DE29615078U1 - Natural stone cuboid with a leveling sole for mechanical laying - Google Patents

Natural stone cuboid with a leveling sole for mechanical laying

Info

Publication number
DE29615078U1
DE29615078U1 DE29615078U DE29615078U DE29615078U1 DE 29615078 U1 DE29615078 U1 DE 29615078U1 DE 29615078 U DE29615078 U DE 29615078U DE 29615078 U DE29615078 U DE 29615078U DE 29615078 U1 DE29615078 U1 DE 29615078U1
Authority
DE
Germany
Prior art keywords
natural stone
stone blocks
laying
blocks according
sole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29615078U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAUDG BAUMARKETING DEV GmbH
Original Assignee
BAUDG BAUMARKETING DEV GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAUDG BAUMARKETING DEV GmbH filed Critical BAUDG BAUMARKETING DEV GmbH
Priority to DE29615078U priority Critical patent/DE29615078U1/en
Publication of DE29615078U1 publication Critical patent/DE29615078U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/22Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/04Paving elements consisting of natural stones and a binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
  • Finger-Pressure Massage (AREA)

Description

aumafke+ing Development Qt
/vsuer\l<ainp 24
48734 Reken
aumafke+ing Development Qt
/vsuer\l<ainp 24
48734 Reken

&eegr; 02864/5154&eegr; 02864/5154

Die Erfindung betrifft unregelmäßige, geschlagene oder bruchrauhe Natursteinquader, die im verlegten Zustand an der unteren Seite, parallel zur oberen Fläche eine nivellierende vollformatierte Sohle, vorzugsweise aus Betonwerkstoff aufweisen und damit höhengleich, mit weiteren auf diese Art und Weise hergestellten Naturverbundsteinquader, auf ein gleichmäßig abgezogenes Pflasterbett auch maschinell verlegt werden können.The invention relates to irregular, chipped or rough-cut natural stone blocks which, when laid, have a leveling, fully formatted base, preferably made of concrete material, on the lower side parallel to the upper surface and can thus be laid at the same height with other natural composite stone blocks produced in this way, even by machine, on a uniformly leveled paving bed.

Es ist bekannt, daß geschlagene und ungleiche Natursteinquader, wie sie auf zahlreichen, meistens historischen Gehwegen, Gassen und Plätzen zu finden sind, durch Druckspannung, dynamische Kräfte und zwangsläufig durch ungleiche Lastverteilung brechen. Desweiteren ist bekannt, daß eine maschinelle wirtschaftliche Verlegung dieser Natursteinquader auf ein abgezogenes und gleichmäßiges Pflasterbett nicht möglich ist oder selbst bei manueller Verlegung unter den teilweise konvex oder konkav geformten Natursteinquadern Hohlräume entstehen, die diese später absacken lassen. Eine arbeits- und kostenintensive Verlegung in ein Mörtelbett scheidet aus, da der Mörtel nicht die notwendige Haftung zum Naturstein erreicht und durch Setzrisse Wasser eindringt, welches bei Frost zu entsprechenden Schaden führt. Ferner ist bei der Neuverlegung von Versorgungsleitungen ein erheblicher Mehraufwand notwendig. Als Flächenbelag sind diese gebrochenen und geschlagenen Natursteinquader den heutigen Anforderungen und Verkehrsbelastungen daher nicht mehr gewachsen. Sie bilden in dem beschriebenem Zustand oftmals eine Gefahr für Verkehrsteilnehmer. Bisweilen wurde häufig auf eine Wiederverlegung verzichtet und diese wertvollen historischen Natursteinquader kamen in Brecher oder fristeten ihr Dasein auf Halden oder Bauschuttdeponien.It is known that broken and uneven natural stone blocks, such as those found on numerous, mostly historic sidewalks, alleys and squares, break due to compressive stress, dynamic forces and inevitably due to uneven load distribution. It is also known that it is not possible to lay these natural stone blocks economically using a machine on a levelled and even paving bed, or that even when laid manually, hollow spaces develop under the partially convex or concave natural stone blocks, which later cause them to sink. Laying them in a mortar bed, which is labor-intensive and costly, is not an option, as the mortar does not achieve the necessary adhesion to the natural stone and water penetrates through settlement cracks, which causes corresponding damage in the event of frost. Furthermore, a considerable amount of extra work is required when laying new supply lines. As a surface covering, these broken and broken natural stone blocks are therefore no longer able to meet today's requirements and traffic loads. In the condition described, they often pose a danger to road users. Sometimes they were not re-laid and these valuable historic natural stone blocks ended up in crushers or languished on heaps or rubble dumps.

Aufgabe der Erfindung ist, aus diesen unregelmäßig geformten Natursteinquadern (Fig. 1) vollformatierte Flächenbelagselemente (Fig. 2) zu schaffen, die nach der Verlegung von historisch verlegten Natursteinflächen nicht zu unterscheiden sind und dennoch kostengünstig maschinell verlegt werden konnte, Druckspannung, dynamische Kräfte und Lasten werden dabei über die angeformte Sohle (1) gleichmäßig auf die Bettung und Tragschicht übertragen.The object of the invention is to create fully formatted surface covering elements (Fig. 2) from these irregularly shaped natural stone blocks (Fig. 1) which, after laying, cannot be distinguished from historically laid natural stone surfaces and which can nevertheless be laid cost-effectively by machine. Compressive stress, dynamic forces and loads are thereby evenly transferred to the bedding and base layer via the molded sole (1).

Erfindungsgemäß wird die Lösung der Aufgabe durch die gekennzeichnenden Merkmale des Anspruchs 1 und die vorteilhafte Ausgestaltungen der Erfindung durch die weiteren Ansprüche beschrieben. According to the invention, the solution to the problem is described by the characterizing features of claim 1 and the advantageous embodiments of the invention by the further claims.

Im folgenden wird die Erfindung anhand der Ausführungsbeispiele darstellenden Zeichnung näher erläutert. Die Zeichnung ist nicht maßstabsgetreu und zeigt nur sinngemäß ein Beispiel. Es zeigen:The invention is explained in more detail below using the drawings showing exemplary embodiments. The drawing is not to scale and only shows an example. It shows:

Fig. 1 NatursteinquaderFig. 1 Natural stone blocks

Fig.2 Natursteinquader mit Sohle, Aussparung, Kanal und VerlegeschlaufenFig.2 Natural stone blocks with base, recess, channel and laying loops

g Development C
auenKamp 24
g Development C
auenKamp 24

BezugszeichenlisteList of reference symbols

1 Sohle1 sole

2 Natursteinquader2 natural stone blocks

3 Aussparung3 Recess

4 Kanal4 channel

5 Transport- und Verlegeschlaufe5 Transport and laying loop

Es werden ungleiche Natursteinquader (2) als Flächenbeläge beschrieben, die mittels Haftvermittler dauerhaft mit einer nivellierenden Sohle (1) mit Verlegeschlaufen (5) verbunden sind, der zwischen Naturstein und der Sohle eine dauerhafte Haftzugfestigkeit gemäß der ZTV-SIB 90 / DIN 1048 nach mindestens 50 Frost-Tau-Wechsel von 1,5 N/mm2 sicherstellt. Auf diese Weise hergestellte Natursteinquader (Fig 2) lassen sich maschinell zügig auf ein abgezogenes Splittbett verlegen und übertragen einwirkende Schubkräfte, Druckspannung, dynamische Kräfte und Lasten gleichmäßig auf die Bettung und Tragschicht. Natursteinquader ohne Sohle lassen sich dagegen nur aufwendig verlegen und brechen häufig nach Belastung auseinander.Uneven natural stone blocks (2) are described as surface coverings that are permanently connected to a leveling base (1) with laying loops (5) using an adhesive agent, which ensures a permanent adhesive tensile strength of 1.5 N/mm 2 between the natural stone and the base in accordance with ZTV-SIB 90 / DIN 1048 after at least 50 freeze-thaw cycles. Natural stone blocks produced in this way (Fig. 2) can be laid quickly by machine on a leveled bed of chippings and transfer the shear forces, compressive stress, dynamic forces and loads evenly to the bedding and base layer. Natural stone blocks without a base, on the other hand, are difficult to lay and often break apart after being loaded.

Claims (9)

keting Development /veuenkamp 24 Kken Schutzansprücheketing Development /veuenkamp 24 Kken Protection claims 1. Unregelmäßig geformte und teilweise an der Unterseite nach innen oder außen gewölbte Natursteinquader (Fig. 1) als Flächenbeläge für Gehwege, Gassen, Plätze usw.,1. Irregularly shaped and partially curved inwards or outwards on the underside natural stone blocks (Fig. 1) as surface coverings for walkways, alleys, squares, etc., dadurch gekennzeichnet, daß im verlegten Zustand an der Unterseite der Natursteinquader, parallel und annähernd randbündig zur oberen Fläche eine nivellierende, frost- und tausalzbeständige Sohle (1) aus Beton oder Kunststoff, dauerhaft mit einer mittleren Haftzugfestigkeit in Anlehnung an die ZTV-SIB 90 / DIN 1048 nach mindestens 50 Frost-Tau-Wechsel von mindestens 1,5 N/mm angebracht ist, die eine maschinenunterstützte oder maschinelle Verlegung ermöglicht, einwirkende Schubkräfte, Druckspannungen, dynamische Kräfte und Lasten gleichmäßig auf die Pflasterbettung und Tragschicht überträgt, characterized in that, when laid, a leveling, frost and de-icing salt-resistant base (1) made of concrete or plastic is permanently attached to the underside of the natural stone blocks, parallel and almost flush with the edge of the upper surface, with an average adhesive tensile strength in accordance with ZTV-SIB 90 / DIN 1048 after at least 50 freeze-thaw cycles of at least 1.5 N/mm, which enables machine-assisted or machine-based laying, transfers acting shear forces, compressive stresses, dynamic forces and loads evenly to the paving bedding and base layer, 2. Natursteinquader nach dem vorangehenden Anspruch,2. Natural stone blocks according to the preceding claim, dadurch gekennzeichnet, daß sich zwischen dem Naturstein (2) und der Betonsohle (1) eine ausgleichende und haftverbindende Schicht aus duoGraniStone (R) - Haftvermittler befindet, die in Anlehnung an die ZTV -SIB 90/DIN 1048 nach 100 Zyklen Frost-Tau-Wechsel eine erhöhte Haftzugfestigkeit von mindestens 2,5 N/mm ^ sicherstellt. characterized in that between the natural stone (2) and the concrete base (1) there is a compensating and bonding layer of duoGraniStone (R) bonding agent, which ensures an increased adhesive tensile strength of at least 2.5 N/mm ^ after 100 freeze-thaw cycles in accordance with ZTV -SIB 90/DIN 1048. 3. Natursteinquader nach einer der vorangehenden Ansprüche3. Natural stone blocks according to one of the preceding claims dadurch gekennzeichnet, daß die nivellierende Sohle (1) die seitlichen Umrisse des Natursteinquaders (2) überragt. characterized in that the leveling sole (1) projects beyond the lateral contours of the natural stone block (2). 4. Natursteinquader nach einer der vorangehenden Ansprüche,4. Natural stone blocks according to one of the preceding claims, dadurch gekennzeichnet, daß die seitlich überragende Sohle unterbrochen und als Abstandhalter ausgeformt ist. characterized in that the laterally projecting sole is interrupted and shaped as a spacer. 5. Natursteinquader nach einer der vorangehenden Ansprüche,
dadurch gekennzeichnet, daß die Sohle (1) eine Bewehrung aufweist.
5. Natural stone blocks according to one of the preceding claims,
characterized in that the sole (1) has a reinforcement.
&Eacgr;>&sgr;.&ngr;&iacgr;&OHacgr;&Ogr;,
ii'--a Develop
&Eacgr;>&sgr;.&ngr;&iacgr;&OHacgr;&Ogr;,
ii'--a Develop
4S734 Reken4S734 Reken
6. Natursteinquader nach einer der vorangehenden Ansprüche,6. Natural stone blocks according to one of the preceding claims, dadurch gekennzeichnet, daß seitlich Transport- und Verlegeschlaufen (5) angebracht sind, die eine leichte Entschalung, einen kostengünstigen Transport und eine rationelle Verlegung ermöglichen, characterized in that transport and laying loops (5) are attached to the sides, which enable easy demolding, cost-effective transport and efficient laying, 7. Natursteinquader nach Anspruch 6 ,7. Natural stone blocks according to claim 6, dadurch gekennzeichnet, daß die seitlich überragende Sohle (1) Aussparungen (3) hat, in die die seitlich angebrachten Transport- und Verlegeschlaufen (5) nach der Verlegung eingesteckt werden, um diese bei einer späteren Wiederaufnahme und Neuverlegung der Natursteinquader wieder zu nutzen. characterized in that the laterally projecting sole (1) has recesses (3) into which the laterally attached transport and laying loops (5) are inserted after laying in order to be reused for later retrieval and re-laying of the natural stone blocks. 8. Natursteinquader nach einer der vorangehenden Ansprüche,8. Natural stone blocks according to one of the preceding claims, dadurch gekennzeichnet, daß die Sohle (1) mit wenigstens einem Kanal (4) versehen ist, deren Öffnungen an mindestens zwei Seiten des Sockels münden, durch den die Transport- und Verlegeschlaufen (5) geführt werden oder Versorgungsleitungen verlegt werden können. characterized in that the base (1) is provided with at least one channel (4), the openings of which open on at least two sides of the base, through which the transport and laying loops (5) are guided or supply lines can be laid. 9. Natursteinquader nach einer der vorangehenden Ansprüche,
dadurch gekennzeichet, daß die Sohle (1) aus Recycling-Material besteht.
9. Natural stone blocks according to one of the preceding claims,
characterized in that the sole (1) is made of recycled material.
DE29615078U 1996-09-02 1996-09-02 Natural stone cuboid with a leveling sole for mechanical laying Expired - Lifetime DE29615078U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE29615078U DE29615078U1 (en) 1996-09-02 1996-09-02 Natural stone cuboid with a leveling sole for mechanical laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29615078U DE29615078U1 (en) 1996-09-02 1996-09-02 Natural stone cuboid with a leveling sole for mechanical laying

Publications (1)

Publication Number Publication Date
DE29615078U1 true DE29615078U1 (en) 1997-01-02

Family

ID=8028545

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29615078U Expired - Lifetime DE29615078U1 (en) 1996-09-02 1996-09-02 Natural stone cuboid with a leveling sole for mechanical laying

Country Status (1)

Country Link
DE (1) DE29615078U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011152791A1 (en) * 2010-06-03 2011-12-08 Johan Forsman Method, element and form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011152791A1 (en) * 2010-06-03 2011-12-08 Johan Forsman Method, element and form

Similar Documents

Publication Publication Date Title
EP2182137A2 (en) Terrazzo floor and manufacturing method therefor
EP0058825A1 (en) Resilient safety surfacing slab
EP1831467B1 (en) Concrete sleeper and method for the production thereof
DE2901109C2 (en) Laying unit made up of a plurality of paving stones and method for their production
WO2012130425A2 (en) Track way for rail-bound vehicles and track support for such a track way
DE29615078U1 (en) Natural stone cuboid with a leveling sole for mechanical laying
DE2850329A1 (en) PROCEDURE FOR FILLING OR PARTIAL FILLING OF A HOLE IN THE BOTTOM
DE102007038461B4 (en) Method for rehabilitating a rail track and associated rail track
AT214966B (en) Method for producing heavy-duty pavements of motor vehicle highways using a number of identically shaped artificial stone bodies consisting of concrete or a similar hardenable mass
DE19525315A1 (en) Hollow flooring structure
DE10004763B4 (en) Laying bed for plate-like coverings such as floor tiles
DE4429115C1 (en) Method of producing terraced flooring
DE4018377A1 (en) Plastics paving plate for roof terraces - has edge projections matched by incisions in opposing edge
DE102017114361A1 (en) Form stone for a roadable pavement in the composite, as well as multi-layer block and method for producing a multi-layer block.
DE4415502A1 (en) Floor covering
DE2129341A1 (en) CONCRETE SLAB FOR A FLOORING
DE10115009C2 (en) Construction of a drivable industrial floor or a carriageway Process for the production of a drivable industrial floor or a carriageway
DE29721118U1 (en) Cross threshold for railroad tracks
DE6938342U (en) ARTIFICIAL STONE SLAB
DE202013100857U1 (en) Platform upgrade and refurbishment system
DE8706982U1 (en) Polygonal plate
DE6408C (en) Innovations to wooden paving for roads
DE147314C (en)
DE29515275U1 (en) Device for keeping a gap between joints of paving stones and / or floor slabs
AT234748B (en) Method for laying prefabricated building elements, in particular road slabs

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19970213

R165 Request for cancellation or ruling filed
R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 19991217

R120 Application withdrawn or ip right abandoned

Effective date: 20000114