DE1719343U - EARTH DRILLS. - Google Patents

EARTH DRILLS.

Info

Publication number
DE1719343U
DE1719343U DEL14594U DEL0014594U DE1719343U DE 1719343 U DE1719343 U DE 1719343U DE L14594 U DEL14594 U DE L14594U DE L0014594 U DEL0014594 U DE L0014594U DE 1719343 U DE1719343 U DE 1719343U
Authority
DE
Germany
Prior art keywords
central rod
auger
screw
earth
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL14594U
Other languages
German (de)
Inventor
Richard Langer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEL14594U priority Critical patent/DE1719343U/en
Publication of DE1719343U publication Critical patent/DE1719343U/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/003Drilling with mechanical conveying means
    • E21B7/005Drilling with mechanical conveying means with helical conveying means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/44Bits with helical conveying portion, e.g. screw type bits; Augers with leading portion or with detachable parts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B11/00Other drilling tools
    • E21B11/005Hand operated drilling tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Screw Conveyors (AREA)
  • Earth Drilling (AREA)

Description

,tentanwaltD.pl.-ing. , ^„^ VtT9^. Rid^li, ,Z\.Ώ , tentanwaltD.pl.-ing. , ^ "^ VtT 9 ^. Rid ^ li,, Z \. Ώ

riHolf OhfTlStOOO' Stuttgart-Birkach. | Erdbohrer. 11.11.55. IL. Ml, J95ßriHolf OhfTlStOOO 'Stuttgart-Birkach. | Earth auger. 11/11/55. IL. Ml, J95ß

S/H - 572S / H - 572

Eichard Langer in Stuttgart-Birkach Eichard Langer in Stuttgart-Birkach

Erdbohrer.Earth auger.

Die Neuerung bezieht sich auf einen Erdbohrer mit an einer zentralen Stange angeordneter Förderschnecke, Diese Förderschnecken dienen lediglich zur Wühlarbeit innerhalb des Erdloches und zur Herausbeförderung des gebohrten Erdreichs. Jedoch wird hierbei weder eine Führung für den Bohrer erzielt, noch erfolgt ein Vorzug. Infolgedessen muß der Arbeiter neben einem hohen Drehmoment verhältnismäßig große Druckkräfte ausüben und noch zusätzlich für eine sichere Führung des Bohrers sorgen. Eine derartige Aufteilung der Kräfte wirkt sich aber äußerst ungünstig aus, 30 daß entweder unsauber gebohrte Löcher erzielt werden oder entsprechend lange Arbeitszeiten erforderlich sind. Bei Erdankern ist es zwar bereits bekannt, mit Schnecken versehene Stiele an ihrem Ende noch zusätzlich schraubenförmig auszugestalten, jedoch wird hierdurch die Führung bzw. der Vorzug nicht wesentlich erhöht und sind auch nicht in dem Maße erfprderlich, da die eigentliche Schnecke bereits diesen Zielen dient.The innovation relates to an auger with a screw conveyor arranged on a central rod, this screw conveyor serve only for digging work within the earth hole and for conveying out the drilled earth. However, there is no guidance for the drill, nor is there any benefit. As a result, the worker must in addition to a high torque exert relatively large pressure forces and also for safe guidance of the drill. Such a distribution of forces has an extremely unfavorable effect, 30 that it is either unclean drilled holes can be achieved or correspondingly long working hours are required. With ground anchors it is Although already known to additionally design helical stems provided with snails at their end, however This does not significantly increase the leadership or the preference and are also not required to the extent that there is the actual snail already serves these goals.

Um die Nachteile der bekannten Erdbohrer zu vermeiden und die Vorrichtungen der bisher verwendeten Erdanker in verbesserter Form auch auf Erdbohrer zu übertragen, weist neuerungsgemäß die zentrale Stange eines Erdbohrers mit an dieser Stange angeordneter Förderschnecke unterhalb der Förderschnecke und mit Abstand von dieser eine Zugschnecke auf, wobei die Zugschnecke einen kleineren Durchmesser als die Förderschnecke besitzt und aus einer plattenartigen, um dieIn order to avoid the disadvantages of the known auger and the devices of the previously used ground anchors in improved To transfer shape to auger, according to the innovation, has the central rod of an auger with it Rod arranged screw conveyor below the screw conveyor and at a distance from this a screw conveyor, wherein the feed screw has a smaller diameter than the conveyor screw and of a plate-like to the

84c, 11/20. 1719 34=3. Richard Langer, __ Stuttgart-Birkach. j Erdbohrer. Π. 1Ϊ.55. .IL HKl. I.QSfi L 14 594. (T. 4; Z. 1)84c, 11/20. 1719 34 = 3. Richard Langer, __ Stuttgart-Birkach. j auger. Π. 1.55. .IL HKl. I.QSfi L 14 594. (T. 4; Z. 1)

zentrale Stange spiralförmig geführten Fläche besteht. Hierdurch wird eine einwandfreie Führung zumindest des vorderen Endes der zentralen Stange gewährleistet und auch die erforderliche Druckkraft des Arbeiters wesentlich verringert» da ein erheblicher Vorzug erzielt wird·central rod consists of a spiral-shaped surface. This ensures perfect management of at least the front end of the central bar and also significantly reduces the required pressure force of the worker » because a significant benefit is achieved

Da jedoch teilweise verhältnismäßig lange Erdbohrer Verwendung finden, ist es zweckmäßig, auch an ihrem oberen, der Zugschnecke entgegengesetzten Ende eine Führungshülse o.dgl· vorzusehen· Diese Hülse kann aus zwei losen Teilen bestehen, die lediglich aufeinander gelegt und in den oberen Teil des Loches eingeschoben werden. Jedoch 1st es durchaus möglich, irgendwelche Scharniere, Verschlüsse oder ähnliches anzuordnen und die Teile auf diese Welse zusammenzuhalten. However, as auger was used for a relatively long time find, it is advisable to also have a guide sleeve at its upper end opposite the worm gear or the like · to be provided · This sleeve can consist of two loose parts consist that are merely placed on top of each other and in the top Part of the hole to be inserted. However, it is entirely possible to use any hinges, fasteners or to arrange something similar and to hold the parts together in this catfish.

Die Zeichnung zeigt ein Ausfuhrungsbeispiel der Neuerung in Vorderansicht.The drawing shows an exemplary embodiment of the innovation in front view.

Die zentrale Stange 1 ist in üblicher Weise mit einer Förderschnecke 2 versehen, die an ihren unteren Ende eine Stütz fläche 3 aufweist. Am unteren Ende der zentralen Stange 1 ist die Zugschnecke 4 vorgesehen, die in einem größeren Abstand 5 von der Förderschnecke 2 angeordnet iat. Die Zugschnecke 4 besteht aus einer plattenartigen, um die zentrale Stange 1 spiralig geführten Fläche. Der Durchmesser 1o der Zugschnecke 4 ist kleiner als der Durchmesser 11 der Förderschnecke 3· Während das unterste Ende der zentralen Stange 1 als Spitze 6 ausgebildet 1st, weist sie am oberen Ende einen Innenvierkant 7 auf, der zur Verbindung mit einem Griffstück 8 dient.The central rod 1 is in the usual way with a screw conveyor 2 provided, which has a support surface 3 at its lower end. At the bottom of the central bar 1 the screw feed 4 is provided, which is arranged at a greater distance 5 from the screw conveyor 2. The snail 4 consists of a plate-like surface that is guided in a spiral around the central rod 1. The diameter 1o the The screw feeder 4 is smaller than the diameter 11 of the screw conveyor 3 · While the lowest end of the central rod 1 is designed as a point 6, it points at the top End of a square socket 7, which is used to connect to a handle 8.

Um auch dem oberen Ende der zentralen Stange 1 eine gute Führung zu geben, ist dipse von einer Führungshülse 9 umgeben, die im Schnitt dargestellt ist. Die Führungshülse 9In order to give good guidance to the upper end of the central rod 1, the dipse is surrounded by a guide sleeve 9, which is shown in section. The guide sleeve 9

i 84c, 11/20. 1719 545. Richard Langer, -_ „„, Sruttgart-Birkach. | Erdbohrer. 11.11.55. ti. hU, 1S5S L 14 594. (T. 4; Z. 1) i 84c, 11/20. 1719 545. Richard Langer, -_ "", Sruttgart-Birkach. | Earth auger. 11/11/55. ti. hU, 1S5S L 14 594. (T. 4; line 1)

i .. . ■ V'- i ... ■ V'-

kann aus zwei losen Teilen bestehen, die lediglich tun die zentrale Stange 1 herumgelegt und in das zu bohrende Erdloch eingeschoben werden· Gegebenenfalls kann jedoch auch durch Scharniere, Verschlüsse ο.dgl. eine Verbindung dieser Seile erzielt werden.can consist of two loose parts that merely do that central rod 1 can be laid around and pushed into the hole to be drilled by hinges, locks, etc. a connection of this Ropes can be achieved.

Claims (2)

84c- 11/20. 1719 343. Richard Langer, , Stuttgart-Birkach. | Erdbohrer. 11.11.55. U, ML 1956 L 14 594. (T. 4; Z. 1) ■ Schutzansprüche84c- 11/20. 1719 343. Richard Langer, Stuttgart-Birkach. | Earth auger. 11/11/55. U, ML 1956 L 14 594. (T. 4; line 1) ■ Protection claims 1) Erdbohrer mit an einer zentralen Stange angeordneter Förderschnecke, dadurch gekennzeichnet» daß die zentrale Stange (1) unterhalb der Förderechnecke (5) und mit Abstand von dieser eine Zugschnecke (4) aufweist» wobei die Zugschnecke (4) einen kleineren Durchmesser (10) als die Förderschnecke (5) besitzt und aus einer plattenartigen, um die zentrale Stange (1) spiralförmig geführten Fläche besteht.1) Auger with arranged on a central rod Conveyor screw, characterized »that the central rod (1) is below the conveyor screw (5) and at a distance therefrom has a worm gear (4) »the worm worm (4) having a smaller diameter (10) as the screw conveyor (5) and from one plate-like, around the central rod (1) spirally guided surface. 2) Erdbohrer nach Anspruch 1, dadurch gekennzeichnet, daß die zentrale Stange (1) zur Führung etwa an ihrem der Zugsohnecke (4) entgegengesetzten Ende eine Führungshülse (9) o.dgl.) aufweist. 2) auger according to claim 1, characterized in that the central rod (1) for guidance approximately at its the Zugsohnecke (4) opposite end has a guide sleeve (9) or the like.).
DEL14594U 1955-11-11 1955-11-11 EARTH DRILLS. Expired DE1719343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL14594U DE1719343U (en) 1955-11-11 1955-11-11 EARTH DRILLS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL14594U DE1719343U (en) 1955-11-11 1955-11-11 EARTH DRILLS.

Publications (1)

Publication Number Publication Date
DE1719343U true DE1719343U (en) 1956-03-22

Family

ID=32664255

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL14594U Expired DE1719343U (en) 1955-11-11 1955-11-11 EARTH DRILLS.

Country Status (1)

Country Link
DE (1) DE1719343U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102021005999A1 (en) 2021-12-04 2023-06-07 Mario von Cederstolpe Auger and method of making it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102021005999A1 (en) 2021-12-04 2023-06-07 Mario von Cederstolpe Auger and method of making it

Similar Documents

Publication Publication Date Title
DE1719343U (en) EARTH DRILLS.
DE745658C (en) Guide device for deep drilling rigs
DE1642164C3 (en) Process for impregnating logs
DE1954621A1 (en) Joint for a base to support a high floor covering
DE2144044C3 (en)
DE324464C (en) Pressure roller attached to the coulter carrier so that it can swing out vertically using lever arm
DE349291C (en) Pocket tripod
DE571810C (en) Track lath connection with attachment to the manhole
DE913370C (en) Drip oil
DE938156C (en) Auxiliary device for planting plants
DE568941C (en) Method for vertical alignment of a deviating borehole using a whipstock and clinometer
DE938167C (en) corkscrew
DE803151C (en) Removable brush holder located on the paint pot
DE340401C (en) Longitudinal beam for Schraemhaemmer
DE932864C (en) Fastening device for window curtain rods
DE1017112B (en) Device for guiding the drill rod in boreholes
DE563343C (en) Cylinder lock with self-adjusting rosettes
DE8610739U1 (en) Use for a plant well
DE1814163C (en) Earth auger
CH197468A (en) Earth auger.
DE1484520B1 (en) Drilling head for drilling vertical, uncased holes in loose soil
DE492342C (en) Device for annealing crucibles, bowls or the like.
DE1634524C (en) Soil survey probe
DE833336C (en) Drill grab
DE469297C (en) Connection of structural parts subject to tension or compression