DE1759793C - Two-storey building with at least one outer wall and two transverse walls and the process for its manufacture - Google Patents

Two-storey building with at least one outer wall and two transverse walls and the process for its manufacture

Info

Publication number
DE1759793C
DE1759793C DE1759793C DE 1759793 C DE1759793 C DE 1759793C DE 1759793 C DE1759793 C DE 1759793C
Authority
DE
Germany
Prior art keywords
wall
post
story building
building according
transverse walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Other languages
German (de)
Inventor
John Edward Sampson East Preston Sussex Glover (Großbritannien)
Original Assignee
Drury Design Service Ltd , Worthing, Sussex (Großbritannien)
Publication date

Links

Description

Die l'ifindung betrifft ein zweigeschossiges Gebäude, this mindestens eine Außenwand aufweist, an die mindestens zwei benachbarte Querwände, die innere oder äußere Querwände sein können, angrenzen und ein Verfahren zu seiner Herstellung.The discovery concerns a two-storey building, this has at least one outer wall to which at least two adjacent transverse walls that internal or external transverse walls can be adjacent and a process for its manufacture.

Ein Nachteil der meisten industriell hergestellten Wohngebäude dieser Art ist, daß es während der Bauarbeiten notwendig ist, zeitweise Verstrebungen anzubringen, um vorgefertigte, vertikale Wände, Wandlcile od. dgl. während der Bauarbeiten in der vorgesehenen Stellung zu halten. Diese Streben behindern jedoch die Bauarbeiten im Gebäudeinneren sowie die Fahrwege von dem Baustofftransport dienenden Förderwagen od. dgl. und verlangsamen somit den Baufortschritt.A disadvantage of most industrially manufactured residential buildings of this type is that it is during the Construction work is necessary to temporarily attach struts to prefabricated, vertical walls, Wandlcile od. Like. To keep in the intended position during the construction work. These strivings hinder however, the construction work inside the building and the routes used to transport building materials serving trolleys or the like and thus slow down the construction progress.

Ferner ist es bei der konventionellen Errichtung von Gebäuden dieser Art üblich, die Umfassungswände d-.s G-'bäudes in einer frühen Baustufe zu errichten, was den Nachteil hat, daß der Zugang zu dem Gebäude und die Bewegung zwischen den Räumen nur durch Türöffnungen in den Wänden möglich ist, wodurch das Fahren von Schubkarren od. dgl. sowie das Transportieren von Bauteilen behindert und verlangsamt und so ebenfalls der Fortschritt der Bauarbeiten verzögert wird.It is also common in the conventional construction of buildings of this type to use the enclosing walls to erect d-.s G-'building at an early stage, which has the disadvantage that access to the building and movement between rooms only is possible through door openings in the walls, which makes driving wheelbarrows or the like Transporting components hinders and slows down, and so does the progress of the construction work is delayed.

Der Erfindung liegt die Aufgabe zugrunde, ein Gebäude der eingangs genannten Art so zu gestalten, daß eine unbehinderte Zugänglichkeit für den Einbau der Bauteile und den Transport der Baustoffe im Gebäiideinneren gewährleistet ist. Die Lösung dieser Aufgabe besteht nach der Erfindung darin, daß die Außenwand in L >!ie des oberen Geschosses zwischen den Querwänden auf mindestens einem Teil der Höhe ties Geschosses einen wirgefertigten Träger aufweist, tier an jedem Ende im Bereich der "toßslelle zwischen einer Querwand und der Außenwand mit einem !'foM'-'ii \erkiiKlen ist, der in meiner lotrechten Stellung durch Befestigung an dem lotrechten Rand der Querwand gehalten ist.The invention is based on the object of designing a building of the type mentioned at the outset in such a way that that unimpeded accessibility for the installation of the components and the transport of the building materials in the Inside the building is guaranteed. The solution to this The object is according to the invention that the outer wall in L>! Ie of the upper floor between the transverse walls at least part of the height at the bottom of the projectile has a custom-made carrier, tier at each end in the area of the "toßslelle" between a transverse wall and the outer wall with a! 'foM' - 'ii \ erkiiKlen, which is in my perpendicular Position is held by fastening to the vertical edge of the transverse wall.

Diese Gebiiudeausbildung ermöglicht es, insbesondere während der Errichtung, die vorderen und rückwärtigen Außenwände — mit Ausnahme des Trägers — erst in einer späten Bauphasc zu errichten, ohne daß als Ersatz für sie Verstrebungen und Abstützungen tier bereits errichteten Gebäudeteile erforderlich wer'Jen. Hierdurch werden Baukosten eingespart, die Herstclluim vereinfacht und die Bauarbeiten erheblich erleichtert.This building training makes it possible, in particular during construction, the front and rear outer walls - with the exception of the Beams - to be erected only in a late building phase, without struts and supports to replace them tier already constructed parts of the building are required who'Jen. This saves construction costs, simplifies the manufacture and the construction work much easier.

Bevorzugt ist der Träger im Verhältnis zu seiner Höhe dünn.The carrier is preferably thin in relation to its height.

Bei einer bevorzugten Weiterbildung ist vorgesehen, daß die Pfosten Betonpfosten sind, und daß der vorgefertigte Träger von Gewindebolzen getragen ist, die aus den Pfosten herausragen.In a preferred development it is provided that the posts are concrete posts, and that the prefabricated carrier is carried by threaded bolts protruding from the post.

Der vorgefertigte Träger kann eine Rahmenkonstruktion, vorzugsweise Holzrahmenkonstruktion sein, an dessen lotrechten Rändern Metallplatten befestigt sind, welche von den Gewindebolzen der Pfosten getragen sind.The prefabricated carrier can be a frame construction, preferably a wooden frame construction be, on the vertical edges of which metal plates are attached, which of the threaded bolts of the Posts are supported.

Die Querwände können massive Blöcke, vorzugsweise Betonblöcke sein, in denen Gewindelöchcr vorgesehen, vorzugsweise eingegossen sind, in die Bolzen einschraubbar sind, die mit Längslöchern in den Pfosten im Eingriff stehen.The transverse walls can be solid blocks, preferably concrete blocks, in which threaded holes are provided, are preferably cast, can be screwed into the bolts with longitudinal holes in the Mullions are engaged.

Die Erfindung betrifft weiter ein Herstellungsverfahren für solche Oebäudc, das darin besteht, daß jede Querwand mindestens an dem lotrechten Rand, der an die Außenwand angrenzt, bis zur Höhe des unteren Geschosses errichtet, ein Pfosten an dem lotrechten Rand jeder Querwand angeordnet und in lotrechter Stellung an dem Rand der Querwand befestigt und ein Träger in Höhe des oberen Geschosses an den Pfosten starr befestigt wird, worauf die Querwände des oberen Geschosses aufgebaut werden. Der Vorteil dieses Verfahrens besteht darin, daß für die Abf.tiii/iing der im Zuge des Baufortschritts zu errichtenden Gebäudeteile jeweils die zuvor errichtetenThe invention further relates to a manufacturing method for such Oebäudc, which consists in that each transverse wall at least on the vertical edge adjoining the outer wall up to the level of the on the lower floor, a post is placed on the vertical edge of each transverse wall and inserted in vertical position attached to the edge of the bulkhead and a beam at the level of the upper floor is rigidly attached to the post, whereupon the transverse walls of the upper floor are built. the The advantage of this method is that for the Abf.tiii / iing to be built in the course of the construction progress Parts of the building the previously erected

ίο Teile der, Gebäudes ausgenutzt werden, so daß die Gebäudestabilität in allen Bauabschnitten bei unbehinderter Zugänglichkeit des Gebäudes gewährleistet ist.ίο parts of the building are exploited so that the Building stability guaranteed in all construction phases with unimpeded accessibility of the building is.

An Hand der Zeichnung wird ein Ausführungsbeispiel des Gebäude nach der Erfindung erläutert. Es zeigtAn exemplary embodiment is shown on the basis of the drawing of the building according to the invention explained. It shows

F i g. 1 eine schaubildliche Ansicht von vier im Bau befindlichen, zweigeschossigen Reihenhäusern in unterschiedlichen Bauphasen,F i g. 1 is a diagrammatic view of four two-story terraced houses under construction in different construction phases,

in F i g. 2 eine schematische Vorderansicht eines Ausschnittes aus einem der in Fig. 1 dargestellten Reihenhäuser,in Fig. 2 is a schematic front view of a section from one of the row houses shown in Fig. 1,

F i g. 3 a bis 3 f geschnittene, ausschnittsweise Draufsichten auf die Enden unterschiedlicher Querwände, undF i g. 3 a to 3 f sectional, partial plan views of the ends of different transverse walls, and

F i g. 4 eine schaubildliche Ansicht eines Ausschnittes der Gebäudekonstruktion, nämlich die Verbindung von zwei Trägern mit einer Zwischenmauer. In Fig. 1 sind vier zweigeschossige Reihenhäuser während ihrer Erstellung in unterschiedlichen Bauphasen dargestellt; selbstverständlich können auch alle Reihenhäuser gleichzeitig in gleichen Bauphaser errichtet werden, anstatt, wie in F i g. 1 gezeigt, in aufeinanderfolgenden Bauphasen.F i g. 4 is a diagrammatic view of a section of the building structure, namely the connection of two girders with an intermediate wall. In Fig. 1 there are four two-story row houses shown in different construction phases during their creation; of course you can too all row houses are built at the same time in the same construction phase, instead of, as in FIG. 1 shown in successive construction phases.

In der ersten Bauphase werden die Querwände i unabhängig davon, ob es sich um Außenwände odei um Zvischenwände handelt, bis zu einer Höhe errichtet, in welcher auf sie die Dielenbalken 2 des ersten Stockwerkes aufgesetzt werden können. In die Enden der Querwände werden hierbei Blöcke 3 au; Beton mit eingebaut, die an die Außenwände angrenzen, wobei die Blöcke 3 Gewindelöcher 4 auf weisen, in welche Bolzen 5 durch Einschrauben befestigt werden können, wobei jeder Bolzen 5 durch einen Pfosten 6 aus Beton in der aus den F i g. 3 ι bis 3 c ersichtlichen Weise hindurchgreift und ar diesen Pfosten sein kopfseitiges Widerlager hat. Aus den F i g. 3 a bis 3 c ist auch ersichtlich, daß be unterschiedlichen dicken Querwänden Pfosten gleich großen Querschnittes vorgesehen werden können wobei der unterschiedlichen Dicke der Querwand« uurch unterschiedliche lange Gewindebolzen 1 Rechnung getragen wird.In the first construction phase, the transverse walls i, regardless of whether they are outer walls or intermediate walls, are erected up to a height at which the floorboards 2 of the first floor can be placed on them. In the ends of the transverse walls, blocks 3 are au; Concrete built in, which border the outer walls, the blocks 3 have threaded holes 4 into which bolts 5 can be screwed in, each bolt 5 being supported by a post 6 made of concrete in the position shown in FIGS. 3 ι to 3 c visible way reaches through and ar this post has its head-side abutment. From the F i g. 3 a to 3 c it can also be seen that posts of the same size cross-section can be provided for different thick transverse walls, the different thickness of the transverse wall being taken into account by threaded bolts 1 of different lengths.

In der zweiten Bauphase werden die Pfosten <In the second construction phase, the posts will be <

hochkant in der aus F i g. 1 ersichtlichen Weise auf gestellt und mit den Blöcken 3 mittels der Bolzen! fest verbunden und hierdurch in inrer vertikaler Stellung gehalten.edgewise in the from FIG. 1 apparent way and with the blocks 3 by means of the bolts! firmly connected and thus in a vertical position Position held.

Während der darauffolgenden Bauphase werdet vorgefertigte Träger 7 an den Seiten der benachbartei Pfosten 6 mittels der Gewindebolzen 8, die in du Pfosten 6 eingegossen sind, befestigt, wobei diesi Bolzen 8 in Schlitze von ebenen Metallplatten 9 de Träger 7 eingreifen (F i g. 4) und mit diesen PlattetDuring the subsequent construction will prefabricated support 7, fastened to the sides of the benachbartei post 6 by means of threaded bolts 8 which are cast into du post 6, wherein Diesi bolt 8 into slots of flat metal plates 9 de support 7 engage (F i g. 4 ) and with this plate

mittels Muttern 10 starr verbunden werden.be rigidly connected by means of nuts 10.

Der Träger 7 kann in die Gewindebolzen 8 einge hängt werden, ohne daß es erforderlich ist, irgend welche Stutzvorrichtungen od. dgl. für den TrageThe carrier 7 can be hung into the threaded bolt 8 without the need for any which support devices or the like for the stretcher

vorzusehen, während die Mullein 10 angezogen werden. Der Träger 7 wirkt als ein Bindeglied zwischen den benachbarten Querwänden 1 und verhindert, daß sie, beispielsweise durch Winddruck, umgeworfen weiden können. Nach Beendigung dieser Hauphase sind die vorderen und rückwärtigen Außenwände — mit Ausnahme der Träger 7 — noch nicht errichtet.to be provided while the Mullein 10 are tightened. The carrier 7 acts as a link between the adjacent transverse walls 1 and prevents them, for example by wind pressure, can graze overturned. After finishing this main hare are the front and rear Outside walls - with the exception of the girders 7 - not yet erected.

Während dei vierten Bauphase werden die Dielenboden 2 in ihre vorgesehene Stellung gebracht und können dann als Plattform verwendet werden, von welcher aus die Querwände bis zu der Höhe der Dachtraufe weiter aufgebaut werden, während in der dann darauffolgenden Bauphase zusammengesetzte Fenstergerüste des ersten Stockwerkes oberhalb des Trägers 7 errichtet werden.During the fourth construction phase, the floorboards will be installed 2 brought into their intended position and can then be used as a platform by which the transverse walls are built up to the level of the eaves, while in the Then in the following construction phase, composite window frames on the first floor above the 7 carrier to be built.

Während der vorstehend beschriebenen Bauphasen ist das gesamte Erdgeschoß frei für das Einbringen von Material in das betreffende Gebäude, und zwar entlang der gesamten Front- und Rückseite, so daß die Entstehung von schmalen, durch den Baustofftransport hervorgerufenen Schhmmpraden verhindert wird, wie sie beim Erstellen von Gebäuden auftreten, bei denen nur ein oder zwei enge Türeingänge während der Gebäudeerrichtung in den Gebäudeinnenraum führen.During the construction phases described above, the entire ground floor is free for installation of material in the building in question, along the entire front and rear, so that prevents the formation of narrow shame promenades caused by the transport of building materials as they occur when building buildings that only have one or two narrow doorways into the interior of the building during construction to lead.

Die Träger 7 können aus einer Tafel, Platte, Blechplatte, Rahmenkonstruktion od. dgl. oder aus einer Kombination derartiger Konstruktionsteile bestehen.The carrier 7 can od from a board, plate, sheet metal plate, frame construction. The like. Or from a Combination of such structural parts exist.

Die Querwände werden durch die Träger 7 während des Fortschreitens der Bauarbeiten ausreichend stabilisiert, so daß die Querwände ohne besondere Abstützungen errichtet werden können. Die Fig. 3a bis 3f zeigen, wie die bis zu der Höhe der Dachtraufen reichenden Pfosten 6 mit den Blöcken 3 der Querwände 1 und den Trägern verbunden sind.The transverse walls are made sufficient by the beams 7 as the construction work progresses stabilized so that the transverse walls can be erected without special supports. the Fig. 3a to 3f show how the up to the level of the Eaves reaching posts 6 are connected to the blocks 3 of the transverse walls 1 and the girders.

Claims (6)

Patentansprüche:Patent claims: 1. Zweigeschossiges Gebäude, das mindestens eine Außenwand aufweist, an die mindestens zwei benachbarte Querwände, die innere oder äußere Querwände sein können, angrenzen, dadurch gekennzeichnet, daß die Außenwand in Höhe des oberen Geschosses zwischen den Quer wänden (1) auf mindestens einem Teil tier lloln des Geschosses einen vorgefertigten TrägiM (7 aufweist, der an jedem Ende im Bereich de: Stoß stelle zwischen einer Querwand und dei Außen wand mit einem Pfosten (6) verbunden ist, dei in seiner lotrechten Stellung durch Befestigung an dem lotrechten Rand der Querwand gehalten ist.1. Two-story building that has at least one external wall to which at least two adjacent transverse walls, which can be inner or outer transverse walls, adjoin, thereby characterized in that the outer wall at the level of the upper floor between the cross walls (1) on at least part of tier lloln of the projectile a prefabricated support (7 has, which at each end in the area de: butt place between a transverse wall and the outside wall is connected to a post (6), dei held in its vertical position by attachment to the vertical edge of the bulkhead is. 2. Zweigeschossiges Gebäude nach Anspruch 1 dadurch gekennzeichnet, daß der Träger (7) in; Verhältnis zu seiner Höhe dünn ist.2. Two-story building according to claim 1, characterized in that the carrier (7) in; Is thin in proportion to its height. 3. Zweigeschossiges Gebäude nach Anspruch I oder 2, dadurch gekennzeichnet, daß diu Pfosten (6) Betonpfosten sind und daß der vorgefertigte Träger (7) von Gewindebolzen (8) getragen ist, die aus den Pfosten (6) herausragen.3. Two-story building according to claim I or 2, characterized in that the posts (6) are concrete posts and that the prefabricated support (7) is supported by threaded bolts (8), which protrude from the post (6). 4. Zweigeschossiges Gebäude nach Anspruch 3, dadurch gekennzeichnet, daß der vorgefertigte Träger (7) eine Rahmenkonstruktion, vorzugsweise eine Holztchmenkonstruktion ist, an dessen lotrechten Rändern Metallplatten (9) befestigt sind, welche von den Gewindebolzen (8) uer Pfosten (6) getragen sind.4. Two-story building according to claim 3, characterized in that the prefabricated Carrier (7) is a frame structure, preferably a wooden frame structure, on which vertical edges metal plates (9) are attached, which uer from the threaded bolts (8) Posts (6) are carried. 5. Zweigeschossiges Gebäude nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß die Querwände (1) massive Blöcke (3), vorzugsweise Betonblöcke sind, in denen Gewindelöcher (4) vorgesehen, vorzugsweise eingegossen sind, in die Bolzen (S) einschraubbar sind, die mit Längslöchern in den Pfosten (6) im Eingriff stehen.5. Two-story building according to one of claims 1 to 4, characterized in that the transverse walls (1) are solid blocks (3), preferably concrete blocks, in which threaded holes (4) are provided, preferably cast, into which bolts (S) can be screwed, which have longitudinal holes are engaged in the post (6). 6. Verfahren zur Herstellung eines zweigeschossigen Gebäudes nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß jede Querwand mindestens an dem lotrechten Rand, der an die Außenwand angrenzt, bis zur Höhe des unteren Geschosses errichtet, ein Pfosten an dem lotrechten Rand jeder Querwand angeordnet und in lotrechter Stellung an dem Rand der Querwand befestigt und ein Träger in Höhe des oberen Geschosses an den Pfosten starr befestigt wird, worauf die Quenvändc des oberen Geschosses aufgebaut werden.6. A method for producing a two-story building according to any one of claims 1 to 5, characterized in that each transverse wall at least on the vertical edge that on the outer wall adjoins, built up to the level of the lower storey, a post on the disposed perpendicular edge of each bulkhead and in perpendicular position to the edge of the bulkhead attached and a beam is rigidly attached to the post at the level of the upper storey, whereupon the quenvändc of the upper floor will be built. Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Family

ID=

Similar Documents

Publication Publication Date Title
DE2401794A1 (en) CONCRETE REINFORCEMENT
DE1759915B2 (en) METHOD OF MANUFACTURING ROOM BOXES FOR FABRIC HOUSES
DE598730C (en) Construction process using components produced in the workshop
DE1759793C (en) Two-storey building with at least one outer wall and two transverse walls and the process for its manufacture
DE2710078A1 (en) Polyhedral room unit resting on central column - has octagonal vertical plane cross=section and column with helical stairs
DE3304907A1 (en) Reinforced concrete room cell for erecting the smallest room unit of a building
DE2923176A1 (en) EXTERIOR WALL CONSTRUCTION FOR PRE-FABRICATED HOUSES
DE3306456A1 (en) COMPONENT
DE3725544A1 (en) Hold cell assemblable from floor-, top-, and wall elements - has floor unit with guide meshing with complementary edge in sliding motion
DE2219202A1 (en) Process for the production of multi-storey buildings from space cells
DE1459901C3 (en) Building that has a front with loggias
DE2400928A1 (en) Concrete wall or roof prefabricated reinforcing frame - with matching openings in component pairs holding reinforcing rods in grid
DE1759793B1 (en) Two-storey building with at least one outer wall and two transverse walls and method for its manufacture
DE1609536A1 (en) Steel skeleton for a multi-storey house
DE4239057C2 (en) Process and prefabricated module for the production of structures and buildings
DE3038878A1 (en) METHOD AND COMPONENTS FOR BUILDING AN INSULATING WALL
DE1609361C3 (en) Buildings with prefabricated, closed, single-cell frame elements made of reinforced concrete
DE4336177C2 (en) Roof element
DE828587C (en) Procedure for erecting basement walls
DE2028409A1 (en) Hollow column with angular cross-section made of reinforced concrete
AT216742B (en) Formwork system with lost formwork for concrete walls
DE1684808C (en) Wall, consisting of a number of wall elements in a row
DE3426898A1 (en) Process for constructing a multi-storey building and partial column for carrying out the process
EP0880624B1 (en) Building kit
DE2358961A1 (en) Hyperboloid-shell natural-draught cooling-tower - containing vertically running hollow spaces over whole height