DE19930323A1 - Switching system for electricity and tax procedures for this - Google Patents
Switching system for electricity and tax procedures for thisInfo
- Publication number
- DE19930323A1 DE19930323A1 DE19930323A DE19930323A DE19930323A1 DE 19930323 A1 DE19930323 A1 DE 19930323A1 DE 19930323 A DE19930323 A DE 19930323A DE 19930323 A DE19930323 A DE 19930323A DE 19930323 A1 DE19930323 A1 DE 19930323A1
- Authority
- DE
- Germany
- Prior art keywords
- data
- switching system
- electricity
- producers
- conductive medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07F—COIN-FREED OR LIKE APPARATUS
- G07F15/00—Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
- G07F15/003—Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
Abstract
Description
Die Erfindung bezieht sich auf ein Vermittlungssystem für ein leitungsfähiges Medium, insbesondere Strom, mit den oberbegrifflichen Merkmalen des Anspruchs 1 und ein Steuerverfahren dazu.The invention relates to a switching system for a conductive medium, especially electricity, with the generic features of claim 1 and a Tax procedures to do so.
Bislang kaufen Endverbraucher Strom zu vorher festgelegten Tarifen bei dem Stromversorger, an dessen Leitungen sie angeschlossen sind. Die Preise können dabei tageszeitabhängig (z. B. Tag- bzw. Nachtstrom) verschieden sein. Die Stromversorger stellen den Strom entweder selber bereit oder kaufen Strom wiederum bei anderen Stromversorgern.So far, end consumers buy electricity at predetermined levels Tariffs at the electricity supplier on whose lines they are are connected. The prices can be there Different depending on the time of day (e.g. day or night electricity) his. The electricity suppliers either provide the electricity themselves ready or buy electricity from others Electricity suppliers.
Aus der EP 0 863 492 A1 des Anmelders ist ein System zum bargeldlosen Betrieb von Kassierzähler-Abgabegeräten bekannt. Dieses System ermöglicht eine vereinfachte Verbuchung von Stromabnahmen durch Endverbraucher. Ein endverbraucherseitiges Abgabegerät umfaßt dabei einen Leistungsschalter, der von einer Steuereinrichtung zur Freigabe von Strom angesteuert wird, und eine mit der Steuereinrichtung kommunizierende Datenträger- Eingabeeinrichtung, in die ein Datenträger mit Geldeinheiten entsprechenden Steuerdaten eingelegt werden kann. Weiterhin ist die Steuereinrichtung mit einem Zentralrechner eines Geldinstituts verbunden, so daß von einem Kundenkonto entsprechend der gezogenen Strommenge und der Steuerdaten entsprechende Geldeinheiten direkt zugunsten des Stromversorgers abgebucht werden können.From the applicant's EP 0 863 492 A1 is a system for cashless operation of cash counter dispensers known. This system enables a simplified Posting of electricity purchases by end users. On Dispenser on the consumer side comprises one Circuit breaker from a control device to Release of electricity is controlled, and one with the Control device communicating data carrier Input device in which a data carrier with Tax data corresponding to monetary units can be inserted can. Furthermore, the control device with a Central computer of a financial institution connected, so that a customer account according to the amount of electricity drawn and monetary units corresponding to the tax data directly can be debited in favor of the electricity supplier.
Dieses System ist aber letztlich auch auf eine direkte Vertragsbeziehung zwischen einem Endverbraucher, seinem Stromversorger und einem Geldinstitut ausgelegt. Der Endverbraucher ist also weiterhin an die Preisvorgaben mit nur einem Stromversorger gebunden. Ultimately, however, this system is also direct Contractual relationship between an end user, his Electricity supplier and a financial institution designed. The End user is therefore still with the price specifications tied to only one electricity supplier.
Aufgrund der staatlichen Regelungen durch das sog. Durchleitungsgesetz werden die Stromversorger verpflichtet, ihre Leitungen mit freien Kapazitäten anderen Stromversorgern oder Strommaklern gegen ein angemessenes Durchleitungsentgelt zur Verfügung zu stellen. Dadurch ist es nun möglich, daß z. B. ein norddeutscher Strommakler in Frankreich hergestellten Strom durch die Netze verschiedener Stromversorger und Netzbetreiber zu seinen norddeutschen Kunden leitet und diese direkt mit Strom versorgt.Due to the state regulations by the so-called Implementation Act obliges electricity suppliers to their lines with free capacity others Electricity suppliers or electricity brokers against a reasonable To provide transmission fee. This is it is now possible that, for. B. a North German electricity broker in France produced electricity through the networks various electricity suppliers and network operators to its North German customers and this directly with electricity provided.
Wie in Fig. 1 angedeutet ist, führt durch Deutschland und die angrenzenden Staaten zur Stromleitung ein dichtes Leitungsnetz mit Fernleitungen L1-L6. Über diese Fernleitungen sind Ballungsräume wie z. B. München, Berlin B und Hamburg HH an Kraftwerke angeschlossen. Als Kraftwerke sind hier beispielsweise das Atomkraftwerk Brunsbüttel BB und ein AKW F in Frankreich sowie das Walchenseekraftwerk W in Bayern BY skizziert.As indicated in FIG. 1, a dense network of lines with long-distance lines L1-L6 leads through Germany and the bordering states to the power line. Metropolitan areas such. B. Munich, Berlin B and Hamburg HH connected to power plants. The power plants here are, for example, the Brunsbüttel BB nuclear power plant and a F nuclear power plant in France and the Walchensee power plant W in Bayern BY.
Der bei der Stromweiterleitung über eine Vielzahl von Leitungen verschiedener Stromversorger entstehende Verwaltungs- und Verbuchungsaufwand ist jedoch sehr aufwendig, was diese Art von Strommakeln nur bei großen Strommengen rentabel macht. Die tatsächlichen Endverbraucher profitieren von den neuen Möglichkeiten also nur bedingt.The one in the transmission of electricity over a variety of Lines from different electricity suppliers Administration and booking effort is very much consuming what this type of power flaw only in large Electricity makes it profitable. The actual End users benefit from the new opportunities limited.
Die Aufgabe der Erfindung besteht somit darin, ein variables Vermittlungssystem für leitungsfähige Medien, insbesondere Strom, und ein Steuerverfahren dazu vorzuschlagen, die ein einfaches Vermitteln und Verrechnen von Energie wie elektrischem Strom und dergleichen ermöglichen.The object of the invention is therefore a variable switching system for conductive media, in particular electricity, and a tax procedure for this propose a simple mediation and accounting of energy such as electricity and the like enable.
Diese Aufgabe wird durch ein Vermittlungssystem, insbesondere für Strom, mit den Merkmalen des Anspruchs 1 und ein Steuerverfahren dazu mit den Merkmalen des Anspruchs 14 gelöst. This task is done through a switching system, in particular for electricity, with the features of claim 1 and a control method for this with the features of Claim 14 solved.
Die Steuerung von Liefermengen des leitungsfähigen Mediums kann aufgrund der aktuell vorliegenden Daten einzelner Anbieter des Mediums und von Transportleitungen optimiert erfolgen. Dadurch ist eine preisoptimierte Anforderung des Mediums bei Anbietern und die Durchleitung über einen preisoptimierten Leitungsweg möglich. Zugleich kann dabei die Berechnung der Durchleitungsentgelte erfolgen.The control of delivery quantities of the conductive medium can be based on the currently available data Provider of the medium and transport lines optimized respectively. This is a price-optimized requirement of the Medium with providers and the transmission through one price-optimized cable route possible. At the same time the transmission charges are calculated.
Vorteilhafte Ausgestaltungen sind Gegenstand der Unteransprüche.Advantageous refinements are the subject of Subclaims.
Momentan und/oder längerfristig freie Kapazitäten C von Leitungen und/oder momentan oder längerfristig mögliche Lieferkapazitäten von Erzeugern und/oder Preise für Liefer- oder Durchleitungsmengen ermöglichen eine optimale Berechnung von Ressourcenanforderungen. Je häufiger die Daten bei Bedarf oder in regelmäßigen Abständen aktualisiert werden, desto besser optimiert kann die Berechnung erfolgen.Free capacities C of Lines and / or possible at the moment or in the long term Delivery capacities of producers and / or prices for delivery or throughput quantities enable an optimal Calculation of resource requirements. The more common the Data as needed or at regular intervals updated, the better optimized the Calculation done.
Die Übermittlung der Daten kann dabei über eine Vielzahl von Schnittstellen erfolgen, insbesondere über Telefonleitungen, Stromleitungen, Paketdatendienste, das Internet oder Funkverbindungen.The transmission of the data can be done in a variety of ways of interfaces, especially via Telephone lines, power lines, packet data services, the Internet or radio connections.
Reservierungsvermerke zur Reservierung von Leitungskapazitäten (C) ermöglichen eine langfristige Planung und Steuerung der optimierten Ausnutzung von Ressourcen und des Leitungsnetzes.Reservation notes for the reservation of Line capacities (C) enable long-term Planning and control of the optimized utilization of Resources and the pipeline network.
Das Berechnen der zu entrichtenden Vergütung für einzelne Erzeuger (z. B. wie oben W, BB, F) und/oder Transporteure des leitungsfähigen Mediums bereits vor, während und/oder unmittelbar nach einer Lieferung ermöglicht (insbesondere in Verbindung mit der direkten Übermittlung zu einem Geldinstitut) eine zügige, anteilsgerechte und kostengünstige Verrechnung der Vergütungen aller Beteiligten, insbesondere der Durchleitungsentgelte für die benutzten Leitungswege. Calculating the remuneration to be paid for individuals Producers (e.g. W, BB, F above) and / or carriers of the conductive medium before, during and / or immediately after delivery (in particular in connection with the direct transmission to one Financial institution) a swift, proportionate and cost-effective settlement of the remuneration of all Participants, especially the transit fees for the used routes.
Die zeitabhängige Staffelung der Daten ermöglicht die gezielte Ausnutzung von freien Kapazitäten zu Zeiten mit geringen Anforderungen, z. B. für Nachtstrom. Die bedarfsabhängige Steuerung von Erzeugereinrichtungen und/oder Transportmedien macht das System besonders flexibel. Maximale und/oder minimale Liefermengen als abgespeicherte Daten ermöglichen planbare Sonderkonditionen für Abnehmer mit regelmäßigen Abnahmemengen.The time-dependent staggering of the data enables targeted use of free capacity at times low requirements, e.g. B. for night electricity. The Demand-based control of generating facilities and / or transport media makes the system special flexible. Maximum and / or minimum delivery quantities as Stored data enable special conditions to be planned for customers with regular purchase quantities.
Ein Ausführungsbeispiel wird nachfolgend anhand der Zeichnung näher erläutert. Es zeigen:An embodiment is described below with reference to Drawing explained in more detail. Show it:
Fig. 1 schematisch ein Leitungsnetz für Strom; Fig. 1 shows schematically a line network for electricity;
Fig. 2 ein Stromvermittlungssystem; und FIG. 2 shows a current switching system; and
Fig. 3 ein Ablaufdiagramm eines Steuerverfahrens dazu. Fig. 3 is a flowchart of a control method therefor.
Wie aus Fig. 2 ersichtlich, besteht ein Stromvermittlungssystem im wesentlichen aus einem Zentralrechner 1, der zur Verwaltung und Steuerung einer Vielzahl von Daten angeschlossener Stromversorger W, BB, F, Leitungsbetreiber L1, L2, . . ., Ln und Verbraucher 3 (V1, V2, . . ., Vn) sowie vorzugsweise auch eines Geldinstituts 2 dient. Alternativ kann auch eine Vielzahl von lokalen Rechnern eingesetzt werden, die zur Verwaltung und Steuerung lokaler Daten dienen und Rahmendaten (z. B. Leitungslängen oder maximale Durchleitung einzelner Stromnetze) mit anderen zentralen Rechnern austauschen und abgleichen.As can be seen from FIG. 2, a power switching system essentially consists of a central computer 1 , which is used to manage and control a large number of data connected power suppliers W, BB, F, line operators L1, L2,. , ., Ln and consumer 3 (V1, V2,..., Vn) and preferably also a financial institution 2 . Alternatively, a large number of local computers can also be used, which are used to manage and control local data and exchange and compare frame data (e.g. line lengths or maximum transmission of individual power networks) with other central computers.
Der Zentralrechner 1 weist eine zentrale Recheneinheit 10 zur Steuerung des gesamten Zentralrechners 1, eine Schnittstelle 11, zum Verbinden des Zentralrechners 1 mit den externen Datenquellen W, BB, F, L1, . . . Ln, 2, 3 und einen ersten Speicherabschnitt 12 zum Abspeichern von Daten der externen Datenquellen W, BB, F, L1, . . . Ln, 2, 3 auf. In einem zweiten Speicherabschnitt 13 sind u. a. Programme zur Steuerung der Funktionen der zentralen Recheneinheit 10 und Codeschlüssel für den Datenaustausch mit den externen Datenquellen, z. B. sog. Vorkassegeräten bei den Endkunden, abgespeichert. Der zweite Speicherabschnitt 13 oder Speicher dient der Datensicherheit und ist daher von außerhalb des Zentralrechners 1 aus nicht zugänglich.The central computer 1 has a central processing unit 10 for controlling the entire central computer 1 , an interface 11 for connecting the central computer 1 to the external data sources W, BB, F, L1,. , , Ln, 2, 3 and a first storage section 12 for storing data from the external data sources W, BB, F, L1,. , , Ln, 2, 3 on. In a second memory section 13 of the central processing unit 10 and code key for data exchange with the external data sources are, for, inter alia, programs for controlling the functions. B. so-called prepayment devices at the end customer. The second memory section 13 or memory is used for data security and is therefore not accessible from outside the central computer 1 .
Vorzugsweise speichert der erste Speicherabschnitt 12 Daten ab, die hier in Form einer Tabelle dargestellt sind. So werden beispielsweise in der ersten Spalte Q die Namen und Speicheradressen der verschiedenen externen Datenquellen W, BB, F, L1, . . . Ln, 2, 3 abgespeichert, um einen gezielten Zugriff darauf zu ermöglichen. Diese Werte sind somit über längere Zeiträume fest abgespeichert. In einer zweiten Spalte werden momentan freie Kapazitäten C von Leitungen L1, L2, . . . und momentan mögliche Lieferkapazitäten C von Kraftwerken W, BB, F abgespeichert. Diese sich ständig ändernden Daten werden in regelmäßigen Abständen dt über die Schnittstelle 11 von den externen Datenquellen W, BB, F, L1, . . . Ln, 2 abgefragt. Je häufiger die Aktualisierungen erfolgen, desto aktueller sind die Daten in der Tabelle. Weiterhin umfaßt die zweite Spalte in den Zeilen für Verbraucher 3 deren momentan angeforderten Bedarfswerte. Diese werden von den Verbrauchern 3 bei Änderungen des Bedarfs an den Zentralrechner 1 übermittelt.The first storage section 12 preferably stores data which are shown here in the form of a table. For example, in the first column Q the names and memory addresses of the various external data sources W, BB, F, L1,. , , Ln, 2, 3 stored to enable targeted access to it. These values are thus permanently saved over longer periods. In a second column, free capacities C of lines L1, L2,. , , and currently possible delivery capacities C of power plants W, BB, F are stored. These constantly changing data are dt at regular intervals via the interface 11 from the external data sources W, BB, F, L1,. , , Ln, 2 queried. The more often the updates are made, the more up-to-date the data in the table are. Furthermore, the second column in the rows for consumer 3 includes their currently requested demand values. These are transmitted to the central computer 1 by the consumers 3 when the requirements change.
In der dritten Spalte werden Reservierungsvermerke R abgespeichert. Diese dienen dazu, Kapazitäten C von Kraftwerken W, BB, F und Leitungen L1, L2, . . . zu reservieren und/oder reservierte Kapazitäten C anzuzeigen.In the third column, reservation notes R saved. These serve capacities C of Power plants W, BB, F and lines L1, L2,. . . to reserve and / or display reserved capacities C.
In der vierten Spalte wird der momentane Preis für die Bereitstellung einer bestimmten Einheitsmenge Strom oder einer bestimmten Leitungskapazität abgespeichert. Auch dieser Wert ändert sich ständig. Beispielsweise werden Heizkraftwerke rund um die Uhr betrieben, so daß dort zu Nachtzeiten mit einem nur geringen Strombedarf Kosten für die Herstellung von Strom entstehen, der nicht gezogen wird. Ein zur Nachtzeit besonders niedriger Preis für Strom aus einem solchen Heizkraftwerk würde dazu führen, daß Strommakler in der Nacht bevorzugt dort Strom anfordern würden.The fourth column shows the current price for the Provision of a certain unit amount of electricity or a certain line capacity stored. Also this value is constantly changing. For example Heating plants operated around the clock, so there too Night times with low electricity consumption costs for producing electricity that is not drawn becomes. A particularly low price for electricity at night from such a cogeneration plant would lead to the fact that Electricity brokers prefer to request electricity there at night would.
Im Gegenzug können Wasserkraftwerke, wie beispielsweise das Walchenseekraftwerk W, gezielt nur bei hohem Strombedarf eingeschaltet werden, also zur Spitzenlastdeckung genutzt werden. Da in Spitzenzeiten besonders hohe Strompreise durchsetzbar sind, ist deren Betrieb dann besonders effektiv. Insbesondere Wasserspeicherkraftwerke bieten den besonderen Vorteil, daß diese über Nacht mit dann kostengünstigem Strom eines Heizkraftwerks Wasser aus einem tiefergelegenen Reservoir in ein höhergelegenes Reservoir pumpen können, was ein besonders effektives Haushalten mit überschüssigem Strom ermöglicht.In return, hydropower plants like that Walchenseekraftwerk W, only targeted at high power requirements be switched on, i.e. used to cover peak loads become. Because electricity peaks are particularly high at peak times are enforceable, their operation is special effectively. Water storage power plants in particular offer that special advantage that this with overnight inexpensive electricity from a CHP plant water from a lower reservoir into a higher reservoir can pump what a particularly effective household with allows excess electricity.
Jedoch ändern sich nicht nur die Preise der Stromhersteller, sondern auch die der Leitungsbetreiber ständig. So ist beispielsweise die Kapazität der direkten Leitung L2 vom AKW F in den Ballungsraum HH zu Stoßzeiten voll ausgeschöpft. Zu diesen Zeiten kann der Leitungsbetreiber demnach einen hohen Durchleitungspreis verlangen. Kann das AKW F jedoch zu günstigeren Preisen als das AKW BB noch mehr Strom liefern, so kann alternativ auch Strom über die Leitung L6 geliefert werden, die teilweise durch die Beneluxstaaten führt und womöglich freie Kapazitäten hat. Zur besseren Auslastung würden die Betreiber somit den Durchleitungspreis der Leitung L6 zur entsprechenden Stoßzeit gegenüber der Leitung L2 absenken. Schnelle Preisschwankungen können durch entsprechende Datenübertragungen zur Aktualisierung der Tabelle an den Zentralrechner 1 übermittelt werden und somit dem Kunden aktuell in Art einer Auktion über Internet angeboten werden.However, not only the prices of electricity producers, but also those of cable operators are constantly changing. For example, the capacity of the direct line L2 from the nuclear power plant F into the metropolitan area HH is fully used at peak times. At these times, the line operator can therefore charge a high transmission price. However, if the F nuclear power plant can supply more electricity at cheaper prices than the BB nuclear power plant, alternatively electricity can also be supplied via line L6, which partly leads through the Benelux countries and may have free capacity. To improve capacity utilization, the operators would therefore lower the transmission price for line L6 at line rush hour compared to line L2. Rapid price fluctuations can be transmitted to the central computer 1 by means of corresponding data transmissions for updating the table and can thus be offered to the customer in the form of an auction via the Internet.
Weitere Spalten der Tabelle dienen z. B. zum Abspeichern von längerfristig reservierten Kapazitäten C oder Rahmenpreisen für solche längerfristigen Reservierungen.Other columns in the table are used e.g. B. for storing Capacities C or frame prices reserved in the long term for such long-term reservations.
Weiterhin können Grenzwerte abgespeichert werden, die zuvor zwischen Großverbrauchern 3 und einem Strommakler vereinbarte und besonders günstige Preis-/ Leistungsverhältnisse berücksichtigen. Tritt bei einem Verbraucher 3 unerwartet ein höherer Strombedarf auf, so bekommt er zwar die vorher z. B. über Internet (mit digitaler Signatur) erworbene und zugestandene Strommenge zu dem vereinbarten Preis, für die zusätzlich angeforderte und gelieferte Strommenge wird jedoch ein anderer u. U. variabler Tarif zugrundegelegt.Furthermore, limit values can be stored which take into account previously agreed and particularly favorable price / performance ratios between bulk consumers 3 and an electricity broker. If a higher power requirement unexpectedly occurs at a consumer 3 , it does get the previously z. B. over the Internet (with digital signature) purchased and granted amount of electricity at the agreed price, but for the additionally requested and delivered amount of electricity is another u. U. variable tariff used.
Die Abrechnung von geliefertem, durchgeleitetem und bezogenem Strom erfolgt ähnlich wie bei der EP 0 863 492 A1 direkt durch eine Verrechnung bei einem Geldinstitut 2, das dazu ebenfalls an den Zentralrechner 1 angeschlossen ist.Similar to EP 0 863 492 A1, billed, supplied, conducted and drawn electricity is billed directly by billing at a financial institution 2 , which is also connected to the central computer 1 for this purpose.
Der Datenaustausch zwischen dem Zentralrechner 1 und den externen Datenquellen W, BB, F, L1, . . . Ln, 2, 3 erfolgt über die Schnittstelle 11. Diese ermöglicht eine Datenübertragung über gängige Kommunikationsmedien, wie z. B. Telefonleitungen 14, Paketdatendienste 15, wie das Internet, oder Funkverbindungen 16, beispielsweise Mobilfunk. Es sind aber auch Datenübertragungen direkt über die Stromleitungen 17 ("power-line") möglich, die beispielsweise vom Strommakler aus zu dem Endverbraucher 3 führen, so daß dann die Preisanfrage und der Kaufabschluß darüber getätigt werden können. Ebenso kann durch Codierungen der Stromzähler des Kunden entsprechend parametriert werden, z. B. auf eine vorher festgelegte maximale Abgabeleistung von z. B. 10 kW bei Privatkunden oder z. B. 100 kW bei Firmenkunden. Diese Höchstgrenzen sind ebenso wie Bezugszeiten im vorher über Internet ausgehandelten Vertrag enthalten und werden an den Stromzähler übertragen.The data exchange between the central computer 1 and the external data sources W, BB, F, L1,. , , Ln, 2, 3 takes place via the interface 11 . This enables data transmission via common communication media, such as. B. telephone lines 14 , packet data services 15 , such as the Internet, or radio connections 16 , for example mobile radio. However, data transfers are also possible directly via the power lines 17 (“power line”), which lead, for example, from the power broker to the end user 3 , so that the price inquiry and the purchase can then be made via this. Similarly, the customer's electricity meter can be parameterized accordingly, e.g. B. to a predetermined maximum output of z. B. 10 kW for private customers or z. B. 100 kW for corporate customers. These maximum limits as well as reference times are included in the contract previously negotiated via the Internet and are transferred to the electricity meter.
Anhand eines beispielhaften Verbrauchers V1 in Hamburg wird nachfolgend unter Bezug auf das Ablaufdiagramm der Fig. 3 das Makeln von Strom veranschaulicht.Using an exemplary consumer V1 in Hamburg, the brokering of electricity is illustrated below with reference to the flowchart in FIG. 3.
Bei der ersten Anmeldung des Verbrauchers V1 wird in dem Zentralrechner 1 eine neue Datenzeile angelegt, in der die Standarddaten des Verbrauchers abgespeichert werden. Zu diesen zählt beispielsweise ein besonders geringer Strombedarf von unter 1 kW/h von 18 bis 7 Uhr und ein für eine Maschinenhalle besonders hoher Strombedarf von bis zu 1 MW/h von 7 bis 18 Uhr.When the consumer V1 logs on for the first time, a new data line is created in the central computer 1 , in which the standard data of the consumer are stored. These include, for example, a particularly low power requirement of less than 1 kW / h from 6 p.m. to 7 a.m. and a particularly high power requirement of up to 1 MW / h from 7 a.m. to 6 p.m. for a machine shop.
Daraufhin werden von der zentralen Recheneinheit die Angaben der einzelnen Stromversorger W, BB, F und Leitungsbetreiber mit gängigen Algorithmen nach einer Kombination durchsucht, die einen besonders günstigen Preis ermöglicht. Hier sei z. B. der günstigste Strom nachts direkt vom Kraftwerk BB, tagsüber aber vom AKW F über die Leitung L6 lieferbar. Die entsprechend benötigten Kapazitäten der beiden Kraftwerke BB und F sowie der Leitung L6 werden längerfristig reserviert. Die Reservierungen werden in der Tabelle und in entsprechenden Rechnern der Betreiber abgespeichert. Aufgrund der langfristigen Planbarkeit bekommt der Verbraucher V1 die besonders günstigen Preise mit einem Maklerzuschlag zugestanden, wobei die Endpreise ebenfalls in der Tabelle abgespeichert werden.Then the central processing unit Details of the individual electricity suppliers W, BB, F and Line operators with common algorithms according to a Combination that searches a particularly affordable price enables. Here is z. B. the cheapest electricity at night directly from the power plant BB, but during the day from the nuclear power plant F via the Cable L6 available. The required accordingly Capacities of the two power plants BB and F and the Line L6 are reserved for a longer period. The Reservations are in the table and in corresponding Computers of the operator. Due to the long-term predictability, the consumer gets V1 particularly low prices with a brokerage surcharge conceded, the final prices also in the table can be saved.
Bekommt der Verbraucher V1 (z. B. eine Maschinenfabrik) jedoch einen dringenden Auftrag, der Nachtschichten in der Maschinenhalle erforderlich macht, so fordert er über die entsprechende Datenleitung 16, hier z. B. ein Mobilfunknetz, vom Zentralrechner 1 mehr Strom an, der in diesem Fall sofort lieferbar sein muß. Alternativ kann auch das Einschalten der Maschinen den erhöhten Strombedarf signalisieren. Der Zentralrechner 1 durchsucht daraufhin die Tabelle mit den aktuellen Daten der einzelnen Kraftwerke W, BB, F und der Leitungen L1, L2, . . . nach einer möglichst günstigen Liefermöglichkeit für den plötzlich anfallenden großen Strombedarf. Dabei wird der Strom unter Umständen auch gleichzeitig von mehreren Kraftwerken BB und W und über verschiedene Leitungen L2 bzw. L3, L4, L5 herangeführt. Somit kann der aktuelle Strompreis dem Kunden zur Angebotsannahme (bzw. -ablehnung) z. B. auf dem Display seines Mobiltelefons angegeben werden. However, if the consumer V1 (e.g. a machine factory) receives an urgent order that requires night shifts in the machine hall, he requests via the corresponding data line 16 , here e.g. B. a mobile network, more power from the central computer 1 , which must be immediately available in this case. Alternatively, switching on the machines can signal the increased power requirement. The central computer 1 then searches the table with the current data of the individual power plants W, BB, F and the lines L1, L2,. , , for the cheapest possible delivery option for the suddenly occurring large electricity demand. Under certain circumstances, the current is also brought in simultaneously from several power plants BB and W and via different lines L2 or L3, L4, L5. Thus, the current electricity price for the customer to accept (or reject) the offer. B. be indicated on the display of his mobile phone.
Nach dem Vertragsabschluß auf elektronischem Wege und sofortigen (bzw. einem anderen gewünschten Zeitpunkt) Aufbau der Stromlieferung und parallel zu dieser werden direkt die durch- bzw. zugeleiteten Strommengen erfaßt. Die Stromversorger und Leitungsbetreiber übermitteln diese Werte über die entsprechenden Datenverbindungen an den Zentralrechner 1. Alternativ oder zusätzlich kann auch die vom Verbraucher V1 an dessen Stromzähler erfaßte Strommenge direkt per Datenleitung 16 zum Zentralrechner 1 übermittelt werden. Diese Werte für den zusätzlich angeforderten Strom werden mit den entsprechenden gerade aktuellen Stunden- oder Tagespreisen, die in der Tabelle abgespeichert sind, verrechnet. Der Stromverbrauch wird somit zu dem zuvor vereinbarten Preis berechnet.After the contract has been concluded electronically and the electricity supply has been set up immediately (or at another desired time) and parallel to this, the amounts of electricity that are passed through or fed in are recorded directly. The electricity suppliers and line operators transmit these values to the central computer 1 via the corresponding data connections. As an alternative or in addition, the amount of electricity detected by the consumer V1 on its electricity meter can be transmitted directly to the central computer 1 via data line 16 . These values for the additionally requested electricity are offset against the corresponding current hourly or daily prices that are stored in the table. The electricity consumption is thus calculated at the previously agreed price.
Am Tagesende (oder auch halbtäglich oder wochenweise) werden dem Geldinstitut 2 über die Datenleitung 14 die einzelnen zu verrechnenden Beträge übermittelt. Dort wird das Entgelt für den Strombezug vom Verbraucher V1 eingezogen und entsprechend anteilig den Betreibern des Zentralrechners 1, der benutzten Leitungen L2-L5 (insbesondere nach der im Speicher abgelegten Leitungslänge und Zuordnung zu den jeweiligen Eignern) und der stromliefernden Kraftwerke W und BB gutgeschrieben.At the end of the day (or even half a day or weekly), the individual amounts to be cleared are transmitted to the financial institution 2 via the data line 14 . There, the charge for electricity consumption is collected from consumer V1 and correspondingly credited to the operators of central computer 1 , the lines L2-L5 used (in particular according to the line length stored in the memory and assignment to the respective owners) and the power-supplying power plants W and BB.
In einer bevorzugten Ausführungsform kann der Zentralrechner 1 bei einem besonders hohen Strombedarf oder ungünstigeren Lieferpreisen der anderen Kraftwerke BB, F oder ungünstigen Durchleitungspreise der für diese geeigneten Leitungen L2, L6 in der Nacht auch direkt beim inaktiven Wasserkraftwerk W eine größere Mindest-Strommenge zu dessen Nacht-Standardpreis anfordern und dadurch die automatische Inbetriebnahme dieses Wasserkraftwerks W veranlassen. In diesem Fall sind auch die Mindest- Strommenge und der Nachtpreis in der Tabelle abgespeichert oder abrufbar.In a preferred embodiment, the central computer 1 can also have a larger minimum amount of electricity directly at the inactive hydropower plant W at night when the power plants BB, F have a particularly high electricity demand or the delivery prices of the other power plants BB, F are less favorable or the transmission prices for these lines L2, L6 are unfavorable - Request the standard price and thereby initiate the automatic commissioning of this hydropower plant W. In this case, the minimum amount of electricity and the night price are stored in the table or can be called up.
Ein weiteres Verbrauchsszenario wird am Beispiel eines privaten Verbrauchers Vn in Hamburg dargestellt. Dieser könnte zwar günstigen Atomstrom vom AKW BB über eine kurze Leitung beziehen, jedoch schließt er mit dem Betreiber des Zentralrechners 1 einen Vertrag für ökologisch vertretbaren Strombezug ab. Norddeutsche Windkraftwerke können zwar zeitweilig relativ günstig aus der Nähe Strom liefern, bei Flaute jedoch nicht. Daher bekommt er über den Zentralrechner bei der Herstellung 15% teureren Strom vom Wasserkraftwerk W geliefert. Die Lieferung erfolgt beispielsweise über die Leitung L3 und L1 der Bayernwerke, die Leitung L4 eines osteuropäischen Leitungsbetreibers und die Leitung L5 eines norddeutschen Stromversorgers. Berechnet wird vom Zentralrechner 1 zugunsten der Bayernwerke die gelieferte Strommenge multipliziert mit dem jeweils aktuellen Tabellenwert des Herstellungspreises (in Zeile W) und der Strommenge multipliziert mit den jeweiligen Durchleitungspreisen für die Leitungen L3 und L1. Der Multiplikationswert des Preises für Leitung L4 und der Strommenge wird dem osteuropäischen Leitungsbetreiber gutgeschrieben. Der norddeutsche Stromversorger bekommt letztendlich den Wert aus der Multiplikation von dem Durchleitungspreis der Leitung L5 aus der Tabelle und der Strommenge. Der Betreiber des Zentralrechners bekommt einen festgelegten oder strommengenabhängigen Vermittlungspreis. Diese Beträge werden dem Geldinstitut 2 übermittelt, das die einzelnen Beträge entsprechend gutschreibt und den Verbraucher Vn mit der Summe der Beträge belastet.Another consumption scenario is illustrated using the example of a private consumer Vn in Hamburg. Although this could obtain cheap nuclear power from the nuclear power plant BB via a short line, it does conclude a contract with the operator of the central computer 1 for ecologically justifiable electricity purchases. Northern German wind turbines can temporarily supply electricity relatively cheaply from nearby, but not when there is a lull. Therefore, he receives 15% more expensive electricity from the W hydropower plant via the central computer. The delivery takes place, for example, via line L3 and L1 of Bayernwerke, line L4 of an Eastern European line operator and line L5 of a north German electricity supplier. Central computer 1 calculates the amount of electricity delivered in favor of Bayernwerke multiplied by the current table value of the manufacturing price (in line W) and the amount of electricity multiplied by the respective transmission prices for lines L3 and L1. The multiplication value of the price for line L4 and the amount of electricity is credited to the Eastern European line operator. The North German electricity supplier ultimately gets the value from the multiplication of the transmission price of line L5 from the table and the amount of electricity. The operator of the central computer receives a fixed or electricity-based agency price. These amounts are transmitted to the financial institution 2 , which credits the individual amounts accordingly and debits the consumer Vn with the total of the amounts.
Der Verbraucher Vn bestellt seinen Strom über das Internet. Zur Identifikation gegenüber dem Zentralrechner 1 übermittelt der Verbraucher Vn zusammen mit seiner Bestellung einen ihm zugewiesenen Codeschlüssel, dessen Kopie in dem zweiten Speicherabschnitt 13 abgespeichert ist. Im Gegenzug erfolgt bei Vertragsabschluß mit diesem Codeschlüssel dann die Freischaltung des Stromzählers beim Kunden.The consumer Vn orders its electricity via the Internet. For identification with the central computer 1 , the consumer Vn transmits together with his order a code key assigned to him, the copy of which is stored in the second memory section 13 . In return, when the contract is concluded with this code key, the electricity meter is activated at the customer.
Möglich ist auch eine automatische Bestellung einer vorbestimmten Strommenge zu einem bestimmten Preis oder über einen vorbestimmten Zeitraum. So kann ein Verbraucher problemlos zwischen für ihn gerade günstigen Strommaklern oder Stromversorgern wechseln.It is also possible to order one automatically predetermined amount of electricity at a certain price or over a predetermined period of time. So can a consumer without any problems between current brokers that are cheap for him or change electricity suppliers.
Anstelle einer Bestellung über das Internet, also einen Computer, der dem Verbraucher zugänglich ist, können auch telefonische Bestellungen abgegeben werden. Eine andere beispielhafte Möglichkeit Strom zu kaufen, ist die Verwendung von Smartcards, Kredit- oder Geldkarten 34, die in ein Lesegerät 32 an den Kassierzähler-Abgabegeräten 33 eingesteckt werden können.Instead of placing an order over the Internet, i.e. a computer that is accessible to the consumer, orders can also be placed by telephone. Another exemplary possibility of buying electricity is the use of smart cards, credit or cash cards 34 , which can be inserted into a reader 32 on the cashier counter dispensers 33 .
Anstelle der Lieferung von Strom kann mit diesem System natürlich auch ein anderes Medium wie Wasser, Gas, Öl, Heizwärme oder dergleichen vermittelt und verrechnet werden.Instead of delivering electricity you can use this system of course another medium like water, gas, oil, Heat and the like conveyed and charged become.
Claims (15)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19930323A DE19930323A1 (en) | 1999-07-02 | 1999-07-02 | Switching system for electricity and tax procedures for this |
AT00114244T ATE472840T1 (en) | 1999-07-02 | 2000-07-03 | SWITCHING SYSTEM FOR ELECTRICITY AND TAX PROCEDURES THEREOF |
EP00114244A EP1067649B1 (en) | 1999-07-02 | 2000-07-03 | Power switching system and its control method |
DE50015948T DE50015948D1 (en) | 1999-07-02 | 2000-07-03 | Switching system for electricity and tax procedures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19930323A DE19930323A1 (en) | 1999-07-02 | 1999-07-02 | Switching system for electricity and tax procedures for this |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19930323A1 true DE19930323A1 (en) | 2001-01-04 |
Family
ID=7913283
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19930323A Withdrawn DE19930323A1 (en) | 1999-07-02 | 1999-07-02 | Switching system for electricity and tax procedures for this |
DE50015948T Expired - Lifetime DE50015948D1 (en) | 1999-07-02 | 2000-07-03 | Switching system for electricity and tax procedures |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE50015948T Expired - Lifetime DE50015948D1 (en) | 1999-07-02 | 2000-07-03 | Switching system for electricity and tax procedures |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1067649B1 (en) |
AT (1) | ATE472840T1 (en) |
DE (2) | DE19930323A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008003095A1 (en) | 2008-01-03 | 2009-07-09 | Franetzki, Manfred, Dr. | System for reduction of cost of e.g. electric current consumed by industrial organization, has information providing unit continuously informing consumers about actual price of medium, where consumer controls produced or stored medium |
DE102012206083A1 (en) * | 2012-04-13 | 2013-10-17 | Krones Ag | Method and device for optimizing a production process |
DE102013010397A1 (en) * | 2013-04-16 | 2014-10-16 | Roland Schulze | AUTENVER- method (AUTOMATIC ENERGY MANAGEMENT and DISTRIBUTION) working as an interconnected system with an AUTENVER energy control unit, an AUTENVER energy meter and communication unit with input keypad and an AUTENVER energy switching unit, for smart power distribution with integration of power generators, for optimal utilization of power grids and possibility for Energy consumers, without supply contracts with various energy suppliers, to realize fast cost-effective access to energy supplies |
US9299093B2 (en) | 2010-01-29 | 2016-03-29 | GM Global Technology Operations LLC | Method for charging a plug-in electric vehicle |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002245306A (en) * | 2001-02-15 | 2002-08-30 | Hitachi Ltd | Transaction mediating system, article transaction mediating system, power transaction mediating system and services therefor |
DE102008044526A1 (en) * | 2008-09-16 | 2010-03-18 | EnBW Energie Baden-Württemberg AG | System for location-independent power purchase and / or for location-independent power supply of a mobile storage and consumption unit |
WO2016151986A1 (en) * | 2015-03-23 | 2016-09-29 | 日本電気株式会社 | Electric power matching device, electric power matching method, and non-transitory computer-readable medium whereon electric power matching program is stored |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19612776A1 (en) * | 1996-03-29 | 1997-10-02 | Sel Alcatel Ag | Open energy distribution system, method for performing energy deliveries, and system components for this system |
DE19632180A1 (en) * | 1996-08-03 | 1998-02-05 | Ind Technik Froeschl Gmbh | Meter data transmission method especially for industry - temporally storing transmitted data from meter in mailbox in data transmission system and retrieving data by authorised user |
DE19720315C1 (en) * | 1997-05-15 | 1998-07-09 | Itf Edv Froeschl Gmbh | Tariff charge calculation method for water, gas or electricity supply services |
DE19754675A1 (en) * | 1997-12-10 | 1999-07-01 | Klaus Dipl Ing Weber | Domestic utility usage recording and billing apparatus for electricity, water, telecommunications etc. |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5794212A (en) * | 1996-04-10 | 1998-08-11 | Dominion Resources, Inc. | System and method for providing more efficient communications between energy suppliers, energy purchasers and transportation providers as necessary for an efficient and non-discriminatory energy market |
DE29704120U1 (en) * | 1997-03-06 | 1997-05-22 | Bauer Franz Hans Peter | System for the cashless operation of cash counter dispensers |
US5930773A (en) * | 1997-12-17 | 1999-07-27 | Avista Advantage, Inc. | Computerized resource accounting methods and systems, computerized utility management methods and systems, multi-user utility management methods and systems, and energy-consumption-based tracking methods and systems |
-
1999
- 1999-07-02 DE DE19930323A patent/DE19930323A1/en not_active Withdrawn
-
2000
- 2000-07-03 DE DE50015948T patent/DE50015948D1/en not_active Expired - Lifetime
- 2000-07-03 EP EP00114244A patent/EP1067649B1/en not_active Expired - Lifetime
- 2000-07-03 AT AT00114244T patent/ATE472840T1/en active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19612776A1 (en) * | 1996-03-29 | 1997-10-02 | Sel Alcatel Ag | Open energy distribution system, method for performing energy deliveries, and system components for this system |
DE19632180A1 (en) * | 1996-08-03 | 1998-02-05 | Ind Technik Froeschl Gmbh | Meter data transmission method especially for industry - temporally storing transmitted data from meter in mailbox in data transmission system and retrieving data by authorised user |
DE19720315C1 (en) * | 1997-05-15 | 1998-07-09 | Itf Edv Froeschl Gmbh | Tariff charge calculation method for water, gas or electricity supply services |
DE19754675A1 (en) * | 1997-12-10 | 1999-07-01 | Klaus Dipl Ing Weber | Domestic utility usage recording and billing apparatus for electricity, water, telecommunications etc. |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008003095A1 (en) | 2008-01-03 | 2009-07-09 | Franetzki, Manfred, Dr. | System for reduction of cost of e.g. electric current consumed by industrial organization, has information providing unit continuously informing consumers about actual price of medium, where consumer controls produced or stored medium |
US9299093B2 (en) | 2010-01-29 | 2016-03-29 | GM Global Technology Operations LLC | Method for charging a plug-in electric vehicle |
DE102012206083A1 (en) * | 2012-04-13 | 2013-10-17 | Krones Ag | Method and device for optimizing a production process |
DE102013010397A1 (en) * | 2013-04-16 | 2014-10-16 | Roland Schulze | AUTENVER- method (AUTOMATIC ENERGY MANAGEMENT and DISTRIBUTION) working as an interconnected system with an AUTENVER energy control unit, an AUTENVER energy meter and communication unit with input keypad and an AUTENVER energy switching unit, for smart power distribution with integration of power generators, for optimal utilization of power grids and possibility for Energy consumers, without supply contracts with various energy suppliers, to realize fast cost-effective access to energy supplies |
Also Published As
Publication number | Publication date |
---|---|
DE50015948D1 (en) | 2010-08-12 |
ATE472840T1 (en) | 2010-07-15 |
EP1067649A3 (en) | 2004-09-22 |
EP1067649B1 (en) | 2010-06-30 |
EP1067649A2 (en) | 2001-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE19720315C1 (en) | Tariff charge calculation method for water, gas or electricity supply services | |
US20110246342A1 (en) | Consolidated invoicing and payment system for communities of multiple members | |
DE102016118115A1 (en) | Energy supply system and method for operating an energy supply system | |
WO2018185300A1 (en) | Method for coordinating an exchange of power between a plurality of technical small units and an electrical transmission network | |
DE112018007800T5 (en) | Electric Vehicle Energy Balance Credit-and-Debit System and Procedure | |
DE19732565C1 (en) | System for the energy and tariff-dependent control of electrical power consumers | |
DE19612776A1 (en) | Open energy distribution system, method for performing energy deliveries, and system components for this system | |
EP1067649B1 (en) | Power switching system and its control method | |
EP0863492B1 (en) | System for cashless operation of prepayment utility metering devices | |
EP0268697B1 (en) | Method and system for reducing the peak power of supply and disposal systems using transmission items | |
DE19632180C2 (en) | Method and system for transmitting data from registering and / or controlling devices to authorized persons | |
DE19947069A1 (en) | Procedure for loading a card account | |
Pierce Jr | Intrastate Natural Gas Regulation: An Alternative Perspective | |
EP1079343B1 (en) | Distribution system for supplying a commodity, such as power, heating, gas or water, to end-users and method for operating the system | |
Hubert et al. | Reform of Russian Power Industry | |
Kirby et al. | Maintaining transmission adequacy in the future | |
DE19940904A1 (en) | Method and system for energy supply via an energy supply network | |
EP0841785B2 (en) | Method for data transmission to control and/or monitoring devices | |
DE102011011812A1 (en) | Meter for electrical work, has units for remote data transmission and storage space that is established in meter, where measured value is determined by meter | |
WO2000013291A1 (en) | System for controlling consumption of a medium, especially a mains-connected medium | |
DE10048229B4 (en) | Computer-controlled switching system | |
DE19940900A1 (en) | Method and system for energy supply via an energy supply network | |
WO2002009467A1 (en) | System for remotely inquiring about the amounts of energy consumed by consumers | |
EP2847729A1 (en) | Method and system for acquiring, storing, removing, and billing goods | |
WO1999020035A2 (en) | Access and billing method using a chip card |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8110 | Request for examination paragraph 44 | ||
8130 | Withdrawal |