DE2030982C3 - - Google Patents

Info

Publication number
DE2030982C3
DE2030982C3 DE19702030982 DE2030982A DE2030982C3 DE 2030982 C3 DE2030982 C3 DE 2030982C3 DE 19702030982 DE19702030982 DE 19702030982 DE 2030982 A DE2030982 A DE 2030982A DE 2030982 C3 DE2030982 C3 DE 2030982C3
Authority
DE
Germany
Prior art keywords
building material
area
length
borehole
tension member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19702030982
Other languages
German (de)
Other versions
DE2030982A1 (en
DE2030982B2 (en
Inventor
Ernst Dipl.-Ing. 8011 Poering Reichert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stump Bohr GmbH
Original Assignee
Stump Bohr GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stump Bohr GmbH filed Critical Stump Bohr GmbH
Priority to DE19702030982 priority Critical patent/DE2030982B2/en
Priority to ES391752A priority patent/ES391752A1/en
Priority to CH918271A priority patent/CH534265A/en
Publication of DE2030982A1 publication Critical patent/DE2030982A1/en
Publication of DE2030982B2 publication Critical patent/DE2030982B2/en
Application granted granted Critical
Publication of DE2030982C3 publication Critical patent/DE2030982C3/de
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

»tfidcrndeTodoi wr/opct idcs Medium iinicj* Druck eingeht acht wird, weil.lies die I uge bildet»TfidcrndeTodoi wr / opct idcs Medium iinicj * Pressure is important because.lies form the eye

2. Verfahren nach Anspruch I. dadurch gekennzeichnet, daß als Medium ein Zementbrei mit einem das Abbinden verzögernden bzw. verhindernden Zusatz verwendet wird.2. The method according to claim I. characterized in that that as a medium a cement paste with a setting retarding or preventing Addition is used.

Die Erfindung bezieht sich auf ein Verfahren zum Herstellen eines Verpreßankers. bei dem ein Zugglied, das über eine vorbestimmte l~änge mit einer Umhüllung umgeben ist. in ein Bohrloch eingebracht und in die Krafteintragungslänge erhärtender Baustoff injiziert und im Bereich der freien Ankeriänge der Raum zwischen Umhüllung und Bohrlochwand mit erhärtendem Baustoff ausgefüllt sowie der Baustoff im Bereich der Kriifteintragungslängc vom Baustoff im Bereich der freien Ankerlänge unter Bildung einer Fug? getrennt wird, nach Hauptpatent 1 904 371.The invention relates to a method for producing a grout anchor. in which a tension member, which is surrounded by a sheath over a predetermined length. placed in a borehole and in the force application length of the hardening building material is injected and the space in the area of the free anchor length between the cladding and the borehole wall filled with hardening building material as well as the building material in the area the force input length of the building material in the area of the free anchor length with the formation of a joint? separated is, according to main patent 1 904 371.

Bei dem vorgenannten Hauptpatent wird die Trennung der Baustoffe zwischen den Bereichen dadurch bewirkt, daß über die das Zugglied über eine vorbestimmte Länge umgebende Umhüllung eine Zugkraft auf den umgebenden Baustoff ausgeübt und dieser von dem Baustoff im Bereich der Krafteintragungslänge abgetrennt und um eine Wegstrecke entfernt wird.In the aforementioned main patent, the separation of the building materials between the areas is thereby causes a tensile force over the casing surrounding the tension member over a predetermined length exerted on the surrounding building material and this separated from the building material in the area of the force input length and is removed by a distance.

Der vorliegenden Erfindung liegt nun die Aufgabe zugrunde, durch weitere Ausbildung des Verfahrens nach dem Hauptpatent die Trennung der beiden Baustoffzonen voneinander mit einfachen Mitteln sicherzustellen. The present invention is now based on the object, through further development of the method according to the main patent to ensure the separation of the two building material zones from each other with simple means.

Die Lösung dieser Aufgabe besteht nach der Erfindung darin, daß in den Bereich zwischen der freien Ankeriänge und der Krafteintragungslänge ein das Abbiniles 8austQ^-fe^hind^Qdes oder ver?öSeradesThe solution to this problem is, according to the invention, that in the area between the free anchor length and the force input length in the Abbiniles 8austQ ^ -fe ^ hind ^ Qdes or ver? ÖSerades

M^ßaajunen fefötdifecpeM ^ ßaajunen fefötdifecpe

Cewähr dafür, <Jaß mir einfachen Mitteln die gCure for it,

der beide» Baustofföone« mit Sicherheit erhalten bleibt. Es wird erreicht daß die auf das Zugglied ausgeübte Zugkraft aUein ober dea Bereich der Kraftrotreigungsiänge auf das umgebende Erdreich ein^ ~itelwho will certainly receive both "building materials" remain. It is achieved that the tensile force exerted on the tension member aUein above the range of Kraftrotreigungsiänge on the surrounding soil an ^ ~ itel

w wirdw will

Das Verfahren nach der Erfindung wird nachfolgendThe method of the invention is as follows

ξ ρ einem Aösführwigsbejspiel näher erläutert.ξ ρ an Aösführwigsbejspiel explained in more detail.

Im Erdreich wird zunächst auf übliche Weise ein Bohrloch hergestellt. Dieses Bohrloch ist mittels einesIn the ground is first used in the usual way Borehole made. This borehole is by means of a

is Rohres, z. B. eines Vortreibrohres, ausgekleidet. In das vorgenannte Bohrloch wird hierauf das Zugglied eingeführt Am Zugglied Ist mindestens eine Zuleitung und wahlweise eine Entlüftungsleitung angeordnet.is Rohres, z. B. a propulsion pipe lined. In the The aforementioned borehole is then inserted into the tension member. On the tension member there is at least one supply line and optionally a vent line arranged.

Das Injizieren des erhärtenden Baustoffes erfolgt da-The hardening building material is then injected

»o durch, daß an das nach außen vorstehende Ende des Vortreibrohres eine Baustoffquelle unter Druck angeschlossen wird. Der zuströmende Baustoff umgibt das Zugglied und tritt bei fortwährendem Ziehen des Vortreibrohres in die Zone der Krafteintragungslänge aus.»O through that to the outwardly protruding end of the Propulsion pipe is connected to a building material source under pressure. The inflowing building material surrounds it Tension member and emerges into the zone of the force input length when the propulsion pipe is continuously pulled.

»5 um dort den Verpreßkörper zu bilden. Das Ziehen des Vortreibrohres erfolgt unter gleichzeitigem Zuführen des Baustoffes unter Druck.»5 to form the grout there. Pulling the The driving pipe is carried out while the building material is being fed in under pressure.

Durch die vorgenannte Zuleitung, deren Austrittsöffnung bis nahe an das luftseitige Ende des Verpreßankers geführt ist. wird ein nicht oder nur verzögernd abbindendes Medium, z. B. Zementbrei mit Zuckerwasser angemacht, eingepumpt. Dieses Medium kann von zäher Konsistenz mit vorzugsweise einem gleichen oder leichteren spezifischen Gtwieht als das des injizierten Baustoffes sein.Through the aforementioned supply line, whose outlet opening is close to the air-side end of the grouting anchor is led. if a medium that does not set or only sets with a delay, e.g. B. cement paste with sugar water turned on, pumped in. This medium can be of chewy consistency with preferably the same or lighter specific weight than that of the injected Be building material.

Hierbei trennt das nicht oder nur verzögernd abbindende, eingepumpte Medium die beiden Baustoffzonen voneinander.
Unter weiterem Ziehen des Vonriebrohres wird im vorgenannten Ausführungsbeispiel in das Bohrloch hinter die mit Zuckerlösung angemachte Zementbreizone kein weiterer Baustoff eingebracht. Der im Bohrloch vorhandene Baustoff ruht auf der Trennzone auf. Der Baustoff in der Zone der Krafteintragungslänge ist in
The pumped-in medium, which does not set or sets only slowly, separates the two building material zones from one another.
While pulling the drive pipe further, no further building material is introduced into the borehole behind the cement paste zone made up with sugar solution in the aforementioned exemplary embodiment. The building material present in the borehole rests on the separation zone. The building material in the zone of the force application length is in

♦5 jedem Fall durch den mit der Zuckerwasserlösung angemachten Zementbrei vom Baustoff in der Zone der freien Ankerlänge getrennt.♦ 5 in each case by the mixed with the sugar water solution Cement paste separated from the building material in the zone of the free anchor length.

Die Prüfung der Tragfähgigkeit des hergestellten Verpreßankers wird in üblicher Weise vorgenommen.The test of the load-bearing capacity of the grouted anchor is carried out in the usual way.

Hält der Verpreßanker der vorgegebenen Prüflast stand, dann ist sichergestellt, daß die vorgegebene Last im Bereich der Krafteintragiingslänge auf das Erdreich übertragen wird.If the grouting anchor withstands the specified test load, it is ensured that the specified load is transferred to the ground in the area of the force input length.

Claims (1)

vorbe-pre- g umgeh en ist, in die KiaFieintrajfi nijii-icri aod im g is bypassed to the KiaFieintra jfi nijii-icri aod im cici Kaum /wischen mil erhärtendem Baustoff im Bereich -Baustoff im Bereich Rdunt» Liner l:ugege-1904 371, da-cici Hardly / wipe with hardening building material in the building material area in the Rdunt area »Liner l : ugege-1904 371, da- r^jbg^^flO^4i^^ieM 1904 371, da- iιCh gükc>ih7.3jVh"7iei. daß m Jon Bereich / wische fi^deV^frcicrrAnkcilanpe und dei Kraftein r ^ jbg ^^ flO ^ 4i ^^ ieM 1904 371, da- i ιCh gükc> ih7.3jVh "7iei. that m Jon area / wische fi ^ deV ^ frcicrrAnkcilanpe und dei Kraftein
DE19702030982 1970-06-23 1970-06-23 Method for producing a grouting anchor Granted DE2030982B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE19702030982 DE2030982B2 (en) 1970-06-23 1970-06-23 Method for producing a grouting anchor
ES391752A ES391752A1 (en) 1970-06-23 1971-05-31 Manufacturing procedure of a traction anchor, especially intended for the anchoring of construction parts. (Machine-translation by Google Translate, not legally binding)
CH918271A CH534265A (en) 1970-06-23 1971-06-23 Method for producing a tie rod, in particular for anchoring components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19702030982 DE2030982B2 (en) 1970-06-23 1970-06-23 Method for producing a grouting anchor

Publications (3)

Publication Number Publication Date
DE2030982A1 DE2030982A1 (en) 1971-12-30
DE2030982B2 DE2030982B2 (en) 1974-07-18
DE2030982C3 true DE2030982C3 (en) 1975-06-12

Family

ID=5774723

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19702030982 Granted DE2030982B2 (en) 1970-06-23 1970-06-23 Method for producing a grouting anchor

Country Status (3)

Country Link
CH (1) CH534265A (en)
DE (1) DE2030982B2 (en)
ES (1) ES391752A1 (en)

Also Published As

Publication number Publication date
CH534265A (en) 1973-02-28
DE2030982A1 (en) 1971-12-30
DE2030982B2 (en) 1974-07-18
ES391752A1 (en) 1974-05-01

Similar Documents

Publication Publication Date Title
DE2523988C2 (en) Method for anchoring a protective wall or the like. with the ground and grouting anchors to carry out the procedure
DE2101236A1 (en) Corrosion-protected tie rods for anchoring components in the ground as well as a method for producing tension anchors with corrosion-protected tie rods
DE2926155A1 (en) CONNECTING A COMPONENT TO SURROUNDING SOIL OR ROCK AND METHOD FOR PRODUCING THIS CONNECTION
DE2432708A1 (en) TUBULAR PILE AND PROCEDURE FOR ITS GROUND IN A DRILLED HOLE
DE2827314A1 (en) TENSIONABLE EARTH AND ROCK ANCHOR
DE2030982C3 (en)
DE1759561C3 (en) Method for producing grouting anchors and device for carrying out the method
DE1904371A1 (en) Method for producing a tie rod for anchoring components in the ground and injection anchors, in particular for carrying out the method
DE2835071A1 (en) METHOD AND DEVICE FOR PRODUCING ROD ANCHORAGES IN THE SOIL AND IN THE ROCK (PRESSED ANCHORS)
DE2022787A1 (en) Method for securing underwater concrete floors against buoyancy
DE2240935C3 (en) Process for the production of an underwater concrete base secured against buoyancy and device for carrying out the process
AT269002B (en) Injection tension anchoring in the ground and process for their production
DE2037061C3 (en) Device for producing a prestressed grouting anchor
AT229230B (en) Driven pile
DE2342581C3 (en) Method for producing a grout anchor and device for carrying out the method
DE1484440A1 (en) Process for the production of prestressed anchors for structures such as retaining walls, Ruehlwandende, etc., and prestressing anchor produced according to this process
DE619189C (en) Device for pressing filler or sealant in layers into cracked concrete, fissured rock or the like.
DE1271045B (en) Method for producing ground anchors
DE1790793U (en) RAMMKOERPER.
AT212227B (en) Process for the creation of groundwater wells
DE976380C (en) Method and apparatus for producing a pre-stressed lining for tunnels u. Like., In particular for pressure tunnels
DE1952707C3 (en) VerpreBanker
DE2209224A1 (en) HOOK ANCHOR FOR LIGHTWEIGHT MATERIALS
DE1634255B2 (en) Method for producing a grouted anchor in the ground
DE1954463B2 (en) TRAIN FOUNDATION

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
E77 Valid patent as to the heymanns-index 1977
8340 Patent of addition ceased/non-payment of fee of main patent