DE2046437A1 - Method and device for Abför deration of moldings, in particular concrete moldings from a molding machine - Google Patents

Method and device for Abför deration of moldings, in particular concrete moldings from a molding machine

Info

Publication number
DE2046437A1
DE2046437A1 DE19702046437 DE2046437A DE2046437A1 DE 2046437 A1 DE2046437 A1 DE 2046437A1 DE 19702046437 DE19702046437 DE 19702046437 DE 2046437 A DE2046437 A DE 2046437A DE 2046437 A1 DE2046437 A1 DE 2046437A1
Authority
DE
Germany
Prior art keywords
foil
stack
film
moldings
dar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19702046437
Other languages
German (de)
Other versions
DE2046437C (en
Inventor
Firmin Nyon Clement (Schweiz)
Original Assignee
Allgemeine Straßenbaubedarfs Ge Seilschaft mbH, 2800 Bremen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Allgemeine Straßenbaubedarfs Ge Seilschaft mbH, 2800 Bremen filed Critical Allgemeine Straßenbaubedarfs Ge Seilschaft mbH, 2800 Bremen
Publication of DE2046437A1 publication Critical patent/DE2046437A1/en
Application granted granted Critical
Publication of DE2046437C publication Critical patent/DE2046437C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G57/00Stacking of articles
    • B65G57/02Stacking of articles by adding to the top of the stack
    • B65G57/03Stacking of articles by adding to the top of the stack from above
    • B65G57/06Gates for releasing articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G57/00Stacking of articles
    • B65G57/02Stacking of articles by adding to the top of the stack
    • B65G57/03Stacking of articles by adding to the top of the stack from above
    • B65G57/035Stacking of articles by adding to the top of the stack from above with a stepwise downward movement of the stack

Description

Allgemeine Strafienbaubedarfs-Gesellschaft bKGeneral penal building supplies society bK

282 Bremen -St. Magnus Unter den Linden 31/35 282 Bremen -St. Magnus Unter den Linden 31/35

Sievogtstraße 21 Telefon 0421-342010Sievogtstraße 21 Telephone 0421-342010

Belegexemplar Darf nicht geändert werdenSpecimen copy May not be changed

Verfahren und Vorrichtung sur Anforderung τοη Formungen, insbesondere Betonformlingen aus einer Formmaschine»Method and device on request τοη Formings, in particular concrete moldings a molding machine »

Die Erfindung betrifft Verfahren und Vorrichtung sur Abförderung τοη Formungen mua einer Formmaschinev vorzugsweise zur Abförderung von Betonformlingen, insbesondere Betonformsteinen, aus einer 3teinfonamaeohinev wobei die Formling· auf einer Unterlage in der foxvmasohine entformt und auf dieser Unterlage aus der Formmaschine abtransportiert werden. The invention relates to a method and device for conveying τοη formations mua a molding machine v, preferably for conveying concrete moldings, in particular concrete blocks, from a 3teinfonamaeohine v whereby the moldings are demolded on a base in the foxvmasohine and transported away from the molding machine on this base.

Betonformsteine sur Herstellung von Straßen- und Piatsdecken werden in groSen Stüoksahlen aaeohinell ait Hilfe ron Steinfonamasohinen hergestellt. Derartige Steinfomaasehinen haben besondere Foreen ait einer Kehrsahl ron forsnestern» je sur Aufnahm· eines Betonfonisteins· In jede» Arbeitstakt der Steinfornanaachin· wird eine gröSere Ansah! τοη Betonformeteinen in einer Lage hergestellt· Bisher 1st es üblich, die rohen» nooh nioht abgebundenen formlinge in der Formmaschine auf sogenannten Unterlagesbrettera su entformen.Concrete blocks sur production of road and Piatsdecken are produced in Grosen Stüoksahlen aaeohinell ait help ron Steinfonamasohinen. Such stone fomaasehinen have a special fore ait a kehrsahl ron forsnestern »each time · a concrete fonist stone · in every» work cycle of the stone fornanaachin · is a bigger look! τοη molded concrete blocks produced in one layer · So far it has been customary to demold the raw, not yet set moldings in the molding machine on so-called base boards.

1098 15/UUO1098 15 / UUO

Amt dl··«! Untsrlagesbrettern werden dl· Formlinge aus der 31 slnfo maliih 1 na herausgeführt und sum Abbinden beziehungsweise Erhärten dea Betons gelagert. ItIe Forme te ine bleiben bis ms Erhärten auf den Unterlagebrettern· Demgemäß ist es bei der Leistung der heute üblichen Steinforsaasohinen erforderlich» daß au jeder Maschine eine sehr große Anzahl von Unterlagebrettern gehört. Außerdem iat für eine derartige Vorrichtung eine verhältnismäßig aufwendige· komplizierte und großflächig« Fabrikationeanlage erforderlich, um die Betonformlinge auf den Unterlagsbrettern sachgerecht zu transportieren und bis sur Erhärtung zu lagern. Office dl · · «! Shelf boards are brought out of the moldings from the 31 slnfo maliih 1 na and stored for the setting or hardening of the concrete. The molds remain on the base boards until it hardens. Accordingly, with the performance of today's stone research machines, it is necessary that a very large number of base boards belong to each machine. In addition, a relatively expensive, complex and large-scale production plant is required for such a device in order to properly transport the concrete moldings on the supporting boards and to store them until they have hardened.

Der Erfindung liegt die Aufgabe zugrunde, neue wege für die Entnahme von Formungen aus Steinfonmaaeohinen vorzuschlagen, duroh die unter Vermeidung der Unterlagebretter der Aufwand bei der Entnahme der Formlinge und bei deren Lagerung erheblich Terringert wird· The invention has for its object to propose new ways for the removal of moldings from Steinfonmaaeohinen, due to the fact that while avoiding the supporting boards, the effort involved in removing the moldings and storing them is considerably reduced.

Durch die Erfindung wird ein Verfahren vorgeschlagen, bei de» die Formlinge in die Formmaschine auf einer Folie, Papierbahn oder dergleichen entformt und auf dieser ohne Änderung dsr Relativlage dsr Formlinge zueinander aus der Formmaschine entnommen sowie in Lagen übereinander in frische« Zustand des Materials, insbesondere Betone gelagert werden. Yorsugswelee werden die Formlinge auf der Bahn, Folie oder dergleichen auoh hergestellt«The invention proposes a method in which the moldings are placed in the molding machine on a film, Paper web or the like is removed from the mold and on this without changing the relative position of the moldings to one another from the Removed from the molding machine and stored in layers one on top of the other in the fresh state of the material, especially concretes will. Yorsugswelee, the moldings are also made on the sheet, foil or the like «

Der Erfindung liegt somit der Gedanke zugrunde, die Formlinge auf einer Folie» Papierbahn oder dergleichen hersuetellen und zu entformen, mit der die Forssteine anschließend in Lagen übereinander gestapelt werden können, ohneThe invention is thus based on the idea of producing the moldings on a film, paper web or the like and to demold, with which the forest stones can then be stacked in layers on top of each other without

109815/UOO109815 / UOO

das die Forasteine die Folie oder dergleichen dabei verlassen oder die Eelativstellung verändern. Bs handelt eich alao iim "verlorene1* Unterlagen, die, anders als bei ünttrlagsbrettern, nur für einen einmaligen Gebrauch bestimmt sind· Die Entnahme der Formlinge aus der Formmaschine wird nach einem weiteren Merkmal so vorgenommen, daß die Folie» Papierbahn oder dergleichen als Fördermittel für die Forstete ine wirkt. that the forastones leave the foil or the like or change the relative position. B's is alao iim "lost 1 * documents, which, unlike supporting boards, are only intended for one-time use. The removal of the moldings from the molding machine is carried out according to a further feature that the film" paper web or the like is used as a means of conveyance works for the forest party.

nachfolgend werden weitere Einzelheiten anhand einer in den Zeichnungen dargestellten Steigformmaschine alt einer Sat» nähmeeinrichtung gemäß der Erfindung näher erläutert« Es zelgttfurther details are given below using one of the Drawings shown vertical forming machine old a satellite » taking device according to the invention explained in more detail «It zelgtt

Fig. 1 - eine Einrichtung geoäS der "Brfindung einschließlich Steinformmasohlne in scheaatischer Seitenansicht,Fig. 1 - a device geoäS the "finding including stone mold soles in a scheaatic side view,

Fig. 2 - einen Teil der Einrichtung geaäS && ^2«^^:^ in vergrößertem Maßetab während einer anderenFig. 2 - a part of the device geaäS && ^ 2 «^^: ^ on an enlarged scale during another

Fig. 3 - eine Stirnansicht eines Teils der Vorrichtung gemäß Flg. 1,Figure 3 is an end view of part of the device according to Flg. 1,

Fig. 4 - eine andere Ausführungsform einerFig. 4 - another embodiment of a

gemäS ;er Erl'ndung in sohematischer Seitenansiotht,according to ; he discovery in a thematic side view,

Fig. 5 - die Entnahmeeinrichtung gemäß der Erfindung während einer anderen Phase bei der Entnahme von Formungen,Fig. 5 - the extraction device according to the invention during another phase in the extraction of molds,

Flg. 6 - eine weitere Ausachnittdareteilung während einer dritten Phase bei der Entnahme von Formungen.Flg. 6 - another detail during a third phase in the removal of molds.

1 0 9 8 i 5 / H 0 01 0 9 8 i 5 / H 0 0

Bit Brfiadvag wlv4 vorsugeweise IhiI der Herstellung von letoaforaliagea» insbesondere Betonforastelnen «ur Herstellung m 8trol«««, *ege~ «ad Flatsdeeken verwendet· Durch Al· Bvflndvag le* es aöglioh, «la· la Aufbau und in der Arbeitsweise TOxItKItOlMKSiC einfache loraaaeohine 10 su verwenden· Mese enthält einen triohterfBraigen Betonbehälter 11» «a« de« unten der Frleohbeton ontnoaaon wird. Die Forallnge, alalieh Foraeteine It aui Beton, werden alt einer for« 13 hergestellt, die »ui einer Mehr—hl von duroh Trennwänden abgeteilten foraneatern« je für einen ?ometein 12, besteht· Me font 19 let bei der AuefUhrungefora naoh flg. 1 bis 5 der sehe «aeh eMrereehiebber gelagert. Der frieohbeton vlzd alt Hilfe einer la einseinen nioht dargestellten rullTorriehtung won oben her la die offene Vera 19 eingefüllt. Sodann werden Frefleteapel 14 von oben her abgesenkt» derart» dsl je ein Treisteapel in ein foranest der Fora 19 eintritt· Boxen diesen Preßeteapel 14 wird der Beton verdientet. Bit Brfiadvag wlv4 as a precaution IhiI the production of letoaforaliagea "especially concrete forastelnen" ur production with 8trol """, * ege ~" ad Flatsdeeken used · by Al · Bvflndvag le * es aöglioh, «la · la structure and in the way of working TOxItaeohItOlMMAS simple 10 how to use it · Mese contains a triohterfBraigen concrete container 11 "" a "de" below which Frleohbeton is ontnoaaon. The formulas, alalie Foraeteine It auii concrete, are made from a for «13, the» ui one more — half of the foraneatern divided by duroh dividing walls «each for an ometein 12, consists · Me font 19 let at the executionfora near flg. 1 up to 5 of the see «aeh eMrereehiebber stored. RullTorriehtung shown the frieohbeton vlzd old one help one a la nioht won above the open la Vera 19 filled. Then the open stack 14 are lowered from above "in such a way that a treble stack enters a foranest of the fora 19. Boxes this press stack 14 deserves the concrete.

Unterhalb der unten offenen fora 19 1st ein Rütteltisch 15 angeordnet» der duroh Rüttelbewegung eine weitere Terdichtung des Betons in der Fora 19 herbeiführt· Der Rütteltieoh 15 1st bei« vorliegenden Beispiel unversohiebbar· lach ausreichende* Terdiohtung der Forasteine 12 in der Fora 19 wird diese relativ m dea Preisteapel 14 angehoben, woduroh die Foraeteine 12 aus der Fora 19 naoh unten aasgestotea bsw. auf dea Rtttteltleeh 15 smrttokgehaltsn werden· He FreBstea· pel 14 werden sodann ebenfalls angehoben» so dafl die Fora~ steine 12 frei liegen·Below the fora 19, which is open at the bottom, is a vibrating table 15 arranged »the duroh shaking movement another seal of the concrete in Fora 19 brings about · Der Rütteltieoh 15 Is irreversible in the present example · laugh sufficient * termination of the fora stones 12 in the fora 19 this relatively m dea price stack 14 raised, where the Foraeteine 12 from the fora 19 naoh below aasgestotea bsw. on dea Rtteltleeh 15 smrttok salaries are · He FreBstea · Pels 14 are then also raised, so that the fora ~ stones 12 are exposed

OeaKi der Srf ladung werden die Formeteine 12 auf einer and· liehen Folie aas Kunststoff oder dergleichen sowohl herge-OeaKi of the Srf charge, the shaped pieces 12 are placed on another borrowed film as plastic or the like both produced

109815/UOO109815 / UOO

stellt wie auch aus der Vorrichtung entnommen und gelagert« Zu dieeem Zweck wird von einer Vorratsrolle 30 diskontinuierlich die folie 19 abgesogen und über den Rütteltisch 15 hinweggeleitet· Die Tonsteine 12 liegen bei ihrer Herstellung sowie nach desi Entformen auf der folie 19· as well as removed from the device and stored. For this purpose, a supply roll 30 is discontinuous the film 19 is sucked off and passed over the vibrating table 15 the clay stones 12 lie on the film 19 during their manufacture and after they have been removed from the mold

Räch den Abheben der Fora 13 sowie der Preßetempel 14 wird die Folie 19 um einen Betrag in Richtung gemäß Pfeil 31 transportiert, wobei die Forasteine 12 mitgenommen werden· Mit der Folie 19 werden so die entformten, frischen Fora- ' steine 12 roe Rütteltisch 15 abgefördert und gelangen auf einen Zwisohentiseh 32. Hier bleiben die Forasteine 12 während eines Arbeitstaktes auf der Folie 19 liegen, wobei gleichseitig die nächste Lage Formet eine 12 in der beschriebenen Weise im Bereloh des Rütteltisches 15 auf der Folie hergestellt wird.Avenge the lifting of the fora 13 and the press die 14 is the film 19 is transported by an amount in the direction according to arrow 31, whereby the fora stones 12 are taken along With the film 19, the demolded, fresh Fora ' stones 12 roe vibrating table 15 conveyed away and arrive at a Zwisohentiseh 32. Here the fora stones 12 remain lie on the foil 19 during a work cycle, with the next layer forming a 12 in the manner described in the Bereloh of the vibrating table 15 on the foil will be produced.

Bein nächsten ftrensporttakt der Folie 19 werden die Foj steine 12 tob Zwisohentisoh 32 in den Bereich der Ablage gefördert, näalloh oberhalb eines bereits vorhandenen Stapels 27 bsw. einer den Stapel 27 aufnehmenden Palette 25· Die Ablage der Formsteine 12 auf der Palette 25 bsw· dea Stapel ä 27 erfolgt mit Hilfe eines dünnen Ablagebleohes 35» weichte mit einen abglichst geringen Abstand, sun Beispiel von 5 am, oberhalb der Palette 25 bsw. oberhalb des Stapels 27 angeordnet 1st. Die Forasteine 12 werden sunäohst mit der Folie 19 auf dieses Ablagebleoh 33 gefordert» bis die Forasteine 12 oberhalb des Stapele 27 liegen· Sodann wird das Ablagebleoh 33 seitlich abgesogen» bei Fig· 1 naoh reohte» derart» dad die Formstein· 12 nacheinander auf den vorhandenen Stapel 27 Tom Ablagebleoh 33 abgleiten, !fach Ablage der Forasteine 12 mit der Folie 19 auf dea Stapel 27 wird la BereiohIn the next ftrensportstakt the foil 19 the foj stones 12 tob two-sided 32 are conveyed in the area of the deposit, next above an already existing stack 27 for example. a stack 27 receiving pallet 25 · The tray of shaped blocks 12 on the pallet 25 bsw · dea stack ä 27 is effected by means of a thin Ablagebleohes 35 »soaked with a abglichst small distance, sun example of 5 am, bsw above the pallet 25th is arranged above the stack 27. The fora stones 12 are pushed onto this storage block 33 with the foil 19 until the fora stones 12 are above the stack 27 existing stack 27 slide off the shelf 33,! fold storage of the fora stones 12 with the foil 19 on the stack 27 is la Bereioh

109815/UOO109815 / UOO

■wischen des Stapel 27 und dtr nächstfolgenden Gruppe Formsteine 12, «l*o is Bereich swisehen Stapel 27 und Zwischentisch 32 tin Trenniohnitt durchgeführt, β. Β. alt Hilfe eines beheisten frenndrahtee 34· Nunnehr ist eine La^e Forme teine 12 Bit einen Abschnitt der Folie 19 als Zwischenschicht auf des Stapel 27 bsw. der Palette 25 abgelegt. Das Ablageblech 33 wird sodann in die Ausganges teilung «urüolcgefahren. Biese hin* und hergehenden Bewegungen des Ablagebleohoe 33 werden alt Hilfe eines Druckaitteleylinders 35 vollsogen.Between the stack 27 and the next group of shaped stones 12, the area between the stack 27 and the intermediate table 32 tin separation carried out, β. Β. old help one beheisten frenndrahtee 34 · Nunnehr is a La ^ e Forme teine 12 bit a section of the film 19 as an intermediate layer on the stack 27 bsw. the pallet 25 deposited. The storage tray 33 is then driven to the exit division. tuck back and forth movements of the Ablagebleohoe 33 are old with the help of a pressure cylinder 35 soaked through.

PUr den Transport der Folie 19 ist eine hin-* und herbewegbare ßreifsange 36 vorgesehen. Diese wird ebenfalls durch einen Druokelttelaylinder 37 oberhalb des Stapele 27 hin- und herbewegt· Die Kleoabaoken 38 und 39 der Oreifsange sind in Horisontalriohtung gegeneinander bewegbar· Us das abgetrennte freie Bnde der Folie 19 «u erfassen» wird dieses Folienende duroh Ton unten auf die Folie wirkende Druckluft aufwärts gerlohtet in eine Vertikaleteilung» so dafi die Klemmbacken 38 und 39 duroh Zusaaeenfahren das Bnde der Folie 19 erfassen können· Pie Bewegungen des Ablagebleohes 33 und der Greifsänge 36 sind so aufeinander abreetiamt, daß sunäohet die Folie 19 erfeJt und mit den Formeteinen 12 auf das Ablagebleoh 33 transportiert wird. Sodann erfolgt die Bewegung dee Ablagebleob.ee 33 sur Ablage der Fomsteine 12 mit der Folie 19 auf des Stapel 27· Vtfhrend dieser Phase befindet sich der die abzulegenden Forasteine 12 tragende Bereich der Folie 19 noch in Verbindung mit den übrigen Teil der Folie 19. Nach Vollsug de» Tpsnnsohnitts werden Ablagebleoh 33 und Greifsamge 36 in die Ausgangsstellung surUokgef ehren.For the transport of the film 19 is a back and forth movable ßreifsange 36 is provided. This is also moved back and forth by a Druokelttelaylinder 37 above the stack 27. The Kleoabaoken 38 and 39 of the Oreifsange are in Horizontal direction can be moved relative to one another. Us the separated free volume of the film 19 "u" will capture this end of the film Duroh sound below on the film acting compressed air upwards brazed in a vertical division »so that the clamping jaws 38 and 39 can capture the volume of the foil 19 by moving the tape together · Pie movements of the storage bar 33 and the gripping chords 36 are so abreetiamt one another that sunäohet them Foil 19 and with the shaped blocks 12 on the storage shelf 33 is transported. Then the movement dee takes place Ablagebleob.ee 33 sur storage of the shaped stones 12 with the foil 19 on the stack 27. During this phase, the area of the foil 19 carrying the fora stones 12 to be deposited is located still in connection with the remaining part of slide 19. After Vollsug de »Tpsnnsohnitts will be filing dead 33 and collection 36 in the starting position surUokgef honor.

Die Palette 25 liegt auf eine« heb- und senkbaren Palettentieoh 40· Nach Ablage einer Gruppe von Formeteinen 12 aufThe pallet 25 lies on a pallet drawer that can be raised and lowered 40 · After depositing a group of shaped pieces 12 on

109815/UOO109815 / UOO

de« Stapel 27 b*w. auf der Palette 85 wird der Paletteatlsca 40 us eiaea der HSh· der Stelalage eatapracaeadea Betrag abgaaeakt. Da die Pejnasteiae la ihrer Bin· «lent geaerell Ubaraiastiaataad aiad, seadara üblicherweise gewisse Herstel~ luagstolaraasea aiaftretea, i»t k«la f«*t·· AbseakMAft 4mb Pal«tt«atieca·· 40 v*r(···!»·«, aoatfam 4····* A»««dclMi««sttas wird durch «lB«m H»fc*ata«t«r 4l gaetttmert, der adt atm A·- l»l*bleeh 53 tt»«r umm Sta»«l 27 ^a- «ad k«rb«v«ft wir« aad bei di«e«r Bewtgoas dl· H)M der ab g· legt «a Foraatela· 12 abtastet WMl #atspr«ch«ad di· JO»e«alcb«w«g«aig d·· P«X«tt«atiachaa 40 st«u«rt.de «Stack 27 b * w. on the pallet 85 the pallet atlsca 40 us eiaea the HSh · the stelalage eatapracaeadea amount is paid off. Since the Pejnasteiae la their Bin · «lent geaerell Ubaraiastiaataad aiad, seadara usually certain manufacturers luagstolaraasea aiaftretea, i» tk «la f« * t ·· AbseakMAft 4mb Pal «tt« atieca ·· 40 v * r (···! »·«, Aoatfam 4 ···· * A »« «dclMi« «sttas is gaetttmert by« lB «m H» fc * ata «t« r 4l, the adt atm A · - l »l * bleeh 53 tt »« R umm Sta »« l 27 ^ a- «ad k« rb «v« ft we «aad at di« e «r Bewtgoas dl · H) M who ab g · lays« a Foraatela · 12 scans WMl #atspr «Ch« ad di · JO »e« alcb «w« g «aig d ·· P« X «tt« atiachaa 40 st «u« rt.

Ia dar «attar»a Badatallaag wird dia PaIatta 25 auf alaaa Tranaportrataaaa %2 abgalagt, dar la Qaarrichtvatg «it SKdara 43 vn<i 4% a«f fchlaaaa %5 «ad 46 varfahrbar let. Di· Läng· da« Traaaportrabjaaaa 42 aawia dar Pahrbaraich daaaalbaa «lad •o b·■·■··&, daß Javalls aia «la· 1··γ· Palatt· 25 aufaaaavtada· Kada da· Traaspartrabataa· 42 a«· da» Baraich dar Yarrletatuag h«rauoragt (rig* 3)· V·»« ·**· Palatta 25 b*l*daa iats wird »la durch Taraehlabiaag #»· traampmrtrmii ~ ~ / " r-Baraieh dar Ablagaetatiam harausgaf«hra& la de» l«r«i«'& %*- ort «fas tan« swiachaa daa aatapraehaad laagaa Scaiaaaa 45 «id 46 aagaordaataa Lagaretaapala 47 «»<* 48. Tier diaear hydraalisch hohaararataXlbaraa Lagarataspal 47 «ad 48 erfassaa dl· baladaaa Palette aa iaraa rtmr Kekaa« habaa sie vom Traa*j»«rtrabaiaw 42 ab «ad aalte« sie la dlaaar Stelluag für am& weitere« Abtraaapert· "*«r aa&u. >«ar «atladeae Traaeportrahaiaa 42 kaaa la die Attagaag»et«ll««g aarttckgefaare« werdea.Ia dar «attar» a Badatallaag dia PaIatta 25 is stored on alaaa Tranaportrataaaa% 2, dar la Qaarrichtvatg «it SKdara 43 vn <i 4% a« f fchlaaaa% 5 «ad 46 variable let. Di · Läng · da «Traaaportrabjaaaa 42 aawia dar Pahrbaraich daaaalbaa« lad • ob · ■ · ■ ·· & that Javalls aia «la · 1 ·· γ · Palatt · 25 aufaaaavtada · Kada da · Traaspartrabataa · 42 a« da »Baraich dar Yarrletatuag h« rauoragt (rig * 3) · V · »« · ** · Palatta 25 b * l * daa iat s becomes »la through Taraehlabiaag #» · traampmrtrmii ~ ~ / " r -Baraieh dar Ablagaetatiam harausgaf« hra & la de »l« r «i« '&% * - ort «fas tan« swiachaa daa aatapraehaad laagaa Scaiaaaa 45 «id 46 aagaordaataa Lagaretaapala 47« »<* 48. Animal diaear hydraalisch hohaararata ·lbaraa Lagarataspala 47« ad 48 erfassa baladaaa palette aa iaraa rtmr Kekaa «habaa you from Traa * j» «rtrabaiaw 42 from« ad aalte «you la dlaaar Stelluag for am & other« Abtraaapert · "*« r aa & u. >"Ar" atladeae Traaeportrahaiaa 42 kaaa la die Attagaag "et" ll "" g aarttckgefaare "werdea.

Bei imr AusfUhnuissfoni geMltA Pig. 4 al· 6 iat der Rütteltisch 15 la <ier Poraaiascalae IO varfahrbar, aHatlich ans der Stelluag ge«IUl Pig. 4 la die Stallaas gesllft Fig. 5 ««d murück.At imr AusfUhnuissfoni GEMltA Pig. 4 al · 6 iat the vibrating table 15 la <ier Poraaiascalae IO movable, also to the position ge «IUl Pig. 4 la die Stallaas Gesllft Fig. 5 «« back.

109816/UOO109816 / UOO

Dl· Batnahae der Forasteine 12 erfolgt hler mit einem τ·γ-fahrbaren Sntnahaetlsoh 18» dtr sweokaäßigerwelee alt dem Rtttteltieoh 15 verbinden 1st· Auf der Obereelte des Entnahaetlsohes 18 liegt dl· Foil· 19» dl· von einer Vorratsrolle 20 abgesogen werden kann.Dl · Batnahae of the fora stones 12 takes place with a τ · γ-mobile Sntnahaetlsoh 18 »dtr sweokaäßigerwelee old dem Rtteltieoh 15 connect 1st · On the upper part of the Entnahaetlsohes 18 lies dl · Foil · 19 »dl · from a supply roll 20 can be sucked off.

Der Bntnahaetisoh 18 let bei der dargestellten AusfUhrungaform abeeakoar« jedooh Ib Rlohtung auf dl· obere Endeteilung geaäB Pig. 4 tad 5 belastet« sub Beispiel duroh eine Zugfeder 22· In einer unteren Bndstellung 1st der Entnahmetisch 18 arretierbar.The Bntnahaetisoh 18 let in the embodiment shown abeeakoar «jedooh Ib Rlohtung on the upper end division here Pig. 4 tad 5 loaded «sub example by means of a tension spring 22 The removal table 18 is in a lower band position lockable.

Der Entnahaetisch 18 wird alt der auf eelner Oberseite liegenden folie 19 In der oberen Endeteilung In die Foraaeeohlne 10 eingeführt, nttalloh unter die hler unbewegliche Pom 13· Sodann werden die fertigen, noch rohen Po met eine 12 au· der Pom 19 auegeetoften duroh Absanken der Preßsteapel 14· Bei dleeer AuaetoAbewegung wird der £atnah»etisoh abgesenkt la dl· untere Bad·teilung geaäe Flg. 6 und dort fixiert· Xa dleeer Stellung eind die Poreeteine 12 von der Fora 13 Tölllg frei» eo da· nunaehr der Sntnahaetisoh 18 aus dar Poraaasohlne 10 herausgefahren werden kann» wobei gleioh-•eitig der RUtteltieoh 15 In die Ausgangsetellung geaäf Flg. 5 surtiokkehrt.The removal table 18 becomes old that on one upper side lying folie 19 In the upper end division into the Foraaeeohlne 10 introduced, nttalloh under the hler immovable Pom 13 · Then the finished, still raw Po met becomes one 12 au · the pom 19 auegeetoften duroh lowering of the press stack 14 · In the case of the dleeer AuaetoA movement, the £ atnah »etisoh lowered la dl · lower bathroom division geaäe Flg. 6 and there fixes the empty position and the pores 12 of the Fora 13 Tölllg free »eo da · now the Sntnahaetisoh 18 from that Poraaa sole 10 can be moved out »with simultaneous • der RUtteltieoh 15 In the starting position geaäf Flg. 5 surtio returns.

Die Palette 25 mir Aufnahae der Formsteine 12 let hler auf elaea Oabelstapler 24 angeordnet« dessen Oabeln 26 taktwelee naoh dea FUllungagrad der Palette 25 abgesenkt werden·The pallet 25 with a recording of the shaped bricks 12 liters elaea Oabelstapler 24 arranged «whose Oabeln 26 taktwelee after the filling level of the pallet 25 are lowered

Der Batnehaetleoh 18 alt dea Foraetelnea 12 wird bis in den Bereich oberhalb der Gabel 26 gefahren. Das freie Bad· der Foil· 19 wird sodann aa Oabelstapler duroh «la· Kleaaelnrloh-The Batnehaetleoh 18 old dea Foraetelnea 12 is up in the Area above the fork 26 driven. The free bath · der Foil · 19 is then aa Oabelstapler duroh «la · Kleaaelnrloh-

109815/U00109815 / U00

tung 28 fixiert· VmuMhr wird der ftttnahaetlMh 18 ton des Gabelstapler 24 angesogen« wodurch dl· Torasteine 12 »it
der Foil· 19 auf der Palette 25 bsw· dta 8t»p«l 27 abgeltet werden. Zwiechen des Stapel 27 und des wieder in die for»» ■aaohine 10 eingefahrenen Eatnahaetlech 18 wird sodann ein Trenneohnitt dureh die Tolle 19 hl&durehgefUhrt·
device 28 fixed · VmuMhr the ftttnahaetlMh 18 ton of the forklift 24 is sucked in «whereby the · Torasteine 12» it
the foil · 19 on the pallet 25 bsw · dta 8t »p« l 27 can be removed. Between the stack 27 and the Eatnahaetlech 18 retracted back into the for »» ■ aaohine 10, a separation is then carried out through the roller 19 ·

109815/UOO109815 / UOO

Claims (1)

iniprUchtiniprUcht 1. Yerfahren suar Abförderung ran Formungen aue einer Formmaschine, roraugsweise sur Abförderung von Betonforallngen, insbesondere Betonformstein« (12), au· einer 8toinfoimmss»liliic (1O)t wobei dl· Formling· auf einer Unterlage entformt und auf dl···!1 Unterimg· au· der Pora-■aeohine abtransportiert werden, daduroh gekenna β lohnet, dat dl· fonuLiae·· lnebeeondere »oimeteine (12) in der foiMMülMue (10) auf einer dünnen Bahn» Inibeeondere folie (19)· Papierbahn oder dergleiohen entforet und auf dieser foil· (19) oder dergleiohen ohne Yeränderung der Relativlage der Porelinge (12) au· der roreeaeohine (10) ent—e und «it dieser folie (19) oder dergleiohen in lac·« Übereinander in frische* Zustand des Material·» insbesondere Beton·· gelagert werden.1. Yerfahren suar removal conveyance ran formations aue a molding machine roraugsweise sur conveyed away from Betonforallngen, especially concrete block "(12), au · a 8toinfoimmss" liliic (1O) t where dl · molding · unmolded on a base and on dl · ·! 1 Unterimg · au · the Pora- ■ aeohine can be transported away, daduroh gekenna β is worthwhile, dat dl · fonuLiae ·· lnebee special »oimeteine (12) in the foiMMülMue (10) on a thin web of» Inibee special foil (19) · paper web or the like deforested and on this foil (19) or dergleiohen without changing the relative position of the porelings (12) outside of the roreeaeohine (10) and on this foil (19) or dergleiohen in lacquer one on top of the other in a fresh state Material · »especially concrete ·· must be stored. 2« Terfahren »aoh Anspruoh 1, dadurch gekennselohnet, da· dl· foraateine (12) auf der dünn·» Bahn, insbesondere foil· (19) hergestellt werden.2 "Driving" aoh Claim 1, thereby being rewarded, da · dl · foraateine (12) on the thin · »track, in particular foil (19). 3· Terfahrea lnsbesonder« naoh Anspruch 1 und/oder 2» dadurch gekeiu»elohnet, dal dl· dünne BaIm9 insbesondere Teile (19)» Papierbahn oder dergleichen al· Fördemittel für dl· formlinge (12) bis sur Abist«· derselben mit der BaIm1 foil· (19) oder dergleiohen auf einer Aufnahm·, s.B. Palette (25) beslehungsvel·· auf einem Stap·! (27) dient.3 · Terfahrea ln particular "according to claim 1 and / or 2" is not rewarded because the thin balls 9 in particular parts (19) "paper web or the like as conveying means for the moldings (12) up to and including" the same the BaIm 1 foil (27) is used. 109815/1400109815/1400 4. Verfahren naoh einen oder mehreren der Ansprüche 1-3» dadurch gekenneeichnet, daß die endliehe Bahn, insbesondere Folie (19) abschnittweise mit darauf liegenden Forasteinen (12) bis in den Bereich einer Ablage transportiert wird und daß nach den Ablegen Aar Formsteine (12) Ait der Folie (19) ein rrennechnitt durch die ?olie (19) geführt wird, derart, daß die Fomateine (12) «it eines Polienabeohnitt abgelegt eind·4. Procedure naoh one or more of claims 1-3 » gekenneeichnet that the finite path, in particular Foil (19) is transported in sections with fora stones (12) lying on it as far as the area of a shelf and that after dropping Aar shaped stones (12) Ait the foil (19) a race pass through the oil (19) is carried out in such a way that that the format (12) has been filed by a Polienabeohnitt and · 5. Vorrichtung insbesondere sur Durchführung des Verfahrens nach einen oder mehreren der Anspruchs 1*4» dadurch gekennsoiohnot» dafl die folie (19) wenigstens in Bsreioh einer Fora (15) «ur Herstellung der Forasteine (12) in der Formmaschine (10) auf einer starren Unterlage» insbesondere auf dem Rütteltisch (15) oder einen Bntnahnetisoh (18) auf* liegt.5. Device in particular for carrying out the method according to one or more of claims 1 * 4 »thereby knowing that the film (19) at least in Bsreioh a fora (15) "for producing the fora stones (12) in the molding machine (10) on a rigid base" in particular on the vibrating table (15) or a Bntnahnetisoh (18) on * lies. 6. Vorrichtung nach Anspruch 5· dadurch6. Apparatus according to claim 5 · thereby daß die Folie (19) auf ihrer gesamten Traneportstreck«« τ der Form (13) bis «ur Ablage auf einer starren Unterlage geführt ist.that the film (19) on its entire transport route «« τ the form (13) until «ur shelf is guided on a rigid base. 7. Vorrichtung insbesondere nach Anspruch 5 und/oder 6» dadurch gekennzeichnet, daß die Formsteine (12) auf der Folie (19) auf * η obe» lalb der Ablage» insbesondere oberhalb einer Palette (25) besiehungsveise oberhalb eines Stapele (27) angeordnetes dU&nes Ablageblech (53) förderbar sind, welches «ur Ablage 4er Forneteine (12) mit der Folie (19) auf der Palette (25) bcsiehungsweisc auf den Stapel (27) Burüoksiehbar ist.7. Device in particular according to claim 5 and / or 6 »characterized in that the shaped stones (12) on the film (19) on * η above» lalb the shelf »in particular above a pallet (25) as above a stack (27) arranged thin storage plate (53) can be conveyed, which can be viewed for storage of 4-piece shapes (12) with the film (19) on the pallet (25) with respect to the stack (27). 109815/UOO109815 / UOO ·. Terrichtamg mach eimern oder mehrere» der Ansprüche 5-7 dadurch gekemmseiemmet, daft awiaehe» dem Rütteltisch (15) mad dem Ablagehlee» (33) aim ertafeatea Zwlschemamflager« lmsbeaemdere eim Zwiachemtlach, amgeeremet iat, deaaem Abmeaammgen im Pttrderriemtmmg dam Abatamd awlscha« amfeimamdarfolgerndem Lagern vom Pormateimem (18) eat spricht.·. Terrichtamg make buckets or several »of claims 5-7 thereby kemmseiemmet, because awiaehe» mad of the vibrating table (15) dem Ablagehlee »(33) aim ertafeatea Zwlschemamflager« lmsbeaemdere eim Zwiachemtlach, amgeeremet iat, deaaem Abmeaammgen im Pttrderriemtmmg dam Abatamd awlscha «amfeimamdarfolerndem Storage speaks of the Pormateimem (18) eat. 9· Tarrialitvas urnnh aiaaai «dar mmhrmrmm dar uaiaprtteha S- ·. gakawuaiateat derail aima him. tamd mar»a«agb«ra« abarhalb daa •ta»ala (17) irmrteiuc%mrm erairsamga (36) mai lrfaaaam daa freiam lmdaa dar Palia (19) aa wie rnrnt Tramapart derselbe» bis im dam Bareleh eberhalb daa Stapels (87).9 · Tarrialitvas urnnh aiaaai «dar mmhrmrmm dar uaiaprtteha S- ·. gakawuaiateat derail aima him. tamd mar "a" agb "ra" abarhalb daa • ta "ala (17) irmrteiuc% mrm erairsamga (36) mai lrfaaaam daa freiam lmdaa dar Palia (19) aa like rnrnt Tramapart the same" until in the dam Bareleh eberhalb daa stack (87 ). 10· Yerrlemtwmg imabaaara maah aimaa «der mehrerem dar Amaprttehe 1-9. dadmrah gekemmaalebmet, daft dia Abseakbewe- «mmgam daa «mf eimosi heb- «md semkbare» Falettemtlsch (40) rmhemdem ftapels (17) dmram eimern BBhemtaster (%l) etowerbar 1st. dar maeh Ablage aimer Lage rarmatalme (18) dare» wirkliehe mVhe abtastet mmd amtapraememd die Abaamkbewagmmg dea Palattemtlaahea (%0) atemert.10 · Yerrlemtwmg imabaaara maah aimaa «of several Amaprttehe 1-9. dadmrah gekemmaalebmet, daft dia Abseakbewe- «Mmgam daa« mf eimosi heb- «md semkbare» Falettemtlsch (40) rmhemdem ftapels (17) dmram buckets BBhemtaster (% l) can be towered 1st. dar maeh filing aimer location rarmatalme (18) dare »actually mVhe scans mmd amtapraememd the Abaamkbewagmmg dea Palattemtlaahea (% 0) is breathing. 11. Terriehtmmg »ach Ameprmem 10, dadmrah gekemmseicmm«t, daft der mlhemtaster *l) adt dam Ablagebleeh (33) aber dem Stapel (87) mim- mmd herbewegbar ist.11. Terriehtmmg "oh Ameprmem 10, dadmrah kemmseicmm" t, daft the mlhemtaster * l) adt dam storage shelf (33) but that Stack (87) mim- mmd is movable. 18. Tarriehtmmg maah A»apr«ch 5, dadurch gekemmaelcbmet, daft der «Otteltiach (15) verfehrbar mmd dar Imtmammetlech (ΐβ) mit dar daramfllegemdem PaUe (19), Papierbah» ader der gleiche» maak Svreekmiehea dea Kitteltlaches (15) im dem Bereich der Pam (13) bewegbar ist mmd die Parmatelme (18) «mf dem18. Tarriehtmmg maah A "apr" ch 5, thereby gekemmaelcbmet, daft der «Otteltiach (15) available mmd dar Imtmammetlech (ΐβ) with the PaUe (19) below, paper train "or the same" maak Svreekmiehea dea Kitteltlaches (15) in the area of the Pam (13) is movable with the Parmatelme (18) 109816/ UOO109816 / UOO ßADßAD originaloriginal Sntnaluwtieeh (18) beslehungeweiae dl« darauf angeordnete folie (19) oder dergleichen entforabar aind, wobei gecebenenfalle der Entnahaetlaoh (16) abeenkbar iet.Sntnaluwtieeh (18) beslehungeweiae dl «arranged on it Foil (19) or the like can be removed from the mold, with gecebenen trap the Entnahaetlaoh (16) can be deflected. 13· Torrlohtusg nach Anepruch 12, dadxiroh gekeonieiolinetv dad Rütteltieoh (15) und ftitnahwitlaeh (18) Miteinander τ·γ-bunden eind·13 Torrlohtusg according to Anepruch 12, dadxiroh gekeonieiolinet v dad Rütteltieoh (15) and ftitnahwitlaeh (18) τ γ-bound together 14· Vorrichtung nach Anapruch 12 und/oder 13t daduroh gekennselohnet, das an den JOitnahaetlseh (18) eine Torrateroll· (20) fUr die folie (19), Papierbahn oder dergleichen angeordnet iet. 14 · Device according to Anapruch 12 and / or 13t daduroh recognized, that at the JOitnahaetlseh (18) a torra roll (20) for the film (19), paper web or the like is arranged. für den Anmelder: Meissner ft Bolt· Patentanwältefor the applicant: Meissner ft Bolt · Patentanwälte Bremen, den 14· Sept. 1970Bremen, September 14, 1970 Allgemeine Straßenbaubedarfe-Oeeellaehaft mbH·General road construction needs-oil liability mbH Unter den Linden 31/35Unter den Linden 31/35 109815/UüO109815 / UüO AfAf LeerseifeEmpty soap
DE19702046437 1969-09-30 1970-09-21 Device for requesting fresh moldings for concrete blocks or the like from a molding machine Expired DE2046437C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR6933235A FR2064577A5 (en) 1969-09-30 1969-09-30
FR6933235 1969-09-30

Publications (2)

Publication Number Publication Date
DE2046437A1 true DE2046437A1 (en) 1971-04-08
DE2046437C DE2046437C (en) 1973-03-08

Family

ID=

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2322811A1 (en) * 1975-09-03 1977-04-01 Alcan Res & Dev APPARATUS TO LOAD SITES
WO1981002878A1 (en) * 1980-04-02 1981-10-15 Krupp Polysius Ag A method and a plant for the piling of bricks

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2322811A1 (en) * 1975-09-03 1977-04-01 Alcan Res & Dev APPARATUS TO LOAD SITES
WO1981002878A1 (en) * 1980-04-02 1981-10-15 Krupp Polysius Ag A method and a plant for the piling of bricks

Also Published As

Publication number Publication date
ES384107A1 (en) 1974-06-01
FR2064577A5 (en) 1971-07-23
BE756774A (en) 1971-03-01
GB1309138A (en) 1973-03-07
DK124463B (en) 1972-10-23
CH521835A (en) 1972-04-30
NL7014275A (en) 1971-04-01

Similar Documents

Publication Publication Date Title
DE2024758A1 (en) Method and device for stacking and depositing products formed from concrete or similar materials on plates
DE2046437A1 (en) Method and device for Abför deration of moldings, in particular concrete moldings from a molding machine
EP0838157A1 (en) Process, apparatus and casting plate for making chocolate slabs or chocolate biscuits
EP1125717B1 (en) Method and device for piling containers made of thermoplastic material
DE60013759T2 (en) Method and apparatus for cutting cut material for cardboard boxes
DE3105237C2 (en) Plant for the production of tempered chipboard, fiberboard and the like.
DE2636320A1 (en) PROCESS AND MACHINE FOR AUTOMATIC PALLETIZING OF OBJECTS
DE4227726C2 (en) System for pressing laminates
DE2558340C2 (en) Device for stacking block-shaped goods
DE10141964B4 (en) Method and apparatus for stacking giants
DE3641450A1 (en) MACHINE FOR PRODUCING THREE-PIECE TABLETS AND BOXES
DE2046437C (en) Device for requesting fresh moldings for concrete blocks or the like from a molding machine
DE1941967C3 (en) Method and device for the production of objects, in particular concrete slabs, from hardening material
DE3015443C2 (en) Stone forming machine
EP2275350A2 (en) Cartridge for storing flat elements, packaging device, method
DE1683989C (en) Device for demolding and stacking of moldings made of concrete in a molding machine or the like
DE2046437B (en) Device for requesting fresh moldings for concrete blocks or the like from a molding machine
AT239112B (en) Method and device for depositing and stacking concrete bricks
AT393258B (en) Process for stacking cuboidal products one above the other, and apparatus for carrying out the process
DE2239751C2 (en) Stacking device for boxes in layers on pallet - has parallel conveyors leading to liftable platform, with support strips rotatable to release boxes
DE3100003A1 (en) Process and apparatus for the stacking of stackable material, especially of mineral-fibre boards in a production line
DE1683989A1 (en) Device for demoulding highly compressed artificial stones
DE1683989B (en) Device for demolding and stacking of moldings made of concrete in a molding machine or the like
DE102004011002A1 (en) Method for operating a thermoforming machine and thermoforming machine
DE102007022845A1 (en) Filling magazine for filling shaft trays and filling station with such a filling magazine

Legal Events

Date Code Title Description
SH Request for examination between 03.10.1968 and 22.04.1971
C3 Grant after two publication steps (3rd publication)