DE1588450A1 - Control circuit for connecting or disconnecting several power generators and several power consumers of an on-board network on ships - Google Patents

Control circuit for connecting or disconnecting several power generators and several power consumers of an on-board network on ships

Info

Publication number
DE1588450A1
DE1588450A1 DE19671588450 DE1588450A DE1588450A1 DE 1588450 A1 DE1588450 A1 DE 1588450A1 DE 19671588450 DE19671588450 DE 19671588450 DE 1588450 A DE1588450 A DE 1588450A DE 1588450 A1 DE1588450 A1 DE 1588450A1
Authority
DE
Germany
Prior art keywords
power
switched
signal
proportional
consumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19671588450
Other languages
German (de)
Inventor
Guenter Jaschke
Frank Lobert
Helmut Looss
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Licentia Patent Verwaltungs GmbH
Original Assignee
Licentia Patent Verwaltungs GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Licentia Patent Verwaltungs GmbH filed Critical Licentia Patent Verwaltungs GmbH
Publication of DE1588450A1 publication Critical patent/DE1588450A1/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers

Description

r'Steuerschaltung für die Zu- oder Abschaltung mehrerer Leistungserzeuger und mehrerer Leistungsverbraucher eines Bordnetzes auf Schiffen " Die Erfindung betrifft eine Steuerschaltung für die Zu- oder Abschaltung mehrerer Leistungserzeuger und mehrerer Leistungsverbraucher eines Bordnetzes auf Schiffen. r'Steuerschaltung for the switching on or off a plurality of power generators and a plurality of power consumers of a vehicle electrical system on board ships "The invention relates to a control circuit for the switching on or off a plurality of power generators and a plurality of power consumers of a vehicle electrical system on board ships.

Bisher ist es auf Schiffen üblich, die Überwachung des Bordnetzes, insbesondere die Überwachung der optimalen Ausnutzung der zur Verfügung stehenden Erzeugerleistung iind einer even- tuellen Überlastung durch Bedienungspersonal durchführen zu lassen. Aufgabe der Erfindung ist es, eine Steuerschaltung vorzuschlagen, mit der die Zu- oder Abschaltung mehrerer Leistungsverbraucher automatisch erfolgen kann, ohne dass eine Überbelastung der Bordnetzes eintritt. Die erf'indungegemässe Steuerschaltung ist gekennzeichnet durch a) einen ersten Bchaltungeblock mit einem $chsltungesweig für jeden vorhandenen lieistungserzeuger, in dem eineder Nennleistung dieses Leistungserzeugers proportionale elektrische Grösse gebildet-wird, und mit einem gemeinsamen Ausgang für diese Sobaltungszweige, an dem ein der Summe der Nennleistungen der eingeschalteten Leistungserzeuger proportionales.Signal ansteht, b) einen zweiten Schaltungsblock mit einem Schaltungszweig für jeden auf des Bordnetz schaltbaren Leistungsverbraucher, in dem eine der Nennleistung dieses Leistungaverbrauabera pro- portionale elektrische Grösse gebildet wird, und mit einem genfeinsamen Ausgang für diese Schaltungszweige, an dem ein der Summe der Nennleistungen der neu einzuschaltenden Leistungsverbraucher proportionales Signal ansteht, a) einen dritten Schaltungsblock, an dessen Ausgang ein der Summe der augenblicklich eingeschalteten Verbraucherleistungen proportionales Signal ansteht und d) eine Vergleichsschaltung, die aus dem Ausgengeeignal des ersten Schaltungsblocks einerseits und dar Bumme-der Aus- gangssignale des zweiten und dritten Schaltungeblocke anderer- seits ein Differenasignel bildet, wobei in Abhängigkeit von dem Vorzeichen dieses Difterenzsignala die Zuschaltung von Verbrauchern entweder freigegeben oder solange gesperrt wird, bis ein weiterer Leistungserzeuger zugeschaltet ist. So far, it is common on ships, monitoring the electrical system, in particular the monitoring of the optimal use of available generation capacity ind to have a contingent tual congestion carried out by operators. The object of the invention is to provide a control circuit with which the connection or disconnection can be performed a plurality of power consumers automatically, without overloading of the on-board network occurs. The control circuit according to the invention is characterized by a) a first connection block with a connection branch for each existing power generator, in which an electrical quantity proportional to the nominal output of this power generator is formed, and with a common output for these switching branches, at which one of the sum of the rated power of switched power generator proportionales.Signal present, b) to a second circuit block having a circuit branch for each on-board network switchable power consumer, in which one of the rated power of this Leistungaverbrauabera proportional electrical variable is formed, and a geneva solitary output for this circuit branches, a signal proportional to the sum of the nominal powers of the new power consumers to be switched on is present, a) a third circuit block, at the output of which a signal proportional to the sum of the currently switched on consumer powers is present d d) forming a comparison circuit which on the other from the Ausgengeeignal the first circuit block on one hand and is Bumme-the output signals of the second and third Schaltungeblocke hand a Differenasignel, wherein the switching of consumers either enabled in response to the sign of this Difterenzsignala or while is blocked until another power generator is switched on.

Anhand eines Schaltungsbeispiels soll die Erfindung näher erläutert werden. Bin erster Schaltungebiock 1o enthält vier parallele Schaltungszweige mit den Widerständen 11 - 14 und den Schaltern 15 - 18. Die vier Widerstände 11 - 14 sollen dabei vier, hier nicht dargestellte Bordnetzgeneratoren eines Schiffsbordnetzes entsprechen. Ein zweiter Schaltungsblock 19 enthält.ebenfalle vier parallele Schaltungszweige mit Widerständen 2o - 23 und Schaltern 24 - 279 wobei die Widerstände 2o - 23 wichtigen Leistungsverbrauchern entsprechen, die vom Scbiffsbordnetz gespeist werden. Ein dritter Schaltungsblock 28 enthält schliesslich eine nur schematisch dargestellte Schalteinrichtung 29, die einen der augenblicklichen Verbraucherleistung im Bordnetz proportionalen Strom erzeugt, und einen Widerstand 3o, durch den dieser Strom fliesst. Die Ausgänge der drei Schaltungsblöcke 1o, 19 und 28 sind in einem Fnotenpunkt zusammengeschaltet, der mit dem Eingang einen Verstärkers t 31 verbunden ist. Der Ausgang des Verstärkers 31 führt über zwei gegensinnig geschaltete Dioden 32@und 33 auf zwei Relais 34 und 35. The invention will be explained in more detail using a circuit example. Bin first Schaltungebiock 1o includes four parallel circuit branches with the resistors 11 - 14 and the switches 15 - 18. The four resistors 11 - four on-board generators, not shown here, a ship's on-board network 14 should correspond. A second circuit block 19 enthält.ebenfalle four parallel circuit branches with resistors 2o - where the resistors 2o 279 - - 23 correspond to the major power consumers, which are fed from Scbiffsbordnetz 23 and switches 24th A third circuit block 28 finally contains a switching device 29, shown only schematically , which generates a current proportional to the instantaneous consumer power in the vehicle electrical system, and a resistor 3o through which this current flows. The outputs of the three circuit blocks 1o, 19 and 28 are interconnected in a node which is connected to the input of an amplifier t 31 . The output of the amplifier 31 leads via two oppositely connected diodes 32 @ and 33 to two relays 34 and 35.

An dem Schaltungsblock 1o liegt eine Gleichspannung von z.B. 15 Volt. Eine gleich grosse negative Gleichspannung liegt an dem zweiten Schaltungsblock 19. A DC voltage of, for example, is 15 volts to the circuit block 1o. An equally large negative direct voltage is applied to the second circuit block 19.

Die Widerstände 11 - 14 im Schaltungsblock 1o sind so dimen- sioniert, dass bei geschlossenen Schaltern 14 - 18 in den einzelnen Schaltungszweigen ein Strom flieset, der den jewei- ligen Nennleistungen der Bordnetzgeneratoren proportional ist. Das gleiche gilt .für den Schaltungsblock 19, in dem bei ge- schlossenen Schaltern 24 - 27 ein den Nennleistungen der Lei- stungsverbraueher proportionaler Strom fliesst. The resistors 11 - 14 results in the circuit block 1o are so dimensioned that, when closed switches 14-18 in the various circuit branches, a current flieset which is proportional to the time jewei- power ratings of the vehicle electrical system generators. The same is true .for the circuit block 19, in the closed at overall switches 24 - 27 to the power rating of a managerial stungsverbraueher proportional current flows.

Die erfindungsgemässe Steuerscbaltung arbeitet nun in folgender eise: Im Schaltungsblock 1o sind die Schalter in den Schaltungszweigen geschlossen, deren entsprechender Bordnetzgenerator augenblicklich in das Bordnetz einspeist. Im gemeinsamen Aus-gang der Schaltungszweige fliesst somit ein Strom, der der Summe der Nennleistungen der eingeschalteten Generatoren proportional ist. Dieser Strom bildet dann mit der Summe aus dem Strom, der der augenblicklich eingeschalteten Verbraucher-leistung proportional ist und der über die Schalteinrichtung 29 gewonnen wird und mit dem Strom, der proportional ist der Leistung des einzuschaltenden Verbrauchers und der am Ausgang des zweiten Schaltungsblocks 19 ansteht, einen Differenzstrom. Dazu nuse im Schaltungsblock 19 der Schalter desjenigen Leistungszweiges geschlossen sein, der dem einzuschaltenden Ver- braucher entspricht. Die Schalter in den übrigen Schaltungszweigen bleiben geöffnet. Der Strom, der der Leistung des zuzuschaltenden Verbrauchers entspricht und der Strom, der der augenblicklich eingeschalteten Verbraucherleistung entspricht, haben die gleiche icichtung und sind entgegengesetzt-gerichtet dem Strom, der den Nennleistungen der augenblicklich eingeschalteten Generatoren entspricht.The control circuit according to the invention now works in the following manner: In the circuit block 1o, the switches in the circuit branches are closed whose corresponding on-board power supply generator instantly feeds into the on-board power supply. A current thus flows in the common output of the circuit branches which is proportional to the sum of the nominal powers of the generators switched on . This stream then forms the sum of the current corresponding to the instantaneously switched consumer performance is proportional to, and which is obtained via the switching device 29 and the current which is proportional to the power of the to be switched on consumer and at the output of the second circuit block 19 is present , a differential current. By nuse be closed, which corresponds to the encryption to be switched on consumers in the circuit block 19, the switch of that power branch. The switches in the other circuit branches remain open. The current that corresponds to the power of the consumer to be switched on and the current that corresponds to the currently switched on consumer power have the same direction and are opposite in direction to the current that corresponds to the nominal power of the currently switched on generators.

Der Differenzstrom hat entweder ein positives oder ein negaivee Voreeiohen, d.h. entweder reicht die vorhandene Kapazität der eingeachelteten.Generatoren aus, auch den neuen, vorgewählten Verbraucher zu versorgen .. in dem Fall kann der neue Verbraucher für die Zuschaltung freigegeben werden - oder die Kapazität der eingeschalteten Generatoren reicht nicht aus. In dem letzteren Fall wird die Zuschaltung des neuen Verbrauchern solange gesperrt, bis ein weiterer Bordnetzgenerator eingeschaltet ist.The differential current has either a positive or a negative advance, ie either the existing capacity of the integrated generators is sufficient to also supply the new, preselected consumer. In this case, the new consumer can be released for connection - or the capacity of the switched on generators is not sufficient. In the latter case, the connection of the new consumer is blocked until another on-board power supply generator is switched on.

Je nach Vorzeichen des Differenzstromes steht also am Verstärker 31 ein positives oder negatives Signal an. Die Vorzeichen sind hier so gewählt, dass bei einem negativen Ausgangsstrom des Verstärkers 31 über die Diode 32 und das Relais 34 die Zuschaltung eines neuen vorgewählten Verbrauchers freigegeben wird. Hei. einem positiven Ausgangsstrom bleibt die Zuschaltung des neuen Verbrauchers solange gesperrt, bis über die Diode 32 und das Relais 35 die Einschaltung eines neuen Generators erfolgt.Depending on the sign of the differential current, a positive or negative signal is present at amplifier 31. The signs are selected here so that, in the event of a negative output current of the amplifier 31, the connection of a new preselected consumer is enabled via the diode 32 and the relay 34. Hey With a positive output current, the connection of the new consumer remains blocked until a new generator is switched on via the diode 32 and the relay 35.

Es gibt auch andere Sohsltung®mäglichkeiten, die Verbrauchsr-und die Generatoren zu simulieren, z.B. durch Reibensehaltung der Widerstände, so dass Spannungen miteinander verglichen werden. Auch lassen sich die Widerstände durch andere passive oder auch aktive Zweipole ersetzen. There are also other possibilities to simulate the consumption and the generators , for example by rubbing the resistors so that voltages can be compared with one another . Also, the resistors by other passive or active Two poles can be replaced.

Es ist zweekmäeeig, die erfindungsgemässe Steuerschaltung nur für wichtige Verbraucher anzuwenden, die ausserdem eine nennenswerte Leistung dem Bordnetz entnehmen. Eine Anwendung auf jeden einzelnen Verbraucher würde einen unzulässig hohen Aufwand bedeuten. Sollen mehrere Verbraucher nacheinender oder nahezu gleich- zeitig eingeschaltet werden, dann :Lot es ferner sweckmäseig, die Einschaltbefehle zu speichern und die Priitung, ob ein Verbraucher eingeschaltet werden kann, jeweils für jeden Verbraucher einzeln durchzuführen, wobei denn die übrigen Verbraucher zunächst für eine Zuechaltung gesperrt sind. Mir den Scheltuagebeispiel bedeutet da®, dose die Schalter 24 - 27 jeweils nur denn geschlossen Bind, wenn eine Überprüfung den jeweils zuzuecheltenden Verbrauchers gerade erfolgt. Die übrigen 2chaiter von noch zuzuschaltenden Verbrauchern bleiben solange geöffnet, bis die Überprüfung des zunächst einsunobel- tendeä verbreuchere abgeschlossen ist. Nach Abschluss der Über- prüfung wird der Schalter in den dem Verbraucher entsprechenden gcheltungezweig wieder geöfnet.Bei nebreren Einschaltbefehlen werden die vorgewählten Verbraucher neob einer vorher festge- legten Rangfolge durobgeprüft, die sich aus der Wichtigkeit des jeweiligen -Yerbrauchero ergibt. Mit einer derart eufgebeuten steuereobeltung wird sumitoh4t geprUt, ob die augsnbliolclioh vorbendene Kapazität der eiarge- eabeltsten heietungoerseuger einen Sohiffsbordnetzeo bei eines neu einsuraheltenden torbreueher noch euereioht, us gegrbemen# falls automatisch einen weiteren %eistungserzeuger zuzu- schalten. Im Grenzfall kann es dazu kommen, denn trotz eines neu eingeschalteten Generators das Bordnetz zu loo% belastet wird. Eine längere Auslastung von loo% kann jedoch nicht zuge- lassen werden, de u.U. noch eine Reihe von anderen Verbrauchern, die nicht in der Steuerecbeltung nachgebildet werden, einge- schaltet werden kann. Daher schlägt die Erfindung eine zusätzliche Schalteinrichtung vor, die kurze Zeit nach den Einschalten eines neuen Verbrauchern einen weiteren Leistungs- vergleich durchführt. Diese Schalteinrichtung ist gekenn- seicbnet durch e) einen vierten Schaltungsblock mit wiederum einem Schaltungs- zweig tü,r jeden vorhandenen Leistungeerseuger,in dem eine der Nennleistung dieser Leistungserzeuger proportionale elektrische leae@gebildet wird, und mit einem gemeinsamen Ausgang für C..eee Schaltungesweige, an den ein der Summe der Rennleistungen der eingasehelteten Leistungserzeuger proportionalen Signal ansteht, b) eine zweite Verglt chvsohaltung, die aus einen der Summe der augenblicklich eingendhalteten Verbraucherleistungen proportio- nalen Blgnal und den Ausgangssignal den vie:rn Schaltungeblochs ein Dittereassignal bildet, und c) ein Zeitrersöaerungoglied, in des des Ditterenseignai.gegeben wird und das nach Ablauf einer vorgegebenen Zeit die Zusahalt»g eines weiteren Leistungserzeugern bewirkt, wenn die Swm der sugegblickiich eingescbelteten Verbraucherleistungen einen oberen ü»nswert der Nennleistung der eingeaobeltetea Leistuage- erzeuger überschreitet. It is two-way to use the control circuit according to the invention only for important consumers who also have a Take significant power from the on-board network. An application on each individual consumer would be an unacceptably high Mean effort. If several consumers are to be used one after the other or almost equally are switched on early, then : plumb it further sweckmäseig, to save the switch-on commands and check whether a Consumers can be switched on, each for each Consumers carry out individually, because the rest Consumers are initially blocked for access. Me The Scheltuage example means da®, box the switches 24 - 27 each only closed because bind when a review the in each case to be zuecheltenden consumer takes place. the remaining 2chiters of consumers to be connected remain open until the check of the initially unobjectionable tendeä consume is complete. After completing the transfer test the switch is in the appropriate to the consumer Opened again at random, with other switch-on commands the preselected consumers are neob one previously determined put the order of precedence tested, resulting from the importance of the respective -Yerbrauchero results. With such a tax evasion, sumitoh4t becomes checked whether the planned capacity of the egg batch eabeltsten heietungoerseuger a Soh iffsborderzeo with one Newly einuraheltenden gatekeeper still euereioht, us grbemen # if a further power generator is automatically added switch. In the borderline case it can come to that, because despite one thing newly switched on generator loads the on-board network to 100% will. However, a longer utilization of loo% cannot be be let, de possibly a number of other consumers, which are not reproduced in the tax system, can be switched. Therefore, the invention proposes one additional switching device before, the short time after Switching on a new consumer another power comparison carries out. This switching device is marked seicbnet through e) a fourth circuit block with again a circuit branch door for every existing performance monster in which one of the Nominal power of this power generator is proportional electrical leae @ is formed, and with a common output for C..eee circuit branches to which one of the sum of the racing performances the input power generator proportional signal pending, b) a second comparison, consisting of one of the sum of the the currently held consumer power proportionally nal signal and the output signal of the four circuit holes forms a dittereassignal, and c) a Zeitrersöae r ungogied, given in des Ditterenseignai and that after a specified period of time, the approval »g caused by another power generator when the S wm the sugegblickiich included consumer services one upper value of the nominal power of the rated power producer exceeds.

Es wird also z.B. ein weiterer Generator auf das Bordnetz geschaltet, falls die augenblicklich eingeschaltete Verbraucherleistung über eine Zeit von etwa 1o Sekunden 85% der eingeschalteten Nennleistung der Generatoren erreicht. Um auch eine Überwachungsmöglichkeit für den lall zu haben; dass eine Reihe von Verbrauchern abgeschaltet sind und die Kapazität der eingeschalteten Generatoren die geforderte Verbraucherleistung bei weiten übersteigt, wird achlieselich vorgeschlagen a) eine dritte Vergleichsschaltung, die aus einen der summe der Nennleistungen der eingeschalteten Leistungserzeuger proportionalen Signal und einem der Summe der augenblicklich eingeschalteten Verbraucherleistungen proportionalen Signal ein Differenzsignal bildet und b) ein weites Zeitglied, in das das Differenzsignal gegeben wird und des nach Ablauf einer vorgegebenen Zeit die Abschaltung einen Leistungeorzeugers bewirkt, wenn die Summe der augenblicklich eingeschalteten Verbraucberleistung einen unteren Ghcenzwert der Nennleistung der Leistungserzeuger unterschreitet.It is switched eg a further generator to the electrical system if the currently switched-load power over a period of about 1o seconds achieved 85% of the nominal power of switched generators. In order to have a monitoring possibility for the lall; that a number of consumers are switched off and the capacity of the switched-generators the required load power exceeds by far, it is proposed achlieselich a) proportional to a third comparison circuit, the sum of one of the nominal power of switched power generator proportional signal and the sum of the instantly switched consumer services signal a difference signal forms and b) a wide timing element, in which the difference signal is given and the switch-off causes a Leistungeorzeugers after a predetermined time when the sum of the instantly switched Verbraucberleistung below a lower Ghcenzwert the rated output of the power generator.

Eine derartige Überwachung wird etwa 15 Minnten nach Abschalten einen wichtigen Verbrauchern vorgenommen und u.U. ein Generator abgeschaltet, wenn die geforderte Verbraucher- leistung in diesem Zeitraum z.H. 35% der eingeschalteten Generetorleistung unterschreitet. In dem Schaltungsbeispiel ist der vierte Schaltungsblock 36 ähnlich wie der Schaltungsblock 1o aufgebaut. In den vier parallelen Schaltungszweigen befinden eich wiederum den Hordrietxgeneratoren entsprechende Widerstände 3? -. 4o und Schalter 4'1 bis 44. Ebenso siLfgebeut ist der fünfte Scheltunge- block 45 mit den Widerständen 46 - 49 und den Schaltern 50 - 53. Die Ausgänge der Schaltungsblöcke 36 und 45, an denen jetzt eine gemeinsame Gleichspannung wieder von beispielnweise 15 Volt liegt, führen jeweils über den Knotenpunkt, in den auch über den Widerstand 54 bzw. 55 ein der Summe der eingeschalteten Verbraucherleistung proportionaler Strom fliesst, der ebenfalls der Scbalteinrichtung 29 entnommen wird. In dem Knotenpunkt wird wiederum ein Differenzstrom gebildet, der auf den Eingang eines Verstärkers 56 bzw. 57 geführt wird, Überschreitet in einem Fell die eingeschaltete Verbraucherleistung länger als 1o Se- kunden etwa 8,9% der Nennleistungen der augenblicklich einge- schalteten Generatoren, so wird über ein Relais 58, das über eine Diode 59 am .ug;ang des Verstärkers 50 liegt, ein weiterer Generator zugeschaltet. Unterschreitet in dem anderen Fall über einen Zeitreim von etwa 15 Minuten die eingeschaltete VerbraucüarleLatung einen unteren Grenzwert von t)eiiipielaweiee 35% der .eirigeaoh@alteten Geiieratornennleistung, denn wird über das Relais 6o, das über eine Diode am Ausgang des Verstärkers 5? liegt, ein Generator vom Bordnetz abgeschaltet, Mit der ertindungsgemäseen Steuerschaltung ist es also möglich, bei vollautomatischem Betrieb der Bordnetzgeneratoren und der sie antreibenden Maschine, das Bordnetz vor Überlastung zu bewahren und es wirtaJhattlioh zu betreiben; indem Überechüaaige Kapazität abgeschaltet wird, Such a monitoring is carried out about 15 minutes after switching off an important consumer and possibly a generator is switched off when the required consumer power during this period zH 35% of the switched on Generator output falls below. In the circuit example, the fourth circuit block is 36 constructed similarly to the circuit block 1o. In the four parallel circuit branches are in turn the Hordrietx generators corresponding resistors 3? -. 4o and Counters 4'1 to 44. The fifth scandal is also safe. block 45 with resistors 46 - 49 and switches 50 - 53. The outputs of the circuit blocks 36 and 45, at which now a common DC voltage again of, for example, 1 5 volts each lead over the junction into which also over the resistor 54 or 55 is the sum of the switched on Consumer power proportional current flows, which also the switching device 29 is removed. In the node will in turn, a differential current is formed, which is fed to the input of a Amplifier 56 or 57 is performed, exceeds in one If the switched-on consumer power lasts longer than 1o customers around 8.9% of the nominal power of the currently switched generators, then a relay 58, which is over a diode 59 is connected to the .ug; ang of the amplifier 50, another Generator switched on. In the other case falls below over a time rhyme of about 1 5 minutes the switched on Consumption rate a lower limit of t) eiiipielaweiee 35% of the .eirigeaoh @ old Geiierator nominal performance, because is over the relay 6o, which has a diode at the output of the amplifier 5? is, a generator shut down by the electrical system, with the ertindungsgemäseen control circuit, it is possible to maintain during fully automatic operation of the vehicle electrical system generators and they driving machine, the electrical system from overload and to operate it wirtaJhattlioh; by switching off excess capacity,

Claims (1)

PATENTANSPRÜMS #9 Steuereahaltung für die Zu- oder Abschaltung mehrerer Leistung®erzeuger und mehrerer Leistungsverbraucher eines Bordnetzes auf Schiften, gekennzeichnet durch e) einen ersten Schaltungsblock (lo) mit einem Schaltungs- zweig für jeden vorhandenen Leistungserzeuger, in dem eine der Nennleistung diesen Leistungserzeugers proportionale elektrische Grösse gebildet wird und mit einem gemeinsamen Ausgang für diese Schaltungszweige, en dem ein der Summe der Nennleistungen der eingeschalteten Leistungserzeuger proportionalen Signal ansteht, b) einen zweiten Sohaltungeblock ('I9) mit einem Schaltungszweig für jeden auf das Bordnetz schaltbaren Leistungsverbraucher, in dem eine der Nennleistung dieses Leistungsverbrauchern proportionale elektrische Grösse gebildet und mit einem gemeinsamen Ausgang für diese Scheltungazweige, an dem ein der Summe der Nennleistungen der neu einzusabaltenden Leistungsverbraucher proportionales Signal ansteht, c) einen dritten Scbaltungeblock (28), an dessen Ausgang ein der Summe der augenblicklibh eingeschalteten Verbraucherleistungen proportionales Signal ansteht und d) eine fergleicheaehaltung, die aus den Ausgangssignal des ersten Schaltungeblocke (1o) einerseits und der Sume der AusgenWeaigesle den sweiten und dritten Schaltungsblocks (79,28) andererseits ein Ditterenzeignal bildet, wobei in Abhängigkeit von den Vorzeichen dieses Differenzsignale die Zuschaltung von Verbrauchern entweder freigegeben oder solange gesperrt wird, bis ein weiterer Leistungserzeuger zugeschaltet ist. .2. Steuersohaltung noch Anspruch 1, gekennzeichnet durch a) einen vierten Scheltungeblock (36) mit wiederum einem Schaltungszweig für jeden vorhandenen Leistungserzeuger, in dem eine der Nennleistung dieser Leistungserzeuger proportionale elektrische Grösse gebildet wir, und mit einem gemeinsamen Ausgang für diese Seheltungszweige, en dem ein der Summe der Nennleistungen der eingeschalteten Leistungserzeuger proportionales Signal ansteht, b) eine zweite Vergleiabsachaltung, die aus einem der Summe der augenblicklich eingeschalteten Verbraucherleistungen proportionalen Si fall und dem Ausgangssignal des vierten Soh®ltungeblocks ein Difrerenzsignel bildet und c) ein Zeitrerzögerungsglied, in das des Difterenzeignel gegeben wird und das nach Ablauf einer vorgegebenen Zeit die Zuscheltung eines weiteren Leistungserzeugers bewirkt, wenn die Summe*der augenblicklich eingeschalteten Verbraueherleietungen einen oberen Grenzwert der Nennleistung der Leitungserzeuger überecäreitet. 3. St eue reab a itung na ab Anaprucb 1, gekennzeichnet darob e) eine dritte Vergleiobaacbaltung, die aus einen der &uatme der Nennleistungen der eingeaobalteten Iosiatungaergeuger Pro- portionalen Signal und einen der Are der augenblicklich eingeaabalteten Verbraucherleistungen proportionalen Signal ein Ditterengeignal bildet und b) ein zweites Zeitglied, in das das Ditterenasignel gegeben wird und, des narb Ablaut einer vorgegebenen Zeit die Ab- aobaltung eines Leiatungeerzeugera bewirkt, wenn die ßuaais der augenbliöiclich eingeacbalteten Verbraucherleiotung einen unteren Grenzwort der Nennleistung der Leiotungeerseuger unterschreitet.
PATENT CLAIM # 9 Controls for the connection or disconnection of several power generators and several power consumers of an on- board network on ships, characterized by e) a first circuit block (lo) with a circuit branch for each existing power generator, in which one of the nominal power of this power generator is proportional electrical variable is formed and with a common output for this circuit branches, en which a sum of the power consumption of the switched power generator is present proportional signal, b) a second Sohaltungeblock ( 'I9) with a circuit branch for each of the onboard power supply switchable power consumer, in which a of the rated power of this power consumers formed proportional electrical size, and with a common output for this Scheltungazweige at which a sum of the power of the newly einzusabaltenden power consumer is present proportional signal, c) a third Scbaltungeblock (28), a n the output of which is a signal proportional to the sum of the currently switched-on consumer powers and d ) a balancing function, which forms a third-term signal from the output signal of the first circuit block (1o) on the one hand and the sum of the AusgenWeaigesle the second and third circuit blocks (79, 28) on the other hand , wherein the switching of consumers either enabled in response to the sign of this difference signals or remain locked is switched to another power generator. .2. Controlling still claim 1, characterized by a) a fourth circuit block (36) with a circuit branch for each existing power generator, in which an electrical quantity proportional to the nominal power of these power generators is formed , and with a common output for these Seheltungszweige, in which one of the Sum of the nominal power of the switched-on power generators proportional signal is present, b) a second comparison elimination, which forms a difference signal from a case proportional to the sum of the currently switched-on consumer power and the output signal of the fourth solenoid block and c) a time delay element into which the difference signal is given and that after a predetermined time has elapsed, a further power generator is switched on if the sum * of the consumer rentals currently switched on exceeds an upper limit of the nominal power of the line generator. 3. Follow-up processing from Anaprucb 1, marked above e) a third Verleiobaacbaltung, which consists of one of the & uatme of Nominal power of the registered Io siatungaergeuger pro portional signal and one of the areas of the instant switched on consumer power proportional signal forms a third signal and b) a second timing element into which the ditterenasignel is given and, after a given time, the scar Aobaltung einer Leiatungegenerera causes when the ßuaais the currently disabled consumer management lower limit of the nominal power of the Leiotunger falls below.
DE19671588450 1967-06-03 1967-06-03 Control circuit for connecting or disconnecting several power generators and several power consumers of an on-board network on ships Pending DE1588450A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL0056656 1967-06-03

Publications (1)

Publication Number Publication Date
DE1588450A1 true DE1588450A1 (en) 1970-08-06

Family

ID=7277949

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19671588450 Pending DE1588450A1 (en) 1967-06-03 1967-06-03 Control circuit for connecting or disconnecting several power generators and several power consumers of an on-board network on ships

Country Status (1)

Country Link
DE (1) DE1588450A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2848413A1 (en) * 1978-11-08 1980-06-04 Struever Kg Ad METHOD FOR THE LOAD-RELATED SWITCHING ON AND OFF OF SEVERAL PARALLEL-OPERATED POWER SUPPLY UNITS IN A POWER SUPPLY SYSTEM
EP0047867A1 (en) * 1980-09-15 1982-03-24 Licentia Patent-Verwaltungs-GmbH Circuit for economically using primary-energy converters

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2848413A1 (en) * 1978-11-08 1980-06-04 Struever Kg Ad METHOD FOR THE LOAD-RELATED SWITCHING ON AND OFF OF SEVERAL PARALLEL-OPERATED POWER SUPPLY UNITS IN A POWER SUPPLY SYSTEM
EP0012219A1 (en) * 1978-11-08 1980-06-25 Ad. Strüver KG (GmbH & Co.) Method and apparatus for adding and removing in accordance with the load a plurality of parallelly working current generator units in a current distribution system
EP0047867A1 (en) * 1980-09-15 1982-03-24 Licentia Patent-Verwaltungs-GmbH Circuit for economically using primary-energy converters

Similar Documents

Publication Publication Date Title
DE2732794A1 (en) Storage battery protective device against heavy discharge - has semiconductor switch which is polarised in blocking direction when end of discharge voltage is reached
DE3417481A1 (en) Protection circuit for an accumulator
DE1538303A1 (en) Voltage-regulated DC voltage device
DE1588450A1 (en) Control circuit for connecting or disconnecting several power generators and several power consumers of an on-board network on ships
DE2657784A1 (en) DEVICE FOR SWITCHING OFF ONE PHASE OF A MULTI-PHASE SUPPLY
DE3738493C2 (en) Fault location device
DE2121239A1 (en) Function test device for earth fault circuit breakers
DE2832193A1 (en) CONTACTLESS RELAY
DE3127460A1 (en) Circuit for invertors for emergency power supply systems
DE739026C (en) Emergency circuit for electrical systems
DE19707819B4 (en) Circuit arrangement with safety function
DE1925632C (en) Circuit arrangement for converting a variable alternating current lying above a predetermined value into a constant signal voltage
DE405681C (en) Device for connecting single-phase networks to multi-phase networks
DE2151947A1 (en) ARRANGEMENT FOR NETWORK-RELEVANT TESTING OF THE DISCONNECTING CAPACITY OF SWITCH SWITCHES AND SWITCH DISCONNECTORS FOR HIGH VOLTAGES
EP0560026B1 (en) Device for the operation of loads on AC supply terminals
AT225796B (en) Voltage regulator with safety device
AT207899B (en) Electrical circuit arrangement for supplying an output voltage as a function of a certain input voltage, preferably for telecommunications systems
DE758663C (en) Device for the step-by-step electrical control of apparatus and machines
DE624150C (en) Switchable power-consuming measuring device with several coil groups
CH602987A5 (en) Photocoupled switch monitor
DE1298626B (en) DC relay for AC operation
DE4004449C1 (en) Load current limiting circuit - has integrated power switch switching off relay if undervoltage appears at input
DE1440155C (en) Electrical protection circuit for several electrical consumers
AT250451B (en) Circuit arrangement for testing lines in telecommunication systems, in particular telephone systems
DE932318C (en) Arrangement for actuation of cell switches for accumulator batteries