DE3424124A1 - Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems - Google Patents
Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systemsInfo
- Publication number
- DE3424124A1 DE3424124A1 DE19843424124 DE3424124A DE3424124A1 DE 3424124 A1 DE3424124 A1 DE 3424124A1 DE 19843424124 DE19843424124 DE 19843424124 DE 3424124 A DE3424124 A DE 3424124A DE 3424124 A1 DE3424124 A1 DE 3424124A1
- Authority
- DE
- Germany
- Prior art keywords
- connection
- peripheral
- simulator
- group
- control devices
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M3/00—Automatic or semi-automatic exchanges
- H04M3/22—Arrangements for supervision, monitoring or testing
- H04M3/26—Arrangements for supervision, monitoring or testing with means for applying test signals or for measuring
- H04M3/28—Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor
- H04M3/32—Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for lines between exchanges
- H04M3/323—Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for lines between exchanges for the arrangements providing the connection (test connection, test call, call simulation)
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Monitoring And Testing Of Exchanges (AREA)
Abstract
Description
Schaltungsanordnung zur Prüfung der Funktionen vonCircuit arrangement for testing the functions of
Fernmelde-, insbesondere Fernsprechvermittlungsanlagen Die Erfindung betrifft eine Schaltungsanordnung zur Prüfung der Funktionen von Fernemelde-, insbesondere Fernsprechvermittlungsanlagen mit zentralen und dezentralen Steuereinrichtungen, die über den Informationsaustausch ermöglichende zentrale und dezentrale Datenkanäle zusammengeschaltet sind.Telecommunications, in particular telephone switching systems. The invention relates to a circuit arrangement for testing the functions of remote signaling, in particular Telephone exchanges with centralized and decentralized control equipment, the central and decentralized data channels that enable the exchange of information are interconnected.
Eine Anordnung zur automatischen Prüfung von Fermsprechanlagen, insbesondere Fernsprechnebenstellenanlagen ist aus der DE-PS 32 15 663 bekannt. Es handelt sich dabei um eine rechnergesteuerte AnlagenDrüSeinrichtung die eine zentrale Prüfsteuerung und periphere Steuerbereiche enthält. Zu den peripheren Bereichen gehören auch teilnehmerseitige und verbindungseinrichtungsseitige Nachbildungen, womit es möglich ist, nicht nur den zentralen Teil sondern auch die gesamte Peripherie, also auch die Anschlußschaltungen zu prüfen. Beim Einsatz einer derartigen Anlagenprüfeinrichtung sind besonde-e Anschlußstellen und Prüfpunkte erforderlich, und es sind in der zu prüfenden Fernsprech vermittlungsanlage entsprechende Vorleistungen vorhanden.An arrangement for the automatic testing of telephone systems, in particular Telephone PBXs are known from DE-PS 32 15 663. It is about This involves a computer-controlled system spraying device that provides a central test control and includes peripheral control areas. The peripheral areas also include those on the subscriber side and connector-side replicas, with which it is possible, not only the central part but also the entire periphery, including the connection circuits to consider. When using such a system test device, special connection points are required and checkpoints are required and there are in the telephone switching system under test Appropriate advance payments are available.
Um einen Zugriff zur zentralen Steuerung zu bekommen, ist ein besonderer Wartungsanschluß vorgesehen. Eine derartige Anordnung bedingt neben den bereits erwähnten Vorleistungen auch, daß beim Anschluß der Prüfeinrichtung an vielen Stellen entsprechende Anschluß-Verbindungen hergestellt werden müssen.To get access to the central control is a special one Maintenance connection provided. Such an arrangement requires in addition to the already Mentioned preliminary work also that when connecting the test facility in many places appropriate connection connections must be established.
Die Aufgabe der vorliegenden Erfindung besteht darin, besteht darn» eine Schaltungsanordnung zur Prüfung der Funktionen von Fernmelde-, insbesondere Fernsprechvermittlungsanlagen anzugeben, wobei in der zu prüfenden Vermittlungsanlage keine Vorleistungen erforderlich sind und die Prüfeinrichtungen selbst an vorhandene Schnittstellen angeschlossen werden können. Diese Aufgabe wird durch eine im kennzeichnenden Teil des Patentanspruchs 1 angegebene Merkmalskombination gelöst.The object of the present invention is to provide a circuit arrangement for testing the functions of telecommunications, in particular Telephone exchanges to be specified, whereby in the switching system to be tested No preliminary work is required and the test facilities themselves are connected to existing ones Interfaces can be connected. This task is carried out by one in the characteristic Part of claim 1 specified combination of features solved.
Damit wird in vorteilhafter Weise erreicht, daß die sogenannten Anschluß-Simulatoren wie dezentrale Steuereinrichtungen an vorhandene Datenkanäle angeschaltet werden können, wobei diese sich wie Steuereinrichtungen verhalten, so daß in der zu prüfenden Vermittlungsanalge keine spezielle für Prüfkonzepte vorgesehene Aufwendungen vorhanden sein müssen. Weiterbildungen der Erfindung ergeben sich aus den Unteransprüchen.It is thus achieved in an advantageous manner that the so-called connection simulators how decentralized control devices are connected to existing data channels can, whereby these behave like control devices, so that in the to be tested Switching system no special expenses provided for test concepts exist must be. Further developments of the invention emerge from the subclaims.
Ein Ausfü'irungsbeispiel der Erfindung wird nachfolgend anlland einer Zeichnung ner erläutert. In der Zeichnung ist dargesteilt, wie eine zentrale Steuereinrichtung IVZ und mehrere Gruppensteuereinrichtungen IVG über einen zentralen Datenkanal ZDK miteinander verbunden sind. An diesem zentralen Datenkanal ZDK kann zum Zwecke der Prüfung zusätzlich ein Gruppenanschluß-Simulator GAS angeschlossen werden, wie später noch erläutert wird.An exemplary embodiment of the invention is given below in an Drawing ner explained. In the drawing it is shown how a central control device IVZ and several group control devices IVG via a central data channel ZDK are connected to each other. At this central data channel ZDK can for the purpose of Test, a group connection simulator GAS can also be connected, as later will be explained.
Jede Gruppensteuereinrichtung IVG hat eine Anschlußschnittstelle ASP zu einem peripheren Datenkanal PDK, an den mehrere periphere Steuereinrichtungen IVP angeschlossen sind.Each group control device IVG has a connection interface ASP to a peripheral data channel PDK to which several peripheral control devices IVP are connected.
Wenn eine Prüfung der Funktionen von Vermittlungsanlagen durchgeführt werden soll, so genügt es, den zu den peripheren Steuereinrichtungen IVP führenden peripheren Datenkanal PDK an einer Anschlußschnittstelle ASP von einer Gruppensteuereinrichtung IVG abzutrennen und anstelle der peripheren Steuereinrichtung IVP einen Peripherie-Anschluß-Simulator PAS anzuschließen. Dieser Peripherie-Anschluß-5lmu~ratorWPkS ist s o - ausgestaltet, daß er alle von den peripheren Steuereinrichtungen IVP lieferbaren elektrische Signale nachbilden kann. Die einzelnen Anreizbefehle oder Befehlsfolgen können entweder manuell von einer Prüf-Bedienungseinrichtung PBE oder von einem Simulationsrechner SR erzeugt werden. Für einfache, wenig zeitaufwendige Prüfschritte genügt es also, nur den Peripherie-Anschluß-Simulator PAS und eine Prüf-Bedienungseinriciitung PBE anzuschließen.When a test of the functions of switching systems is carried out is to be, so it is sufficient to lead to the peripheral control devices IVP peripheral data channel PDK at a connection interface ASP from a group control device Separate IVG and instead of the peripheral control device IVP a peripheral connection simulator To connect PAS. This Periphery connection 5lmu ~ ratorWPkS is s o - designed so that it can deliver all of the peripheral control devices IVP can emulate electrical signals. The individual incentive commands or command sequences can either be done manually by a test operator control device PBE or by a Simulation computer SR are generated. For simple, less time-consuming test steps It is therefore sufficient to only use the peripheral connection simulator PAS and a test and control unit Connect PBE.
Die über die Prüf-Bedienungseinrichtung PBE eingegebenen Anreizbefehle oder -befehlsfolgen führen dazu, daß äe nach Art des einzelnen Befehls die betreffende Gruppensteuereinrichtung IVG und ggf. auch die zentrale Steuerung IVZ tätig werden und entsprechende Antwortbefehle daraufhin an der Anschlußschnittstelle ASP des peripheren Datenkanals FDK erscheinen, die im Peripherie-Anschluß-Simulator PAS aufgenommen werden.Aufgrund seiner inneren Programmierung ist der Peripl1erie-Anschluß-Simulator PAS in der Lage festzustellen, ob der aufgrund eines gegebenen Anreizbefehls szurü bertragene Antwortbefehl, der nomalerweise an die peripheren Steuereinrichtung IVP gesendet würde elektrisch und logisch richtig ist. Wenn ein vom Peripherie-Anschluß-Simulator PAS empfangener Antwortbe fehl nicht übereinstimmt mit dem aufgrund eines Anreizbefehles zu erwartenden Befehl, so wird dies in Form einer Fehlermeldung zur Prüf-Bedienungseinrichtung PBE gemeldet, wo eine Anzeige oder ein Ausdruck erfolgen kann.The incentive commands entered via the test operator control device PBE or command sequences lead to the fact that depending on the nature of the individual command, the relevant Group control device IVG and possibly also the central control IVZ and corresponding response commands thereupon at the connection interface ASP of the peripheral data channel FDK appear in the peripheral connection simulator PAS Due to its internal programming, the peripheral connection simulator PAS is able to determine whether the due to a given incentive command transmitted response command, which is normally sent to the peripheral control device IVP would be sent electrically and logically correct. If a peripheral connection simulator PAS response command received does not match that due to an incentive command command to be expected, this is in the form of an error message for the test operator control device PBE reported where a display or a printout can be made.
Sollen in schneller Folge relativ viele Anreizbefehle oder -befehlsfolgen abgegeben werden, so ist es zweckmäßig, einen Simulati?nsrechner SR vorzusehen. Im Simulationsrechner SR sind Speicher vorgesehen, wo jeder einzelne in der Vermittlungsanlage v3rkommende Anreizbefehl gespeichert und abrufbar ist. Der Simulationsrechner SR kann entweder wie die Prüf-Bedienungseinrichtung PBE nur über den Peripherie-Anschluß-Simulator PAS mit der Vermittlungsanlage verbunden sein, oder es kann zusätzlich ein Gruppenanschluß-Simulator GAS vorgesehen sein. Dieser Gruppenanschluß-Simulator GAS ist an den zentralen Datenkanal ZDE angeschlossen, so daß der zwischen der zentralen tteuemeinrichvurlg IVZ und den Gruppensteuereinrichtungen IVG stattfindende Datenaustausch vom Gruppenanschluß-Simulator GAS empfangen werden kann. Über diesen Weg sind å jedoch auch direkte Anreizbefehle für die zentrale Steuereinrichtung IVZ oder Anreizbefehle für eine Gruppensteuereinrichtung IVG übertragbar.Should a relatively large number of incentive commands or command sequences be in quick succession are delivered, it is expedient to provide a simulation computer SR. In the simulation computer SR memories are provided where each one in the switching system The incoming incentive command is stored and retrievable. The simulation computer SR can either, like the test control unit PBE, only via the peripheral connection simulator PAS can be connected to the switching system, or a group connection simulator can also be used GAS should be provided. This group connection simulator GAS is connected to the central data channel ZDE connected so that the one between the central tteuemeinrichvurlg IVZ and the group control devices IVG taking place data exchange from the group connection simulator GAS can be received. However, direct incentive commands can also be used in this way for the central control device IVZ or incentive commands for a group control device IVG transferable.
Die zusätzliche Anschaltung des Gruppen-Anschluß-Simulators GAS wird vorzugsweise bei größeren Vermittlungsanlagen angewendet. Es ergibt sich dabei der Vorteil, daß beim Erkennen von Fehlern festgestellt werden kann, ob der Datenaustausch auf dem zentalen Datenkanal ZDK in dem betreffenden Zeitabschnitt in richtiger Weise stattgefunden hat. Damit ist eine schnelle Fehlereingrenzung möglich.The additional connection of the group connection simulator GAS is preferably used for larger switching systems. The result is the The advantage is that when errors are detected, it can be determined whether the data is being exchanged on the central data channel ZDK in the relevant time segment in the correct manner has taken place. This enables faults to be localized quickly.
Plit der erfindungsgemäßen Schaltungsanordnung sind mehrere Arten von Prüfungen möglich, von denen einige im folgenden erläutert werden. Mit der Prüf-Bedienungseinrichtung PBE können in langsamer Folge entweder direkt oder auch über den Simulations-Rechner SR einzelne Anreizbefehle an den Periphene-Ansch'uß-Simulator PAS abgegeben werden. Diese Anreizbefehle, beipsieisweise Teilnehmerbelegung, Wahlziffer, Teilnehmermeldung, Teilnehmerauslösung, usw. werden im Peripherie-Anschiu-Simulator PAS so umgesetzt, daß die gleichen Befehle entstehen, die bei den entsprechenden Vorgängen von den peripheren Steuereinrichtungen IVP abzugeben wären. Auf diese Weise können Schritt für Schritt verschiedene Verbindungsvorgänge nachvollzogen werden.There are several types of the circuit arrangement according to the invention possible tests, some of which are explained below. With the test operating device PBE can be performed in slow succession either directly or via the simulation computer SR individual incentive commands are issued to the peripheral connection simulator PAS. These incentive commands, e.g. participant occupancy, dialing number, participant message, Participant triggering, etc. are implemented in the peripheral connection simulator PAS in such a way that that the same commands arise that are used by the peripheral control devices IVP would have to be delivered. That way you can step different connection processes can be tracked step by step.
Bei äedem Prüfschritt wird dann vom Peripherie-Anschluß-Simulator PAS gemeldet, ob das zugehörige Antwortelegramm von der Gruppensteuereinrichtung IVG richtig war oder nicht.In each test step, the peripheral connection simulator PAS reported whether the associated response telegram from the group control device IVG was right or not.
Wenn zusätzlich auch der Gruppenanschluß-Simulator GAS vorgesehen ist, kann parallel dazu der Datenaustausch überwacht werden, der auf dem zentralen Datenkanal ZDIx stattgefunden hat.If the group connection simulator GAS is also provided is, the data exchange can be monitored in parallel on the central Data channel ZDIx has taken place.
Hit Hilfe des Simulatonsrechners SR ist es möglich, schnelle Anreizbefehlsfolgen zu erzeugen, ohne daß an dem Anschalteprinzip Änderungen erforderlich sind. Damit kann eine künstlich Verkehrsbelastung erzeugt werden, und es kann getestet werden, wie die Vermittlungsanlage darauf reagiert. Mit dem Simulationsrechner ist es auBeriem möglich, die Reaktionszeiten auf werden einzelnen Anreizbefehl zu messen, so da3 rkannt werden kann, wie sich diese Reaktionszeiten unter starker Verkehrs last verändern. Schnelle Anreizbefehlsfolgen dieser Art können sowohl über den Peripherie-Anschluß-Simulator PAS als auch über den Gruppenanschluß-Simulator GAS direkt auf den zentralen Datenkanal ZDK eingespeist werden.With the help of the simulation computer SR, it is possible to generate fast incentive command sequences to generate without changes to the connection principle are required. In order to an artificial traffic load can be created and it can be tested how the switching system reacts to it. With the Simulation computer It is also possible to adjust the response times to individual incentive commands measure, so that it can be seen how these reaction times under strong Change traffic load. Fast incentive sequences of this type can be used via both the peripheral connection simulator PAS as well as the group connection simulator GAS can be fed directly into the central data channel ZDK.
werden Bei jedem einzelnen Anreizbefehl außerdem Anschlußadressen mitgegeben, um zu prüfen, ob der daraufhin von der Gruppensteuereinrichtung IVG abzugebende Antwortbefehl die richtige Adressierung enthält. Auf diese Weise ist es möglich, das logische Verhalten jeder einzelnen Anschlußschaltung elektrisch nachzabilden.Connection addresses are also used for each individual stimulus command given to check whether the group control device IVG The response command to be issued contains the correct addressing. That way is it is possible to electrically control the logical behavior of each individual connection circuit nachzabilden.
Außerdem kann bei der Einzelanreiz-Hethode und auch bei den schnellen Befehlsfolgen bewirkt werden, daß bewußt unlogische Anreize abgegeben werden. So kann beispielsweise unter einer Anschlußadresse ein Wählsignal erzeugt werden, ohne daß vorher ein Belegungsanreiz abgegeben wurde. Hier sind alle denkbaren Fehlermöglichkeiten nachvollziehbar, beispielsweise auch das Abgeben eines Auslösesignals unter einer Anschlußadresse die zuvor garnicht belegt worden war.In addition, the single incentive method and also the fast Command sequences cause deliberately illogical incentives to be given. So For example, a dial signal can be generated under a connection address without that an occupancy incentive was given beforehand. Here are all conceivable possible sources of error understandable, for example also the output of a trigger signal under a Connection address that had not previously been assigned.
Bei dieser Prüfmethode wird getestet, wie sich die Anlage verhält, wenn derartige Störungen vorliegen. Es ist dabei besonders darauf zu achten, daß keine Blockade von Steuereinrichtungen eintritt, und es wird deshalb festgetellt, in welcher Zeit sich die betroffenen Steuereinrichtungen freischaiten und welche Befehle dabei abgegeben werden.This test method tests how the system behaves, if there are such disturbances. It is particularly important to ensure that no blockage of control devices occurs, and it is therefore determined in what time the affected control devices are activated and which Orders are given.
In der Zeichnung ist dargestellt, daß nur ein Peripherie-Anschluß-Simulator PAS angeschlossen ist, worüber Anreizbefehle oder -befehlsfolgen eingespeist werden und die entsprechenden Antworten von der Anlage empfangen werden.The drawing shows that only one peripheral connection simulator PAS is connected, via which incentive commands or command sequences are fed and the corresponding responses are received by the system.
Es ist jedoch auch ohne weiteres möglich, mehrere Peripherie-Anschluß-Simulatoren PAS vorzusehen, so daß insbesondere bei mehrgruppigen Vermittlunsanlagen der Verbindungsaufbau von einer Gruppe zur anderen geprüft werden kann. Die bereits erwähnte Verkehrssimulation durch Abgabe von sehr vielen Meldungen in kurzen Zeitabständen kann selbstver- ständlich auch beim Einsatz von mehreren Peripherie-Anschluß-Simulatoren PAS durchgeführt werden. Bei Verkehrsbelastungstests, insbesondere dann wenn mehrere Peripherie-Anschluß-Simulatoren PAS vorgesehen sind, ist es zweckmäßig, die Anreizbefehlsfolgen in Programmen- zusammenzufassen, die im Simulationsrechner SR abgelegt sind. Die-Pruf-BedìenungE einrichtung PBE dient dann nur noch dazu, verschiedene Testprogramme für das Prüfen des Verbindungsaufbaus, des Verhaltens der Anlage beim Einspeisen von Fehlbelegungen und die Verkehrsbelastbarkeit zu starten.However, it is also easily possible to have several peripheral connection simulators PAS to be provided so that the connection can be set up, especially in the case of multi-group switching systems can be checked from one group to another. The already mentioned traffic simulation by submitting a large number of reports at short time intervals, it is self-evident of course also carried out when using several peripheral connection simulators PAS will. In traffic load tests, especially if there are several peripheral connection simulators PAS are provided, it is useful to summarize the incentive command sequences in programs, which are stored in the simulation computer SR. The test control device PBE then only serves to run various test programs for checking the connection establishment, the behavior of the system when feeding incorrect assignments and the traffic load capacity to start.
Die Peripherie-Anschluß-Simulatoren können mit einer Schnittstelle, beispielsweise V24 ausgestattet sein, womit der Test einer Vermittlungsanlage auch fernbedient von einem räumlich abgesetzten Bedienungszentrum aus erfolgen kann.The peripheral connection simulators can be equipped with an interface, for example V24, with which the test of a switching system also can be done remotely from a remote control center.
Bei dieser Version können von einer einzigen Prüf-Bedienungseinrichtung PBE aus nacheinander mehrere mit Peripherie-Anschluß-Simulatoren und ggf. auch Gruppen-Anschluß-Simulatoren GAS ausgestattete Vermittlungsanlagen geprüft werden.With this version you can use a single test operator PBE from successively several with peripheral connection simulators and possibly also group connection simulators GAS-equipped switching systems are checked.
Bei allen Arten von Funktionstests werden die Ergebnisse einer Anzeige an der Prüf-Bedienungseinrichtung PBE zugeführt und außerdem werden durch einen in-nicht dargestellter Weise angeschl Dssenen Drucker Protokolle ausgefertigt. Anhand der Protokolle ist der Fachmann ohne weiteres in der Lage, Fehler festzustellen und zu lokalisieren sowie bei extremen Betriebsfällen auftretende Verhaltensweisen der Vermittlungs anlage zu analysieren.With all types of functional tests, the results of a display supplied to the test control device PBE and also by a Protocols are made out in a manner not shown connected to the printer. Based With the logs, the person skilled in the art is easily able to determine errors and to localize as well as behaviors occurring in extreme operating cases to analyze the switching system.
- Leerseite -- blank page -
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19843424124 DE3424124A1 (en) | 1984-06-30 | 1984-06-30 | Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19843424124 DE3424124A1 (en) | 1984-06-30 | 1984-06-30 | Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3424124A1 true DE3424124A1 (en) | 1986-01-09 |
Family
ID=6239517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19843424124 Withdrawn DE3424124A1 (en) | 1984-06-30 | 1984-06-30 | Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3424124A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3633477A1 (en) * | 1986-09-29 | 1988-03-31 | Siemens Ag | Method for testing modular switching systems |
DE3824250A1 (en) * | 1988-07-13 | 1990-01-18 | Siemens Ag | TEST CIRCUIT ARRANGEMENT FOR COMPUTER-CONTROLLED MESSAGE SWITCHING SYSTEMS |
EP1067751A2 (en) * | 1999-07-07 | 2001-01-10 | Siemens Aktiengesellschaft | Method and test device for testing service features of communication installations |
WO2001047245A2 (en) * | 1999-12-22 | 2001-06-28 | Siemens Aktiengesellschaft | Method and arrangement for locally controlling a testing process in a telecommunications network |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3212006C2 (en) * | 1982-03-31 | 1984-01-19 | Siemens AG, 1000 Berlin und 8000 München | Method for a computer-controlled device for simulating traffic in telephone switching systems |
-
1984
- 1984-06-30 DE DE19843424124 patent/DE3424124A1/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3212006C2 (en) * | 1982-03-31 | 1984-01-19 | Siemens AG, 1000 Berlin und 8000 München | Method for a computer-controlled device for simulating traffic in telephone switching systems |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3633477A1 (en) * | 1986-09-29 | 1988-03-31 | Siemens Ag | Method for testing modular switching systems |
DE3824250A1 (en) * | 1988-07-13 | 1990-01-18 | Siemens Ag | TEST CIRCUIT ARRANGEMENT FOR COMPUTER-CONTROLLED MESSAGE SWITCHING SYSTEMS |
EP1067751A2 (en) * | 1999-07-07 | 2001-01-10 | Siemens Aktiengesellschaft | Method and test device for testing service features of communication installations |
EP1067751A3 (en) * | 1999-07-07 | 2004-02-11 | Siemens Aktiengesellschaft | Method and test device for testing service features of communication installations |
WO2001047245A2 (en) * | 1999-12-22 | 2001-06-28 | Siemens Aktiengesellschaft | Method and arrangement for locally controlling a testing process in a telecommunications network |
WO2001047245A3 (en) * | 1999-12-22 | 2001-12-27 | Siemens Ag | Method and arrangement for locally controlling a testing process in a telecommunications network |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE4309000C2 (en) | Method for determining the reliability of data transmission lines and associated circuitry | |
DE3824250C2 (en) | ||
DE69323001T2 (en) | Central monitoring system of a multiplex subscriber loop with carrier | |
DE3823925C2 (en) | ||
DE3424124A1 (en) | Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems | |
DE3215672C1 (en) | Arrangement for automatic testing of telephone systems, in particular telephone PABX systems | |
DE3743959C2 (en) | ||
DE3215663C1 (en) | Arrangement for automatic testing of telephone systems, in particular telephone PABX systems | |
EP0211261B1 (en) | Method for automatically testing a communication system, especially a private branch exchange | |
DE3689245T2 (en) | Automatic test device. | |
EP0272513B1 (en) | Method for testing an interface unit | |
DE2348921C3 (en) | Monitored control matrix for unipolar controlled receiving switching means, in particular storage elements and methods for operating the same | |
EP0143455B1 (en) | Traffic simulation device | |
EP1221245A2 (en) | System, evaluation device and method for verifying connection-related communication data determined by a digital exchange | |
CH669700A5 (en) | ||
DE2828092C2 (en) | Method and circuit arrangement for monitoring a license plate converter during operation | |
DE2633986C3 (en) | Method for checking line multiples in centrally controlled telecommunications, in particular telephone switching systems | |
DE60100291T2 (en) | Method and device for collecting information on the operating state | |
DE3330889A1 (en) | Circuit arrangement for testing the functional capability of a computer-controlled telephone exchange | |
DE3215651C1 (en) | Arrangement for automatic creation of different system-specific test data collations for the purposes of testing telephone systems, in particular telephone PABX systems | |
DE2736419B1 (en) | Circuit arrangement for an indirectly controlled switching system, in particular a telephone system | |
DE3216206C1 (en) | Method for a device with which different operational processes, supplemented by test routines with a fault printout, are effected, in particular for a traffic simulation device in telephone switching installations | |
DE3428603C2 (en) | Method for testing the signal converter multiplexer in a PCM transmission link and test arrangement for carrying out the method | |
DE3235870A1 (en) | Circuit arrangement for a processor-controlled test device which can be connected via interfaces to a system to be tested, for example a telephone switching system | |
DE2029762C3 (en) | Method for determining the simultaneous occupancy of two or more of several assemblies |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
8130 | Withdrawal |