DE202009017058U1 - Self-monitoring connection cable and equipment - Google Patents

Self-monitoring connection cable and equipment Download PDF

Info

Publication number
DE202009017058U1
DE202009017058U1 DE200920017058 DE202009017058U DE202009017058U1 DE 202009017058 U1 DE202009017058 U1 DE 202009017058U1 DE 200920017058 DE200920017058 DE 200920017058 DE 202009017058 U DE202009017058 U DE 202009017058U DE 202009017058 U1 DE202009017058 U1 DE 202009017058U1
Authority
DE
Germany
Prior art keywords
measuring
conductor
protective conductor
resistance
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200920017058
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prueftech GmbH
Prueftech GmbH
Original Assignee
Prueftech GmbH
Prueftech GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prueftech GmbH, Prueftech GmbH filed Critical Prueftech GmbH
Priority to DE200920017058 priority Critical patent/DE202009017058U1/en
Priority to PCT/EP2010/070038 priority patent/WO2011083029A1/en
Priority to EP10803074A priority patent/EP2514043A1/en
Priority to US13/516,969 priority patent/US9470730B2/en
Publication of DE202009017058U1 publication Critical patent/DE202009017058U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Resistance Or Impedance (AREA)

Abstract

Anschlussleitung (10) mit zumindest zwei Leitern (N, L) zur Übertragung einer Versorgungsspannung, dadurch gekennzeichnet, dass die Anschlussleitung (12) ferner einen Schutzleiter (PE) und einen Messleiter (P) aufweist, welche am ersten Ende der Anschlussleitung leitend miteinander verbunden sind und entweder
die Anschlussleitung (10) am zweiten Ende eine Messvorrichtung (30) umfasst, die eingerichtet ist, den Widerstand über einen die Schutzleiter (PE) und Messleiter (P) umfassenden Messkreis zu messen und bei Widerstandsüberschreitungen ein Warnsignal auszugeben oder
die Anschlussleitung am zweiten Ende eine Kupplung (50) aufweist, die eingerichtet ist, mit einem entsprechenden Gegenstück (52) eines anschließbaren Geräts (60) verbunden zu werden, so dass über eine Messvorrichtung (62) dieses Geräts (60) der Widerstand eines den Schutzleiter (PE) und Messleiter (P) umfassenden Messkreis messbar und bei Widerstandsüberschreitungen ein Warnsignal ausgebbar ist.
Connecting line (10) with at least two conductors (N, L) for transmitting a supply voltage, characterized in that the connecting line (12) further comprises a protective conductor (PE) and a measuring conductor (P), which conductively connected to each other at the first end of the connecting line are and either
the connection line (10) comprises at the second end a measuring device (30) which is set up to measure the resistance via a measuring circuit comprising the protective conductor (PE) and measuring conductor (P) and to output a warning signal in the event of excessively high resistance or
the connection line has at the second end a coupling (50) which is set up to be connected to a corresponding counterpiece (52) of a connectable device (60), so that the resistance of a device (60) is determined by means of a measuring device (62) Protective conductor (PE) and measuring conductor (P) measuring circuit can be measured and in case of excessive resistance a warning signal can be output.

Figure 00000001
Figure 00000001

Description

Die Erfindung bezieht sich auf eine Anschlussleitung gemäß dem Oberbegriff des Anspruchs 1, ein Betriebsmittel und eine Gebäudeinstallation.The invention relates to a connection line according to the preamble of claim 1, a resource and a building installation.

Elektrische Geräte werden mit einer Anschlussleitung versehen, wobei es passieren kann, dass die Anschlussleitung bzw. das Betriebsmittel beschädigt wird. Wenn eine entsprechende Beschädigung nicht erkannt wird, so entsteht eine Gefährdung von Bedienpersonen, wie bspw. durch einen elektrischen Schlag, und ein Sicherheitsproblem, wie bspw. eine Brandgefahr durch Überhitzungen.Electrical devices are provided with a connection cable, whereby it can happen that the connection line or the equipment is damaged. If such damage is not detected, then there is a risk to operators, such as. By an electric shock, and a security problem, such as. A fire hazard from overheating.

Normgemäß, gemäß DIN-VDE 0701-0702 müssen unter anderem folgende Prüfungen in regelmäßigen Zeitabständen durchgeführt werden:

  • 1. Widerstandsmessung, insbesondere des Schutzleiters (RSL)
  • 2. Schutzleiterstrom, wobei gemessen wird, ob in einem angeschlossenen Gerät oder dessen Anschlussleitung ein Schutzleiterstrom, also ein Fehlerstrom, entstanden ist.
  • 3. Sichtprüfung
Normally, according to DIN-VDE 0701-0702 Among other things, the following tests must be carried out at regular intervals:
  • 1. Resistance measurement, in particular of the protective conductor (RSL)
  • 2. Protective conductor current, whereby it is measured whether a protective conductor current, ie a fault current, has arisen in a connected device or its connecting line.
  • 3. Visual inspection

Aufgabe der vorliegenden Erfindung ist es, eine Anschlussleitung bereitzustellen, mit welcher eine Beschädigung möglichst einfach und durch den Nutzer sicher erkannt werden kann.Object of the present invention is to provide a connection line with which damage as simple as possible and can be reliably detected by the user.

Erfindungsgemäß wird eine Anschlussleitung mit zumindest zwei Leitern N und L zur Übertragung einer Versorgungs- bzw. Netzspannung bereitgestellt, wobei die Anschlussleitung ferner einen Schutzleiter PE und einen Messleiter P aufweist, welche am ersten Ende der Anschlussleitung miteinander leitend verbunden sind. Entweder umfasst dabei die Anschlussleitung am zweiten Ende eine Messvorrichtung, die eingerichtet ist, den Widerstand über einen die Leiter P und PE umfassenden Messkreis zu messen und bei Widerstandsüberschreitungen ein Warnsignal auszugeben. Alternativ weist die Anschlussleitung am zweiten Ende eine Kupplung auf, wie bspw. eine Steckverbindung, die eingerichtet ist, mit einem entsprechenden Gegenstück eines anschließbaren Geräts verbunden zu werden, so dass über eine Messvorrichtung dieses Geräts der Widerstand eines die Schutzleiter umfassenden Messkreis gemessen und bei Widerstandsüberschreitungen ein Warnsignal (optisch oder akustisch) ausgegeben werden kann. Durch Verwendung des zusätzlichen Messleiters P wird über den Messkreis eine Widerstandserhöhung, wie z. B. bei einer Leitungsbeschädigung des Schutzleiters PE frühzeitig erkannt. So können die Zyklen der regelmäßigen Prüfung rechtssicher durch eine Gefährdungsbeurteilung nach Betriebssicherheitsverordnung verlängert werden, da nun kontinuierlich der Nachweis gegeben ist (erkennbar für den technischen Laien) über die Einhaltung des max. zulässigen Schutzleiterwiderstands des überwachten Betriebsmittels. Entsprechend werden Kosten eingespart. Hierbei ist es erfindungsgemäß nicht wesentlich, ob die Widerstandsmessung in der Anschlussleitung selbst integriert oder in ein angeschlossenes Betriebsmittel ausgelagert wird.According to the invention, a connecting line with at least two conductors N and L is provided for transmitting a supply or mains voltage, wherein the connecting line further comprises a protective conductor PE and a measuring conductor P which are conductively connected to one another at the first end of the connecting line. Either the connection line at the second end comprises a measuring device which is set up to measure the resistance via a measuring circuit comprising the conductors P and PE and to output a warning signal in the event of a resistance violation. Alternatively, the connection line has a coupling at the second end, such as a plug connection which is set up to be connected to a corresponding counterpart of a connectable device, so that the resistance of a measuring circuit comprising the protective conductor is measured via a measuring device of this device and if the resistance exceeds this limit a warning signal (optical or acoustic) can be issued. By using the additional measuring conductor P is a resistance increase, such. B. detected early in a line damage to the protective conductor PE. Thus, the cycles of the regular test can be legally extended by a risk assessment according to the German Industrial Safety Ordinance, because now the proof is given (recognizable for the technical layman) about the observance of the max. permissible protective conductor resistance of the monitored equipment. Accordingly, costs are saved. In this case, it is not essential according to the invention whether the resistance measurement is integrated in the connecting line itself or is outsourced to a connected operating medium.

Weiterführend umfasst die Messeinrichtung einen Strommesser zur Messung des Schutzleiterstroms. Wie später im Ausführungsbeispiel detailliert erläutert, kann aufgrund der parallel in der Anschlussleitung 10 verlaufenden Schutzleiter PE und Messleiter P der Schutzleiterstrom im laufenden Betrieb eines angeschlossenen Verbrauchers gemessen werden, insbesondere ohne dass Umbauten vorgenommen werden müssten. Entsprechend kann wie bei der Widerstandsmessung kontinuierlich und für den technischen Laien einfach die ordnungsgemäße Funktionsweise eines Betriebsmittels überprüft werden.In addition, the measuring device comprises an ammeter for measuring the protective conductor current. As explained in detail later in the exemplary embodiment, due to the parallel in the connecting line 10 extending protective conductor PE and measuring conductor P of the protective conductor current during operation of a connected load to be measured, in particular without having to make modifications. Correspondingly, as with resistance measurement, the proper functioning of a resource can be checked continuously and for the technical layman.

Vorteilhafterweise ist am ersten Ende der Anschlussleitung ein Netzstecker angeschlossen, wodurch ermöglicht wird, die erfindungsgemäße Anschlussleitung leicht und einfach in eine bestehende elektrische Infrastruktur einzubinden. Insbesondere ist der Netzstecker dabei ein Standardstecker, insbesondere ein Schutzkontakt- bzw. Schukostecker oder Kaltgerätestecker.Advantageously, a mains plug is connected to the first end of the connecting line, which makes it possible to easily and simply integrate the connecting line according to the invention into an existing electrical infrastructure. In particular, the power plug is a standard plug, in particular a grounded or Schukostecker or IEC connector.

Ein elektrisches Gerät mit einer Anschlussleitung, wie insbesondere ein elektrischer Verbraucher, Verlängerungskabel, Kabeltrommel oder Verteilersteckdose umfasst eine entsprechende Messvorrichtung und die Anschlussleitung ist entweder mit dem Gerät untrennbar verbunden oder über eine trennbare Verbindung mit dem Gerät verbindbar. Sofern das Gerät bereits über elektrische/elektronische Schaltkreise verfügt, können diese kostengünstig um die beschriebenen Messfunktionen erweitert werden. Im Fall einer trennbaren Anschlussleitung kann diese bei einer Beschädigung einfach und kostengünstig ausgetauscht werden.An electrical device with a connecting line, such as in particular an electrical load, extension cable, cable drum or distribution socket comprises a corresponding measuring device and the connecting line is either inseparably connected to the device or connectable via a separable connection to the device. If the device already has electrical / electronic circuits, these can be extended cost-effectively by the described measuring functions. In the case of a separable connection cable can be easily and inexpensively replaced if damaged.

Ferner kann die Anschlussleitung in einer Gebäudeinstallation verwendet werden, wobei die Messvorrichtung am gebäudeseitigen Ende des Anschlusskabels vorgesehen und eingerichtet ist, den Schutzleiterstrom und Schutzleiterwiderstand zu messen.Furthermore, the connection line can be used in a building installation, wherein the measuring device is provided at the building end of the connection cable and is adapted to measure the protective conductor current and the protective conductor resistance.

In einem entsprechenden Verfahren zur Erkennung einer Störung in einem Messkreis einer Anschlussleitung mit einem Schutzleiter PE und einem Messleiter P und einem Netzstecker wird nach dem Einstecken des Netzsteckers in eine Steckdose ein Funktionstest/eine Kalibierfunkion durchgeführt und kurzzeitig durch eine Funktionsmeldung angezeigt, wie insbesondere in Form eines Kontrollleuchtens bzw. kurzes akustischen Signals. Hierdurch kann ähnlich wie beim Airbag eines Autos dem Anwender zu Beginn ein Feedback der ordnungsgemäßen Funktion der Messvorrichtung gegeben werden. Die Messvorrichtung misst anschließend vorzugsweise kontinuierlich den Widerstand des Messkreises und/oder den Schutzleiterstrom und gibt bei Überschreiten eines unzulässigen Widerstandswerts ein Warnsignal aus.In a corresponding method for detecting a malfunction in a measuring circuit of a connecting line with a protective conductor PE and a measuring conductor P and a power plug a functional test / a Kalibierfunkion is performed after plugging the power plug into a socket and briefly displayed by a function message, especially in shape a flashing or short acoustic signal. This can Similar to the airbag of a car, the user is initially given feedback on the proper functioning of the measuring device. The measuring device then measures preferably continuously the resistance of the measuring circuit and / or the protective conductor current and outputs a warning signal when an unacceptable resistance value is exceeded.

Wenn die Messvorrichtung kontinuierlich den Widerstand und/oder Schutzleiterstrom misst, kann mit geringem technischem Aufwand eine Beschädigung der Anschlussleitung erkannt werden. Des Weiteren kann auch ein Fehler oder eine Beschädigung des an die Anschlussleitung angeschlossenen Betriebsmittels erkannt werden.If the measuring device continuously measures the resistance and / or protective conductor current, damage to the connecting line can be detected with little technical effort. Furthermore, a fault or damage to the equipment connected to the connection cable can also be detected.

Anhand der Zeichnung wird die eine Ausführung der Erfindung nachstehend eingehend erläutert. Es zeigt:Reference to the drawing, an embodiment of the invention will be explained in detail below. It shows:

1 eine schematische Darstellung der Anschlussleitung mit einer kupplungsintegrierter Messvorrichtung (wie z. B. einer Kaltgeräteanschlussleitung), 1 a schematic representation of the connecting line with a coupling-integrated measuring device (such as a cold device connection line),

2 eine schematische Darstellung der Anschlussleitung mit einem angeschlossenem elektrischem Gerät, wie einer Kaltgeräteleitung mit Prüfdraht P parallel zum Schutzleiter, 2 a schematic representation of the connecting cable with a connected electrical device, such as a cold device line with test wire P parallel to the protective conductor,

3 das Anwendungsbeispiel bei einer 3-fach Tischverteiler-(steckdose) 230 V und 3 the application example for a 3-way table distribution (socket) 230 V and

4 eine Gebäudeinstallation. 4 a building installation.

Die Anschlussleitung 10 der 1 umfasst vier Leiter und zwar L als Phase und N als Nullleiter, PE als Schutzleiter und P als Messleiter.The connection cable 10 of the 1 includes four conductors, namely L as phase and N as neutral, PE as protective conductor and P as measuring conductor.

An dem ersten Ende der Anschlussleitung 10 ist ein erster Netzstecker 12 vorgesehen, bei dem die Leiter N und L mit dessen Anschlusskontakten 13 verbunden sind und der Schutzleiter PE und der Messleiter P sind mit dem Schutzleiterkontakt 14 des Netzsteckers 12 verbunden. Am anderen Ende der Anschlussleitung ist ein zweiter Stecker oder eine Kupplung 40 angeordnet. In diesem zweiten Stecker 40 kann eine Messvorrichtung 30 integriert sein, welche eine Stromversorgung 38, einen Widerstandsmesser 32, einen akustischen Warngeber 34, eine Kontrollleuchte 36 und einen Strommesser 32 aufweist. Der Widerstandsmesser 32 ist innerhalb des zweiten Steckers 40 mit seinem einen Messpotential mit dem Schutzleiter PE und seinem zweiten Ende über die zwischengeschaltete Stromversorgung 38 mit dem Messleiter P verbunden, so dass ein Kontroll- bzw. Messkreis gebildet wird, welcher die Leiter PE und P über Länge der Anschlussleitung umfasst. Eine Unterbrechung eines der Leiter PE oder P oder eine entsprechende Widerstandserhöhung„ welche aufgrund einer Beschädigung entstehen kann, wird von dem Widerstandsmesser 32 erkannt. Über eine Kontrollleuchte 36 und/oder einen akustischen Warngeber 34 kann eine entsprechende Warnung ausgeben werden. Der Anwender erkennt aufgrund dieser Warnsignale die Beschädigung der Anschlussleitung 10 und kann es entsprechend austauschen bzw. den technischen Serviceverständigen.At the first end of the connecting cable 10 is a first power plug 12 provided in which the conductors N and L with its connection contacts 13 are connected and the protective conductor PE and the measuring conductor P are connected to the protective conductor contact 14 of the power plug 12 connected. At the other end of the connecting cable is a second plug or a coupling 40 arranged. In this second plug 40 can be a measuring device 30 be integrated, which is a power supply 38 , an ohmmeter 32 , an acoustic warning device 34 , a warning light 36 and a power knife 32 having. The resistance meter 32 is inside the second connector 40 with its one measuring potential with the protective conductor PE and its second end via the intermediate power supply 38 connected to the measuring conductor P, so that a control or measuring circuit is formed, which includes the conductors PE and P over the length of the connecting line. An interruption of one of the conductors PE or P or a corresponding increase in resistance ", which may occur due to damage, is provided by the ohmmeter 32 recognized. About a control lamp 36 and / or an audible warning device 34 a corresponding warning can be issued. The user recognizes the damage to the connecting cable due to these warning signals 10 and can replace it accordingly or the technical service expert.

Ferner ist in der Messvorrichtung 30 ein Strommesser 33 zur Messung des Schutzleiterstroms im Schutzleiter P vorgesehen. Bei einer Messung ist ein elektrisches Gerät/Verbraucher (nicht dargestellt) an dem zweiten Stecker 40 mit den drei Kontakten N, L und PE angeschlossen. Wenn in diesem Gerät eine Störung vorliegt, so entsteht ein Schutzleiterstrom, welcher an das Potential PE des Steckers 40 übertragen und so zum einen über den Schutzleiter PE über die Anschlussleitung 10 an den ersten Netzstecker 12 weitergeleitet und entsprechend abgeführt wird. Zum anderen ist an dem Potential PE des Steckers der Messleiter P angeschlossen, der auch, wie bereits beschrieben über die Messvorrichtung 30 mit dem Schutzleiterkontakt 14 des ersten Netzsteckers 12 verbunden ist. PE und P sind also parallel geschaltet. So wird sich der Fehlerstrom des angeschlossenen Geräts auf beide Leiter P und PE aufteilen. Wenn der Widerstand des Messleiters P dem des Schutzleiters PE entspricht, so wird die Aufteilung im Sinne eines Stromteilers hälftig sein. Der Strommesser 33 misst den über den Messleiter P fließenden Strom und kann bei entsprechenden Messergebnissen (wie später noch erläutert wird) erkennen, dass ein Schutzleiterstrom über den PE-Kontakt des zweiten Steckers 40 in den Messkreislauf eingeleitet wurde. Entsprechend kann der Strommesser über die Kontrollleuchte 36 und/oder den akustischen Warngeber 34 eine Warnung ausgeben. Alternativ und/oder zusätzlich ist die Weitergabe des Signals über per Transponder möglich.Further, in the measuring device 30 an electricity meter 33 provided for measuring the protective conductor current in the protective conductor P. In one measurement is an electrical device / consumer (not shown) on the second connector 40 connected with the three contacts N, L and PE. If there is a fault in this device, a protective conductor current is generated, which is connected to the potential PE of the connector 40 transmitted and so on the one hand via the protective conductor PE via the connecting cable 10 to the first power plug 12 forwarded and discharged accordingly. On the other hand, at the potential PE of the plug of the measuring conductor P is connected, which also, as already described on the measuring device 30 with the protective conductor contact 14 of the first power plug 12 connected is. PE and P are thus connected in parallel. This will divide the fault current of the connected device between both P and PE conductors. If the resistance of the measuring conductor P corresponds to that of the protective conductor PE, then the division in the sense of a current divider will be half. The electricity meter 33 measures the current flowing through the measuring conductor P and, with the corresponding measurement results (as will be explained later), can recognize that a protective conductor current flows via the PE contact of the second connector 40 was introduced into the measuring circuit. Accordingly, the ammeter on the indicator light 36 and / or the audible warning device 34 to issue a warning. Alternatively and / or additionally, the transmission of the signal via a transponder is possible.

Durch die Erdung des angeschlossenen Geräts über die parallel laufenden Leiter P und PE, muss die Verbindung des Schutzleiters PE nicht unterbrochen werden und so ist eine Messung im laufenden Betrieb des Geräts, also insbesondere kontinuierlich, möglich.By grounding the connected device via the parallel conductors P and PE, the connection of the protective conductor PE must not be interrupted and so a measurement during operation of the device, ie in particular continuously possible.

Falls eine beschädigte Leitung nicht ausgetauscht wird, so ergibt sich eine Gefährdung des Bedienpersonals oder eine Brandgefahr kann entstehen. Aus diesem Grund werden normgemäß in der DIN VDI 0701-0702 bzw. der Betriebssicherheitsverordnung Kontrollen von Betriebmitteln, Leitern oder Kabeln vorgeschrieben. Der Prüfungsintervall wird anhand einer zu erstellenden Gefährdungsbeurteilung durch den Betreiber festgesetzt. Da die beschriebene Anschlussleitung selbst einen Messtest durchführt, so kann der Prüfzyklus erhöht werden. Um eine Störung in der Messvorrichtung selbst erkennen zu können, so ist die Messvorrichtung 30 eingerichtet, dass sie beim Einstecken des Netzsteckers 12 in eine entsprechende Steckdose mit einem kurzzeitigen Leuchten der Kontrollleuchte 36 von ca. 1–2 Sekunden reagiert und/oder mit einem Ton des akustischen Warngebers 34 als Signal an den Anwender, dass die Messvorrichtung 30 einwandfrei arbeitet. Falls die Messvorrichtung ein derartiges Signal nicht ausgibt, ist es für den Anwender ein Hinweis auf eine Störung, so dass die Anschlussleitung 10 ebenfalls auszutauschen ist.If a damaged cable is not replaced, the operating personnel is at risk or a fire hazard may arise. For this reason, standard in the DIN VDI 0701-0702 or the Ordinance on Industrial Safety Control of equipment, conductors or cables prescribed. The test interval is determined by the operator on the basis of a risk assessment to be prepared. Since the described connection line carries out a measurement test itself, the test cycle can be increased. In order to be able to recognize a fault in the measuring device itself, the measuring device is 30 set up that when plugging in the power plug 12 into a corresponding socket with a brief illumination of the indicator light 36 reacts for about 1-2 seconds and / or with a sound from the acoustic warning device 34 as a signal to the user that the measuring device 30 works perfectly. If the measuring device does not output such a signal, it is an indication of a fault for the user, so that the connecting cable 10 also exchange.

Die Stromversorgung 38 koppelt aus der Netzspannung, also über die Potentiale N und L, eine Niederspannung aus. Dies geschieht über eine galvanische Trennung, um die Netzspannung von den Schutzleitern P und PE getrennt zu halten.The power supply 38 decouples a low voltage from the mains voltage, ie via the potentials N and L. This is done via a galvanic isolation in order to keep the mains voltage separate from the protective conductors P and PE.

Der Widerstandsmesser 30 hat dabei einen Schwellwert von ca. 150 mΩ, der somit kleiner ist als der herkömmlich verwendete Schwellwert von max. 300 mΩ, da die Übergangswiderstände geringer sind. Der Widerstandsmesser gibt die Warnung dann aus, wenn der gemessene Widerstand den Schwellwert übersteigt. Im vorliegenden Ausführungsbeispiel beträgt der Prüfstrom 200 mA, kann aber angepasst werden. Der Schutzleiter PE wird zur Erdung verwendet und ist über entsprechende Normen in dem Querschnitt und Beschaffenheit definiert. Dieses gilt nicht für den Messleiter P, welcher für die Prüfaufgabe verwendet wird. Aus diesem Grund kann er einen anderen, insbesondere kleineren Querschnitt aufweisen, um so Material und Kosten zu sparen. Hierdurch wird die beschriebene Aufteilung des Schutzleiterstroms eines angeschlossenen Geräts entsprechend verändert.The resistance meter 30 has a threshold value of approx. 150 mΩ, which is therefore smaller than the conventionally used threshold value of max. 300 mΩ, because the contact resistance is lower. The ohmmeter outputs the warning when the measured resistance exceeds the threshold. In the present embodiment, the test current is 200 mA, but can be adjusted. The protective conductor PE is used for earthing and is defined by corresponding standards in the cross section and nature. This does not apply to the measuring conductor P, which is used for the testing task. For this reason, it can have a different, in particular smaller cross-section, so as to save material and costs. As a result, the described division of the protective conductor current of a connected device is changed accordingly.

2 zeigt eine alternative Ausführungsform bei der ebenfalls das zweite Ende der Anschlussleitung 10 mit einem Stecker oder Kupplung 50 versehen ist. Hierbei ist in dieser Kupplung 50 aber keine Messvorrichtung integriert. Statt dessen kann die Kupplung 50 mit einem Kupplungsgegenstück 52 eines elektrischen Geräts/Betriebsmittel 60 verbunden werden, welches eine Messvorrichtung 62 aufweist, welche vergleichbar zu der bereits beschriebenen Messvorrichtung 30 arbeitet. Im Gerät wird das Potential des Schutzleiters PE zur Erdung verwendet, indem es mit den zu erdenden Teilen, insbesondere dem Gehäuse, verbunden wird. Die Messvorrichtung 62 misst den Widerstand zwischen dem Gehäuse des Geräts 60 und dem Potential P inklusive mit den Übergangswiderständen von den Steckkontakten, also insbesondere der Kaltgeräteanschlussleitung zur Anschlussbuchse des Betriebsmittels. Das angeschlossene Gerät 30 kann ein beliebiger Verbraucher, wie z. B. ein Hausgerät, Werkstattgerät, Computer oder auch bspw. ein passives Gerät wie eine Kabeltrommel sein. Die Messvorrichtung 62 kann also entsprechend zum ersten Ausführungsbeispiel sowohl eine Beschädigung der Anschlussleitung 10, der Steckkontakte, als auch einen Schutzleiterstrom im Gerät im laufenden Betrieb selbst detektieren. 2 shows an alternative embodiment in which also the second end of the connecting line 10 with a plug or coupling 50 is provided. Here is in this coupling 50 but no measuring device integrated. Instead, the clutch can 50 with a coupling counterpart 52 an electrical device / equipment 60 connected, which is a measuring device 62 which is comparable to the measuring device already described 30 is working. In the device, the potential of the protective conductor PE is used for grounding, by being connected to the parts to be grounded, in particular the housing. The measuring device 62 measures the resistance between the case of the device 60 and the potential P including the contact resistances of the plug contacts, so in particular the cold device connection line to the connection socket of the equipment. The connected device 30 can any consumer, such as. As a home appliance, workshop equipment, computer or even, for example. Be a passive device such as a cable drum. The measuring device 62 Thus, according to the first embodiment, both damage to the connecting cable 10 , the plug contacts, as well as a protective conductor current in the device during operation to detect yourself.

Alternativ zum Gerät 60 kann gemäß 3 die Anschlussleitung 10 mit einer Verteilerdose 20 verbunden sein. Die Verteilerdose 20 umfasst drei Steckplätze/Steckdosen 22 für einzusteckende Stecker und jede der Steckdosen weist zwei Schutzleiterkontakte 24 auf, welche innerhalb jeder Steckdose miteinander verbunden sind. Die Messvorrichtung ist so geschaltet, dass der Messkreis über die Schutzleiter der einzelnen Steckdosen 22 über den Schutzleiter PE der Anschlussleitung zum Netzstecker 12 am ersten Ende der Anschlussleitung 10, über den Messleiter P zurück zur Verteilerdose 20 und dort zur Messvorrichtung 30 geleitet wird. Hierdurch kann im Widerstandsmesstest erkannt werden, ob die Schutzleiterkontakte der Steckdose 20 ordnungsgemäß insbesondere geringohmig mit dem Schutzleiterkontakt 14 des Netzsteckers 12 verbunden sind. Ferner kann, wie oben beschrieben, über die Messung des Stroms im Strommesser 33 eine Störung der daran angeschlossenen Betriebsmittel im Schutzleiterstrom eines angeschlossenen Geräts erkannt werden und der Mangel für den Nutzer akustisch oder optisch erkennbar machen.Alternative to the device 60 can according to 3 the connection line 10 with a junction box 20 be connected. The junction box 20 includes three slots / sockets 22 for plug-in plug and each of the sockets has two protective earth contacts 24 on which are connected within each outlet. The measuring device is connected so that the measuring circuit via the protective conductor of the individual sockets 22 via the PE protective conductor of the connecting cable to the mains plug 12 at the first end of the connecting cable 10 , via the measuring lead P back to the junction box 20 and there to the measuring device 30 is directed. This can be detected in the resistance test, whether the protective earth contacts of the socket 20 properly in particular low impedance with the protective conductor contact 14 of the power plug 12 are connected. Further, as described above, via the measurement of the current in the flowmeter 33 a fault in the equipment connected thereto in the protective conductor current of a connected device are detected and make the defect acoustically or optically recognizable to the user.

4 zeigt eine Gebäudeinstallation, bei der von der einem Stromnetz 89 die Potentiale L, N und PE bereitgestellt werden und über Sicherungen F1 und F2 jeweils zu einem Controller 80 geleitet werden. Von dem Controller gehen zwei Anschlussleitungen 10 ab, welche wie bereits beschrieben neben dem Schutzleiter PE auch den Messleiter P aufweisen. Diese Anschlussleitungen führen zu bspw. einer Verteilerdose oder (insbesondere ortsfest installierten) Steckdose(n) 22, welche bspw. in einem Bodentank (bzw. Bodenauslass) integriert sind. Dort wird die Anschlussleitung 10 mit beiden Potentialen für Leiter N und L, dem Schutzleiter PE angeschlossen. An einer Steckdose 22, die von der Steckdose, an der PE angeschlossen ist, entfernt ist, wird der Messleiter P angeschlossen, so dass eine leitende Verbindung von PE zu P über alle Steckdosen hergestellt wird. Dies entspricht der Kontaktierung, wie sie bereits bei Ausführungsbeispiel der 3 beschrieben wurde. Mit dieser Anordnung sind die gleichen Messungen möglich, wie sie bei den obigen Ausführungen beschrieben wurden. Eine fehlerhafte Kontaktierung kann also über eine Widerstandsmessung am Messleiter P erkannt werden. Dabei umfasst der Controller 80 zwei Messvorrichtungen 30, welche jeweils an einem Messleiter P einer der Anschlussleitungen 10 verbunden sind. Über den Controller können die beschriebenen Dauermessungen des Widerstands und des Schutzleiterstroms durchgeführt werden. Die Ergebnisse können über eine Statusauswertung 85 entweder per Funk oder Internet weitergeleitet werden. Hierdurch wird eine Alarmierung eines Hausmeisters oder einer Servicestelle beim Überschreiten der Grenzwerte ermöglicht. Neben den beiden Anschlussleitungen 10 kann der Controller auch mit weiteren Anschlussleitungen verbunden sein. 4 shows a building installation in which by a power grid 89 the potentials L, N and PE are provided and via fuses F1 and F2 each to a controller 80 be directed. From the controller go two connecting cables 10 which, as already described, also have the measuring conductor P in addition to the protective conductor PE. These connecting leads lead to, for example, a junction box or (in particular fixedly installed) socket (s) 22 which are integrated, for example, in a floor tank (or floor outlet). There is the connection line 10 connected to both potentials for conductors N and L, the protective conductor PE. At a power outlet 22 disconnected from the socket to which PE is connected, the measuring lead P is connected so that a conductive connection is made from PE to P across all sockets. This corresponds to the contacting, as already in the embodiment of 3 has been described. With this arrangement, the same measurements are possible as described in the above embodiments. A faulty contact can therefore be detected via a resistance measurement on the measuring conductor P. This includes the controller 80 two measuring devices 30 , which in each case on a measuring conductor P one of the connection lines 10 are connected. The described continuous measurements of the resistance and the protective conductor current can be carried out via the controller. The results can be via a status evaluation 85 either by radio or internet to get redirected. As a result, an alarm of a janitor or a service point is allowed when exceeding the limits. Next to the two connection lines 10 The controller can also be connected to other connecting cables.

Ferner kann der Controller 80 eine Vorrichtung zur Isolationsmessung (nicht dargestellt) umfassen. Um eine entsprechende Isolationsmessung durchzuführen, müssen alle Verbraucher von den Steckdosen 22 entfernt werden, und anschließend kann manuell die Prüfung gestartet werden und mit einer hohen Spannung gemäß din VDE 0105-100 eine Isolationsmessung durchgeführt werden, um den Isolationswiderstand der Anschlussleitung 10 und der Steckdosen 22 zu messen. Da vor der Messung sämtliche angeschlossenen Geräte unbedingt entfernt werden müssen, darf diese Messung nur durch eine Elektrofachkraft durchgeführt werden.Furthermore, the controller can 80 a device for insulation measurement (not shown) include. In order to carry out a corresponding insulation measurement, all consumers must be disconnected from the sockets 22 can be removed and then manually start the test and with a high voltage according to din VDE 0105-100 an insulation measurement can be made to the insulation resistance of the connecting cable 10 and the sockets 22 to eat. Since all connected devices must be removed prior to the measurement, this measurement may only be performed by a qualified electrician.

Im Erfindungsgedanken sind Anschlussleitungen mit mehr als zwei Leiter, wie z. B. drei Leitern beim Dreiphasenwechselstrom (Drehstrom) oder mehr Leiter umfasst.In the spirit of the invention are connecting cables with more than two conductors, such. B. comprises three conductors in the three-phase alternating current (three-phase) or more conductors.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1010
Anschlussleitungconnecting cable
1212
Netzsteckerpower plug
1313
Anschlusskontakteterminals
1414
SchutzleiterkontaktA ground contact
2020
Verteilerdosejunction box
2222
Steckdosesocket
2424
SchutzleiterkontaktA ground contact
3030
Messvorrichtungmeasuring device
3232
Widerstandsmesserohmmeter
3333
Strommesserammeter
3434
akustischer Warngeberacoustic warning device
3636
Kontrollleuchteindicator light
3838
Stromversorgungpower supply
4040
zweiter Stecker/Kupplungsecond plug / coupling
5050
Stecker/KupplungM / F
5252
KupplungsgegenstückCoupling counterpart
6060
(elektrisches) Gerät(electric device
6262
Messvorrichtungmeasuring device
8080
Controllercontroller
8181
Computercomputer
8282
StatusweiterleitungStatus propagation
8484
Datenspeicherdata storage
8989
Stromnetzpower grid
PP
Messleitermeasuring Head
PEPE
Schutzleiterprotective conductor
LL
Leiter (Phase)Ladder (phase)
NN
Null-LeiterNeutral

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte Nicht-PatentliteraturCited non-patent literature

  • DIN-VDE 0701-0702 [0003] DIN-VDE 0701-0702 [0003]
  • DIN VDI 0701-0702 [0021] DIN VDI 0701-0702 [0021]
  • din VDE 0105-100 [0027] DIN VDE 0105-100 [0027]

Claims (8)

Anschlussleitung (10) mit zumindest zwei Leitern (N, L) zur Übertragung einer Versorgungsspannung, dadurch gekennzeichnet, dass die Anschlussleitung (12) ferner einen Schutzleiter (PE) und einen Messleiter (P) aufweist, welche am ersten Ende der Anschlussleitung leitend miteinander verbunden sind und entweder die Anschlussleitung (10) am zweiten Ende eine Messvorrichtung (30) umfasst, die eingerichtet ist, den Widerstand über einen die Schutzleiter (PE) und Messleiter (P) umfassenden Messkreis zu messen und bei Widerstandsüberschreitungen ein Warnsignal auszugeben oder die Anschlussleitung am zweiten Ende eine Kupplung (50) aufweist, die eingerichtet ist, mit einem entsprechenden Gegenstück (52) eines anschließbaren Geräts (60) verbunden zu werden, so dass über eine Messvorrichtung (62) dieses Geräts (60) der Widerstand eines den Schutzleiter (PE) und Messleiter (P) umfassenden Messkreis messbar und bei Widerstandsüberschreitungen ein Warnsignal ausgebbar ist.Connecting cable ( 10 ) with at least two conductors (N, L) for transmitting a supply voltage, characterized in that the connecting line ( 12 ) further comprises a protective conductor (PE) and a measuring conductor (P), which are conductively connected to each other at the first end of the connecting line and either the connecting line ( 10 ) at the second end a measuring device ( 30 ), which is set up to measure the resistance via a measuring circuit comprising the protective conductor (PE) and measuring conductor (P) and to issue a warning signal in the event of a resistance being exceeded or the connection line at the second end 50 ), which is set up, with a corresponding counterpart ( 52 ) of a connectable device ( 60 ), so that via a measuring device ( 62 ) of this device ( 60 ) the resistance of a measuring circuit comprising the protective conductor (PE) and measuring conductor (P) can be measured and a warning signal can be output in the event of excessively high resistance. Anschlussleitung (10) gemäß Anspruch 1 dadurch gekennzeichnet, dass die Messeinrichtung (30, 62) einen Strommesser (33) zur Messung des Schutzleiterstroms umfasst.Connecting cable ( 10 ) according to claim 1, characterized in that the measuring device ( 30 . 62 ) an ammeter ( 33 ) for measuring the protective conductor current. Anschlussleitung (10) gemäß Anspruch 1 dadurch gekennzeichnet, dass am ersten Ende ein Netzstecker (12) angeschlossen ist.Connecting cable ( 10 ) according to claim 1, characterized in that at the first end a mains plug ( 12 ) connected. Anschlussleitung (10) gemäß einem der vorangegangenen Ansprüche dadurch gekennzeichnet, dass der Netzstecker (12) ein Standardstecker, insbesondere ein Schutzkontakt- bzw. Schukostecker oder Kaltgerätestecker ist.Connecting cable ( 10 ) according to one of the preceding claims, characterized in that the mains plug ( 12 ) is a standard plug, in particular a Schuko plug or plug or IEC plug is. Anschlussleitung (10) gemäß einem der vorangegangenen Ansprüche dadurch gekennzeichnet, dass die Schutzleiter (PE) und Messleiter (P) unterschiedliche Querschnitte aufweisen.Connecting cable ( 10 ) according to one of the preceding claims, characterized in that the protective conductor (PE) and measuring conductor (P) have different cross-sections. Elektrisches Betriebsmittel, wie insbesondere ein elektrischer Verbraucher, Verlängerungskabel, Kabeltrommel oder Verteilersteckdose mit einer Anschlussleitung nach einem der Ansprüche 1 bis 5, wobei das Gerät die Messvorrichtung (30, 62) umfasst und die Anschlussleitung entweder untrennbar oder über eine trennbare Verbindung (50, 52) mit dem Gerät (20, 60) verbindbar ist.Electrical equipment, in particular an electrical consumer, extension cable, cable drum or distribution socket with a connecting line according to one of claims 1 to 5, wherein the device is the measuring device ( 30 . 62 ) and the connecting line either inseparably or via a separable connection ( 50 . 52 ) with the device ( 20 . 60 ) is connectable. Gebäudeinstallation mit einer Anschlussleitung (10) gemäß Anspruch 1, wobei die Messvorrichtung (30) am gebäudeseitigen Ende des Anschlusskabels vorgesehen und insbesondere eingerichtet ist, den Schutzleiterstrom und Schutzleiterwiderstand zu messen.Building installation with a connecting cable ( 10 ) according to claim 1, wherein the measuring device ( 30 ) is provided at the building end of the connection cable and in particular is arranged to measure the protective conductor current and protective conductor resistance. Gebäudeinstallation gemäß Anspruch 7 dadurch gekennzeichnet, dass die Gebäudeinstallation eingerichtet ist, bei nicht angeschlossenen Verbrauchern eine Isolationsmessung vorzunehmen.Building installation according to claim 7, characterized in that the building installation is set up to make an insulation measurement with non-connected consumers.
DE200920017058 2009-12-17 2009-12-17 Self-monitoring connection cable and equipment Expired - Lifetime DE202009017058U1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE200920017058 DE202009017058U1 (en) 2009-12-17 2009-12-17 Self-monitoring connection cable and equipment
PCT/EP2010/070038 WO2011083029A1 (en) 2009-12-17 2010-12-17 Self-monitoring connection line and operating equipment
EP10803074A EP2514043A1 (en) 2009-12-17 2010-12-17 Self-monitoring connection line and operating equipment
US13/516,969 US9470730B2 (en) 2009-12-17 2010-12-17 Self-monitoring power supply cord and operating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200920017058 DE202009017058U1 (en) 2009-12-17 2009-12-17 Self-monitoring connection cable and equipment

Publications (1)

Publication Number Publication Date
DE202009017058U1 true DE202009017058U1 (en) 2011-04-28

Family

ID=43927376

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200920017058 Expired - Lifetime DE202009017058U1 (en) 2009-12-17 2009-12-17 Self-monitoring connection cable and equipment

Country Status (1)

Country Link
DE (1) DE202009017058U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012156635A1 (en) * 2011-05-19 2012-11-22 Renault S.A.S. Device and method for estimating the resistance of the earth connection of an electrical apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
din VDE 0105-100
DIN-VDE 0701-0702

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012156635A1 (en) * 2011-05-19 2012-11-22 Renault S.A.S. Device and method for estimating the resistance of the earth connection of an electrical apparatus
FR2975498A1 (en) * 2011-05-19 2012-11-23 Renault Sa DEVICE AND METHOD FOR ESTIMATING THE RESISTANCE OF EARTH CONNECTION OF AN ELECTRICAL APPARATUS

Similar Documents

Publication Publication Date Title
DE102011076320B4 (en) Grounding monitoring device and charging system
EP2574939B1 (en) Isolation fault detection device and device for insulation fault localisation in an unearthed power supply network
DE68908123T2 (en) PORTABLE IDENTIFIER FOR COMMUNICATION CABLES.
WO2010127375A1 (en) Monitoring apparatus
DE102015226223A1 (en) Device and method for checking a charging cable
DE102009054834B4 (en) Self-monitoring connection cable and device
AT518594A2 (en) Method and device for protective conductor monitoring
DE102016116695A1 (en) Method and measuring device for checking a cable harness
WO2002065593A1 (en) Plug-and-socket device comprising an integrated diagnostic/evaluation circuit, display and switchable terminating resistors
DE102020114906A1 (en) Earthing contact socket and method for isolation fault localization in an ungrounded power supply system with isolation monitoring
DE102011117248A1 (en) Method for monitoring high voltage components of electrical system of electrical vehicle, involves checking plug connections automatically to obtain plug connector test result, and comparing result with cable set test result
WO2011083029A1 (en) Self-monitoring connection line and operating equipment
DE102011084361A1 (en) Electrical device for monitoring and testing unearthed isolated power supply systems in medical room, has measuring device formed as device for proper execution of technical measurement for initial and periodical testing of supply system
DE202009017058U1 (en) Self-monitoring connection cable and equipment
DE102009061072B4 (en) Self-monitoring connection cable and equipment
WO2009155622A1 (en) Socket
AT406091B (en) METHOD FOR REPAIR AND REPEAT CHECKING OF ELECTRICAL DEVICES AND DEVICE FOR IMPLEMENTING THE METHOD
DE102013202921A1 (en) Time domain reflectometry system for sensing abnormalities in cable of electric circuit in vehicle, has processor connected with receiver and database to determine abnormal condition based on reflection of signal pulse and stored data
DE102017104234A1 (en) Error detection and location on process control communication lines through a portable maintenance tool
DE10013864A1 (en) Electric power cable pluggable connector e.g. for large machines and equipment - includes signal bridge for enabling auxiliary outputs of socket outlet to be connected to one another for signal transfer
DE102011108229B4 (en) Production system and method for checking vehicle power sockets in the assembly of motor vehicles
DE102010013103B4 (en) Device and method for the diagnosis of measurement objects using a measurement voltage
EP2237057A1 (en) Analysis device for analysing an electricity network
DE3421829A1 (en) Measuring method for checking protective measures in electrical installations and measuring instrument for carrying out the method
DE102019105383A1 (en) Measuring adapter for an electric vehicle

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20110601

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20130110

R151 Utility model maintained after payment of second maintenance fee after six years
R152 Utility model maintained after payment of third maintenance fee after eight years
R071 Expiry of right