DE3314702A1 - Circuit arrangement for an electronic actuating mechanism - Google Patents

Circuit arrangement for an electronic actuating mechanism

Info

Publication number
DE3314702A1
DE3314702A1 DE19833314702 DE3314702A DE3314702A1 DE 3314702 A1 DE3314702 A1 DE 3314702A1 DE 19833314702 DE19833314702 DE 19833314702 DE 3314702 A DE3314702 A DE 3314702A DE 3314702 A1 DE3314702 A1 DE 3314702A1
Authority
DE
Germany
Prior art keywords
control circuits
sub
functions
groups
circuit arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19833314702
Other languages
German (de)
Other versions
DE3314702C2 (en
Inventor
Hans Jörg 7015 Korntal Knapp
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alcatel Lucent Deutschland AG
Original Assignee
Standard Elektrik Lorenz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Standard Elektrik Lorenz AG filed Critical Standard Elektrik Lorenz AG
Priority to DE19833314702 priority Critical patent/DE3314702A1/en
Publication of DE3314702A1 publication Critical patent/DE3314702A1/en
Application granted granted Critical
Publication of DE3314702C2 publication Critical patent/DE3314702C2/de
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • B61L19/06Interlocking devices having electrical operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks

Abstract

A circuit arrangement for an electronic actuating mechanism is disclosed, in which the individual travelway elements are assigned groups (GI...GIV) which contain control circuits which carry out control programs designed in accordance with the functions of the respective travelway elements and have geographic data inputs and data outputs via which they are connected to the control circuits of adjacent groups in accordance with the geographic layout of the track system. The functions of the individual groups are divided up into different sub-functions which are fulfilled by separate sub-control circuits (T1...T12). By combining the same kind of functions of various groups into specific function planes, a three-dimensional structure of the design of the actuating mechanism is produced, in which structure individual or even in each case several sub-control circuits located in a function plane or a group are combined and can be realised by means of a microcomputer (R1...R10). The junctions between the sub-control circuits are realised outside the computers by means of interface elements (SE) and within the computers by means of parameter transfers. <IMAGE>

Description

'ti ■** 'ti ■ **

H.J.Knapp -4H.J. Knapp -4

Schaltungsanordnung für ein elektronisches StellwerkCircuit arrangement for an electronic signal box

Die Erfindung betrifft eine Schaltungsanordnung gemäß dem Oberbegriff des Patentanspruchs .1.The invention relates to a circuit arrangement according to the preamble of claim .1.

Eine solche Schaltungsanordnung ist beispielsweise in der älteren Deutschen Patentanmeldung P 32 32 308.5 beschrieben. Die in herkömmlichen Spurplanstellwerken verwendeten, die einzelnen Stellgruppen miteinander verbindenden sogenannten geographischen Stromkreise sind hier durch entsprechend dem geographischen Aufbau der Gleisanlage verlaufende Datenverbindungen ersetzt. Zentrale Einrichtungen wie eine besondere Bediengruppe zur überwachung der Bedieneinrichtung oder eine zentrale Fahrweg.-Auswahlgruppe können bei einem mit der in der o.g. Patentanmeldung beschriebenen Ei nri chtung ausgestatteten Stellwerk entfallen. Die zur Ausführung von Stellhandlungen notwendigen Bedienelemente sind direkt den einzelnen Stellgruppen zugeordnet.Such a circuit arrangement is, for example, in the older one German patent application P 32 32 308.5. the used in conventional track plan signal boxes, the So-called geographical circuits that connect with each other individual control groups are here by accordingly the geographic structure of the track system replaces data connections. Central facilities like a special operating group for monitoring the operating device or a central route selection group can be used with one of the ones described in the above-mentioned patent application There is no need for an interlocking device equipped with a device. The operating elements necessary to carry out control actions are directly associated with the individual control groups assigned.

Bei einem Stellwerk gibt es einerseits -Gruppen,die·nur relativ einfache Steuerprogramme auszuführen haben, andererseits auch Gruppen mit sehr komplizierten Steuer-In an interlocking there are on the one hand groups that · only have to execute relatively simple control programs, on the other hand also groups with very complicated control

ZT/P1-P/BLZT / P1-P / BL

29.03.1983 -5-03/29/1983 -5-

COPYCOPY

H .J .Knapp -4H .J. Knapp -4

Programmen. Solche Gruppen enthalten, vor allem dann, wenn sie signaltechnisch sicher sein müssen, umfangreiche Steuerschaltungen, die genau auf die wahrzunehmende Funktion zugeschnitten sind und oft schon bei geringfügigen Änderungen des Steuerprogrammes nicht mehr verwendbar sind. Werden frei programmierbare Bauelemente in den Steuerschaltungen eingesetzt, so lassen sich nachträgliche Änderungen der Steuerprogramme leicht vornehmen. Es besteht aber dann die Gefahr, daß bei sehr umfangreichen Steuerprogrammen die für die Stellvorgänge benötigten Schaltzeiten zu lang werden, z.B. dann, wenn eine Fahrstraße mit vielen E lement gruppen eingestellt werden soll und die dabei zur Markierung der Fahrstraße maximal zulässige Zeit nicht mehr als 1 bis 2 Sekunden betragen darf.Programs. Such groups contain, especially if they have to be signal-technically secure, extensive Control circuits that precisely target the perceivable Function are tailored and often at minor Changes to the control program can no longer be used are. If freely programmable components are used in the control circuits, subsequent Make changes to control programs easily. But there is then the risk that with very extensive Control programs required for the actuation processes Switching times become too long, e.g. when a route with many element groups is to be set and the maximum time allowed for marking the route may not be more than 1 to 2 seconds.

Die Erfindung soll solchen mit dem Umfang der Steuerschaltungen zunehmenden Nachteilen entgegenwirken und wird durch die Merkmale des Patentanspruchs 1 beschrieben.The invention is intended to counteract such disadvantages, which increase with the scope of the control circuits, and is carried out by the features of claim 1 described.

Die Schaltungsanordnung nach der Erfindung sieht zusätzlich zur Aufteilung eines Stellwerks nach geographischen Gesichtspunkten eine Aufteilung der einzelnen Gruppen nach Funktionen vor. Damit wird eine dreidimensionale Struktur des Stellwerks geschaffen. Eine Gruppe enthält danach Teilsteuerschaltungen, die einzelnen Tei I funktionen dieser Gruppe zugeordnet sind und sowohl untereinander als auch mit Teilsteuerschaltungen von Nachbargruppen über Date ην erbindungen korrespondieren. Es ergibt sich so die Möglichkeit, mehrere Arbeitsvorgänge in einer Gruppe gleichzeitig ablaufen zu lassen, anstatt sie inThe circuit arrangement according to the invention also provides to divide a signal box according to geographical aspects, a division of the individual groups after functions before. This becomes a three-dimensional Structure of the signal box created. A group then contains sub-control circuits, the individual Tei I functions assigned to this group and among each other as well as with partial control circuits from neighboring groups correspond via date ην connections. There is thus the possibility of several work processes in one Group running at the same time instead of running them in

-6-COPY -6-COPY

H.J.Knapp -4H.J. Knapp -4

einer Steuerschaltung nacheinander zu erledigen. Dies verkürzt z.B. die Einstellzeit von Fahrstraßen ganz ei— heblich. Zusätzlich ermöglicht die dreidimensionale Struktur des Stellwerks, in der sich die verschiedenen Tei I-funktionen zugeordneten Teilsteuerschaltungen der Gruppen in Funktionsebenen anordnen lassen, einen direkten Dialog von in dieser Ebene angeordneten Teilsteuerschaltungen miteinander, so daß eine größere Zahl paralleler geographischer Schnittstellen zwischen einzelnen Gruppen zur Verfugung steht, was insbesondere bei serieller Datenübertragung die Übertragungszeit herabsetzt.a control circuit to do one after the other. this shortens e.g. the setting time of routes considerably. In addition, the three-dimensional structure enables of the signal box, in which the various part I functions assigned partial control circuits of the groups can be arranged in functional levels, a direct dialogue of sub-control circuits arranged in this level with each other, so that a larger number of parallel geographical interfaces between individual groups for It is available, which reduces the transmission time, especially in the case of serial data transmission.

Gemäß Anspruch 2 können für sicherheitskritische Funktionen TeiLsteuerschaItungen verdoppelt und die Ausgaben durch Vergleich überprüft werden.According to claim 2, for safety-critical functions Partial control circuits doubled and the expenses be checked by comparison.

Eine in Anspruch 3 beschriebene Ausgestaltung der Schaltungsanordnung nach der Erfindung sieht Schnittstellenelemente zwischen einzelnen Teilsteuerschaltungen, gemäß Anspruch 4 auch zwischen den Teilsteuerschaltungen innerhalb einer Gruppe vor. Diese·Schnittstel lenelemente wandein die zu übertragenden Daten in serielle Datentelegramme um, welche (z.B. durch einen Datensicherungscode) besser gegen Verfälschungen auf dem übertragungsweg gesichert werden können als parallel übertragene Daten.An embodiment of the circuit arrangement described in claim 3 according to the invention sees interface elements between individual sub-control circuits, according to Claim 4 also between the sub-control circuits within a group. These interface elements wall into one another converts the data to be transmitted into serial data telegrams, which (e.g. by means of a data security code) better secured against corruption on the transmission path can be transmitted as parallel data.

Eine in Anspruch 5 beschriebene Ausgestaltung der Schaltungsanordnung bezieht sich auf die Realisierung der TeiI steuerscha 11ungen durch Mikrorechner.An embodiment of the circuit arrangement described in claim 5 relates to the implementation of the partial control circuits using microcomputers.

COPYCOPY

*. 7 ■.*. 7 ■.

H.J.Knapp -4H.J. Knapp -4

Anspruch 6 schließlich sieht den Ersatz mehrerer Teilsteuer scha I tungen durch einen Rechner oder ein Mehrrechnersystem mit par a I Ie larbeitenden Rechnern vor. Die SchnittsteL lenelemente zwischen Tei Isteuerse ha Itungen werden dabei durch Parameterübergaben zwischen einzelnen Programmblöcken des Rechners ersetzt. Damit ergibt sich die MögIichkeit,die Rechnerkonfigurationen der einzelnen Gruppen und letztlich sogar des gesamten Stellwerks erst nach der Erstellung der Steuerprogramme zu optimieren. Dies stellt einen wichtigen Vorteil bei der Entwicklung elektronischer Spurplanstellwerke dar.Claim 6 finally provides for the replacement of several partial control circuits by a computer or a multi-computer system with parallel working computers. the Interface elements between part control units are replaced by parameter transfers between individual program blocks of the computer. So that results the possibility of changing the computer configurations of the individual Groups and ultimately even the entire interlocking only after the control programs have been created optimize. This is an important advantage in the development of electronic track plan signal boxes.

Anhand einer Figur soll nun ein Ausführungsbeispiel der Rechneranordnung nach der Erfindung beschrieben und seine Funktion erklärt werden.Based on a figure, an embodiment of the Computer arrangement according to the invention described and his Function are explained.

In der Figur ist schematisch die Aufteilung von Stellgruppen GI...GIV in TeiIsteuerscha Itungen T1...T12 und eine mögliche Realisierung dieser TeiIsteuerschaItungen durch Rechner R1...R10 dargestellt. Die Stellgruppen sind den Stellelementen zugeordnet, welche aus dem in·The figure shows the distribution of control groups schematically GI ... GIV in partial control circuits T1 ... T12 and a possible implementation of these partial control circuits represented by computer R1 ... R10. The control groups are assigned to the control elements, which are selected from the

20" Ebene I der Figur dargestellten Gleisbild zu entnehmen sind. Demnach sind die Stellgruppen GI und GIV Signalgruppen, die Stellgruppe GII ist eine Weichengruppe und die Stellgruppe GIII eine Gleisabschnittsgruppe, deren zugeordneter Abschnitt z.B. durch einen Gleisstromkreis auf seinen Besetzungszustand hin überwacht wird. Auch die Weiche soll einen Gleisstromkreis enthalten, der ihren Besetzungszustand überwacht.20 "level I can be seen in the track diagram shown in the figure are. Accordingly, the control groups GI and GIV are signal groups, the control group GII is a turnout group and the control group GIII a track section group, its assigned Section e.g. through a track circuit its occupation status is monitored. The turnout should also contain a track circuit, its Occupation status monitored.

- 8 -COPY - 8 -COPY

I -* I SJ L·.I - * I SJ L ·.

H.J.Knapp - 4H.J. Knapp - 4th

Die Ebenen II bis V sind Funktionsebenen, d.h. die in diesen Ebenen angeordneten TeiLsteuerschaLtungen haben gleiche oder ähnliche Aufgaben. So sind z.B. der Funktionsebene III die Funktionen Fahrwegsuche und Fahrwegstellung zugeordnet. In Funktionsebene IV wird Verschluß und überwachung der Fahrwege'lemente sichergestellt. In. Funktionsebene II erfolgt die zugbewirkte Fahrstraßenauflösung und in Funktionsebene V die Ansteuerung von Lichtsignalen L und Weichenantrieben WA.Levels II to V are functional levels, i.e. those in have partial control circuits arranged at these levels same or similar tasks. For example, the functions for route search and route setting are assigned to function level III. In function level IV there is lock and monitoring of the route elements ensured. In. Function level II is the train-induced route resolution and in function level V the control of Light signals L and point machines WA.

Die einzelnen Teilsteuerschaltungen T1...T12 sind über Schnittstellenelemente SE mit den jeweils benachbarten Teilsteuerschaltungen verbunden. Dies *ann sowohl innerhalb einer Gruppe als auch zwischen den Gruppen innerhalb einer FunktionsebeneThe individual sub-control circuits T1 ... T12 are over Interface elements SE with the respectively neighboring Part control circuits connected. This can be done both within a Group as well as between the groups within a functional level der Fall sein. Im Prinzip kann auch - dieser Fall ist in der Fig. nicht dargestellt - eine Teilsteuerschaltung mit einer anderen Teilsteuerschaltung verbunden sein, die weder derselben Gruppe noch derselben Funktionsebene angehört. Ein Schnittstellenelement besteht entweder aus einem Parallel/Serien-Wandler oder einem Serien/Par a I lel-Wandler. Die seriell zu übertragende. Information kann auch über ein rückgekoppeltes Schieberegister ausgegeben und so mittels eines zyklischen Codes gegen Verfälschung gesichert werden.be the case. In principle it can also - this is not the case in the figure shown - a sub-control circuit can be connected to another sub-control circuit that is neither the same group nor the same Functional level heard. There is an interface element either from a parallel / series converter or a Series / Par a I lel converter. The one to be transmitted serially. Information can also be output via a feedback shift register and thus by means of a cyclic code be secured against falsification.

Werden die einzelnen TeiLsteuerscha ltungen mittels Mikro-' rechnern realisiert, so können diese sowohl parallel alsIf the individual partial control circuits are operated by means of micro ' computers, so they can be used both in parallel and auch über Schnittstellenelemente seriell miteinander verbunden sein. Bei Teilsteuerschaltungen, die nur wenige Steuerschritte ausführen müssen, ist es auch möglich- - wie dies in der Figur bei den Teilsteuerschaltungenalso be connected to one another serially via interface elements. In the case of partial control circuits, only a few Need to carry out control steps, it is also possible- - As shown in the figure for the partial control circuits

COPYCOPY

33H70233H702

_ Q —_ Q -

H.J.Knapp - 4H.J. Knapp - 4th

T3 und T7 oder T8 und T9 der FaLL ist - diese in einem Rechner zusammenzufassen. Den von bisher getrennten Tei L-steuers chaLtungen wahrzunehmenden Ten Lfunkt ionen werden dann getrennte Programm- und Datenblöcke zugeordnet. Die bisher notwendigen SchnittsteL lenelemente werden durch Parameterübergabe simuliert.T3 and T7 or T8 and T9 are the case - these in one Summarize calculator. The previously separated part of the L-tax Changes become perceptible ten functions then assigned separate program and data blocks. The previously necessary interface elements are carried out Parameter transfer simulated.

Befehle zu einzelnen Ste IL hand Lungen werden durch nicht dargestellte BedieneLemente oder über Befeh L seingänge in bestimmte TeiLsteuerscha Itungen eingegeben und lösen dort Datentelegramme aus, die der Spur folgen, d.h. sich entlang der in der Figur waagerecht eingezeichneten Verbindungen fortpflanzen. Der Befehl zur Stellung einer Fahrstraße wird z.B. in der Funktionsebene III in die TeiIsteuerschaltung T1 eingegeben. Ist die Fahrstraße nach Abgabe eines FahrwegsuchdatenteLegrammes über die Tei IsteuerschaLtung T5 und T10 hinaus bis zu einer die Fahrwegsuchfunktion einer nicht dargestellten Zielgruppe wahrnehmenden Tei I st euer scha ltung und dem Empfang eines von dieser Teilsteuerschaltung rückgesandten Datentelegrammes gefunden und markiert, so erfolgt deren Verschluß und überwachung in der Funktionsebene IV. In dieser Ebene werden nicht nur Tei Isteuerschaltungen der SignaL- und Weichengruppen aktiv, sondern auch TeiLsteuerschaLtungen T9 von Gleisgruppen, die keine Ste I Lfunkt ionen sondern Lediglich Überwachungsfunktionen haben. Ist die Fahrstraße gesichert und verschlossen, erfolgt in der Funktionsebene V die Ansteuerung der Lichtsignale und der Weichenantriebe einschließlich Funktionsüberwachung der Signale und Weichenlageüberwachung. Zwischen den Teil-Steuerschaltungen dieser Funktionsebene sind Schnitt-Commands to individual SteIL hand lungs are not given by operating elements shown or via command inputs Entered and solve in certain sub-control circuits data telegrams there that follow the track, i.e. themselves along the connections drawn horizontally in the figure propagate. The command to post a Route is e.g. in function level III in the Partial control circuit T1 entered. Is the route after submission of a route search data telegram via the Partial control circuit T5 and T10 up to one of the Route search function for a target group not shown perceiving part of your circuit and the receipt of a data telegram returned by this part of the control circuit found and marked, they are locked and monitored in functional level IV. In this level are not only part I control circuits of the signal and Switch groups are active, but also partial control circuits T9 of track groups that have no steering functions but Only have monitoring functions. Is the driveway secured and locked, takes place on the functional level V the control of the light signals and the point machines including function monitoring of the Signals and point position monitoring. Between the sub-control circuits of this functional level are sectional

COPV COPV

33U70233U702

H.J.Knapp - 4H.J. Knapp - 4th

stellen nur in Sonderfällen erforderlich. Weitere notwendige tionsebene V die Ansteuerung der Lichtsignale und der Weichenantriebe einschließlich Funktionsüberwachung der Signale und Weichen lageüberwachung. Weitere notwendige .Steuervorgänge laufen in anderen Funktionsebenen ab, die der Übersichtlichkeit wegen in der Figur nicht dargestellt sind.only required in special cases. Other necessary tion level V the control of the light signals and the point machines including function monitoring of the Signals and point position monitoring. Other necessary Control processes take place in other functional levels, the not shown in the figure for reasons of clarity are.

Die in Funktionsebene II angeordneten.Tei IsteuerschaL-tungen werden erst zur Auflösung der eingestellten Fahrstraße aktiv, wenn abhängig von der erfolgten Durchfahrt^ eines Zuges die zuvor eingestellte Fahrstraße aufgelöst werden soll. Hierzu ist der Besetzungszustand der einzelnen Gleisabschnitte zu prüfen, was für den Gleisstromkreis der Gruppe GIII die TeiL steuerschaltung T8 und für den Weichenkreis der Gruppe GII die Teilsteuerschaltung T4 bewerkstelligt.The part I control circuits arranged in function level II are only used to resolve the set route active, if dependent on the completed passage ^ one Train the previously set route is to be canceled. For this purpose, the occupation status of the individual Track sections to check what's going on for the track circuit the group GIII the part control circuit T8 and for the Switch circuit of group GII the sub-control circuit T4 accomplished.

copy'copy '

Claims (6)

33U702 Standard Elektrik Lorenz Aktiengesellschaft Stuttgart H . J .Knapp - 4 Patentansprüche33U702 Standard electrical system Lorenz Aktiengesellschaft Stuttgart H. J .Knapp - 4 claims 1.1 Schaltungsanordnung für ein nach dem Spurplanprinzip 'bei ten des elektronisches Stellwerk mit einzelnen Fahrwegelementen zugeordneten, SteuerschaLtungen enthaltenden Gruppen, welche entsprechend den Funktionen der jeweiligen Fahrwegelemente gestaltete Steuerprogramme durchführen und geographische Dateneingänge und Datenausgänge aufweisen, über die sie entsprechend dem geographischen Aufbau der Gleisanlage mit den jeweils benachbarten Grup1.1 Circuit arrangement for a according to the track plan principle At the end of the electronic interlocking with individual guideway elements, containing control circuits Groups, which according to the functions of the respective Carry out control programs designed for guideway elements and geographical data inputs and data outputs via which they correspond to the geographical Construction of the track system with the respective neighboring group pen verbunden sind, und mit diesen Informationen austau schen, dadurch gekennzeichnet, daß jede Gruppe (GI ... GIV) mehrere Teilsteuerschaltungen (T1 .. T3; T4 ... T7; T8, T9; T10 .. T12) aufweist, die einzelnen, von der Gruppe auszuführenden Teilfunktiopen and exchange information with it rule, characterized in that each group (GI ... GIV) has several sub-control circuits (T1 .. T3; T4 ... T7; T8, T9; T10 .. T12), the individual sub-functions to be carried out by the group nen zugeordnet sind, und die über Datenverbindungen sowohl untereinander als auch mit Teilsteuerschaltungen anderer Gruppen verbunden sind.nen are assigned, and those over data connections both with each other as well as with partial control circuits of others Groups are connected. 2. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß den TeiIfunktionen einer Gruppe, die signaltechnisch sicher ausgeführt werden müssen, zwei oder2. Circuit arrangement according to claim 1, characterized in that the partial functions of a group which must be carried out safely in terms of signaling are two or more mehr para I Ie larbeitende Teilsteuerschaltungen zugeordnetmore para I Ie larbeitende sub-control circuits assigned 21.04.1983 -Apr 21, 1983 - copycopy : --- 33H702 : --- 33H702 H.J.Knapp -4H.J. Knapp -4 sind, deren Verarbeitungsergebnisse vor Ausgabe miteinander verglichen und nur bei Übereinstimmung ausgegeben werden.whose processing results are compared with each other before output and are only output if they match will. 3. Schaltungsanordnung nach Anspruch 1 oder Anspruch 2, dadurch gekennzeichnet, daß den geographischen Ein-3. Circuit arrangement according to claim 1 or claim 2, characterized in that the geographical und Ausgängen der Gruppen SchnittstelLenelemente (SE) zugeordnet sind, die zwischen den Teilsteuerschaltungen der Gruppen auszutauschende Daten in gegen übertragungsfehler gesicherte Datentelegramme umwandeln oder solche Datentelegramme in die ursprünglichen Daten rückwandeln kön nen.and outputs of the groups of interface elements (SE) are assigned between the sub-control circuits of the Groups of data to be exchanged against transmission errors convert secured data telegrams or convert such data telegrams back into the original data nen. 4. Schaltungsanordnung nach Anspruch 3, dadurch gekennzei chnet, daß auch zwischen den Teilsteuerschaltungen innerhalb einer Gruppe Schnittstellenelemente angeordnet4. Circuit arrangement according to claim 3, characterized in that chnet also between the sub-control circuits arranged within a group of interface elements sind.are. 5. Schaltungsanordnung nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, daß die Teilsteuerschaltungen durch Mikrorechner (R1 ... R1Q) oder aus parallelarbeitenden Mikrorechnern bestehende Mehrrechnersysteme rea-5. Circuit arrangement according to one of the preceding claims, characterized in that the sub-control circuits rea- lisiert sind.are lized. 6. Schaltungsanordnung nach Anspruch 5, dadurch gekennzeichnet, daß mehrere Teilfunktionen einer Gruppe oder mehrere gleichartige Teilfunktionen verschiedener Gruppen von einem gemeinsamen,mehrere Tei Isteuerscha I-6. Circuit arrangement according to claim 5, characterized in that several sub-functions of a group or several similar sub-functions of different types Groups of a common, multiple part I tax scha I- tungen ersetzenden Rechner (R3, R7) oder Mehrrechnersystem wahr genommen werden, wobei die den einzelnen Teilfunktionenthe computer (R3, R7) or the multi-computer system that is being used are taken, with the individual sub-functions -3--3- - " "-'"■-■ 33U702- "" - '"■ - ■ 33U702 H.J.Knapp -4H.J. Knapp -4 zugeordneten TeiLsteuerschaLtungen durch Unterprogramme und die SchnittsteLLeneLemente durch Parameterübergaben Simuliertwerden.assigned partial control circuits through subroutines and the interface elements through parameter transfers Be simulated.
DE19833314702 1983-04-22 1983-04-22 Circuit arrangement for an electronic actuating mechanism Granted DE3314702A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19833314702 DE3314702A1 (en) 1983-04-22 1983-04-22 Circuit arrangement for an electronic actuating mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19833314702 DE3314702A1 (en) 1983-04-22 1983-04-22 Circuit arrangement for an electronic actuating mechanism

Publications (2)

Publication Number Publication Date
DE3314702A1 true DE3314702A1 (en) 1984-10-25
DE3314702C2 DE3314702C2 (en) 1992-09-24

Family

ID=6197131

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19833314702 Granted DE3314702A1 (en) 1983-04-22 1983-04-22 Circuit arrangement for an electronic actuating mechanism

Country Status (1)

Country Link
DE (1) DE3314702A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000002760A2 (en) * 1998-07-09 2000-01-20 Siemens Aktiengesellschaft Element connection plan for an electronic signal box

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2434418C2 (en) * 1974-07-17 1979-03-22 Siemens Ag, 1000 Berlin Und 8000 Muenchen Arrangement in an interlocking that works according to the track plan principle
DE2909512B1 (en) * 1979-03-10 1980-07-10 Standard Elek K Lorenz Ag Track interlocking
DE2925169A1 (en) * 1979-06-22 1981-01-15 Standard Elektrik Lorenz Ag COMPUTER CONTROLLED ACTUATOR
DE3007960C2 (en) * 1980-03-01 1982-08-12 Standard Elektrik Lorenz Ag, 7000 Stuttgart Electronic signal box
DE3232308A1 (en) * 1982-08-31 1984-03-15 Standard Elektrik Lorenz Ag, 7000 Stuttgart DEVICE FOR DECENTRALIZING ROUTES IN A TRACK PLANT

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2434418C2 (en) * 1974-07-17 1979-03-22 Siemens Ag, 1000 Berlin Und 8000 Muenchen Arrangement in an interlocking that works according to the track plan principle
DE2909512B1 (en) * 1979-03-10 1980-07-10 Standard Elek K Lorenz Ag Track interlocking
DE2925169A1 (en) * 1979-06-22 1981-01-15 Standard Elektrik Lorenz Ag COMPUTER CONTROLLED ACTUATOR
DE2925169C2 (en) * 1979-06-22 1986-10-23 Standard Elektrik Lorenz Ag, 7000 Stuttgart Computer-controlled signal box
DE3007960C2 (en) * 1980-03-01 1982-08-12 Standard Elektrik Lorenz Ag, 7000 Stuttgart Electronic signal box
DE3232308A1 (en) * 1982-08-31 1984-03-15 Standard Elektrik Lorenz Ag, 7000 Stuttgart DEVICE FOR DECENTRALIZING ROUTES IN A TRACK PLANT
DE3232308C2 (en) * 1982-08-31 1984-10-31 Standard Elektrik Lorenz Ag, 7000 Stuttgart Device for the decentralized selection of routes in a track plan signal box

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
SEL-Nachrichten, 1960, H. 3, S. 101-113, Aufsatz v. Schmitz: Das Spurplan-Drucktasten- stellwerk Lorenz 30 (SpDrL30) *
Silverman, Stundel, Lehman: "The Modular Multiprozessor- A Model for Laboratory Instrument Design " in IEEE MICRO, 1982, S. 51-60 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000002760A2 (en) * 1998-07-09 2000-01-20 Siemens Aktiengesellschaft Element connection plan for an electronic signal box
WO2000002760A3 (en) * 1998-07-09 2000-03-30 Siemens Ag Element connection plan for an electronic signal box

Also Published As

Publication number Publication date
DE3314702C2 (en) 1992-09-24

Similar Documents

Publication Publication Date Title
DE102013215032A1 (en) Device and method for a driver assistance system of a vehicle
DE2350146A1 (en) PROCEDURE AND NETWORK FOR REORGANIZATION OF A COMPUTER STORAGE SYSTEM
WO2016141998A1 (en) Device and method for providing a digital representation of a physical entity
DE112018004163T5 (en) Control device and control method for autonomous driving
EP0207284B1 (en) Process for the synchronization of square pulses
DE3314702A1 (en) Circuit arrangement for an electronic actuating mechanism
DE2940551C2 (en) Operating and display device for computer-controlled railway signal systems
DE2805754C2 (en) Device for checking distances in an image pattern
EP0021250A1 (en) Traffic signal systems
DE102021006166A1 (en) Procedure for data transfer between two digital road maps
EP0623499B1 (en) Method for clear track, signalling by axle counting with automatic correction of count errors
EP3686080A1 (en) Method for securely operating a railway engineering system and network node of a data network
EP1242852B1 (en) Device and method for linking automation components
EP0246556B1 (en) Circuit for monitoring a control unit
DE102018211702A1 (en) Control unit for a driver assistance system of a motor vehicle
DE3839289C1 (en) Circuit for the operation of an integrated circuit of which it is a component, optionally in a test operation mode or a functional operation mode
CH654260A5 (en) Computer-controlled signal box
DE2014729A1 (en) Data processing system with at least one data processing unit
WO2023285107A1 (en) Method for providing an electronic horizon for an autonomous motor vehicle
DE3240342C2 (en) Device for connecting central functional units to a track plan signal box
DE3506237A1 (en) Device for inspecting printed-circuit-board layouts
EP1532555A2 (en) Method and device for an equivalence comparison of digital circuits
DE4406924A1 (en) Method for the synchronized operation of a distributed data processing system consisting of several computers and device for applying the method
EP0012794A1 (en) Method and device for checking the control signals derived from an instruction of an electronic data processing unit
WO1996024517A1 (en) Process for simulating dynamic situations in a railway network

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8363 Opposition against the patent
8366 Restricted maintained after opposition proceedings
8305 Restricted maintenance of patent after opposition
D4 Patent maintained restricted
8327 Change in the person/name/address of the patent owner

Owner name: ALCATEL SEL AKTIENGESELLSCHAFT, 7000 STUTTGART, DE

8339 Ceased/non-payment of the annual fee