Allen et al.
1975
Research laboratory architecture and the structuring of communications
Allen et al.
1973
A field experiment to improve communications in a product engineering department: The nonterritorial office
Krarup-Hansen et al.
1991
Chemotherapy in malignant mesothelioma: a review
DE1489495U
(cg-RX-API-DMAC10.html )
DE69722599T2
(de )
2004-04-29
Kombiniertes gebäude, zum beispiel für wohn- und geschäftsbereich
English
1999
Bioterrorism readiness plan: a template for healthcare facilities
Leask et al.
2003
Anthrax and other suspect powders: initial responses to an outbreak of hoaxes and scares
DE1165097B
(de )
1964-03-12
Schaltungsanordnung fuer Fernsprechselbstanschlussanlagen
EP1469437B1
(de )
2008-04-16
Verfahren zur Funkübertragung in einem Gefahrenmeldesystem
ANTICO
2025
1ST INTERNATIONAL SAFETY WORKSHOP
Chung
2021
Post corona architecture
DE1825816U
(de )
1961-02-02
Neuartiger haushaltskuehlschrank.
Banatvala et al.
1998
Mortality and morbidity among Rwandan refugees repatriated from Zaire, November, 1996
Illanes
2021
Continuous and Crucial Campus Support During COVID-19
CGIAR Technical Advisory Committee
1991
Future reveiews: ILCA, progress report
Kobayashi et al.
2001
Development of Robots for Nuclear Accident in Japan Atomic Energy Research Institute (1) Development of Remote Surveillance Squad
World Health Organization
1987
Review of the onchocerciasis chemotherapy project
DE1602600U
(de )
1950-03-02
Kontroll- und schalttafel fuer automatische kuehlanlagen.
DE2820304A1
(de )
1979-11-22
Infrarot-warnanlage
Care et al.
2016
EMS Crews Share their Experience of the San Bernardino Terrorist Attack
McKell
1990
Sustainable development and environmental protection
Yosephine et al.
0
Humanitarian Supply Chain Management Challenges in COVID-19 Vaccine Distribution: A Study Case From Bandung Indonesia
Bryden
2008
Therapeutic help from man's best friend
Badri et al.
2010
STUDY OF PERFORMANCE LEVELS AND ANNUAL FREQUENCY OF EXCEEDING MAXIMUM INTERSTORY DRIFT IN LOW-RISE STEEL MOMENT RESISTING FRAMES BY USING INCREMENTAL
SV et al.
0
MOVING LOGISTIC OF MECHANIZATION EQUIPMENT AT SORTING OUT OF BUILDING OBJECTS DESTRUCTIONS