DE3337911A1 - Climbing device for tower cranes - Google Patents

Climbing device for tower cranes

Info

Publication number
DE3337911A1
DE3337911A1 DE19833337911 DE3337911A DE3337911A1 DE 3337911 A1 DE3337911 A1 DE 3337911A1 DE 19833337911 DE19833337911 DE 19833337911 DE 3337911 A DE3337911 A DE 3337911A DE 3337911 A1 DE3337911 A1 DE 3337911A1
Authority
DE
Germany
Prior art keywords
crane
tower
tubular column
climbing
lower mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19833337911
Other languages
German (de)
Inventor
Helmut 6670 St Ingbert Trapp
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alb-Werk Maschinen-Gesellschaft Mbh & Co 7505 Ett
Original Assignee
Elba Werk Maschinen GmbH and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elba Werk Maschinen GmbH and Co filed Critical Elba Werk Maschinen GmbH and Co
Priority to DE19833337911 priority Critical patent/DE3337911A1/en
Publication of DE3337911A1 publication Critical patent/DE3337911A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/283Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of assembled elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

In an erecting device for a height-extendable tower crane in which the tower elements are in each case inserted into an intermediate space between a lower mast and an upper part of the crane, and the upper part of the crane is pushed away from the lower mast by means of a climbing device supported on a lifting mechanism, the climbing device can be joined together on the crane itself on the basis of the following components: 1) a laterally projecting connection rail is provided on the upper part of the crane, 2) a tubular column corresponding to the intermediate space is linked to this connection rail, which tubular column has two pairs of laterally projecting guide arms, 3) one flexurally rigid U-shaped guide frame each is attached to the pairs of guide arms and is pinned to them, 4) in its area facing the lower mast, the tubular column is connected in an articulated manner to a lifting cylinder which lifts the unit consisting of guide frame, tubular column, connection rail and crane upper part from the lower mast. This erecting device has extremely favourable transport properties and in addition has the advantage that it can climb virtually continuously from tower element to tower element without the upper part of the crane first having to be bolted every time to the lower mast in order to move the climbing device into position. <IMAGE>

Description

Beschreibung description

Die vorliegende Erfindung bezieht sich auf eine Montageeinrichtung für einen aus mehreren Turmelementen aufstockbaren Turmdrehkran nach dem Oberbegriff des Patentanspruchs 1.The present invention relates to a mounting device for a tower crane that can be extended from several tower elements according to the generic term of claim 1.

Eine Montageeinrichtung dieser Art ist aus der DE-PS 12 02 447 bekannt. Sie ist bezogen auf die Auslegerrichtung seitlich angeordnet und besteht aus zwei relativ zueinander beweglichen Bauteilen, einem (Kletter-) Schlitten und einem Führungsrahmen. Der Schlitten wird für einen Klet-tervorgang mit dem Kranoberteil verbolzt; der Führungsrahmen wird mit dem Untermast verbolzt.Nach Lösung der Verbindung zwischen Kranoberteil und Untermast wird mittels eines Hubzylinders das Kranoberteil weggedrückt, bis der Zwischenraum groß genug ist, das nächste Turmelement aufzunehmen. Kranoberteil, eingesetztes Turmelement und Untermast werden sodann wieder miteinander verbunden. Zum Einsetzen eines neuen Turmelements muß der Schlitten des Montagerahmens nachgeführt und die Turmverbindung zwischen Kranoberteil und zuletzt eingefügtem Turmelement wieder gelöst werden.An assembly device of this type is known from DE-PS 12 02 447. It is arranged laterally in relation to the boom direction and consists of two Components that can move relative to one another, a (climbing) slide and a guide frame. The slide is bolted to the upper part of the crane for a climbing process; the The guide frame is bolted to the lower mast. After the connection between The upper part of the crane and the lower mast are pushed away by means of a lifting cylinder, until the gap is large enough to accommodate the next tower element. Crane top, inserted tower element and lower mast are then connected to one another again. To insert a new tower element, the slide of the mounting frame must be tracked and the tower connection between the upper part of the crane and the tower element inserted last be solved again.

Diese bekannte Montageeinrichtung erfüllt ihre Aufgabe für die bekannten Kletterkrane an sich bereits optimal.This known mounting device fulfills its task for the known Climbing cranes in themselves are already optimal.

Sie hat jedoch einige Nachteile: 1) Die aus den genannten zwei Bauteilen bestehende Montageeinrichtung bildet eine konstruktive Einheit. Die Grundmaße der Montageeinrichtung sind dem größten einzufügenden Turmelement entsprechend dimensioniert, d.h. sie ist relativ voluminös und nur mit entsprechenden Transportmitteln zu bewegen.However, it has some disadvantages: 1) The one from the two components mentioned existing assembly equipment forms a structural unit. The basic dimensions of the Assembly devices are dimensioned according to the largest tower element to be inserted, i.e. it is relatively bulky and can only be moved with appropriate means of transport.

2) Beim Aufstocken, also Aufbau eines Turmdrehkrans, muß jeweils die Verbindung zwischen Untermast und Kranoberteil hergestellt werden, damit die Bolzenverbindung zwischen Führungsrahmen und (vorletztem) Turmelement gelöst und der Führungsrahmen durch Abwärts fahren des Schlittens nachgezogen und mit dem neu montierten Turmelement wieder verbolzt werden kann. Die Turmverbindung selbst muß jeweils beim Umsetzen der Montageeinrichtung fixiert sein, weil die Montageeinrichtung bei diesem Arbeitsschritt keine Kräfte übernehmen kann. (Diese Kräfte werden bei gelöster Turmverbindung über die Bolzenverbindung zwischen Kranoberteil und Schlitten bzw. zwischen Führungsrahmen und Untermast aufgenommen).2) When building up a tower crane, the Connection between the lower mast and the upper part of the crane are made so that the bolt connection between the guide frame and the (penultimate) tower element and the guide frame by moving the slide downwards and pulled with the newly installed tower element can be bolted again. The tower connection itself must be used when moving the assembly device be fixed because the assembly device in this work step cannot take over any forces. (These forces are transferred when the tower connection is released the bolt connection between the upper part of the crane and the slide or between the guide frame and lower mast added).

Die der vorliegenden Erfindung zugrunde liegende Aufgabe besteht darin, eine Klettereinrichtung der gattungsgemäßen Art anzugeben, die nicht als komplette konstruktive Einheit transportiert werden muß und bei deren Verwendung beim Kranaufbau nicht jeweils nach bzw. vor dem Einbau eines weiteren Turmelements Kranoberteil und Untermast verbunden werden müssen.The object on which the present invention is based is to specify a climbing facility of the generic type, which is not considered complete Constructive unit must be transported and when using them when building a crane not in each case after or before the installation of a further tower element crane upper part and the lower mast have to be connected.

Diese Aufgabe wird durch die im kennzeichnenden Teil des Patentanspruchs 1 gegebenen Mittel gelöst.This task is carried out in the characterizing part of the claim 1 given means solved.

Dieses Konzept hat abgesehen von den der Aufgabenstellung immanenten Vorteilen noch den weiteren positiven Aspekt, daß die Seitenwindempfindlichkeit geringer ist als bei der bekannten Montageeinrichtung.Apart from the one inherent in the task at hand, this concept has Another positive aspect is that they are sensitive to crosswinds is less than with the known assembly device.

Bezugnehmend auf die der Aufgabenstellung entsprechenden Vorteile soll explizit noch auf folgendes hingewiesen werden.With reference to the advantages corresponding to the task at hand the following should also be pointed out explicitly.

Durch den Anbau der erfindungsgemäßen Klettereinrichtung am Kran bzw. durch den modularen Aufbau dieser Klettereinrichtung bedingt spielt das Transportproblem nur eine untergeordnete Rolle. Schließlich besteht die Klettereinrichtung aus einer Mehrzahl funktionell zusammenwirkender und gemeinsam zu transportierender Einzelteile, deren Hauptelement, die Rohrsäule, an sich noch teilbar ausgebildet sein kann.By attaching the climbing device according to the invention to the crane or Due to the modular structure of this climbing device, there is a problem with transport only a minor role. Finally, the climbing device consists of a A large number of functionally interacting individual parts that can be transported together, whose main element, the tubular column, can still be designed to be divisible.

Bezugnehmend auf das Problem der Kraftübertragung ist zur Erläuterung der erzielten Vorteile noch anzumerken, daß bei der erfindungsgemäßen Montageeinrichtung auf Grund der völligen Umschließung des Untermastes durch die Führungsrahmen und deren Verbolzung mit den Führungsarmen der Rohrsäule alle Momente auf den Untermast übertragen werden.Referring to the problem of power transmission is illustrative of the advantages achieved should be noted that in the assembly device according to the invention due to the complete enclosure of the lower mast by the guide frames and bolting them to the guide arms of the tubular column all moments on the lower mast be transmitted.

Vorteilhafte Ausgestaltung der Erfindung ergeben sich aus den Unteransprüchen; die Einzelheiten werden im folgenden anhand der Zeichnungen näher erläutert: Fig. 1 zeigt einen Turmdrehkran ohne Klettereinrichtung, Fig. 2 zeigt die Montage der Klettereinrichtung, Fig. 3 zeigt einen Klettervorgang einschließlich Montage bzw. Einbau eines Turmelements (Kranteils), Fig. 4 zeigt die Klettereinrichtung im Detail, Fig. 5 zeigt eine Schnittdarstellung in Höhe des oberen Führungsrahmens der Klettereinrichtung.Advantageous refinements of the invention emerge from the subclaims; the details are explained in more detail below with reference to the drawings: 1 shows a tower crane without a climbing device, FIG. 2 shows the assembly of the Climbing device, Fig. 3 shows a climbing process including assembly or Installation of a tower element (crane part), Fig. 4 shows the climbing device in detail, Fig. 5 shows a sectional view at the level of the upper guide frame the climbing device.

Fig. 1 zeigt einen. Turmdrehkran 1 , der aus mehreren (hier drei) Turmelementen 2 und einem Kranoberteil 3 mit Ausleger 4 , Kranführerkabine 5 und Gegenausleger 6 mit Ballastgewicht 7 besteht. Das Kranoberteil 3 ist über ein als Gittermastkonstruktion ausgebildetes Zwischenstück 8 mit dem benachbarten Turmelement über eine Drehverbindung gekoppelt.Fig. 1 shows a. Tower crane 1, which consists of several (here three) Tower elements 2 and a crane upper part 3 with boom 4, crane operator's cab 5 and Counter jib 6 with ballast weight 7 consists. The crane upper part 3 is as a Lattice mast construction formed intermediate piece 8 with the adjacent tower element coupled via a rotary joint.

Der in Fig. 1 gezeigte Turmdrehkran 1 ist mittels der erfindungsgemäßen Montageeinrichtung Turmelement für Turmelementaufstockbar. Bis zu einer bestimmten Mindesthöhe A wird der Turmdrehkran 1 als sogenannter City-Kran mittels eines Autokrans aufgestockt.The tower crane 1 shown in Fig. 1 is by means of the invention Assembly device tower element for tower element can be increased. Up to a certain one The tower crane 1 becomes the minimum height A as a so-called city crane by means of a truck-mounted crane increased.

Diese Montageeinrichtung wird anhand von Fig. 2 erläutert - und zwar anhand ihres Anbaus an einen Turmdrehkran 1 gemäß Fig. 1.This assembly device is explained with reference to FIG based on their attachment to a tower crane 1 according to FIG. 1.

Die Montageeinrichtung besteht prinzipiell aus vier Funktionselementen bzw. Konstruktionselementen, deren funktionelles Zusammenwirken die erfindungsgemäße Klettereinrichtung ergibt.The assembly device basically consists of four functional elements or construction elements, the functional interaction of which the inventive Climbing device results.

Der Ansatzpunkt für die Montageeinrichtung ist eine unterhalb der Drehverbindung des Kranoberteils 3 seitlich - in Richtung Gegenausleger 6 weisende - überkragende Anschlußschiene 20. Diese Anschlußschiene 20 liegt somit zwischen der genannten Drehverbindung und dem Zwischenstück 8 u-nd kragt seitlich über den Umfang der Drehverbindung und das Zwischenstück 8 hinaus.The starting point for the assembly device is one below the Rotary connection of the crane upper part 3 laterally - pointing in the direction of the counter jib 6 - Projecting connecting rail 20. This connecting rail 20 is thus between the said rotary joint and the intermediate piece 8 u-nd cantilevered over the side Scope of the rotary joint and the intermediate piece 8 also.

An diesen überkragenden Teil der Anschlußschiene 20 wird mittels entsprechender Anlenkungsmittel eine Rohrsäule 21. angehängt und von hier in eine Position parallel zu den Turmelementen 2 abgelassen (vgl.Pfeil X) und mit dem Zwischenstück 8 verbundene die Rohrsäule 21 hängt nunmehr lotrecht nach unten und zwar angehängt an der Anschlußschiene 20 des Kranoberteils 3 und verbunden mit dem Zwischenstück 8.Die Länge der Rohrsäule 21 ist der Länge der Turmelemente 2 entsprechend gewählt -und zwar insoweit, als die Rohrsäule 21 im Bereich des Kranoberteils 3 über das vorgenannte Zwischenstück 8 hinausreicht und im Bereich des vom Kranoberteil aus betrachtet übernächsten Turmelement in dieses hineinreicht. Die Rohrsäule hat in diesem letztgenannten Bereich zwei Paare von Führungsarmen, deren Bedeutung nachfolgend erläutert wird.At this projecting part of the connecting rail 20 is by means of corresponding Articulation means a tubular column 21 is attached and from here in a parallel position lowered to the tower elements 2 (see arrow X) and connected to the intermediate piece 8 the tubular column 21 now hangs vertically downwards and that is attached to the connecting rail 20 of the crane upper part 3 and connected to the intermediate piece 8. The length of the tubular column 21 is chosen to correspond to the length of the tower elements 2 - to the extent that the tubular column 21 in the area of the crane upper part 3 via the aforementioned intermediate piece 8 extends out and in the area of the next but one tower element viewed from the top of the crane reaches into this. The tubular column has two in this latter area Pairs of guide arms, the meaning of which is explained below.

Die konstruktive Komplettierung der Montageeinrichtung erfolgt mittels zweier biegesteifer U-förmiger Führungsrahmen 22. Diese werden nacheinander mittels der Kranflasche angehoben und von der der Rohrsäule 21 gegenüberliegenden Seite der Turmelemente 2 her im Sinne einer völligen Umschließung an die Turmelemente angelegt und mit den Führungsarmen an der Rohrsäule 21 verbolzt. Die genannten beiden Führungsrahmen können zwecks Erhöhung der Stabilität gegeneinander verspannt sein.The structural completion of the assembly device is carried out by means of two rigid U-shaped guide frames 22. These are successively by means of the crane block raised and from the side opposite the tubular column 21 the tower elements 2 ago in the sense of a complete enclosure to the tower elements applied and bolted to the tubular column 21 with the guide arms. The two mentioned Guide frames can be braced against one another in order to increase stability.

Damit ist nun die Montageeinrichtung als konstruktive Einheit komplett. Sie bsteht aus den Anschlußschienen 20, der Rohrsäule 21 und dem Paar von Führungsrahmen 22.The assembly device is now complete as a structural unit. It consists of the connecting rails 20, the tubular column 21 and the pair of guide frames 22nd

Diese konstruktive Einheit wird vervollständigt durch einen im unteren Bereich der Rohrsäule 21 eingesetzten Hubzylinder 23.This constructive unit is completed by a lower one The lifting cylinder 23 inserted in the area of the tubular column 21.

Dieser Hubzylinder 23 ist gelenkig mit der Rohrsäule verbunden und insoweit integrierter Bestandteil; das freie Ende stützt sich am Untermast ab und zwar an sogenannten Kletterblechen, die in dem Kolbenweg des Hubzylinders 23 entsprechenden Abständen an den Turmelementen 2 vorgesehen sind.This lifting cylinder 23 is articulated to the tubular column and insofar an integral part; the free end is based on Lower mast from so-called climbing plates, which are in the piston path of the lifting cylinder 23 corresponding distances are provided on the tower elements 2.

Die Funktionsweise der vorgenannten Montageeinrichtung wird anhand von Fig. 3 erläutert.The functioning of the aforementioned assembly device is based on of Fig. 3 explained.

Diese zeigt den Turmdrehkran nach Fig. 2 mit angesetzter Montageeinrichtung - bestehend aus den Anschlußschienen 20, der Rohrsäule 21 , den Führungsrahmen 22 und dem Hubzylinder 23. Letzterer stützt sich jeweils an Kletterblechen 24 ab, die an den Turmelementen 2 fixiert sind.This shows the tower crane according to FIG. 2 with the assembly device attached - Consists of the connecting rails 20, the tubular column 21, the guide frame 22 and the lifting cylinder 23. The latter is supported in each case on climbing plates 24 which are fixed to the tower elements 2.

Aus der Gegenüberstellung der Fig. 2 und 3 ist erkennbar, daß die an dem Turmelement 28 (Fig. 2) über die Führungsarme 22 angebaute Montageeinrichtung -schrittweise von Kletterblech zu Kletterblech - in die entsprechende Position am Turmelement 258 geklettert ist. Dabei wurde der Kranoberteil 3 mit von diesem letztgenannten Turmelement 2 abgehoben. Die Längen von Rohrsäulen 21 und Turmelementen 2 sind insoweit aufeinander abgestimmt, daß bei hochgekletterter Montageeinrichtung der Zwischenraum 25 zwischen Turmelement 2'' bzw. Untermast und Kranoberteil 3 groß genug ist, daß ein weiteres Turmelement 2''' einge-(vgl.Pfeil Y) fügt werden kann./Dieses weitere Turmelement 2''' wird sodann mit dem benachbarten Turmelement 2' verschraubt ...und es kann unmittelbar weitergeklettert werden.From the comparison of FIGS. 2 and 3 it can be seen that the Mounting device attached to the tower element 28 (FIG. 2) via the guide arms 22 - step by step from climbing plate to climbing plate - in the corresponding position on Tower element 258 has climbed. The upper part of the crane 3 was joined by the latter Tower element 2 lifted off. The lengths of tubular columns 21 and tower elements 2 are so far coordinated that when the assembly device has been climbed the gap 25 between tower element 2 "or lower mast and crane top 3 is large enough that Another tower element 2 '' 'can be inserted (see arrow Y). / This additional one Tower element 2 '' 'is then screwed to the adjacent tower element 2' ... and you can continue climbing immediately.

Durch die Verbindung der Montageeinrichtung mit der Anschlußschiene 20 sowie dem Zwischenstück 8 und. die vollständige Umschließung des Untermastes im Bereich der Führungsrahmen 22 werden sämtliche Horizontalkräfte und Momente vom Kranoberteil 3 auf'den Untermast ür die Klettereinrichtung übertragen. Die Vertikalkräfte werden vom Hubzylinder 23 auf die Kletterbleche 24 am Untermast übertragen.By connecting the assembly device to the connecting rail 20 and the intermediate piece 8 and. the complete enclosure of the lower mast in the field of Guide frame 22 are all horizontal forces and moments from the crane upper part 3 are transferred to the lower mast for the climbing device. The vertical forces are exerted by the lifting cylinder 23 on the climbing plates 24 on the lower mast transfer.

Die erfindungsgemäße Montage- (Kletter-) Einrichtung wird anhand der vergrößerten Darstellung von Fig. 4 noch näher erläutert.The assembly (climbing) device according to the invention is based on enlarged illustration of Fig. 4 explained in more detail.

Ausgehend von der Montage folge selbst geht die Montageeinrichtung aus von einer am Kranoberteil 3 überstehenden Anschlußschiene 20, die Teil einer zwischen Drehverbindung und Zwischenstück 8 liegenden Traverse ist. Mit dieser Anschlußschiene 20 wird die Rohrsäule 21 gelenkig verbunden - und zwar über eine Lagertraverse 30, die mit der Rohrsäule 21 fest verbunden ist und mit der Anschlußschiene 20 verbolzt ist. Die Rohrsäule 21 weist darüberhinaus eine greiferähnliche Horizontallagerung 31 auf, die mit komplementären Gegenstücken am Zwischenstück 8 verbolzt ist.The assembly device is based on the assembly sequence itself from a protruding on the crane upper part 3 connecting rail 20, which is part of a between the rotary joint and the intermediate piece 8 lying traverse. With this connecting rail 20, the tubular column 21 is articulated - via a bearing traverse 30, which is firmly connected to the tubular column 21 and bolted to the connecting rail 20 is. The tubular column 21 also has a gripper-like horizontal bearing 31, which is bolted to the intermediate piece 8 with complementary counterparts.

Die in Fig. 4 dargestellte Rohrsäule 21 besteht aus drei Säulenelementen 21.1, 21.2 und 21.3. Diese drei Säulenelemente sind miteinander verflanscht und bilden an sich das Herzstück der Montageeinrichtung. Die Teilbarkeit der Rohrsäule 21 an sich ist einmal vorgesehen wegen der Transportlänge und zum anderen im Hinblick auf die Länge der einzusetzenden Turmelemente.The tubular column 21 shown in Fig. 4 consists of three column elements 21.1, 21.2 and 21.3. These three pillar elements are flanged together and themselves form the heart of the assembly facility. The divisibility of the tubular column 21 per se is provided on the one hand because of the transport length and on the other hand in view on the length of the tower elements to be used.

Mit dieser Konzeption sind Montageeinrichtungen für Turmelemente unterschiedlicher Längen aufzubauen.With this conception, assembly devices for tower elements are different Build lengths.

Das oberste Rohrsäulenelement 21.1 ist mit dem Kranoberteil 3 verbunden. Das mittlere Rohrsäulenelement 21.2 ist ein reines Verlängerungsstück, das gegebenenfalls einfach weggelassen werden kann. Das dritte untere Rohrsäulenelement 21.3 liegt beim Einhängen der gesamten Rohrsäule 21 dem Kopfteil des letzt eingebauten Turmelements 2 gegenüber.The uppermost tubular column element 21.1 is connected to the crane upper part 3. The middle tubular column element 21.2 is a pure extension piece, which optionally can simply be omitted. That third lower tubular column element 21.3 is when hanging the entire tubular column 21 the head part of the last installed Tower elements 2 opposite.

Wie bereits vorher erwähnt, weist die Rohrsäule 21 an ihrem unteren Endbereich (das ist hier an dem unteren Rohrsäulenelement 21.3) zwei Paare von Führungsarmen 33 auf, an die von der anderen Seite des Untermastes her die Führungsrahmen 22 angesetzt werden. Diese Führungsrahmen 22 sind starre Gebilde und umschließen das Endteil des obersten Turmelements 2 völlig; sie werden mit den Führungsarmen 33 verbolzt.As already mentioned before, the tubular column 21 has at its lower End area (that is here on the lower tubular column element 21.3) two pairs of guide arms 33 to which the guide frame 22 is attached from the other side of the lower mast will. These guide frames 22 are rigid structures and enclose the end part of the uppermost tower element 2 completely; they are bolted to the guide arms 33.

Damit ergibt sich eine geschlossene Umklammerung des Turmelements 2 Da die Montageeinrichtung bestimmungsgemäß an den Turmelementen 2 hochklettern muß, soll der Vollständigkeit halber noch auf folgende Konstruktionselemente hingewiesen werden.This results in a closed clasping of the tower element 2 Because the assembly equipment is intended to climb up the tower elements 2 must, for the sake of completeness, reference should also be made to the following design elements will.

Unter Klettern im Sinne dieser Anwendung versteht man ein stufenweises Hochgleiten des aus den Führungsrahmen 22 und der Rohrsäule 21 mit den Führungsarmen 33 bestehenden Rahmengebildes. Dies bedeutet aber auch, daß an den Berührungspunkten zwischen diesem Rahmengebilde und den Eckstielen der Turmelemente Führungsrollen 34 bzw. 35 vorgesehen sind, auf denen das Rahmengebilde an den Turmelementen 2 hochgleitet.Climbing in the sense of this application means a gradual Slide up of the guide frame 22 and the tubular column 21 with the guide arms 33 existing framework. But this also means that at the points of contact between this frame structure and the corner posts of the tower elements guide rollers 34 and 35 are provided, on which the frame structure slides up on the tower elements 2.

Am unteren Führungsrahmen braucht unter Umständen keine Führungsrolle vorgesehen zu werden; hier genügt es, die Führung über ein einfaches starres Führungsstück 36 zu realisieren.There may be no need for a guide roller on the lower guide frame to be provided; here it is sufficient to use a simple rigid guide piece for guidance 36 to be realized.

Das Klettern der Rohrsäule 21 mit dem Kranoberteil 3 geht wie bereits erwähnt stufenweise vonstatten. Die Stufen sind durch den Hub des Hubzylinders 23 vorgegeben, der innerhalb der Rohrsäule 21 an einer Hydrauliklagerung 40 eingehängt ist. Entsprechend diesem Hub sind längs der Turmelemente 2 Kletterbleche 24 vorgesehen. An diese Kletterbleche 24 wird jeweils eine Klettertraverse 41 angesetzt, die am Kolben des Hubzylinders 23 angelenkt ist. Die Klettertraverse 41 geht über die ganze Breite der Turmelemente 2 und stützt sich somit jeweils an zwei benachbarten Eckstielen ab. Zur Unterstützung der Krafteinleitung im ruhenden Zustand der Montageeinrichtung ist am oberen Führungsrahmen 22 eine zusätzliche Kletterklaue 42 vorgesehen, die jeweils nach einem Kletterschritt sich an den Kletterblechen 24 abstützt.Climbing the tubular column 21 with the crane upper part 3 is as already done mentioned in stages. The stages are determined by the stroke of the lifting cylinder 23 predetermined, which is suspended within the tubular column 21 on a hydraulic bearing 40 is. Corresponding to this stroke 2 climbing plates 24 are provided along the tower elements. A climbing traverse 41 is attached to each of these climbing plates 24, which on the Piston of the lifting cylinder 23 is articulated. The climbing cross member 41 goes over the whole Width of the tower elements 2 and is thus based on two adjacent corner posts away. To support the introduction of force when the assembly device is at rest an additional climbing claw 42 is provided on the upper guide frame 22, which is supported on the climbing plates 24 after each climbing step.

Fig. 5 zeigt einen Schnitt durch die Montageeinrichtung in Höhe des oberen Führungsrahmens 22 (gemäß Fig. 4).Fig. 5 shows a section through the mounting device at the level of upper guide frame 22 (according to FIG. 4).

Der genannte Führungsrahmen 22 besteht aus einem starren U-förmigen Gebilde, das ein aus Eckstielen 50 und Trägern 51 bestehendes rechteckiges Turmelement 2 umschließt. Die offene Seite des U8s des Führungsrahmens 22 ist durch ein Paar von Führungsarmen 33 der Rohrsäule 21 geschlossen. Die Verbindung zwischen den Führungsarmen 33 und dem Führungsrahmen 22 ist als Bolzenverbindung 52 ausgeführt.Said guide frame 22 consists of a rigid U-shaped Structure that consists of corner posts 50 and beams 51 rectangular tower element 2 encloses. The open side of the U8s of the guide frame 22 is through a pair closed by guide arms 33 of tubular column 21. The connection between the guide arms 33 and the guide frame 22 is designed as a bolt connection 52.

Aus dieser Schnittdarstellung von Fig. 5 sind insbesondere die Führungsrollen 34,35 der Führungsrahmen 22 ersichtlich, über die die Montageeinrichtung als Ganzes an den Turmelementen anliegt und rollend geführt wird.From this sectional view of FIG. 5, in particular, the guide rollers 34,35 of the guide frame 22 can be seen over which the assembly device as a whole rests against the tower elements and is guided rolling.

Alles in allem wird hiermit eine Montageeinrichtung für aufstockbare Turmdrehkrane angegeben, deren besonderer Vorzug unter anderem auch darin besteht, daß sie ausgesprochen einfach an bestehende Turmdrehkrane an- und abgebaut werden kann. Damit läßt sich diese Einrichtun-g auch an mehreren Kranen verwenden und unter Umständen sogar im Mietgeschäft nutzen. All in all, this is a mounting facility for add-ons Tower cranes specified, whose particular advantage is, among other things, that they are extremely easy to attach to and remove from existing tower cranes can. This means that this device can also be used on several cranes and under Even use it in the rental business.

Ein besonderer Vorzug der erfindungsgemäßen Montageeinrichtung ist noch darin zu sehen, daß sogenannte City-Krane, die mit einem Autokran zu einem bis zu einer gewissen Höhe voll funktionsfähigen Kran aufgebaut werden, ohne weiteres in Kletterkrane umgewandelt werden können.A particular advantage of the assembly device according to the invention is can still be seen in the fact that so-called city cranes, which with a truck crane to one A fully functional crane can be built up to a certain height without further ado can be converted into climbing cranes.

Bezugs zeichen 1 Turmdrehkran 2 Turmelemente 3 Kranoberteil 4 Ausleger 5 Kranführerkabine 6 Gegenausleger 7 Ballastgewicht 8 Zwischenstück 20 Anschlußschiene 21 Rohrsäule 22 Führungsrahmen 23 Hubzylinder 24 Kletterblech 25 Zwischenraum 30 Lagertraverse 31 Horizontallagerung 33 Führungsarme 34 Führungsrollen 35 36 Führungsstück 40 Hydrauliklagerung 41 Klettertraverse 42 Kletterklaue 50 Eckstiele 51 Träger L e e r s e i t eReference characters 1 tower crane 2 tower elements 3 crane upper part 4 boom 5 crane operator's cab 6 counter-jib 7 ballast weight 8 intermediate piece 20 connecting rail 21 tubular column 22 guide frame 23 lifting cylinder 24 climbing plate 25 gap 30 bearing traverse 31 horizontal bearing 33 guide arms 34 Leadership roles 35 36 Guide piece 40 Hydraulic bearing 41 Climbing traverse 42 Climbing claw 50 Corner posts 51 Beam on the lower side

Claims (4)

Klettereinrichtung für Turmdrehkrane Patentansprüche 1. Montageeinrichtung für einen aus mehreren Turmelementen aufstockbaren Turmdrehkran, bei dem die Turmelemente jeweils in einen Zwischenraum zwischen einem Untermast und einem Kranoberteil eingesetzt werden und dieser Zwischenraum dadurch erreicht wird, daß das Kranoberteil mittels einer an einem Hubwerk abgestützten Klettereinrichtung vom Untermast weggedrückt wird, d a d u r c h g e k e n n z e i c h n e t , daß die Klettereinrichtung am Kran selbst auf der Grundlage folgender Bauteile zusammenfügbar ist: a: am Kranoberteil ist eine seitlich überstehende Anschlußschiene vorgesehen, b: an diese Anschlußschiene ist an dem seitlich überstehenden Ende eine dem Zwischenraum entsprechende Rohrsäule angelenkt, die an ihrem zweiten Ende, bezogen auf die Rohrsäulenachse, übereinander zwei Paare von seitlich abstehenden Führungsarmen aufweist, c: an die Führungsarmpaare wird von der gegenüberliegenden Seite des Untermastes her je ein biegesteifer U-förmiger Führungsrahmen angesetzt und mit den Führungsarmen verbolzt, d: die Rohrsäule ist in ihrem dem Untermast gegenüberliegenden Bereich gelenkig mit einem Hubzylinder verbunden, der sich an am Untermast in periodischen Abständen vorgesehenen Kletterblechen abstützt und die aus Führungsrahmen, Rohrsäule, Anschlußschiene und Kranoberteil bestehende Einheit in dem Abstand der Kletterbleche entsprechenden Schritten vom Untermast abhebt. Climbing device for tower cranes Patent claims 1. Assembly device for a tower crane that can be extended from several tower elements, in which the tower elements each used in a space between a lower mast and a crane upper part are and this gap is achieved in that the crane upper part by means of pushed away from the lower mast by a climbing device supported on a hoist it will be shown that the climbing device is on The crane itself can be assembled on the basis of the following components: a: on the upper part of the crane a laterally protruding connecting bar is provided, b: on this connecting bar is at the laterally protruding end a tubular column corresponding to the gap hinged, which at their second end, based on the tubular column axis, one above the other has two pairs of laterally protruding guide arms, c: on the pair of guide arms is depending on the opposite side of the lower mast a rigid U-shaped guide frame attached and bolted to the guide arms, d: the tubular column is articulated in its area opposite the lower mast connected to a lifting cylinder, which is attached to the lower mast at periodic intervals provided climbing plates and the guide frame, tubular column, connecting rail and crane upper part corresponding to the distance between the climbing plates Steps away from the base mast. 2. Montageeinrichtung nach Anspruch 1, d a d u r c h g e k e n n z e i c h n e t , daß die Rohrsäule geteilt und damit verschiedenen Zwischenräumen entsprechend anpaßbar ist.2. Mounting device according to claim 1, d a d u r c h g e k e n n z e i c h n e t that the tubular column is divided and thus different spaces is adaptable accordingly. 3. Montageeinrichtung nach Anspruch 1 oder 2, d a d u r c h gek e n n z e i c h n e t, daß der obere Führungsrahmen an seinem überstehenden Ende Kletterklauen aufweist, die sich an den Kletterblechen abstützen.3. Mounting device according to claim 1 or 2, d a d u r c h gek e It is noted that the upper guide frame has climbing claws at its protruding end has, which are supported on the climbing plates. 4. Montageeinrichtung nach den Ansprüchen 1,2 oder 3, d a d u r c h g e k e n n z e i c h n e t , daß die Führungsrahmen gegeneinander verspannt sind.4. Mounting device according to claims 1, 2 or 3, d a d u r c It is noted that the guide frames are braced against one another.
DE19833337911 1983-10-19 1983-10-19 Climbing device for tower cranes Withdrawn DE3337911A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19833337911 DE3337911A1 (en) 1983-10-19 1983-10-19 Climbing device for tower cranes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19833337911 DE3337911A1 (en) 1983-10-19 1983-10-19 Climbing device for tower cranes

Publications (1)

Publication Number Publication Date
DE3337911A1 true DE3337911A1 (en) 1985-05-09

Family

ID=6212165

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19833337911 Withdrawn DE3337911A1 (en) 1983-10-19 1983-10-19 Climbing device for tower cranes

Country Status (1)

Country Link
DE (1) DE3337911A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4856662A (en) * 1987-12-09 1989-08-15 Cbi Research Corporation Pedestal crane and method of assembling and erecting it
WO2001025548A1 (en) * 1999-10-01 2001-04-12 Mantsinen Oy Crane structure and a method for transforming a crane body
CN101858146A (en) * 2010-04-08 2010-10-13 上海汽车改装厂有限公司 Self-climbing lifting mechanism and using method thereof
CN103979433A (en) * 2014-05-26 2014-08-13 上海市机械施工集团有限公司 Method for climbing of tower crane in construction process
WO2014140723A1 (en) * 2013-03-12 2014-09-18 Konecranes Plc Self erecting jacking tower
US9388599B2 (en) 2014-02-27 2016-07-12 Parsons Corporation Wind tower erection system
US10273122B2 (en) 2014-03-11 2019-04-30 Liebherr-Werk Biberach Gmbh Climbing device for a tower crane

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1198981B (en) * 1964-03-06 1965-08-19 Bbc Brown Boveri & Cie Assembly device for tube antenna elements and mast structures
DE1202447B (en) * 1964-05-30 1965-10-07 Otto Kaiser K G Maschf Assembly device for tower cranes
FR1476734A (en) * 1966-02-24 1967-04-14 Richier Sa Cranes or other lifting devices with tower or extendable pylon
DE1245559B (en) * 1960-06-28 1967-07-27 Otto Kaiser K G Maschf Height-adjustable tower crane, especially high-rise crane
DE2235613A1 (en) * 1972-07-20 1974-01-31 Ts K Bjuro Strojmasch DEVICE FOR EXTENDING TOWER CRANES UP BY INSTALLING SHOOTS
DE2311689B1 (en) * 1973-03-09 1974-04-18 Maschinenfabrik Otto Kaiser Kg, 6670 St. Ingbert Tower crane that can be raised

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1245559B (en) * 1960-06-28 1967-07-27 Otto Kaiser K G Maschf Height-adjustable tower crane, especially high-rise crane
DE1198981B (en) * 1964-03-06 1965-08-19 Bbc Brown Boveri & Cie Assembly device for tube antenna elements and mast structures
DE1202447B (en) * 1964-05-30 1965-10-07 Otto Kaiser K G Maschf Assembly device for tower cranes
FR1476734A (en) * 1966-02-24 1967-04-14 Richier Sa Cranes or other lifting devices with tower or extendable pylon
DE2235613A1 (en) * 1972-07-20 1974-01-31 Ts K Bjuro Strojmasch DEVICE FOR EXTENDING TOWER CRANES UP BY INSTALLING SHOOTS
DE2311689B1 (en) * 1973-03-09 1974-04-18 Maschinenfabrik Otto Kaiser Kg, 6670 St. Ingbert Tower crane that can be raised

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4856662A (en) * 1987-12-09 1989-08-15 Cbi Research Corporation Pedestal crane and method of assembling and erecting it
WO2001025548A1 (en) * 1999-10-01 2001-04-12 Mantsinen Oy Crane structure and a method for transforming a crane body
CN101858146A (en) * 2010-04-08 2010-10-13 上海汽车改装厂有限公司 Self-climbing lifting mechanism and using method thereof
WO2014140723A1 (en) * 2013-03-12 2014-09-18 Konecranes Plc Self erecting jacking tower
US9032689B2 (en) 2013-03-12 2015-05-19 Konecranes Plc Jacking tower
CN105263849A (en) * 2013-03-12 2016-01-20 科尼起重机有限公司 Self erecting jacking tower
CN105263849B (en) * 2013-03-12 2018-06-15 科尼全球公司 Tower is jacked from setting up
US9388599B2 (en) 2014-02-27 2016-07-12 Parsons Corporation Wind tower erection system
US10392827B2 (en) 2014-02-27 2019-08-27 Parsons Corporation Wind tower erection system
US10273122B2 (en) 2014-03-11 2019-04-30 Liebherr-Werk Biberach Gmbh Climbing device for a tower crane
CN103979433A (en) * 2014-05-26 2014-08-13 上海市机械施工集团有限公司 Method for climbing of tower crane in construction process
CN103979433B (en) * 2014-05-26 2016-10-05 上海市机械施工集团有限公司 The method that tower crane climbs in work progress

Similar Documents

Publication Publication Date Title
DE2323881C2 (en) framework
DE102018117727A1 (en) LIFT DRIVE FOR A RAILWAY CLIMBING SYSTEM
DE2642766C2 (en) Device for pulling shoring walls, panels, sheet piles or similar shoring elements for trench shoring
EP2052118B1 (en) Climbing formwork for concreting a wall of a structure
DE8005117U1 (en) Support structure for transferring a crane from a tower to a place adjacent to it
DE3337911A1 (en) Climbing device for tower cranes
EP1068144A1 (en) Ring lifting crane
DE2846819C2 (en)
DE69400159T2 (en) Scaffolding floor and assembly process for scaffolding with this floor
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
DE69810981T2 (en) Technique for erecting the mast for a telescopic crane
DE2324843C2 (en) Device for assembling multi-part masts
AT397404B (en) DEVICE FOR BUILDING CONSTRUCTION WALLS
EP0456072A1 (en) Device for parking motor vehicles on platforms
DE1925578A1 (en) Tower crane
DE2305425A1 (en) DEVICE FOR ERECTING CRANE MASTES
DE1756481A1 (en) Method for topping up a mobile tower crane
DE1972477U (en) PALLET TRUCK.
DE102014110824A1 (en) A tower-like amusement device and method for constructing an amusement device
DE1227632B (en) Chimney with a framework and the method for its assembly
DE2253201C3 (en) Device for stocking up a tower of a tower crane or the like consisting of several elements. Crane
DE2044410A1 (en) Lifting device
DE7817700U1 (en) SELF-CLIMBING TOWER CRANE
DE302781C (en)
DE970333C (en) Slewing crane with nacelle and fixed boom

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8110 Request for examination paragraph 44
8127 New person/name/address of the applicant

Owner name: ALB-WERK MASCHINEN-GESELLSCHAFT MBH & CO, 7505 ETT

8139 Disposal/non-payment of the annual fee