CN113094794B
(zh )
2022-04-15
一种基于bim与gis技术的自动计量和核算方法及系统
CN107545080A
(zh )
2018-01-05
一种基于bim模型的钢桥虚拟预拼装方法
CN114201807B
(zh )
2023-11-17
一种基于bim技术的整节段式钢桁梁桁架设计方法
KR20200097462A
(ko )
2020-08-19
Bim 기반 pc 구조물 시공 및 관리 방법
Raghuram et al.
2016
Investigation on the causes and adverse effects of reworks in construction projects and developing a rework reduction model to mitigate time and cost
CN120046248A
(zh )
2025-05-27
一种基于应力场调控的飞机蒙皮装配变形抑制方法
Lago-Dominguez et al.
2024
Improvement design to increase productivity by applying Poka Yoke, VSM and SMED in a plastic company
CN116629673A
(zh )
2023-08-22
多作业面复杂施工现场智能管理系统
Lago-Domínguez et al.
2024
Improvement Design to Increase Productivity in the Finishing Area Through the Use of Poka Yoke, Value Stream Mapping and SMED in a Company of the Plastics Business
JP2003058231A
(ja )
2003-02-28
工程管理装置
TWM671216U
(zh )
2025-06-01
銀行資產管理系統
DE1408082U
(enExample )
CN113408145B
(zh )
2023-05-23
一种面向可逆恢复故障的车间关键制造资源sis识别方法
Bizet et al.
2022
Variations of the SIR model for COVID-19 evolution
Chechenova
2024
Evaluation of the introduction of lean manufacturing elements in the track management units
Kordos
2016
Outline of the theoretical TQM model in official statistics
Huang
2022
Advisory Committee on Immunization Practices and Vaccination Policy in Taiwan
DE1529522U
(enExample )
COUNCIL et al.
0
activités culturelles
Petkar et al.
2022
An Investigation on Cost, Delay & Labor Problems in PEB Structure
TWI659385B
(zh )
2019-05-11
營建流程管控方法
Meng et al.
2025
Opportunities and Feasibility of Urban Freight Consolidation: A Case Study in the Event Area of Gothenburg
O'Brien
2024
QI 172 Improve Time Taken From Referral to Assessment in Children's Dysphagia Service
Sykes
0
Homogeneous 2-nondegenerate CR manifolds of hypersurface type, maximally symmetric relative to their modified CR symbols
DE1398390U
(enExample )