DE3634863C2 - Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it - Google Patents

Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it

Info

Publication number
DE3634863C2
DE3634863C2 DE19863634863 DE3634863A DE3634863C2 DE 3634863 C2 DE3634863 C2 DE 3634863C2 DE 19863634863 DE19863634863 DE 19863634863 DE 3634863 A DE3634863 A DE 3634863A DE 3634863 C2 DE3634863 C2 DE 3634863C2
Authority
DE
Germany
Prior art keywords
connection
control unit
switching
sub
central
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE19863634863
Other languages
German (de)
Other versions
DE3634863A1 (en
Inventor
Werner Dipl Ing Hoehne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19863634863 priority Critical patent/DE3634863C2/en
Publication of DE3634863A1 publication Critical patent/DE3634863A1/en
Application granted granted Critical
Publication of DE3634863C2 publication Critical patent/DE3634863C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/04Selecting arrangements for multiplex systems for time-division multiplexing
    • H04Q11/0407Selecting arrangements for multiplex systems for time-division multiplexing using a stored programme control

Description

Die Erfindung betrifft eine Schaltungsanordnung für eine zentral­ gesteuerte Fernmeldevermittlungsanlage, insbesondere PCM-Fern­ sprechvermittlungsanlage, mit einem ein zentrales Koppelfeld und einen zentralen Koordinationsprozessor umfassenden Zentralteil und mit dezentralen, je ein mit dem zentralen Koppelfeld über zur Herstellung gewählter Verbindungen belegbare Verbindungs­ wege, z. B. Leitungen, Kanäle o. dgl., verbundenes Teilkoppelfeld sowie ein u. a. einer Verbindungsdurchschaltung über dieses dienendes Teilsteuerwerk umfassenden Anschlußgruppen, die mit Teilnehmerleitungen und Verbindungsleitungen bzw. ihnen ent­ sprechenden, in Übertragungssystemen, z. B. PCM-30-System, zu­ sammengefaßten Kanälen beschaltet sind, und von deren jeweiligem Teilsteuerwerk über das Teilkoppelfeld, über einen der Verbin­ dungswege und über das zentrale Koppelfeld ein Steuerkanal ver­ läuft, der bei Betriebsbeginn durchgeschaltet und während des Betriebes ständig im durchgeschalteten Zustand bereitgehalten wird, und über den zum Austausch von Informationen und Steuer­ signalen für den laufenden Vermittlungsbetrieb das Teilsteuer­ werk Zugang zum Koordinatenprozessor und dieser jederzeit Zugriff zu dem Teilsteuerwerk hat, und zu dessen Durchschaltung über das Teilkoppelfeld Daten im Teilsteuerwerk bereits vor seiner Inbe­ triebnahme gespeichert sind, die bei seiner Inbetriebnahme die Durchschaltung des Steuerkanals vom Teilsteuerwerk über das Teilkoppelfeld bewerkstelligen.The invention relates to a circuit arrangement for a central Controlled telecommunications switching system, in particular PCM remote voice switching system, with a central switching network and a central part comprising a central coordination processor and with decentralized, one each with the central switching matrix connection that can be used to establish selected connections ways, e.g. B. lines, channels or the like. Connected sub-switching network as well as a u. a. a connection through this serving sub-control unit comprehensive connection groups with Subscriber lines and connecting lines or ent speaking, in transmission systems, e.g. B. PCM-30 system summarized channels are connected, and their respective Partial control unit via the sub-switching network, via one of the connections routes and a control channel via the central switching matrix runs, which is switched on at the start of operation and during the Operation kept ready in the switched state will, and about the exchange of information and tax signals the partial tax for the ongoing switching operation Access to the coordinate processor and access at all times to the partial control unit, and for its connection through the Sub-switching matrix data in the sub-control unit before it is included drive are stored, which when it is started up the Switching through the control channel from the partial control unit via the Establish partial switching matrix.

Schaltungsanordnungen dieser Art sind bereits durch die europä­ ischen Patentschriften 00 06 132 und 00 58 750 bekannt. Hierin ist also ein zur Abwicklung der Schaltvorgänge des gesamten Informationsaustausches zwischen zentralem Koordinationsprozessor einerseits und jedem der Teil­ steuerwerke andererseits erforderlicher Steuerweg nicht als ein zentrales Steuerdaten-Busleitungssystem ausgebildet, sondern pro Teilsteuerwerk ist ein eigener Steuerkanal vorgesehen. Es sind also so viele Steuerkanäle vorgesehen, wie Teilsteuerwerke vor­ handen sind. Jedes Teilsteuerwerk ist also mit einem eigenen Steuerkanal ausgestattet. Die Vielzahl dieser teilsteuerwerks­ individuellen Steuerkanäle ist über das zentrale Koppelfeld bereitgestellt. Über dasselbe werden also bei Betriebsbeginn durch den zentralen Koordinationsprozessor zunächst viele Ver­ bindungen aufgebaut, von denen jede zu je einer der Anschluß­ gruppen führt. Diese Verbindungen werden außer über das zentrale Koppelfeld weiter über je einen Verbindungsweg zu der jeweiligen Anschlußgruppe hergestellt. Bei diesen Verbindungswegen sowie bei den Verbindungswegen innerhalb des zentralen Koppelfeldes handelt es sich also um Verbindungswege, die sowohl im zentralen Koppelfeld selbst, als auch zwischen diesem einerseits und jeder der Anschlußgruppen andererseits in größerer Anzahl zur Herstel­ lung gewählter Verbindungen bereitgestellt sind. Von diesen Verbindungswegen werden nun einige dafür benutzt, bei Betriebs­ beginn Verbindungen vom zentralen Koordinationsprozessor zu jeder der Anschlußgruppen aufzubauen; diese Verbindungen dienen dann jeweils als teilsteuerwerks-individuelle Steuerkanäle und werden während des gesamten sich anschließenden Vermittlungsbetriebes ständig in betriebsbereitem Zustand bereitgehalten. Gemäß der letzten der beiden genannten Literaturstellen werden diese Steuer­ kanäle laufend auf ihre Betriebsbereitschaft hin überwacht.Circuit arrangements of this type are already in use by the European patents 00 06 132 and 00 58 750  known. So here is one for handling the Switching of the entire information exchange between central coordination processor on the one hand and each of the part Tax authorities, on the other hand, do not consider the required tax path as a central control data bus line system, but pro A separate control channel is provided for the partial control unit. There are So as many control channels are provided as partial control units before are available. Each control unit is therefore with its own Control channel equipped. The multitude of these sub-control units individual control channels is via the central switching matrix provided. So about the same at the start of operations through the central coordination processor, initially many ver bindings built, each of which is one of the connection leads groups. These connections are made beyond the central Koppelfeld continue via a connection path to the respective Connection group established. With these connection paths as well the connection paths within the central switching matrix So there are connection paths that are both in the central Koppelfeld itself, as well as between this one and everyone the connection groups, on the other hand, in larger numbers for the manufacture selected connections are provided. Of these Connection paths are now used for some of them during operation starts connections from the central coordination processor to everyone to build up the connection groups; these connections then serve each as and individual control unit control channels during the entire subsequent placement operation always kept ready for use. According to the The last of the two references cited will be this tax channels are continuously monitored for operational readiness.

Der teilsteuerwerks-individuelle Steuerkanal dient also dem Aus­ tausch von Informationen und Steuersignalen für den laufenden Vermittlungsbetrieb über die betreffende Anschlußgruppe. Dabei hat das betreffende Teilsteuerwerk über den Steuerkanal Zugang zum Koordinationsprozessor; ebenso hat dieser jederzeit Zugriff zum Teilsteuerwerk. Die genannten Informationen können z. B. die­ jenigen Informationen sein, die innerhalb einer Anschlußgruppe vom betreffenden Teilsteuerwerk laufend gesammelt werden, und die zur Verarbeitung im zentralen Koordinationsprozessor bestimmt sind. Bei diesen Informationen kann es sich z. B. um die Wahlin­ formationen von wählenden Teilnehmern handeln, sowie um weitere Schaltkennzeichen, die im Zusammenhang von herzustellenden oder hergestellten Verbindungen in der betreffenden Anschlußgruppe eintreffen und ebenfalls vom zentralen Koordinationsprozessor zu verarbeiten und deshalb ihm zuzuleiten sind. Bei den genannten Steuersignalen für den laufenden Vermittlungsbetrieb kann es sich um Informationen handeln, die zur Durchschaltung von gewählten Verbindungen innerhalb der jeweiligen Anschlußgruppe, und zwar über das zu ihr gehörende Teilkoppelfeld dienen. Solche Verbin­ dungen verlaufen über das zentrale Koppelfeld und i.d.R. über die Teilkoppelfelder von zwei Anschlußgruppen.The control unit-individual control channel is therefore used exchange of information and control signals for the current Switching operation via the relevant line group. Here the relevant sub-control unit has access via the control channel  to the coordination processor; it also has access at all times to the partial control unit. The information mentioned can, for. B. the that information be within a line group are continuously collected by the sub-control unit concerned, and destined for processing in the central coordination processor are. This information may be e.g. B. the Wahlin act formations of voting participants, as well as others Switching marks in the context of to be manufactured or established connections in the relevant line group arrive and also from the central coordination processor process and are therefore to be sent to him. With the above There can be control signals for the ongoing operator operation is information that is used to switch through selected Connections within the respective line group, namely serve over the sub-switching matrix belonging to it. Such a verb dung run through the central switching network and usually about the Sub-switching networks of two line trunk groups.

Prozessoren und Steuerwerke der hier angesprochenen Art sind be­ kanntlich programmgesteuert. Entsprechende Programminformationen sind im zentralen Koordinationsprozessor und in den Teilsteuer­ werken gespeichert. Anhand dieser Programminformationen ist dem Koordinationsprozessor und den Teilsteuerwerken vorgegeben, in welcher Weise und nach welchem Schema sie sämtliche Verarbeitungs­ prozeduren abzuwickeln haben. Das Prinzip programmgesteuerter Datenverarbeitungsanlagen ist in großer Vielfalt und in vielen Variationen bekannt.Processors and control units of the type mentioned here are known program-controlled. Corresponding program information are in the central coordination processor and in the partial tax works saved. Based on this program information, the Coordination processor and the sub-control units specified in how and according to what scheme they all processing procedures have to be carried out. The principle of program-controlled Data processing equipment is in great variety and in many Variations known.

Die Arbeitsweise des zentralen Koordinationsprozessors einerseits und der dezentralen Teilsteuerwerke andererseits ist nicht nur durch die betreffenden Programminformationen vorgegeben, sondern auch durch den gesamten Aufbau einer entsprechenden Fernmelde­ vermittlungsanlage. Dieser Aufbau betrifft nicht nur den inneren Aufbau des zentralen Koppelfeldes und dessen Verbindungen über die genannten Verbindungswege mit den Teilkoppelfeldern der An­ schlußgruppen, sondern auch den inneren Aufbau der Anschlußgruppen selber, insbesondere ihrer Teilkoppelfelder sowie die Beschal­ tung des jeweiligen Teilkoppelfeldes der betreffenden Anschluß­ gruppe mit Teilnehmer- und Verbindungsleitungen. Dementsprechend sind in jedem Teilsteuerwerk außer Programminformationen auch Strukturierungs-Informationen zu speichern, die den Aufbau und die Beschaltung der Anschlußgruppe mit Teilnehmer- und/oder Verbindungsleitungen betreffen. Diese Strukturierungs-Informa­ tionen geben also Auskunft darüber, welche Leitung wo an­ geschlossen ist, welcher Art die jeweilige Leitung ist, welche Bedingungen für eine Verbindungsherstellung gelten u. dgl.The functioning of the central coordination processor on the one hand and the decentralized control units on the other hand is not only given by the relevant program information, but also through the entire structure of a corresponding telecommunications switching system. This structure does not only affect the inner one Establishment of the central switching matrix and its connections via the mentioned connection paths with the sub-coupling fields of the An conclusion groups, but also the internal structure of the connection groups  themselves, in particular their sub-coupling fields and the scarf tion of the respective switching matrix of the relevant connection group with subscriber and connecting lines. Accordingly are in every sub-control unit in addition to program information Structuring information to store the structure and the connection group with subscriber and / or Connection lines concern. This structuring informa So information about which line goes where is closed, which type the respective line is, which Conditions for establishing a connection may apply. the like

Der die in jedem der Teilsteuerwerke zu speichernde Programmin­ formation und die den Aufbau und die Beschaltung der Anschluß­ gruppe mit Teilnehmer- und Verbindungsleitungen angebende Strukturierungsinformation insgesamt umfassende Datenbestand für die Gesamtheit einer zentralgesteuerten Fernmeldevermitt­ lungsanlage der angesprochenen Art ist zunächst an zentraler Stelle in dieser gesammelt und gespeichert. So enthält zu Betriebsbeginn einer derartigen Fernmeldevermittlungsanlage der zentrale Koordinationsprozessor nicht nur für sich selber sondern auch für sämtliche Teilsteuerwerke die zur Abwicklung des Vermittlungsbetriebes erforderliche Programminformation und Strukturierungs-Information, und zwar für jede der Anschluß­ gruppen, d. h., für jedes ihrer Teilsteuerwerke.The program to be stored in each of the sub-control units formation and the construction and wiring of the connection group with subscriber and connecting lines Structuring information overall comprehensive database for the whole of a centrally controlled telecommunications exchange The system of the type mentioned is initially more central Place collected and saved in this. So contains too Start of operation of such a telecommunications switching system central coordination processor not only for yourself but also for all sub-control units for processing of the switching company required program information and Structuring information for each of the connections groups, d. that is, for each of its sub-control units.

Bei Inbetriebnahme einer Fernmeldevermittlungsanlage der eingangs umrissenen Art ist deshalb vom zentralen Koordinationsprozessor zu jedem der Teilsteuerwerke die entsprechende Programminformation und die Strukturierungs-Information zu übertragen. In Anordnungen der bekannten Art werden nun hierfür die teilsteuerwerks-indivi­ duellen Steuerkanäle verwendet. Hierzu ist es erforderlich, daß bei Betriebsbeginn zunächst diese Steuerkanäle bereitgestellt werden, wofür vom zentralen Koordinationsprozessor die oben genannten Verbindungen hergestellt werden. Da diese Verbindungen nicht nur über das zentrale Koppelfeld und nicht nur über die genannten Verbindungswege zwischen demselben und den Anschluß­ gruppen hergestellt werden, sondern auch innerhalb jeder der Anschlußgruppen über das betreffende Teilkoppelfeld zum betreffen­ den Teilsteuerwerk hin weiter durchzuschalten sind, müssen in jedem Teilsteuerwerk bereits vor seiner Inbetriebnahme sämtliche Daten gespeichert sein, die zur Durchschaltung des Steuerkanals innerhalb des Teilkoppelfeldes gebraucht werden, die also bei Inbetriebnahme einer Fernsprechvermittlungsanlage der ange­ sprochenen Art die Durchschaltung des Steuerkanals vom Teilsteuerwerk über das Teilkoppelfeld bewerkstelligen.When commissioning a telecommunications switching system at the beginning outlined type is therefore from the central coordination processor too the corresponding program information for each of the partial control units and transmit the structuring information. In orders The sub-control unit indivi are now of the known type duel control channels used. This requires that these control channels are initially provided at the start of operation what the central coordination processor does the above mentioned connections are made. Because these connections  not just over the central switching matrix and not just over the mentioned connection paths between the same and the connection groups are produced, but also within each of the Connection groups on the relevant sub-switching matrix to concern the partial control unit are to be switched through further, in every control unit before it is put into operation Data can be stored to switch the control channel are needed within the sub-switching matrix, i.e. at Commissioning of a telephone exchange of the specified spoken kind the switching of the control channel from Carry out the partial control unit via the partial switching matrix.

In Fernsprechvermittlungsanlagen der genannten bekannten Art ist im Zusammenhang der zuvor beschriebenen Sachverhalte vor­ gesehen, daß die zur Abwicklung des Vermittlungsbetriebes erforderliche Programminformation in oder beim Teilsteuerwerk gespeichert ist. Diese Speicherung ist dem betreffenden Teil­ steuerwerk bereits durch seine Herstellung mitgegeben, weil davon ausgegangen wird, daß die Abwicklung des Vermittlungs­ betriebes und damit das entsprechende Gesamt-Programm feststeht. Dagegen ist die ebenso zur Abwicklung des Vermittlungsbetriebes erforderliche, den Aufbau und die Beschaltung einer jeden Anschlußgruppe mit Teilnehmer- und Verbindungsleitungen ange­ bende Strukturierungs-Information von Fall zu Fall verschieden, weil jede der Anschlußgruppen anders als sämtliche anderen Anschlußgruppen beschaltet sein kann und in der Regel beschaltet ist. Deshalb ist in Fernmeldevermittlungsanlagen der eingangs angegebenen Art vorgesehen, daß bei Betriebsbeginn die zur Abwicklung des Vermittlungsbetriebes erforderliche, den Aufbau und die Beschaltung der Anschlußgruppe mit Teilnehmer- und/oder Verbindungsleitungen angebende Strukturierungs-Infor­ mation vom zentralen Koordinationsprozessor einzeln an jedes der Teilsteuerwerke jeder der verschiedenen Anschlußgruppen übertragen wird. In bekannten Fernsprechvermittlungsanlagen der eingangs genannten Art erfolgen diese Übertragungsvorgänge über die genannten Steuerkanäle.In telephone switching systems of the known type mentioned is in the context of the circumstances described above seen that to handle the brokerage required program information in or at the control unit is saved. This storage is the part concerned control unit already given through its production, because it is assumed that the handling of the mediation company and thus the corresponding overall program is fixed. On the other hand, it is also used for handling brokerage required, the construction and wiring of each Connection group with subscriber and connecting lines structuring information varies from case to case, because each of the line groups is different from all the others Connection groups can be connected and usually connected is. That is why in telecommunications switching systems is the beginning specified type provided that at the start of operations for Processing of the brokerage required, the construction and the connection group with subscriber and / or structuring information indicating connecting lines mation from the central coordination processor individually to each of the sub-control units of each of the different line groups  is transmitted. In known telephone exchanges These transmission processes take place via the type mentioned above the control channels mentioned.

Die zeitliche Aufeinanderfolge bei Inbetriebnahme einer Fernmelde­ vermittlungsanlage der eingangs genannten Art ist also in groben Zügen folgende: Nach Inbetriebsetzung des zentralen Koordinations­ prozessors selbst baut dieser Verbindungen zur Bereitstellung der einzelnen Steuerkanäle auf. Da diese Verbindungen teilweise inner­ halb der Anschlußgruppen, und zwar über ihre Teilkoppelfelder durchzuschalten sind, enthalten die Teilsteuerwerke bereits ihre Programminformation, anhand deren sie auch die jeweils erste durchzuschaltende Verbindung, nämlich die Verbindung für den Steuerkanal herstellen. Sind die Steuerkanäle vom zentralen Koordinationsprozessor zu sämtlichen Anschlußgruppen und zu den Teilsteuerwerken in ihnen hergestellt, so überträgt der zentrale Koordinationsprozessor zu den Teilsteuerwerken die jeweilige Strukturierungs-Information. Die Übertragung der gesamten Strukturierungs-Information zu jedem der einzelnen Teilsteuer­ werke erfolgt nach den Regeln eines für den laufenden Vermitt­ lungsbetrieb vorgesehenen Übertragungsverfahrens. Für den laufenden Vermittlungsbetrieb werden Daten in Portionen jeweils solchen Umfanges, also in einem solchen Datenformat ausgetauscht, das den Bedingungen des laufenden Vermittlungsbetriebes optimal angepaßt ist, wobei ein entsprechend gesichertes Übertragungs­ verfahren wesentlich ist. Diese Informationen liegen durchweg in kleineren Portionen gleicher Größenordnung vor.The chronological sequence when commissioning a telecommunication switching system of the type mentioned is rough Trains following: After commissioning the central coordination processor itself builds these connections to provide the individual control channels. Because these connections are partially internal half of the line trunk groups, via their sub-switching networks to be switched through, the partial control units already contain theirs Program information, based on which they are also the first connection to be switched through, namely the connection for the Establish control channel. Are the control channels from the central Coordination processor to all line groups and to the The central control unit transmits partial control units in them Coordinating processor to the respective control units Structuring information. The transfer of the whole Structuring information for each of the individual partial taxes works are carried out according to the rules of an ongoing broker transmission operation. For the ongoing brokerage data is in portions each such a scope, i.e. exchanged in such a data format, that the conditions of the current brokerage optimal is adapted, with a correspondingly secured transmission procedure is essential. This information is consistent in smaller portions of the same order of magnitude.

Die Übertragung der gesamten Strukturierungs-Information indi­ viduell zu jedem der Teilsteuerwerke nach den für den laufenden Vermittlungsbetrieb vorgesehenen Regeln hat zur Folge, daß die Übertragung der Strukturierungs-Information relativ lange dauert, und daß insgesamt bei der Inbetriebnahme einer Fernmeldevermitt­ lungsanlage der eingangs genannten bekannten Art ein relativ großer Zeitbedarf entsteht für die Ladung der Teilsteuerwerke mit ihrer jeweiligen Strukturierungs-Information. Es besteht deshalb u. a. für die Erfindung die Aufgabe, den bei der Inbetriebnahme einer Fernmeldevermittlungsanlage der eingangs genannten Art entstehenden Zeitbedarf zu verkleinern.The transfer of all structuring information indi viduell to each of the partial control units according to the current one Provisioning agency rules means that the Transferring the structuring information takes a relatively long time and that overall when commissioning a telecommunications operator lungsanlage of the known type mentioned a relative great time is required to load the partial control units their respective structuring information. Therefore it exists  u. a. for the invention, the task at startup a telecommunications exchange of the type mentioned at the beginning to reduce the time required.

Wie praktische Erfahrungen mit dem Betrieb und der Inbetrieb­ nahme von Fernmeldevermittlungsanlagen der eingangs genannten bekannten Art zeigen, ist es überdies nicht immer wünschenswert, daß die Teilsteuerwerke sämtlicher Anschlußgruppen in gleicher Weise programmiert sind. Allerdings wäre aber eine unterschied­ liche Programmierung bei Fernsprechvermittlungsanlagen der bekann­ ten Art bereits bei der Herstellung der Anschlußgruppen zu berück­ sichtigen. Diese werden ja - wie bereits ausgeführt wurde - bei ihrer Fertigung programmiert, was ja entscheidend dazu beiträgt, daß der teilsteuerwerks-individuelle Steuerkanal innerhalb einer Anschlußgruppe, d. h., über ihr Teilkoppelfeld, durchschaltbar ist, also in einem Zeitpunkt, in dem der Steuerkanal noch nicht besteht und folglich noch nicht für eine Übertragung von Steuer­ informationen vom zentralen Koordinationsprozessor zum betreffen­ den Teilsteuerwerk verwendet werden kann, d. h., auch nicht für die Abwicklung der Steuerungsvorgänge für die Herstellung des teilsteuerwerks-individuellen Steuerkanals. Jedes Teilsteuerwerk muß deshalb bereits über die hierfür erforderlichen Daten, d. h., über die betreffenden Einstellinformationen für das jeweilige Teilkoppelfeld, aber nicht nur über diese, sondern ins­ besondere auch über die entsprechenden, für die Verbindungs­ herstellung über das Teilkoppelfeld erforderlichen Programm- Informationen verfügen. Deshalb sind jedem Teilsteuerwerk diese Programm-Informationen bereits durch die Herstellung mitgegeben und in Verbindung damit der gesamte Programm-Datenbestand, den ein jedes Teilsteuerwerk überhaupt braucht.How practical experience with the operation and commissioning take telecommunications switching systems of the aforementioned known type, it is also not always desirable that the sub-control units of all line groups in the same Are programmed. However, there would be a difference programming in telephone exchanges that is known ten kind already in the manufacture of the connection groups sight. These are - as already mentioned - at programmed their production, which contributes significantly to that the control unit-individual control channel within a Extension group, d. that is, switchable via its sub-switching matrix is, at a time when the control channel is not yet exists and therefore not yet for a transfer of tax information from the central coordination processor to the concern the partial control unit can be used, d. that is, not even for the handling of the control processes for the production of the control unit-individual control channel. Each sub-control unit must therefore already have the data required for this, i.e. H., about the relevant setting information for the respective Sub switching network, but not only over this, but into special also about the corresponding, for the connection production via the sub-switching network Information. That is why these are part of every control unit Program information already provided by the production and in connection with it the entire program database, the every control unit needs at all.

Für die Erfindung besteht deshalb im weiteren die Aufgabe, unter den gegebenen, weiter oben im Detail beschriebenen Zusammenhängen die Arbeits­ weise der Teilsteuerwerke variieren zu können; dabei soll den erwähnten Problemen des Zeitbedarfs im Zusammenhang mit der Inbetriebnahme einer Fernsprechanlage der eingangs angegebenen Art Rechnung getragen werden.For the invention there is therefore the further task, among the given contexts described in detail above the working  how the sub-control units can vary; thereby the mentioned problems of time requirements in connection with the Commissioning of a telephone system of the type specified at the beginning Kind of be taken into account.

Die Erfindung löst die gestellte Aufgabe dadurch, daß bei Be­ triebsbeginn einer Anschlußgruppe vom zentralen Koordinaten­ prozessor zusätzlich zum Steuerkanal eine Verbindung für einen Datenladekanal aufgebaut wird, über den der Koordinations­ prozessor Zugriff zum Teilsteuerwerk für eine Übertragung größerer Datenmengen an dieses hat, und daß die Herstellung dieser Verbindung einerseits durch den zentralen Koordinationsprozessor über das zentrale Koppelfeld und über einen der Ver­ bindungswege durchgeführt wird, sowie andererseits durch das Teilsteuerwerk bezüglich des über das Teilkoppelfeld zum Teil­ steuerwerk verlaufenden Teiles der genannten Verbindung mit Hilfe von vom Koordinationsprozessor über den Steuerkanal über­ tragenen Steuerinformationen abgewickelt wird, daß über den Steu­ erkanal oder über den Datenladekanal ein den Beginn eines Da­ tenladevorganges signalisierendes Beginnzeichen und ein das Ende desselben signalisierendes Endezeichen übertragen wird, und daß über den Datenladekanal die für das Teilsteuerwerk zur Abwicklung des Vermittlungsbetriebes erforderliche und dementsprechend im Teilsteuerwerk zu speichernde Programm­ information und/oder die ebenso dafür erforderliche, den Aufbau und/oder die Beschaltung der Anschlußgruppe mit Teilnehmer- und/oder Verbindungsleitungen angebende Struktu­ rierungs-Information übertragen wird, und daß nach Beendigung des Datenladevorganges die für den Datenladekanal hergestellte Verbindung wieder ausgelöst wird.The invention solves this problem in that at Be drive start of a connection group from the central coordinates processor in addition to the control channel a connection for one Data loading channel is established over which the coordination processor Access to the partial control unit for a transmission has larger amounts of data on this, and that manufacturing this connection on the one hand by the central coordination processor over the central switching matrix and over one of the ver binding paths is carried out, and on the other hand by the Partial control unit with respect to the part via the switching matrix Control unit running part of the connection mentioned Help from the coordination processor via the control channel via carried tax information is processed that about the tax or the beginning of a data via the data loading channel signaling start signal and a the End of the same signaling end signal is transmitted, and that over the data loading channel for the partial control unit necessary for handling the brokerage and accordingly program to be stored in the partial control unit information and / or the necessary for that Structure and / or the wiring of the connection group with Structure indicating subscriber and / or connecting lines ration information is transmitted, and that after completion of the data loading process that produced for the data loading channel Connection is triggered again.

Durch die Erfindung wird also für die Inbetriebnahme einer Fern­ sprechvermittlungsanlage der eingangs genannten bekannten Art ein vom teilsteuerwerks-individuellen Steuerkanal unabhängiger weiterer Datenweg geschaffen. Dieser Datenweg braucht nur während der Dauer der Inbetriebnahme zu bestehen, braucht also nur so lange zu bestehen, wie relativ große Mengen von Daten im Vergleich zum laufenden Vermittlungsbetrieb vom zentralen Ko­ ordinationsprozessor an jedes der Teilsteuerwerke zu übertragen sind. Der teilsteuerwerks-individuelle Steuerkanal pro Anschluß­ gruppe wird also entlastet von der Aufgabe der im Zusammenhang mit der Inbetriebnahme abzuwickelnden Ladung jedes Teilsteuer­ werks mit den für den laufenden Vermittlungsbetrieb erforder­ lichen und in jedem der Teilsteuerwerke zu speichernden teil­ steuerwerks-individuellen Strukturierungs-Informationen. Über diesen gesonderten Datenweg können die in das jeweilige Teil­ steuerwerk zu ladenden und hier zu speichernden Daten in einer von der Betriebsabwicklung über den teilsteuerwerks-individu­ ellen Steuerkanal unabhängigen Weise übertragen werden. Ferner kann außer der gesamten, jeweils für ein Teilsteuerwerk erfor­ derlichen Strukturierungs-Information auch der größte Teil der zur Abwicklung des Vermittlungsbetriebes erforderliche und dem­ entsprechend im Teilsteuerwerk zu speichernden Programminfor­ mation auf diese Weise bei Inbetriebnahme vom zentralen Koor­ dinationsprozessor zu jedem der betreffenden Teilsteuerwerke hin übertragen werden. Obwohl also die bei einer Inbetriebnahme vom zentralen Koordinationsprozessor zu jedem der Teilsteuer­ werke zu übertragende Datenmenge erfindungsgemäß noch vergrößert wird, wird hierdurch der teilsteuerwerks-individuelle Steuer­ kanal nicht belastet.The invention thus becomes for the commissioning of a remote voice switching system of the known type mentioned a control channel that is independent of the individual control unit another data path created. This data path only needs during  So it only needs to survive the duration of the commissioning to persist for a long time, such as relatively large amounts of data in the Comparison to the ongoing brokerage from the central ko ordination processor to transmit to each of the sub-control units are. The control unit-individual control channel per connection group is thus relieved of the task of related every partial tax to be processed with the commissioning works with those required for ongoing brokerage Lichen and part to be stored in each of the control units control unit-specific structuring information. over This separate data path can be used in the respective part data to be loaded and stored here in one control unit from the operational handling to the partial control unit individual The control channel can be transmitted independently. Further can be used for a partial control unit in addition to the entire one most of the structural information necessary for handling the brokerage and the according to the program information to be stored in the partial control unit in this way when starting up from the central gate combination processor for each of the sub-control units concerned be transferred there. So although the one when commissioning from the central coordination processor to each of the partial taxes works to be transferred data amount according to the invention still enlarged is thereby the individual control unit tax channel not loaded.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung nur in wesentlich zu ihrem Verständnis beitragenden Bestandteilen dargestellt. Die Beschreibung geht zunächst auf die allgemeinen Funktionsabläufe einer erfindungsgemäß arbeitenden rechnerge­ steuerten Fernsprechvermittlungsanlage ein. Erst weiter unten werden die erfindungsgemäßen Besonderheiten dieser Vermitt­ lungsanlage erläutert.In the drawing is an embodiment of the invention only in parts that contribute to their understanding shown. The description first goes to the general Functional sequences of a computer working according to the invention controlled telephone exchange. First below the particularities of this mediator according to the invention system explained.

Ein aus drei Koppelstufen RZE, R und RZA aufgebautes Koppelfeld, das also ein zentrales Koppelfeld ist, weist eingangsseitig eine große Anzahl von Koppelfeldanschlüssen auf, von denen einer dargestellt und mit A bezeichnet ist. Das Koppelfeld besteht aus mehreren Koppelfeldteilen. Jeder der Koppelfeldan­ schlüsse umfaßt immer ein Paar von Zeitmultiplexleitungen, von denen die eine Zeitmultiplexleitung zur Signalübertragung zum Koppelfeld hin und die andere Zeitmultiplexleitung zur Signalübertragung aus dem Koppelfeld heraus dient. Dement­ sprechend umfaßt der Koppelfeldanschluß A eine Zeitmultiplex­ leitung A1 und eine Zeitmultiplexleitung A2. Für jede dieser beiden Zeitmultiplexleitungen ist die jeweilige Signalüber­ tragungsrichtung durch entsprechende Pfeile angedeutet.A switching matrix made up of three coupling stages RZE, R and RZA,  So this is a central switching matrix, points on the input side a large number of switching network connections, of which one is shown and labeled A. The switching matrix consists of several switching matrix parts. Each of the paddocks conclusions always includes a pair of time division lines one of which is a time-division multiplex line for signal transmission to the switching matrix and the other time-division multiplex line to Signal transmission from the switching matrix is used. Dement speaking, the switching network connection A comprises a time division multiplex line A1 and a time-division multiplex line A2. For each of these in both time-division multiplex lines, the respective signal is over direction of wear indicated by corresponding arrows.

Die Koppelvielfache der ersten Koppelstufe RZE sind kombinier­ te Zeitlage-Raumlage-Vielfache, wie die dargestellten Symbole erkennen lassen. Die Koppelvielfache der mittleren Koppelstufe R sind Raumlagevielfache. Die Koppelvielfache der letzten Koppelstufe RZA sind wieder Raumlage-Zeitlage- Vielfache. In jeder Koppelstufe ist eine größere Anzahl der angegebenen Vielfache vorgesehen, wenngleich pro Koppelstufe jeweils nur drei Vielfache der angegebenen Art dargestellt sind. Die Koppelvielfache der verschiedenen Koppelstufen sind untereinander über Zwischenleitungen in der aus der Zeichnung ersichtlichen Weise verbunden. Diese Zwischenlei­ tungen sind Zeitmultiplex-Zwischenleitungen. Ebenso sind die Koppelfeldanschlüsse zeitmultiplexer Art. Das zentrale Koppel­ feld kann aus mehreren Teilen der dargestellten Art bestehen, die in der z. B. durch die DE-PS 15 37 849 bekannten Weise über Zeitmultiplexzwischenleitungen (s1-s3) unter­ einander verbunden sind. In diesem Falle stellen diese mehreren Teile also zusammen das zentrale Koppelfeld dar.The switching multiples of the first switching stage RZE are combined te time position-space position multiples, like those shown Let symbols be recognized. The coupling multiple of the middle one Coupling stage R are spatial multiples. The coupling multiple the last coupling stage RZA are again spatial position-time position Multiples. There is a larger number of in each coupling stage specified multiples provided, albeit per coupling stage only three multiples of the specified type are shown are. The coupling multiple of the different coupling levels are connected to each other via intermediate lines in the Drawing clearly connected. This interim lines are time-division multiplex intermediate lines. Likewise, they are Switching point connections of time-multiplexed type. The central switch field can consist of several parts of the type shown, which in the z. B. known from DE-PS 15 37 849 Way over time-division intermediate lines (s1-s3) are connected. In this case, these represent several So share together the central switching matrix.

An die Koppelfeldanschlüsse, zum Beispiel A des in der zuvor an­ gegebenen Weise aus mehreren Koppelfeldteilen (K) bestehenden zentralen Koppelfeldes, sind über für jeweils beide Nachrichten­ übertragungsrichtungen ausgelegte Zeitmultiplexleitungen, zum Beispiel der Zeitmultiplexleitung ltg1, Anschlußgruppen, zum Beispiel die Anschlußgruppe LTG1 (Line Trunk Group), einzeln angeschlossen. Eine solche Anschlußgruppe ist eingangsseitig mit Teilnehmerleitungen (analog und/oder digital), Analog- Verbindungsleitungen und mit PCM-Verbindungsleitungen (alter­ nativ sowie auch in Kombination) beschaltbar. Eine über eine Teilnehmerleitung angeschlossene Teilnehmerstation ist mit T1 bezeichnet. In einer Anschlußgruppe sind Codierer, Decodierer, Multiplexer, Demultiplexer und die für eine Realisierung der sogenannten BORSCHT-Funktion erforderlichen Einrichtungen enthalten (vgl. NTZ Bd. 33/1980, Heft 10, Seiten 646 bis 652, und 1978 International Zurich Seminar on Digital Communications, Proceedings IEEE Catalogue, Nr. 78 CH 1325-0 ASST, Seiten B2-1, A4.1, auch die deutsche Patentanmeldung P 31 00 811.9; P 31 04 002.0 und P 31 06 903.7. In einer Anschlußgruppe sind Teilnehmeran­ schlußschaltungen für die Telnehmerstationen zu Mehrfach- Teilnehmeranschlußschaltungen LTU1-LTU8 zusammengefaßt, die u. a. Speicher LS für Daten enthalten, die in Zuordnung zu den einzelnen Teilnehmeranschlüssen gespeichert werden. Es kann sich auch um Daten handeln, die die Arbeitsweise dieser An­ schlußschaltungen festlegen (z. B. also auch um Programme).To the switching network connections, for example A in the previous one given from several switching network parts (K) central switching network, are over for both messages  Time-division multiplex lines designed for transmission directions Example of the time-division multiplex line ltg1, line groups, for Example the connection group LTG1 (Line Trunk Group), individually connected. Such a connection group is on the input side with subscriber lines (analog and / or digital), analog Connection lines and with PCM connection lines (old native as well as in combination). One over one Subscriber line connected subscriber station is with T1 designated. In a line trunk group there are encoders, decoders, Multiplexers, demultiplexers and those for realizing the so-called BORSCHT function required facilities included (see NTZ vol. 33/1980, issue 10, pages 646 to 652, and 1978 International Zurich Seminar on Digital Communications, Proceedings IEEE Catalog, No. 78 CH 1325-0 ASST, pages B2-1, A4.1, also the German patent application P 31 00 811.9; P 31 04 002.0 and P 31 06 903.7. In a connection group there are participants closing circuits for the subscriber stations to multiple Subscriber line circuits LTU1-LTU8 summarized the u. a. Memory LS for data contained in association with the individual subscriber lines can be saved. It can is also data that describes the way this work Define final circuits (e.g. also around programs).

Eine Anschlußgruppe umfaßt ferner ein Teilkoppelfeld TSU und eine zu dessen Steuerung durch ein Teilsteuerwerk, z. B. GP1, dienende Einstelleinrichtung SESC. Ein Teilkoppelfeld (z. B. TSU) ist also das Koppelfeld einer Anschlußgruppe; dagegen ist ein (weiter oben erwähnter) Koppelfeldteil (K) ein Teil des aus mehreren solchen Koppelfeldteilen in der angegebe­ nen Weise zusammengefügten zentralen Koppelfeldes.A line trunk group also includes a sub-switching network TSU and one to control it by a partial control unit, e.g. B. GP1, serving adjustment device SESC. A sub-switching network (e.g. TSU) is thus the switching matrix of a line trunk group; on the other hand is a switching matrix part (mentioned above) a part of several such switching network parts in the specified a central switching matrix.

In der Zeichnung ist unter anderem die Anschlußgruppe LTG1 gezeigt. Deren Aufbau und Arbeitsweise sind ausführ­ lich in der DE-OS 28 26 113 ab Seite 5, 2. Abs. beschrieben. Ferner ist auf die Beschreibung des Fernsprechvermittlungs­ systems EWSD im Beiheft zum 4. Jahrgang (1981) der Zeit­ schrift "telcom report" und auf das USA-Patent 45 64 725 hinzuweisen. Die weiteren Erläuterungen setzen insbesondere diese Beschreibung als bekannt voraus und beschränken sich auf die im vorliegenden Falle besonders wesentlichen Zusammen­ hänge.In the drawing, among other things, the connection group LTG1 shown. Their structure and mode of operation are detailed Lich described in DE-OS 28 26 113 from page 5, 2nd paragraph. Furthermore, on the description of the telephone exchange  systems EWSD in the booklet for the 4th year (1981) of the time font "telcom report" and on the US patent 45 64 725 point out. The further explanations set in particular this description as known ahead and is limited to the particularly essential together in the present case hang.

Ein als zentrales Steuerwerk CP bezeichneter zentraler Koordinationsprozessor wirkt unter anderem bei der Herstellung der über das zentrale Koppelfeld aufzubauenden Nachrichten­ verbindungen mit. Er ermittelt die für die Herstellung einer jeden Verbindung erforderlichen Vermittlungsdaten. Die Ver­ mittlungsdaten für eine durchzuschaltende Verbindung geben bekanntlich genau den Verlauf der betreffenden Verbindung über das Koppelfeld an, also die von der Verbindung durchlaufenden Koppelvielfache und Zwischenleitungen, sowie die darin je­ weils belegten Kanäle. Diese Vermittlungsdaten werden mit Hilfe des zentralen Steuerwerkes, das also u. a. auch die Funktion einer Wegsucheinrichtung nebst Belegungsspeicher ausübt, erarbeitet und zur Koppelfeldeinrichtung KE des Koppelfeldes übertragen. Der die Vermittlungsdaten übertra­ gende Datenfluß vom zentralen Steuerwerk CP zur Koppelfeld­ einstelleinrichtung KE verläuft über eine mit dem zentralen Steuerwerk verbundene Puffereinrichtung, z. B. MB2, die einer Zwischenspeicherung und Umcodierung von Daten sowie einer Anpassung der Übertragungsgeschwindigkeit dient. Die Puffer­ einrichtung kann auf einen Teil dieser Funktionen oder auf jeweils nur eine dieser Funktionen beschränkt sein. Eine solche Puffereinrichtung ist zum Beispiel in der DE-PS 15 37 849 ausführlich beschrieben.A central control unit called the central control unit CP Coordination processor works among other things in the production the messages to be set up via the central switching matrix connections with. He determines the one for making one switching data required for each connection. The Ver Provide averaging data for a connection to be switched through As is well known, exactly the course of the connection in question the switching matrix, i.e. the ones passing through the connection Coupling multiples and intermediate lines, as well as those in each because channels are occupied. This mediation data is with Help of the central control unit, which u. a. also the Function of a route search device with occupancy memory exercises, elaborates and to the switching matrix facility KE des Transfer switching network. Who transfers the mediation data Data flow from the central control unit CP to the switching matrix KE adjustment device runs over a with the central Control unit connected buffer device, e.g. B. MB2, the one Intermediate storage and recoding of data as well as one Adaptation of the transmission speed is used. The buffers Setup can be based on some of these functions or on only one of these functions may be restricted. A such a buffer device is for example in DE-PS 15 37 849 described in detail.

Außer dem zentralen Steuerwerk CP ist eine größere Anzahl von jeweils auch als Teilsteuerwerk bezeichneten dezentralen Steuer­ einrichtungen GP1 bis GPn dargestellt, die jeweils den Anschluß­ gruppen LTG1 bis LTGn individuell zugeordnet sind. Diese Steuer­ einrichtungen dienen zur Durchführung sämtlicher Schaltvor­ gänge innerhalb jeder der genannten Anschlußgruppen. Zu diesen Schaltvorgängen gehören insbesondere sämtliche Vermittlungs­ vorgänge innerhalb dieser Anschlußgruppen. Weitere Einzel­ heiten hierüber beschreibt auch die bereits angegebene DE-OS 28 26 113.In addition to the central control unit CP there is a larger number of each also referred to as a partial control unit decentralized tax devices GP1 to GPn shown, each the connection groups LTG1 to LTGn are individually assigned. This tax facilities serve to carry out all Schaltvor  within each of the connection groups mentioned. To this Switching operations include in particular all switching processes within these connection groups. More single The above also describes the above DE-OS 28 26 113.

Die dezentralen Steuereinrichtungen GP1 bis GPn stehen mit dem zentralen Steuerwerk CP über Steuerkanäle in Verbindung, die einzeln pro dezentrale Steuereinrichtung über das Koppel­ feld (K) bis zu einer Puffereinrichtung, z. B. MB2, durchge­ schaltet sind. Von dieser Puffereinrichtung führt also je ein eigener Steuerkanal zu jeder der dezentralen Steuerein­ richtungen. Hierzu ist die Puffereinrichtung über eine Zeitmultiplexleitung m an einen der Koppelfeldanschlüsse angeschlossen. Die Puffereinrichtung ist an einen der Koppelfeldanschlüsse des Koppelfeldes in der gleichen Weise angeschlossen, wie jede der genannten Anschlußgruppen LTG1 bis LTGn. Die Zeitmultiplexleitung m ist also an einen Koppelfeldanschluß angeschaltet, der einen Zeitmultiplexein­ gang zu einem Raumlagen-Zeitlagen-Vielfach der ersten Koppel­ stufe und einen Zeitmultiplexausgang von einem Raumlagen- Zeitlagen-Vielfach der letzten Koppelstufe umfaßt. Die Zeit­ multiplexleitung m ist also an einen Koppelfeldanschluß wie den mit A bezeichneten angeschaltet. Sie umfaßt eine Mehr­ zahl von Steuerkanälen. Die Puffereinrichtung dient allen diesen Steuerkanälen, ist also gemeinsam für sie vorgesehen. Die zu jeweils einer Puffereinrichtung, z. B. MB2, führenden Steuerkanäle sind über den in der Zeichnung dargestellten Teil des zentralen Koppelfeldes (K), das ja aus mehreren solchen Teilen bestehen kann (s.o. . .), mit den an diesen Teil angeschlossenen Anschlußgruppen, z. B. LTG1 bis LTGn, verbunden. Gegebenenfalls weiteren solchen Teilen gehören die Pufferein­ richtungen MB1 und MB8 an.The decentralized control devices GP1 to GPn are included the central control unit CP in connection via control channels, the individually per decentralized control device via the coupling field (K) up to a buffer device, e.g. B. MB2 are switched. This leads from this buffer device a separate control channel for each of the decentralized control units directions. For this purpose, the buffer device is via a Time-division multiplex line m to one of the switching network connections connected. The buffer device is at one of the Switchboard connections of the switchboard in the same way connected like each of the LTG1 line groups mentioned to LTGn. The time-division multiplex line m is therefore to one Switching network connection switched on, which is a time division multiplex going to a space-time-multiple of the first paddock stage and a time-division multiplex output from a spatial Time slot multiple of the last coupling stage. The time Multiplex line m is therefore to a switching network connection like the one labeled A. It includes a more number of control channels. The buffer device serves everyone these control channels, is therefore intended jointly for them. The to a buffer device, for. B. MB2, leading Control channels are above those shown in the drawing Part of the central switching matrix (K), which consists of several such parts can exist (see above), with those attached to this part connected line groups, e.g. B. LTG1 to LTGn connected. If necessary, other such parts include the buffers directions MB1 and MB8.

Jede Verbindung zwischen einer Puffereinrichtung und einer jeden der Anschlußgruppen, zum Beispiel der Anschlußgruppe LTG1, verläuft über einen Steuerkanal zur Übertragung von Steuersignalen von der Puffereinrichtung zur betreffenden Anschlußgruppe und zur Übertragung von Informationen in der umgekehrten Richtung. Jeder Steuerkanal besteht - genauer besehen - bekanntlich aus einem Paar von Übertragungskanälen von denen je einer für die eine und je ein weiterer für die andere der jeweils zwei vorgegebenen Übertragungsrichtungen vorgesehen ist.Any connection between a buffer device and one each of the line groups, for example the line group  LTG1, runs over a control channel for the transmission of Control signals from the buffer device to the relevant one Connection group and for the transmission of information in the reverse direction. Every control channel exists - more precisely seen - known from a pair of transmission channels one for each and one for each other of the two given directions of transmission is provided.

Das in der Zeichnung dargestellte Ausführungsbeispiel zeigt also eine zentralgesteuerte Fernmeldevermittlungsanlage, und zwar eine PCM-Fernsprechvermittlungsanlage, mit einem u. a. ein zentrales Koppelfeld und einen zentralen Koordi­ nationsprozessor umfassenden Zentralteil. Ferner sind mit dem zentralen Koppelfeld dezentrale Anschlußgruppen verbunden, und zwar über zur Herstellung gewählter Verbindungen beleg­ bare Verbindungswege, z. B. Leitungen, Kanäle o. dgl. Diese führen in der jeweiligen Anschlußgruppe zu einem zu dieser gehörenden Teilkoppelfeld. Einer Verbindungsdurchschaltung über dieses dient ein Teilsteuerwerk in der jeweiligen An­ schlußgruppe. Die Anschlußgruppe ist mit Teilnehmerleitungen und Verbindungsleitungen bzw. ihnen entsprechenden, in Über­ tragungssystemen, z. B. PCM-30-System, zusammengefaßten Kanälen beschaltet. Von dem Teilsteuerwerk einer Anschlußgruppe verläuft über das zu ihr gehörende Teilkoppelfeld, über einen der genannten Verbindungswege und über das zentrale Koppelfeld ein Steuerkanal, der bei Betriebsbeginn durchgeschaltet und während des Betriebes ständig im durchgeschalteten Zustand bereitgehalten wird, und über den zum Austausch von Informa­ tionen und Steuersignalen für den laufenden Vermittlungsbe­ trieb das Teilsteuerwerk Zugang zum Koordinationsprozessor und dieser jederzeit Zugriff zu dem Teilsteuerwerk hat. Zu dessen Durchschaltung über das Teilkoppelfeld sind im Teilsteuerwerk bereits vor seiner Inbetriebnahme Daten gespeichert, die bei seiner Inbetriebnahme die Durchschaltung des Steuerkanals vom Teilsteuerwerk über das Teilkoppelfeld bewerkstelli­ gen. The embodiment shown in the drawing shows that is, a centrally controlled telecommunications exchange, namely a PCM telephone exchange, with one u. a. a central switching matrix and a central coordinator nation processor central part. Furthermore, with the central switching network, decentralized connection groups connected, namely over documents selected for the establishment of connections bare connection paths, e.g. B. lines, channels or the like. This lead to one in the respective connection group belonging sub-switching network. A connection connection A partial control unit in the respective An serves via this closing group. The extension group is with subscriber lines and connecting lines or their corresponding ones, in About support systems, e.g. B. PCM-30 system summarized Channels connected. From the sub-control unit of a line group runs over the sub-matrix belonging to it, over one of the connection routes mentioned and via the central switching matrix a control channel which is switched through at the start of operation and constantly switched on during operation is kept ready, and about the exchange of informa tion and control signals for the current operator drove the sub-controller access to the coordination processor and this has access to the partial control unit at all times. To that Connection via the sub-switching matrix are in the sub-control unit data is saved even before it is put into operation when the control channel is started up from the partial control unit via the partial switching matrix gene.  

Die Durchschaltung und die Aufrechterhaltung der erläuterten Steuerkanäle, die als semipermanente Verbindungen bezeichnet werden, über das zentrale Koppelfeld (K) erfolgt mit Hilfe der Koppelfeldeinstelleinrichtung KE in der gleichen Weise wie die Herstellung und die Aufrechterhaltung von Nachrichtenverbin­ dungen, zum Beispiel Fernsprechverbindungen. Hierzu sind in an sich bekannter Weise den Koppelvielfachen des Koppelfeldes K Haltespeicher zugeordnet, in die die jeweils ein Koppelvielfach betreffenden Vermittlungsdaten eingespeichert werden. Mit Hilfe dieser Haltespeicher wird bewerkstelligt, daß in den jeweiligen Zeitlagen die erforderlichen Durchschaltungen zur Verfügung stehen, bzw. die erforderlichen Schreibvorgänge sowie Lesevorgänge für die Vollspeicher der Zeitlagenviel­ fache stattfinden. Alle weiteren Einzelheiten, die Aufbau und Arbeitsweise einer Zeitmultiplexkoppelanordnung betreffen, werden hier als bekannt vorausgesetzt und deshalb nicht weiter im einzelnen beschrieben.The interconnection and maintenance of the explained Control channels, called semi-permanent connections be done over the central switching matrix (K) with the help of Switch matrix setting device KE in the same way as that Establishing and maintaining communications applications, for example telephone connections. For this purpose, see in known the multiples of the switching matrix K Hold memory assigned, in each of which a switching matrix relevant switching data are stored. With With the help of this memory is accomplished that in the the respective connections for the respective time slots Are available, or the necessary writes as well as reading processes for the full memory of the time slots take place multiple times. All other details, the construction and operation of a time-division multiplex switching arrangement, are assumed to be known here and therefore not further described in detail.

Da die weiter oben beschriebenen Steuerkanäle zwischen der jeweils betreffenden Puffereinrichtung MB . . . über die Zeit­ multiplexleitung m zu jeder der Anschlußgruppen LTG1 bis LTGn mit Hilfe des Koppelfeldes (K) durchgeschaltet sein müssen, bevor der Aufbau von Nichrichtenverbindungen, zum Beispiel Fernsprechverbindungen, begonnen werden kann, steht für die Herstellung dieser Datenverbindungen in der Regel ein völlig freies Koppelfeld zur Verfügung, also ein Koppelfeld, in dem sämtliche Kanäle unbelegt sind. Deshalb kann der Aufbau der Verbindungen für diese Steuerkanäle nach einem willkürlich festgelegten Schema erfolgen, das für alle Zeiten unverändert bleibt. Deshalb ist vorgesehen, daß die Koppelfeldeinstellein­ richtung KE außerdem in einem ihr zugeordneten Speicher V1 Einstelldaten, d. h., also die Vermittlungsdaten, für die Steu­ erkanäle gespeichert, enthält. Diese Vermittlungsdaten brauchen also bei einem Neuaufbau der Verbindungen für diese Steuerkanäle nicht jeweils vom zentralen Steuerwerk CP neu erarbeitet zu werden und nicht über die Puffereinrichtung (MB. . .) erneut übertragen zu werden. Sind zwischen der Puffereinrichtung (MB. . .) und den Anschlußgruppen LTG1 bis LTGn, d. h., ih­ ren dezentralen Steuereinrichtungen Gp1 bis GPn, erforder­ lichen Verbindungen für die Steuerkanäle über das zentra­ le Koppelfeld (K) neu herzustellen, so gibt das zentrale Steuerwerk CP lediglich einen entsprechenden Befehl an die Puffereinrichtung MB ab, den sie an die Koppelfeldeinstell­ einrichtung KE weitergibt, und aufgrund deren diese die in ihrem Speicher V1 gespeicherten Vermittlungsdaten ent­ nimmt, um in an sich bekannter Weise die erforderlichen Ver­ mittlungsvorgänge einzeln nacheinander auszuführen.Since the control channels described above between the relevant buffer device MB. . . over time multiplex line m to each of the line trunk groups LTG1 to LTGn must be switched through using the switching matrix (K), before establishing non-directional connections, for example Telephone connections that can be started stand for Establishing these data connections is usually a complete free switching matrix is available, i.e. a switching matrix in which all channels are unoccupied. Therefore, the structure of the Connections for these control channels after an arbitrary fixed scheme that is unchanged for all times remains. It is therefore envisaged that the switching matrix should be set direction KE also in a memory V1 assigned to it Setting data, d. that is, the mediation data for the tax channels saved, contains. Need this mediation data that is, when the connections for these control channels are re-established not newly developed by the central control unit CP and not again via the buffer device (MB...)  to be transferred. Are between the buffer device (MB...) And the connection groups LTG1 to LTGn, d. i Ren decentralized control devices Gp1 to GPn, required connections for the control channels via the zentra To produce le Koppelfeld (K) anew, so the central Control unit CP only sends a corresponding command to the Buffer device MB, which they set to the switching matrix device KE passes on, and on the basis of which this the switching data stored in their memory V1 takes to the required Ver in a conventional manner Execute averaging processes one after the other.

Wie in der bereits genannten DE-OS 28 26 113 erläutert ist, werden über das Teilkoppelfeld TSU der Anschlußgruppe LTG1 außer Nachrichtenverbindungen von und zu Teilnehmerstellen sowie Verbindungsleitungen auch die bereits erwähnten Ver­ bindungen für die Steuerkanäle zwischen den den Anschluß­ gruppen, zum Beispiel LTG1, zugeordneten dezentralen Steuereinrichtungen, zum Beispiel GP1, einerseits und dem zentralen Steuerwerk CP andererseits, hergestellt. Diese Verbindungen verlaufen, wie bereits dargelegt, weiterhin über das zentrale Koppelfeld (K) und die Zeitmultiplex­ leitung m.As explained in DE-OS 28 26 113 already mentioned, are via the sub-switching network TSU of the connection group LTG1 except communications from and to subscriber stations as well as connecting lines also the already mentioned Ver Connections for the control channels between the connection groups, for example LTG1, assigned to decentralized Control devices, for example GP1, on the one hand and the central control unit CP on the other hand. This Connections continue, as already stated over the central switching matrix (K) and the time division multiplex line m.

Die Durchschaltung der den Anschlußgruppen, z. B. LTG1, in­ dividuellen Steuerkanäle einzeln zu den dezentralen Steu­ ereinrichtungen, z. B. GP1, erfolgt außer in der beschrie­ benen Weise über das Koppelfeld K und jeweils einen der Ka­ näle zwischen diesem und dem betreffenden Teilkoppelfeld, z. B. TSU, auch noch über das letztere selbst. Zur Durchschal­ tung des jeweiligen Steuerkanals über das betreffende Teil­ koppelfeld sind im Teilsteuerwerk bereits vor seiner Inbe­ triebnahme Daten gespeichert, die bei seiner Inbetriebnahme die Durchschaltung des Steuerkanals vom Teilsteuerwerk über das Teilkoppelfeld bewerkstelligen. Diese Daten sind einer­ seits Einstelldaten, die den Verbindungsverlauf für den durchzuschaltenden Steuerkanal innerhalb des Teilkoppel­ feldes TSU beschreiben und andererseits Programminforma­ tionen, die zur Abwicklung des Durchschaltevorganges für den Steuerkanal erforderlich sind, die also das programmge­ steuerte Teilsteuerwerk GP1 für diese Steuerungsprozedur benötigt. Diese Programminformationen und Einstelldaten mögen in Speichern (PU, MU) des Teilsteuerwerkes, z. B. GP1, gespeichert sein.The switching of the connection groups, e.g. B. LTG1, in individual control channels individually to the decentralized tax establish, e.g. B. GP1, except in the described benen way over the switching matrix K and one of the Ka channels between this and the relevant sub-switching matrix, e.g. B. TSU, also about the latter itself of the respective control channel via the part in question coupling fields are already in the partial control unit before it is installed drive data stored when it was commissioned the switching of the control channel from the partial control unit accomplish the partial switching matrix. This data is one on the one hand, setting data that shows the connection process for the  control channel to be switched through within the sub-coupling field TSU and on the other hand program information tions that are used to process the switching process for the control channel are required, which is the programmge controlled partial control unit GP1 for this control procedure needed. This program information and setting data like in memories (PU, MU) of the partial control unit, e.g. B. GP1.

Wie ausgeführt wurde, ist außer dem zentralen Koppelfeld K eine Anzahl von Anschlußgruppen LTG1 bis LTGn vorgesehen. Jede dieser Anschlußgruppen ist je über eine PCM-Leitung, zum Beispiel ltg1, an einen Koppelfeldanschluß, zum Beispiel A, des Koppelfeldes K in der beschriebenen Weise angeschlossen. Diese PCM-Leitung pro Anschlußgruppe führt innerhalb derselben zu einer Durchschalteeinrichtung TSU. Bei dieser Durchschalte­ anordnung handelt es sich um das bereits genannte Teilkoppel­ feld, über das sowohl die genannten Steuerkanäle als auch die Verbindungen von und zu Teilnehmern und von und zu Verbindungs­ leitungen durchgeschaltet werden. Unter "Verbindungsleitungen" sind selbstverständlich auch Kanäle von angeschlossenen PCM- Verbindungsleitungen zu verstehen. Der Anschluß dieser Teil­ nehmerleitungen, Verbindungsleitungen und Kanäle ist den be­ reits genannten Literaturstellen zu entnehmen.As has been stated, in addition to the central switching matrix K a number of line trunk groups LTG1 to LTGn are provided. Each of these connection groups is via a PCM line, for example ltg1, to a switching network connection, for example A, the switching matrix K connected in the manner described. This PCM line per line group runs within the same to a switching device TSU. With this switching arrangement is the sub-coupling already mentioned field over which both the control channels mentioned and the Connections from and to participants and from and to connection lines are switched through. Under "connecting lines" are of course also channels from connected PCM Understand connecting lines. The connection of this part subscriber lines, connecting lines and channels is the be references already mentioned.

Über eingangsseitig an eine Anschlußgruppe angeschlossene Teilnehmerleitungen, Verbindungsleitungen und Kanäle treffen verschiedenerlei Informationen ein, zum Beispiel Anrufsignale von Teilnehmerstationen, die eine Verbindung herzustellen wünschen, ferner Wahlkennzeichen von diesen Teilnehmerstellen, aber auch über Verbindungsleitungen und Kanäle, ferner Lei­ tungszeichen über Verbindungsleitungen sowie in Zuordnung zu Kanälen. Teilnehmeranschlußschaltungen zum Anschluß von Teilnehmerleitungen, Leitungsabschlußschaltungen zum Anschluß von ankommend und/oder abgehend belegbaren Orts- und Fern­ verbindungsleitungen, Internverbindungssätze, Wahlempfangs­ sätze und dergleichen sind teilnehmerindividuelle und/oder verbindungsindividuelle Schalteinrichtungen. Das Teilsteuer­ werk nun dient in an sich bekannter Weise zur Abwicklung der Aufnahme der zuvor erwähnten eintreffenden verbindungs­ individuellen Informationen. Ein Teilsteuerwerk nimmt außer­ dem eine Verarbeitung oder eine Vorverarbeitung dieser auf­ genommenen Informationen jeweils in Zuordnung zu der betref­ fenden Teilnehmerleitung, Verbindungsleitung oder zu dem be­ treffenden Kanal vor. Außerdem werden einige solcher Infor­ mationen in dem dem Teilsteuerwerk jeweils individuell zuge­ ordneten Speicher SP zwischengespeichert und zwar mit Hilfe einer Eingabe-Ausgabe-Einrichtung IOP. Ferner hat das Teil­ steuerwerk die Aufgabe, Signale und Steuersignale über diese Leitungen (Teilnehmerleitungen und Verbindungsleitungen, sowie Kanäle) zur Aussendung zu bringen, zum Beispiel Rufwechsel­ stromimpulse und Hörtonsignale über Teilnehmerleitungen sowie Wahlkennzeichen und Leitungszeichen und dergleichen über ab­ gehend belegte Verbindungsleitungen.Via a connection group connected on the input side Meet subscriber lines, connecting lines and channels various information, for example call signals from subscriber stations that establish a connection wish, furthermore election codes from these subscriber positions, but also via connecting lines and channels, also Lei quotes about connecting lines and in assignment to channels. Subscriber connection circuits for connecting Subscriber lines, line termination circuits for connection from incoming and / or outgoing verifiable local and long distance connecting lines, internal connection sets, election reception  sentences and the like are participant-specific and / or connection-specific switching devices. The partial tax Now works in a manner known per se for processing the inclusion of the aforementioned incoming connection individual information. A partial control unit does not processing or preprocessing them information taken in each case in association with the concerned end subscriber line, connecting line or to the channel. In addition, some such information mations in the individual control unit ordered memory SP cached with the help an input-output device IOP. Furthermore, the part control unit the task, signals and control signals through this Lines (subscriber lines and connecting lines, as well Channels), for example call changes current impulses and audio signals via subscriber lines as well Election marks and line signs and the like about from outgoing busy connecting lines.

Über das einer Anschlußgruppe zugehörige Teilkoppelfeld werden Verbindungen hinsichtlich der Verbindungsaufbaurichtung sowohl ankommend von einer Leitung (Teilnehmerleitung, Verbindungsleitung bzw. ein entsprechender Kanal) in Richtung zum zentralen Koppelfeld (K) hin als auch von diesem abgehend zu einer solchen Leitung durchgeschaltet. Bei einer Verbindungsherstellung erfolgt zunächst eine Durchschaltung zum Beispiel von einer Teilnehmerleitung über das Teilkoppelfeld der betreffenden Anschlußgruppe zum zentralen Koppelfeld K. Die für die weitere Durchschaltung der betreffenden Verbindung über dieses Koppelfeld erforderlichen Informationen, z. B. Wahlinformationen, werden vom Gruppensteuerwerk über den betreffenden, bereits erwähnten Steuerkanal zum zentralen Koordinations-Prozessor CP übertragen. In umgekehrter Richtung überträgt dieser Steuersignale zu jedem der Teilsteuerwerke. Hierbei wirkt ein Eingabe-Ausgabe-Prozessor G mit, dessen Auf­ bau und Funktionsweise in der DE-OS 31 28 365 bereits ausführlich erläutert ist.Via the sub-switching network belonging to a line trunk group Connections with regard to the direction of connection establishment both arriving from a line (subscriber line, Connecting line or a corresponding channel) in the direction to the central switching matrix (K) as well as from this connected to such a line. At a A connection is first made to the Example of a subscriber line via the sub-switching matrix of relevant connection group to the central switching matrix K. The for the further switching of the concerned Connection required via this switching matrix, e.g. B. election information are from the group control over the relevant, already mentioned control channel to the central Coordination processor CP transmitted. In the opposite direction this transmits control signals to each of the sub-control units. An input-output processor G is involved in this, its up construction and operation in DE-OS 31 28 365  has already been explained in detail.

Im Zusammenhang der beschriebenen Funktionsvorgänge verdient besondere Beachtung der bei Betriebsbeginn durchgeschaltete und während des Betriebes ständig im durchgeschalteten Zustand bereitgehaltene Steuerkanal pro Anschlußgruppe. Dieser Steuer­ kanal dient also für den laufenden Vermittlungsbetrieb zum Aus­ tausch von Informationen und Steuersignalen. In diesem Zusammen­ hang ist unter "Informationen" alles dasjenige zu verstehen, was im laufenden Vermittlungsbetrieb und für denselben jeweils vom Teilsteuerwerk einer Anschlußgruppe zum zentralen Koordi­ nationsprozessor zu übertragen ist; unter Steuersignalen in diesem Zusammenhang ist alles dasjenige zu verstehen, was im laufenden Vermittlungsbetrieb und für denselben vom zentralen Koordinationsprozessor zu den verschiedenen Teilsteuerwerken jeder der Anschlußgruppen zu übertragen ist.Deserved in connection with the described functional processes special attention to those switched through at the start of operation and constantly in the switched-on state during operation Control channel available per line group. That tax channel is therefore used for the ongoing switching operation to the off exchange of information and control signals. In this together hang is to be understood by "information" everything what is in the ongoing brokerage and for the same from the control unit of a connection group to the central coordinator nation processor is to be transferred; under control signals in In this context, everything is to be understood what is in the ongoing brokerage and for the same from the central Coordination processor for the various sub-control units each of the line groups is to be transmitted.

Jedes Teilsteuerwerk hat Zugang zum Koordinationsprozessor und dieser hat jederzeit Zugriff zu jedem der Teilsteuerwerke. Hierzu kann der zentrale Koordinationsprozessor in zyklischer Folge nacheinander sämtliche Teilsteuerwerke auf ein Vorliegen von Informationen abfragen. Diese Weiterleitung der Informati­ onen kann auch auf andere bekannte Weise erfolgen. Der zentrale Koordinationsprozessor nimmt also ganz allgemein Informationen herein und gibt Steuersignale aus. Die Übertragung von Infor­ mationen und Steuersignalen über den Steuerkanal einer jeden der Anschlußgruppen erfolgt in an sich bekannter Weise.Each sub-controller has access to the coordination processor and this has access to each of the partial control units at all times. For this, the central coordination processor can be cyclical Follow all of the partial control units one after the other for one query information. This forwarding of the Informati onen can also be done in other known ways. The central one So the coordination processor takes information in general and outputs control signals. The transfer of Infor mations and control signals via the control channel of everyone the connection groups are carried out in a manner known per se.

Für den laufenden Vermittlungsbetrieb werden diese Informatio­ nen und Steuersignale in Portionen begrenzten Umfanges über­ tragen, also in einem geeigneten vorgegebenen Datenformat, das den Bedingungen des laufenden Vermittlungsbetriebs optimal an­ gepaßt ist. Hierbei ist ein entsprechend gesichertes Übertra­ gungsverfahren wesentlich. Weitere Einzelheiten hierüber kön­ nen der Europäischen Patentschrift 00 58 750, sowie der bereits oben angeführten Deutschen Offenlegungs­ schrift 31 28 365 entnommen werden. Dies betrifft insbesondere den Aufbau und die Arbeitsweise des in der Zeichnung in weite­ ren Einzelheiten dargestellten Eingabe-Ausgabe-Prozessors G, der die Übertragung der genannten Informationen und Steuer­ signale von und zu den Anschlußgruppen abwickelt. Die Lei­ stungsfähigkeit der den Anschlußgruppen individuell zugeord­ neten Steuerkanäle ist der Stärke des Flusses von Informatio­ nen und Steuersignalen im laufenden Vermittlungsbetrieb an­ gepaßt. This information is used for ongoing brokerage and control signals in portions of limited scope wear, i.e. in a suitable predetermined data format, the the conditions of the ongoing brokerage is fit. Here is an appropriately secured transfer essential. More details can be found here European patent 00 58 750, as well as the German disclosure already mentioned above  font 31 28 365 can be taken. This applies in particular the structure and operation of the drawing in wide ren details shown input-output processor G, of the transfer of said information and tax signals from and to the connection groups. The lei Ability of individually assigned to the extension groups Neten control channels is the strength of the flow of informatio and control signals during the ongoing switching operation fit.

Wie bereits ausgeführt wurde, sind bereits vor Betriebsbeginn in jedem Teilsteuerwerk Daten gespeichert, die bei seiner In­ betriebnahme die Durchschaltung des Steuerkanals über das Teil­ koppelfeld bewerkstelligen, der ja vom Teilsteuerwerk über das Teilkoppelfeld und das zentrale Koppelfeld zum zentralen Koordinationsprozessor durchzuschalten ist. Bei diesen Daten handelt es sich einerseits um Einstelldaten, die den Ver­ bindungsverlauf für den Steuerkanal innerhalb des Teilkoppel­ feldes angeben; andererseits handelt es sich bei diesen Daten um bestimmte Programminformationen, die zur Abwicklung des Durchschaltevorganges für den Steuerkanal erforderlich sind. Diese Programminformationen und Einstelldaten stellen eine Grundinformation dar, die jedes Teilsteuerwerk haben muß, damit es eingeschaltet, also in Betrieb genommen werden kann. Die für ein Teilsteuerwerk zur Abwicklung des gesamten Ver­ mittlungsbetriebes erforderliche Programminformation ist dem­ gegenüber jedoch wesentlich umfangreicher. Ferner ist für die Abwicklung des laufenden Vermittlungsbetriebes eine umfassende Strukturierungs-Information in jedem Teilsteuerwerk erforder­ lich, die den Aufbau sowie die Beschaltung der Anschlußgruppe mit Teilnehmer- und/oder Verbindungsleitungen angibt. Zweck­ mäßigerweise wird die für das Teilsteuerwerk zur Abwicklung des Vermittlungsbetriebes erforderliche gesamte Programminformation im Teilsteuerwerk erst gespeichert, wenn es in Betrieb genommen wird. Desgleichen wird zweckmäßigerweise die ebenfalls zur Abwicklung des Vermittlungsbetriebes erforderliche sowie die Beschaltung der Anschlußgruppe mit Teilnehmer- und/oder Ver­ bindungsleitungen angebende Strukturierungs-Information in einem Teilsteuerwerk erst gespeichert, wenn es in Betrieb ge­ nommen wird. Diese in jedem der Teilsteuerwerke zu speichernde Programminformation sowie die ebenfalls zu speichernde Struk­ turierungs-Information wird an ein in Betrieb gehendes Teil­ steuerwerk vom zentralen Koordinationsprozessor übertragen. Um mit der Übertragung dieser gesamten Programminformation und dieser gesamten Strukturierungs-Information an eine in Betrieb gehende Anschlußgruppe nicht deren Steuerkanal zu belasten, ist erfindungsgemäß vorgesehen, daß bei Betriebsbeginn einer Anschlußgruppe vom zentralen Koordinationsprozessor zusätzlich zum Steuerkanal eine Verbindung für einen Datenladekanal auf­ gebaut wird, über den der Koordinationsprozessor Zugriff zum Teilsteuerwerk für eine Übertragung größerer Datenmengen an dieses hat. Hierzu verfügt der zentrale Koordinationspro­ zessor CP zusätzlich zum Eingabe-Ausgabe-Prozessor G über eine Datenübertragungseinrichtung DE, die ihrerseits über einen Kanal de an das Koppelfeld K angeschlossen ist.As already stated, are before the start of operations data is stored in each sub-control unit, which when it is in commissioning the switching of the control channel via the part accomplish coupling field, the yes from the partial control unit the partial switching matrix and the central switching matrix to the central one Is to be switched through the coordination processor. With this data it is on the one hand setting data that ver binding process for the control channel within the sub-coupling specify field; on the other hand, this is data to certain program information, which is necessary for the execution of the Switching process for the control channel are required. This program information and setting data represent a Basic information that each control unit must have, so that it can be switched on, i.e. put into operation. The for a partial control unit to handle the entire Ver Program information required is the compared to much more extensive. Furthermore, for the Completion of ongoing brokerage operations a comprehensive Structuring information required in each control unit Lich, the structure and the wiring of the connection group with subscriber and / or connecting lines. Purpose moderately is that for the partial control unit for the processing of the Brokerage company required all program information only stored in the partial control unit when it is put into operation becomes. Likewise, it is also expedient to Processing of the brokerage required and the  Connection of the connection group with subscriber and / or Ver structuring information in connection lines a partial control unit is only saved when it is in operation is taken. These to be stored in each of the sub-control units Program information and the structure also to be saved Turing information is sent to an operating part control unit transferred from the central coordination processor. In order to transmit all of this program information and all this structuring information to one in operation outgoing line group not to burden their control channel, It is provided according to the invention that a Connection group from the central coordination processor additionally to the control channel a connection for a data loading channel is built, through which the coordination processor access to the Partial control unit for transmission of larger amounts of data this one has. The central coordination pro processor CP in addition to the input-output processor G via a data transmission device DE, which in turn via a channel de is connected to the switching matrix K.

Wird eine Anschlußgruppe neu eingeschaltet, so ist dies der Betriebsbeginn dieser Anschlußgruppe. Bei Betriebsbeginn einer Anschlußgruppe schaltet der zentrale Koordinationspro­ zessor CP in der üblichen, an sich bekannten Weise den Steuerkanal zum Teilsteuerwerk dieser Anschlußgruppe durch. Für den Betriebsbeginn dieser Anschlußgruppe baut der zentrale Koordinationsprozessor zusätzlich zum Steuerkanal eine Ver­ bindung für einen Datenladekanal auf. Diese Verbindung baut er über die Datenübertragungseinrichtung DE und den Kanal de, sowie über das Koppelfeld K und einen zu der betreffenden An­ schlußgruppe verlaufenden Kanal auf. Die Herstellung dieser Verbindung wird also einerseits durch den zentralen Koordi­ nationsprozessor unmittelbar über das zentrale Koppelfeld und über einen der Verbindungswege (ltg1) durchgeführt. Die Verbindung für den Datenladekanal wird andererseits durch das betreffende Teilsteuerwerk bezüglich des über das betreffende Teilkoppelfeld zu diesem Teilsteuerwerk verlaufenden Teiles dieser Verbindung mit Hilfe von vom Koordinationsprozessor über den Steuerkanal übertragenen Steuerinformationen abge­ wickelt. Um also diesen Datenladekanal herzustellen, überträgt der zentrale Koordinationsprozessor über den vorher durchge­ schalteten Steuerkanal Steuerinformationen an das betreffen­ de Teilsteuerwerk, wodurch es in die Lage versetzt wird, die Verbindung für den Datenladekanal innerhalb des ihm zugeord­ neten Teilkoppelfeldes durchzuschalten.If a line group is switched on again, this is the Start of this connection group. At the start of operations a central group switches the central coordination pro processor CP in the usual manner known per se Control channel to the partial control unit of this connection group. The central office builds for the start of this branch group Coordination processor in addition to the control channel a Ver binding for a data loading channel. This connection builds he via the data transmission device DE and the channel de, as well as via the switching matrix K and one to the relevant An closing group extending channel. The making of this Connection is made on the one hand by the central coordinator nation processor directly via the central switching matrix and carried out via one of the connection paths (ltg1). The Connection for the data loading channel is on the other hand through the Sub-control unit concerned with respect to the relevant  Sub switching network for this part control unit running part this connection with the help of the coordination processor control information transmitted via the control channel wraps. So in order to establish this data loading channel, transmits the central coordination processor via the previously switched control channel control information to the concern de partial control unit, which enables it to control the Connection for the data loading channel within the assigned neten sub-switching network.

Ist der Datenladekanal auf die zuvor beschriebene Weise zwischen dem zentralen Koordinationsprozessor einerseits und dem betreffenden Teilsteuerwerk andererseits hergestellt, so führt der Koordinationsprozessor den erforderlichen Datenlade­ vorgang durch. Hierzu überträgt es die für das Teilsteuerwerk zur Abwicklung des Vermittlungsbetriebes erforderliche und dementsprechend in ihm zu speichernde Programminformation sowie die ebenso für die Abwicklung des Vermittlungsbetriebes erfor­ derliche, den Aufbau und die Beschaltung der Anschlußgruppe mit Teilnehmer- und Verbindungsleitungen angebende Strukturierungs- Information. Alle diese Informationen sind vom Teilsteuerwerk in einem zu ihm gehörenden Programmspeicher und in einem weiteren Speicher gespeichert.Is the data loading channel in the manner previously described between the central coordination processor on the one hand and the relevant control unit on the other hand, so the coordination processor performs the necessary data loading operation through. To do this, it transmits those for the partial control unit necessary for handling the brokerage and accordingly program information to be stored in it as well who also need to process the brokerage derliche, the structure and the wiring of the connection group with Structuring that indicates subscriber and connection lines Information. All of this information is from the partial control unit in a program memory belonging to it and in one additional memory saved.

Der Beginn und das Ende eines derartigen Datenladevorganges werden mit Hilfe eines Beginnzeichens und eines Endezeichens signalisiert. Diese Zeichen können ebenfalls über den Daten­ ladekanal übertragen werden, oder aber auch über den Steuer­ kanal. Nach Beendigung des Datenladevorganges wird die für den Datenladekanal hergestellte Verbindung wieder ausgelöst.The beginning and end of such a data load are marked with a start character and an end character signals. These characters can also appear over the data charging channel can be transmitted, or via the tax channel. After the data loading process has ended, the for connection established again.

Die Datenübertragungseinrichtung DE kann vorzugsweise anstatt direkt an den zentralen Koordinationsprozessor CP auch ebenso wie die Puffereinrichtungen, z. B. MB2, an den Ein­ gabe-Ausgabe-Prozessor angeschlossen sein und in der glei­ chen Weise wie diese Puffereinrichtungen mit diesem zusam­ menarbeiten, d. h., über diesen mit dem Koordinationspro­ zessor; sie kann darüber hinaus auch ebenso wie diese Puf­ fereinrichtungen oder wie deren als "Datenkopf" bezeichne­ ter Teil, z. B. ML2, ausgebildet sein.The data transmission device DE can preferably instead directly to the central coordination processor CP too as well as the buffer devices, e.g. B. MB2, to the on Handheld output processor to be connected and in the same Chen way as these buffer devices together with this  menwork, d. that is, via this with the coordination pro processor; it can also just like this pouf or like what they call "data headers" ter part, e.g. B. ML2.

Die Erfindung hat Bedeutung sowohl für die Einschaltung einer gesamten Fernsprechvermittlungsanlage der beschriebenen Art, als auch für die Einschaltung nur einzelner Anschlußgruppen oder auch nur einer einzigen Anschlußgruppe. Im Vergleich zum Steuerkanal erfolgt die Übertragung der genannten Programmin­ formation und der Strukturierungs-Information an einer An­ schlußgruppe wesentlich schneller über den Datenladekanal, weil diese Informationen über ihn unabhängig von dem für den Steuerkanal vorgesehenen Übertragungsverfahren übertragen werden können. Geht es darum, während des bereits laufenden Vermittlungsbetriebes zusätzlich nur einige Anschlußgruppen in Betrieb zu nehmen, so wird das System der Steuerkanäle ein­ schließlich des Eingabe-Ausgabe-Prozessors G von der Abwick­ lung der betreffenden Datenladevorgänge entlastet. Der Ver­ mittlungsbetrieb kann also ungestört weiterlaufen. Unabhängig davon übergibt der zentrale Koordinationsprozessor die zur Speicherung in einer Anschlußgruppe erforderliche Programm­ information und Strukturierungs-Information an die Daten­ übertragungseinrichtung DE. Ferner stellt der zentrale Koor­ dinationsprozessor in der beschriebenen Weise die Verbindung für den Datenladekanal her. Dann kann der gesamte Datenlade­ vorgang ohne Mitwirken des zentralen Koordinationsprozessors ablaufen. Ist der Datenladevorgang beendet, so wird die Ver­ bindung für den Datenladekanal wieder ausgelöst, und es kann ein Datenladevorgang für eine nächste Anschlußgruppe statt­ finden.The invention is important both for switching on entire telephone exchange of the type described, as well as for switching on only individual line groups or even a single line group. Compared to Control channel is the transmission of the program mentioned formation and the structuring information on one type closing group much faster via the data loading channel, because this information about him is independent of that for the Control channel provided transmission method can be. It is about being in progress Switching company in addition only a few line groups in To put into operation, the system of control channels becomes one finally the I / O processor G from the handler relieved of the relevant data loading processes. The Ver averaging can therefore continue undisturbed. Independently the central coordination processor transfers the data to the Program required in a line group information and structuring information to the data transmission facility DE. Furthermore, the central Koor dination processor in the manner described the connection for the data loading channel. Then the entire data store operation without the involvement of the central coordination processor expire. If the data loading process is finished, the Ver Binding for the data loading channel is triggered again and it can a data loading process takes place for a next line trunk group Find.

Mit Hilfe der Erfindung ist es möglich, verschiedene Anschluß­ gruppen mit unterschiedlichen Programminformationen und Strukturierungs-Informationen zu laden. Dies kommt einer gege­ benenfalls gewünschten unterschiedlichen Betriebsweise ver­ schiedener Anschlußgruppen entgegen, insbesondere aber der normalerweise unterschiedlichen Beschaltung der Anschluß­ gruppen mit Leitungen.With the help of the invention it is possible to connect various groups with different program information and Load structuring information. This comes against if necessary, different operating mode ver  different connection groups, but especially the normally different wiring of the connection groups with lines.

Es ist auch noch auf die Möglichkeit hinzuweisen, einen ver­ zweigten Datenladekanal herzustellen. In einem solchen Fall wird durch den zentralen Koordinationsprozessor über die Datenübertragungseinrichtung DE und den Kanal de eine Ver­ bindung über das Koppelfeld K aufgebaut, die sich in diesem zu einer Mehrzahl von Anschlußgruppen hin verzweigt. Dement­ sprechend ist der durchgeschaltete Datenladekanal ebenfalls verzweigt und führt gleichzeitig zu den betreffenden mehreren Anschlußgruppen. Unter dieser Voraussetzung ist es möglich, einen Datenladevorgang zeitlich parallel für die Teilsteuer­ werke mehrerer Anschlußgruppen abzuwickeln. Es ist auch mög­ lich, für die Teilsteuerwerke mehrerer Anschlußgruppen, teils einen Datenladevorgang gemeinsam, also zeitlich parallel für diese, und teils individuelle Datenladevorgänge für jedes die­ ser Teilsteuerwerke einzeln durchzuführen. Dies kann in belie­ biger Reihenfolge nacheinander geschehen.It should also be pointed out the possibility of ver to establish branched data loading channel. In such a case is carried out by the central coordination processor via the Data transmission device DE and the channel de Ver bond built up over the switching matrix K, which is in this branches to a plurality of line groups. Dement the connected data loading channel is also speaking branches and leads to the relevant several at the same time Connection groups. Under this condition it is possible a data loading process in parallel for the partial tax works of several extension groups. It is also possible Lich, for the control units of several connection groups, some a data loading process together, i.e. in parallel for these, and some individual data loads for each of them to carry out these partial control units individually. This can be done in belie biger order in succession.

Schließlich sei auch noch auf eine weitere Möglichkeit hin­ gewiesen, die bei einem Anschluß von Konzentratoren besteht. In der Zeichnung ist ein Konzentrator Kt angedeutet. Der Auf­ bau und die Betriebsweise solcher Konzentratoren wird hier als bekannt vorausgesetzt. - Der in der Zeichnung dargestellte Konzentrator ist über zwei Zeitmultiplexleitungen PCM1 und PCM2 mit zwei verschiedenen Anschlußgruppen verbunden. In dem Konzentrator sind zwei Konzentratorprozessoren KP1 und KP2 vorgesehen. Sie dienen zur Abwicklung der in dem Konzen­ trator erforderlichen Steuerungsvorgänge in an sich bekannter Weise. Im hier vorliegenden Zusammenhang geht es lediglich um den Datenladevorgang im Sinne der bisherigen Beschreibung. Ebenso wie für das Teilsteuerwerk einer Anschlußgruppe ist es für die Konzentratorprozessoren erforderlich, daß ihnen die für den laufenden Vermittlungsbetrieb erforderliche Programminformation sowie Strukturierungs-Information über­ tragen wird. Dies geschieht in der gleichen Weise, wie zuvor für die Teilsteuerwerke der Anschlußgruppen beschrieben. Es wird also eine Verbindung für einen Datenladekanal vom zen­ tralen Koordinationsprozessor CP zu dem betreffenden Konzentratorprozessor hergestellt. Der betreffende Datenlade­ vorgang erfolgt in einer der bisherigen Beschreibung ent­ sprechenden Weise. Wesentlich hierbei jedoch ist die Tatsache, daß der Datenladekanal von der Datenübertragungseinrichtung DE des zentralen Koordinationsprozessors zum betreffenden Konzentratorprozessor direkt durchgeschaltet wird, d. h., unter Umgehung des betreffenden Teilsteuerwerks innerhalb der vom Datenladekanal durchlaufenen Anschlußgruppe. Der Datenlade­ vorgang wird also von der Datenübertragungseinrichtung DE des zentralen Koordinationsprozessors direkt mit dem be­ treffenden Konzentratorprozessor abgewickelt. Hierbei ist eine Umsetzung der Programminformation sowie der Strukturie­ rungs-Information, die von der Datenübertragungseinrichtung DE des zentralen Koordinationsprozessors zum betreffenden Konzentratorprozessor übertragen werden, innerhalb des Teil­ steuerwerks derjenigen Anschlußgruppe nicht erforderlich, die von der für den betreffenden Datenladekanal durchge­ schalteten Verbindung durchlaufen wird.Finally, there is also another possibility indicated, which exists when connecting concentrators. A concentrator Kt is indicated in the drawing. The up construction and operation of such concentrators becomes here assumed to be known. - The one in the drawing Concentrator shown is over two time-division lines PCM1 and PCM2 connected to two different line groups. In the concentrator are two concentrator processors KP1 and KP2 provided. They are used to process the in the Konzen trator required control processes in known per se Wise. In the present context, it is only possible the data loading process in the sense of the previous description. Just as for the sub-control unit of a line group it is required for the concentrator processors that they  the one required for the ongoing operator operation Program information and structuring information on will wear. This is done in the same way as before described for the sub-control units of the connection groups. It is a connection for a data loading channel from the zen central coordination processor CP to the concentrator processor in question produced. The relevant data store operation takes place in a previous description speaking way. What is essential here, however, is the fact that the data loading channel from the data transmission device DE of the central coordination processor for the concerned Concentrator processor is turned on directly, d. i.e., under Bypassing the sub-control unit concerned within the Data loading channel through connection group. The data store The process is therefore carried out by the data transmission device DE of the central coordination processor directly with the be processed concentrator processor. Here is an implementation of the program information and the structure tion information provided by the data transmission device DE of the central coordination processor for the concerned Concentrator processor are transmitted within the part control unit of the connection group not required, carried out by the for the relevant data loading channel switched connection is run through.

In ähnlicher Weise, wie der zuvor beschriebene Datenladevor­ gang für einen Konzentratorprozessor kann auch ein Datenlade­ vorgang für jede der oben erwähnten Mehrfachteilnehmeran­ schlußschaltungen abgewickelt werden. Wie erläutert, ent­ halten diese je einen Speicher LS für Daten, die eine Programm­ information für einen Mikroprozessor in jeder dieser Mehrfach­ teilnehmeranschlußschaltungen sowie eine dieselbe betreffen­ de Strukturierungs-Information umfassen oder nur eines von beiden. In bekannten Anordnungen der eingangs angegebenen Art werden diese Daten über den Steuerkanal der betreffenden An­ schlußgruppe zunächst von ihrem Teilsteuerwerk aufgenommen und dann von diesem zu den verschiedenen Mehrfachteilnehmeran­ schlußschaltungen hin verteilt und demgemäß über eine interne Busleitung ay sukzessive nacheinander zu jenen hin übertragen, was sowohl das Teilsteuerwerk als auch diese Bus-Leitung zeit­ lich stark in Anspruch nimmt. Demgegenüber ist bei dem be­ schriebenen erfindungsgemäßen Ausführungsbeispiel außerdem vorgesehen, den Datenladevorgang für jede der Mehrfachteil­ nehmeranschlußschaltungen, z. B. LTU1, ebenfalls über eine vom zentralen Koordinationsprozessor CP über die Datenübertra­ gungseinrichtung DE, das zentrale Koppelfeld K und das be­ treffende Teilkoppelfeld TSU, sowie über eine von diesem zu der Mehrfachteilnehmeranschlußschaltung LTGU1 führende PCM- Leitung ti (über einen ihrer Kanäle) durchgeschaltete Ver­ bindung abzuwickeln.In a similar manner to the data loading described above gear for a concentrator processor can also load a data process for each of the multiple participants mentioned above final circuits are processed. As explained, ent each hold a memory LS for data that a program information for a microprocessor in each of these multiples subscriber connection circuits and one concern the same structuring information or only one of both. In known arrangements of the type mentioned this data is transmitted via the control channel of the relevant To final group from their sub-control unit and  then from this to the various multiple participants final circuits distributed and accordingly via an internal Bus line ay successively transferred to those which both the sub-control unit and this bus line is heavily used. In contrast, the be described embodiment of the invention also provided the data load for each of the multiple parts slave connection circuits, e.g. B. LTU1, also via one of central coordination processor CP via the data transfer supply device DE, the central switching matrix K and the be relevant sub-switching network TSU, as well as via one of these the multi-subscriber connection circuit LTGU1 leading PCM Line ti (through one of its channels) switched ver unwind binding.

Die Herstellung der zuvor angegebenen Verbindung zur Bereit­ stellung eines entsprechenden Datenladekanals, der also das betreffende Teilsteuerwerk umgeht, erfolgt in bereits be­ schriebener Weise unter Mitwirkung des betreffenden Teilsteu­ erwerkes und seines Steuerkanals. Diese letzteren beiden wirken also bei der Herstellung der Verbindung für den er­ forderlichen Datenladekanal mit, nehmen dann aber an dem abzuwickelnden Datenladevorgang selber nicht teil (allenfalls wird das Beginnzeichen und/oder das Endezeichen, wie oben er­ wähnt, über sie übertragen). Bei der Herstellung der Verbin­ dung für den erforderlichen Datenladekanal steuert das be­ treffende Teilsteuerwerk unter anderem die Betätigung eines in der jeweiligen Mehrfachteilnehmeranschlußschaltung hierfür vorgesehenen, vorzugsweise in an sich bekannter Weise elektro­ nisch arbeitend ausgebildeten Umschalters tu zwecks Durch­ schaltung des Datenladekanals zu dem Speicher LS bzw. eines ihm zugeordneten, nicht gezeigten Prozessors oder Mikropro­ zessors in der betreffenden Mehrfachteilnehmeranschlußschal­ tung.The establishment of the previously specified connection for ready provision of a corresponding data loading channel, i.e. the bypasses sub-control unit concerned, is already in be in written form with the participation of the relevant partial tax erwerk and its control channel. The latter two so act in making the connection for which he required data loading channel, but then take part in the the data loading process itself is not part of it (at most becomes the start character and / or the end character as above thinks about it). When making the verbin This controls the data loading channel required relevant control unit, including the actuation of a in the respective multiple subscriber connection circuit for this provided, preferably electro in a conventional manner nisch working trained switch do for the purpose circuit of the data loading channel to the memory LS or one associated processor, not shown, or micropro cessors in the relevant multiple subscriber connection scarf tung.

Gemäß der zuletzt angesprochenen entsprechenden Weiterbildung der Erfindung ist also vorgesehen, daß bei einem Anschluß von Anschlußschaltungen, zum Beispiel Mehrfachteilnehmeranschluß­ schaltungen oder entsprechenden Mehrfachanschlußschaltungen für Verbindungsleitungen oder entsprechende Kanäle, über eine interne Busleitung (ay) an das Teilsteuerwerk einer Anschluß­ gruppe, sowie über eine einer Anschlußgruppe, sowie über eine einer Anschlußschaltung individuelle Leitung (ti) an das Teil­ koppelfeld dieser Anschlußgruppe ein Datenladekanal vom Koor­ dinationsprozessor CP über das betreffende Teilkoppelfeld unter Umgehung des Teilsteuerwerks der betreffenden Anschluß­ gruppe durchgeschaltet wird. Hierbei wird in der betreffenden Mehrfachteilnehmeranschlußschaltung LTU1 der Umschalter tu durch das betreffende Teilsteuerwerk GP1 betätigt, wozu die­ ses eine entsprechende Steuerinformation über seinen Steuer­ kanal vom zentralen Koordinationsprozessor CP erhält. Das Teilsteuerwerk GP1 bewerkstelligt danach also die Umschaltung des Umschalters tu. Nach Abwicklung des vorgesehenen Datenla­ devorganges wird mit Hilfe eines ebenfalls über den Steuerka­ nal zum Teilsteuerwerk GP1 übertragenen Steuersignal bewirkt, daß das Teilsteuerwerk diesen Umschalter wieder in seine in der Zeichnung dargestellte Ruhelage zurückführt.According to the relevant training mentioned last  The invention thus provides that when connecting Connection circuits, for example multiple subscriber connection circuits or corresponding multiple connection circuits for connecting lines or corresponding channels, via a internal bus line (ay) to the partial control unit of a connection group, as well as via a connection group, as well as via a a connection circuit individual line (ti) to the part coupling field of this connection group a data loading channel from the Koor dination processor CP on the relevant switching matrix bypassing the partial control unit of the connection concerned group is switched through. This is in the concerned Multiple subscriber connection circuit LTU1 the switch tu actuated by the relevant sub-control unit GP1, for which the corresponding tax information about his tax channel received from the central coordination processor CP. The Sub-control unit GP1 then effects the switchover of the switch do. After processing the planned data devorganges is also using the Steuerka nal to the control unit GP1 transmitted control signal, that the partial control unit switches this switch back into its the rest position shown in the drawing.

Durch die zuletzt beschriebenen Maßnahmen und Schaltvorgänge wird erreicht, daß die interne Bus-Leitung ay ganz wesentlich entlastet wird, indem über diese keine Datenladevorgänge mehr abgewickelt werden müssen. Das ist nicht nur von Bedeutung im Hinblick auf die Einschaltung einer gesamten Fernsprechver­ mittlungsanlage der hier beschriebenen Art, sondern auch im Hinblick auf eine Inbetriebnahme einzelner Mehrfachteil­ nehmeranschlußschaltungen bzw. Anschlußschaltungen ähnlicher Art, während des bereits laufenden Vermittlungsbetriebes ei­ ner solchen Fernsprechvermittlungsanlage.Through the measures and switching operations described last is achieved that the internal bus line ay very essential is relieved by no more data loading processes have to be handled. This is not only important in the With regard to the activation of an entire telephone company averaging system of the type described here, but also with regard to commissioning individual multiple parts slave connection circuits or connection circuits similar Kind, during the ongoing brokerage operation ner such telephone exchange.

Claims (4)

1. Schaltungsanordnung für eine zentralgesteuerte Fern­ meldevermittlungsanlage, insbesondere PCM-Fernsprech­ vermittlungsanlage, mit einem ein zentrales Koppelfeld (RZE, R, RZA) und einen zentralen Koordinationsprozessor (CP) umfassenden Zentralteil und mit dezentralen, je ein mit dem zentralen Koppelfeld über zur Herstellung gewählter Verbindungen belegbare Verbindungswege, z. B. Leitungen, Kanäle o. dgl., verbundenes Teilkoppelfeld (TSU) sowie ein u. a. einer Verbindungsdurchschaltung über dieses dienendes Teilsteuerwerk umfassenden Anschlußgruppen (LTG1 bis LTGn), die mit Teilnehmerleitungen und Verbindungsleitungen bzw. ihnen entsprechenden, in Übertragungssystemen, z. B. PCM-30-System, zusammengefaßten Kanälen beschaltet sind, und von deren jeweiligem Teilsteuerwerk (GP1 bis GPn) über das Teilkoppelfeld (TSU), über einen der Verbindungswege und über das zentrale Koppelfeld (RZE, R, RZA) ein Steuerkanal verläuft, der bei Betriebsbeginn durchgeschaltet und während des Betriebes ständig im durchgeschalteten Zustand bereitgehalten wird, und über den zum Austausch von Informationen und Steuersignalen für den laufenden Vermittlungsbetrieb das Teilsteuerwerk (TSU) Zugang zum Koordinationsprozessor (CP) und dieser jederzeit Zugriff zu dem Teilsteuerwerk (GP1 bis GPn) hat, und zu dessen Durchschaltung über das Teilkoppelfeld (TSU) Daten im Teilsteuerwerk (GP1 bis GPn) bereits vor seiner Inbetriebnahme gespeichert sind, die bei seiner Inbetriebnahme die Durchschaltung des Steuerkanals vom Teilsteuerwerk (GP1 bis GPn) über das Teilkoppelfeld (TSU) bewerkstelligen, dadurch gekennzeichnet, daß bei Betriebsbeginn einer Anschlußgruppe (LTG1 bis LTGn) vom zentralen Koordinationsprozessor (CP) zusätzlich zum Steuerkanal eine Verbindung für einen Datenladekanal aufgebaut wird, über den der Koordinationsprozessor (CP) Zugriff zum Teilsteuerwerk (GP1 bis GPn) für eine Übertragung größerer Datenmengen an dieses hat, und daß die Herstellung dieser Verbindung einerseits durch den zentralen Koordinationsprozessor (CP) über das zentrale Koppelfeld (RZE, R, RZA) und über einen der Verbindungswege durchgeführt wird, sowie andererseits durch das Teilsteuerwerk (GP1 bis GPn) bezüglich des über das Teilkoppelfeld zum Teilsteuerwerk verlaufenden Teiles der genannten Verbindung mit Hilfe von vom Koordinationsprozessor (CP) über den Steuerkanal übertragenen Steuerinformationen abgewickelt wird, daß über den Steuerkanal oder über den Datenladekanal ein den Beginn eines Datenladevorganges signalisierendes Beginnzeichen und ein das Ende desselben signalisierendes Endezeichen übertragen wird, und daß über den Datenladekanal die für das Teilsteuerwerk (GP1 bis GPn) zur Abwicklung des Vermittlungsbetriebes erforderliche und dementsprechend im Teilsteuerwerk (GP1 bis GPn) zu speichernde Programminformation und/oder die ebenso dafür erforderliche, den Aufbau und/oder die Beschaltung der Anschlußgruppe (LTG1 bis LTGn) mit Teilnehmer- und/oder Verbindungsleitungen angebende Strukturierungs-Information übertragen wird, und daß nach Beendigung des Datenladevorganges die für den Datenladekanal hergestellte Verbindung wieder ausgelöst wird.1.Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part (RZE, R, RZA) and a central coordination processor (CP) comprising a central part and with decentralized parts, one with the central switching field via selected for production Connections verifiable connection paths, e.g. B. lines, channels or the like. Connected sub-switching network (TSU) and, among other things, a connection through this serving sub-controller comprehensive line groups (LTG1 to LTGn), with subscriber lines and connecting lines or their corresponding, in transmission systems, for. B. PCM-30 system, combined channels are connected, and a control channel runs from their respective sub-control unit (GP1 to GPn) via the sub-switching network (TSU), via one of the connection paths and via the central switching network (RZE, R, RZA), which is switched through at the start of operation and is constantly kept in the switched-through state during operation, and via which the partial control unit (TSU) has access to the coordination processor (CP) and this has access to the partial control unit (GP1 to GPn) at all times in order to exchange information and control signals for the ongoing switching operation ), and for its connection via the partial switching matrix (TSU), data is already stored in the partial control unit (GP1 to GPn) prior to its commissioning, which, when it is started up, manage the switching through of the control channel from the partial control unit (GP1 to GPn) via the partial switching matrix (TSU) , characterized in that at the start of operation of a line trunk group (LTG1 to LTGn ) in addition to the control channel, a connection for a data loading channel is established by the central coordination processor (CP), via which the coordination processor (CP) has access to the partial control unit (GP1 to GPn) for the transmission of larger amounts of data to it, and that the connection is established on the one hand by the central coordination processor (CP) is carried out via the central switching matrix (RZE, R, RZA) and via one of the connection paths, and on the other hand by the partial control unit (GP1 to GPn) with regard to the part of the connection mentioned which runs over the partial switching matrix to the partial control unit with the aid of Control information transmitted by the coordination processor (CP) via the control channel is processed such that a start signal signaling the beginning of a data loading process and an end signal signaling the end of the same is transmitted via the control channel or via the data loading channel, and that the f r the sub-control unit (GP1 to GPn) required for handling the switching operation and accordingly to be stored in the sub-control unit (GP1 to GPn) and / or the program information and / or the connection group (LTG1 to LTGn) with subscriber and / or structuring information indicating connecting lines is transmitted, and that the connection established for the data loading channel is triggered again after the data loading process has ended. 2. Schaltungsansordnung nach Anspruch 1, dadurch gekennzeichnet, daß die für den Datenladekanal durchgeschaltete Verbindung sich im zentralen Koppelfeld (RZE, R, RZA) verzweigt und gleich zu den Teilsteuerwerken (GP1 bis GPn) mehrerer Anschlußgruppen (LTG1 bis LTGn) hin verläuft und daß der Datenladevorgang für mehrere Teilsteuerwerke (GP1 bis GPn) gleichzeitig erfolgt.2. Circuit arrangement according to claim 1, characterized in that the for the connection through which the data load channel is switched central switching network (RZE, R, RZA) branches and equal to the Partial control units (GP1 to GPn) of several connection groups (LTG1 to LTGn) and that the data loading process for several partial control units (GP1 to GPn) at the same time. 3. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß bei einem Anschluß von programmiert zentralgesteuerten Konzentratoren (Kt) an die Anschlußgruppen (LTG1 bis LTGn) ein Datenladekanal vom Koordinationsprozessor (CP) über das Teilkoppelfeld (TSU) zum betreffenden Konzentratorprozessor (KP1, KP2) unter Umgehung des Teilsteuerwerks der betreffenden Anschlußgruppe durchgeschaltet wird. 3. Circuit arrangement according to claim 1, characterized in that with a connection of programmed centrally controlled Concentrators (Kt) to the connection groups (LTG1 to LTGn) a data loading channel from the coordination processor (CP) via the Sub-switching network (TSU) to the concentrator processor concerned (KP1, KP2) bypassing the partial control unit of the concerned Connection group is switched through.   4. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß bei einem Anschluß von Anschlußleitungen, zum Bei­ spiel Mehrfachteilnehmeranschlußschaltungen (LTU1 bis LTU8) oder entsprechenden Mehrfachanschlußschaltungen für Verbindungsleitungen oder entsprechende Kanäle, über eine interne Busleitung (ay) an das Teilsteuerwerk einer An­ schlußgruppe, sowie über eine einer Anschlußleitung in­ dividuelle Leitung (ti) an das Teilkoppelfeld (TSU) die­ ser Anschlußgruppe (zum Beispiel (LTG1) ein Datenladekanal vom Koordinationsprozessor (CP) über das zentrale Koppel­ feld (K) und über das Teilkoppelfeld (TSU) zu jeder der Anschlußschaltungen entweder einzeln oder gemeinsam zu­ gleich für mehrere Anschlußschaltungen, aber unter Um­ gehung des Teilsteuerwerks (GP1) der betreffenden An­ schlußgruppe (LTG1) durchgeschaltet wird.4. Circuit arrangement according to claim 1, characterized, that with a connection of connecting lines, for game multiple subscriber connection circuits (LTU1 to LTU8) or corresponding multiple connection circuits for Connection lines or corresponding channels, via a internal bus line (ay) to the sub-control unit of an An closing group, as well as via a connecting line in individual line (ti) to the sub-switching network (TSU) water connection group (for example (LTG1) a data loading channel from the coordination processor (CP) via the central coupling field (K) and over the sub-switching network (TSU) to each of the Connection circuits either individually or together same for several connection circuits, but under Um walk of the partial control unit (GP1) of the concerned An closing group (LTG1) is switched through.
DE19863634863 1986-10-13 1986-10-13 Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it Expired - Fee Related DE3634863C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19863634863 DE3634863C2 (en) 1986-10-13 1986-10-13 Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19863634863 DE3634863C2 (en) 1986-10-13 1986-10-13 Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it

Publications (2)

Publication Number Publication Date
DE3634863A1 DE3634863A1 (en) 1988-04-14
DE3634863C2 true DE3634863C2 (en) 1994-11-24

Family

ID=6311640

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19863634863 Expired - Fee Related DE3634863C2 (en) 1986-10-13 1986-10-13 Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it

Country Status (1)

Country Link
DE (1) DE3634863C2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU87095A1 (en) * 1987-06-11 1988-04-05 Siemens Ag CIRCUIT ARRANGEMENT FOR A CENTRALLY CONTROLLED TELECOMMUNICATION SYSTEM, ESPECIALLY PCM TELEPHONE SYSTEM, WITH A CENTRAL PART AND WITH THIS CONNECTED GROUPS
DK0419920T3 (en) * 1989-09-26 1996-07-15 Siemens Ag Connection device for a centrally controlled telecommunication switching system, in particular PCM telephony switching system, with a central coordination processor and decentralized connection groups with part control systems
DE4319877C1 (en) * 1993-06-16 1994-06-16 Siemens Ag Commissioning decentralised redundant equipment in communications system - dividing operating programmes before loading into segments common to all peripherals and segments for specific peripherals

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1537849B2 (en) * 1967-10-19 1971-04-01 Siemens AG, 1000 Berlin u 8000 München CIRCUIT ARRANGEMENT FOR CENTRALLY CONTROLLED TELEPHONE SWITCHING SYSTEMS, IN PARTICULAR TELEPHONE SWITCHING SYSTEMS
DE2826113C2 (en) * 1978-06-14 1986-11-06 Siemens AG, 1000 Berlin und 8000 München Indirectly controlled switching system with time channel connection paths routed via time channel couplers, in particular telephone switching system
DE3100811A1 (en) * 1981-01-13 1982-08-12 Siemens AG, 1000 Berlin und 8000 München CIRCUIT ARRANGEMENT FOR TELECOMMUNICATION SWITCHING SYSTEMS, ESPECIALLY PCM TELEPHONE SWITCHING SYSTEMS, WITH A TIME MULTIPLEX COUPLING ARRANGEMENT WITH DIFFERENT TIMES
DE3104002C2 (en) * 1981-02-05 1984-01-26 Siemens AG, 1000 Berlin und 8000 München Circuit arrangement for telecommunication exchanges, in particular PCM telephone exchanges, with a time division multiplex switching arrangement with time slot multiples
DE3106903C2 (en) * 1981-02-24 1983-10-06 Siemens Ag, 1000 Berlin Und 8000 Muenchen Circuit arrangement for time division multiplex telecommunications switching systems, in particular PCM telephone switching systems, with data paths between a central control unit and decentralized control devices
DE3128365C2 (en) * 1981-07-17 1984-09-06 Siemens AG, 1000 Berlin und 8000 München Circuit arrangement for centrally controlled telecommunications switching systems, in particular for time division multiplex telephone switching systems, with information exchange between partially centralized facilities via a central facility
DE3311900A1 (en) * 1983-03-31 1984-10-04 Siemens AG, 1000 Berlin und 8000 München CIRCUIT ARRANGEMENT FOR TELECOMMUNICATION SYSTEMS, ESPECIALLY TELECOMMUNICATION SYSTEMS WITH INFORMATION-PROCESSING SWITCHGEAR AND DEVICES TO DEFEND OVERLOAD

Also Published As

Publication number Publication date
DE3634863A1 (en) 1988-04-14

Similar Documents

Publication Publication Date Title
EP0236779B1 (en) Circuit arrangement for centrally controlled tdm telecommunication exchanges, especially pcm telephone exchanges with connection modules connected to a switching network
DE2406195C3 (en) Modular program-controlled switching system
DE2249371A1 (en) TIME MULTIPLE MEDIATION SYSTEM
DE2621320A1 (en) AUTOMATIC OPERATING ARRANGEMENT
EP0070502B1 (en) Circuit for centrally controlled telecommunication exchanges, in particular tdm telephone exchanges, with exchange of information between partly centralized installations
EP0058750B1 (en) Circuit arrangement for tdm-telecommunications exchanges, in particular pcm-telephone exchanges with data channels between a central control unit and decentralised control equipment
EP0690635B1 (en) Method for software charging in communication systems with non-redundant distributed devices
DE1207453B (en) Circuit arrangement for time division multiplex telecommunications, in particular telephone switching systems
DE3634863C2 (en) Circuit arrangement for a centrally controlled telecommunication switching system, in particular PCM telephone switching system, with a central part and connection groups connected to it
EP0291790A1 (en) Circuit arrangement for telecommunication exchanges, especially PCM time-division telephone exchanges, with decentralized switching stages connected to a cental switching network
EP0294644B1 (en) Method for operating of a circuit arrangement for a centrally controlled telecommunication exchange, especially a pcm telephone exchange, with a central part and with connection groups connected to this central part
EP0419920B1 (en) Circuit arrangement for a central controlled telecommunication exchange, especially a PCM telephone exchange, with a central coordination processor and decentralized terminal groups with group processors
DE3111022C2 (en) "Circuit arrangement for clock-controlled telecommunications switching systems, in particular PCM telephone switching systems"
DE2316042C2 (en) PCM time division switching
DE3122172C2 (en)
DE2602561C3 (en) Time division switching network
EP0360065B1 (en) Method for operating telecommunication exchanges, especially PCM time division telephone exchanges, with distributed switching networks connected to a central switching network
DE1802123A1 (en) Circuit arrangement for centrally controlled telecommunications systems, in particular telephone exchanges
EP0059242B1 (en) Circuit arrangement for tdm-telecommunications exchanges, in particular pcm-telephone exchanges with data channels between a central control unit and decentralised control equipment
DE3023205A1 (en) CONNECTING DEVICE FOR A TIME-MULTIPLEX TELEPHONE SWITCHING SYSTEM
DE1910974A1 (en) Method for transmitting switching indicators in a PCM time division multiplex exchange, in particular telephone exchange
DE2358834C2 (en) Multiplex arrangement for telecommunications, in particular telephone switching systems with time division multiple operation
CH650372A5 (en) Procedure for the settlement of vermittlungsvorgaengen in telephone systems, particularly telephone private exchanges.
DE2540339C2 (en) Circuit arrangement for telecommunications switching systems, in particular telephone switching systems with central and peripheral devices
DE3106868C2 (en) Circuit arrangement for time division multiplex telecommunications switching systems, in particular PCM telephone switching systems, with data paths between a central control unit and decentralized control devices

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8125 Change of the main classification

Ipc: H04Q 11/04

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee