DE19758386A1 - Continued operation of flue gas desulphurization plant on limestone supply failure - Google Patents

Continued operation of flue gas desulphurization plant on limestone supply failure

Info

Publication number
DE19758386A1
DE19758386A1 DE1997158386 DE19758386A DE19758386A1 DE 19758386 A1 DE19758386 A1 DE 19758386A1 DE 1997158386 DE1997158386 DE 1997158386 DE 19758386 A DE19758386 A DE 19758386A DE 19758386 A1 DE19758386 A1 DE 19758386A1
Authority
DE
Germany
Prior art keywords
absorber
limestone
flue gas
supply
quencher
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE1997158386
Other languages
German (de)
Inventor
Andreas Dipl Ing Sparmann
Gerald Dipl Ing Heinze
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vattenfall Europe Generation AG and Co KG
Original Assignee
VEAG Vereinigte Energiewerke AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VEAG Vereinigte Energiewerke AG filed Critical VEAG Vereinigte Energiewerke AG
Priority to DE1997158386 priority Critical patent/DE19758386A1/en
Publication of DE19758386A1 publication Critical patent/DE19758386A1/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/80Semi-solid phase processes, i.e. by using slurries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • B01D53/501Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • F23J15/04Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material using washing fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2215/00Preventing emissions
    • F23J2215/20Sulfur; Compounds thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2219/00Treatment devices
    • F23J2219/50Sorption with semi-dry devices, e.g. with slurries

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Treating Waste Gases (AREA)

Abstract

Limestone excess available in the absorber supply vessel (4) is employed. Operation continues with a quench- (2) and absorber- (5) supply pump. As pH changes in the quencher suspension, the absorber hydrocyclone (6) is brought in, in stages.

Description

Die Erfindung betrifft ein Verfahren zur Sicherstellung des temporären Weiterbetriebes eines Absorbersystems einer Rauchgasentschwefelungsanlage nach dem Kalkstein- Zweikreisnaßwaschverfahren eines Kraftwerkes insbesondere bei einem totalen Ausfall der Kalksteinversorgung, wobei ei­ ne geordnete Zurücküberführung des Prozesses in Normalpara­ meter gesichert wird.The invention relates to a method for ensuring the temporary continued operation of an absorber system Flue gas desulphurization plant after the limestone Dual cycle wet washing process of a power plant in particular in the event of a total failure of the limestone supply, whereby ei ne orderly return of the process to normal par meter is secured.

Für die Rauchgasentschwefelung ist bekannt, daß ein Gas­ wäscher mit einer vorgeschalteten oder integrierten Haloge­ nidauswaschung vorgesehen und die Düsenebene mit einer Kalk­ steinsuspension oder einer Kalkhydratsuspension betrieben wird (z. B. DE 195 02 632; 195 02 636; 44 02 773; 38 30 390; DE 37 28 128; 37 24 512). Nachteilig dabei ist, daß für ei­ nen solchen Betrieb einer Rauchgasentschwefelungsanlage eine verhältnismäßig große Menge an Kalkstein- bzw. Kalkhydrat- Suspension erforderlich ist, die nicht ausreichend zu Verfü­ gung steht. Ein Mangel an Suspension führt zu Ausfällen der Rauchgasentschwefelungsanlage.For flue gas desulfurization it is known that a gas scrubber with an upstream or integrated halogen No washout provided and the nozzle level with a lime stone suspension or a lime hydrate suspension operated (e.g. DE 195 02 632; 195 02 636; 44 02 773; 38 30 390; DE 37 28 128; 37 24 512). The disadvantage here is that for egg such operation of a flue gas desulfurization plant relatively large amount of limestone or hydrated lime Suspension is required, which is not available is available. A lack of suspension leads to failure of the Flue gas desulfurization plant.

Es ist weiterhin bekannt, daß in einer Rauchgasentschwefe­ lungsanlage nach dem Kalkstein-Zweikreisnaßwaschverfahren die Versorgung von Absorbern über den Ansatz einer Kalk­ steinsuspension aus Wasser und Kalksteinmehl erfolgt, wobei der Kalkstein am Standort der Rauchgasentschwefelungsanlage mittels Kalksteinmühlen aus angeliefertem Kalksteinschotter gemahlen wird. Nachteilig dabei ist, daß die Kalksteinmüh­ lenkapazität mit dem Bedarf der Rauchgasentschwefelungsanla­ ge übereinstimmt. It is also known that in a flue gas desulfurizer system according to the limestone dual-circuit wet washing process the supply of absorbers via the approach of a lime stone suspension is made of water and limestone flour, whereby the limestone at the site of the flue gas desulfurization plant using limestone mills from delivered limestone gravel is ground. The disadvantage here is that the limestone mill steering capacity with the needs of the flue gas desulfurization system ge matches.  

Das bedeutet, daß keine Reservemühle vorhanden ist und bei Störungen der Kalksteinmühlen die unzureichende Kalkstein­ versorgung in kurzer Zeit zu Einschränkungen des Rauchgas­ entschwefelungsprozesses führt. Bei Nichtvorhandensein eines Bypassschornsteins wird folglich die zugehörige Dampferzeu­ geranlage des kohlenstaubgefeuerten Kraftwerkes abgeschal­ tet. Nachteilig dabei ist, daß ein Mangel an Kalksuspension diese ihre zweifunktionale Aufgabe, d. h. sowohl als Absorp­ tionsmittel des Prozesses und auch als werkstoffschützender Puffer zur Senkung des Wirkpotentials der sich bildenden schwefeligen Säure, nicht erfüllen kann. Die Rauchgasent­ schwefelungsanlage geht außer Betrieb und mit ihr die zuge­ hörige Dampfkesselanlage.This means that there is no reserve mill and at Disorders of the limestone mills the insufficient limestone supply in a short time to restrictions on the flue gas desulfurization process leads. In the absence of one Bypass chimney consequently the associated steam generator of the coal dust-fired power plant tet. The disadvantage here is that a lack of lime suspension this their dual function, d. H. both as an absorber means of the process and also as a protective material Buffers to reduce the potential of the developing sulfurous acid, can not meet. The Rauchgasent sulfurization plant goes out of operation and with it the sound boiler system.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zu finden, daß den temporären Weiterbetrieb einer Rauchgasent­ schwefelungsanlage bei totalem Ausfall der Kalksteinversor­ gung gewährleistet, wobei die Grenzbelastbarkeiten aller zu­ gehörigen Aggregate einzuhalten sind und bei dem die Wieder­ verfügbarkeit der definitiven Kalksteinversorgung den tempo­ rären Prozeß in den Normalparameterprozeß überführt.The invention is based on the object of a method find that the temporary continued operation of a flue gas Sulfurization plant in the event of total failure of the limestone supplier guaranteed, whereby the maximum resilience of all proper aggregates are to be observed and where the re availability of definitive limestone supply at the pace transferred process into the normal parameter process.

Dies wird erfindungsgemäß dadurch erreicht, daß der im Ab­ sorberversorgungssystem vorhandene Kalksteinüberschuß im Ab­ sorberversorgungsbehälter genutzt und ein Weiterbetrieb mit einer Quencherpumpe und einer Absorberversorgungspumpe fort­ gesetzt wird und in Abhängigkeit der pH-Wertentwicklung der Quenchersuspension eine stufenweise Zuschaltung des Absor­ berhydrozyklons gesichert wird.This is achieved in that the Ab sorber supply system existing limestone excess in the Ab sorber supply container used and continued operation with a quencher pump and an absorber supply pump is set and depending on the pH development of the Quench suspension a gradual connection of the absorber overhydrocyclones is secured.

An einem Ausführungsbeispiel wird die Erfindung näher erläu­ tert. Dabei zeigt die Fig. 1 den prinzipiellen Aufbau einer Rauchgasentschwefelungsanlage nach dem Kalkstein-Zweikreis­ naßwaschverfahren.In one embodiment, the invention is explained in more detail. Fig. 1 shows the basic structure of a flue gas desulfurization system according to the limestone dual-circuit wet washing process.

Eine Rauchgasentschwefelungsanlage nach dem Kalkstein- Zweikreisnaßwaschverfahren mit Kalksteindosierung 7 nach Kalksteinmühle 8 und Vorratsbehälter 9 weist einen Wäscher­ turm 10 auf, der zweigeteilt ist und einen Quencherteil 1 mit einer sauren Quenchersuspension von einem pH-Wert 4,5-5,2 und der jeweiligen zugehörigen Quencherpumpe 2. Das Absorberversorgungssystem weist ein Absorberteil 3 mit Absorberversorgungsbehälter 4 und zugehörige Absorberversor­ gungspumpen 5 auf. Das Absorberversorgungssystem nutzt ei­ nen Kalksteinüberschuß, den die Absorbersuspension in einem Absorberversorgungsbehälter 4 enthält und sichert den Wei­ terbetrieb mit einer Quencherpumpe 2 und einer Absorberver­ sorgungspumpe 5. In Abhängigkeit der pH-Wertentwicklung der Quenchersuspension erfolgt eine stufenweise Zuschaltung der Absorberhydrozyklone 6.A flue gas desulfurization system according to the limestone two-circuit wet scrubbing process with limestone metering 7 after limestone mill 8 and storage container 9 has a scrubber tower 10 , which is divided into two and a quencher part 1 with an acidic quencher suspension with a pH value of 4.5-5.2 and the respective associated one Quencher pump 2 . The absorber supply system has an absorber part 3 with an absorber supply container 4 and associated absorber supply pumps 5 . The absorber supply system uses an excess of limestone which the absorber suspension contains in an absorber supply container 4 and ensures continued operation with a quencher pump 2 and an absorber supply pump 5 . Depending on the pH development of the quencher suspension, the absorber hydrocyclones 6 are switched on in stages.

Die Wirkungsweise ist folgende:
Bei totalem Ausfall der Kalksteinmühlen wird für die temporä­ re Aufrechterhaltung des Rauchgasentschwefelungsprozesses der im oberen Kreislauf einer Rauchgasentschwefelungsanlage nach dem Kalkstein-Zweikreisnaßwaschverfahren für die Ab­ deckung normaler prozeßbedingter Schwankungen im Absorberver­ sorgungssystem vorhandene Kalksteinüberschuß genutzt und der Wäscherbetrieb mit einer Quencherpumpe und mit einer Absor­ berpumpe fortgesetzt.
The mode of action is as follows:
In the event of total failure of the limestone mills, for the temporary maintenance of the flue gas desulfurization process, the excess limestone present in the upper circuit of a flue gas desulfurization system using the limestone dual-circuit wet scrubbing process is used to cover normal process-related fluctuations in the absorber supply system, and the laundry operation with a quencher pump and with an absorber is continued.

Dabei wird in Abhängigkeit von der pH-Wertentwicklung der Quenchersuspension eine stufenweise Zuschaltung der Absor­ berhydrozyklone gesichert, wobei durch die Verringerung der Absorberpumpen und des Quencherpumpenbetriebes der Kalk­ steinverbrauch verringert wird.Depending on the pH development, the Quencher suspension a gradual connection of the absorber secured overhydrocyclones, by reducing the Absorber pumps and the quencher pump operation the lime stone consumption is reduced.

Durch die Erfindung werden folgende Vorteile erreicht:
The following advantages are achieved by the invention:

  • 1. Das gemäß der geltenden Betriebsvorschrift kalkulierte Weiterbetriebslimit der Dampfkesselanlage mit nachfolgen­ der Rauchgasentschwefelungsanlage nach einem Kalkstein­ versorgungsausfalls wird bedeutend erhöht.1. That calculated in accordance with the applicable operating regulations Continuing operation limit of the steam boiler system with follow the flue gas desulphurization plant after a limestone loss of supply is significantly increased.
  • 2. Aufgrund der Quencher pH-Wert geführten und gestuften Wiederinbetriebnahme der Absorbersysteme, wie Absorber- und Quencherpumpen sowie durch ein gestuftes Zurückfahren der Absorberhydrozyklone werden die gesetzlich vorge­ schriebenen Emissionsgrenzwerte nach Wiederaufnahme der Kalksteindosierung schnellstmöglich eingehalten bei der gleichzeitigen Aufpufferung des Kalksteinvorrates der Ab­ sorbersysteme.2. Based on the Quencher pH level and graded Recommissioning of the absorber systems, such as absorber and Quencher pumps as well as a gradual retraction the absorber hydrocyclones are prescribed by law emission limits after resumption of the Limestone dosing complied with as soon as possible simultaneous buffering of the limestone reserve of Ab sorber systems.
  • 3. Trotz Ausfall der Kalksteinmühlen und Kalksteinversorgung kann durch die Aktivierung des Vorrates an Kalkstein im Absorberversorgungssystem einer Rauchgasentschwefelungs­ anlage nach dem Kalkstein-Zweikreisnaßwaschverfahren eine längere Weiterbetriebszeit der Rauchgasentschwefelungsan­ lage gewährleistet werden.3. Despite the failure of the limestone mills and limestone supply can be activated by activating the supply of limestone in the Absorber supply system for a flue gas desulfurization system using the limestone dual-circuit wet washing process longer operating time of the flue gas desulfurization location can be guaranteed.
BezugszeichenlisteReference list

11

Quencherteil
Quencher part

22nd

Quencherpumpe
Quencher pump

33rd

Absorberteil
Absorber part

44th

Absorberversorgungsbehälter
Absorber supply container

55

Absorberversorgungspumpe
Absorber supply pump

66

Absorberhydrozyklon
Absorber hydrocyclone

77

Kalksteindosierung
Limestone dosing

88th

Kalksteinmühle
Limestone mill

99

Vorratsbehälter
Storage container

1010th

Wäscherturm
Laundry tower

Claims (1)

Verfahren zur Sicherstellung des temporären Weiterbetriebes eines Absorbersystems einer Rauchgasentschwefelungsanlage nach dem Kalkstein-Zweikreisnaßwaschverfahren eines Kraft­ werkes, insbesondere bei einem totalen Ausfall der Kalk­ steinversorgung, wobei eine geordnete Zurücküberführung des Prozesses in Normalparameter gesichert wird, gekennzeichnet dadurch, daß der im Absorberversorgungssystem im Absorberversorgungs­ behälter vorhandene Kalksteinüberschuß genutzt und ein Wei­ terbetrieb mit einer Quencherpumpe und einer Absorberversor­ gungspumpe fortgesetzt wird und in Abhängigkeit der pH-Wertentwicklung der Quenchersuspension eine stufenweise Zu­ schaltung des Absorberhydrozyklons gesichert wird.A method for ensuring the temporary continued operation of an absorber system of a flue gas desulfurization system according to the limestone dual-circuit wet scrubbing process of a power plant, especially in the event of a total failure of the limestone supply, whereby an orderly return of the process to normal parameters is ensured, characterized in that the container present in the absorber supply system in the absorber supply system Excess limestone is used and continued operation with a quencher pump and an absorber supply pump is continued and a gradual connection of the absorber hydrocyclone is ensured depending on the pH value development of the quencher suspension.
DE1997158386 1997-12-23 1997-12-23 Continued operation of flue gas desulphurization plant on limestone supply failure Ceased DE19758386A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1997158386 DE19758386A1 (en) 1997-12-23 1997-12-23 Continued operation of flue gas desulphurization plant on limestone supply failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1997158386 DE19758386A1 (en) 1997-12-23 1997-12-23 Continued operation of flue gas desulphurization plant on limestone supply failure

Publications (1)

Publication Number Publication Date
DE19758386A1 true DE19758386A1 (en) 1999-06-24

Family

ID=7853680

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997158386 Ceased DE19758386A1 (en) 1997-12-23 1997-12-23 Continued operation of flue gas desulphurization plant on limestone supply failure

Country Status (1)

Country Link
DE (1) DE19758386A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10107911A1 (en) * 2001-02-15 2002-09-05 Neckarwerke Stuttgart Ag Use of a product from a non-wet flue gas desulfurization process
CN102500220A (en) * 2011-11-04 2012-06-20 西安航空动力股份有限公司 Dust-removal and desulphurization device for negative pressure running boiler
CN103691298A (en) * 2013-12-25 2014-04-02 卞福林 Desulfurization tower with ring-shaped bottom
CN104998538A (en) * 2015-08-20 2015-10-28 滕州市东郭水泥有限公司 Demisting, dedusting, deodorizing and desulfurizing equipment as well as demisting, dedusting, deodorizing and desulfurizing technology thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10107911A1 (en) * 2001-02-15 2002-09-05 Neckarwerke Stuttgart Ag Use of a product from a non-wet flue gas desulfurization process
CN102500220A (en) * 2011-11-04 2012-06-20 西安航空动力股份有限公司 Dust-removal and desulphurization device for negative pressure running boiler
CN102500220B (en) * 2011-11-04 2013-11-06 西安航空动力股份有限公司 Dust-removal and desulphurization device for negative pressure running boiler
CN103691298A (en) * 2013-12-25 2014-04-02 卞福林 Desulfurization tower with ring-shaped bottom
CN104998538A (en) * 2015-08-20 2015-10-28 滕州市东郭水泥有限公司 Demisting, dedusting, deodorizing and desulfurizing equipment as well as demisting, dedusting, deodorizing and desulfurizing technology thereof

Similar Documents

Publication Publication Date Title
DE19758386A1 (en) Continued operation of flue gas desulphurization plant on limestone supply failure
DE2753209A1 (en) METHOD AND DEVICE FOR REMOVING SULFUR OXIDES FROM AN EXHAUST GAS OR. COMBUSTION GAS FLOW
DE3236905A1 (en) PLANT FOR THE DESULFURATION OF SMOKE GASES AND METHOD FOR OPERATING THE PLANT
DD223074A5 (en) METHOD AND APPARATUS FOR REMOVING SULFUR DIOXIDE AND OTHER CONTAMINANTS FROM FLUE GASES
DE3513544A1 (en) METHOD FOR DEPOSITING NITROGEN OXIDES
DE3114555C2 (en) Use of a hydraulically setting multi-component mixture
DE3821349C2 (en)
DE4002741C2 (en)
DE3335947C2 (en) Plant for desulfurization of flue gas
DE3714749C2 (en)
DE3504775A1 (en) USE OF STEAM POWER PLANT SLUDGE FOR THE WET DESULFURATION OF SMOKE GASES
EP0235737B1 (en) Process for controlling the water balance of wet flue gas desulfurisation plants
EP1039964B1 (en) Method and device for exploiting the flue-gas heat in brown coal power stations with wet flue-gas desulphurisation
DE2609797A1 (en) SCHUETTGUTBUNKER WITH A COIL CHUTE
DE19502635C2 (en) Process for the desulphurization of flue gases from a power plant fired with fossil fuels
DE3222943C2 (en) Nuclear reactor plant
DE102005044779A1 (en) Method for adjusting the sulfur dioxide concentration in flue gases
DE3429663C2 (en) Process for simultaneous SO2 and NOx separation from the flue gases of combustion boilers
DE2141944A1 (en) METHOD OF ABSORPTION OF NITROSE-CONTAINING EXHAUST GASES
DE3317505C2 (en)
DE2059200A1 (en) FLOOR GAS CLEANING SYSTEM FOR PRESSURE FURNACE
CN204911217U (en) Papermaking desulfurization system
DE19603837A1 (en) Process for H2S deposition from a gas containing H2S, e.g. B. coke oven gas, and device for performing the method
DE29903455U1 (en) Heating installation system
DE964507C (en) Method for operating a high pressure blast furnace

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8127 New person/name/address of the applicant

Owner name: VATTENFALL EUROPE GENERATION AG & CO. KG, 10115 BE

8127 New person/name/address of the applicant

Owner name: VATTENFALL EUROPE GENERATION AG & CO. KG, 03050 CO

8131 Rejection