Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Re: Approval letter with comments for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Annual Operations and Maintenance (O&M) Butte Treatment Lagoons (BTL) System 2024 (dated May 30, 2025)
Secondary particle fluence on implanted metals and electronic damages in cardiac pacemakers; Sekundaerteilchenfluenz an Implantatsmetallen und Elektronikschaedigungen in Herzschrittmachern