SAMPLING DEVICE, IN PARTICULAR FOR HETEROGEN NUCLEAR REACTOR COOLANT.

Info

Publication number
DE1761408U
DE1761408U DEU1995U DEU0001995U DE1761408U DE 1761408 U DE1761408 U DE 1761408U DE U1995 U DEU1995 U DE U1995U DE U0001995 U DEU0001995 U DE U0001995U DE 1761408 U DE1761408 U DE 1761408U
Authority
DE
Germany
Prior art keywords
content
groups
outlets
heterogen
sampling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEU1995U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UK Atomic Energy Authority
Original Assignee
UK Atomic Energy Authority
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB30134/56A external-priority patent/GB814416A/en
Application filed by UK Atomic Energy Authority filed Critical UK Atomic Energy Authority
Publication of DE1761408U publication Critical patent/DE1761408U/en
Expired legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/02Devices or arrangements for monitoring coolant or moderator
    • G21C17/04Detecting burst slugs
    • G21C17/042Devices for selective sampling, e.g. valves, shutters, rotatable selector valves
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/02Devices or arrangements for monitoring coolant or moderator
    • G21C17/04Detecting burst slugs
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Description

United Kingdom Atomic Energy Authoriy, Patents Branch, Bedford Chambere, Covent Garden, London, W. C. 2., England. -.-A Für diese AnmeMua wir die Priorität aus er britischen Anmeldung Nr. 30134/56 vom 3. Oktober 1956 in Anspruch genommen. Si''insbesondere fr rcrrerüht 1 ! Rt PXL>s e Mk-mr22klot Die Neuerung besieht sich auf heterogen oder ungleichförmig rmig aufgebauteKernreaktoren bzw. Heterogenkernreaktoren und ins- besondere auf eine Vorrichtung sur Probeentnahme/sampling/ des über die Brennstoffelemente des Kernreaktors hinwestreiöhen- denKühlmitteißt um ndureh den Spaltproduktgehsit des Kühl Mittels su <sae, eleMr die Sicherheit oer Kadererseitß die Beschaffenheit Soliutzhülle der gn- zeigt. Tm Nchfolgendn wir<3 eise derartige Vorrichtung als beveiehnet. 33ß Probla ey Brmi. ttlum bsw. der Anzeige oder den Nach- weisen eines Leokauetretens bei einer Brennstoffelemnt-Schutz- hülle in einem in Betrieb bef lndliehen Peaktor int typiseherweise ein roble der Anseile bsw< des Nachweißte welcheSpaltpouktKbnseatrionen i Rektor-KQhlsittel egen ine HintyrnßrunreiniuN/bc'kgrod eontssinatioa/, wlohe in d gleichen Srseenornung wie diejenige des Leck- auetrttß selbst auftritt. Bin weiteret Problem benteht ausser- em in der Anseile eines Leckauptretene in efdnem frheßten Stditni, dBit nicht ddureh dass es übermittelt bzwunent- deckt fortschreitet, die Hintergrundverunreiniung allmählich soweitznimatt <aß ! 3 c'ie Sesamtempfindlichkeit allmählich uf eien Punkt ebTllt, bei welchem gefährliche LeckuBfrLtte uf- trsten ohe ass si aneseigt eren eodßs Anlaea welche nooh vr rden könnteng ilber einen Punkt, bei welchem noch eine Wied er nd eets $e v n c Grenzen mSglioh re, hinane aktiviert werden. Höchste nseige6 ! 3pfindlißhkeit wird dadurch erreichte aea Ilöchnte AI, 1"ieiF KÜhlittcl-Probeentnhepunkte an der Stelle der geringsten Ter- düngung gewählt worden. Bei einem ergibt sich daraue die Forderung, ds. ss eine Probeentnahme len V-erden-euso, ilnd anfedern Knal im Moderatoraufbau vorgesehen werden muss, und swr individuell am hImittel-Auetrittßende des Kanalß. Die gerinstgliehe Verärgerung bi der Anseige eines Leck- wird wird dadurch erreicht. dass ein kantinuierliol-ter Warnen bsw. Prüfen nnd Melden/monitoring and recording/ (it Alnrmvorrichtungen) an allen Probeentnehmepunkten erfolgt. Dies wJrd jedoch typischerwelee etwa 200 PrUf-. Melde-und Alorsvrrichtungen gusammn mit individuellen. Pumpen und Wrmeaueteuschern erforderlich machen. Eine derartige Ausfhrungsanordnung wre nicht wirtschaftlich, und demgeäeß wej ? den Gr-ap- werden Sruppen mit sylisehn'b* im Kreislauf folgenden umvorgeehen u ddrh die Anzahl der erforderlichen 5O sor he, and die Sgmmelrobre tiad Kanälen sin'3 2000 Probeentnahmerohre vorgesehen und so angel ernel daß die Rohre su vieren gruppiert sind und jeweils vier Rohre ein Ssmelrohr/manifold/speisen (d<h* ee müssen 500 Samselrohre vorgesehen eein), und die Sammelrohre eind in Gruppen zu fünfzig unterteilte wobei jeweils eines der fnfsiß Ssamelrohre im Zyklus alle 0 Sekunden durch ein ge- eignetenAuewahlerSt it einem Prüf-un Slcerus, ve. rbungen ierd-o Dadurch wird. eine Vorrichtunr, geechuffent welche eine Empfindlichkeit tut die ein Viertel derjenigen batrãgt, weloh hõchstfalla erreicht werden k5nnte, und zwar miteinr gr8ßßten Terssgerungsseit der Probeentnahme von 25 Minntn Dies stellt ein vertretb&re KompraieelSeun dar. Bei dieser zeigen in Betrieb die meide. gerste stets eine Hintergruadmessua, und sie eben voa Sait su it Modung Uber Meesmga., di anzeigen, ob eine Über. schreiten dß Hintergrundes oer ein ersehreitn eines fes- gesetztenTolernnsminimuas erfolgt ist* erm dieser all ein- tritt ist anzunehmen, dss ein eckauetrten begonnen hat, und AUSßründn er absoluten Sicherheit snss er Reaktor durch eine Bedienungsperson tilleßetzt und der Kernbrennstoff aus den vier Kanälen entfernt werden, welche dem Samelrohr zugeordnet sind, welches die erhöhte Meseun angibt* Bei oine Reaktor, welcherelektrischen rtro erzeut ißt eine derartige Mass- nähme besserst kostspielig (typiehereise verliert die Be- diemmperson 24 Stunden Srseugungsapssität zu 30 Hegewatt, x g vi tt, nioben der der vier Ka-n'-41e t*, ec Kernbrenn- stoffes, um das eine kleine Leokauatreten bzw. leckende Element zubeseitigen), wobei dies alles noch durch irreführende/spurious/ umstände hervorgerufen wt veranlasst werden kann. Die Alter- native welche wahrscheinlich annehmbarer ist besteht drrin, r ! ie fehlerhafte Gruppe von vier Kpalen kontinuierlich zu über- wachen, nm zu beobachten, ob die Lecustrittsverhltnieße sich Wtix 2g m ck tt e s verbessern oder verschlechtern. Diese Alternative bringt jeeoc't) ei4 » rLe S¢e rz, ke, n h d dn r eine Schwierigkeit mit sich nämlich die, das, während der Bedienun5smann das eine Sammelrohr kontinuierlich über\nchtt Bedien, tt. nr dieUbrigen Aeunundvierzig Semeelrohre =beobachtet bleibenv und die Zykluszeit von 25 Minuten kann sieh unschwer verdoppeln odervordreifaehen* Aodaso Kataetrokihenverhlltnionn in nnderen Kanälen übermittelt bzw. tmangeseigt verlaufen< Die Neuerung seist sich mit der Schaffung einer Brennstoff- element-LecksLuetrittAnseigevorrichtung auseinander, bei welcher eine kontinuierliche Überwachung von zumindcet einem Probe- entnahmepunkt stattfinden kann-ohne dves die Uberviachung der anderen ? robeentnahmepunkto gestört oder beeinflußst wird. Die neimrungßgcBßse rcnnstoffelement-untritts-Anseise- Vorrichtung seist sich sueejmeH. suc einem Sats ? robeentnehe röhre, welche jeweils an den Bingnng eines Absperrhahnes ge- J. d Ki kuppelt sind, welcher nnch ein ereten un nach eines sweiten Außlss bs : w< Ausang hin gedreht ordcN. &nn, woei die vor- erwähnten ersten Aualäese in Gruppen, angeordnet sind, um in eine Reihe von SammelrohreA zu führen während die besäten zweitenAnslsße in Gruppen angeordnet sind, um e'in einzelnes Samslrohy Siu. speisen, a. us Mitteln fSr das ykliache überwachen des Inhalts der vorerwähnten Bßih von Sammelrohren und aus Nitteln fr dB kontinuierliche Überwachen des Inhalts os einseinen Sammelrohres. einzelnen Die Neuerung soll nunmehr anhand der sie beispielsweise wiedergebenden Zeichnung näher erläutert werden, umd zwar eigt : Fi. 1 eine scaubildliehe'Wiedersähe der gesagten or- richtung. i. 2 eia. e teilweise im Schnitt dargestellte Flehenansicht der beiden Gruppen von Absperrhähnen und Sasmel- rohreentlang der Linie 11-11 in der Fig* 3, während FiS « 3 eine teilweise im Schnitt dargestellte Seitenansicht entlang der Linie 111-111 der Fig. 2 wiedergibt. entlp-n, m Es sei Einmachet suf Fig. 1 verwiesen, bei welcher 200 Probe- e PO eweiS hb hChnen entnaherohre 11 jeweils sit den Eingang von 2000 Abßperrhhnen 1S kuppelt sind, welche jeweils zwei Auslässe bzw. Ausginge aufweisen (13 und 14 in Fig. 2). Die 3030 Auslaeö 13 sind in (X, Xuk) pell 7, U vic-rea an'- Gruppen u Tieren angeordnet und fihren in eine Reie von 500 Samelrohren'} 5. Die Auslöse 4 speisen alle ein einzelnes 16. Die Samselrohrreihen 15 sind in Banksätzen u fünfzigvermittele Rohre 15a an 50 Sanmelrolir-Wegaü. swahlrohre ! 8 ngschlossM., welche alle Saselrohre 15 is ykluG ait den Warn- bzw.Prüfgeräten 17/monitora/verbinden kSnnen. Das einzelne Saramelrohr 16 ist mit einem gesonderten Wrn bzvi. 2r, fc bs. rfert 19 vermittels eines Rohre l6a. verbunden. Bei einer abgeänderten Ausführung der Fig. 1 ist das ein- zelneSgelrohr 16 durch zumindest ein bsperrohr 20 unterteilt, und es int ein zusätzliches Warn-bzw* Prüfgerät 19a vorgesehen. Bei den Figuren 2 und 3 ist ein Block 21 aus roßtfreiem um zl,, lei lat'i 1 Stphl mit Bohrungen versehen., u Mei SaiMalrohro 15t einen Abschnitt 22 des Saelrhree 16, LHcher 23 für die Absperr- hhne1&tigßse24rdiProbeentnahaerohr& 11 und Ausnge 13 nd 14 2U. schaffen. Des vollständige Sam-nelrohr 16 wird dadurch erhalten,, daes &lle Abschnitte 22 durch Rohre 25 mlteinander ver- bünden worden. Die AbsperrMhno 12 weisen Zapfen 26 mit Löchern 27 undVlrkantenden 23 Feststellringe 29, Asbesthülsen 30 it rost- freien $zell 31 un it Schraubenewinde versehene Tile 32 auf, welche Beohskntkpfe 33 ben. Die/'bn'ocrrhhne ren in S"tsen. su vieren, von Hauben. 34 vorecM welche ßurch Muttern 35 scicl- -< ! urch Rine 36 eedichtct werden. In iß Vier- 3 5 kRntcdGn 8 ist eine Sfu-te 37 einscschnitten, um dcurch die k e716 uto 57 e : hrs n, c f} h die Stellungder Außlee 13 und 14 anzuseilen, ynedroselunss" upeprunen 3B/heat throttle grooves/ocr Wrmeausdehnungs- nuten welche ein Scheiscen ernlichen und mit chroüben- ge de lte r 39 or he Bei Potrteb sin<5 ie bsperrhhne l ? so eingestellt, dnns die von den Rohren 11 hr kowenden Gasproben nolar- weiec über die uelH-sae 13 in die Selrohre 15 hinein fliessen. DieseGBproben eren in regelmssien Abstanden alle 25 Minuten durob die b,-ovi.-ft. eine 17 gerrl, t durch, die Warn-bnw Prüfgeräte 17 soprüft* Wemi eine abnormale A n tine st 17 her, lte rd s v. tet vier Kanäle der in Btrcht kosenden Gruppe dadurch ir'.'"ochsel individuell überprüft, dasR die entsprechenden bsperrhhne 12 soedreh weyen ds jeweils eine G-asprobe zu einem Zeitpunkt durch ie Aßläse 1 in &s gemeinere Samelrohr 16 fliesst, nd :f3.Pri!fer.t, 19 ißt somit in der Lfge, denjenigen Ksnl fcstsustllen welcher die abnormste Ablesung verursacht. Dieser ? anal kann dmi kontinuierlich im Prüfgerät 19 überwacht werden um nurch ie iterenticlun su beobachten, whren ie nor- male Überprüfung aller anderen. Kanäle unestSrt fortgesetzt werden'knn. knn, n,. en de SauMugtlrohr 16 durch die Rohre 20 unterteilt ist dli4, Ohr 16 durch die r können swoi Kanäle kontinuierlich überwacht bzw. geprüft werden, unü swar durch Betätigung des entsprechenden Rohres und durch Verwendung der Prüfgeräte 19 und 19t-L- Sc'iu.'bzssphe. ;. United Kingdom Atomic Energy Authoriy, Patents Branch, Bedford Chambere, Covent Garden, London, WC 2., England. -.- A For this anmeMua we give priority from he British Application No. 30134/56 dated October 3, 1956 taken. Si '' especially fr rcrreche 1 ! Rt PXL> se Mk-mr22klot The innovation relates to heterogeneous or non-uniform poor built-up nuclear reactors or heterogeneous nuclear reactors and special on a device for sampling / sampling / of the west row over the fuel elements of the nuclear reactor the cooling medium and the cleavage product belong to the cooling system By means of su <sae, eleMr the security of the management team the texture of the solid cover of the green shows. In the following, we shall call such a device advised. 33ß Probla ey Brmi. ttlum bsw. the advertisement or the indicate a stepping leopard in a fuel element protection shell in a working peactor int Typically a roll of ropes bsw <of the proof Which gap point kbnseatrionen i Rektor-KQhlsittel own ine HintyrnßrunreiniuN / bc'kgrod eontssinatioa /, wlohe in the same breakout as that of the leakage auetrttß occurs itself. I need another problem em in the ropes of a leaker in a fdnem frheßten Stditni, dBit not dureh that it transmits or covers progresses, the background pollution gradually as far as znimatt <ate! 3 c'ie velvet sensitivity gradually uf there is a point at which dangerous leakages occur. comfort without eating nooh vr rden could give you one Point at which there is still another return c Limits mSglioh re, hinane to be activated. Highest nseige6! 3 sensitivity is thereby achieved aea Ilworth AI, 1 "ieiF KÜhlittcl sampling points at the point of least fertilization has been chosen. At a this results in the requirement, ds. ss a sampling len V-erden-euso, ilnd spring bang must be provided in the moderator structure, and swr individually at the middle exit end of the canal. the the slightest annoyance at the appearance of a leak is achieved thereby. that a cantinu-ter Warn, etc. Checking and reporting / monitoring and recording / (it Alnrmvorrichtungen) takes place at all sampling points. However, this is typically about 200 tests. Reporting and Alert devices are combined with individual. Pumps and Make heat de-icing necessary. Such a one Execution arrangement would not be economical, and accordingly wej? the gr-ap- are soups with sylisehn'b * in the following cycle work around and ddrh the number of required 5O sor he, and die Sgmmelrobre tiad Channels are provided with 2000 sampling tubes and so angled ernel that the tubes are grouped su four and each four pipes a Ssmelrohr / manifold / dine (d <h * ee must 500 collector pipes provided eein), and the collector pipes divided into groups of fifty, each with one of the five cones in a cycle every 0 seconds through a Suitable electors with a test and assessment, ve. rbungen ierd-o This will. a device, chuffed which one a sensitivity does a quarter of those batrãgt, which could be reached in the most extreme case, namely with the largest reduction since sampling of 25 Minntn This represents a representable KompraieelSeun. At this point in operation the avoid. barley always has a background messua, and she just voa Sait su it modung Uber Meesmga., di indicate whether an over. walk the background or a desires of a festival set minimum level of tolerance has taken place * erm this all step is to be assumed that a corner step has begun, and From the outset of absolute safety, the reactor snss through a Operator shut down and the nuclear fuel out of the four channels are removed, which are assigned to the manifold are, which indicates the increased Meseun * With oine reactor, which electrical rtro generates eats such a would be more expensive (typical trip loses the diemmperson 24 hours of suction capacity to 30 hegewatt, xg vi tt, nioben that of the four Ka-n'-41e t *, ec nuclear fuel fabric, around the one small leopard or leaking element to be removed), all of which is still through misleading / spurious / circumstances caused wt can be initiated. The age- native, which is probably more acceptable, consists of r! The faulty group of four Kpals to be continuously watch to see whether the leakage behavior is good Wtix 2g mck tt it improve or worsen. This alternative brings jeeoc't) ei4 »rLe S ¢ e rz, ke, nhd dn r a difficulty with itself namely the, that, during the Operator who monitors a manifold continuously Serve, dd. No the remaining forty-five semeel tubes = remain observedv and the cycle time of 25 minutes can easily be doubled or pre-maturity * Aodaso kataetrokihenverhlltnionn in others Channels transmitted or tmandesign run < The innovation is the creation of a fuel element leakage display device, in which continuous monitoring of at least one trial withdrawal point can take place -without the monitoring of the dves others ? robe withdrawal point is disturbed or influenced. The fuel element-entry-anise- Device is sueejmeH. suc a sats? robeentnehe tube, each of which is connected to the ring of a stopcock J. d Ki are coupled, which after a first and after another Exclusively: w <ordcN rotated towards the exit. & nn, where the previous mentioned first Aualaeses in groups, arranged to be in a series of manifoldsA to guide during the sown second ashes are arranged in groups to form a single one Samslrohy Siu. dine, a. We use means to monitor the building the contents of the aforementioned Bßih from collecting pipes and from Averaging for dB continuous monitoring of the content os one of its collecting pipe. individual The innovation should now be based on them, for example reproducing drawing are explained in more detail, including: Fi. 1 a pictorial repetition of the said or- direction. i. 2 eia. e supplication view shown partially in section of the two groups of stopcocks and Sasmel- tubes along the line 11-11 in Fig * 3, while FIG. 3 is a side view, shown partially in section along line 111-111 of FIG. entlp-n, m It is referred to Fig. 1, in which 200 sample e PO eWhB hChnen Entnaherohre 11 each sit the entrance of 2000 shut-off cocks 1S are coupled, which each have two outlets or outlets have (13 and 14 in Fig. 2). The 3030 Auslaeö 13 are in (X, Xuk) pell 7, U vic-rea an'- Groups and animals are arranged and lead into a series of 500 Collector pipes'} 5. The release 4 all feed a single one 16. The Samselrohrreihen 15 are u in bank sets fifty brokered pipes 15a to 50 Sanmelrolir Wegaü. swivel tubes! 8th ngschlossM., which all Saselrohre 15 is ykluG ait the warning or test devices 17 / monitors / can connect. The individual Saramel pipe 16 is with a separate Wrn bzvi. 2r, fc bs. rfert 19 by means of a pipe l6a. tied together. In a modified embodiment of Fig. 1, the one individual gel tube 16 divided by at least one blocking tube 20, and an additional warning or testing device 19a is provided. In Figures 2 and 3, a block 21 is made of rust-free um zl ,, lei lat'i 1 Stphl provided with holes., U Mei SaiMalrohro 15t a Section 22 of Saelrhree 16, LHcher 23 for the shut-off hhne1 & tigßse24rdiProbeentnahaerohr & 11 and Ausnge 13 and 14 2U. create. The complete collection pipe 16 is thereby get, the & lle sections 22 are interconnected by tubes 25 have been covenants. The AbsperrMhno 12 have pins 26 with holes 27 and vertical edge ends 23 locking rings 29, asbestos sleeves 30 with rustproof free $ cell 31 un it screw thread provided tiles 32, which controls 33 should be used. The / 'bn'ocrhhne ren in S "tsen. Su four, from hoods. 34 vorecM which through nuts 35 scicl- - <! be sealed by Rine 36. In eat four 3 5 kRntcdGn 8 is a foot 37 incised to through the k e716 uto 57 e: hrs n, cf} h die Roping position of the outer lines 13 and 14, ynedroselunss " upeprunen 3B / heat throttle grooves / ocr thermal expansion utes which take a shit and with chrome ge de lte r 39 or he At Potrteb sin <5 ie shut-off cocks l? so set The gas samples flowing from the pipes are nolar Weiec flow through the UELH-SAE 13 into the Selrohre 15. These GB samples are taken at regular intervals every 25 minutes durob the b, -ovi.-ft. one 17 gerrl, t by, the warning bnw test equipment 17 soprüft * Wemi an abnormal A n tine st 17 her, lte rd s v. tet four channels of the group kissing in Btrcht thereby ir '.'"ochsel individually checked that the corresponding shut-off cocks 12 soedreh weyen ds one gas sample at a time flows through the outlet 1 into the more common collecting pipe 16, nd: f3.Pri! fer.t, 19 thus eats that Ksnl Find out which is causing the most abnormal reading. This ? dmi can be continuously monitored in the test device 19 in order to only observe the iterative process, while the normal male review of everyone else. Channels continued unestSrt will be able to. knn, n ,. en de SauMugtlrohr 16 is divided by the tubes 20 dli4, ear 16 through the r swoi channels can be continuously monitored or checked, unü swar by actuating the corresponding tube and through Use of test devices 19 and 19t-L- Sc'iu.'bzssphe. ;.

Claims (1)

t. . . JSS. *.
die Bren. nstoffeleEtent-Lecke. uE'tritts-Anseigevorrichtut insbesondere für Xernrestoren, dadurch gokennsolchnet, dass die Torrichtung sich susamensetst aup einem Satz rrobeentnahme- rohren, welche jeweils an den Eingang eines bsperrhhnes ge- kuppelt sind,'elcer nach einem erstem und ach einem zweiten AuslassbKv<-< Aß-ng'i. in gedreht v-eren'at obei die vorer- wähnten ersten Auslässe in Gruppen neordnt eLnd, um in eine Reie von Smelrore su fhren wirrend die bes&ten Auslässe bs : '..'\u&'. n. e in Gruppen angeordnet sind, um ein einzelnes SGiror u epeisen, u. p-Mitteln fr ds zyklische berprfen des Inh lts der vorer'Uj. nton Reihe von Seelrohren und ?'u s Mitteln f'r d.-s kontinuierliche Überprüfen des Inhalts des einzelnen ßanr'ielrohes. e lrle,. At 7 ; Sst3s ? lit O
2.)Bremistoffeleent-Leckaatritto-Anseigcvorrichtun nach 1, dadti-ra--, daer, das einzelne SAn., z. elro, ir durchzumindest ein Absperro'ir unterteilt ist und das jede Unter- teilungMittel f : tr dps'kontinuierliche Cberprufen der Inhalte aufseist. vor- 3.) BrennstoffelemgLeckaußtritts-Aneigevorrichtun, vor- smg-eißo i'r Kernreaktoren, insbesondere nach Anspruch 1 oder 2, wiedargestellt und beschrieben.
t. . . JSS. *.
the bears. nutrient-element leaks. uE'stance-Anseigevorrichtut especially for Xern restorers, due to the fact that the gate direction is susamensetst aup one sentence rrobeentnahme- pipes, each of which is connected to the inlet of a stopcock are coupled, 'elcer after a first and oh a second AuslassbKv <- <Aß-ng'i. in rotated v-eren'at obei the previous first thought outlets were rearranged in groups to become one Rows of Smelrore swirled around the best outlets bs: '..' \ u &'. n. arranged in groups to make a single SGiror feed and check p-means for the cyclical of the content of the vorer'Uj. nton series of sea tubes and? 'u s Means for d.s continuous checking of the content of the individual ßanr'ielrohes. e lrle ,. At 7; Sst3s? lit O
2.) Bremistoffeleent-Leckaatritto-Anseigcvorrichtun according to 1, dadti-ra--, daer, the single SAn., E.g. elro, ir is divided by at least one barrier and that every sub- TeilungMittel f: tr dps'continuous review of the content up. before- 3.) Fuel element leakage device, pre- smg-eißo i'r nuclear reactors, in particular according to claim 1 or 2, illustrated and described.
DEU1995U 1956-10-03 1957-10-01 SAMPLING DEVICE, IN PARTICULAR FOR HETEROGEN NUCLEAR REACTOR COOLANT. Expired DE1761408U (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB30134/56A GB814416A (en) 1956-10-03 Improvements in or relating to heterogeneous nuclear reactors

Publications (1)

Publication Number Publication Date
DE1761408U true DE1761408U (en) 1958-02-13

Family

ID=10302854

Family Applications (1)

Application Number Title Priority Date Filing Date
DEU1995U Expired DE1761408U (en) 1956-10-03 1957-10-01 SAMPLING DEVICE, IN PARTICULAR FOR HETEROGEN NUCLEAR REACTOR COOLANT.

Country Status (3)

Country Link
BE (1) BE561356A (en)
DE (1) DE1761408U (en)
FR (1) FR1183814A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU38227A1 (en) * 1959-02-17
NL272215A (en) * 1960-12-09 1900-01-01

Also Published As

Publication number Publication date
FR1183814A (en) 1959-07-15
BE561356A (en)

Similar Documents

Publication Publication Date Title
DE1097048B (en) Nuclear reactor plant with pressure vessel
DE1802999B2 (en) CIRCUIT ARRANGEMENT FOR CENTRALLY CONTROLLED SWITCHING SYSTEMS IN PARTICULAR TELEPHONE SWITCHING SYSTEMS EACH WITH AT LEAST ONE PROGRAM AND OR STATUS MEMORY
DE1761408U (en) SAMPLING DEVICE, IN PARTICULAR FOR HETEROGEN NUCLEAR REACTOR COOLANT.
DE3043853A1 (en) HOT GAS COOLER WITH A PRESSURE TANK
EP2567133B1 (en) Method for monitoring a quick-closing multiple fitting and accompanying device
DE1930439B1 (en) Device for determining the neutron flux distribution in a nuclear reactor
DE3141734A1 (en) Nuclear reactor having a gas-cooled pebble-bed nuclear reactor
DE2639877C2 (en)
DE2636352B2 (en) Protection system for a nuclear reactor
DE3226300C2 (en)
DE684736C (en) Tubular heat exchanger with two sealing tube bases arranged at a distance from one another
DE2738351A1 (en) IMPROVEMENTS IN OR REGARDING CORE REACTORS
EP0028742B1 (en) Folding bellows compensator
DE2742396C2 (en) Method and circuit arrangements for detecting a cooling fault
DE3822212C1 (en) Nuclear reactor installation consisting of a high-temperature small reactor, a helium/helium heat exchanger and a helium/water heat exchanger
DE2122317A1 (en) Evaporative cooling system for metallurgical furnaces
DE1614610B1 (en) Nuclear power plant with a reactor pressure vessel and an associated, pressure-tight machine chamber
DE2448591C3 (en) Emergency and / or after-cooling system for a nuclear reactor
DE1130084B (en) Arrangement for the detection of defective casings of the fuel elements of a heterogeneous nuclear reactor
DE3210382C2 (en)
DE1589845C (en) Sealing for a breakthrough in a nuclear reactor pressure vessel
DE563896C (en) Turbine system
DE2711545A1 (en) HEAT EXCHANGER WITH A VARIETY OF STRAIGHT TUBE BUNCHES
DE2521086A1 (en) HOT BLAST STOVE
DE1802563A1 (en) Connection of two axially misaligned pipes