DE202005008099U1 - Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets - Google Patents

Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets Download PDF

Info

Publication number
DE202005008099U1
DE202005008099U1 DE200520008099 DE202005008099U DE202005008099U1 DE 202005008099 U1 DE202005008099 U1 DE 202005008099U1 DE 200520008099 DE200520008099 DE 200520008099 DE 202005008099 U DE202005008099 U DE 202005008099U DE 202005008099 U1 DE202005008099 U1 DE 202005008099U1
Authority
DE
Germany
Prior art keywords
reinforcing bars
concrete
reinforcing
length direction
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200520008099
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ERHARTITSCH KARL AUGUST
ERHARTITSCH KARL-AUGUST
Original Assignee
ERHARTITSCH KARL AUGUST
ERHARTITSCH KARL-AUGUST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ERHARTITSCH KARL AUGUST, ERHARTITSCH KARL-AUGUST filed Critical ERHARTITSCH KARL AUGUST
Priority to DE200520008099 priority Critical patent/DE202005008099U1/en
Publication of DE202005008099U1 publication Critical patent/DE202005008099U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Abstract

Reinforcing bars (2) and a tube (1) for injecting and compacting concrete are supported by a steel plate (3). One of the reinforcing bars (6) is movable in its length direction and secured to cross-direction brackets (5) for securing to the length direction reinforcing bars.

Description

Rohr und Armierung zum Füllen von Schlitzen im Tunnel und Spezialtiefbau.pipe and reinforcement for filling of slots in the tunnel and special civil engineering.

Der Verbau zur temporären Ausbruchsicherung im Tunnelbau wird üblicherweise mit Baustahlgitter, Stahlbögen und Spritzbeton hergestellt.Of the Shoring to temporary Burglar protection in tunneling is usually with reinforcing steel mesh, steel arches and shotcrete produced.

Dieser Verbau erfolgt sofort nach dem Ausbruch. Die Ausbruchstiefe ist von der Gebirgsstandfestigkeit abhängig.This Shoring occurs immediately after the outbreak. The breakout depth is depending on the mountain stand strength.

Der im Schutzanspruch 1 angegebenen Erfindung liegt das Problem zugrunde, eine Armierung zu schaffen, welche es ermöglicht, in einem Schlitz verdichteten Stahlbeton herzustellen. Durch die Kombination aus Armierung und Rohr mit einem beweglichen Innenrohr, lässt sich der Beton fachgerecht, sofort nachdem der Schlitz ein Stück offen ist, einbringen.Of the in claim 1 protection invention is based on the problem to create a reinforcement which makes it possible to compact in a slot To produce reinforced concrete. Through the combination of reinforcement and Pipe with a movable inner pipe, the concrete can be professionally, immediately after the slot is open a bit, bring.

Der gefräste Schlitz im Kalottenbereich an der Ortsbrust hat den Vorteil, dass im Lockergestein das schützende Stahlbeton Gewölbe voreilend hergestellt wird, bevor der Ausbruch der Kalotte stattfindet.Of the milled Slot in the dome area at the face has the advantage that in loose rock the protective Reinforced concrete vault is made prematurely before the outbreak of the dome takes place.

Dieses Problem wird mit dem im Schutzanspruch 1 angeführten Merkmalen gelöst.This Problem is solved with the features mentioned in the protection claim 1.

Mit der Erfindung wird erreicht, dass in einem, mit einer großen Kettensäge gefrästen Schlitz ein Stahlbetongewölbe hergestellt wird. Der Schlitz wird über den gesamten Kalottenbereich, sägezahnförmig eingefräst. Um die Ausbruchsfläche möglichst klein zu halten, wird gefräst, armiert, betoniert und verdichtet in möglichst kurzen Abständen. Wenn der Schlitz 30 cm bis 40 cm breit ist, kann das nächste Element nachgeschoben und fixiert werden. Über das Innenrohr wird Beton eingepumpt und verdichtet. Dadurch wird eine große, frei tragende Ausbruchfläche verhindert. Das überhängende Material aus dem Gewölbebereich kann nicht einbrechen.With The invention is achieved in that in a, with a large chain saw milled slot Reinforced concrete vault will be produced. The slot is over the entire dome area, Milled in sawtooth. To the outbreak area as small as possible to keep, is milled, reinforced, concreted and compacted in the shortest possible intervals. If the slot is 30 cm to 40 cm wide, the next item may be be pushed and fixed. The inner pipe becomes concrete pumped in and compacted. This prevents a large, free-floating breakout area. The overhanging material from the vaulted area can not break.

Eine vorteilhafte Ausgestaltung der Erfindung ist im Schutzanspruch 2 gegeben.A advantageous embodiment of the invention is in the protection claim 2 given.

Die Weiterbildung nach Schutzanspruch 2 für die Anwendung zur Herstellung von Stahlbeton im Schlitz ermöglicht die Befestigung des Elements durch schweißen, die Herstellung der Querarmierung durch das ziehen am Griff, die Einbringung von Beton durch das Innenrohr und die Verdichtung des Betons mit einer Rüttelflasche im Rohr.The Training for protection claim 2 for the application for production of reinforced concrete in the slot allows the attachment of the element by welding, the production of the transverse reinforcement by that pull on the handle, the introduction of concrete through the inner tube and the compaction of the concrete with a vibrator bottle in the pipe.

Ein Ausführungsbeispiel der Erfindung wird Anhand der 1 bis 15 erläutert, es zeigen:An embodiment of the invention is based on the 1 to 15 explained, show it:

1 das vorgefertigte Element zum Schlitz armieren, füllen und verdichten von Beton. Das Überschubrohr 1, die Längsstäbe 2 und die Stahlplatte 3 bilden eine starre Verbindung. Der Längsstab 6 ist mit dem Griff 7 in Längsrichtung verstellbar, wodurch die U – Bügel 5 in Richtung auf einen rechten Winkel zur Konstruktion gedreht wird. Ein Injektionsschlauch 4. 1 Reinforcing the prefabricated element to the slot, fill and compact concrete. The tube 1 , the longitudinal bars 2 and the steel plate 3 form a rigid connection. The longitudinal bar 6 is with the handle 7 adjustable in the longitudinal direction, which makes the U - hanger 5 is rotated in the direction of a right angle to the construction. An injection hose 4 ,

2 die U-Bügel 5 in der Position im Schlitz, als Querarmierung, wenn der Bügel ausgezogen ist. Die U – förmige Halterung 8, am Außenrohr 1, erlaubt eine Drehung der U – Bügel 5, im rechten Winkel zur Längsachse hin. Im Außenrohr 1 befindet sich ein verschiebbares Innenrohr 9, mit dem Gewinde 10 und dem geschlossenen Ende 13. 2 the U-bolts 5 in position in the slot, as a cross arm, when the bar is pulled out. The U - shaped bracket 8th , on the outer tube 1 , allows rotation of the U - bracket 5 , at right angles to the longitudinal axis. In the outer tube 1 there is a sliding inner tube 9 , with the thread 10 and the closed end 13 ,

3 die Elemente im eingebauten Zustand. Sowohl im Außenrohr 1, als auch im Innenrohr 9 sind Öffnungen 11 eingeschnitten. Im eingeschobenen Zustand 16, wenn die Schraubenmutter 12 an die Platte 3 stößt, decken sich die Öffnungen 11 von den beiden Rohren – 1 und 9. In dieser Stellung wird Beton eingepumpt. Durch die ausgezogenen Griffe 7 entsteht die Überlappung 14, der U – Bügel 5. An den Stößen 15 werden die Platten 3 miteinander verschweißt. Stirnseitig 17 werden die Schlitze 27, vor dem Beton pumpen mit etwas Spritzbeton abgedichtet. 3 the elements in the installed state. Both in the outer tube 1 , as well as in the inner tube 9 are openings 11 cut. In the inserted state 16 if the nut 12 to the plate 3 pushes, cover the openings 11 from the two pipes - 1 and 9 , In this position concrete is pumped in. Through the extended handles 7 the overlap arises 14 , the U-hanger 5 , At the bumps 15 become the plates 3 welded together. face side 17 be the slots 27 , before the concrete pumps sealed with some shotcrete.

4 das Rohr 9, im Zustand 18, wo die Schraubenmutter 12 von der Platte 3 weggezogen ist. Die Öffnungen 11 sind abgedichtet. Mit dem Blasrohr 19 wird das Innenrohr 9, nachdem der Beton eingepumpt ist, gereinigt. 4 the pipe 9 , in condition 18 where the nut is 12 from the plate 3 moved away. The openings 11 are sealed. With the blowpipe 19 becomes the inner tube 9 after the concrete has been pumped in, cleaned.

Die ins Innenrohr 9 eingeschobene Rüttelflasche 20 verdichtet den Frischbeton. Die Hartgummiringe 21 vermindern harte Schläge beim Rütteln. Im Zustand 16 sind die Öffnungen 11 offen, die Überwurfemutter 23 wird auf das Gewinde 10 geschraubt und über den Schlauch 22 wird Beton eingepumpt.The in the inner tube 9 inserted vibrator bottle 20 compacts the fresh concrete. The hard rubber rings 21 reduce hard knocks when shaking. In condition 16 are the openings 11 open, the union nut 23 gets on the thread 10 screwed and over the hose 22 concrete is pumped in.

5 das Außenrohr 1, das Innenrohr 9, mit den Öffnungen 11, sowie die Platte 3. 5 the outer tube 1 , the inner tube 9 , with the openings 11 , as well as the plate 3 ,

6 einen Schnitt durch das Schwert, außen die Kette 25, oben und unten die Förderschnecken 26. 6 a section through the sword, outside the chain 25 , above and below the screw conveyors 26 ,

7 ein Kettengerät, als Träger für das Schwert. 7 a chain device, as a carrier for the sword.

8 das Kalottengewölbe 28, mit dem Schlitz 27, welcher mit Spritzbeton 29 abgedichtet ist. 8th the dome vault 28 , with the slot 27 , which with shotcrete 29 is sealed.

9 zeigt das Schwert für die Kettensäge. 9 shows the sword for the chainsaw.

10 einen Schneckenförderer. 10 a screw conveyor.

11 die Teile einer Kettensäge für härteres Gestein, wobei die Rollen und die Zähne mit Diamanten besetzt sind. 11 the parts of a chainsaw for harder rock, the rollers and the teeth with slide manten are busy.

12 die Teile einer anderen Kette. 12 the parts of another chain.

13 die Teile einer Kette für Lockergestein. Mit der Umlenkrolle 32 und der Antriebsrolle 31, sowie ein schwenkbares Schneidglied 30, für den Lauf der Kette in beide Richtungen, vorwärts und rückwärts. 13 the parts of a chain for loose rock. With the pulley 32 and the drive roller 31 , as well as a pivotable cutting member 30 , for running the chain in both directions, forward and backward.

14 den Schlitz 27 von Innen, während Beton gepumpt wird. 14 the slot 27 from inside while concrete is being pumped.

15 einen Schnitt durch den Tunnel, mit der Ortsbrust 28 und Schlitz 27. 15 a section through the tunnel, with the working face 28 and slot 27 ,

Claims (2)

Rohr und Armierung, zum Betonieren von Schlitzen im Tunnel und Spezialtiefbau, dadurch gekennzeichnet, dass die Stahlplatte 3, das Überschubrohr 1 und die Armierungsstäben 2 trägt, woran ein beweglicher Rundstab 6 mit den Querbügeln 5 befestigt ist, wobei das Rohr im Rohr, ein System zum Beton einpumpen und zum Beton verdichten ist.Pipe and reinforcement, for concreting of slits in tunnels and special civil engineering, characterized in that the steel plate 3 , the tube 1 and the reinforcing bars 2 carries, what a movable rod 6 with the crossbars 5 is attached, wherein the pipe in the pipe, a system to concrete pump and compact to concrete is. Rohr und Armierung nach Schutzanspruch 2, dadurch gekennzeichnet, dass ein Schlitz 27, von einer, mit Diamant besetzten Kettensäge gefräst ist, dass in kurzen Abständen hinter der Kettensäge, die Armierung eingebracht, der Beton gefüllt und verdichtet ist.Pipe and reinforcement according to protection claim 2, characterized in that a slot 27 Milled by a diamond-studded chain saw, at short intervals behind the chainsaw, the reinforcement is inserted, the concrete is filled and compacted.
DE200520008099 2005-05-24 2005-05-24 Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets Expired - Lifetime DE202005008099U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200520008099 DE202005008099U1 (en) 2005-05-24 2005-05-24 Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200520008099 DE202005008099U1 (en) 2005-05-24 2005-05-24 Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets

Publications (1)

Publication Number Publication Date
DE202005008099U1 true DE202005008099U1 (en) 2005-08-18

Family

ID=34877950

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200520008099 Expired - Lifetime DE202005008099U1 (en) 2005-05-24 2005-05-24 Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets

Country Status (1)

Country Link
DE (1) DE202005008099U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111828048A (en) * 2020-07-28 2020-10-27 中建七局安装工程有限公司 Method for preventing powder soil from collapsing at top of shallow-buried and underground-excavated tunnel construction hole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111828048A (en) * 2020-07-28 2020-10-27 中建七局安装工程有限公司 Method for preventing powder soil from collapsing at top of shallow-buried and underground-excavated tunnel construction hole

Similar Documents

Publication Publication Date Title
EP0413693A1 (en) Reinforced concrete construction for road tunnels.
DE2627256C3 (en) Expansion for underground mining
DE2932430C2 (en) Method for placing a concrete tunnel lining
DE2108591B2 (en) EQUIPMENT AND PROCEDURE FOR IMPLEMENTING THE SHIELD CONSTRUCTION FOR THE ESTABLISHMENT OF TUNNELS AND ADAPTERS
DE202005008099U1 (en) Tunnel lining and reinforcing construction, comprises concrete injection and compaction tube, length direction reinforcing bars and cross direction brackets
DE1658751A1 (en) Method and device for creating tunnels, tunnels or the like in mountains with changing stability in zones
DE102009012570A1 (en) Method for securing long-roadway building element in underground mine, involves reinforcing and/or stabilizing roof in transition area in front of roof support with back-filling building material by support system
EP1722067A1 (en) Tubing segment with supports for a lining sheet
DE2653954C3 (en) Jacking knife
AT402534B (en) METHOD FOR DRIVING A TUNNEL OR THE LIKE AND REMOVAL REINFORCEMENT FOR IMPLEMENTING THE METHOD
EP0189158A2 (en) Process and apparatus for sealing off refuse tips and contaminated areas
WO1990014499A2 (en) Flexible telescopic prop for building materials
DE2454913C3 (en) Method and arrangement for driving a tunnel
DE3236423A1 (en) Yielding roadway casing
EP3135819B1 (en) Filler tube and method for creating a filler column in the soil
DE3309381C1 (en) Method and device for securing the wall of gate roads in mining by means of an accompanying dam of hydraulically setting dam construction material
AT522502B1 (en) Method for placing concrete with a horizontal sliding construction in in-situ concrete construction, device for the production of a horizontal concrete element
DE1291310B (en) Route expansion
DE3531183A1 (en) Nocturnal landfill sealing
DE1534678C (en) Device for the production of tubular, underground structures
DE202006013839U1 (en) Device for building effluent channels in underground tunneling comprises a shaft element which fits a rectangular shaft cross-section and is formed as a cutting shoe with a protruding head region in its front region
DE3200888A1 (en) Device for nailing friable rock strata
DE4104726C1 (en) Mined roadway support with spaced support arches - has reinforcement mats, in support stowing space, and underpinning lintel
AT329464B (en) PRE-FABRICATED PART FOR DUCTING OR TUNNELING
AT312663B (en) Facility for upgrading tunnels and galleries

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20050922

R156 Lapse of ip right after 3 years

Effective date: 20081202