feuerzügen steht der Zug II mit der hinter den Flammrohren liegenden Rauchkammer und der Zug III an seinem hinteren Ende mit dem Fuchs und dem Schornstein in Verbindung.In the embodiment according to Fig. I to 5 is in front of the steam boiler arranged the furnace, from which the fire gases pass into the two flame tubes I. The walling of the flame tube boiler is made in such a way that. through one under the Separating wall in the middle of the boiler, two fire trains II and III are created in the front through an opening which can be closed by means of a flap d stand. Of the two fire trains, train II with the one behind the flame pipes lying smoke chamber and the train III at its rear end with the fox and connected to the chimney.

Über dem Vorderteil dies Kessels ist -in einem haubenartigen Aufbau ein Kanal h angeordnet, der bei geschlossener Klappe d den Zug II mit dem Zug III verbindet. In diesem Kanal :h ist ein Lufterhitzer L eingebaut, durch dessen Taschen die Luft mittels eines Gebläses v in eine Windkammer geleitet wird, von der Kanäle unter den Rost der Feuerung und in den Trockenschacht führen.Above the front part of this boiler there is a duct h arranged in a hood-like structure, which connects the train II with the train III when the flap d is closed. An air heater L is installed in this duct : h , through whose pockets the air is directed by means of a fan v into a wind chamber, from which ducts lead under the grate of the furnace and into the drying shaft.

Die Rauchgase durchziehen zunächst die Flammrohre I, welches den ersten Zug bilden, und kommen aus der hinteren Rauchkammer durch den Zug II wieder nach vorn. Ist die Klappe d geßffnet, so treten sie unmittelbar vom Zug II unter Umgehung des Lufterhitzers in dein Zug III und strömen durch diesen nach hinten in den Fuchs. Ist die Klappe d hingegen geschlossen, so steigen sie aus d= Zug II nach oben und durchströmen den Lufteirhitzer l in der Pfeilrichtung (Abb. 2), und zwar zunächst nach oben, werden dann in der Haube umgelenkt nach unten, um endlich durch den Zug III nach dem Fuchs abzuziehen.The flue gases first pass through the flame tubes I, which is the first Form a train, and come back from the rear smoke chamber through train II front. If the flap d is open, they step directly from train II, bypassing them of the air heater in your train III and flow through this back into the fox. If the flap d is closed, however, so they rise from d = train II upwards and flow through the air heater l in the direction of the arrow (Fig. 2), initially upwards, are then deflected downwards in the hood to finally get through the train III to subtract after the fox.

Durch die abziehenden Rauchgase wird die durch .den Lufterhitzer L mittels des Gebläses v hindurchgeblasene Luft erhitzt. Aus dem Windraum w strömt alsdann die hehle Luft durch Blechrohre Y (Abb. i, 3, 5) von elliptischem oder ähnlichem Querschnitt, welche in die, Wände der Feuerung eingemauert sind, nach abwärts. Hier tritt sie am hinteren Ende des Rostes in die zwecks besserer Wärmeableitung mit Rippen versehenen Seitenwangen s (Abb. i, 3, q.) der Feuerung, in denen sie nach vorn geleitet wird. Sie wirkt dabei kühlend auf die Wangen, wobei sie selbst noch stärker erwärmt wird. Aus den Seitenwangen s tritt die Luft durch öffnungen ;o (Abb. i und q.) in den Raum unterhalb des Rostes. Hierbei kann die Menge der heißen Verbrennungsluft durch Klappen k (Abb. 3) oder andere Absperrmittel geregelt werden.Due to the evacuating flue gases, the air heater L heated air blown through by means of the fan v. From the wind space w flows then the hollow air through sheet metal pipes Y (Fig. 1, 3, 5) of elliptical or similar shape Cross-section, which are built into the walls of the furnace, downwards. here it enters the back of the grate for better heat dissipation Ribbed side walls s (Fig. I, 3, q.) Of the furnace, in which they are after is directed in front. It has a cooling effect on the cheeks, while still itself is heated more strongly. The air comes out of the side walls s through openings; o (Fig. i and q.) in the space below the grate. Here, the amount of hot combustion air can be regulated by flaps k (Fig. 3) or other shut-off devices.

Der Windraum w hat weiterhin durch Kanäle a (Abb. i und 5) eine Verbindung nach dem Raum b vor dem Trockenschacht t, um heiße Trockenluft vom Vorraum b aus quer durch den Trockenschacht hindurchleiten zu können. Die Menge der Trockenluft kann ebenfalls durch Schieber c, Klappen o. dgl. (Abb. i und 5) eingestellt- werden: Bei der Ausführungsform nach Abb.6 bis 8 durchströmen die Rauchgase zunächst die beiden Flammrohre des unteren Kessels i, steigen dann in der hinteren Rauchkammer empor und strömen dann durch das Flammrohr des oberen Kessels 2 nach vorn zurück. Nach Verlassen des oberen Kessels durchströmen sie wieder den Lufterhitzer 1, um schließlich in den Seitenzügen 3, q. des oberen Kessels, wie dies aus den Abb. 7', 8 au ersehen ist, nach dem Fuchs und Schornstein zu gei_ langen.The wind space w also has a connection through ducts a (Fig. I and 5) to space b in front of the drying shaft t, in order to be able to pass hot dry air from anteroom b across the drying shaft. The amount of dry air can also be adjusted by slide c, flaps or the like (Fig. I and 5): In the embodiment according to Fig. 6 to 8, the flue gases first flow through the two flame tubes of the lower boiler i, then rise into the rear smoke chamber and then flow back through the flame tube of the upper boiler 2 to the front. After leaving the upper boiler, they flow through the air heater 1 again to finally move into the side flues 3, q. of the upper boiler, as can be seen from Figs. 7 ', 8, to go to the fox and chimney.

Durch das über dem Lufterhitzer angeordnete Gebläse v wird die Luft durch den Lufterhitzer L iai dem. Wixidfaum w geblasen, von wo sie wiedeirum durch die eingemauerten Blechleitungen r nach unten gelangt. Aus diesem tritt siel in die mit Rippen versehenen Seitenwangen s der Feuerung, um diese nach vorn zu durchströmen. Am vorderen Ende derselben gelangt sie durch Öffnungen o in den Raum unterhalb des Rostes, wobei die Luftmenge durch Klappen k o der andere Regelorgane eingestellt werden kann.The air is displaced by the fan v arranged above the air heater through the air heater L iai dem. Wixidfaum w blown, from where she again through the walled-in sheet metal lines r comes down. From this step fell into the ribbed side walls s of the furnace in order to flow through them to the front. At the front end of the same it passes through openings o into the space below the Grate, the amount of air being adjusted by flaps k o the other regulating organs can be.

Ein Zweigstrom der heiß,en Luft gelangt wiederum vom Windraum w durch Kanäle a in den Vorraum b des Trockenschachtes t. Diese Trockenluftmenge wird durch ein Regelorgan c eingestellt.A branch flow of hot air in turn arrives from the wind space w through channels a into the anteroom b of the drying shaft t. This amount of dry air is set by a control element c.

Bei dieser Ausführungsform sind ebenfalls ähnlich der Klappe d der Ausfiü'hrungsform nach Abb. i bis 5 Klappen in den Seitenwänden zwischen Lufterhitzer und oberem Flammrohrkessel 2 vorgesehen, wodurch bei Nichtbenutzung den Lufterhitzers die überleitung der Rauchgase unmittelbar in die Seitenzüge des Oberkessels herbeigeführt wird.In this embodiment are also similar to the flap d of Embodiments according to Fig. 1 to 5 flaps in the side walls between the air heater and upper flame tube boiler 2 is provided, whereby the air heater when not in use the transfer of the flue gases is brought about directly into the side passages of the upper boiler will.

Claims (1)

PATENTANSPRUCH. Vorfeuerung der Flammrohr- oder Flammrohr-Rauchrohrkessel mit Einführung von in einem Lufterhitzer vorgewwärmter Verbrennungsluft in die Feuerung, dadurch gekennzeichnet, daß der Lufterhitzer (L) am Stirnende des Kessels oberhalb der Feuerung in den rückkehrenden Fenexzug eingebaut und durch in den Wänden angeordnete Kanäle (r, a) unmittelbar mit der Feuerung und dem dieser vorgebautean Trockenschacht (t) verbunden ist. PATENT CLAIM. Pre-firing of the flame tube or flame tube smoke tube boilers with the introduction of combustion air preheated in an air heater into the furnace, characterized in that the air heater (L) is built into the returning Fenex pass at the front end of the boiler above the furnace and through ducts arranged in the walls (r , a) directly with the furnace and to which it is connected to the dry shaft (t).
DET33102D 1927-02-23 1927-02-23 Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace Expired DE490089C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DET33102D DE490089C (en) 1927-02-23 1927-02-23 Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DET33102D DE490089C (en) 1927-02-23 1927-02-23 Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace

Publications (1)

Publication Number Publication Date
DE490089C true DE490089C (en) 1930-01-29

Family

ID=7557514

Family Applications (1)

Application Number Title Priority Date Filing Date
DET33102D Expired DE490089C (en) 1927-02-23 1927-02-23 Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace

Country Status (1)

Country Link
DE (1) DE490089C (en)

Similar Documents

Publication Publication Date Title
DE490089C (en) Pre-firing for flame tube or flame tube smoke tube boiler with introduction of combustion air preheated in an air heater into the furnace
DE949258C (en) Vertical boiler for generating hot water and warm air
DE526173C (en) Steam generator with superheater
DE831398C (en) Flame tube boiler
DE423309C (en) Waste heat boiler with superheater
DE624769C (en) Arrangement for regulating the overheating temperature in water-tube boilers with a pulverized coal furnace working with the return of flue gases
DE371163C (en) Sectional boiler with shaft firing, upper burnout and heating ducts guided between the sections
DE469623C (en) Articulated boiler with exhaust gas collecting chambers arranged in its foot frame under the heating elements
DE436154C (en) Heating boiler for lower burnout
DE932679C (en) Steam generator with reheater
AT94790B (en) Heating gas routing for symmetrically built vertical tube boilers.
DE521845C (en) Water tube boiler with upper fuel supply and a pair of drums
AT235521B (en) Air heater
DE421632C (en) Spark arrester arranged in the smoke chamber
DE911180C (en) Boiler with chute firing, lower combustion and downstream combustion chamber
DE445680C (en) Wrought-iron articulated kettle, the cross members of which consist of pipes connected to each other on both sides of the filling shaft in the same plane
DE408847C (en) Device for generating superheated steam
DE937591C (en) Steam generator with water tube pre-boiler and downstream smoke tube multi-pass boiler
AT209914B (en) Steam boilers, especially for railcars and diesel locomotives
DE371879C (en) Steam boiler system
DE380636C (en) Heating gas supply for boiler systems with vertical tube boilers
DE363834C (en) Steam boiler firing from traveling grate and this upstream step grate
DE890112C (en) Tubular air heater
DE1120061B (en) Radiant steam generator with several muffle-like combustion chambers
DE957947C (en) Flue gas feed water preheater