Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Areva NP SAS
Commissariat a lEnergie Atomique et aux Energies Alternatives CEA
Original Assignee
Commissariat a lEnergie Atomique CEA
Framatome SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from FR8006695Aexternal-prioritypatent/FR2479536A1/en
Application filed by Commissariat a lEnergie Atomique CEA, Framatome SAfiledCriticalCommissariat a lEnergie Atomique CEA
Application grantedgrantedCritical
Publication of DE3176239D1publicationCriticalpatent/DE3176239D1/en
DE8484102008T1980-03-261981-03-23Guide tubes dismantling and reconstructing method for a fuel assembly of a light water nuclear reactor
ExpiredDE3176239D1
(en)