DE1802034C - Construction dock for the assembly line-like production of ships - Google Patents

Construction dock for the assembly line-like production of ships

Info

Publication number
DE1802034C
DE1802034C DE1802034C DE 1802034 C DE1802034 C DE 1802034C DE 1802034 C DE1802034 C DE 1802034C
Authority
DE
Germany
Prior art keywords
dock
assembly
construction
ship
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Other languages
German (de)
Inventor
der Anmelder. B63b 39-00 ist
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Publication date

Links

Description

ι 2 ι 2

Die Erfindung betrifft ein Baudock zur fließband- Sektion schwimmfähig geworden ist und aus demThe invention relates to a building dock for the assembly line section has become buoyant and from which

artigen Herstellung von Schiffen durch Zusammen- Dock entfernt werden kannlike manufacture of ships by joint- dock can be removed

bau und Ausrüstung einzelner oder mehrerer vorge- Diese Aufgabe wird ^^ construction and equipping of one or more pre- This task is ^^

fertigter Großsektionen, die nach ihrer vollständigen löst, daß die Montagestattenfinished large sections, which after their complete solves that the assembly place

oder teilweisen Fertigstellung den bereits im Bau- 5 docks vorgesehen sind, die ^V? ^fJj?or partial completion of the 5 already planned in the building docks, the ^ V? ^ fJj?

dock befindlichen Sektionen mit Hilfe von Gleitbah- Verbindung stellen, quer zu ihm hegen und derendock the sections with the help of sliding rail connections, hang across to him and their

nen od. dgl. aus besonderen überdachten Montage- Bodenflächen in gleicher oder ädernd gleichernen or the like from special roofed assembly floor areas in the same or otherwise the same

Stätten zuführbar sind. Hohe verlaufen wie diejenige des HauptdocksSites are accessible. Heights run like that of the main dock

Beim Bau von Schiffen in konventionellen Docks In derartigen Montagestatten lassen swh leicht wird bisher in der Regel so vorgegangen, daß der io mehrere Maschinenraumseküonetι gleichartig vol· Schiffskörper bzw. Schiffsrumpf emscMießlicb der ständig oder annähernd vollständig aiKrustenrod Decksaufbauten im Dock fertiggesteUt wird. Auch fertigstellen. Hierbei wird zweckmäßig so vorgegandie maschinenbaulichen Ausrüstungsarbeiten werden gen, daß die jeweils dem Hauptdock und dem dann bereits während der Dockbauzeit begonnen. Nach befindlichen TeU des Schiffsrumpfes nachstgelegene dem Ausdocken des Schiffes ist dann das Dock zwar 15 Maschinenraumsektion baulich am weitesten voranfür den nächsten Bau frei; die restlichen Arbeiten, getrieben wird, derart, daß sie anbaurerf ist, sobald insbesondere die fertige Ausrüstung der Maschinen- im Hauptdock der übrige Schiffsrumpf bis etwa zur räume einschließlich der endgültigen Einrichtung der Schwimmfähigkeit zusammengebaut worden ist Die Hauptaufbauten, d. h. die sogenannte Nachausrü- bezüglich ihrer iaiwnausrüstung fertige (oder nahezu stung, muß jedoch nach dem Ausdocken des Schif- ao fertige) Maschinenraumsektion laßt sich dann leicht fes an Ausrüstungspieren durchgeführt werden. durch seitliches Verschieben auf Gleitbahnen od dgLWhen building ships in conventional docks so far, the procedure has generally been such that the io several engine room secrets are of the same type. The hull or hull is made up of constantly or almost completely aiKrustenrod Deck superstructures in the dock is completed. Also finish. This is expediently done in this way Mechanical equipment works are gene that each of the main dock and the then already started during the dock construction period. Closest to the located TeU of the hull When the ship is undocked, the dock is structurally the furthest ahead for the next construction; the rest of the work is carried out in such a way that it is necessary to cultivate it as soon as possible in particular the finished equipment of the machine in the main dock the rest of the ship's hull up to about spaces including the final facility of the buoyancy has been assembled Main structures, d. H. the so-called retrofitting with regard to your iaiwn equipment finished (or almost stung, but must after undocking the ship ao finished) engine room section can then be easily fes can be carried out at equipment piers. by moving sideways on slideways or the like

Bei einer anderen bekannten, in Baudocks durch- vor den übrigen auf dem gleichen Niveau stehendenIn another well-known one, standing in building docks before the others on the same level

geführten Schiffbauweise werden die einzelnen Sek- Rumpf des Schiffes bewegen und dann mil: ihm inguided shipbuilding will move the individual hull of the ship and then mil: him in

lionen des Schiffes in Montagehallen zusammenge- Verbindung bringen. Das Schiff wird anschueBendBring lions of the ship together in assembly halls. The ship is ready to go

baut, die den Baudocks vorgeschaltet sind und in a5 aufgeschwommen und aus dem Dock herausgezogen,builds that are upstream of the building docks and floated up in a 5 and pulled out of the dock,

denen dje Leistungsfähigkeit der Arbeiter nicht durch das nun gegebenenfalls für Reparaturzwecke od. dgLwhere the productivity of the workers is not due to the now, if necessary, for repair purposes or the like

Regen usw. beeinträchtigt werden kann. Die einzel- so lange frei ist, bis in Anpassung an den fertigiings-Rain, etc. can be affected. The individual is free until it is adapted to the manufacturing

nen in einer solchen Montagehalle zusammengebau- stand der nächstfolgenden Maschmenraumsektion mitThe next machine room section was assembled in such an assembly hall

ten Großsektionen werden dann nacheinander mit- dem Bau weiterer einfach gestalteter und ^aschm- these major sections are then successively with- the construction of more easily designed and ^ aschm-

tels hydraulischer Preßvorrichtungen auf einer auf 30 sammenzusetzender Laderaumsektionen im Dockby means of hydraulic pressing devices on one of the cargo space sections in the dock to be composed of 30 pieces

der Sohle des Docks vorgesehenen Gleitbahn aus der begonnen werden kann.the sole of the dock provided slideway from which one can begin.

Montagehalle in das nichtüberdachte Dock gescho- Weitere Einzelheiten und Vorteile ergeben sich ausAssembly hall in the uncovered dock. Further details and advantages result from

ben, so daß in der HaUe Platz für den Bau der je- der nachstehenden Beschreibung einer in der Zeich-so that there is space in the house for the construction of each of the following descriptions of a

weils folgenden Großsektion geschaffen ist. Bei die- nung veranschaulichten Ausführungsform eines Bau-because the following large section is created. In the illustrated embodiment of a building

ser bekannten Bauweise wird zunächst mit dem Zu- 35 docks nach der Erfindung. Es zeigtThis known construction is first used with the docking 35 according to the invention. It shows

sammenbau derjenigen Großsektion begonnen, die F i g. 1 des Baudock im Grundriß,Assembly of that large section started, the F i g. 1 of the building dock in plan,

die Maschinenräume u.dgL enthält, worauf nach- Fig. 2 einen Schnitt nach der Linien-B dercontains the engine rooms u.dgL, whereupon after- Fig. 2 is a section along the line-B of

einander der Bau der einzelnen Laderaumgroßsek- Fig. 1.each other the construction of the individual cargo space large sec- Fig. 1.

tionen folgt. So entsteht allmählich der Schiffs- In einem Baudock 1, das mit einem Dock-Tor 2 ge-actions follows. In a building dock 1, which is equipped with a dock gate 2, the ship's

körper. 40 genüber dem Hafenbecken verschließbar ist, befindetbody. 40 opposite the harbor basin can be closed

Bei allen diesen bekannten in Docks durchge- sich der aus einer Reihe von Laderaumsektionen 3In all of these known ones in docks, the one consists of a series of hold sections 3

führten Schiffbauverfahren hängt die Gesamtdauer bestehende Teil 4 eines Schiffskörpers im Bau. Derled shipbuilding process depends on the total duration of existing part 4 of a hull under construction. the

der Dockinanspruchnahme von der Zeit ab, die be- Bau dieses überwiegenden Teils des Schiffskörpersthe use of the dock from the time the construction of this predominant part of the hull

nötigt wird, um in dem Dock außer den Laderaum- nimmt wegen der einfachen Gestaltung und Ausrü-is required to be in the dock except for the cargo space- takes up because of the simple design and equip-

sektionen auch die baulich komplizierte Maschinen- 45 stung der Laderäume od. dgl. nur verhältnißmäßigSections, the structurally complicated machinery of the cargo holds or the like is only proportionate

raumsektion zu erstellen, was wesentlich länger dau- wenig Zeit in Anspruch. Dennoch ist es nach Fertig-to create a room section, which takes much longer and takes little time. Nevertheless it is after finished

ert als der Zusammenbau der einfach gestalteten stellung dieses größten Teils des Schiffskörpers nichtIt is not the assembly of the simply designed position of this major part of the hull

Laderaumsektionen. möglich, das Dock für den Bau eines folgendenHold sections. possible the dock for building a following

Der Erfindung liegt nun die Aufgabe 'zugrunde, ein Schiffes freizumachen, da noch die — beim darge-Baudock zur fließbandartigen Herstellung von Schif- 50 stellten Ausführungsbeispiel am Heck des Schiffes fen so auszubilden, daß die im Baudock gebauten liegende — sogenannte Maschinenraumsektion 5 fer-Großsektionen mit in Folge umfangreicher Ausrü- tigzustellen ist, deren Zusammenbau und Ausrüstung stung längerer Sektionsbauzeit keinen größeren An- wegen der umfangreichen maschinellen Ausstattung teil an der Endmontagezeit haben als die technolo- mehr Zeit in Anspruch nehmen als der Zusammengisch einfachen Laderaumsektionen. Es soll also das 55 bau der übrigen Sektionen des Schiffsrumpfes. Erst Dock nicht länger in Anspruch genommen werden wenn die Maschinenraumsektion 5 weitgehend fertigmüssen, als es der Zusammenbau einfacher Lade- gestellt worden ist, läßt sich das Dock fluten und raumsektionen od. dgl. und der Anbau einer fertigen nach öffnen des Tores 2 für den nächsten Bau frei-Maschinenraumsektion erfordert. Das auszudockende machen.The invention is now based on the task 'to clear a ship, since the - at the darge building dock for the assembly line-like production of ships 50 presented embodiment at the stern of the ship fen so that the built in the building dock lying - so-called machine room section 5 fer large sections with the result that extensive equipment has to be carried out, their assembly and equipment For longer section construction times, there is no major concern because of the extensive mechanical equipment take part in the final assembly time than the technology takes more time than the conglomeration simple hold sections. So it should be the construction of the remaining sections of the ship's hull. First Dock can no longer be used when the engine room section 5 has to be largely finished, When the assembly has been put to simple loading, the dock can be flooded and Room sections or the like and the cultivation of a finished machine room section after opening the gate 2 for the next construction requires. Do what needs to be undocked.

Schiff soll hinsichtlich seiner baulich und ausrüstungs- 60 Mit dem Ausdocken des Schiffes ist natürlich auch mäßig umfangreichen Maschinenraumsektion bereits so lange zu warten, bis die mit komplizierten Schiffsendgültig oder nahezu endgültig fertiggestellt sein, Steuerungsanlagen od. dgl. ausgestatteten Decksaufso daß der Ausrüstungskai nur kurze Zeit für etwa bauten 6 auf dem Oberdeck des Schiffskörpers 4 ernoch erforderliche Restarbeiten oder unter Umstän- richtet und wenigstens überwiegend ausgerüstet worden sogar überhaupt nicht mehr benötigt wird. Das 65 den sind.In terms of its construction and equipment, the ship should of course also be 60 With the undocking of the ship moderately extensive engine room section to wait until the decks equipped with complicated ships are finally or almost completely finished, control systems or the like that the equipment quay was only built for a short time for about 6 on the upper deck of the hull 4 necessary remaining work or, under certain circumstances, has been set up and at least predominantly equipped is even no longer needed at all. That is 65 den.

Dock soll nur so lange in Anspruch genommen wer- Erfindungsgemäß steht nun das Hauptdock 1 mitDock should only be used for so long. According to the invention, the main dock 1 is now with it

den, bis das Schiff nach dem Zusammenbau der einem quer zu ihm liegenden seitlichen Nebendock 7until the ship, after the assembly of one of the side dock 7

Laderaumsektionen mit der fertigen Maschinenraum- in Verbindung, in dem eine Montagestätte vorge-Load compartment sections in connection with the finished engine room, in which an assembly site has been

18O218O2

sehen ist, deren Bodenfläche in gleicher oder annähernd gleicher Höhe verläuft wit diejenige descan be seen whose bottom surface is at the same or approximately the same height wit that of the

Hauptdocks 1. In dieser Montagestätte 7 erfolgt Main docks 1. In this assembly site 7 takes place

zeitlich und räumlich unabhängig von den im Dock 1 ausgeführten Arbeiten — der Zusammenbau und die Ausrüstung der die Maschinenräume enthaltenden Schiffssektion.temporally and spatially independent of the work carried out in Dock 1 - the assembly and the Equipment of the ship section containing the engine rooms.

Zum Zusammenbau der benötigten Decksaufbaueinheiten 6 ist eine weitere Montagestätte S vorgesehen, deren Gleitschienen 10 in Höhe der Oberkante ίο des Schiffsrunipfes 4 liegen.To assemble the required deck construction units 6 , a further assembly site S is provided, the slide rails 10 of which are at the level of the upper edge ίο of the ship's curb 4.

Beide Montagestätten 7 und 8 sind zweckmäßig überdacht, so daß darin unabhängig von den jeweils herrschenden Witterungsverhältnissen gearbeitet wer- · den kann. . xg Both assembly sites 7 and 8 are expediently covered so that work can be carried out in them independently of the prevailing weather conditions. . xg

Die Montagestätten sind ferner so eingerichtet, daß an mehreren Maschinensektionen 5,5', 5" und Aufbaueinheiten 6,6' gleichzeitig gearbeitet werden kann.The assembly sites are also set up so that on several machine sections 5.5 ', 5 "and Build-up units 6,6 'can be worked at the same time.

Um das Hauptdock 1 mit Rücksicht auf die lange ao Baudauer einer Maschinenraumsektion 5 nicht unnötig zu beanspruchen, braucht nun die Kiellegung im Hauptdock 1 erst zu erfolgen, wenn die mit einer entsprechenden zeitlichen Vorgabe begonnene Maschinenraumsektion 5 anbaufertig istNot unnecessary about the main dock 1 considering the long ao construction time of an engine room section 5 to claim, the keel laying in the main dock 1 only needs to be done if the one with a Machine room section 5 started according to the specified time is ready for installation

Ist diese Anbaufertigkeit erreicht worden, so werden die Maschinenraumsektion 5 und die Aufbaueinheit 6 mit HiKe der als Gleitbahnen 9 bzw. 10 ausgebildeten Fördereinrichtungen jenen Stellen des im Hauptdock 1 liegenden Teils 4 des Gesamtschiffskörpers zugeführt, an denen sie mit diesen zu verbinden sind. Bei dem dargestellten Ausfuhrungsbeispiel wird also die Maschinenraumsektion 5, die gleichzeitig das Heck des Schiffes bildet, hinter den achtersten Laderaum 3 geführt und hier mit dem Schiffsrumpf verbunden.When this level of add-on skill has been achieved, the machine room section 5 and the assembly unit 6 with HiKe of the conveyors designed as slideways 9 and 10 those points of the in the main dock 1 lying part 4 of the entire hull supplied, at which they connect with these are. In the illustrated exemplary embodiment, the machine room section 5, which is simultaneously forms the stern of the ship, guided behind the aftmost cargo hold 3 and here with the ship's hull connected.

Die auf das obere Deck der Maschinenraumsektion 5 aufzusetzende Aufbaueinheit 6, die den Kommandostand bzw. die Brücke des Schiffes mit allen notwendigen Geräten und Steuerungseinrichtungen bildet, wird anschließend von der Seite her in der Ebene des oberen Decks dem Schiffskörper 4 zugeführt und mit der Maschinenraumsektion 5 verbunden. The superstructure unit 6 to be placed on the upper deck of the engine room section 5, which is the command post or the bridge of the ship with all necessary devices and control devices forms, is then fed to the hull 4 from the side in the plane of the upper deck and connected to the engine room section 5.

Die Montagestätten 7 und 8 sind so ausgebildet und bemessen, daß gegebenenfalls mehrere Maschinenraumsektionen 5, 5' und 5" usw. und mehrere Aufbaueinheiten 6,6' usw. gleichzeitig m Arbeit genommen werden können, wobei so vorgegangen wird, daß der dem Hauptdock 1 nächstliegende Bauteil 5 bzw. 6 jeweils de*höchsten Fertigunff^n
nach Vollendung des Zusammenbaues der Lade-Sne3 KTlim Anbau gebrachtjentaι kann. Ist dies geschehen, so wird Äe *?^£ρη£ ^aschinenraumsektioaS' bzw. die «^^f^" baueinheit 6' in die bisher von den Sektionen 5 und 6 emge™enenAnbauberei^^
führt. Es wird auf diese We.se eme füeßbandartge Fertigung von Maschinenraumsektionen 5 und !anheften 6 ermöglicht '.
The assembly sites 7 and 8 are so formed and dimensioned so that optionally a plurality of engine room sections 5, 5 'and 5 ", etc., and a plurality of building units 6,6', etc. m work can be taken simultaneously, wherein the procedure is such that the the main dock 1 Closest component 5 or 6 each with the highest level of manufacture
after completion of the assembly of the charging Sne3 KTlim cultivation brought jentaι. Once this is done, Äe *? ^ £ ρη £ ^ aschinenraumsektioaS 'or the «^^ f ^" unit 6' in the cultivation area previously separated from sections 5 and 6 ^^
leads. In this way, it is possible to manufacture machine room sections 5 and 6 attaching to the feet.

Durch die beschriebene Ausgestaltung des Dpcks ist erreicht, daß das Hauptdock 1wahrend eines erheblichen Teiles der Zeit, die ^** Fertigungs- und Ausrüstungsarbeiten in den Montegestatten 7 und 8 benötigt wird, anderweitig, das heißt z. B. fur Reparaturarbeiten an schon fertigen Schiffen, ausgenutzt werden kann. -^- A a The described configuration of the Dpck ensures that the main dock 1during a considerable part of the time, the ^ ** production and equipment work in the assembly facilities 7 and 8 is required, otherwise, that is z. B. for repair work on already finished ships can be used. - ^ - A a

Wie F i g. 2 zeigt, sind die Montagestatten 7 und 8 und die in ihnen vorgesehenen Gleitbahnen 9 und 10 in solchen Ebenen gegenüber dem im Hauptdock i entstehenden Schiffsrumpf 4 angelegt, daß die Maschin^nraumsektionen und Decksaufbauten 6 ohne Überwindung nennenswerter Höhenunterschiede leicht in die Stellungen gebracht werden können, ia denen sie mit dem Schiffsrumpf 4 zu verbinden sind.Like F i g. 2 shows the mounting locations 7 and 8 and the slideways 9 and 10 provided in them in such levels compared to that in the main dock i created hull 4 created that the engine room sections and deck superstructures 6 can easily be brought into the positions without overcoming significant differences in height, ia which they are to be connected to the hull 4.

Die Lageanordnung der Montagestatten 7 bzw. 8 gegenüber dem Baudock 1 hängt natürlich von der Gesamtkonstruktion des bzw. der im Dock zu bauenden Schiffe ab. Werden z.B. Schiffe gebaut deren Maschinenräume mehr in der Mitte des Schiffes liegen, so wird man das Nebendock bzw. die Montagestätte? seitlich etwa neben der Mitte des Hauptdocks 1 anordnen.The positional arrangement of the assembly sites 7 and 8 relative to the building dock 1 naturally depends on the Overall construction of the ship (s) to be built in the dock. For example, if ships are built If the engine rooms are more in the middle of the ship, will one become the side dock or the assembly site? to the side about the middle of the main dock 1.

Claims (1)

Patentanspruch:Claim: Baudock zur fließbandartigen Herstellung von Schiffen durch Zusammenbau und Ausrüstung einzelner oder mehrerer vorgefertigter Großsektionen, die nach der vollständigen oder teilweisen Fertigstellung den bereits im Baudock befindlichen Sektionen mit Hilfe von Gleitbahnen od. dgl. aus besonderen überdachten Montagestatten zuführbar sind, dadurch gekennzeichne t, daß die Montagestatten in seitlichen Nebendocks (7) vorgesehen sind, die mit dem Hauptdock (4) in Verbindung^ stehen, quer zu ihm liegen und deren Bodenflächen in gleicher oder annähernd gleicher Höhe verlaufen wie diejenige des Hauptdocks.Construction dock for the assembly line-like production of ships through assembly and equipment single or several prefabricated large sections, which after the complete or partial Completion of the sections already in the building dock with the help of slide ways od. The like. Can be supplied from special covered assembly areas, thereby marked t that the assembly sites are provided in the side docks (7) with the Main dock (4) are connected to each other, are transverse to it and their floor areas are the same or approximately the same height as that of the main dock. Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Family

ID=

Similar Documents

Publication Publication Date Title
DE3605161A1 (en) METHOD FOR BUILDING THE TOP OF AN OFFSHORE PLATFORM
EP3693261A1 (en) Offshore solar array and a method of constructing the same
DE2700624A1 (en) DOCKING SYSTEM
DE2534171B1 (en) FLOATING DOCK WITH LIFTING POND
DE4427345A1 (en) Boat unloading on rivers with great water level differences
DE1531587C3 (en) Method for building a hull which can be assembled from a plurality of ring sections
DE1802034C (en) Construction dock for the assembly line-like production of ships
DE3143457C2 (en) Dock ship for the transport of barges
DE4139542C2 (en) Ship, especially merchant ship
DE1802034A1 (en) Construction of ships in docks or on Helgen
DE3140469A1 (en) "FLOATING DOCK"
EP2093143B1 (en) Service vessel
DE2426755A1 (en) HULL AND METHOD OF BUILDING THESE
DE1940813A1 (en) Dock arrangement for ships
DE3019706C2 (en) Watercraft for transporting and receiving, in particular, floating loads
WO2008151712A1 (en) Barge transport vessel
DE1925550C3 (en) Process for the production of a larger ship unit from two operational ship units
EP1363832B1 (en) Auxiliary device for handling, such as mounting and dismounting, large ship thrusters
DE2129228C3 (en) Device for building a ship's hull
DE2550916A1 (en) Pleasure boat with observation decks - has circular shape for better viewing and manoeuvrability
DE2232854C3 (en) Floating garage facility
DE2920791A1 (en) Sectionalised marine hull construction - has prefabricated sub-sections aligned on servo rigs and welded together
DE1103171B (en) Device for landing and launching ships, in particular boats
DE2639270A1 (en) Floating movable load pontoon - has trimmable sections to allow lighters to float on board
DD157692A1 (en) Floating