DE202011002737U1 - Device for simulating a building construction - Google Patents

Device for simulating a building construction Download PDF

Info

Publication number
DE202011002737U1
DE202011002737U1 DE202011002737U DE202011002737U DE202011002737U1 DE 202011002737 U1 DE202011002737 U1 DE 202011002737U1 DE 202011002737 U DE202011002737 U DE 202011002737U DE 202011002737 U DE202011002737 U DE 202011002737U DE 202011002737 U1 DE202011002737 U1 DE 202011002737U1
Authority
DE
Germany
Prior art keywords
construction
building
requirements
module
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202011002737U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alvinum Geschaeftsfuehrungs De GmbH
Original Assignee
ADVISDA AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ADVISDA AG filed Critical ADVISDA AG
Publication of DE202011002737U1 publication Critical patent/DE202011002737U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/02CAD in a network environment, e.g. collaborative CAD or distributed simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Computer Hardware Design (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Civil Engineering (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Architecture (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Vorrichtung zur Simulation einer Baukonstruktion, umfassend ein erstes Vorrichtungsmodul zur Konstruktionsplanung der Baukonstruktion, wobei das erste Vorrichtungsmodul die folgenden Vorrichtungen umfasst:
eine Art-Identifizierungseinrichtung zum Identifizieren der Art der Baukonstruktion (S310),
eine Lage-Identifizierungseinrichtung zum Identifizieren der geographischen Lage der Baukonstruktion (S320),
eine Anforderungs-Auswahleinrichtung zum Auswählen von Anforderungen an die Baukonstruktion aus einem ersten Speicher und
eine erste Steuerungseinrichtung, die eingerichtet ist, das erste Vorrichtungsmodul derart zu steuern (S330), dass
die ausgewählten Anforderungen an die Baukonstruktion konform zur Art und geographischen Lage der Baukonstruktion sind.
Apparatus for simulating a building construction, comprising a first apparatus module for structural design of the building structure, the first apparatus module comprising the following apparatuses:
a kind identifying means for identifying the kind of the construction (S310),
a location identifying means for identifying the geographical location of the construction (S320),
a request selector for selecting building design requirements from a first memory and
a first control device configured to control the first device module (S330) such that
the selected construction requirements are in conformity with the type and geographic position of the building structure.

Figure 00000001
Figure 00000001

Description

TECHNISCHES GEBIETTECHNICAL AREA

Die Erfindung bezieht sich auf eine Vorrichtung zur Simulation einer Baukonstruktion mit zumindest einem ersten Vorrichtungsmodul zur Konstruktionsplanung der Baukonstruktion.The invention relates to a device for simulating a building construction with at least a first device module for the design planning of the building construction.

STAND DER TECHNIKSTATE OF THE ART

Das Bauwesen ist in der Vergangenheit einem immer dichter werdenden Netz von Regeln, Normen und Vorschriften unterworfen worden. Durch die Vielzahl von größtenteils regional begrenzt geltenden Vorschriften wird heutzutage praktisch kein einziges Bauwerk erstellt, das sämtliche geltenden Normen und Vorschriften erfüllt. Dabei ist zu berücksichtigen, dass je nach Verwendungszweck, geographischer Lage, klimatischer Umgebung und lokalen politischen Vorschriften, wie beispielsweise Gestaltungsvorschriften und Sicherheitsbestimmungen für das Bauwerk, unterschiedliche Regeln einzuhalten sind.The building industry has in the past been subjected to an increasingly dense network of rules, norms and regulations. Due to the large number of largely regionally limited regulations, virtually no single structure is currently being created which complies with all applicable standards and regulations. It should be borne in mind that different rules have to be followed depending on the purpose, geographical location, climatic environment and local political regulations, such as design rules and safety regulations for the building.

Die Planungsphase für eine Baukonstruktion, die vollständig Regelkonform gebaut werden soll, müsste derart lang sein, dass in der Praxis auf eine akribische Überprüfung der einschlägigen Normen verzichtet wird. Falls bei der Herstellung einer Baukonstruktion auf vollständige Regelkonformität besonders großen Wert gelegt wird, wird der Aufwand zur Überprüfung der Regelkonformität jeder Komponente der Baukonstruktion erhöht. Damit verlängert sich jedoch die Planungszeit und damit die Herstellungszeit der Baukonstruktion im Vergleich zur „üblichen” Bauweise drastisch.The planning phase for a building construction that is to be built completely in compliance with the rules would have to be so long that a meticulous examination of the relevant standards is not required in practice. If great importance is attached to full compliance in the manufacture of a building construction, the expense of checking the conformity of each component of the building structure is increased. Thus, however, the planning time and thus the production time of the building construction is drastically extended compared to the "usual" construction method.

Das Problem im Stand der Technik liegt somit darin, dass eine vollständig regelkonforme Baukonstruktion nur mit unverhältnismäßig hohem Aufwand hergestellt werden kann, wenn die in der Praxis wichtige Individualität der Baukonstruktion beibehalten wird.The problem in the prior art is thus that a completely compliant construction can be made only with disproportionate effort if the important in practice individuality of the building structure is maintained.

Ein damit verbundenes Problem im Stand der Technik liegt darin, dass die Regelkonformität einer Baukonstruktion nicht ohne Weiteres dokumentiert werden kann, wenn die Baukonstruktion aus Komponenten zusammengestellt ist, die von einer Vielzahl von Herstellern geliefert werden. Dies ist unter Anderem damit zu begründen, dass sich ein Teil der Normen darauf bezieht, in welcher Zusammensetzung einzelne Komponenten verbaut werden. Daher kann weder ein einzelner Zulieferer noch ein Planer oder Bauherr die Regelkonformität ohne Weiteres nachweisen.A related problem in the prior art is that the conformance of a building structure can not be readily documented when the building structure is composed of components supplied by a variety of manufacturers. Among other things, this can be explained by the fact that some of the standards refer to the composition in which individual components are installed. Therefore, neither a single supplier nor a planner or builder can easily demonstrate compliance.

DARSTELLUNG DER ERFINDUNGPRESENTATION OF THE INVENTION

Die Aufgabe der vorliegenden Erfindung liegt darin, eine dem obigen technischen Gebiet zugehörige Vorrichtung zur Simulation einer Baukonstruktion bereitzustellen, mit der eine Baukonstruktion mit vertretbarem Aufwand zuverlässig und unter Einhaltung aller relevanter Regeln, Normen und Vorschriften geplant werden kann, so dass auch ein Nachweis der Regelkonformität der Baukonstruktion leicht erbracht werden kann. Entsprechend ist es eine weitere Aufgabe der Erfindung, ein Verfahren, mit dem eine Baukonstruktion computergestützt geplant werden kann, sowie ein Computerprogramm bereitzustellen, um dieses Verfahren auszuführen. Die Lösung der Aufgabe wird durch die Gegenstände der unabhängigen Ansprüche gegeben.The object of the present invention is to provide an apparatus for simulating a building construction which is associated with the above technical field, with which a building construction can be planned reliably and in compliance with all relevant rules, standards and regulations with justifiable effort, so that proof of conformity with the rules can also be provided the construction can be easily provided. Accordingly, it is a further object of the invention to provide a method of computer-aided design of a building structure as well as a computer program for carrying out this method. The solution of the problem is given by the subject matters of the independent claims.

Erfindungsgemäß umfasst eine Vorrichtung zur Simulation einer Baukonstruktion ein erstes Vorrichtungsmodul zur Konstruktionsplanung der Baukonstruktion, wobei das erste Vorrichtungsmodul die folgenden Vorrichtungen umfasst: eine Art-Identifizierungseinrichtung zum Identifizieren der Art der Baukonstruktion, eine Lage-Identifizierungseinrichtung zum Identifizieren der geographischen Lage der Baukonstruktion, eine Anforderungs-Auswahleinrichtung zum Auswählen von Anforderungen an die Baukonstruktion aus einem ersten Speicher und eine erste Steuerungseinrichtung, die eingerichtet ist, das erste Vorrichtungsmodul derart zu steuern, dass die ausgewählten Anforderungen an die Baukonstruktion konform zur Art und geographischen Lage der Baukonstruktion sind.According to the invention, a device for simulating a building construction comprises a first device module for design planning of the construction, the first device module comprising the following devices: a type identification device for identifying the type of construction, a location identification device for identifying the geographical position of the construction, a requirement Selecting means for selecting building design requirements from a first memory and first control means arranged to control the first apparatus module such that the selected building design requirements are compliant with the type and geographic location of the building structure.

Unter einer Baukonstruktion ist insbesondere ein ganzes Bauwerk zu verstehen, also eine unbewegliche, durch Verwendung von Arbeit und Material in Verbindung mit dem Erdboden hergestellte Sache, wobei eine Baukonstruktion auch einen Teil eines solchen Bauwerks bilden kann. Unter dem Begriff Bauwerk ist demnach ein auf oder unter der Erdoberfläche errichtetes Werk zu verstehen. Darunter fallen auch ortsfeste technische Anlagen, die mit dem Grundstück dauerhaft verbunden sind, wobei es insbesondere genügt, dass das Bauwerk allein durch sein Gewicht mit dem Grundstück so verbunden ist, dass eine Trennung von demselben nur mit einem größeren Aufwand möglich ist. Unter Bauwerk fällt neben einem Gebäude somit auch ein Ingenieurbauwerk, beispielsweise ein Brunnen, eine Verkehrsanlage, eine Brücke und dergleichen. Die Baukonstruktion als Teil eines Bauwerks umfasst somit auch Teile, z. B. eine Wandkonstruktion, einen Dachstuhl, eine Isolationsvorrichtung, Fenster, eine Heizungsanlage und dergleichen.A building construction is to be understood in particular as meaning an entire building, that is to say an immovable object produced by using work and material in connection with the ground, whereby a building construction can also form part of such a building. The term building is therefore understood to mean a work erected on or below the earth's surface. This also includes stationary technical facilities that are permanently connected to the property, and in particular it is sufficient that the structure is connected solely by its weight with the property so that a separation of the same is possible only with greater effort. Under construction falls next to a building thus also an engineering structure, such as a well, a traffic system, a bridge and the like. The building construction as part of a building thus also includes parts, eg. As a wall construction, a roof structure, an insulation device, windows, a heating system and the like.

Die Art der Baukonstruktion, die durch die Art-Identifizierungseinrichtung identifiziert wird, umfasst Leistungsanforderungen wie die Maße, die Gestaltung, technische Werte, geplante Verwendung, zeitliche Rahmenbedingungen, Angaben dazu, ob die Baukonstruktion ein Neubau oder Umbau ist, Angaben zur Lage der Baukonstruktion im Gebäude, insbesondere ästhetische, technische und/oder zeitliche Leistungsanforderungen an die Baukonstruktion.The type of building construction identified by the species identification means includes performance requirements such as the dimensions that Design, technical values, planned use, time frame conditions, information on whether the building construction is a new building or conversion, information on the location of the building construction in the building, in particular aesthetic, technical and / or temporal performance requirements of the building structure.

Die geographische Lage der Baukonstruktion bezeichnet die geographische Lage des Orts der Bauausführung, insbesondere den Staat, das Land, die Gemeinde oder das Postleitzahlengebiet, die geographische Umgebung und daraus resultierend das dort vorherrschende Klima. Die geographische Lage der Baukonstruktion kann somit neben politischen Einteilungen in Ortsteile, Gemeinden, Länder, Bundesländer oder Staaten sowie Staatenverbünde, insbesondere auch durch die Nähe zu einem Meer, die Ortshöhe über dem Meeresspiegel, die klimatischen Verhältnisse, insbesondere Niederschlagsverhältnisse, üblichen Luftdruck und Luftfeuchtigkeit, Erdbebenwahrscheinlichkeit, Überflutungsgefahr, üblichen Temperaturbereich und dergleichen bestimmend vorgeben.The geographic location of the construction designates the geographical location of the site of the construction, in particular the state, the country, the municipality or the postal code area, the geographical environment and the resulting therefrom climate. The geographic location of the building construction can thus in addition to political divisions in districts, municipalities, countries, states or states and federations, in particular by the proximity to a sea, the altitude above the sea level, the climatic conditions, especially precipitation conditions, usual air pressure and humidity, Determine earthquake probability, flood risk, usual temperature range and the like.

Die durch die Anforderungs-Auswahleinrichtung auszuwählenden Anforderungen an die Baukonstruktion sind beispielsweise ergänzende technische Spezifikationen, Materialvorgaben, Gestaltungsvorgaben, Sicherheitsvorschriften, andere Nutzeranforderungen DIN-, EN-, oder ISO-Normen, durchzuführende Tests und dergleichen. Als „ergänzende technische Spezifikationen” sind derartige Spezifikationen zu verstehen, die sich nicht zwangsläufig aus der Art der Baukonstruktion ergeben, sondern optional vorgesehen werden können.The design requirements to be selected by the request selector are, for example, supplemental technical specifications, material specifications, design specifications, safety regulations, other user requirements DIN, EN, or ISO standards, tests to be performed, and the like. "Supplementary technical specifications" are to be understood as meaning such specifications, which do not necessarily result from the type of construction, but can optionally be provided.

Erfindungsgemäß ist die erste Steuerungseinrichtung so eingerichtet, dass sie das erste Vorrichtungsmodul derart steuert, dass die ausgewählten Anforderungen, die durch die Anforderungs-Auswahleinrichtung aus dem ersten Speicher ausgewählt werden, konform zur Art und geographischen Lage der Baukonstruktion sind. Das bedeutet, dass die Steuerungseinrichtung eine der Regelkonformität der Baukonstruktion widersprechende Auswahl von Anforderungen an die Baukonstruktion verhindert oder, falls die Kombination aus identifizierter Art, geographischer Lage und Anforderungen nicht vollständig Regelkonform durchführbar ist, anzeigt, welche weiteren Voraussetzungen erfüllt werden müssen oder welche Modifikationen zur Verfügung stehen, um zur vollständigen Regelkonformität zu gelangen.According to the invention, the first controller is arranged to control the first device module such that the selected requirements selected by the request selector from the first memory are compliant with the type and geographic location of the structure. This means that the control device prevents design construction requirements from conflicting with the structural design or, if the combination of identified type, geographical location and requirements is not completely compliant, indicates which further requirements must be satisfied or which modifications to Available for full compliance.

Es wird somit lediglich eine Auswahl von Anforderungen an die Baukonstruktion zugelassen, die der regelkonformen Erstellung der Baukonstruktion nicht entgegensteht, oder im Fall der fehlenden Regekonformität darauf hingewiesen, dass Änderungen vorgesehen werden müssen, und bevorzugt ein Lösungsvorschlag zur Modifikation der Baukonstruktion angezeigt, um die Baukonstruktion vollständig regelkonform ausführen zu können. Dabei ist die Steuerungseinrichtung beispielsweise eingerichtet, maßgebliche gesetzliche Bestimmungen und technische Normen auf der Grundlage der Art und der geographischen Lage der Baukonstruktion dieser zuzuordnen und Vorschläge für eine konkrete Konstruktion zu erstellen.Thus, only a selection of building construction requirements is permitted, which does not preclude compliant construction, or, in the case of lack of conformity, indicates that changes must be made and, preferably, proposes a solution for modifying the building structure to the building construction fully compliant with the rules. In this case, the control device is set up, for example, to allocate authoritative legal provisions and technical standards on the basis of the type and geographic location of the building construction and to make proposals for a concrete construction.

Mit Vorteil ist die erste Steuerungseinrichtung eingerichtet, dass erste Vorrichtungsmodul derart zu steuern, dass mindestens eine Anforderung konform zu zumindest einer, bevorzugt mehreren, besonders bevorzugt allen bereits ausgewählten Anforderungen ausgewählt wird.Advantageously, the first control device is set up to control the first device module in such a way that at least one request is selected in conformity with at least one, preferably several, particularly preferably all already selected requirements.

In der bevorzugten Ausführungsform ist die Steuerungseinrichtung also derart eingerichtet, dass nicht nur die Lage und Art der Baukonstruktion bei der Steuerung der Auswahl der Anforderungen zu berücksichtigen sind, sondern auch die bereits ausgewählten Anforderungen, die ihrerseits Konsequenzen auf die weitere mögliche Auswahl von Anforderungen an die Baukonstruktion haben können. Dabei werden bevorzugt mehrere Anforderungen berücksichtigt und besonders bevorzugt findet die Gesamtheit der Anforderungen an die Baukonstruktion ihre Berücksichtigung.In the preferred embodiment, the control device is thus set up so that not only the position and type of the construction are to be considered in controlling the selection of requirements, but also the already selected requirements, which in turn have consequences on the further possible selection of requirements for the Building construction can have. In this case, several requirements are preferably taken into account and more preferably the totality of the requirements of the building construction is taken into account.

Mit Vorteil weist das erste Vorrichtungsmodul ferner eine Konstruktionseinrichtung zum Erstellen von konformen Konstruktionsvorschlägen für Baukonstruktionen, insbesondere mit einer technischen Leistungsbeschreibung auf.Advantageously, the first device module further comprises a construction device for producing conformal design proposals for building structures, in particular with a technical performance description.

In dieser bevorzugten Ausführungsform des ersten Vorrichtungsmoduls kann also auf der Grundlage der Auswahl von Anforderungen, die durch die Anforderungs-Auswahleinrichtung und durch die erste Steuerungseinrichtung gesteuert ausgewählt wurden, unmittelbar eine konkrete Konstruktion vorgeschlagen werden. Dabei wird bevorzugt, dass die Konstruktionseinrichtung im Fall von fehlender Konformität der Kombination der identifizierten Art, geographischen Lage und der Anforderungen an die Baukonstruktion auch Änderungen dieser Werte vorschlägt, um zu einer vollständig regelkonformen Baukonstruktion zu gelangen. Die Konstruktionseinrichtung basiert dabei mit Vorteil auf einer Vielzahl gespeicherter und geprüfter oder bewährter Lösungen einzelner Konstruktionen für die Baukonstruktion oder besonders für Teile davon. In der besonders bevorzugten Ausführungsform ist die Konstruktionseinrichtung ferner dazu in der Lage, eine technische Leistungsbeschreibung zu erstellen, die es dem Planer oder Bauherrn der Baukonstruktion besonders gut ermöglicht, die Baukonstruktion zu überblicken und zu bewerten.Thus, in this preferred embodiment of the first device module, a concrete construction can be immediately proposed based on the selection of requests controlled by the request selector and the first controller. In this case, it is preferred that in the case of lack of conformity of the combination of the identified type, geographical position and the requirements of the construction, the construction device also proposes changes to these values, in order to arrive at a fully compliant construction construction. The construction device is based on advantage of a variety of stored and tested or proven solutions of individual structures for the construction or especially for parts thereof. In the most preferred embodiment, the constructional device is further capable of producing a technical specification which allows the designer of the building construction to best survey and evaluate the construction.

Mit Vorteil umfasst die Vorrichtung ferner ein zweites Vorrichtungsmodul zur Angebotserstellung für die Baukonstruktion mit einer Speichereinrichtung zum Speichern eines oder mehrerer Angebote eines oder mehrerer Anbieter und/oder eines Hinweises darauf in einem zweiten Speicher, wobei eine zweite Steuerungseinrichtung eingerichtet ist, das zweite Vorrichtungsmodul derart zu steuern, dass die ausgewählten Anforderungen durch den oder die Anbieter abrufbar sind. Advantageously, the apparatus further comprises a second device module for bidding for the building construction with a memory device for storing one or more offers of one or more providers and / or an indication thereof in a second memory, wherein a second control device is set up, the second device module in such a way control that the selected requirements are available through the provider (s).

Die Vorrichtung zur Angebotserstellung für die Baukonstruktion ermöglicht insbesondere eine gute Interaktion zwischen einem die Baukonstruktion planenden Planer oder Bauherrn und möglichen Anbietern für die bei der konkreten Ausführung der Baukonstruktion benötigten Teile der Baukonstruktion oder die vollständige Baukonstruktion. Um hier besonders effizient und sicher arbeiten zu können, ist bei dem zweiten Vorrichtungsmodul die zweite Steuerungseinrichtung derart eingerichtet, dass die möglichen Anbieter für die Teile der Baukonstruktion die auf Konformität überprüften Anforderungen abrufen können. Somit werden bei den Anbietern der Teile der Baukonstruktion solche Teile nachgefragt, mit denen eine normkonforme Herstellung der Baukonstruktion möglich ist. Gegebenenfalls werden den Anbietern auch Auflagen übermittelt, unter denen die Teile der Baukonstruktion bereitzustellen sind oder die gewünscht werden, jedoch nicht zwingende Voraussetzung für die vollständig regelkonforme Baukonstruktion sind.In particular, the device for making offers for the construction permits a good interaction between a planner or builder planning the building construction and possible suppliers for the parts of the building construction or the complete construction required for the concrete execution of the building construction. In order to be able to work here particularly efficiently and safely, in the case of the second device module, the second control device is set up in such a way that the possible suppliers for the parts of the construction can call up the requirements checked for conformity. Thus, in the suppliers of parts of the building design such parts are in demand, with which a standard-compliant production of the building structure is possible. If necessary, the providers will also be issued conditions under which to provide the parts of the building or which are desired, but are not mandatory requirement for the fully compliant construction.

Das Angebot oder die Angebote eines oder mehrerer Anbieter können gemäß dieser bevorzugten Ausführungsform in dem zweiten Speicher gespeichert werden, um die Verfügbarkeit des Angebots oder der Angebote für den Planer oder Bauherrn der Baukonstruktion sicherzustellen. Statt des Angebots selbst kann in dem zweiten Speicher auch ein Hinweis auf ein Angebot oder wesentliche Merkmale des Angebots hinterlegt werden. Hierzu können auch Änderungsanfragen der potentiellen Anbieter zählen, beispielsweise wenn eine Anforderung oder Auflage nicht oder nur unter bestimmten Bedingungen erfüllt werden kann.The offer or offers from one or more providers may be stored in the second memory according to this preferred embodiment to ensure availability of the offer or offers to the designer of the building construction. Instead of the offer itself, a reference to an offer or essential features of the offer can also be deposited in the second store. This may include change requests from potential providers, for example, if a requirement or requirement can not be met or only under certain conditions.

Bevorzugt weist das zweite Vorrichtungsmodul dabei eine Merkmals-Identifizierungseinrichtung auf, die eingerichtet ist, für das Angebot oder ein oder mehrere der Angebote, bevorzugt für sämtliche Angebote in dem zweiten Speicher je ein oder mehrere Qualitätsmerkmale zu identifizieren.In this case, the second device module preferably has a feature identification device which is set up to identify one or more quality features for the offer or one or more of the offers, preferably for all offers in the second store.

Ein Qualitätsmerkmal im Sinne dieser Vorrichtung ist ein inhärentes Merkmal eines Produkts bzw. eines Angebots, also ein Merkmal, das einem Produkt nicht zugeordnet ist, sondern diesem innewohnt, dass sich auf eine der ausgewählten Anforderungen oder eine optionale Anforderung oder Auflage bezieht und diese erfüllt könnte. Die Merkmals-Identifizierungseinrichtung ist somit eingerichtet, bevorzugt für sämtliche Angebote in dem zweiten Speicher, auf der Seite des Planers oder Bauherrn der Baukonstruktion Merkmale des jeweiligen Angebots zu identifizieren, die den Anforderungen an die Baukonstruktion gerecht werden könnten.A quality characteristic in the sense of this device is an inherent feature of a product or offer, ie a feature that is not associated with a product, but inherent therein, that relates to and meets one of the selected requirements or an optional requirement or condition , The feature identification device is thus set up, preferably for all offers in the second store, to identify features of the respective offer on the side of the planner or constructor of the construction that could meet the requirements of the building construction.

Weiter bevorzugt weist das zweite Vorrichtungsmodul eine Prüfeinrichtung auf, die eingerichtet ist, das Qualitätsmerkmal oder die Qualitätsmerkmale jedes Angebots auf Konformität mit den Anforderungen zu überprüfen.More preferably, the second device module has a testing device that is set up to check the quality feature or the quality features of each offer for conformity with the requirements.

Gemäß dieser weiter bevorzugten Ausführungsform ist die Prüfeinrichtung also eingerichtet, die identifizierten Qualitätsmerkmale oder das identifizierte Qualitätsmerkmal jedes Angebots dahingehend zu überprüfen, ob es mit der ausgewählten Anforderung bzw. den ausgewählten Anforderungen konform ist, diese also erfüllt. Die Prüfeinrichtung geht somit über das Identifizieren von Qualitätsmerkmalen, die sich auf bestimmte Anforderungen an die Baukonstruktion beziehen und diese erfüllen könnten, hinaus und überprüft zudem, ob die Anforderungen durch die Qualitätsmerkmale tatsächlich erfüllt werden oder würden. Dabei wird bevorzugt nicht jedes Qualitätsmerkmal eines Angebots separat überprüft, sondern eine Gesamtschau der Qualitätsmerkmale eines Angebots bewertet.In accordance with this further preferred embodiment, the checking device is thus set up to check the identified quality features or the identified quality feature of each offer as to whether it complies with the selected request or the selected requirements and thus fulfills them. The test facility thus goes beyond identifying quality features that may relate to and meet specific building design requirements and also verifies that the requirements are or would be met by the quality features. In this case, preferably not every quality feature of an offer is checked separately, but an overall view of the quality features of an offer is evaluated.

In einer bevorzugten Ausführungsform umfasst die Vorrichtung ferner ein drittes Vorrichtungsmodul zur Fertigungsplanung der Baukonstruktion, welches Modul eine Anforderungs-Erstellungseinrichtung, die eingerichtet ist, Anforderungen an Teile der Baukonstruktion zu erstellen, und eine dritte Steuerungseinrichtung aufweist, die eingerichtet ist, das dritte Vorrichtungsmodul derart zu steuern, dass die Anforderungen an die Teile der Baukonstruktion konform mit den Anforderungen an die Baukonstruktion sind.In a preferred embodiment, the apparatus further comprises a third apparatus module for production planning of the building structure, which module has a request-creating device that is configured to create requirements for parts of the building structure, and a third control device that is configured to the third device module in such a way control that the requirements for the parts of the construction are in conformity with the requirements of the building construction.

Gemäß dieser bevorzugten Ausführungsform ist ein Vorrichtungsmodul in der Vorrichtung enthalten, dass die Fertigung der Baukonstruktion im Sinne einer Zusammenstellung aus mehreren Teilen planen kann. Die Anforderungs-Erstellungseinrichtung ist dabei dazu in der Lage, für einzelne Teile der Baukonstruktion Anforderungen auszuarbeiten, die sich aus den Anforderungen an die Baukonstruktion selbst ergeben. Dies wird durch die dritte Steuerungseinrichtung gesteuert, so dass aufgrund der dritten Steuerungseinrichtung die Konformität der Anforderungen an die Teile der Baukonstruktion mit den Anforderungen an die Baukonstruktion selbst sichergestellt wird.According to this preferred embodiment, a device module is included in the device that can plan the manufacture of the building construction in the sense of a compilation of several parts. The requirement-creation device is able to work out for individual parts of the building requirements that arise from the requirements of the building itself. This is controlled by the third control device, so that due to the third control device, the conformity of the requirements of the parts of the construction with the requirements of the building construction itself is ensured.

Bevorzugt erstellt die Anforderungs-Erstellungseinrichtung gegebenenfalls auch Auflagen für die Teile der Baukonstruktion, die zur Erfüllung optionaler Auflagen an die Baukonstruktion nötig sind.If necessary, the request creation device also creates conditions for the parts of the building construction necessary for the fulfillment of optional requirements for the building construction.

Die Anforderungs-Erstellungseinrichtung kann dabei bevorzugt mit einem Produktionsplanungs- und Steuerungssystem des Anbieters korrespondieren.The request creation device can preferably correspond with a production planning and control system of the provider.

Mit Vorteil weist das dritte Vorrichtungsmodul eine Teile-Dokumentationseinrichtung auf, die eingerichtet ist, eine Fertigung von Teilen der Baukonstruktion in Bezug auf die Qualifikation der Teile der Baukonstruktion zu dokumentieren. Die Qualifikation der Teile der Baukonstruktion ist dabei die nachgewiesene Erfüllung der Anforderungen an die Beschaffenheit der Teile der Baukonstruktion.Advantageously, the third device module has a parts documentation device that is configured to document a manufacturing of parts of the construction with respect to the qualification of the parts of the construction. The qualification of the parts of the building construction is the proven fulfillment of the requirements on the condition of the parts of the building construction.

Somit ist die Teile-Dokumentationseinrichtung eingerichtet, die Erfüllung der Anforderungen der Teile der Baukonstruktion während oder nach der Fertigung der Teile der Baukonstruktion zu dokumentieren. Durch diese Dokumentation der Teile der Baukonstruktion bzw. der Baukonstruktion selbst kann die Konformität der Baukonstruktion mit den Anforderungen an die Baukonstruktion leicht nachgewiesen werden. Somit ist es besonders einfach, nicht nur eine Baukonstruktion vollständig normkonform zu planen und herzustellen, sondern dies auch nötigenfalls nachzuweisen.Thus, the parts documentation device is adapted to document the fulfillment of the requirements of the parts of the building structure during or after the production of the parts of the building construction. Through this documentation of the parts of the building construction or the construction itself, the conformity of the construction with the requirements of the construction can be easily demonstrated. Thus, it is particularly easy to design and manufacture not only a construction completely compliant with the standards, but also to prove this if necessary.

Mit Vorteil weist das dritte Vorrichtungsmodul eine Kalkulationseinrichtung auf, die eingerichtet ist, eine Terminkalkulation zur Abstimmung einzelner Fertigungsschritte aufeinander durchzuführen.Advantageously, the third device module has a calculation device which is set up to carry out an appointment calculation for the coordination of individual production steps with one another.

Die Abstimmung einzelner Fertigungsschritte aufeinander durch die Terminkalkulation ermöglicht eine besonders effiziente Herstellung der Baukonstruktion. Sie kann sich jedoch darüber auch positiv auf Sicherheitsaspekte der Baukonstruktion auswirken, wenn beispielsweise Lagerungszeiten, Lagerungsbedingungen, die Reihenfolge des Zusammenbaus oder der Herstellung der Baukonstruktion oder von Teilen davon von Bedeutung sind.The coordination of individual production steps on each other by the schedule calculation allows a particularly efficient production of the building construction. However, it can also have a positive effect on safety aspects of the construction, for example, if storage times, storage conditions, the order of assembly or the construction of the building or parts thereof are important.

Die Kalkulationseinrichtung ist nicht darauf beschränkt, einzelne Fertigungsschritte eines einzelnen Teils abzustimmen, sondern kann auch Fertigungsschritte verschiedener Teile der Baukonstruktion, die gegebenenfalls von verschiedenen Anbietern bereitgestellt werden, untereinander koordinieren.The calculator is not limited to tuning individual manufacturing steps of a single part, but can also coordinate manufacturing steps of different parts of the construction, which may be provided by different providers, among themselves.

Mit Vorteil umfasst die Vorrichtung ferner ein viertes Vorrichtungsmodul zum Abschließen der Baukonstruktion, welches Modul eine Merkmals-Erstellungseinrichtung, die eingerichtet ist, Prüfmerkmale für eine Abnahmeprüfung der Baukonstruktion und/oder von Teilen davon vorzubereiten, und eine vierte Steuerungseinrichtung aufweist, die eingerichtet ist, das vierte Vorrichtungsmodul derart zu steuern, dass die Prüfungsmerkmale für Teile der Baukonstruktion auf den Anforderungen an die Teile der Baukonstruktion basieren.Advantageously, the apparatus further comprises a fourth device module for completing the construction, which module comprises feature creation means adapted to prepare inspection features for acceptance inspection of the construction and / or parts thereof, and a fourth control means arranged To control fourth device module such that the inspection features for parts of the building structure based on the requirements of the parts of the building structure.

Die vierte Steuerungseinrichtung steuert das vierte Vorrichtungsmodul somit derart, dass konforme Teile der Baukonstruktion und somit eine insgesamt konforme Baukonstruktion sichergestellt werden. Das vierte Vorrichtungsmodul dient insbesondere der Dokumentation der Konformität der Baukonstruktion und der Teile der Baukonstruktion, damit die vollständige Konformität der Baukonstruktion später nachweisbar ist. Dies ermöglicht eine gut funktionierende Qualitätssicherung bei der Herstellung von Baukonstruktionen, insbesondere von Bauwerken.The fourth control device thus controls the fourth device module such that conformal parts of the construction and thus an overall compliant construction are ensured. The fourth device module is used in particular to document the conformity of the building construction and the parts of the building construction, so that the complete conformity of the building structure can be verified later. This allows a well-functioning quality assurance in the manufacture of building structures, in particular of buildings.

Die Erstellung von Prüfmerkmalen für eine Abnahmeprüfung der Baukonstruktion basiert dabei ebenfalls auf den Anforderungen an die Baukonstruktion. Für Teile der Baukonstruktion wird durch die vierte Steuerungseinrichtung sichergestellt, dass auch die Prüfmerkmale an diese auf den Anforderungen an die Teile der Baukonstruktion und somit an die Baukonstruktion insgesamt basieren.The creation of test features for an acceptance test of the building construction is also based on the requirements of the building construction. For parts of the building construction, the fourth control device ensures that the test features are also based on these on the requirements of the parts of the building construction and thus of the building construction as a whole.

Bevorzugt weist das vierte Vorrichtungsmodul eine Baukonstruktions-Dokumentationseinrichtung auf, die eingerichtet ist, eine Schlussdokumentation der Baukonstruktion zu erstellen. Die Baukonstruktions-Dokumentationseinrichtung erleichtert wiederum den Nachweis der vollständig regelkonformen Herstellung der Baukonstruktion und eine Dokumentation der Abnahme der Baukonstruktion. Somit ergibt sich der Vorteil einer guten und relativ einfachen Qualitätssicherung und es wird eine bis zum Ende der Herstellung der Baukonstruktion reichende und vollständig regelkonforme Planung der Baukonstruktion ermöglicht.The fourth device module preferably has a construction-documentation device that is set up to create a final documentation of the construction. In turn, the construction documentation facility facilitates the proof of fully compliant construction of the construction and documentation of the acceptance of the construction. Thus, there is the advantage of a good and relatively simple quality assurance and it is possible until the end of the production of the building construction and fully compliant planning of the construction.

Ein Verfahren zur computergestützten Simulation einer Baukonstruktion umfasst die folgenden Schritte: Identifizieren der Art der Baukonstruktion, Identifizieren der geographischen Lage der Baukonstruktion und Auswählen von Anforderungen an die Baukonstruktion aus einem ersten Speicher, wobei das Auswählen von Anforderungen an die Baukonstruktion derart gesteuert wird, dass die ausgewählten Anforderungen an die Baukonstruktion konform zur Art und geographischen Lage der Baukonstruktion sind.A method for computer-aided simulation of a building construction comprises the following steps: identifying the type of building construction, identifying the geographic location of the building structure, and selecting building design requirements from a first memory, wherein the selection of building construction requirements is controlled such that the selected construction requirements are in conformity with the type and geographic location of the building structure.

Das Verfahren ermöglicht eine computergestützte Simulation einer Baukonstruktion, die eine schnelle, effiziente und damit kostengünstige Planung der Herstellung eines Bauwerks ermöglicht. Bei dem beschriebenen Verfahren werden zunächst die Art und dann die geographische Lage der Baukonstruktion festgestellt, wobei diese Begriffe im Sinne der oben angeführten Definition zu verstehen sind. Anschließend werden aus dem ersten Speicher Anforderungen an die Baukonstruktion entsprechend der obigen Beschreibung ausgewählt, so dass die ausgewählten Anforderungen an die Baukonstruktion konform zur Art und geographischen Lage derselben sind oder, falls diese Konformität nicht vorliegt, angezeigt wird, welche Merkmale einer vollständigen Konformität entgegenstehen. Falls die Ausführung des beschriebenen Verfahrens ergibt, dass die Kombination der Art, der geographischen Lage und der Anforderungen an die Baukonstruktion nicht vollständig regelkonform ist, lässt sich durch das Verfahren, analog zur oben beschriebenen Vorrichtung, anzeigen, welche weiteren Voraussetzungen erfüllt werden müssen oder welche Modifikationen zur Verfügung stehen, um zur vollständigen Regelkonformität zu gelangen.The method allows a computer-aided simulation of a building structure, which allows a fast, efficient and thus cost-effective planning of the construction of a building. In the described method, first the type and then the geographical position of the building structure are determined, these terms being understood in the sense of the above-mentioned definition. Subsequently, building design requirements are selected from the first memory as described above so that the selected building design requirements conform to the type and geographic location thereof or, if that is not the case, indicate which features conflict with full compliance. If the execution of the described method shows that the combination of the type, the geographic location and the requirements of the building construction is not completely compliant with the rules, analogously to the device described above, it can be indicated which further prerequisites must be fulfilled or which Modifications are available to achieve full compliance.

Bevorzugt weist das Verfahren weitere Verfahrensschritte auf, die sich aus der vorgehenden Beschreibung der erfindungsgemäßen Vorrichtung ergeben.Preferably, the method has further method steps, which result from the preceding description of the device according to the invention.

Ein Computerprogramm veranlasst einen Prozessor dazu, das vorgehend beschriebene Verfahren auszuführen.A computer program causes a processor to execute the method described above.

Durch ein solches Computerprogramm lässt sich das beschriebene Verfahren besonders schnell und einfach ausführen, so dass die Planung der Baukonstruktion besonders gut unterstützt werden kann.By means of such a computer program, the method described can be carried out particularly quickly and easily, so that the planning of the construction can be particularly well supported.

Durch die erfindungsgemäße Vorrichtung wird also eine modulare Bau- und Abwicklungsvorrichtung und ein entsprechendes Verfahren sowie ein Computerprogramm für private oder öffentliche Bauvorhaben bereitgestellt, durch die zunächst die Bauplanung und die Bauabwicklung in Teilprozesse zerlegt werden. Dabei wird zunächst die Bauleistung identifiziert, d. h. z. B. in einen Computer eingegeben und von diesem erkannt, die erfindungsgemäß als Art der Baukonstruktion beschrieben wird und insbesondere Leistungsanforderungen der oben genannten Art umfasst. Danach wird die geographische Lage des Orts der Bauausführung, nämlich die geographische Lage der Baukonstruktion identifiziert, d. h. z. B. in einen Computer eingegeben und von diesem erkannt, die sich einerseits auf der Grundlage politischer Bedingungen, zum Beispiel Staat, Land, Gemeinde, Ortsteil der Baukonstruktion, und andererseits aufgrund geologischer, klimatischer oder anderer naturgegebener Bedingungen ergibt.The device according to the invention thus provides a modular construction and development device and a corresponding method as well as a computer program for private or public construction projects, by means of which the construction planning and the construction work are first divided into sub-processes. Initially, the construction work is identified, ie. H. z. B. entered into a computer and recognized by this, which is described according to the invention as a type of construction and in particular includes performance requirements of the above type. Thereafter, the geographical location of the site of the construction, namely the geographical position of the construction is identified, d. H. z. B. entered into a computer and recognized by this, which results on the one hand on the basis of political conditions, for example, state, country, community, district of the building, and on the other hand due to geological, climatic or other natural conditions.

Auf der Grundlage zumindest dieser zwei identifizierten Eigenschaften lässt sich durch die Vorrichtung bzw. das Verfahren eine Auswahl von Anforderungen, insbesondere Bestimmungen und Normen an die Baukonstruktion unterstützen bzw. treffen.On the basis of at least these two identified properties can be supported by the device or the method, a selection of requirements, in particular provisions and standards to the building structure or meet.

Mit Vorteil wird ferner ein Konstruktionsvorschlag auf der Basis der identifizierten oder eingegebenen Eigenschaften und ausgewählten Anforderungen der Baukonstruktion erstellt, eine technische Leistungsbeschreibung, beispielsweise in Verbindung mit einer Ausschreibung der Anforderungen für potentielle Anbieter, d. h. Zulieferer oder Bauträger, ausgearbeitet. Durch potentielle Anbieter können Angebote eingegeben oder Hinweise darauf, ggf. mit Änderungsanfragen hinterlegt werden und somit die Auftragsverhandlung in die Planung und Simulation der Baukonstruktion miteinbezogen werden. Hierbei ist es auch möglich, Vertragsbedingungen durch den Planer vorzugeben und/oder diese durch einen Anbieter zu variieren und die daraus resultierenden Konsequenzen aufzuzeigen. Auch kann ein Anbieter Vertragsbedingungen stellen, die ihrerseits von dem Planer oder Bauherrn der Baukonstruktion variiert werden können, um zu einem Vertragsabschluss zu gelangen.Advantageously, a design proposal is also made on the basis of the identified or input characteristics and selected requirements of the construction, a technical performance description, for example, in connection with a tender of the requirements for potential suppliers, d. H. Supplier or builder, worked out. Offers can be entered by potential providers or references to them, if necessary with change requests, and thus the order negotiation can be included in the planning and simulation of the building construction. It is also possible to specify contract conditions by the planner and / or to vary these by a provider and to show the resulting consequences. Also, a provider can provide contract terms, which in turn can be varied by the planner or builder of the building to arrive at a contract.

Daneben lässt sich bevorzugt durch die Vorrichtung auch eine Dokumentations- und Produktionskontrolle des Bauwerks oder von Teilen davon darstellen, wodurch insbesondere auch Nachweise und Prüfzeugnisse, beispielsweise aufgrund der Möglichkeit zum Verfolgen der Produktion der Baukonstruktion, erzeugt werden. Hierzu können insbesondere im Vorfeld Anforderungen an die Produktionskontrolle erstellt werden, die eine konforme Herstellung der Baukonstruktion sicherstellen. Neben dem Erstellen einer Kalkulation und Kostenverfolgung in Form von Budgetierung, Terminverfolgung, Rechnungsstellung und Überwachung von Zahlungen kann bevorzugt auch eine Schlussdokumentation und eine Schlussrechnung erstellt oder geplant werden.In addition, the device can also be used to display a documentation and production control of the building or of parts thereof, as a result of which, in particular, proofs and test certificates, for example due to the possibility of following the production of the building construction, are produced. For this purpose, in particular, production control requirements can be established in advance, which ensure a compliant production of the building construction. In addition to the creation of a calculation and cost tracking in the form of budgeting, scheduling, invoicing and monitoring of payments, a final documentation and a final invoice can preferably also be created or planned.

Somit lässt sich durch die Simulation der Baukonstruktion ein vollständiges Bild vom Bauprozess erzeugen, das einerseits eine gesamthafte Planung der Baukonstruktion besonders gut ermöglicht und andererseits die vollständig regelkonforme Erstellung der Baukonstruktion mit vertretbarem Aufwand sicherstellt.Thus, by simulating the construction a complete picture of the construction process can be generated, which on the one hand enables overall planning of the building construction and on the other hand ensures the compliant construction of the building construction with justifiable effort.

Die Vorrichtung umfasst bevorzugt eine Datenbank, die geographische und nutzungsspezifische Formen und Vorschriften enthält, wobei diese durch die Steuerungseinrichtung mit Eingaben oder identifizierten Eigenschaften der Art der Baukonstruktion verknüpft werden, so dass die Auswahl von Anforderungen an die Baukonstruktion, nämlich konkrete Eigenschaften dieser Konstruktion, durch die Steuerungseinrichtung gesteuert wird. Bevorzugt ist auch eine Interaktion zwischen dem Planer und potentiellen Anbietern möglich, in der Vertragsbedingungen verhandelt und eine Auswahl des oder der Anbieter vorgenommen werden kann. In diesem Zusammenhang ist es bevorzugt auch möglich, auf das beim Anbieter genutzte Produktionsplanungs- und Steuerungssystem einzuwirken.The apparatus preferably comprises a database containing geographical and usage-specific forms and regulations, which are linked by the controller with inputs or identified characteristics of the type of building construction, so that the selection of requirements for the construction, namely concrete properties of this construction, by the control device is controlled. Preferably, an interaction between the planner and potential providers is possible, negotiated in the contract terms and a selection of the provider or can be made. In this context, it is preferably also possible on the at Provider used to influence production planning and control system.

Im Rahmen der Simulation der Baukonstruktion ist es auch möglich, dass die Vorrichtung während der Umsetzung des Bauvorhabens, also der Herstellung der Baukonstruktion, insbesondere des Bauwerks, die Einhaltung der Vorgaben vorausschauend überwacht und gegebenenfalls benötigte Zertifikate und dergleichen erstellt.As part of the simulation of the construction, it is also possible that the device during the implementation of the construction project, ie the production of the building construction, in particular of the building, monitoring compliance with the requirements anticipatory and created any required certificates and the like.

Ein Computerprogramm, dass einen Prozessor dazu veranlasst, das beschriebene Verfahren in einer bevorzugten Weise auszuführen, sieht zunächst die Identifikation der Art der Baukonstruktion durch grundlegende Eingaben des Planers vor. Hierbei können Maße, Gestaltungsvorgaben, technische Werte, Stückzahlen, die Einbausituation oder Bauzeitvorhaben durch den Planer eingegeben und dann die Art der Baukonstruktion identifiziert werden. Daneben kann durch den Planer der Einbauort durch einen Ländercode, eine Postleitzahl, Koordinaten oder auf andere Weise und gegebenenfalls die vorgesehene Lage der Baukonstruktion in einem Gebäude, beispielsweise das Stockwerk, für das eine Baukonstruktion geplant wird, eine Spezifikation der Baukonstruktion oder des Bauwerks oder andere Nutzeranforderungen eingegeben und dann die Lage der Baukonstruktion identifiziert werden.A computer program that causes a processor to execute the described method in a preferred manner initially provides for the identification of the type of construction by basic inputs from the designer. In this case, dimensions, design specifications, technical values, quantities, the installation situation or construction time projects can be entered by the planner and then the type of building construction can be identified. In addition, by the planner, the installation location by a country code, a postal code, coordinates or otherwise and possibly the intended location of the building construction in a building, for example, the floor for which a construction is planned, a specification of the building or construction or other User requirements are entered and then the location of the building structure are identified.

Das Computerprogramm kann dann relevante Vorgaben, insbesondere gesetzliche Bestimmungen, Normen und Vorschriften aus einer Datenbank mit den identifizierten Eigenschaften der Baukonstruktion vergleichen und zu dem Ergebnis kommen, dass die Baukonstruktion wie gewünscht vollständig regelkonform baubar oder nur unter der Bedingung zusätzliche Genehmigungen bzw. nicht vollständig regelkonform baubar ist. Alternativ und zusätzlich kann das Computerprogramm dem Planer auch mögliche Konstruktionen vorschlagen, aus denen der Planer die von ihm bevorzugte Konstruktion auswählen kann.The computer program can then compare relevant specifications, in particular legal provisions, standards and regulations from a database with the identified properties of the building construction and come to the conclusion that the building construction as fully compliant with regulations or only on condition additional permits or not fully compliant is buildable. Alternatively and additionally, the computer program can also suggest to the planner possible constructions from which the planner can select the design preferred by him.

Falls die Baukonstruktion in der ausgewählten Form vollständig regelkonform baubar ist, kann das Computerprogramm gegebenenfalls gesetzlich geforderte oder vom Planer auswählbare Leistungsnachweise oder eine Eigenschaftsübersicht zusammenstellen.If the building construction can be constructed in the selected form in a fully compliant manner, the computer program may, if required, compile statutorily required or planner selectable performance records or a property overview.

Falls die Baukonstruktion nur mit zusätzlicher Genehmigung oder nicht vollständig regelkonform baubar ist, kann das Computerprogramm ebenfalls gegebenenfalls gesetzlich geforderte Nachweise oder eine Übersicht von Leistungseigenschaften zusammenstellen und hierbei auf zu berücksichtigende Abweichungen hinweisen, sowie gegebenenfalls Hinweise auf erforderliche zusätzliche Genehmigungen und Auflagen geben.If the construction is only buildable with additional approval or not fully compliant, the computer program may also compile legally required evidence or an overview of performance characteristics and hereby point out deviations to be considered, as well as possibly provide indications of additional approvals and requirements.

Auf der Grundlage der Eigenschaften der Baukonstruktion erlaubt es das Computerprogramm, bewährte bzw. geprüfte Konstruktionen auszuwählen, für die die geforderten Nachweise bereits vorliegen oder grundsätzlich verfügbar sind, ohne eine weitere Prüfung durchführen zu müssen. In diesem Fall kann das Computerprogramm die geforderten Nachweise unmittelbar bereitstellen oder angeben.Based on the characteristics of the building construction, the computer program allows to select proven or tested constructions for which the required proofs are already available or basically available without having to carry out another test. In this case, the computer program can provide or provide the required evidence directly.

Falls die Baukonstruktion nur mit zusätzlicher Genehmigung vollständig regelkonform baubar ist, kann das Computerprogramm eine genehmigende Stelle mit den zusammengestellten Daten, nämlich den Eigenschaften der Baukonstruktion, geforderten Nachweisen sowie vorhandenen Abweichungen, versorgen. Die genehmigende Stelle kann dann auf der Grundlage dieser Daten prüfen, ob eine zusätzliche Genehmigung erteilt werden muss und kann, ob für die Herstellung der Baukonstruktion bestimmte Auflagen erlassen werden müssen, oder die Baukonstruktion so nicht gebaut werden darf.If the construction is fully compliant with additional approval only, the computer program may provide an approving body with the compiled data, namely, the characteristics of the construction, required evidence, and any deviations that exist. The certifying body may then, on the basis of that data, assess whether additional approval must be granted and whether certain conditions must be imposed for the construction of the structure or the structure may not be so constructed.

Falls für die Herstellung der Baukonstruktion weitere Auflagen erlassen werden, lassen sich durch das Computerprogramm ähnliche bewährte bzw. geprüfte Konstruktionen als Basis auswählen, und die genehmigende Stelle kann die erforderlichen zusätzlichen Nachweise oder sonstigen Auflagen dem Planer oder Bauherrn zur Verfügung stellen, der diese in das Computerprogramm eingeben kann. Es ist grundsätzlich auch möglich, dass die genehmigende Stelle direkt über eine Datenverbindung mit dem Computerprogramm korrespondieren kann und die Informationen der genehmigenden Stelle direkt von dort in das Computerprogramm eingespeist werden.If further editions are issued for the manufacture of the building construction, the computer program may select similar proven or tested structures as a basis, and the approving authority may provide the requisite additional evidence or other conditions to the designer or contractor, who will include them in the Computer program can enter. In principle, it is also possible that the authorizing body can correspond directly to the computer program via a data connection and the information from the authorizing body is fed directly from there into the computer program.

Im Fall eine ohne Weiteres vollständig regelkonform baubaren Baukonstruktion wird durch das Computerprogramm auf der Grundlage der erzeugten geforderten Nachweise eine technische Leistungsbeschreibung und eine Positionsbeschreibung der Baukonstruktion erstellt. Auch im Fall zusätzlicher Auflagen für die vollständig regelkonforme Herstellung der Baukonstruktion auf der Grundlage von Informationen der prüfenden Stelle, erzeugt das Computerprogramm eine entsprechend angepasste technische Leistungsbeschreibung und eine Positionsbeschreibung der Baukonstruktion.In the case of a building construction that can be easily constructed in accordance with the rules, the computer program will create a technical performance description and a description of the position of the building construction on the basis of the required proofs produced. Also, in the case of additional requirements for the fully compliant construction of the building structure based on information of the verifying body, the computer program generates a correspondingly adapted technical performance description and a positional description of the building structure.

Ein zweites Modul des Computerprogramms erlaubt es dem Bauherrn oder Planer, kaufmännische Daten vorzugeben, die im Rahmen der Angebotserstellung durch potentielle Anbieter von Interesse sein können. Die Leistungsbeschreibung und die Positionsbeschreibung sowie die kaufmännischen Daten können dann durch das Computerprogramm an geeigneter Stelle veröffentlicht und somit potentiellen Anbietern zugänglich gemacht werden.A second module of the computer program allows the builder or planner to specify commercial data that may be of interest to potential bidders as part of their bidding process. The service description and the position description as well as the commercial data can then be published by the computer program at a suitable location and thus made available to potential providers.

Die potentiellen Anbieter können die veröffentlichten Daten, insbesondere die erstellten Anforderungen, mit ihren Möglichkeiten, zum Beispiel ihrem Sortiment, vergleichen und gegebenenfalls ein Angebot an den Bauherrn oder Planer abgeben, dass durch das Computerprogramm aufgenommen und in einem separaten Speicher abgelegt werden kann. Daneben ist es auch möglich, dass die potentiellen Anbieter lediglich einen Hinweis auf ihr Angebot abgeben, auf den sich der Bauherr oder Planer bei dem potentiellen Anbieter erkundigen kann. The potential providers can compare the published data, in particular the requirements created, with their possibilities, for example their assortment, and, if appropriate, make an offer to the client or planner that can be recorded by the computer program and stored in a separate memory. In addition, it is also possible that the potential providers merely give an indication of their offer, on which the builder or planner can inquire at the potential provider.

Dabei können die potentiellen Anbieter einerseits direkt auf das Computerprogramm zugreifen, indem sie ein eigenes Programmmodul benutzen können, das die Interaktion zwischen dem Computerprogramm des Planers oder Bauherrn und dem Anbieter besonders leicht ermöglicht. Es kann alternativ auch ein Angebot vom Planer oder Bauherrn eingegeben werden, das vom potentiellen Anbieter zuvor auf anderem Weg bekannt gemacht wurde. Daneben können auch Änderungsanfragen durch potentielle Anbieter oder variierende Angebote eingegeben werden, die durch das Computerprogramm weiter verarbeitet werden können.On the one hand, the potential providers can directly access the computer program by being able to use their own program module, which makes the interaction between the computer program of the planner or client and the provider particularly easy. Alternatively, an offer can be entered by the planner or client, which was previously announced by the potential provider by other means. In addition, change requests can also be entered by potential providers or varying offers, which can be further processed by the computer program.

Das Computerprogramm ermöglicht somit eine Sammlung und Gegenüberstellung und damit einen Vergleich der abgegebenen Angebote potentieller Anbieter für die Baukonstruktion.The computer program thus enables a collection and comparison and thus a comparison of the offers submitted by potential providers for the construction.

Auf der Grundlage der abgegebenen Angebote potentieller Anbieter kann der Planer oder Bauherr über Änderungen der Leistung, die von einem potentiellen Anbieter angeboten wird, verhandeln und gegebenenfalls die Leistungsbeschreibung der Baukonstruktion an die verfügbaren Leistungen der potentiellen Anbieter anpassen. Die veröffentlichten Daten der Leistungsbeschreibung, Positionsbeschreibung und der kaufmännischen Daten können somit aktualisiert werden, um gegebenenfalls nötige Korrekturen der Ausschreibung vorzunehmen und anderen potentiellen Anbietern die Möglichkeit zur Reaktion auf die korrigierte Ausschreibung zu geben.On the basis of the offers submitted by potential suppliers, the planner or builder can negotiate changes in the performance offered by a potential supplier and, if appropriate, adapt the performance description of the construction to the available services of the potential suppliers. The published data of the specification, position description and the commercial data can thus be updated to make any necessary corrections to the call for tenders and to give other potential providers the opportunity to respond to the revised call for tenders.

Der Planer oder Bauherr kann seine Auswahl eines Anbieters zur Herstellung der Baukonstruktion oder eines Teils der Baukonstruktion in das Computerprogramm eingeben und verbindliche Termine und Konditionen darin festlegen, die durch das Computerprogramm in Form einer Auftragsbestätigung festgehalten werden können. Bevorzugt kann das Computerprogramm auch Vorschläge für die Termine und Konditionen abgeben.The planner or builder can enter his selection of a provider for the construction of the construction or a part of the construction in the computer program and set binding dates and conditions therein, which can be recorded by the computer program in the form of an order confirmation. Preferably, the computer program can also make suggestions for the dates and conditions.

Der Anbieter kann die dem Computerprogramm zur Verfügung stehenden Daten durch weitere technische Eingaben seinerseits ergänzen, um die Funktion des Computerprogramms als Produktionsplanungs- und Steuerungssystem (PPS-System) bzw. zur Koordinierung des eigenen PPS-Systems zu nutzen. Das Computerprogramm erstellt Detailpläne, Stücklisten und dergleichen, um die Prozesssteuerung des Anbieters zu unterstützen.The provider can complement the data available to the computer program by further technical inputs in turn, to use the function of the computer program as a production planning and control system (PPS system) or to coordinate the own PPS system. The computer program creates detailed plans, parts lists and the like in order to support the process control of the provider.

Daneben ermöglicht diese Funktion des Computerprogramms als unterstützendes PPS-System das Erstellen zusätzlicher Nachweise durch den Anbieter, die eine oder mehrere regelkonforme Eigenschaften der einzelnen Teile der Baukonstruktion, deren Zusammensetzung, die verwendeten Materialien und dergleichen sicherstellen und dokumentieren. Hierfür kann insbesondere auch ein Prüfungsalgorithmus beim Anbieter ausgearbeitet werden, durch den das Computerprogramm bewerten kann, ob die vom Anbieter gemachten Angaben zur Produktion die Regelkonformität der Baukonstruktion ermöglichen bzw. sicherstellen. Gegebenenfalls kann das Computerprogramm dann einen Nachweis über die Regelkonformität der Teile der Baukonstruktion erstellen und abspeichern, um diesen im Rahmen einer Schlussdokumentation über die vollständige Regelkonformität der Baukonstruktion zu berücksichtigen.In addition, this feature of the computer program, as a supporting PPS system, allows the provider to provide additional credentials that ensure and document one or more conformant properties of the individual parts of the building structure, their composition, the materials used, and the like. For this purpose, in particular, a test algorithm can be worked out by the provider, by means of which the computer program can evaluate whether the information provided by the provider on the production permit or ensure the conformity of the building structure. If necessary, the computer program can then create and store proof of the conformity of the parts of the building construction in order to take this into account in the context of a final documentation on the complete conformity of the building structure.

Das Computerprogramm kann daraufhin Inhalt und Umfang einer werkseigenen Produktionskontrolle (WPK) beim Planer oder Bauherren, aber auch beim Anbieter erstellen. Beim Anbieter kann daraufhin, unterstützt durch das Computerprogramm, ein PPS-System dazu dienen, die Produktion zu verfolgen. Die WPK wird bevorzugt auch durchgeführt.The computer program can then create the content and scope of a factory production control (WPK) at the planner or builder, but also the provider. The vendor can then use a PPS system, supported by the computer program, to track production. The WPK is preferably also carried out.

Damit lassen sich eine Terminierung, eine Maßkontrolle oder andere Kontrolle, durchführen und Vorleistungen sowie der Montagebeginn zuverlässig planen. Beim Anbieter laufen in seinem eigenen PPS-System entsprechende Abläufe ab, die durch das Computerprogramm beim Planer oder Bauherrn überprüft werden können. Das Computerprogramm ermöglicht zudem eine Kalkulation und Kostenverfolgung im Simulationsstadium bereits während der Planungsphase sowie später während der Fertigung der Baukonstruktion bzw. deren Teile.This makes it possible to carry out a scheduling, a dimensional control or other control, and to reliably plan intermediate services as well as the start of installation. The provider runs corresponding processes in his own PPS system that can be checked by the computer program at the planner or client. In addition, the computer program enables calculation and cost tracking in the simulation stage during the planning phase as well as later during the production of the building construction or its parts.

Auf der Grundlage der PPS-Systeme sowie der WPK kann das Computerprogramm individuelle Nachweise, Prüfzeugnisse und Dokumentationen erstellen, die abgespeichert und später in einer Gesamtdokumentation angezeigt werden können.On the basis of the PPS systems and the WPK, the computer program can create individual proofs, test certificates and documentation that can be saved and later displayed in a complete documentation.

Nach der Fertigstellung der Baukonstruktion kann beispielsweise durch den Anbieter indiziert werden, dass die Baukonstruktion abnahmebereit ist, worauf das Computerprogramm ein Abnahmeprotokoll für den Planer oder Bauherrn vorschlägt. Daneben kann das Computerprogramm auch einen Sachverständigen vorschlagen, der das erarbeitete Abnahmeprotokoll abarbeiten kann. Auch die zeitliche Organisation der Abnahme lässt sich durch das Computerprogramm in der bevorzugten Ausführungsform koordinieren, indem den Beteiligten beispielsweise Fristen und Nachfristen für die Abnahme gesetzt werden.After completion of the construction can be indexed for example by the provider that the construction is ready to accept, whereupon the computer program proposes an acceptance protocol for the planner or builder. In addition, the computer program can also propose an expert who can process the prepared acceptance record. The temporal organization of the decrease can be explained by the Coordinate computer program in the preferred embodiment, for example, the parties are set deadlines and grace periods for acceptance.

Für eine Schlussdokumentation werden die verfügbaren Nachweise und Informationen zusammengetragen und durch das Computerprogramm zusammengestellt. Hierzu zählen insbesondere Bedienungsanleitungen und Handbücher sowie von dem Computerprogramm bereitgestellte, erzeugte oder benannte Prüfnachweise, Produktkennzeichnungen, Pläne oder Wartungsvorgaben.For a final documentation, the available evidence and information are collected and compiled by the computer program. These include, in particular, operating instructions and manuals as well as test certificates provided by the computer program, generated or named, product identifications, plans or maintenance specifications.

Die somit zusammengestellte Schlussdokumentation des Computerprogramms kann dann an den Anbieter weitergegeben und von diesem zur Zusammenstellung der Daten für eine Schlussrechnung verwendet werden. Das Computerprogramm eignet sich grundsätzlich auch dafür, selbst einen Entwurf für die Schlussrechnung zu erstellen. In diesem Zusammenhang kann das Computerprogramm auch Vorschläge für Fälligkeitsdaten, Nachfristsetzung nach Fälligkeitseintritt und dergleichen ausarbeiten und die Schlussrechnung ausgeben.The thus compiled final documentation of the computer program can then be forwarded to the provider and used by him to compile the data for a final invoice. The computer program is basically also suitable for creating a draft for the final invoice. In this context, the computer program can also develop proposals for due dates, grace period after maturity and the like and spend the final bill.

Das Computerprogramm kann auch vor dem Ablauf von Verjährungsfristen aus Verträgen mit Anbietern oder Zulieferern warnen und Informationen für Wartungsangebote machen, sowie Wartungsdaten verwalten.The computer program may also warn against the expiration of limitation periods from contracts with suppliers or suppliers and provide information for maintenance offers, as well as manage maintenance data.

Somit ist das Computerprogramm in der bevorzugten Ausführungsform, die vorstehend beschrieben wurde, dazu geeignet, eine schnelle und effiziente Planung einer Baukonstruktion zu ermöglichen. Das Computerprogramm, das vorstehend beschrieben wurde, weist darüber hinaus einige Zusatzleistungen auf, welche die Planung der Baukonstruktion oder des Bauwerks weiter erleichtern.Thus, in the preferred embodiment described above, the computer program is capable of enabling fast and efficient planning of a building construction. The computer program described above also has some additional benefits that further facilitate the design of the building or structure.

KURZE FIGURENBESCHREIBUNGBRIEF FIGURE DESCRIPTION

1 zeigt eine Diagrammdarstellung eines ersten Beispiels der Simulation eines Bauwerks, nämlich eines Wohnhauses mit Büro in Bayern 1 shows a diagram of a first example of the simulation of a building, namely a residential building with office in Bavaria

2 zeigt eine Diagrammdarstellung eines zweiten Beispiels der Simulation einer Baukonstruktion, nämlich eines Fensters oder einer Tür für das Bauwerk aus Beispiel 1, wobei diese Simulation optional Teil der Simulation des Bauwerks sein kann. 2 shows a diagram representation of a second example of the simulation of a building construction, namely a window or a door for the building of Example 1, which simulation can optionally be part of the simulation of the building.

3 zeigt eine schematische Darstellung der durch die Vorrichtung durchgeführten Schritte 3 shows a schematic representation of the steps performed by the device

BEISPIEL 1: WOHNHAUS MIT BÜRO IN BAYERNEXAMPLE 1: RESIDENTIAL HOUSE WITH OFFICE IN BAVARIA

Dieses Beispiel ist in 1 illustriert. Ein Planer, der einen Neubau eines Wohnhauses mit Büro in Bayern in Deutschland planen möchte, gibt zunächst in die Eingabemaske eines Computerprogramms grundlegende Angaben zum Wohnhaus ein (S110). Solche grundlegenden Eingaben sind z. B. die Maße des Wohnhauses, einige Gestaltungsvorgaben, die sich auf das optische Erscheinungsbild des Wohnhauses beziehen, z. B. die Dachform, die verwendeten Farben, Türen und Fensterformen etc., technische Werte und die Einbausituation „Neubau” sowie gegebenenfalls Vorgaben für die Bauzeiten.This example is in 1 illustrated. A planner, who would like to plan a new construction of a residential building with an office in Bavaria in Germany, first enters basic information about the residential building into the input mask of a computer program (S110). Such basic inputs are z. As the dimensions of the house, some design specifications that relate to the visual appearance of the house, z. As the roof shape, the colors used, doors and window shapes, etc., technical values and the installation situation "new building" and, where appropriate, specifications for the construction times.

Durch Eingabe des Orts des Bauwerks (S120), z. B. durch Angabe der Postleitzahl, der Anschrift oder einer ähnlichen genügend präzisen geographischen Angabe, ermittelt das Computerprogramm die an diesem Ort einschlägigen Normen und Vorschriften (S130), die durch das Wohnhaus mit Büro an diesem Ort zu erfüllen sind.By entering the location of the structure (S120), e.g. For example, by indicating the zip code, the address or a similar sufficiently precise geographical indication, the computer program shall determine the relevant standards and regulations (S130) applicable at that location to be met by the dwelling house with office at that location.

Die Art-Identifizierungseinrichtung identifiziert die Art und die Lage-Identifizierungseinrichtung identifiziert die geographische Lage des Bauwerks. Das durch die erste Steuerungseinrichtung gesteuerte erste Vorrichtungsmodul kann somit die Anforderungs-Auswahleinrichtung zum Auswählen von Anforderungen an das Bauwerk aus dem ersten Speicher derart steuern, dass diese Anforderungen konform zur Art und geographischen Lage der Baukonstruktion sind (S140).The species identification means identifies the species and the location identification means identifies the geographic location of the structure. The first device module controlled by the first controller may thus control the request selector to select requirements for the structure from the first memory such that these requirements conform to the type and geographic location of the structure (S140).

In diesem Beispiel bedeutet dies, dass die Anforderungen an ein den Eingaben des Planers entsprechendes Wohnhaus mit Büro in einer bestimmten Ortschaft in Bayern durch die Anforderungs-Auswahleinrichtung aus dem ersten Speicher ausgewählt werden.In this example, this means that the requirements for a dwelling house with office in a certain location in Bavaria, which corresponds to the input of the planner, are selected by the request selector from the first memory.

Dabei geht das Computerprogramm derart vor, dass eine von der Anforderungs-Auswahleinrichtung ausgewählte Anforderung bei der Auswahl einer weiteren Anforderung durch die Anforderungs-Auswahleinrichtung berücksichtigt wird. Somit wird in einer rekursiven Schleife (S144) nach und nach eine Anforderung nach der anderen unter Berücksichtigung einer oder mehrerer bereits ausgewählter Anforderungen ausgewählt (S146).The computer program proceeds in such a way that a request selected by the request selection device is taken into account in the selection of a further request by the request selection device. Thus, in a recursive loop (S144), one request at a time is selected one by one in consideration of one or more requests already selected (S146).

Alternativ oder zusätzlich dazu lässt sich die Art einer Baukonstruktion, beispielsweise eines Fensters oder einer Tür auswählen (S180) und die im Folgenden unter Beispiel 2 genannten Schritte im Anschluss ausführen. Diesbezüglich können insbesondere auch viele verschiedene Baukonstruktionen ausgewählt werden (S180), für die dann (A) jeweils die in Beispiel 2 genannten Schritte analog ausgeführt werden. Am Ende (B) der in Beispiel 2 genannten und in 2 illustrierten Abfolge von Schritten können die Ergebnisse zentral ausgewertet werden.Alternatively or additionally, the type of building construction, for example a window or a door, can be selected (S180) and the steps mentioned below under Example 2 subsequently carried out. In this regard, in particular, many different constructions can be selected (S180), for which then (A) in each case the steps mentioned in Example 2 are carried out analogously. At the end (B) of the example mentioned in Example 2 and in 2 illustrated sequence of steps, the results can be evaluated centrally.

Danach prüft das Computerprogramm, ob die Eingaben bezüglich der Art, d. h. z. B. die Maße, Gestaltungsvorgaben, technischen Werte, Einbausituation, unter Berücksichtigung der identifizierten geographischen Lage der Baukonstruktion mit den ausgewählten Anforderungen übereinstimmen (S150) und somit das Bauwerk vollständig regelkonform herstellbar ist (S160). Insbesondere wird überprüft, ob die Angaben zur Art der Baukonstruktion(en), z. B. Fenster und Türen, konform mit den Anforderungen an diese Baukonstruktion(en) unter Berücksichtigung des Ortes des Bauwerks sind. Thereafter, the computer program checks whether the inputs with respect to the type, ie eg the dimensions, design specifications, technical values, installation situation, taking into account the identified geographical position of the building construction with the selected requirements (S150) and thus the structure is fully compliant to produce ( S160). In particular, it is checked whether the information on the type of building construction (s), z. As windows and doors, compliant with the requirements of this building structure (s) taking into account the location of the structure are.

Falls dies nicht der Fall ist, zeigt das Computerprogramm an, welche Modifikationen an der Baukonstruktion oder dem Bauwerk vorzunehmen wären oder welche zusätzlichen Genehmigungen gegebenenfalls einzuholen wären, um das Wohnhaus mit Büro wunschgemäß am gewählten Ort zu errichten (S170).If this is not the case, the computer program indicates what modifications would be made to the construction or the structure or which additional approvals might be required to set up the home with office as desired at the chosen location (S170).

BEISPIEL 2: FENSTER UND AUSSENTÜREN (Fig. 2)EXAMPLE 2: WINDOWS AND OUTDOOR DOORS (FIG. 2)

Das nachfolgende Beispiel bezieht sich auf die Konstruktion von Fenstern und Außentüren des Wohnhauses aus Beispiel 1. Analog kann für die Simulation andere Baukonstruktionen vorgegangen werden. Beispiele hierfür sind Erdarbeiten, Mauerarbeiten, Beton- und Stahlbetonarbeiten, Klempnerarbeiten, Putz- und Stuckarbeiten, Dachdeckungsarbeiten, Elektroarbeiten, Abdichtungsarbeiten, Maler- und Lackierarbeiten, Heizungsanlagen und raumlufttechnische Anlagen, Zimmer- und Holzbauarbeiten, Metallbauarbeiten, Trockenbauarbeiten, Rollladen- und Sonnenschutzvorrichtungen, Fliesen- und Plattenarbeiten, Estricharbeiten oder Sanitärarbeiten. Im Gegensatz dazu betrifft die Baukonstruktion der Fenster und Außentüren im wesentlichen Tischlerarbeiten und Verglasungsarbeiten. Dieses Beispiel ist in 2 illustriert.The following example refers to the construction of windows and exterior doors of the residential building of Example 1. Analogously, other building constructions can be used for the simulation. Examples include earthworks, masonry, concrete and reinforced concrete works, plumbing, plastering and stucco work, roofing, electrical work, waterproofing, painting and varnishing, heating and ventilation systems, carpentry and timber construction, metalwork, drywall, roller shutter and sun protection, tiles - and panel work, screed or sanitary work. In contrast, the construction of the windows and exterior doors is essentially carpentry and glazing work. This example is in 2 illustrated.

Falls die Simulation gemäß Beispiel 2 ein Teil der Simulation gemäß Beispiel 1 ist, schließen sich die Schritte nach (A) in 2 an den Schritt vor (A) in 1 an. Nach Schritt (B) in 2 kann in diesem Fall nach Schritt (B) in 1 fortgefahren werden.If the simulation according to Example 2 is part of the simulation according to Example 1, the steps according to (A) in 2 to the step before (A) in 1 at. After step (B) in 2 may in this case after step (B) in 1 be continued.

Zunächst wird durch die Lage-Identifizierungseinrichtung die geographische Lage der Baukonstruktion, z. B. Bayern, Voralpenland, Deutschland identifiziert (S200).First, by the location identification device, the geographical location of the building construction, for. B. Bavaria, Alpine foothills, Germany identified (S200).

Durch die Art-Identifizierungseinrichtung wird dann die Art der Baukonstruktion, nämlich Fenster und Außentüren eines Neubauwohnhauses mit Büro in Bayern identifiziert (S210). Ferner wird in diesem Beispiel angenommen, dass die vom Bauherrn gewünschten Außenfenster eine geklebte Verglasung mit absturzhemmenden Eigenschaften verwenden. Anschließend wird die Auswahl der Anforderungen an die Fenster und Außentüren durch die Anforderungs-Auswahleinrichtung von der ersten Steuerungseinrichtung gesteuert (S220). Die Anforderungs-Auswahleinrichtung wählt aus den relevanten Regelwerken aus, die in diesem Beispiel durch die EnEV, LBO Bayern, VOB C, Normen DIN/EN/ISO gegeben werden. Die Anforderungs-Auswahleinrichtung wählt aus dem Speicher, in dem die oben genannten relevanten Regelwerke abgespeichert sind, unter Anderem die Produktnorm DIN EN 14351-1 aus. Diese Norm bildet die Basis für die Definition von technischen Anforderungen an Außenfenster und Türen und ist somit bei der Herstellung eines vollständig normkonformen Bauwerks zu berücksichtigen.The type identification device then identifies the type of building construction, namely the windows and exterior doors of a newly built residential building with an office in Bavaria (S210). Further, in this example, it is assumed that the exterior windows desired by the client use glued glazing with anti-crash properties. Subsequently, the selection of the demands on the windows and exterior doors by the request selector is controlled by the first controller (S220). The requirement selection device selects from the relevant regulations, which in this example are given by the EnEV, LBO Bayern, VOB C, DIN / EN / ISO standards. The request selector selects from the memory in which the above-mentioned relevant rules are stored, among others the Product standard DIN EN 14351-1 out. This standard forms the basis for the definition of technical requirements for exterior windows and doors and must therefore be taken into account in the production of a fully compliant building.

Die technische Regel für absturzsichernde Verglasungen des DIBt sieht jedoch beispielsweise die vom Bauherrn gewünschte Konstruktion der Fenster und Außentüren mit geklebter Verglasung nicht vor.However, the technical rule for fall-resistant glazing of the DIBt does not provide, for example, the construction of windows and exterior doors with glued glazing desired by the client.

Die Anforderungs-Auswahleinrichtung wird durch die Steuerungseinrichtung derart gesteuert, dass die Möglichkeit angeboten wird, die sich aus der Norm ergebenden Vorgaben für die Fenster und Außentüren durch eine gesonderte Genehmigung durch das zuständige Bauamt zu ergänzen und damit die Regelkonformität der Fenster und Außentüren sicherzustellen.The request selection device is controlled by the control device in such a way that it offers the possibility of supplementing the standard requirements for the windows and exterior doors with a separate approval from the responsible building authority and thus ensuring the conformity of the windows and exterior doors.

In diesem Beispiel ist dazu die Möglichkeit vorgesehen, dass durch ein Computerprogramm eine Information des Bauamts über die geplante Ausführung und die vorhandene Abweichung ergeht, um eine Entscheidung über eine besondere Genehmigung herbeizuführen. Hierzu werden die relevanten Regelwerke und Informationen zusammengestellt, die hierbei in der TRAV, ETAG 002 sowie bereits ausgeführten Konstruktionen mit Nachweisen der Gebrauchstauglichkeit bestehen.In this example, there is the possibility for a computer program to provide the building authority with information about the planned execution and the existing deviation in order to bring about a decision on a special permit. For this purpose, the relevant rules and information are compiled, which exist in the TRAV, ETAG 002 and already executed constructions with proof of serviceability.

Durch das Bauamt werden nötige Auflagen übermittelt, die in diesem Fall in einem erforderlichen Pendelschlagversuch nach DIN EN 13049 bestehen.The Bauamt sends the necessary conditions, which in this case follow a required pendulum impact test DIN EN 13049 consist.

Die Auflage des Pendelschlagversuchs nach DIN EN 13049 wird durch ein Computerprogramm in den ersten Speicher aufgenommen und von der Anforderungs-Auswahleinrichtung ausgewählt, um eine normkonforme Konstruktion der Fenster und Außentüren sicherzustellen.The circulation of the pendulum impact test after DIN EN 13049 is recorded by a computer program in the first memory and selected by the request selector to ensure a compliant construction of the windows and exterior doors.

Nachfolgend kann eine Konstruktionseinrichtung zum Erstellen von konformen Konstruktionsvorschlägen für die Fenster und Außentüren dem Planer insbesondere zwei Alternativen aufweisen (S230). Dies ist bevorzugt aber nicht zwingend. Einerseits ist die vorgesehene Ausführung der Fenster und Außentüren mit dem zusätzlichen Erfordernis eines Pendelschlagversuchs nach DIN EN 13049 möglich. Andererseits kann eine zusätzliche Absturzhemmung durch ein Geländer vorgesehen werden, um den teuren Pendelschlagversuch zu vermeiden. Somit kann der Planer oder Bauherr, beispielsweise auf der Grundlage der zu erwartenden Kosten, die Entscheidung treffen, welchen Konstruktionsvorschlag der Konstruktionseinrichtung er weiterverfolgen möchte.In the following, a construction device for creating conformal design proposals for the windows and outer doors can in particular have two alternatives to the planner (S230). This is preferred but not mandatory. On the one hand, the intended design of the windows and exterior doors with the additional Requirement of a pendulum impact test after DIN EN 13049 possible. On the other hand, an additional fall inhibition can be provided by a railing to avoid the expensive pendulum impact test. Thus, the planner or builder, for example, based on the expected costs, can make the decision as to which design proposal of the construction device he wants to pursue.

Auf der Grundlage der Auswahl durch den Planer oder Bauherren kann dann eine technische Leistungsbeschreibung für die vorgesehenen Fenster und Außentüren erstellt werden (S240), die zur Auftragsvorbereitung weiterverwendet werden kann.Based on the selection by the planner or builders, a technical specification for the intended windows and exterior doors can then be created (S240) that can be reused for job preparation.

Ein zweites Vorrichtungsmodul kann dann auf der Grundlage der erstellten Leistungsbeschreibung eine Ausschreibung, zum Beispiel auf einen virtuellen Marktplatz, veröffentlichen (S250) und potentielle Anbieter in die Lage versetzen, ein oder mehrere Angebote für die Baukonstruktion abzugeben. Dabei ist es möglich, dass neben der Leistungsbeschreibung weitere Rahmenbedingungen vorgegeben werden, die beispielsweise in einer regionalen Auswahl von Anbietern, bestimmten Materialien für die Fensterrahmen oder dergleichen bestehen können. In dem vorliegenden Beispiel könnte die Veröffentlichung beispielsweise durch eine direkte Anfrage verschiedener regionaler Anbieter aus Bayern mit der Vorgabe eines bestimmten Rahmenmaterials erfolgen. Ein Computerprogramm kann es den potentiellen Anbietern auch ermöglichen, die Ausschreibung für die Fenster und Außentüren selbst abzurufen.A second device module may then publish a bid invitation, for example on a virtual marketplace, based on the created service description (S250) and enable potential providers to submit one or more bids for the construction design. It is possible that in addition to the performance description further conditions are given, which may for example consist of a regional selection of providers, certain materials for the window frames or the like. For example, in the present example, the publication could be made by direct request from various regional suppliers from Bavaria with the specification of a specific frame material. A computer program may also allow potential providers to retrieve the tender for the windows and exterior doors themselves.

Ein potentieller Anbieter kann somit einen Datensatz ausgewählter Anforderungen in ein eigenes Programmmodul laden und auf dieser Grundlage ein Angebot kalkulieren und erstellen. Dabei ist es möglich, dass das Programmmodul des potentiellen Anbieters selbständig auf nachzuholende Nachweise im Falle einer normabweichenden Modifizierung der Fenster und Außentüren hinweist. Im vorliegenden Beispiel kann das Programmmodul des potentiellen Anbieters, im Fall einer Auswahl der geklebten Verglasung mit absturzhemmenden Eigenschaften, auf die Abweichung von der Norm DIN EN 14351-1 hinweisen, einen normkonformen Alternativvorschlag ausarbeiten und eine Rückfrage mit dem Planer oder Bauherrn vorbereiten. Ein eigenes Programmmodul auf Seiten des potentiellen Anbieters ist jedoch für die erfindungsgemäße Vorrichtung, das beschriebene Verfahren und das beschriebene Computerprogramm nicht nötig, sondern erhöht lediglich die erreichbare Arbeitserleichterung und Planungssicherheit.A potential provider can thus load a record of selected requirements into its own program module and calculate and create an offer on this basis. It is possible that the program module of the potential provider independently indicates evidence to be retrieved in the event of a non-standard modification of the windows and exterior doors. In the present example, the program module of the potential provider, in the case of a selection of the glued glazing with anti-crash properties, can refer to the deviation from the Standard DIN EN 14351-1 point out a standard-compliant alternative proposal and prepare a consultation with the planner or client. However, a separate program module on the part of the potential provider is not necessary for the device according to the invention, the method described and the computer program described, but only increases the achievable workload and planning security.

Nach der Kalkulation eines Angebots kann der potentielle Anbieter sein Angebot durch sein Programmmodul auf dem zweiten Speicher der Vorrichtung zur Simulation der Baukonstruktion abspeichern (S260) und dem Planer oder Bauherrn somit zur Verfügung stellen.After the calculation of an offer, the potential provider can store his offer through his program module on the second memory of the device for simulating the construction (S260) and thus make the planner or client available.

Eine Merkmals-Identifizierungseinrichtung kann für den Planer oder Bauherrn alle eingegangenen Angebote potentieller Anbieter hinsichtlich möglicher Abweichungen von den Anforderungen, der jeweiligen Preise und sonstiger Eigenschaften analysieren und einordnen (S270). Auf der Grundlage dieser Analyse ist es dem Planer oder Bauherrn besonders leicht möglich, mit den potentiellen Anbietern zu verhandeln.A feature identification means may analyze and classify for the designer or builder all offers received from potential suppliers regarding possible deviations from the requirements, the respective prices and other characteristics (S270). On the basis of this analysis, it is particularly easy for the planner or client to negotiate with the potential suppliers.

Beispielsweise können gewünschte Leistungsänderungen an den abgegebenen Angeboten gesammelt, mit den vorher ausgewählten Anforderungen abgeglichen, auf Regelkonformität überprüft und an den potentiellen Anbieter übertragen werden. Andererseits lässt sich aus der Sammlung von Abweichungen von den Anforderungen durch die potentiellen Anbieter auch ein Vorschlag für Änderungen an den Anforderungen generieren, um somit die Anforderungen an die Angebote potentieller Anbieter anzupassen.For example, desired changes in the performance of the bids submitted can be collected, compared with the previously selected requests, checked for compliance with rules, and transmitted to the potential provider. On the other hand, the collection of deviations from the requirements by the potential suppliers can also generate a proposal for changes to the requirements in order to adapt the requirements to the offers of potential suppliers.

Somit wird eine computerunterstützte Möglichkeit zur Verhandlung zwischen potentiellen Anbietern und dem Planer oder Bauherrn gegeben.Thus, a computer-aided possibility for negotiation between potential providers and the planner or builder is given.

Der Planer oder Bauherr kann anschließend den Anbieter, der den Zuschlag bekommen soll, in die Vorrichtung eingeben (S280), um weitere Schritte auszulösen. Im Simulationsstadium kann diese Eingabe auch simuliert werden. Terminwünsche, Konditionen und technische Vereinbarungen in Form einer Auftragsbestätigung können durch den Planer oder Bauherrn eingegeben oder von der Vorrichtung vorbereitet werden, um verbindliche Rahmenbedingungen für die weitere Planung der Herstellung der Baukonstruktion festzulegen.The planner or builder may then enter the provider to be awarded the contract (S280) to initiate further action. In the simulation stage, this input can also be simulated. Appointment requests, conditions and technical agreements in the form of an order confirmation can be entered by the planner or builder or prepared by the device to establish binding framework conditions for the further planning of the construction of the building.

Die Vorrichtung zur Simulation lässt sich auch losgelöst von der tatsächlichen Interaktion mit potentiellen Anbietern oder dem Baufortschritt durchführen, so dass eine gesamthafte Simulation unter Annahme geeigneter Vorgaben möglich ist. Beispielsweise kann angenommen werden, dass es einen potentiellen Anbieter gibt, der die ausgewählten Anforderungen zu einem bestimmten Preis bereitstellt.The simulation device can also be carried out independently of the actual interaction with potential suppliers or the construction progress, so that an overall simulation is possible assuming suitable specifications. For example, it can be assumed that there is a potential provider that provides the selected requirements at a certain price.

Ein drittes Vorrichtungsmodul zur Fertigungsplanung der Fenster und Außentüren erstellt Anforderungen an deren Teile (S290) und lässt diese in einem PPS-System des ausgewählten Anbieters weiterverarbeiten. Das PPS-System des Anbieters, der mit der Fertigung eines Teils der Fenster und Außentüren oder den gesamten Fenstern und Außentüren beauftragt ist, kann auf der Grundlage der Anforderungen an die Teile der Fenster und Außentüren Vorgaben für die Herstellung dieser Teile entwickeln, so dass die Teile konform mit den Anforderungen der Fenster und Außentüren sind.A third device module for production planning of the windows and exterior doors creates requirements for their parts (S290) and has them processed in a PPS system of the selected supplier. The supplier's PPS system, which is responsible for the manufacture of part of the windows and external doors or the entire windows and external doors, may be based on the requirements for the parts of the windows and exterior doors Develop specifications for the manufacture of these parts so that the parts conform to the requirements of the windows and exterior doors.

Dies kann beispielsweise dadurch geschehen, dass beim Anbieter oder beim Planer oder Bauherrn Dokumente zur Prozesssteuerung durch eine Teile-Dokumentationseinrichtung erstellt werden, die eine Terminierung einer Maßkontrolle, Erstellung eines Aufnahmeprotokolls oder die Durchführung einer Datenaufnahme vorgeben und damit planen oder steuern. Im Rahmen der WPK wird die Produktion der Teile der Baukonstruktion verfolgt und entsprechende WPK-Protokolle erstellt.This can be done, for example, by the fact that the supplier or the planner or client documents for process control are created by a parts documentation device that specify a scheduling a Maßkontrolle, creating a recording protocol or the implementation of a data recording and thus plan or control. As part of the WPK, the production of the parts of the building construction is tracked and corresponding WPK protocols are created.

Auf der Grundlage solcher WPK-Protokolle kann das Programmmodul des Anbieters oder die Teile-Dokumentationseinrichtung des Planers oder Bauherrn Einzelnachweise erstellen. So lässt sich beispielsweise ein so genannter Einzel-U-Wert für jedes Element je nach Abmessung, Rahmenanteil und verwendetem Profil und/oder Glas, eine Dichtheitsklassifizierung usw. automatisiert erstellen, falls keine Abweichungen von einer bereits geprüften Konstruktion vorliegen.Based on such WPK protocols, the vendor's program module or the part-documentation facility of the scheduler or builder may provide individual credentials. Thus, for example, a so-called single U-value for each element depending on dimensions, frame portion and profile and / or glass used, a leakage classification, etc. automatically create, if there are no deviations from an already tested design.

Im Fall auferlegter Auflagen lässt sich eine Dokumentation der Erfüllung dieser Auflagen erstellen, zum Beispiel eine Dokumentation des Pendelschlagversuchs nach DIN EN 13049 für die Ausführung der Fenster und Außentüren mit geklebter Verglasung mit absturzhemmenden Eigenschaften im Gegensatz zur Verwendung eines Geländers.In the case of imposed conditions, a documentation of the fulfillment of these requirements can be prepared, for example a documentation of the pendulum impact test DIN EN 13049 for the execution of windows and external doors with glued glazing with anti-crash properties as opposed to using a railing.

Das dritte Vorrichtungsmodul zur Fertigungsplanung kann Datensätze für die Endkundendokumentation zusammenstellen (S295), die beispielsweise eine Herstellererklärung, ein CE-Zeichen, Wartungshinweise, WPK-Protokolle, Einzelnachweise und dergleichen umfassen. Durch das Programmmodul des Anbieters lässt sich eine entsprechende Dokumentation auch in der Vorrichtung des Planers oder Bauherrn abspeichern, so dass dieser stets den Überblick über die vorhandenen Nachweise und damit die Konformität der Fenster und Außentüren behält.The third production planning device module may compile end user documentation records (S295) including, for example, a manufacturer's declaration, a CE mark, service notes, WPK protocols, itemized records, and the like. By the program module of the provider, a corresponding documentation can also be stored in the device of the planner or client, so that this always keeps track of the existing evidence and thus the conformity of the windows and exterior doors.

Wie bereits zuvor beschrieben wurde, ist es bei einer Simulation der Herstellung der Baukonstruktion möglich, entsprechende Protokolle und Einzelnachweise unter der Annahme bestimmter Vorgaben, z. B. bestimmter WPK-Protokolle, zu erzeugen und eine Enddokumentation daraus herzustellen.As has already been described above, it is possible in a simulation of the production of the building construction, corresponding protocols and itemizations under the assumption of certain specifications, eg. As certain WPK protocols to produce and produce a final documentation of it.

Ein viertes Vorrichtungsmodul zum Abschließen der Baukonstruktion kann die Abnahme der Baukonstruktion terminieren und die Ausgabe eines Abnahmeprotokolls leisten. Das Abnahmeprotokoll enthält bevorzugt die Prüfmerkmale für die Abnahmeprüfung der Fenster und Außentüren und/oder von Teilen davon, die durch die Merkmals-Erstellungseinrichtung vorbereitet wurden und auf den Anforderungen an die Teile der Fenster und Außentüren basieren.A fourth device module for completing the construction may schedule the decrease of the construction and make the issue of an acceptance log. The acceptance report preferably includes the inspection features for the acceptance inspection of the windows and exterior doors and / or parts thereof prepared by the feature creation facility and based on the requirements of the parts of the windows and exterior doors.

Nach dem tatsächlichen Durchführen der Abnahme können die Ergebnisse der Abnahme in der Vorrichtung gespeichert werden und durch die Baukonstruktions-Dokumentationseinrichtung eine Schlussdokumentation erstellt werden. Die Schlussdokumentation kann dabei die Daten für die Erstellung der Schlussrechnung zusammengestellt präsentieren und gegebenenfalls auf zu beachtende Fristen im Zusammenhang mit möglichen Mängeln der Baukonstruktion und der Bezahlung der Leistungen hinweisen.After actually performing the acceptance, the results of the decrease can be stored in the apparatus and a final documentation can be made by the construction-documentation facility. The final documentation can compile the data for the preparation of the final invoice and, if necessary, point out periods to be observed in connection with possible defects in the construction and payment of the services.

Die Schlussdokumentation kann auch die Schlussrechnung selbst sowie einen Wartungsplan und gegebenenfalls ein Angebot zur Wartung der Baukonstruktion enthalten. Die Vorrichtung kann anschließend an den Ablauf von Fristen, zum Beispiel Verjährungsfristen gegenüber Zulieferern, Rückgabedaten von Bürgschaften, Wartungstermine usw. erinnern und Daten zur Dokumentation der Wartung abspeichern.The final documentation may also include the final invoice itself as well as a maintenance plan and, if applicable, an offer to maintain the construction. The device may then recall the expiration of deadlines, for example, limitation periods against suppliers, return dates of surety bonds, maintenance dates, etc., and store data for documentation of the maintenance.

Im Fall eines herstellungsbegleitenden Einsatzes der vorstehend beschriebenen Vorrichtung, beispielsweise in Form eines auf einem Computer laufenden Computerprogramms, ermöglicht diese den Zugriff aller am Bau Beteiligten auf ein gemeinsames System, so dass auch die Koordination der Herstellung der Fenster und Außentüren effizient gestaltet werden kann. Dies führt zu einer verkürzten Planungsphase und zu einem verbesserten Produkt, sowohl im Fall der Fenster und Außentüren als auch im Fall des Wohnhauses, da dieses bei der Herstellung mithilfe der erfindungsgemäßen Vorrichtung mit umfassenden Qualitätssicherungsmaßnahmen überprüft und eine vorschriftskonforme Herstellung desselben sichergestellt werden kann.In the case of a manufacturing-accompanying use of the device described above, for example in the form of a computer program running on a computer, this allows the access of all involved in the construction of a common system, so that the coordination of the production of windows and exterior doors can be made efficient. This leads to a shortened planning phase and to an improved product, both in the case of the windows and exterior doors and in the case of the dwelling house, since this can be checked in production using the device according to the invention with comprehensive quality assurance measures and a compliant manufacture of the same can be ensured.

Die erfindungsgemäße Vorrichtung, insbesondere auch das vorgehend beschriebene Computerprogramm, eignet sich für alle Arten von Baumaßnahmen in allen Ländern, insbesondere des europäischen Binnenmarkts. Es ist für die Verwendung der erfindungsgemäßen Vorrichtung also irrelevant, ob es sich bei der Baukonstruktion um ein Wohnhaus, eine Brücke, ein Parkhaus, eine Straße, Teile von Häusern, wie etwa einen Dachstuhl, eine Wandkonstruktion, Träger oder Säulen, Fenster oder Türen usw. handelt.The device according to the invention, in particular also the computer program described above, is suitable for all types of construction measures in all countries, in particular the European internal market. It is therefore irrelevant for the use of the device according to the invention, whether the construction is a dwelling house, a bridge, a car park, a street, parts of houses, such as a roof truss, a wall construction, supports or pillars, windows or doors, etc . acts.

Bei der Planung und Genehmigung der Baukonstruktion wird durch die erfindungsgemäße Vorrichtung eine starke Vereinfachung aller beteiligter Prozesse erreicht, die sich schließlich auch während der Bauphase in einer hohen Transparenz und damit effektiven Qualitätssicherung für alle Baumaßnahmen niederschlägt.In the planning and approval of the building construction, the device according to the invention achieves a great simplification of all the processes involved, which finally also have a high degree of transparency during the construction phase so that effective quality assurance for all construction measures is reflected.

Bei durchgehender Verwendung der erfindungsgemäßen Vorrichtung wird eine zukünftige Planung einer Baukonstruktion auch dadurch weiter vereinfacht, dass alle relevanten Daten durch die erfindungsgemäße Vorrichtung koordiniert abgespeichert werden und somit in Zukunft abrufbar sind. Bei der Planung einer weiteren Baukonstruktion kann somit auf bereits durchgeführte Baukonstruktionen zurückgegriffen und die hierbei durchgeführten Veränderungen und deren Ergebnisse auf ein zukünftiges Projekt übertragen werden.With continuous use of the device according to the invention, a future planning of a building construction is also further simplified by the fact that all relevant data are stored in a coordinated manner by the device according to the invention and thus can be retrieved in the future. When planning a further building construction, it is thus possible to make use of existing construction structures and to transfer the changes made there and their results to a future project.

Weitere Merkmale und Vorteile der Erfindung ergeben sich auch aus der Gesamtheit der nachfolgenden Patentansprüche.Further features and advantages of the invention will become apparent from the totality of the following claims.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte Nicht-PatentliteraturCited non-patent literature

  • Produktnorm DIN EN 14351-1 [0088] Product standard DIN EN 14351-1 [0088]
  • DIN EN 13049 [0092] DIN EN 13049 [0092]
  • DIN EN 13049 [0093] DIN EN 13049 [0093]
  • DIN EN 13049 [0094] DIN EN 13049 [0094]
  • Norm DIN EN 14351-1 [0097] Standard DIN EN 14351-1 [0097]
  • DIN EN 13049 [0107] DIN EN 13049 [0107]

Claims (11)

Vorrichtung zur Simulation einer Baukonstruktion, umfassend ein erstes Vorrichtungsmodul zur Konstruktionsplanung der Baukonstruktion, wobei das erste Vorrichtungsmodul die folgenden Vorrichtungen umfasst: eine Art-Identifizierungseinrichtung zum Identifizieren der Art der Baukonstruktion (S310), eine Lage-Identifizierungseinrichtung zum Identifizieren der geographischen Lage der Baukonstruktion (S320), eine Anforderungs-Auswahleinrichtung zum Auswählen von Anforderungen an die Baukonstruktion aus einem ersten Speicher und eine erste Steuerungseinrichtung, die eingerichtet ist, das erste Vorrichtungsmodul derart zu steuern (S330), dass die ausgewählten Anforderungen an die Baukonstruktion konform zur Art und geographischen Lage der Baukonstruktion sind.Apparatus for simulating a building construction, comprising a first apparatus module for structural design of the building structure, the first apparatus module comprising the following apparatuses: a kind identifying means for identifying the kind of the construction (S310), a location identifying means for identifying the geographical location of the construction (S320), a request selector for selecting building design requirements from a first memory and a first control device configured to control the first device module (S330) such that the selected construction requirements are in conformity with the type and geographic position of the building structure. Vorrichtung nach Anspruch 1, wobei die erste Steuerungseinrichtung eingerichtet ist, das erste Vorrichtungsmodul derart zu steuern, dass mindestens eine Anforderung konform zu zumindest einer, bevorzugt mehrerer, besonders bevorzugt aller bereits ausgewählten Anforderung oder Anforderungen ausgewählt wird.The apparatus of claim 1, wherein the first controller is configured to control the first device module such that at least one request is selected in accordance with at least one, preferably more, more preferably, all of the already selected requests or requests. Vorrichtung nach einem vorgehenden Anspruch, wobei das erste Vorrichtungsmodul ferner eine Konstruktionseinrichtung zum Erstellen von konformen Konstruktionsvorschlägen für Baukonstruktionen, insbesondere mit einer technischen Leistungsbeschreibung aufweist.An apparatus according to any preceding claim, wherein the first apparatus module further comprises construction means for producing conformal design proposals for building structures, in particular with a technical specification. Vorrichtung nach einem vorgehenden Anspruch, ferner umfassend ein zweites Vorrichtungsmodul zur Angebotserstellung für die Baukonstruktion mit einer Speichereinrichtung zum Speichern eines oder mehrerer Angebote eines oder mehrerer Anbieter und/oder eines Hinweises darauf in einem zweiten Speicher, wobei eine zweite Steuerungseinrichtung eingerichtet ist, das zweite Vorrichtungsmodul derart zu steuern, dass die ausgewählten Anforderungen durch den oder die Anbieter abrufbar sind.Apparatus according to any preceding claim, further comprising a second apparatus module for bidding for the building construction with a memory device for storing one or more offers of one or more providers and / or an indication of them in a second memory, wherein a second control means is arranged to control the second device module such that the selected requirements can be retrieved by the provider (s). Vorrichtung nach Anspruch 4, wobei das zweite Vorrichtungsmodul eine Merkmals-Identifizierungseinrichtung aufweist, die eingerichtet ist, für das Angebot oder ein oder mehrere der Angebote, bevorzugt sämtliche Angebote in dem zweiten Speicher je ein oder mehrere Qualitätsmerkmale zu identifizieren.The device of claim 4, wherein the second device module comprises feature identification means arranged to identify one or more quality features for the offer or one or more of the offers, preferably all offers in the second store. Vorrichtung nach Anspruch 5, wobei das zweite Vorrichtungsmodul eine Prüfeinrichtung aufweist, die eingerichtet ist, das Qualitätsmerkmal oder die Qualitätsmerkmale jedes Angebots auf Konformität mit den Anforderungen zu überprüfen.The apparatus of claim 5, wherein the second device module comprises a verifier configured to check the quality feature or quality features of each offer for compliance with the requirements. Vorrichtung nach Anspruch 5 oder 6, ferner umfassend ein drittes Vorrichtungsmodul zur Fertigungsplanung der Baukonstruktion, welches Modul eine Anforderungs-Erstellungseinrichtung, die eingerichtet ist, Anforderungen an Teile der Baukonstruktion zu erstellen, und eine dritte Steuerungseinrichtung aufweist, die eingerichtet ist, das dritte Vorrichtungsmodul derart zu steuern, dass die Anforderungen an die Teile der Baukonstruktion konform mit den Anforderungen an die Baukonstruktion sind.Apparatus according to claim 5 or 6, further comprising a third apparatus module for production planning of the building structure, which module a request creator that is set up to create requirements for parts of the construction, and a third control device configured to control the third device module such that the requirements for the parts of the building construction are in conformity with the requirements of the building construction. Vorrichtung nach Anspruch 7, wobei das dritte Vorrichtungsmodul eine Teile-Dokumentationseinrichtung aufweist, die eingerichtet ist, eine Fertigung von Teilen der Baukonstruktion in Bezug auf die Qualifikation der Teile der Baukonstruktion zu dokumentieren.The apparatus of claim 7, wherein the third device module comprises a part documentation device configured to document a manufacturing of parts of the construction with respect to the qualification of the parts of the construction. Vorrichtung nach Anspruch 8, wobei das dritte Vorrichtungsmodul eine Kalkulationseinrichtung aufweist, die eingerichtet ist, eine Terminkalkulation zur Abstimmung einzelner Fertigungsschritte aufeinander durchzuführen.The apparatus of claim 8, wherein the third device module comprises a calculation device configured to perform an appointment calculation for matching individual production steps to each other. Vorrichtung nach einem der Ansprüche 7 bis 9, ferner umfassend ein viertes Vorrichtungsmodul zum Abschließen der Baukonstruktion, das eine Merkmals-Erstellungseinrichtung, die eingerichtet ist, Prüfmerkmale für eine Abnahmeprüfung der Baukonstruktion und/oder von Teilen davon vorzubereiten, und eine vierte Steuerungseinrichtung aufweist, die eingerichtet ist, das vierte Vorrichtungsmodul derart zu steuern, dass die Prüfmerkmale für Teile der Baukonstruktion auf den Anforderungen an die Teile der Baukonstruktion basieren.Apparatus according to any one of claims 7 to 9, further comprising a fourth device module for completing the building construction a feature creator configured to prepare inspection features for acceptance inspection of the construction and / or parts thereof, and a fourth control device configured to control the fourth device module such that the test characteristics for parts of the building construction are based on the requirements of the parts of the building construction. Vorrichtung nach Anspruch 10, wobei das vierte Vorrichtungsmodul eine Baukonstruktions-Dokumentationseinrichtung aufweist, die eingerichtet ist, eine Schlussdokumentation der Baukonstruktion zu erstellen.The apparatus of claim 10, wherein the fourth device module comprises a construction-documentation device configured to create a final documentation of the construction.
DE202011002737U 2010-03-11 2011-02-15 Device for simulating a building construction Expired - Lifetime DE202011002737U1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP10002575 2010-03-11
EP10002575 2010-03-11

Publications (1)

Publication Number Publication Date
DE202011002737U1 true DE202011002737U1 (en) 2011-04-21

Family

ID=42203836

Family Applications (2)

Application Number Title Priority Date Filing Date
DE202011002737U Expired - Lifetime DE202011002737U1 (en) 2010-03-11 2011-02-15 Device for simulating a building construction
DE102011005436A Withdrawn DE102011005436A1 (en) 2010-03-11 2011-03-11 Apparatus and method for simulating a building construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE102011005436A Withdrawn DE102011005436A1 (en) 2010-03-11 2011-03-11 Apparatus and method for simulating a building construction

Country Status (1)

Country Link
DE (2) DE202011002737U1 (en)

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DIN EN 13049
Produktnorm DIN EN 14351-1

Also Published As

Publication number Publication date
DE102011005436A1 (en) 2011-09-15

Similar Documents

Publication Publication Date Title
Allen et al. Fundamentals of building construction: materials and methods
Brook Estimating and tendering for construction work
Forbes et al. Modern construction: lean project delivery and integrated practices
US9152934B2 (en) Arrangements for administrating and managing a construction project
Levy Construction process planning and management: An owner's guide to successful projects
Nguyen et al. An innovative approach to temporary educational facilities: A case study of relocatable modular school in South Korea
WO2012085136A2 (en) Apparatus and method for determining the clean-up and construction requirements of parts of a building
DE202011002737U1 (en) Device for simulating a building construction
EP3909011A1 (en) Efficient creation of a building configuration
Wang et al. 3D printing and housing: Intellectual property and construction law
Zubairu Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach
Chan et al. Sustainable development worldwide: costs of green buildings
House Overview
Roachanakanan A case study of cost overruns in a Thai condominium project
Clarke From craft to qualified building labour in Britain: A comparative approach
Heilman Factors hindering the adoption of sustainable design and construction practices: The case of office building development in Dar es Salaam, Tanzania
Wilson et al. Construction of an Apartment Building and Parking Garage
Akelia Evaluating the Feasibility of Building Refugee Shelters with 3D Printing Technology in the Middle East through BIM Design & Simulation Platform
Brown Incorporating Green-Building Design Principles into Campus Facilities Planning: Obstacles and Opportunities
Di Croche Building physics aspects in the building delivery process: a case study from Vienna
Hans et al. French national service life information platform
Gmeiner Evaluation of building information modelling to energy performance certificate workflows: a variant study of an industrial building
González et al. Harmonization of design rules in Europe
Iacono Building Information Modeling for Construction Management. Testing interoperability and procedures for a healthcare facility in Moncrivello
Breedt Estimating: A valid exercise or a false sense of security?

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20110526

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20140226

R082 Change of representative

Representative=s name: HOFFMANN - EITLE PATENT- UND RECHTSANWAELTE PA, DE

R081 Change of applicant/patentee

Owner name: ALVINUM GESCHAEFTSFUEHRUNGS GMBH, DE

Free format text: FORMER OWNER: ADVISDA AG, 65760 ESCHBORN, DE

Effective date: 20150123

R082 Change of representative

Representative=s name: HOFFMANN - EITLE PATENT- UND RECHTSANWAELTE PA, DE

Effective date: 20150123

R151 Utility model maintained after payment of second maintenance fee after six years
R152 Utility model maintained after payment of third maintenance fee after eight years
R079 Amendment of ipc main class

Free format text: PREVIOUS MAIN CLASS: G06F0017500000

Ipc: G06F0030000000

R071 Expiry of right