DE3004646A1 - Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frame - Google Patents
Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frameInfo
- Publication number
- DE3004646A1 DE3004646A1 DE19803004646 DE3004646A DE3004646A1 DE 3004646 A1 DE3004646 A1 DE 3004646A1 DE 19803004646 DE19803004646 DE 19803004646 DE 3004646 A DE3004646 A DE 3004646A DE 3004646 A1 DE3004646 A1 DE 3004646A1
- Authority
- DE
- Germany
- Prior art keywords
- string
- frame
- holes
- strings
- markings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B49/00—Stringed rackets, e.g. for tennis
- A63B49/02—Frames
- A63B49/025—Means on frames for clamping string ends
Abstract
Description
Tennis schläger Tennis racket
Die Erfindung betrifft einen Tennisschläger mit einem einen Rahmenkopf aufweisenden Spannrahmen sowie einer Bespannungsfläche aus sich netzartig kreuzenden, quer und längs zur Schlägermittelachse verlaufenden Saitenstrecken wenigstens einer Saite, die in einer bestimmten Bespannungsfolge mit wechselnder Spannrichtung parallel oder quer zur Schlägermittelachse durch Bohrungen im Spannrahmen geführt ist, und ein Verfahren zu seiner Herstellung.The invention relates to a tennis racket with a frame head exhibiting tensioning frame as well as a covering surface made of mesh-like intersecting, at least one string sections running transversely and longitudinally to the racket center axis String that is parallel in a certain stringing sequence with alternating tensioning direction or is guided transversely to the club center axis through holes in the clamping frame, and a process for its manufacture.
Tennis schläger der vorgenannten Art sind allgemein bekannt, wobei ihre durch den Spannrahmen bestimmte Form von tropfenförmig bis kreisrund variiert.Tennis rackets of the aforementioned type are generally known, wherein their shape, determined by the clamping frame, varies from teardrop-shaped to circular.
Der Spannrahmen läuft in der Regel in einen Schlägers hals aus, an den sich ein Griff anschließt.The clamping frame usually ends in a racket neck which is followed by a handle.
Der Spannrahmen selbst weist einen rechteckigen oder U - bis doppel T-förmigen Querschnitt auf, so daß die den Spannrahmen durchsetzenden Bohrungen ganz oder teilweise im Spannrahmen verschwinden.The clamping frame itself has a rectangular or U - to double T-shaped cross-section, so that the holes penetrating the clamping frame completely or partially disappear in the clamping frame.
Die Bespannung selbst erfolgt netzartig, wobei der Winkel zwischen einer Quersaiten- und einer Längssaitenstrecke normalerweise 900 beträgt, aber auch größer oder kleiner sein kann.The covering itself is net-like, with the angle between a cross string section and a main string section is normally 900, but also can be larger or smaller.
In der Regel wird bei der Bespannung eines neuen Schlägers oder der neuen Bespannung eines gebrauchten Schlägers mit dem Einziehen der Längssaitenstrecken begonnen. Der Grund liegt in der bevorzugten ovalen Form des Spannrahmens, bei der die Zugbeanspruchung parallel zur Mittelachse höher ist als parallel zur Nebenachse.As a rule, when stringing a new racket or the new stringing of a used racket with the pulling in of the main strings began. The reason lies in the preferred oval shape of the clamping frame the tensile stress parallel to the central axis is higher than that parallel to the minor axis.
Dabei hat sich gezeigt, daß es beim Bespannen des Schlägers immer wieder Schwierigkeiten und damit zeitliche Verzögerungen gibt, weil die eihenfolge der zu durchfahrenden Bohrungen unklar ist.It has been shown that it always occurs when stringing the racket again difficulties and thus delays arise because of the sequence the holes to be driven through is unclear.
Dies beginnt bereits beim Einziehen der ersten Längssaitenstrecke mit der Frage, welche der gegenüberliegenden Bohrungen nach dem Durchfahren der ersten Bohrung zu verwenden ist. Weitere derartige Zweifelsfälle ergeben sich dann, wenn Bohrungen für Quer- bzw. Längssaitenbespannung abwechseln.This starts with pulling in the first main string section with the question of which of the opposite holes after driving through the first hole is to be used. Further such doubtful cases then arise if the bores for the cross and main strings alternate.
Der Erfinder hat sich zum Ziel gesetzt, einen Tennisschläger der o. g. Art zu entwickeln, bei dem die genannten Nachteile nicht vorhanden sind, der vor allem schnell und wirtschaftlich zu bespannen ist.The inventor has set himself the goal of making a tennis racket of the above G. To develop a way in which the disadvantages mentioned do not exist, the above all, it is quick and economical to string.
Diese Aufgabe wird dadurch gelöst, daß auf dem Spannrahmen Markierungen an den bei der Bespannungsfolge mit der Saite nacheinander zu durchfahrenden Bohrunqen vorgesehen sind.This object is achieved in that markings on the clamping frame at the holes to be driven through one after the other in the stringing sequence are provided.
Dabei können erfindungsgemäß alle Bohrungen für die Längssaitenbespannung und alle Bohrungen für die Quersaitenbespannung mit unterschiedlichen Markierunren gekennzeichnet werden oder die betreffenden Bohrungen einerseits der Mittelachse und / oder der Querachse des Spannrahmens für die Längssaitenbespannung und die betreffenden Bohrungen andererseits der Mittelachse und / oder Querachse für die Quersaitenbespannung mit gleichen oder unterschiedlichen Markierungen versehen werden.According to the invention, all holes for the main string cover can be used and all holes for the cross string covering with different markings are marked or the holes concerned on the one hand the central axis and / or the transverse axis of the tensioning frame for the main string covering and the relevant holes on the other hand the central axis and / or transverse axis for the Cross string covering can be provided with the same or different markings.
Möglich ist auch die Kennzeichnung aller Längssaitenbohrungen auf der Oberseite und / oder aller Quersaitenbohrungen auf der Unterseite des Spannrahmens mit gleichen oder unterschiedlichen Markierungen.It is also possible to mark all main string bores the top and / or all cross string holes on the underside of the clamping frame with the same or different markings.
Die Erfindung umfaßt aber auch, daß die Bohrungen nur teilweise gleiche oder unterschiedliche Markierungen gegebenenfalls einerseits oder andererseits der Mittel- bzw. Querachse und / oder der Ober- bzw. Unterseite des Spannrahmens aufweisen, vorzugsweise, daß nur Bohrungen markiert sind, die mindestens einer anderen Bohrung für eine Saitenstrecke querlaufender Spannrichtung benachbart liegen.However, the invention also includes that the bores are only partially identical or different markings optionally on the one hand or on the other hand Have central or transverse axis and / or the top or bottom of the clamping frame, preferably that only holes are marked that at least one other hole are adjacent for a string length transverse tensioning direction.
Vor allem die letztgenannte Anordnung ermöglicht die Einhaltung der richtigen Bespannungsfolge, ohne daß der Bespanner Bohrungen abzählen od.-dgl. muß.Above all, the latter arrangement enables compliance with the correct stringing sequence without the stringers counting holes or the like. got to.
Damit wird die Bespannung genauer, schneller und kostengünstiger vollzogen.This means that the covering is carried out more precisely, faster and more cost-effectively.
Diesem Ziel dient auch die Markierung von zumindest einer Bohrung am Rahmenkopf, vorzugsweise von der Mittelachse nächstliegenden Bohrung, welche dem Einziehen der ersten Längssaitenstrecke dient.The marking of at least one hole also serves this purpose on the frame head, preferably the hole closest to the central axis, which is used to pull in the first main string section.
Werden alle Bohrungen markiert sollte die Rahmenkopfbohrung vorzugsweise eine dazu unterschiedliche Markierung aufweisen. Werden die Bohrungen nur teilweise markiert, genügt eine Kennzeichnung mit der für die Längssaitenbespannung vorgesehenen Markierung.If all holes are marked, the frame head hole should preferably be have a different marking. The holes are only partially marked, a marking with the one intended for the main string covering is sufficient Mark.
Die Markierung kann auf oder in dem Spannrahmen, an seiner Innen- und / oder Außenfläche angebracht sein. Auch die Bohrung selbst kann z. B.The marking can be on or in the clamping frame, on its inner and / or outer surface. The hole itself can be, for. B.
eine farblich unterschiedliche Innenfläche aufweisen.have a different colored inner surface.
Als Markierung kommt z. B. eine Zahlen- und / oder Farbmarkierung oder dergleichen in Betracht.As a marking z. B. a number and / or color marking or the like.
Die Erfindung umfaßt auch Markierungen, welche durch ein Einschieben von Hülsen, vorzugsweise farblich unterschiedLich ausgestattet, in die zu kennzeichnenden Bohrungen erzeugt wird.The invention also includes markings, which by insertion from sleeves, preferably equipped with different colors, into those to be labeled Holes is generated.
Vorzugsweise besteht die Markierung aus wenigstens einem Streifen, der in oder parallel zu ihr entsprechenden Spannrichtung verläuft, was die Klarheit der Kennzeichnung verbessert.The marking preferably consists of at least one strip, which runs in or parallel to its corresponding tensioning direction, what the clarity the labeling improved.
Weiterhin sieht ein Verfahren zum Herstellen eines Tennisschlägers der o. g. Art vor, daß während und / oder nach der Ausformung des Spannrahmens an den bei der Bespannungsfolge mit der Saite nacheinander zu durchfahrenden Bohrungen Markierungen angebracht werden.Also provides a method for manufacturing a tennis racket the above Kind before that during and / or after the formation of the tenter frame the one in the stringing sequence to be passed through one after the other Drilling marks are attached.
So kann bereits ein Formwerkzeug für den Spannrahmen Vorsprünge oder Einformungen aufweisen, welche die geforderten Markierungen erzeugen.So can already a molding tool for the tenter projections or Have indentations that produce the required markings.
Nach der Ausformung des Spannrahmens können z. B.After the formation of the clamping frame, for. B.
Markierungen aufgeklebt oder aufgemalt werden.Markings can be glued or painted on.
Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus der nachfolgenden Beschreibung bevorzugter Ausführungsbeispiele sowie anhand der Zeinh nung; diese zeigt in Fig. 1: einen Tennisschläger in Draufsicht; Fig. 2: ein weiteres Ausführungsbeispiel nach Fig. 1 mit Angaben über eine Bespannungsfolge.Further advantages, features and details of the invention result can be derived from the following description of preferred exemplary embodiments and based on the perforation; this shows in FIG. 1: a tennis racket in plan view; Fig. 2: Another embodiment according to FIG. 1 with information about a stringing sequence.
Fin Tennisschläger S besteht aus einem ovalen Spannrahmen 1 mit einer Außenfläche A und einer Innenfläche I, welcher an einer Schmalseite des Ovals in einen Schlägehals 2 übergeht und an der gegenüberliegenden Schmalseite einen Rahmenkopf o aufweist. Am Schlägerhals 2 sitzt ei.nnicht dargestellter -- Handgriff.Fin tennis racket S consists of an oval frame 1 with a Outer surface A and an inner surface I, which on one narrow side of the oval in a beater neck 2 passes over and a frame head on the opposite narrow side o has. A handle, not shown, sits on the neck of the racket 2.
Der Spannrahmen 1 weist vorzugsweise einen U-förmigen Querscnitt 5 auf nnd rahmt die Bespannungsfläche F in welcher etwa parallel zur Spannrahmenquerachse 0 Saitenstrecken 3 verlaufen, die von Saitnstrecken 4 zur Frzeugung eines Bespannungsbetzes gekreuzt werden. Die Saitenstrecken 3, 4 liegen in Bohrungen 6 am Spann rahmen 1 fest.The clamping frame 1 preferably has a U-shaped cross section 5 on and frames the covering surface F approximately parallel to the transverse axis of the clamping frame 0 string sections 3 run, those of string sections 4 to the generation of a string be crossed. The strings 3, 4 are located in holes 6 on the clamping frame 1 fixed.
Die Mittelachse des Tennisschlägers 5 dient. als Symmetrie achse M.The central axis of the tennis racket 5 is used. as the symmetry axis M.
Af oder in dem Spannrahmen 1 sind Markierungen 8 ange bracht, welche der Kennzeichnung der Einfädelfolge der Saitenstrecken 3, 4 heim Bespannen des Schlägers S dienen.Af or in the tenter frame 1 markings 8 are attached, which the identification of the threading sequence of the String sections 3, 4 home Stringing the racket S is used.
Dabei sind Markierungen 8q zu unterscheiden, die parallel zur Spannrahmenquerachse 0 verlaufen und Markierungen 8m, die parallel zur Symmetrieachse M angeordnet sind.A distinction must be made between markings 8q, which are parallel to the transverse axis of the clamping frame 0 run and markings 8m, which are arranged parallel to the M axis of symmetry.
Die Markierungen 8 weisen auf Bohrungen 6 hin, in welche q Quersaitenstrecken 3 einzuführen sind; die Markierungen 8 m dienen dem gleichen Zweck für die Längssaitenstrecken 4.The markings 8 indicate holes 6 into which q cross strings 3 are to be introduced; the 8 m markings serve the same purpose for the main strings 4th
Vorzugsweise trägt der Spannrahmen 1 ai,f den zwischen Querachse 0 und Schlägerhals 2 gelegenen Teilen auf der einen Seite der Mittelachse M vier Markierungen S und auf der anderen Seite fünf Markierungen 8 m. Auf den zwischen Rahmenkopf 9 und Spannrahmenquerachse 0 liegenden Teilen des Spannrahmens 1 sind snwohl auf der einen Seite der Mittelachse M zwei Markierungen 8 q, als auch auf der anderen Seite zwei Markierungen S m zu sehen. Zwischen jpwei1.s zwei Markierungen 8 m bzw. 8 q befindet sich wenigstens eine Bohrung 6 für eine jeweils querlaufende SAitenstrecke 3 bzw. 4.The clamping frame 1 ai, f preferably bears the between the transverse axis 0 and club neck 2 parts located on one side of the central axis M four markings S and on the other side five marks 8 m. On the between the frame head 9 and clamping frame transverse axis 0 lying parts of the clamping frame 1 are snwohl on the one side of the central axis M two markings 8 q, as well as on the other side two markings S m can be seen. Between jpwei1.s two markings 8 m or 8 q there is at least one hole 6 for each transverse string section 3 or 4.
Im Rahmenkopf o selbst sind beidseits der Mittelachse M Markierungen 8r angebracht. Sie kennzeichnen den Beginn und das Ende der Längssaitenbespannung am Rahmenkopf 9.In the frame head o itself there are markings on both sides of the central axis M 8r attached. They mark the beginning and the end of the main string covering on the frame head 9.
Der Vorgang des Bespannens mit einer Saite 7 nach Fig. ? beginnt vorzugsweise mit dem Einführen der Längssaitenstrecken von der Mittelachse M weg, da diese wegen der in der Regel ovalen Form des Schlägers S höheren Zugspannung ausgesetzt werden.The process of stringing 7 according to Fig.? preferably starts with the introduction of the main strings away from the central axis M, as this is due to the usually oval shape of the racket S higher tensile stress get abandoned.
Zur besseren Orientierung wird die Bespannungsfläche F durch die Mittelachse M und die Querachse Q in Sektoren I - IV eingeteilt, welche durch die Spannrahmenaußen-Seite A begrenzt sind. Die Nummerierung erfolgt im vorliegenden Reispiel entgegen dem Uhrzeigersinn, beginnend mit Sektor I rechts von der Mittelachse M. Soll die J,ängssaitenbespannung links von der Mittelachse M beginnnen, werden die Sektoren im Uhrzeigersinn nummeriert.For better orientation, the covering area F is aligned through the central axis M and the transverse axis Q divided into sectors I - IV, which are divided by the outer side of the tenter frame A are limited. The numbering is done in the present example against the Clockwise, starting with sector I to the right of the central axis M. Should the J, longitudinal string covering Starting to the left of the central axis M, the sectors are numbered clockwise.
Die Bespannungsrichtung ist mit Pfeilen x bezeichnet.The stringing direction is indicated by arrows x.
Als erste mit der Saite 7 von der Spannrahmenaußensaite A her zu durchfahrende Bohrung wird die dem Schlägerhals 2 im Sektor I nächstliegende verwendet. Dieser gegenüber liegt im Rahmenkopf 9 im Sektor II eine mit 8 r gekennzeichnete weitere Bohrung, welche von der Spannrahmeninnenseite I her mit der Saite 7 durchfahren wird, wodurch die erste Längssaitenstrecke 4 erzeugt ist.As the first to be passed through with the string 7 from the outer string A of the clamping frame The hole closest to the club neck 2 in sector I is used. This opposite is another marked 8 r in the frame head 9 in sector II Bore through which the string 7 runs from the inside I of the clamping frame is, whereby the first main string section 4 is generated.
Die nächsten dazu parallelen oder fächerförmigen Längssaitenstrecken 4 durchqueren die Sektoren II bzw. I, indem im wechselnden Rhythmus dip Saite 7 von der Spannrahmenaußenfläche A durch der Mittelachse M fernere folgende Bohrungen rtl jeweils gegenüberliegenden Bohrungen, welche die Saite 7 von der Spannrahmeninnenseite I her durchfährt, geführt wird.The next parallel or fan-shaped main strings 4 traverse sectors II and I by dipping string 7 from the outer surface of the tenter frame A through the central axis M further the following holes rtl in each case opposite holes, which the string 7 from the inside of the frame I drives through, is guided.
Bei dem Einziehen der fünften Längssaitenstrecke 4 wird die erste mit 8 m markierte im Sektor 1 angeordnete Bohrung von der Spannrahmenaußenseite A her passiert.When the fifth main string section 4 is drawn in, the first Hole marked 8 m in sector 1 from the outside of the tenter frame A her happened.
Diese Markierung 8 m weist draufhin, daß die neben ihr im Sektor I liegende nicht markierte/n Bohrungen mit einer Quersaite 3 zu durchfahren ist/sind und somit heim Herstellen der Längssaitenbespannung ausgelassen werden muß/müssen. Im folgenden dürfen also im Sektor T nur noch die mit der Markierung 8 m versehenen Bohrungen benutzt werden.This 8 m marker indicates that the next to it in sector I. Horizontal unmarked holes must be passed through with a cross string 3 and thus must / must be omitted when making the main string covering. In the following, only the 8 m marked with the marking are allowed in the T sector Holes are used.
Nach dem Einziehen der siebten Längssaitenstrecke 4 fölgt auch im Sektor II eine Bohrung mit einer Markierung 8 welche daraufhinweist, daß A;e zwischen ihr und der nächsten mit 8 m markierten Bohrung im Sektor TT angeordnete Bohrung bei der Quersaitenbespannung verwendet wird.After pulling in the seventh main string section 4 also follows in the Sector II a hole with a marking 8 which indicates that A; e between her and the next 8 m marked hole in the TT sector is used for cross stringing.
Die Bespannungsfolge ist so ausgelegt, daß nach der letzten mit 8 m markierten Bohrung im Sektor II der Wechsel auf die-andere Seite der Mittelachse M durch den Einzug der dem Rahmenkopf 9 nächstliegenden Quersaitenstrecke 7 quer durch die Sektoren II und III erfolgt. Dabei wird die zwischen den beiden mit 8 m im Sektor II beziechnete nicht markierte Bohrung von der Spannrahmenaußenfläche her und die ihr im Sektor IIT gegenüberliegende mit 8 q markierte Bohrung von der spannrahmeninnenfläche T her durchfahren.The stringing sequence is designed so that after the last with 8 m marked hole in sector II the change to the other side of the central axis M by pulling in the cross string section 7 closest to the frame head 9 across takes place through sectors II and III. The one between the two with 8 m unmarked hole in sector II from the outer surface of the tenter frame and the hole opposite it in sector IIT marked with 8 q from the Drive through the inner surface T of the clamping frame.
Nun erfolgt zur Fortsetzungen der Längssaitenbespannung widerum ein Richtungswechsel, wobei die Sektoren III und IV mit einer Längssaitenbespannung zur Mittelachse M hin belegt werden. Dabei wird zuerst die nicht markierte zwischen den beiden Bohrungen R q im Sektor III sneordnete Bohrung von der Spannrahmenaußenfläche her durchfahren und die der Mittelachse M fernste Längssaitenstrecke unter Verwendung der zwischen der Querachse Q nächstliegenden mit 8 q markierten Bohrung angeordneten nicht markierten Bohrung eingezogen.Now there is a turn to continue the main string covering Change of direction, sectors III and IV with a string covering to the central axis M are occupied. The unmarked between the two holes R q in sector III sneordered hole from the outer surface of the tenter frame drive through and use the main string section furthest from the central axis M. the closest hole marked 8 q between the transverse axis Q. unmarked hole drawn in.
Die nächsten dazu parallelen oder fächerförmigen Langssaitenstrecken 4 durchqueren die Sektoren IV bzw.The next parallel or fan-shaped long string sections 4 cross sectors IV resp.
III, indem in wechselndem Rhythmus die Saiten 7 von der Spannrahmenaußenfläche A durch der Mittelachse M näherliegende folgende nicht markierte Bohrungen zu jeweils gegenüberliegenden Bohrungen, welche die Saite 7 von der Spannrahmeninnenseite T her durchfährt, e.-ffihrt wird.III, in that the strings 7 are removed from the outer surface of the clamping frame in an alternating rhythm A through the central axis M closer to the following unmarked holes in each case opposite holes, which the string 7 from the inner side of the tensioning frame T drives through, e.-ffihrt.
Die vorletzte Bohrung für die Längssaitenbespannung ist mit der zweiten Markierung 8 r am Rahmenkopf 9 im Sektor TIT gekennzeichnet. Nach ihrem Durchqueren von der Spannrahmenaußenfläche A her wird die der Mittelachse M nächste Längssaitenstrecke 4 eingezogen, indem die Saite 7 von der Spannrahmeninnenfräche I her die dem Schiägerhals 2 nächste Bohrung im Sektor IV durchzieht.The penultimate hole for the main string covering is with the second Marking 8 r marked on the frame head 9 in the TIT sector. After crossing them from the outer surface of the tenter frame A, the longitudinal string section closest to the central axis M becomes 4 is drawn in by pulling the string 7 from the inner surface of the clamping frame I that the striker's neck 2 runs through the next borehole in Sector IV.
Danach erfolgt die Quersaitenbespannung, beginnend an der dem Schlägerhals 2 nächstliegenden mit 8 q markierten Bohrung im Sektor IV. Dieser liegt im Sektor I eine zwischen zwei mit 8 m markierten Bohrungen angeordnet nicht markierte Bohrung in etwa gleichem Abstand von der Querachse Q gegenüber, die von der Spannrahmeninnen fläche 1 her mit der Seite 7 durchfahren wird.Then the cross strings are stretched, starting with the neck of the racket 2 nearest borehole marked with 8 q in sector IV. This is in sector I an unmarked hole arranged between two holes marked with 8 m at about the same distance from the transverse axis Q opposite that of the inside of the tenter frame area 1 is passed through with side 7.
Nun wird die .SaSte 7 wieder in wechselndem Rhythmus von der Spannrahmenaußenfläche A durch jeweils dem Rahmenkopf 9 näherliegende Bohrungen zu jeweils gegenüberliegenden Bohrungen, welche die Saite 7 von der .Spannrahmeninnenseite I her durchfährt, geführt. Dabei werden in den Sektoren 1 und II alle freien, nicht markierten Rohrungen verwendet, im Sektor IV der Reihe nach die vier mit 8 q markierten und danach jede weitere Bohrung und im Sektor III alle nicht markierten, freien Bohrungen.Now the .SaSte 7 is back in an alternating rhythm from the outer surface of the tenter frame A through each of the frame head 9 closer holes to each opposite Holes through which the string 7 passes through the inner side of the stretcher I, guided. All free, unmarked pipes are used in sectors 1 and II, in sector IV the four marked with 8 q one after the other and then each further Borehole and in sector III all unmarked, free boreholes.
Die vorletzte von der Spannrahmenaußenfläche her zu durch fahrende Bohrung ist die zweite mit 8 q markierte Bohrung in Sektor III.The penultimate from the outer surface of the tenter frame to be driven through Hole is the second hole marked 8 q in Sector III.
Nach der letzten Bohrung in Sektor II, die unterhalb der Querachse nächstliegenden mit 8 m markierten Bohrung angeordnet ist und von der Spannrahmeninnenfläche T her durchfahren wird, erfolgt die Verknotung K der Saite 7.After the last drilling in sector II, the one below the transverse axis nearest hole marked 8 m is arranged and from the inner surface of the tenter frame T is passed through, the knot K of the string 7 takes place.
L e e r s e i t eL e r s e i t e
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19803004646 DE3004646A1 (en) | 1980-02-08 | 1980-02-08 | Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19803004646 DE3004646A1 (en) | 1980-02-08 | 1980-02-08 | Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frame |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3004646A1 true DE3004646A1 (en) | 1981-08-13 |
Family
ID=6094084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19803004646 Withdrawn DE3004646A1 (en) | 1980-02-08 | 1980-02-08 | Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frame |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3004646A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6074315A (en) * | 1998-02-19 | 2000-06-13 | Linda C. Yimoyines | Racquet with visually differentiated grommets and method of stringing thereof |
US6217466B1 (en) * | 1998-07-30 | 2001-04-17 | Linda C. Yimoyines | Racquet and method of stringing a racquet |
-
1980
- 1980-02-08 DE DE19803004646 patent/DE3004646A1/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6074315A (en) * | 1998-02-19 | 2000-06-13 | Linda C. Yimoyines | Racquet with visually differentiated grommets and method of stringing thereof |
US6217466B1 (en) * | 1998-07-30 | 2001-04-17 | Linda C. Yimoyines | Racquet and method of stringing a racquet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE4010722A1 (en) | RACKETS, ESPECIALLY BALL RACKETS | |
DE2631288A1 (en) | FRAMEWORK FOR GAME BATS | |
EP1557204B1 (en) | Racquet for ball sports and method for manufacturing | |
DE3004646A1 (en) | Tennis racquet stringing system - uses at least one string in pre-set alternating sequence indicated by markings near holes of tensioning frame | |
EP0350620B1 (en) | Method for manufacturing concrete sleepers for switch points | |
DE102004003528B3 (en) | Racket for ball games, e.g. tennis, squash, badminton or racket ball comprises a racket head and a frame with a connected grip section | |
DE3034541A1 (en) | HANDLEBAND | |
DE1916526A1 (en) | Bushing for sports rackets | |
DE4313203A1 (en) | Racket with improved tensioning device | |
EP0461561B1 (en) | Racket, especially tennis or squash racket | |
DE102004010349A1 (en) | Rackets for ball games and manufacturing processes | |
DE2911026A1 (en) | Tennis racquet stringing system - uses two groups of strings extending in same direction crossing each other and placed alternately in front and behind other group | |
DE2449480A1 (en) | Tennis racket stringing system - plastic strings at sides with gut stringing at centre of racket | |
DE2228245A1 (en) | RACKET FOR TENNIS AND SIMILAR GAMES | |
DE19725430C1 (en) | Racquet for tennis, squash or badminton | |
AT390564B (en) | Tennis racket | |
DE3141369A1 (en) | Tennis racket | |
DE3135521A1 (en) | Apparatus for straightening the stringing of rackets, especially tennis rackets | |
DE2236921A1 (en) | PROCEDURE FOR STRINGING A STICK FRAME | |
DE2757971A1 (en) | Tennis racquet with special string arrangement - has strung head with longitudinal strings in fan arrangement and uniform spacing for transverse strings | |
DE4035796A1 (en) | Prefab tennis racquet structure - has transverse and lengthwise strings, with collector part | |
DE3131939C2 (en) | Ball game racket frames, in particular for squash rackets | |
DE4032745A1 (en) | Stringing system for racquets - has homogeneous stringing, without displaced strings | |
DE3327009A1 (en) | Double-sided tennis racket stringing | |
DE2738997A1 (en) | Tennis racket with hollow section frame - deflects under impact of ball to increase elasticity and help control stroke played |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8139 | Disposal/non-payment of the annual fee |