DE3331271A1 - Mining of minerals - Google Patents

Mining of minerals

Info

Publication number
DE3331271A1
DE3331271A1 DE19833331271 DE3331271A DE3331271A1 DE 3331271 A1 DE3331271 A1 DE 3331271A1 DE 19833331271 DE19833331271 DE 19833331271 DE 3331271 A DE3331271 A DE 3331271A DE 3331271 A1 DE3331271 A1 DE 3331271A1
Authority
DE
Germany
Prior art keywords
belt conveyor
mineral
field
mining
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19833331271
Other languages
German (de)
Inventor
Michael James Ayling Worcester Butcher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dowty Meco Ltd
Original Assignee
Dowty Meco Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dowty Meco Ltd filed Critical Dowty Meco Ltd
Priority to DE19833331271 priority Critical patent/DE3331271A1/en
Publication of DE3331271A1 publication Critical patent/DE3331271A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/20Methods of underground mining; Layouts therefor for rock salt or potash salt

Abstract

A method for mining a mineral such as potassium from a mining field 2 of potassium-containing material is described, according to which pieces of the field are mined one after the other by repeated passage of a mining machine from one end of the field to the other. The mined material is removed by a displaceable belt conveyor which extends from one end of the field to the other and on which the material is supplied to a suitable point, at which the mineral is separated from the residual material. The material which does not contain mineral, expediently the residual material remaining after separation from the mineral, passes to another displaceable belt conveyor which extends from one end of the space formed by the removed pieces to the other. This material then serves for filling, from one end to the other, the furthest removed space, from which a piece is mined, in order to support the hanging section remaining after removal of the pieces. <IMAGE>

Description

BESCHREIBUNG:DESCRIPTION:

Die Erfindung betrifft Verfahren und eine Einrichtung zum Untertageabbau eines Minerals wie Kalium (Pottasche). Gewinnt eine Maschine, beispielsweise eine Abbaumaschine, Material vom Untertagevorkommen, das unter anderem das Mineral enthält. Das gewonnene mineralhaltige Material wird dann zutage gefördert, wobei mindestens ein Teil des Untertageweges auf Muldenkippern erfolgt. Übertage wird das gewonnene Material einer Bearbeitung unterworfen, um das Abbaugut vom restlichen Material zu trennen. Dieses wird übertage gelagert,9t es ist nicht nur unansehnlich, sondern erzeugt auch Probleme der Umweltverschmutzung.The invention relates to a method and a device for underground mining of a mineral such as potassium (potash). If a machine wins, for example a Extraction machine, material from underground deposits, which among other things contains the mineral. The extracted mineral-containing material is then brought to light, with at least part of the underground route is carried out on dump trucks. What is gained is above ground Material subjected to processing in order to remove the degraded material from the remaining material to separate. This is stored above ground, 9t it is not only unsightly, but also creates pollution problems.

Das gesamte Volumen des. zu gewinnenden Materials wird meist als abbaufest bezeichnet. Die Fläche des Abbaufeldes ist ziemlich groß und kann in der Größenordnung von 2000 mal 3000 m liegen.The entire volume of the material to be extracted is usually considered to be resistant to degradation designated. The area of the mining field is quite large and can be of the order of magnitude of 2000 by 3000 m.

Das Gewinnen von Material aus dem Abbaufeld regt das Hangende eines Strebs bloß. Aufgrund der Beschaffenheit der geologischen Bedingungen und Zustände im Streb ist das Hangende bis zu einer gewissen Breite selbsttragend, jedoch beim Abbau von weiterem Material vom Abbaufeld beginnt das Hangende einzustürzen,. wobei das Material über dem Hangenden in den Raum fällt, durch das gewonnene Material entstanden ist.The recovery of material from the mining field stimulates the hanging wall of a Just strive. Due to the nature of the geological conditions and states in the longwall the hanging wall is self-supporting up to a certain width, but in the Removal of more material from the field, the hanging wall begins to collapse. whereby the material above the hanging wall falls into the room through the recovered material originated.

Ein Einsturz des Hangenden ist nicht nur für die Personen gefährlich, die im Streb arbeiten, sondern führt auch zum Absinken des Grundes über dem Streb.A collapse of the hanging wall is not only dangerous for people, who work in the longwall, but also leads to the subsidence of the ground above the longwall.

Um einen Einsturz des Hangenden beim Fördern von einem Abbaufeld zu verhindern, wurde es erforderlich, im Streb nicht geförderte Materialmengen in Abständen voneinander zu belassen, die durch die Breite bestimmt werden, auf welcher das Hangende selbsttragend ist, wobei die Mengen Abbau- oder Streckenpfeiler bilden, welche das Hangende tragen. Nach diesen Gewinnungsverfahren werden meist parallele aufsteigende Stollen vom Feld abgebaut, die on einem zum nächsten voneinander abstehen und in Zwischenräumen durch Querstollen miteinander verbunden sind-, um die Streckenpfeiler zu schaffen, welche das Hangende abstützen.To prevent the hanging wall from collapsing when conveying a mining field To prevent it, it became necessary to periodically dispose of unsupported amounts of material in the face from each other, which are determined by the width on which the hanging wall is self-supporting, the Quantities of mining or route pillars form, which support the hanging wall. After this extraction process are mostly parallel ascending tunnels mined from the field, one to the next from one another protrude and are connected to each other in gaps by transverse studs, in order to to create the piers that support the hanging wall.

Als Folge wird nur ein Teil des vorhandenen Abbaugutes in einem Untertagevorkommen vom Streb gewonnen.As a result, only part of the existing mined material is found in an underground deposit won by the longwall.

Somit besteht die Aufgabe der Erfindung darin, ein verbessertes Verfahren sowie eine Einrichtung zum Abbauen von einem Mineral in einem Untertagestreb zu schaffen.Thus the object of the invention is to provide an improved method and a facility for mining a mineral in an underground strut create.

Erfindungsgemäß ist ein Verfahren zum Abbauen in einem Untertagestreb vorgesehen, gekennzeichnet durch: (I) aufeinanderfolgendes Gewinnen von mineralhaltigen Materialstücken von einem Feld aus solchem Material-, indem man eine Abbaumaschine hintereinander von einem Ende des Feldes zu einem anderen Ende fahren läßt, (II) Abtransportieren des gewonnenen mineralhaltigen Materials von diesem Bereich des Feldes zur nachfolgenden Trennung des Minerals vom mineralhaltigen Material, (EII) Anlieferung von nicht-mineralhaltigem Material in den Raumabschnitt, der durch das Gewinnen von mineralhaltigen Stücken geschaffen wurde, (IV) Verfahren einer materialliefernden oder materialfüllenden Vorrichtung hintereinander von einem Ende eines Teils des durch Gewinnen der Stücke von mineralhaltigem Material geschaffenen Raumes zum anderen Ende und fortschreitend während des Verfahrens Ablagern von nicht-mineralhaltigem Material in dem Teil des Raumes, der am weitesten von dem abgebauten oder abzubauenden Stück entfernt ist, um den vom abgebauten oder abzubauenden Stück entferntesten Teil des Raumes aufzufüllen und damit das Hangende über diesem Teil des Raumes abzustützen, ehe die Breite des unabgestützten Hangenden einen kritischen Wert erreicht, über den das unabgestützte Hangende sich nicht mehr selbst trägt.According to the invention is a method for mining in an underground strut provided, characterized by: (I) sequential recovery of mineral-containing Pieces of material from a field of such material- by making a mining machine one after the other from one end of the field to another end, (II) Transporting away the extracted mineral-containing material from this area of the Field for the subsequent separation of the mineral from the mineral-containing material, (EII) Delivery of non-mineral-containing material to the section of space that is caused by the Extraction of mineral-bearing pieces was created, (IV) method of a material-supplying or material-filling device one after the other from one end part of that created by recovering the pieces of mineral-bearing material Space to the other end and progressively during the process deposition of non-mineral Material in the part of the room furthest from the one being mined or to be mined Distance is to be the furthest from the dismantled or dismantled part To fill in part of the room and thus support the hanging wall above this part of the room, before the width of the unsupported hanging wall reaches a critical value, over which the unsupported hanging wall no longer supports itself.

Setzt man das vorstehende Verfahren ein, so wird praktisch das gesamte. Material des Feldes gewonnen, da keine Notwendigkeit besteht, Abbaupfeiler aus Material zu hinterlassen, welche das Hangende in der Gegend des gewonnenen Feldes abstützen. Anstattdessenwird das Hangende dadurch abgestützt, daß der durch die Abbauarbeiten geschaffene Raum mit nicht-mineralhaltigem Material dicht aufgefüllt wird.Using the above procedure, practically all of it becomes. Extracted material from the field as there is no need to make mining piers of material to leave behind, which support the hanging wall in the area of the field won. Instead, the hanging wall will be supported by the excavation work created space is tightly filled with non-mineral-containing material.

Nach einem bevorzugten Ausführungsbeispiel der Erfindung ist ein Verfahren zum Abbau eine Minerals in einem Untertagestreb - gekennzeichnet durch: (I) Verfahren einer Abbaumaschine von einem Ende zum anderen des Stoßes eines Abbaufeldes aus Material, um ein Materialstück von diesem Feld zu gewinnen worauf anschließend die Abbaumaschine von einem Ende zum anderen des Feldes wiederholt verfahren wird, um hintereinander Materialstücke vom Feld zu gewinnen, (II) Fördern des Materials wenn es durch die Abbaumaschine gewonnen wird zu einem Ende des Stoßes mit einem ersteff Bandförderer, der im wesentlichen parallel zum Stoß läuft, (III) Verrücken deis ersten Bandförderers bei Bedarf zum neu abgebauten Stoß, so daß er das anschließend vom Stoß abzubauende Material entfernen kann, (IV) direktes oder indirektes Transportieren des vom ersten Förderer geförderten Materials an einen zweiten Bandförderer, welcher das abgebaute Material direkt oder indirekt an einen vom Feld entfernten Ort fördert, (V) Trennen des Abbaugutes vom restlichen Material an einen vom Feld entfernten Ort, (VI) direktes oder indirektes Fördern mit einem dritten Bandförderer des Restmaterials in einen Bereich nahe dem Ende eines Stoßes, (VII) direktes oder indirektes Transportieren des vom dritten Bandförderer geförderten Restmaterials zu einem vierten Bandförderer, der im wesentlichen parallel zum ersten Bandförderer läuft und von diesem auf der entfernten Seite des Stoßes getrennt angeordnet ist, (VIII) fortschreitendes Entfernen des unerwünschten Restmaterials vom vierten Bandförderer um von einem Ende zum anderen den Teil des Raumes aufzufüllen, der durch vorangehende Abbauarbeiten auf der Seite des vierten vom Stoß entfernten Bandförderers ge- schaffen wurde, ehe die Breite des unabgestützten Hangenden einen Wert erreicht, über den hinaus es sich nicht mehr selbst trägt, (IX) Verrücken des vierten Bandförderers bei Bedarf zum ersten Bandförderer hin, so daß dieser weiterhin den'durch frühere Abbauarbeiten geschaffenen Raum auffüllen kann.According to a preferred embodiment of the invention is a method for mining a mineral in an underground strut - characterized by: (I) Process a mining machine from one end to the other of the joint of a mining field Material to extract a piece of material from this field whereupon the The mining machine is traversed repeatedly from one end to the other of the field to win pieces of material from the field one after the other, (II) Promote of the material when it is recovered by the mining machine to one end of the shock with a first belt conveyor that runs essentially parallel to the joint, (III) If necessary, move the first belt conveyor to the newly dismantled joint so that it can can remove the material subsequently to be degraded by the impact, (IV) direct or indirectly transporting the material conveyed by the first conveyor to one second belt conveyor, which the excavated material directly or indirectly to a promotes a place remote from the field, (V) separating the excavated material from the remaining material to a location remote from the field, (VI) direct or indirect conveying with a third belt conveyor of the residual material to an area near the end of a pile, (VII) direct or indirect transport of the conveyed by the third belt conveyor Remaining material to a fourth belt conveyor, which is essentially parallel to the first Belt conveyor runs and is separated from it on the far side of the pile (VIII) progressive removal of the unwanted residual material from the fourth Belt conveyor to fill up from one end to the other the part of the space that by previous dismantling work on the side of the fourth belt conveyor removed from the joint ge was created before the width of the unsupported hanging wall reaches a value beyond which it is no longer self-supporting, (IX) dislocating of the fourth belt conveyor if necessary to the first belt conveyor, so that this can continue to fill the space created by earlier dismantling work.

Durch Anwenden des bevorzugten Ausführungsbeispiels der Erfindung wird nicht nur im wesentlichen das gesamte Material des Abbaufeldes gewonnen, sondern auch das unerwünschte Restmaterial, das bisher übertage gelagert wurde, wird zur Abstützung des Hangenden gegen Einsturz verwendet.By applying the preferred embodiment of the invention not only is essentially all of the material in the mining field recovered, but the unwanted residual material that was previously stored above ground is also used Support of the hanging wall against collapse used.

Das gewonnene Material kann von einem Ende des abzubauenden Stoßes entfernt werden, wobei das Restmaterial in einem Bereich nahe dem anderen Ende des abzubauenden Stoßes überführt werden kann.The recovered material can be from one end of the impact to be mined be removed, leaving the residual material in an area near the other end of the to be reduced shock can be transferred.

Das untere oder Rücklauftrum des zweiten Bandförderers kann ein lasttragendes Trum sein, das den dritten Bandförderer bildet.The lower or return run of the second belt conveyor can be a load-bearing one Be strand, which forms the third belt conveyor.

Ein oder mehrere Bunker können an geeigneten Stellen vorgesehen werden, um das Material zu lagern, nachdem es abgebaut wurde, jedoch ehe es nach Abbaugut und Restmaterial getrennt worden ist.One or more bunkers can be provided at suitable locations, to store the material after it has been mined, but before it is after mined and residual material has been separated.

Weiter können auch ein oder mehrere Bunker an geeigneten Stellen angebracht werden, um das unerwünschte Restmaterial zu lagern.One or more bunkers can also be attached at suitable locations to store the unwanted residual material.

Solche Bunker ermöglichen es, daß das abzubauende bzw.Such bunkers make it possible that the to be dismantled or

Restmaterial in dem aufzufüllenden Raum gelagert wird, selbst wenn dies eine Unterbrechung der einen oder anderen Art der Abbauarbeiten bedingen würde.Residual material is stored in the space to be filled, even if this would necessitate an interruption of one or the other type of dismantling work.

Es gibt Gelegenheiten, bei denen es offensichtlich ist, daß eine Menge des abzubauenden Lagers kein Abbaugut enthält. Wurde dieses Restmaterial abgebaut, so kann es zu einem Brechwerk/Größensortierwerk gefördert werden, und nach dem Brechen/Sortieren wird es direkt oder indirekt dem vierten Bandförderer zugeführt.There are times when it is obvious that a lot of the warehouse to be dismantled does not contain any dismantled material. If this residual material was mined, so it can be conveyed to a crusher / sizing mill, and after crushing / sorting it is fed directly or indirectly to the fourth belt conveyor.

Der erste und vierte Bandförderer können durch ein Raupenfahrzeug oder andere geeignete Einrichtungen verrückt werden, das, wenn es sich im wesentlichen parallel zum Stoß bewegt, fortschreitend den Bandförderer von einer Stelle in eine verrückt.The first and fourth belt conveyors can be carried by a crawler vehicle or other appropriate bodies will go mad that if it is essentially moved parallel to the joint, progressing the belt conveyor from one place to another crazy.

Ein Arbeitsgang,z.B. das Auffüllen des Raumes, kann durchgeführt werden, wenn der andere Arbeitsgang zeitweilig unterbrochen wird.One operation, e.g. the filling of the space can be carried out if the other operation is temporarily interrupted.

Der Abstand zwischen dem Stoß des abzubauenden Vorkommens und dem mit Restmaterial aufgefüllten Raum darf nicht größer sein, wie leicht zu erkennen ist, als die Breite des unabgestützten Hangenden des Strebs, welche infolge der Schichtformation ein Einstürzen des Hangenden bewirken würde.The distance between the collision of the deposit being mined and the The space filled with residual material must not be larger, as can easily be seen is, as the width of the unsupported hanging wall of the strut, which is due to the Layer formation would cause the hanging wall to collapse.

Die Erfindung wird nachstehend näher erläutert. Alle in der Beschreibung enthaltenen Merkmale und Maßnahmen können von erfindungswesentlicher Bedeutung sein. Die Zeichnung stellt einen schematischen Plan eines Untertagestrebs im Zustand eines Abbauvorgangs dar.The invention is explained in more detail below. All in the description Features and measures contained therein can be essential to the invention. The drawing represents a schematic plan of an underground crab in the state of a The dismantling process.

Zunächst wird im Bereich eines Feldes abgebaut, das einen Teil eines Untertagevorkommens bildet, das abgebaut werden soll, wobei die Anlage folgendes aufweist: Eine erste längs eines Feldes 2 laufende Förderbahn 1, eine zweite längs der anderen Seite des Feldes. 2 laufende Förderbahn 3 sowie eine Hauptförderbahn 4, die zwischen den Enden der beiden Förderbahnen 1 und 3 läuft und sich bis zu einem nicht gezeigten Schacht erstreckt. Die Hangenden der Förderbahnen 1 und 3.werden jeweils durch mehrere Streckenpfeiler 5 aus unabgebautem Material abgestützt. Das Hangende der Förderbahn 4 wird durch Langpfeiler aus Material 6 abgestützt.First of all, a field that is part of a Forms underground deposit that is to be mined, the system the following comprises: a first conveyor track 1 running along a field 2, a second longitudinally the other side of the field. 2 running conveyor track 3 and a main conveyor track 4, which runs between the ends of the two conveyor tracks 1 and 3 and extends up to extends a shaft, not shown. The hanging walls of conveyor tracks 1 and 3 will be each supported by a plurality of piers 5 made of undecorated material. That The hanging wall of the conveyor track 4 is supported by long pillars made of material 6.

Der Zweck der Förderbahnen 1 und 3 besteht darin, Rangierraum für eine Abbaumaschine 7 an einem Ende des Abbaufeldes 2 zu schaffen, damit ein Materialstück von einem Ende des Feldes 2 bis zum anderen Ende abgebaut werden kann.- Außerdem bietet die Förderbahn 1 Platz für eine erste zwischengeschaltete Bandförderanlage 8, und die Förderbahn 3 bietet Platz für eine zweite zwischen geschaltete Bandförderanlage 9.The purpose of the conveyor tracks 1 and 3 is to provide shunting space for to create a mining machine 7 at one end of the mining field 2, so that a piece of material can be mined from one end of field 2 to the other end the conveyor track offers 1 space for a first intermediate belt conveyor system 8, and the conveyor track 3 offers space for a second belt conveyor system connected between them 9.

Diese beiden zwischengeschalteten Bandförderanlagen werden periodisch auf ihren Förderbahnen phasengleich mit dem Stoß verlängert, wenn aufeinanderfolgende Materialstücke vom Feld 2 durch die Abbaumaschine 7 gewonnen werden.These two intermediate belt conveyor systems are periodic extended on their conveyor tracks in phase with the shock if consecutive Pieces of material from field 2 can be obtained by the mining machine 7.

Die Hauptförderbahn 4 weist genügend Platz für einen zweiten Bandförder 10 und einen dritten Bandförderer 11 auf.The main conveyor track 4 has enough space for a second belt conveyor 10 and a third belt conveyor 11.

Bei diesem Ausführungsbeispiel ist das unterste Trum (in der Zeichnung nicht zu-sehen) des zweiten Bandförderers 10 als lastenförderndes Trum ausgelegt und bildet den dritten Bandförderer 11. Bei anderen Ausführungsbeispielen kann dies ein eigener Bandförderer sein.In this embodiment, the lowest run (in the drawing not visible) of the second belt conveyor 10 designed as a load-conveying strand and forms the third belt conveyor 11. In other exemplary embodiments, this can be your own belt conveyor.

Ein die beiden Förderbahnen 1 und 3 verbindender Querstollen wird geschlagen, um genügend Platz für einen ersten und vierten Bandförderer 12, 13 zu schaffen, die parallel zum Stoß des abzubauenden Feldes gelegt werden.A cross tunnel connecting the two conveyor tracks 1 and 3 is beaten to enough space for a first and fourth belt conveyor 12, 13 too create, which are placed parallel to the joint of the field to be mined.

Der Querstollen ist zur Hauptförderbahn 4 um den Abstand eines Förderbahnstreckenpfeilers 14 angeordnet.The transverse tunnel is to the main conveyor track 4 by the distance of a conveyor track pillar 14 arranged.

Der erste Bandförderer 12 ist nahe am und im wesentlichen parallel zu dem Stoß, so daß das von.der Abbaumaschine 7 gewonnene Material auf den ersten Bandförderer abgeladen werden kann. Der vierte Bandförderer 13 rist an der Seite des ersten Bandförderers 12 angeordnet, die vom Stoß entfernt liegt, wobei er in einem Abstand und im wesentlil chen parallel zum ersten Bandförderer 12 liegt.The first belt conveyor 12 is close to and substantially parallel to the shock, so that the material obtained by the mining machine 7 on the first Belt conveyor can be unloaded. The fourth belt conveyor 13 rests on the side of the first belt conveyor 12, which is located away from the joint, being in a distance and in wesentlil chen parallel to the first belt conveyor 12 is located.

Im Betrieb fährt die Abbaumaschine 7 fortschreitend von einer Förderbahn zur anderen - in dem in der Zeichnung gezeigten Stadium hat sie eine bestimmte Fläche des Feldes abgebaut und fährt von der zweiten Förderbahn 3 zur ersten Förderbahn 1. Beim Verfahren baut sie fortschreitend ein Stück Material vom Stoß des Feldes 2 ab, ebenso.In operation, the mining machine 7 moves progressively off a conveyor track on the other - at the stage shown in the drawing, it has a certain area of the field and moves from the second conveyor track 3 to the first conveyor track 1. As it moves, it progressively builds a piece of material from the field's impact 2 off, likewise.

wie sie früher Stücke vom Feld gewonnen hatte. Das abgebaute Material wird, wie vorher beim Gewinnen von Stücken vom Feld, auf den ersten Bandförderer 12 abgeladen, der es zur ersten Förderbahn 1 transportiert. Dort wird es auf den ersten zwischengeschalteten Bandförderer 8 abgeladen, der das Material zum oberen Trum des zweiten Bandförderers 10 befördert und dort ablädt. Der zweite Bandförderer 10 transportiert dann Material zum Schacht und wird dann vom Streb entfernt.how she used to win pieces from the field. The mined material is, as before when extracting pieces from the field, onto the first belt conveyor 12 unloaded, which transports it to the first conveyor track 1. There it will be on the first intermediate belt conveyor 8 unloaded, which the material to the upper Conveyed strand of the second belt conveyor 10 and unloads there. The second belt conveyor 10 then transports material to the shaft and is then removed from the longwall.

Wenn das so abgebaute und beförderte-Material übertage angelangt ist, wird es einer entsprechenden Behandlung unterworfen (im Falle von Kalium einem chemischen Prozeß) um das Abbaugut vom Restmaterial zu trennen.When the material that has been mined and transported has reached the surface, it is subjected to an appropriate treatment (in the case of potassium, a chemical Process) to separate the degraded material from the residual material.

Beim Fortschreiten der Abbauarbeiten gelangt das Restmaterial von seinem Platz übertag den Schacht hinunter und wird durch das untere Trum des zweiten Bandförderers 10, das den dritten Bandförderer 11 bildet, zur zweiten Förderbahn 3 transportiert. Von dort gelangt es zum zweiten zwischengeschalteten Bandförderer 9,der es zum vierten Bandförderer 13 befördert und dort auf diesen ablädt.As the mining work progresses, the residual material comes off Its place is down the shaft and is through the lower run of the second Belt conveyor 10, which forms the third belt conveyor 11, to the second conveyor track 3 transported. From there it goes to the second intermediate belt conveyor 9, which conveys it to the fourth belt conveyor 13 and unloads it there onto it.

Das Restmaterial am vierten Bandförderer 13 wird fortschreitend entladen, z.B. durch eine Auswurfmaschine 15, die mit dem vierten -Bandförderer verbunden ist, und in den Raum an der Seite des vierten Bandförderers 13 geworfen, der vom ersten Bandförderer 12 entfernt ist, um diesen Raum von einem Ende bis zum anderen aufzufüllen.The remaining material on the fourth belt conveyor 13 is progressively unloaded, e.g. by an ejection machine 15 connected to the fourth belt conveyor is, and thrown into the space on the side of the fourth belt conveyor 13, which is from first belt conveyor 12 is removed to move this space from one end to the other to fill up.

Das den Raum füliende Restmaterial 16 ist genügend kompakt, um däs Hangende abzustützen.The remaining material 16 filling the space is sufficiently compact to allow the Support hanging walls.

Das fortschreitende Auffüllen des Raums mit unerwünschten .Restmaterial erfolgt vorzugsweise mit einer Geschwindigkeit, die gleich der oder größer ist als die Gewinnungsgeschwindigkeit des Materials der Abbaumaschine, wobei die Breite des aufgefüllten Raumes vorzugsweise im wesentlichen gleich ist der Breite des abgebauten Materials.The progressive filling of the space with unwanted residual material is preferably carried out at a speed equal to or greater than the rate of extraction of the material by the mining machine, the width of the filled space is preferably substantially equal to the width of the mined Materials.

Alles.eingedrungene Material, das fast gänzlich aus Restmaterial des Feldes besteht und das von der Abbaumaschine 7 gewonnen wurde, kann nach Belieben vom ersten zwischengeschalteten Bandförderer 8 auf ein Brechwerk/Sortierwerk 17 anstatt auf den zweiten Bandförderer 10 abgeladen werden. Das gebrochene und größensortierte Material gelangt dann auf den vierten Bandförderer 13 und dient zum Auffüllen des Raumes.Everything that has penetrated, which is almost entirely made up of residual material of the Field exists and that was won by the mining machine 7, can at will from the first intermediate belt conveyor 8 to a crusher / sorting unit 17 instead of being unloaded onto the second belt conveyor 10. The broken and sized Material then arrives at the fourth belt conveyor 13 and is used to fill up the Space.

Um für Nachschub von Restmaterial im Streb zu sorgen, das beispielsweise verwendet wird, wenn das erste Material- stück vom Feld entfernt wird oder, wenn Unterbrechnungen bei Abbauarbeiten eintreten, kann ein nicht gezeigter Bunker mit Restmaterial etwa nahe dem Schacht vorgesehen werden. Anstelle dieses Bunkers oder zusätzlich zu diesem kann ein anderer Bunker 18 für Restmaterial etwa im Bereich angelegt werden, indem sich die zweite Förderbahn 3 und die Hauptförderbahn 4 treffen.To ensure a replenishment of residual material in the longwall, for example is used when the first material piece away from the field or, if there are interruptions during dismantling work, a not shown Bunkers with residual material are provided approximately near the shaft. Instead of this Bunker or in addition to this can be another bunker 18 for residual material be created in the area by the second conveyor track 3 and the main conveyor track 4 meet.

Das zum Auffüllen verwendete Restmaterial kann vom abgebauten Material oder auch von Restmaterial gewonnen werden, das stich aus Abbauarbeiten ergeben hat, bei denen ein anderes Feld abgebaut wurde, oder selbst aus Restmaterial, das für einige Zeit übertage gelagert wurde.The residual material used for replenishment can be from the excavated material or can also be obtained from residual material resulting from mining work in which another field has been removed, or even from residual material that was stored above ground for some time.

Bei einigen Ausführungsbeispielen kann der Raum zwischen dem ersten Bandförderer 12 und dem vierten Bandförderer 13 eine Trennwand aufweisen, welche die Atmosphäre in einem Teil des Raums gegen die Atmosphäre im anderen Teil abdichtet. Diese Barriere kann von einem der-beiden Bandförderer getragen werden. Außerdem kann auch der Raum zwischen dem zweiten Bandförderer 10 und dem dritten Bandförderer 11 eine Trennwand aufweisen, welche die- Atmosphäre in einem Teil dieses Raumes von der aln anderen Teil trennt.In some embodiments, the space between the first Belt conveyor 12 and the fourth belt conveyor 13 have a partition which seals the atmosphere in one part of the room from the atmosphere in the other part. This barrier can be carried by either belt conveyor. aside from that can also be the space between the second belt conveyor 10 and the third belt conveyor 11 have a partition wall, which the atmosphere in a part of this room from the other part.

Das vorerwähnte Abbaufeld 2 kann auch nur einen Teil einer Materialablagerung darstellen. Ist dies der Fall, so kann das vorstehend anhand der Zeichnung beschriebene Verfahren durch Vortreiben einer weiteren Förderbahn wiederholt werden, die parallel zur Förderbahn 3 liegt und vom Schacht weiter entfernt ist als diese wodurch ein zweites Abbaufeld neben dem gerade abgebauten geschaffen werden kann.The aforementioned mining field 2 can also only be part of a material deposit represent. If this is the case, this can be described above with reference to the drawing Procedure can be repeated by driving another conveyor track running in parallel to the conveyor track 3 and is farther away from the shaft than this, whereby a second mining field can be created next to the one that has just been dismantled.

Die Stücke werden dann vom neuen Feld abgebaut, wobei neben der Förderbahn 4 begonnen wird.-Andererseits kann der Abbau der Stücke vom 1neuen Feld auch vom Ende des von der Förderbahn 4 entfernten Feldes begonnen werden. Wird dies durchgeführt, so können die zwischengeschalteten Bandförderanlagen gekürzt oder phasengleich mit dem Feld "zurückgezogen" werden.The pieces are then mined from the new field, being next to the conveyor track 4 is started.-On the other hand, the removal of the pieces from 1new field can also be done from End of the Conveyor track 4 remote field are started. If this is done, the intermediate belt conveyor systems can be shortened or be in phase with the "withdrawn" field.

Wenn andererseits das Feld 2 nur einen Teil einer Materialablagerung bildet, kann das nächste Abbaufeld, d.h. das Feld neben dem Feld 2 unbearbeitet gelassen werden. Das zweite abzubauende Feld ist dann das übernächste Feld, und nach-dem dieses abgebaut wurde, kann das nächste Feld, beginnend'neben der Förderbahn 4,dadurch abgebaut werden, daß mit dem Abbau am Ende des von der Förderbahn 4 entfernten Feldes begonnen wird. Damit lassen sich die Bandförderanlagen in der Förderbahn 3 und in der nächsten Förderbahn am besten ausnutzen, die zu dieser parallel liegt und die eine Seite des nächsten Feldes bildet.On the other hand, if field 2 is only part of a deposit of material the next mining field, i.e. the field next to field 2, can be left unprocessed be left. The second field to be mined is then the next but one, and after this has been dismantled, the next field, beginning next to the conveyor track 4, are dismantled in that with the dismantling at the end of the removed from the conveyor track 4 Field is started. This allows the belt conveyor systems to be in the conveyor track 3 and make best use of it in the next conveyor track, which is parallel to this one and forms one side of the next field.

- Leerseite -- blank page -

Claims (10)

PATENTANSPRÜCHE: 1. Verfahren zum Untertageabbau eines Strebs, gekennzeichnet durch: (I) aufeinanderfolgendes Abbauen von Stücken von mineraihaltigem Material von einem Abbaufeld, indem man die Abbaumaschine hintereinander von einem Ende des Feldes zum anderen fahren läßt, (II) Abtransportieren des abgebauten mineralhaltigen Materials -vom Bereich des Feldes zwecks anschließender Trennung des Minerals vom mineralhaltigen Material, (tII) Befördern des nicht-mineralhaltigen Materials j z.um Bezirk des durch den Abbau der Stücke von mineralhaltigem Material geschaffenen Raumes, (IV) aufeinanderfolgendes Verrücken einer materialförderden Vorrichtung von einem Ende des Teils des durch den Abbau von Stücken aus mineralhaltigem Material geschaffenen Raumes zum anderen Ende und fortschreitendes Abgeben beim Verrücken des nicht mineralhaltigen Materials an diesem Teil des Raumes, der am entferntesten vom abgebauten oder abzubauenden Stuck liegt, um den Teil des Raumes aufzufüllen, der am entferntesten vom abgebauten oder abzubauenden Stück liegt und damit das Hangende über dem Teil des .Raumes abzustützen, ehe die Breite des unabgestützten Hangenden einen solchen Wert erreicht, über den das nicht abgestützte Hangende sich nicht mehr selbst trägt.PATENT CLAIMS: 1. Method for underground mining of a longwall, characterized by: (I) sequentially mining pieces of mineral-bearing material from a mining field by moving the mining machine at a time from one end of the Field to the other, (II) transporting away the mined mineral-containing Materials -from the area of the field for the purpose of subsequent separation of the mineral from mineral-containing material, (tII) conveying the non-mineral-containing material j z. to the district of the created by the mining of the pieces of mineral-containing material Space, (IV) successive displacement of a material-conveying device from one end of the part of the by the mining of pieces of mineral-bearing material created space to the other end and progressive surrender when moving of the non-mineral material in that part of the room that is furthest away from the dismantled or dismantled stucco to fill up that part of the room, which is the furthest from the dismantled or dismantled piece and thus the Support the hanging wall over the part of the .Raumes before the width of the unsupported The hanging wall reaches a value above which the unsupported hanging wall extends no longer carries itself. 2. Abbauverfahren nach Anspruch 1, gekennzeichnet durch: (I) Entfernen des mineralhaltigen Materials nach dem Abbau durch eine endlose Bandförderanlage, die sich vom einen Ende zum anderen des Abbaufeldes parallel zu im abgebauten Stück erstreckt, (II) Verrücken des Förderbandes nach dem Abbau eines Stücks zum Rest des Abbaufeldes hin.2. Degradation method according to claim 1, characterized by: (I) removing the mineral-containing material after mining through an endless belt conveyor system, which extends from one end to the other of the mining field parallel to in the excavated piece extends, (ii) moving the conveyor belt after dismantling a piece to the rest of the mining field. 3. Abbauverfahren nach Anspruch 2, gekennzeichnet durch: (I) Transportieren des Materials von einem endlosen Förderband über eine Bandförderanlage, die längs einer Endfläche des Abbaufeldes folgt, zu einer Hauptförderbahn mit endloser Bandförderanlage, die sich in abgekehrter Richtung vom Bereich des Abbaufeldes bis zu einer von diesem Feld entfernten Stelle erstreckt, (II) periodisches Verlängern der Bandförderanlage beim Entfernen von Stücken vom Abbaufeld.3. Dismantling method according to claim 2, characterized by: (I) transporting of the material from an endless conveyor belt via a belt conveyor that runs lengthways follows an end face of the mining field to a main conveyor track with an endless belt conveyor system, which extends in the opposite direction from the area of the mining field to one of this Field remote location, (II) periodic lengthening of the belt conveyor system when removing pieces from the mining field. 4. Abbauverfahren nach Anspruch 3,gekennzeichnet durch: (I) Wegtransportieren des gewonnenen mineralhaltigen Materials vom Bereich des Abbaufeldes mit Hilfe des oberen Trums der endlosen Bandförderanlage der Hauptförderbahn, (II) Transportieren des nicht-mineralhaltigen Materials zum Bereich des Raumes-, der durch den Abbau von Stücken mineralhaltigen Materials gewonnen wurde, über das untere Trum der endlosen Bandförderanlage der Hauptförderbahn.4. Dismantling method according to claim 3, characterized by: (I) transporting away of the extracted mineral-containing material from the area of the mining field with the help of the upper run of the endless belt conveyor system of the main conveyor track, (II) transporting of the non-mineral material to the area of the space created by the mining from pieces of mineral-bearing material obtained over the lower run of the endless Main conveyor belt conveyor system. 5. Abbauverfahren nach Anspruch 2, gekennzeichnet durch: (I) Versorgen der Materialverteileinrichtung mit nicht-mineralhaltigem Material über eine endlose Bandförderanlage, die sich parallel zu dem mit nicht-mineralhaltigem Material aufzufüllenden Raum von einem Ende zum anderen Ende des Raumes erstreckt, (II) schrittweises Verrücken der Materialverteilungseinrichtung vqn einem zum anderen Ende der endlosen Bandförderanlage, (III) nach Verrücken der Materialverteilungsanlage von einem Ende zum anderen Entfernen der endlosen Bandförderanlage von diesem Teil des Raumes in weichem das nicht-mineralhaltige Material abgeladen wurde, damit weiteres nicht-mineralhaltiges Material in dem Raum abgeladen werden kann, der dann am weitesten von dem Stück entfernt ist, das abgebaut wird oder abgebaut werden soll.5. degradation method according to claim 2, characterized by: (I) supply the material distribution device with non-mineral-containing material over an endless Belt conveyor that runs parallel to the one to be filled with non-mineral material Extending space from one end to the other end of the space, (II) moving it gradually the material distribution device from one end to the other of the endless belt conveyor system, (III) Remove after moving the material distribution system from one end to the other the endless belt conveyor from that part of the room in soft the non-mineral Material was dumped so that more non-mineral material was in the room can be dumped, which is then furthest from the piece that is being mined is or is to be dismantled. 6. Abbauverfahren nach Anspruch 1, gekennzeichnet durch Trennen mit einer Trennwand der Atmosphäre im Bereich des Abbaufeldes von der Atmosphäre im Bereich des aufzufüllenden Raumes.6. degradation method according to claim 1, characterized by separating with a partition wall between the atmosphere in the area of the mining field and the atmosphere in the Area of the space to be filled. 7. Abbauverfahren nach Anspruch 1, gekennzeichnet durch .Brechen und Größensortieren des Materials, das von hauptsächlich nicht-mineralhaltigen Materialeindringlingen in einem Feld im- Bereich des Raumes gewonnen wurde, der durch den Abbau des Materials vom Felde entstanden ist und, durch TranspOrtieren .dieses Materials zur Materialverteilungsanlage.7. degradation method according to claim 1, characterized by .break and Re-sizing the material used by mainly non-mineral material invaders in a field in the area of the room, which was obtained by the breakdown of the material originated from the field and, by transporting this material to the material distribution system. 8. Abbauverfahren für ein Mineral in einem Untertageschacht, gekennzeichnet durch: (I) Verrücken einer Abbaumaschine nacheinander von einem Ende zum anderen Ende eines Abbaufeldes von mineralhaltigem Material, um nacheinander Stücke des Materials vom Feld abzubauen, (II) Befördern des Materials, wenn es von der Maschine abgebaut wird, zu einem Ende des Feldes über einen ersten endlosen Bandförderer, der sich im wesentlichen parallel zu dem abgebauten Stück von einem Ende des Feldes zum anderen erstreckt, (III) Verrücken des ersten Bandförderers zum Feld hin, nach dem das Stück vom Felde abgebaut wurde, so daß er Material vom Feld abtransportieren kann, nachdem das Stück abgebaut wurde, (IV) direktes oder indirektes Übertragen des von der ersten Bandfördereinrichtung beförderten-Materials durch einen zweiten Bandförderer, der das abgebaute Material direkt oder indirekt an eine vom Felde entfernte Stelle transportiert, (V) Trennen an einer vom Abbaufeld entfernten Stelle des Minerals vom mineralhaltigen Mater-ial, (VI) Befördern des Ausschußmaterials, das mindestens.8. Mining method for a mineral in an underground shaft, marked by: (I) moving a mining machine from one end to the other, one at a time End of a mining field of mineral-bearing material in order to successively cut pieces of the Mining material from the field, (II) Moving the material when it is off the machine is dismantled, to one end of the field via a first endless belt conveyor, which is substantially parallel to the mined piece from one end of the field to the other, (III) moving the first belt conveyor towards the field, after which the piece of the field was mined, so that he can transport material away from the field can, after the piece has been dismantled, (IV) transmit directly or indirectly the material conveyed by the first belt conveyor through a second Belt conveyor that sends the excavated material directly or indirectly to one of the fields transported remote location, (V) separation at a location remote from the mining field the mineral from the mineral-containing mater-ial, (VI) conveying the reject material, at least that. einiges Material enthält, von dem das Mineral getrennt wurde, direkt oder indirekt über einen dritten Bandförderer zum Bereich nahe des Abbaufeldes, (VII) direktes oder indirektes Transportieren des Ausschußmaterials am dritten Bandförderer zu einer Materialverteilungsanlage, (VIII) Einsetzen der Materialverteilungsanlage zum Auffüllen dieses Teils des Raumes von einem zum anderen, der durch vorhergehende Abbauarbeiten entstanden ist und der am weitesten vom ersten endlosen Bandförderer entfernt ist, ehe die Breite des bloßgelegten Hangenden über dem unaufgefüllten Raum größer ist als die Breite über die hinaus das unabgestützte Hangende sich nicht mehr selbst trägt. contains some material from which the mineral has been separated, directly or indirectly via a third belt conveyor to the area near the mining field, (VII) direct or indirect transport of the reject material on the third belt conveyor to a material distribution system, (VIII) Insertion of the material distribution system to fill this part of the space from one to the other, the one through the previous one Dismantling work has arisen and the furthest from the first endless belt conveyor removed before the width of the exposed hanging wall above the unfilled one Room is larger than the width beyond which the unsupported hanging wall is not more even carries. 9. Abbauverfahren nach Anspruch 6, gekennzeichnet durch: (I) Befördern des Ausschußmaterials zur Materialverteilungsanlage über einen vierten endlosen Bandförderer, der im wesentlichen parallel zum ersten endlosen Bandförderer läuft und sich neben diesem von dessen einem Ende zum anderen erstreckt, wobei der Teil des Raumes, der am entferntesten von der ersten endlosen Bandförderanlage liegt, aufgefüllt wird, (II) schrittweises Verrücken der Materialverteilungsanlage von einem Ende des vierten Bandförderers zum anderen, um von einem Ende zum anderen diesen Teil des Raumes aufzufüllen, (III) Verrücken des vierten Bandförderers zum ersten Bandförderer hin, nachdem die Materialvertei-.lungsanlage von einem Ende zum anderen des vierten Bandförderers bewegt wurde, so daß die Materialverteilungsanlage schrittweise von einem Ende zum anderen den Teil des Raumes auffüllen kann, der dann am weitesten vom ersten Bandförderer entfernt ist.9. mining method according to claim 6, characterized by: (I) conveying of the reject material to the material distribution system via a fourth endless Belt conveyor that runs essentially parallel to the first endless belt conveyor and extending adjacent to it from one end to the other, the part the room that is furthest away from the first endless belt conveyor system, is replenished, (II) gradually moving the material distribution system from one end of the fourth belt conveyor to the other, to move from one end to the other to fill this part of the space, (III) moving the fourth belt conveyor to the first belt conveyor after the material distribution system from one end to the other of the fourth belt conveyor was moved, so that the material distribution system gradually from one End to fill up the part of the room which is then furthest away from the first belt conveyor. 10. Einrichtung, dadurch gekennzeichnet, daß sie (7,8,9, 10,11,12,13,17) ein Verfahren nach einem der vorhergehenden Ansprüche ausführt.10. Device, characterized in that it (7,8,9, 10,11,12,13,17) carries out a method according to any one of the preceding claims.
DE19833331271 1983-08-30 1983-08-30 Mining of minerals Withdrawn DE3331271A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19833331271 DE3331271A1 (en) 1983-08-30 1983-08-30 Mining of minerals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19833331271 DE3331271A1 (en) 1983-08-30 1983-08-30 Mining of minerals

Publications (1)

Publication Number Publication Date
DE3331271A1 true DE3331271A1 (en) 1985-03-14

Family

ID=6207817

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19833331271 Withdrawn DE3331271A1 (en) 1983-08-30 1983-08-30 Mining of minerals

Country Status (1)

Country Link
DE (1) DE3331271A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA014130B1 (en) * 2008-11-19 2010-10-29 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of seam selective mining
CN102305069A (en) * 2011-05-17 2012-01-04 山东新煤机械有限公司 Technology and equipment for separating coal and gangue and refilling gangue
CN101922292B (en) * 2010-02-04 2012-11-07 成云海 Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN103114853A (en) * 2013-02-08 2013-05-22 山东新煤机械装备股份有限公司 Method for backfilling separately-recovered and sub-transported gangues of underground dirt band coal layer and complete equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA014130B1 (en) * 2008-11-19 2010-10-29 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of seam selective mining
CN101922292B (en) * 2010-02-04 2012-11-07 成云海 Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN102305069A (en) * 2011-05-17 2012-01-04 山东新煤机械有限公司 Technology and equipment for separating coal and gangue and refilling gangue
CN103114853A (en) * 2013-02-08 2013-05-22 山东新煤机械装备股份有限公司 Method for backfilling separately-recovered and sub-transported gangues of underground dirt band coal layer and complete equipment

Similar Documents

Publication Publication Date Title
DE3246544C2 (en)
EP0169435A2 (en) Jig
DE3331271A1 (en) Mining of minerals
DE2531143A1 (en) MINING DRILLING MACHINE
EP0972725A1 (en) Silo installation
DE2547712C2 (en) Process for the extraction of coal in longwall mining
DE736399C (en) Arrangement of an extraction and loading device and a face conveyor under the protection of moving steel construction frames
EP0250606A1 (en) Method and apparatus for the posterior mounting of construction elements on an extended floor in the soil at drift mining operations
DE3018507C2 (en) Method for withdrawing ore debris from discharge openings and device for carrying out the method
DE4018822C2 (en)
DE3115247C2 (en) Upsetting machine
DE938543C (en) Schraembaggergeraet with shield for mining underground natural resources, preferably lignite
DE977589C (en) Method for coal extraction by means of several extraction devices moved along the mining face by a traction device
DE2701886A1 (en) Coal cutting machine for steeply declining seams - has ripping roller guided along coal face and tapered to correspond to incline of seam worked
DE2237976A1 (en) FOERDERER CROSSING STATION
GB2120301A (en) Mining of minerals
DE2657865A1 (en) Ceramic tile feed to packing boxes - has computer holding tiles in buffer stores according to grade
AT200604B (en) Track renewal procedure and device for its implementation
DE968419C (en) Method and device for the removal of dredged material in opencast mines
DE495439C (en) Process for clearing coal sands and for extracting and conveying coal in open-cast mines
DE3621768C1 (en) Equipment for winning and / or conveying various materials
DE3711003C2 (en)
DE3335098A1 (en) Mining method for seam-like deposits
DE722727C (en) Process for mechanical coal extraction and removal of the extracted coal
DE572888C (en) Charging device when driving on routes

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee