DE4416043A1 - Installing metal and/or plastic service supply lines in multi-storey building - Google Patents

Installing metal and/or plastic service supply lines in multi-storey building

Info

Publication number
DE4416043A1
DE4416043A1 DE19944416043 DE4416043A DE4416043A1 DE 4416043 A1 DE4416043 A1 DE 4416043A1 DE 19944416043 DE19944416043 DE 19944416043 DE 4416043 A DE4416043 A DE 4416043A DE 4416043 A1 DE4416043 A1 DE 4416043A1
Authority
DE
Germany
Prior art keywords
floor
assembly
pipe
solder
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19944416043
Other languages
German (de)
Inventor
Meinfried Kruegel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CTA ANLAGENBAU GmbH
Original Assignee
CTA ANLAGENBAU GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CTA ANLAGENBAU GmbH filed Critical CTA ANLAGENBAU GmbH
Priority to DE19944416043 priority Critical patent/DE4416043A1/en
Publication of DE4416043A1 publication Critical patent/DE4416043A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/08Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes

Abstract

The wall thickness deviation (DELTAd) of all rooms, storey-to-storey is established. An installation template is established in the topmost storey of the plumb point (P1) for the pipe run (P2) of the individual pipe entries, taking account of the deviations and the shaft size. The drilling with the largest dia. is firstly set as the main bore (13) with a basic tolerance(alpha). An imaginary plumb line from this is dropped on the floor of the underlying storey. The coincidence of plumb and bore marks is tested by the template.The positional deviation is established w.r.t. the top shaft, and with a deviation the imaginary plumb line is shifted. This method is repeated storey-by-storey. The drilling run is always aligned according to the reference point in the topmost storey. The correction is carried out by a correction organ suspended in the bore. A plumb bob (18) with a plumb line (27) is arranged in the middle of the organ. A receiver (28) is provided in the bob (18), in which a laser light source (29) with a current supply is accommodated.

Description

Die Erfindung betrifft ein Verfahren zur Montage von Rohrleitungen in Versorgungsschächten, insbesondere Versorgungsstränge für Warm- und Kaltwasser sowie Gas aus Kunststoff und/oder Metall in mehrstöckigen Altbauhäusern, bei dem zur nachträglichen Sanierung von in den einzelnen Stockwerken übereinander liegenden Räumen, wie Bäder und/oder Küchen, mit vertikal verlaufenden Rohrleitungsabschnitten über Rohrdurchführungen in Decke und Fußboden feuersicher verbunden werden, wobei die Rohrdurchführungen mittels Bohrung hergestellt und die Rohrleitungsabschnitte mit vorinstallierten Armaturen in Vorsatzmontagesätzen an den Wänden befestigt werden. The invention relates to a method for assembling Pipelines in supply shafts, in particular Supply lines for hot and cold water and gas off Plastic and / or metal in multi-storey Old buildings, for the subsequent renovation of overlapping in the individual floors Rooms, such as bathrooms and / or kitchens, with vertical running pipe sections over Fire-proof pipe ducts in the ceiling and floor are connected, the pipe bushings using Drilled hole and the pipe sections with pre-installed fittings in front mounting kits on the Walls.  

Die Erfindung betrifft auch eine Montagelehre zur Durchführung des Verfahren zur Montage von Rohrleitungen in Versorgungsschächten, insbesondere Versorgungsstränge für Warm- und Kaltwasser sowie Gas in Altbauhäusern.The invention also relates to an assembly template for Implementation of the procedure for the assembly of pipelines in supply shafts, especially supply lines for hot and cold water and gas in old buildings.

Die Sanierung von Küchen und Bädern in Altbauten ist trotz vieler Verbesserungen immer noch problematisch geblieben, insbesondere im Hinblick auf den nachträglichen Einbau der vertikalen Versorgungsstränge für Wasser und Gas in den einzelnen Wohnungseinheiten. Bisher war es üblich, die Sanierung der Räume, beispielsweise Bäder von Stockwerk zu Stockwerk in Handwerksarbeit einzeln durchzuführen und die Rohrleitungen in ihrem vertikalen Verlauf individuell anzupassen.The renovation of kitchens and bathrooms in old buildings is still problematic despite many improvements remained, especially with regard to the subsequent installation of the vertical supply lines for water and gas in the individual apartment units. So far it has been common to renovate the rooms, for example baths from floor to floor in Carry out craft work individually and the Pipes individually in their vertical course adapt.

Dieser Stand der Technik hat den Nachteil eines erheblichen Arbeitszeitaufwandes und verursacht sehr oft Nacharbeiten, weil durch Putzdickenunterschiede und Fliesenauflagen in den übereinanderliegenden Räumen, beispielsweise Bäder, die Wanddicken dieser Räume verhältnismäßig stark voneinander abweichen können.This prior art has the disadvantage of one considerable work time and very often causes Rework because of differences in plaster thickness and Tile supports in the superimposed rooms, for example bathrooms, the wall thickness of these rooms can deviate relatively strongly from one another.

Ein Bezug auf die Wände bei der Festlegung der Bohrpunkte in Decke und Boden führt deshalb zu Ungenauigkeiten in der Flucht der zu verlegenden Rohrleitungen.A reference to the walls when defining the drilling points in the ceiling and floor therefore leads to inaccuracies the escape of the pipelines to be laid.

Die Sanierung ist deshalb zeitaufwendig und teuer. The renovation is therefore time-consuming and expensive.  

Bei diesem Stand der Technik liegt der Erfindung die Aufgabe zugrunde, die nachträgliche Rohrleitungsmontage in Versorgungsschächten unabhängig von den zu Etage zu Etage auftretenden Wanddickenabweichungen in wesentlich verkürzter Zeit und höherer Genauigkeit zu ermöglichen, so daß mehrere Badeinheiten mit hoher Effektivität zugleich saniert werden können.In this prior art, the invention Task based on the subsequent pipeline assembly in supply shafts regardless of the level Floor thickness deviations occurring in essential enable reduced time and higher accuracy, so that multiple bathroom units with high effectiveness can be renovated at the same time.

Dies wird mit dem Verfahren der eingangs genannten Art erfindungsgemäß dadurch gelöst, daß die Wanddickenabweichung aller, von Stockwerk zu Stockwerk übereinanderliegender Räume festgestellt, mit einer diese Abweichungen berücksichtigen Montagelehre im obersten Stockwerk der Lotpunkt für die Bohrflucht der einzelnen Rohrdurchführungen derart festgelegt wird, daß zunächst als Hauptbohrung die Bohrung mit dem größten Durchmesser mit einer Grundtoleranz gesetzt wird, anschließend ein fiktives Lot von dieser Bohrung aus auf den Boden des darunterliegenden Fußbodens gefällt wird, dann die Übereinstimmung von fiktivem Lot und Bohrmarke mittels der Montagelehre geprüft wird, in dem im Lotpunkt die Montagelehre angelegt, die Lageabweichung zum oberen Schacht festgestellt und bei Abweichung die zuvor fiktiv gesetzte Lotflucht auf die ermittelten Bohrmarke innerhalb des Grundtoleranzbereiches verschoben wird, wobei jeweils auf den Fußboden des darunterliegenden Raumes in der Toleranz korrigiert gelotet und dieser sodann durchbohrt wird, derart, daß die Bohrflucht mit der Lotflucht im Versorgungsschacht durch alle Fußböden bzw. Decken übereinstimmt, und daß anschließend alle Nebenbohrungen etagenweise gesetzt werden, in dem von der jeweiligen Bohrachse aus mittels der Montagelehre die Bohrmarken ermittelt und an diesen Marken die Nebenbohrungen gebohrt werden.This is done with the method of the above Art solved according to the invention in that the Wall thickness variation of all, from floor to floor superimposed spaces, with one of these Deviations take assembly gauges into account at the top Floor is the plumbing point for the drill alignment of the individual Pipe bushings is set so that initially the main hole is the hole with the largest diameter is set with a basic tolerance, then a fictitious solder from this hole to the bottom of the underlying floor is felled, then the Correspondence between fictitious solder and drilling mark by means of the assembly gauge is checked, in which the Assembly jig created, the positional deviation from the upper one Shaft determined and in case of deviation the previously fictitious set solder escape on the determined drilling mark is shifted within the basic tolerance range, being each on the floor of the one below Corrected the space corrected in tolerance and this is then pierced such that the drilling alignment with  the escape of solder in the supply shaft through all floors or ceilings matches, and then all Subsidiary holes are set in stages, in which of the respective drilling axis using the assembly gauge Drill marks determined and the on these marks Subsidiary holes are drilled.

Die Wanddickenabweichungen werden vorteilhafterweise durch Probebohrungen oder durch die Feststellung von Putzdicke und Fliesendicke in denjenigen Wänden ermittelt, an denen die Vormontagesätze befestigt werden sollen. Dies gestattet es, sowohl Breiten- als auch Längenabweichungen zu berücksichtigen.The wall thickness deviations are advantageous by trial drilling or by determining Plaster thickness and tile thickness in those walls determined on which the pre-assembly kits are attached should. This allows both latitude and longitude Length deviations to be taken into account.

Das Lot wird nacheinander mittig durch alle eingebrachten Bohrungen in Fußboden bzw. Decke auf den jeweils darunter liegenden Raum gefällt, wobei das jeweilige Lot nach der Bohrachse ausgerichtet wird.The solder is introduced one after the other through the middle Holes in the floor or ceiling on the one below lying space, whereby the respective lot after the Drilling axis is aligned.

In einer bevorzugten Ausführungsform der Erfindung werden die Rohrleitungsstränge eines jeden Vormontagesatzes innerhalb der Rohrdurchführungen feuersicher montiert. In a preferred embodiment of the invention become the piping lines of everyone Pre-assembly kit within the pipe penetrations mounted fire-proof.  

Dies wird vorzugsweise dadurch ermöglicht, daß die Rohre in den Rohrdurchführungen in Schaumkunststoff eingeschäumt werden, der bei Überschreiten einer bestimmten Temperatur sich ausdehnt und die Kunststoffrohre abquetscht.This is preferably made possible by the tubes in the pipe penetrations in foam plastic be foamed in if one is exceeded certain temperature expands and the Squeezed plastic pipes.

Die Aufgabe wird weiterhin dadurch gelöst, daß als Lehre zur Montage der Rohrleitungen in Versorgungsschächten, insbesondere Versorgungsstränge aus Metall und/oder Kunststoff für Gas, Warm- und Kaltwasser in AltbautenThe task is further solved by teaching for installing the pipelines in supply shafts, in particular supply lines made of metal and / or Plastic for gas, hot and cold water in old buildings

  • a) ein in die oberste Bohrung mittels Flansch einhängbarer, rohrförmiger Einsatz, in dem mittig ein Quersteg mit kulissenförmigem Langloch angeordnet ist, in dem längsverschieblich und feststellbar ein kegelförmiges Korrekturorgan mit einem den Kegel durchsetzenden, zur Spitze laufenden Kanal geführt ist,a) one in the top hole by means of flange insertable, tubular insert, in the middle Cross bar with a slotted slot is arranged in the longitudinally displaceable and lockable a conical Correction device with a penetrating the cone, for Tip running channel is led
  • b) ein mit einer mittigen Aufnahme für eine Lichtquelle mit Stromversorgung versehener Lotkörper, an dem dreipunktartig eine Lotschnur angelenkt ist, die andererends durch den Kanal verläuft und in ihrer Länge variabel einstellbar und befestigbar ist undb) one with a central receptacle for a light source solder body provided with power supply on which a solder cord is articulated in three points, which elsewhere runs through the canal and in length is variably adjustable and attachable and
  • c) eine flächige Meßlehre vorgesehen ist, die in ihrer Längen- und Breitenabmessung der Schachtabmessung entspricht und die die Bohrmarken für die einzubringenden Bohrungen aufweist.c) a flat gauge is provided, which in its Length and width dimension of the shaft dimension corresponds and the the drilling marks for the to be introduced Has holes.

Das Korrekturorgan ist im Langloch mittels einer Spannschraube in seiner jeweiligen Stellung feststellbar.The correction organ is in the slot by means of a Locking screw lockable in its respective position.

Von besonderen Vorteil ist es auch, als Lichtquelle im Lotkörper eine Laserlichtquelle vorzusehen. Ein weiteres Merkmal sieht vor, daß das Langloch einseitig in Richtung der Rohrwandung verschoben ist und sich etwa bis über die Rohrachse hinaus erstreckt. Es ist jedoch auch möglich, daß das Langloch sich über die gesamte Länge des Quersteges erstreckt.It is also of particular advantage as a light source in the Solder body to provide a laser light source. Another feature provides that the elongated hole is displaced on one side in the direction of the tube wall and extends approximately beyond the pipe axis. However, it is also possible that the elongated hole overlaps extends the entire length of the crossbar.

Damit die Korrektur der jeweiligen Lotachse auf die Bohrachse hin innerhalb eines vorgegebenen Toleranzbereich erfolgen kann, muß die Länge des Langloches zumindest gleich groß oder größer der Toleranzvorgabe sein.So that the correction of the respective perpendicular axis to the Drilling axis towards within a predetermined Tolerance range, the length of the Elongated hole at least the same size or larger than Tolerance specification.

Durch alle diese Merkmale wird erreicht, daß die erfindungsgemäße Lösung den komplexen Anforderungen einer kontinuierlichen Sanierung mehrerer übereinanderliegender Badeinheiten mit hoher Präzision und Effektivität gerecht wird.All these features ensure that the Solution according to the invention the complex requirements of a continuous renovation of several superimposed ones Bathroom units with high precision and effectiveness becomes.

Mit der erfindungsgemäßen Lösung werden weitgehend aufwendige Nacharbeiten beseitigt und eine sehr große Flexibilität bei der Sanierung auch unterschiedlichster Bad- und/oder Küchenräume in Altbauten erreicht. Die erfindungsgemäße Lösung gestattet es außerdem, einen weit höheren Automatisierungsgrad bei der Sanierung von Bädern und/oder Küchen zu erreichen, da die Vor- und Folgeverarbeitungsprozesse wie beispielsweise das Bohren und Montieren kontinuierlicher ablaufen können. With the solution according to the invention are largely elaborate rework eliminated and a very large Flexibility in the renovation of a wide variety Bathroom and / or kitchen rooms in old buildings reached. The solution according to the invention also allows a much higher degree of automation during renovation of bathrooms and / or kitchens because the front and Follow-up processes such as that Drilling and assembly can run more continuously.  

Es ermöglicht ferner, daß bei bewohnten Häusern bzw. Wohnungen die Sanierung durchgeführt werden kann.It also enables houses or Apartments the renovation can be carried out.

Weitere Vorteile, Einzelheiten und erfindungswesentliche Merkmale ergeben sich aus der nachfolgenden Beschreibung unter Bezugnahme auf die beigefügten Zeichnungen:Further advantages, details and essential to the invention Features result from the following description with reference to the accompanying drawings:

Es zeigen:Show it:

Fig. 1 eine schematische Darstellung des erfindungsgemäßen Verfahrens mit Profilverlauf in der Wanddickenabweichung, Fig. 1 is a schematic representation of the method according to the invention with a profile curve in the wall thickness deviation,

Fig. 2 eine Darstellung der erfindungsgemäßen Montagelehre und Fig. 2 shows the assembly template according to the invention and

Fig. 3 einen Aufriß eines sanierten Bades. Fig. 3 is an elevation of a renovated bathroom.

In einem vierstöckigen Altbau 1 sollen die übereinander angeordneten Bäder 2 dem Standard entsprechend mit einem Wannenbad 3, WC 4 und Waschbecken 5 mit Warm- und Kaltwasserzufluß 6 bzw. 7 versehen werden.In a four-storey old building 1 , the baths 2 arranged one above the other are to be provided with a bath 3 , toilet 4 and wash basin 5 with hot and cold water inflows 6 and 7 according to the standard.

In Fig. 1 ist der Verlauf der Wanddicke 8 in den einzelnen Bädern 2 schraffiert dargestellt. Die unterschiedlichen Wanddicken 8 können durch Abweichungen in der Putzdicke, aber auch durch Wandbelege wie beispielsweise Fliesen hervorgerufen sein. In Fig. 1 the course of the wall thickness 8 in the individual baths 2 is shown hatched. The different wall thicknesses 8 can be caused by deviations in the plaster thickness, but also by wall coverings such as tiles.

Diese Abweichungen Δd werden durch die Feststellung der Putzdicke und der Fließendicke, beispielsweise durch Bohrung, ermittelt.These deviations Δd are determined by the determination of the Plaster thickness and the tile thickness, for example by Hole determined.

Zur Versorgung der Bäder mit Warm- und Kaltwasser müssen Rohrleitungsstränge 9 vertikal übereinander in Vormontagesätze 10 an den Wänden 11 der Bäder 2 befestigt werden. Damit diese Stränge vertikal in einer Flucht liegen und auch die Vormontagesätze an den Wänden in Länge und Breite (Tiefe) paßgenau installiert werden können, wird nach dem erfindungsgemäßen Verfahren wie folgt vorgegangen.To supply the baths with hot and cold water, pipeline strings 9 must be fastened vertically one above the other in pre-assembly sets 10 on the walls 11 of the baths 2 . In order for these strands to be vertically aligned and for the length and width (depth) of the pre-assembly kits to be installed precisely on the walls, the procedure according to the invention is as follows.

In den Fußboden 12 des obersten Stockes wird die Hauptbohrung 13 der Versorgungsleitung mit dem größten Durchmesser eingebracht. Die Lage dieser Hauptbohrung 13 von der Wand 11 richtet sich nach der durchschnittlich ermittelten Wanddickenabweichung Δd aller gemessenen Wanddicken.The main bore 13 of the supply line with the largest diameter is made in the floor 12 of the top floor. The position of this main bore 13 from the wall 11 is based on the average wall thickness deviation Δd of all measured wall thicknesses.

Zur Festlegung der Lage dieser Hauptbohrung 13 auf dem Fußboden 12 wird eine Meßlehre 14 (Fig. 2) eingesetzt, die aus einem rechteckigen Flachblech 15 besteht, in der Bohrmarken für wenigstens drei Versorgungsleitungen eingebracht sind. Die Längenabmessung A und Breitenabmessung B dieses Flachbleches 15 hat eine um etwa die durchschnittliche Wanddickenabweichung größere Abmessung, so daß bei seiner Anlage an die Wand 11 die Lage der einzubringenden Hauptbohrung 13 im Fußboden 12 kenntlich gemacht werden kann. To determine the position of this main bore 13 on the floor 12 , a measuring gauge 14 ( FIG. 2) is used, which consists of a rectangular flat sheet 15 in which drilling marks for at least three supply lines are introduced. The length dimension A and width dimension B of this flat sheet 15 has a larger dimension by approximately the average wall thickness deviation, so that the position of the main bore 13 to be made in the floor 12 can be identified when it is in contact with the wall 11 .

Die Hauptbohrung 13 wird dann in den Fußboden 12 mit einer Grundtoleranz α gebohrt, die etwa 30 mm größer ist als der Kernlochdurchmesser.The main bore 13 is then drilled in the floor 12 with a basic tolerance α, which is approximately 30 mm larger than the core hole diameter.

In diese Hauptbohrung 13 wird sodann ein rohrförmiger Einsatz 16 eingehangen. Zum Einhängen besitzt der Einsatz 16 einen umlaufenden Kragen oder Flansch 20, der sich auf dem Fußboden 12 abstützt.A tubular insert 16 is then suspended in this main bore 13 . For hanging in, the insert 16 has a circumferential collar or flange 20 which is supported on the floor 12 .

Der rohrförmige Einsatz 16 (Fig. 2) trägt mittig einen Quersteg 17 der sich von Rohrwand 22 zu Rohrwand 23 erstreckt. Im Quersteg 17 ist ein kulissenförmiges Langloch 21 eingearbeitet, das von der einen Rohrwandung 22 oder 23 bis etwas über die Rohrachse C hinaus verläuft. Natürlich kann auch das Langloch 21 die gesamte Breite des Quersteges 17 einnehmen. Die Länge D des Langloches 21 muß wenigstens gleich oder größer der vorgegebenen Grundtoleranz α sein, um die Lotflucht innerhalb dieser Toleranz korrigieren zu können.The tubular insert 16 ( FIG. 2) carries in the middle a transverse web 17 which extends from tube wall 22 to tube wall 23 . In the crosspiece 17 , a slot-shaped elongated hole 21 is incorporated, which extends from one pipe wall 22 or 23 to somewhat beyond the pipe axis C. Of course, the elongated hole 21 can also take up the entire width of the crosspiece 17 . The length D of the elongated hole 21 must be at least equal to or greater than the predetermined basic tolerance α in order to be able to correct the solder alignment within this tolerance.

In dem Langloch 21 befindet sich dazu längsverschieblich ein kegelförmiges Korrekturorgan 24, das mittels einer Spannschraube 25 in seiner jeweiligen Lage feststellbar ist. Das Korrekturorgan 24 ist mit einem zur Kegelspitze hin verlaufenden Kanal 26 durchsetzt, der zur Aufnahme einer, in ihrer Länge variablen Lotschnur 27 dient. Die Lotschnur 27 trägt an ihrem einen Ende dreipunktförmig einen Lotkörper 18. In diesem Lotkörper 18 befindet sich eine Aufnahme 28, in der eine Laserlichtquelle 29 mit Stromversorgung untergebracht ist. For this purpose, a conical correction element 24 is located in the elongated hole 21 and can be locked in its respective position by means of a clamping screw 25 . The correction element 24 is penetrated by a channel 26 which runs towards the cone tip and serves to receive a plumb line 27 which is variable in length. The solder cord 27 carries a solder body 18 at one end in a three-point shape. In this solder body 18 there is a receptacle 28 in which a laser light source 29 with a power supply is accommodated.

Von dem in die Hauptbohrung 13 eingehangenen Einsatz 16 wird mittels dem Lotkörper 18 mit Laserlichtquelle 30 auf den Fußboden 12 des darunterliegenden Stockwerkes fiktiv gelotet.From the insert 16 inserted into the main bore 13 , the solder body 18 with the laser light source 30 is fictitiously soldered onto the floor 12 of the floor below.

In diesem Lotpunkt wird die, mit der Schachtabmessung übereinstimmende flächige Meßlehre 14 angelegt und überprüft, ob die Lage des Versorgungsschachtes mit der der Lehre übereinstimmt. Wird festgestellt, daß der Lotpunkt nicht mit der Bohrmarke für die Hauptbohrung 13 übereinstimmt, muß der fiktive Lotpunkt so verschoben werden, daß Lotpunkt und Bohrmarke zur Deckung gelangen. Dies geschieht dadurch, daß die Spannschraube 25 gelöst wird und das Korrekturorgan 24 im Langloch 21 in die entsprechende Stellung gebracht und wieder gespannt wird. Stimmen Lotpunkt und Bohrmarke überein, wird der Fußboden 12 an dieser Stelle angerissen und die nächst folgende Hauptbohrung 13 gebohrt.At this plumb point, the flat measuring gauge 14, which corresponds to the shaft dimension, is applied and checked whether the position of the supply shaft corresponds to that of the gauge. If it is found that the solder point does not coincide with the drilling mark for the main bore 13 , the fictitious solder point must be shifted in such a way that the solder point and the drilling mark coincide. This is done in that the clamping screw 25 is loosened and the correction element 24 is brought into the corresponding position in the elongated hole 21 and tensioned again. If the solder point and the drilling mark match, the floor 12 is torn at this point and the next main bore 13 is drilled.

Diese Arbeitsgänge wiederholen sich solange, bis alle Fußböden bzw. Decken 12 des zu sanierenden Altbaus 1 mit den entsprechenden Hauptbohrungen 13 versehen sind. Lotflucht und Bohrflucht stimmen dann in allen Fußböden 12 überein und sind deckungsgleich.These operations are repeated until all floors or ceilings 12 of the old building 1 to be renovated are provided with the corresponding main bores 13 . Brazing and drilling alignment then match in all floors 12 and are congruent.

Sodann wird der Einsatz 16 erneut in die Hauptbohrungen 13 eingehangen und die Bohrmarke für die Hauptbohrung 13 auf das kegelförmige Korrekturorgan 24 aufgesetzt, so daß sichergestellt ist, daß die exakte Lage für die Nebenbohrungen auf den jeweiligen Fußböden 12 angerissen werden kann. Then the insert 16 is hung again in the main bores 13 and the drilling mark for the main bore 13 is placed on the conical correction member 24 , so that it is ensured that the exact position for the secondary bores can be marked on the respective floors 12 .

Diese Verfahrensweise setzt sich fort bis alle Bohrungen in einer vertikalen Flucht durch alle übereinander angeordneten Bäder 2 liegen.This procedure continues until all holes are in a vertical alignment through all the baths 2 arranged one above the other.

In den Bädern 2 werden sodann die Vormontagesätze 10 an den Wänden 11 befestigt (Fig. 3). Die Rohrleitungen 9 liegen durch diese Verfahrensweise von Stockwerk zu Stockwerk genau vertikal übereinander und lassen sich ohne Probleme durch die zuvor in die Bohrungen eingesetzten Rohrdurchführungen 19 miteinander verbinden. Die Vormontagesätze 10 können durch die Exaktheit der Rohrverlegung sehr genau am vorbestimmten Platz installiert werden, ohne daß zusätzliche Anpassungsarbeiten notwendig werden.In the bathrooms 2 , the pre-assembly sets 10 are then attached to the walls 11 ( Fig. 3). Due to this procedure, the pipes 9 lie vertically one above the other from floor to floor and can be connected to one another without problems by the pipe bushings 19 previously inserted into the bores. The pre-assembly kits 10 can be installed very precisely at the predetermined location due to the accuracy of the pipe installation, without additional adjustment work being necessary.

BezugszeichenlisteReference list

1 Altbau
2 Bäder
3 Wannenbad
4 WC
5 Waschbecken
6 Warmwasserleitung
7 Kaltwasserleitung
8 Wanddicke
9 Rohrleitungsstränge
10 Vormontagesatz
11 Wand
12 Fußboden
13 Bohrungen
14 Lehre
15 Flachblech
16 Einsatz
17 Quersteg
18 Lotkörper
19 Rohrdurchführungen
20 Flansch
21 Langloch
22, 23 Rohrwand
24 Korrekturorgan
25 Spannschraube
26 Kanal
27 Lotschnur
28 Aufnahme
29 Laserlichtquelle
A Längenabmessung
B Breitenabmessung
C Rohrachse
D Länge des Langloches
P1 Lotpunkt
P2 Bohrpunkt
Δd Wanddickenabweichung
α Toleranzbreite
1 old building
2 bathrooms
3 bath
4 toilets
5 sinks
6 hot water pipe
7 cold water pipe
8 wall thickness
9 pipeline strings
10 pre-assembly kit
11 wall
12 floor
13 holes
14 teaching
15 flat sheet
16 use
17 crossbar
18 solder body
19 pipe bushings
20 flange
21 slot
22 , 23 pipe wall
24 correction body
25 clamping screw
26 channel
27 plumb line
28 recording
29 Laser light source
A length dimension
B width dimension
C pipe axis
D length of the elongated hole
P1 plumb point
P2 drilling point
Δd wall thickness deviation
α tolerance range

Claims (12)

1. Verfahren zur Montage von Rohrleitungen in Versorgungsschächten, insbesondere Versorgungsstränge aus Metall und/oder Kunststoff für Gas, Warm- und Kaltwasser in mehrstöckigen Altbauhäusern, bei dem zur nachträglichen Sanierung von in den einzelnen Stockwerken übereinander liegenden Räumen, wie Bäder und/oder Küchen, mit vertikal verlaufenden Rohrleitungsabschnitten über Rohrdurchführungen in Decke und Fußboden feuersicher verbunden werden, wobei die Rohrdurchführungen mittels Bohrung hergestellt und die Rohrleitungsabschnitte mit vorinstallierten Armaturen in Vorsatzmontagesätzen an den Wänden befestigt werden,
dadurch gekennzeichnet, daß die Wanddickenabweichung (Δd) aller, von Stockwerk zu Stockwerk übereinanderliegender Räume festgestellt, mit einer diese Abweichungen und die Schachtgroße berücksichtigenden Montagelehre im obersten Stockwerk der Lotpunkt (P1) für die Bohrflucht (P2) der einzelnen Rohrdurchführungen derart festgelegt wird, daß zunächst als Hauptbohrung die Bohrung mit dem größten Durchmesser mit einer Grundtoleranz gesetzt wird, anschließend ein fiktives Lot von dieser Bohrung aus auf den Boden des darunterliegenden Fußbodens gefällt wird, dann die Übereinstimmung von Lot und Bohrmarke mittels der Montagelehre geprüft wird, in dem im Lotpunkt (P1) die Montagelehre angelegt und die Lageabweichung zum oberen Schacht festgestellt und bei Abweichung die zuvor fiktiv gesetzte Lotflucht auf die ermittelte Bohrmarke innerhalb des Grundtoleranzbereiches verschoben wird, wobei jeweils auf den Fußboden des darunterliegenden Raumes korrigiert gelotet, in diesem korrigierten Lotpunkt die nächstfolgende Bohrung gebohrt und wiederum auf den Fußboden des darunterliegenden Raumes in der Toleranz korrigiert gelotet und dieser durchbohrt wird, derart, daß die Bohrflucht mit der Lotflucht im Versorgungsschacht durch alle Stockwerke übereinstimmt, und daß anschließend alle Nebenbohrungen etagenweise gesetzt werden, in dem von der jeweiligen Bohrachse aus mittels der Montagelehre die Bohrmarken ermittelt und in diesen Punkten die Nebenbohrungen gebohrt werden.
1.Procedure for the installation of pipelines in supply shafts, in particular supply lines made of metal and / or plastic for gas, hot and cold water in multi-storey old buildings, for the subsequent renovation of rooms located one above the other, such as bathrooms and / or kitchens, on the individual floors, are connected fire-proof with vertically running pipe sections via pipe bushings in the ceiling and floor, the pipe bushings being made by means of a hole and the pipe sections being fastened to the walls with pre-installed fittings in front mounting kits,
characterized in that the wall thickness deviation (Δd) of all rooms lying one above the other from floor to floor is determined with an assembly gauge on the top floor taking these deviations and the shaft size into account, the plumb point (P1) for the drilling alignment (P2) of the individual pipe penetrations is determined such that First the main hole is the hole with the largest diameter with a basic tolerance, then a fictitious solder is felled from this hole onto the floor of the floor below, then the conformity of the solder and the drilling mark is checked using the assembly gauge, in which at the solder point ( P1) the assembly jig created and the positional deviation from the upper shaft determined and in the event of a deviation the previously fictitiously set solder escape is shifted to the determined drilling mark within the basic tolerance range, corrected soldering to the floor of the room underneath, corrected in this Gier Lotpunkt the next hole drilled and again soldered corrected to the floor of the room below in the tolerance and this is drilled through such that the drilling alignment coincides with the solder alignment in the supply shaft through all floors, and that all secondary holes are then set on the floor in the The drilling marks are determined from the respective drilling axis using the assembly gauge and the secondary holes are drilled at these points.
2. Verfahren zur Rohrleitungsmontage nach Anspruch 1, dadurch gekennzeichnet, daß die Wanddickenabweichung (Δd) durch Bohrung festgestellt wird.2. A method for pipe assembly according to claim 1, characterized, that the wall thickness deviation (Δd) through hole is detected. 3. Verfahren zur Rohrleitungsmontage nach Anspruch 1 und 2, dadurch gekennzeichnet, daß das Lot korrigiert durch alle zuvor eingebrachten Bohrungen gefällt wird.3. A method for pipe assembly according to claim 1 and 2, characterized, that the solder corrected by all previously brought in Holes is felled. 4. Verfahren zur Rohrleitungsmontage nach Anspruch 1 bis 3, dadurch gekennzeichnet, daß die Rohrleitungsstränge eines jeden Vorsatzmontagesatzes innerhalb der Rohrdurchführung feuersicher abquetschbar ist.4. Procedure for pipe assembly according to Claims 1 to 3, characterized, that the piping strings of everyone Attachment mounting kit inside the pipe duct is fire-proof squeezable. 5. Verfahren zur Rohrleitungsmontage nach Anspruch 4, dadurch gekennzeichnet, daß die Rohrleitungen durch Schaumkunststoff abgequetscht werden. 5. Pipeline assembly procedure according to Claim 4 characterized, that the pipes are squeezed out by foam plastic become.   6. Verfahren zur Rohrleitungsmontage nach Anspruch 1, dadurch gekennzeichnet, daß die Grundtoleranz des Kernlochdurchmessers bis zu 30 mm beträgt.6. A method for pipe assembly according to claim 1, characterized, that the basic tolerance of the core hole diameter up to Is 30 mm. 7. Montagelehre zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß als Lehre
  • a) ein in die oberste Bohrung mittels Flansch (20) einhängbarer rohrförmiger Einsatz (16), in dem mittig ein Quersteg (17) mit kulissenförmigem Langloch (21) angeordnet ist, in dem längsverschieblich und feststellbar ein kegelförmiges Korrekturorgan (24) mit einem den Kegel durchsetzenden, zur Spitze laufenden Kanal (26) geführt ist,
  • b) ein mit einer mittigen Aufnahme (28) für eine Lichtquelle (29) mit Stromversorgung versehenen Lotkörper (18), an dem dreipunktartig eine Lotschnur (27) angelenkt ist, die andererends durch den Kanal (26) verläuft und in ihrer Länge variabel im Kanal (26) einstellbar und befestigbar ist und
  • c) eine flächige Meßlehre (14) vorgesehen ist, die in ihrer Längen- und Breitenabmessung (A; B) der Schachtabmessung entspricht und die die Bohrmarken für die einzubringenden Bohrungen aufweist.
7. assembly gauge for performing the method according to claim 1, characterized in that as a teaching
  • a) a tubular insert ( 16 ) which can be suspended in the uppermost bore by means of a flange ( 20 ), in which a transverse web ( 17 ) with a slot-shaped elongated hole ( 21 ) is arranged in the center, in which a conical correction element ( 24 ) with one can be moved longitudinally and ascertained Channel ( 26 ) passing through the cone and leading to the tip,
  • b) a with a central receptacle ( 28 ) for a light source ( 29 ) with power supply solder body ( 18 ) to which a solder cord ( 27 ) is articulated in three-point fashion, which at the other end runs through the channel ( 26 ) and is variable in length Channel ( 26 ) is adjustable and attachable and
  • c) a flat measuring gauge ( 14 ) is provided which corresponds in its length and width dimension (A; B) to the shaft dimension and which has the drilling marks for the holes to be drilled.
8. Montagelehre nach Anspruch 7 und 8, dadurch gekennzeichnet, daß das Korrekturorgan (24) mittels Spannschraube (25) im Langloch feststellbar ist.8. Assembly template according to claim 7 and 8, characterized in that the correction member ( 24 ) by means of clamping screw ( 25 ) can be determined in the slot. 9. Montagelehre nach Anspruch 7 bis 9, dadurch gekennzeichnet, daß die Lichtquelle (29) eine Laserlichtquelle ist.9. Assembly template according to claim 7 to 9, characterized in that the light source ( 29 ) is a laser light source. 10. Montagelehre nach Anspruch 7 bis 10, dadurch gekennzeichnet, daß das Langloch (21) einseitig in Richtung der Rohrwandung (22) verschoben ist und sich etwa bis über die Rohrachse (C) hinaus erstreckt.10. Assembly template according to claim 7 to 10, characterized in that the elongated hole ( 21 ) is displaced on one side in the direction of the tube wall ( 22 ) and extends approximately up to about the tube axis (C). 11. Montagelehre nach Anspruch 7 bis 10, dadurch gekennzeichnet, daß das Langloch sich über die gesamte Länge des Quersteges (17) erstreckt. 11. Assembly template according to claim 7 to 10, characterized in that the elongated hole extends over the entire length of the crossbar ( 17 ). 12. Montagelehre nach Anspruch 7 bis 11, dadurch gekennzeichnet, daß die Langlochlänge (D) gleich oder größer der Toleranzbreite (α) ist.12. assembly template according to claim 7 to 11, characterized in that the Slot length (D) equal to or greater than the tolerance range (α) is.
DE19944416043 1994-05-03 1994-05-03 Installing metal and/or plastic service supply lines in multi-storey building Withdrawn DE4416043A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19944416043 DE4416043A1 (en) 1994-05-03 1994-05-03 Installing metal and/or plastic service supply lines in multi-storey building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19944416043 DE4416043A1 (en) 1994-05-03 1994-05-03 Installing metal and/or plastic service supply lines in multi-storey building

Publications (1)

Publication Number Publication Date
DE4416043A1 true DE4416043A1 (en) 1995-11-09

Family

ID=6517489

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19944416043 Withdrawn DE4416043A1 (en) 1994-05-03 1994-05-03 Installing metal and/or plastic service supply lines in multi-storey building

Country Status (1)

Country Link
DE (1) DE4416043A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19616132A1 (en) * 1996-04-11 1997-10-30 Cta Anlagenbau Gmbh Method for retro-fitting of plumbing services in multi-storey premises
DE19731589A1 (en) * 1997-07-17 1999-02-11 Oetec Haustechnik Gmbh Prefabricated building-storey sections installation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
NICHTS ERMITTELT *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19616132A1 (en) * 1996-04-11 1997-10-30 Cta Anlagenbau Gmbh Method for retro-fitting of plumbing services in multi-storey premises
DE19616132C2 (en) * 1996-04-11 1999-10-28 Cta Anlagenbau Gmbh Method for assembling installation blocks constituting sanitary supply systems in houses and device therefor
DE19731589A1 (en) * 1997-07-17 1999-02-11 Oetec Haustechnik Gmbh Prefabricated building-storey sections installation system
DE19731589C2 (en) * 1997-07-17 1999-11-11 Oetec Haustechnik Gmbh Process and prefabricated floor installation block for arrangement in one or as a supply shaft of new buildings

Similar Documents

Publication Publication Date Title
EP3527731A1 (en) Sanitary wall module and method for setting up a sanitary wall
DE19639770C2 (en) Process and kit for cladding and piping of sanitary rooms
DE4416043A1 (en) Installing metal and/or plastic service supply lines in multi-storey building
DE2852944A1 (en) Masonry building block with service provision - has grooves aligned for rows to hold electrical and other ducts
DE19616132C2 (en) Method for assembling installation blocks constituting sanitary supply systems in houses and device therefor
DE19632322C2 (en) Method and arrangement for installing pipe mats
DE19963046B4 (en) Kit for producing at least one supply line system in a building
DE2403187A1 (en) Installation device for built-in assemblies in buildings - assemblies are mounted on steel frame support element with adjustment and aligning device
DE102019002223A1 (en) Sanitary facility with at least one fluid hose having at least one strain sensor
DE19628492A1 (en) Radiator assembly template for use in position
DE102019107862A1 (en) Ceiling penetration device, installation arrangement and installation method
DE102021003409A1 (en) Arrangement of devices and methods to simplify the introduction of house connection lines in buildings
DE3142938A1 (en) Housing for receiving domestic services
DE842322C (en) Sanitary facility for houses
DE809102C (en) Installation unit
DE102017116038A1 (en) Device for the early detection and reduction of water damage due to pipe leaks or other moisture in buildings
DE202007009453U1 (en) Pipe holder for laying drainage pipes
DE617504C (en) Procedure for installing installation parts in buildings
EP1811104A2 (en) Prefabricated installation module
DE1984786U (en) SPIRIT LEVEL.
JP3100968U (en) Penetration bracket and penetration unit
AT508387A4 (en) MOUNTING BLOCK FOR CONNECTING DEVICES
DE102008032445A1 (en) Installation channel, has sealable openings attached at upper and under ends for outer atmosphere, where heat insulator of housing wall and heat insulator above channel are covered by common thin walled fixed layer
DE1149153B (en) Holding device for one-pipe heating systems
DE4413776A1 (en) System for installation of bathroom equipment

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
OP8 Request for examination as to paragraph 44 patent law
8139 Disposal/non-payment of the annual fee