Van Lancker et al.
2022
HRM in entrepreneurial firms: A systematic review and research agenda
DE112007002137T5
(de )
2009-07-02
Automatisches Lager
DE1476248U
(enExample )
EP0847943B1
(de )
2002-07-17
Vollautomatischer Warenaufzug
Cummings et al.
2024
On minimal non-σ-scattered linear orders
Fry et al.
1991
Implementing drum-buffer-rope to control manufacturing lead time
Zhang et al.
2015
Cyclic scheduling of flexible job-shop with time window constraints and resource capacity constraints
Kim et al.
2019
The Status of Nuclear Material Accountancy at KAERI
Shuraleva
2024
Labor Relations in the Context of the Precarity of Labor and Employment in Russia
Conway et al.
2020
From data to action
Ojogbo
2024
Analysis and development of shop floor management in a unique manufacturing company
Carlo et al.
2018
A shared strategy to minimize unloaded travel in cross-docks
Blažević et al.
2006
MES System Data Acquisition in Rolling Mill
Lindblom
2021
Proactive order monitoring in available-to-promise chain: Possibilities in material availability reporting
DE1524880U
(enExample )
KASHIWADANI et al.
1982
A STUDY OF MULTIOBJECTIVE ACTIVITY ALLOCATION MODEL IN COASTAL AREA
WATANABE et al.
1990
The Locally Transitive Representation of a Strongly Connected Tournament
Collins
2002
CBOT's Neubauer ready to move on
Cozzi et al.
1993
Integrated process control in a minimill
Tyroler
1988
Nicaragua: 80% Of Yatama Members Reported To Have Accepted Permanent Truce With Government
Wentz et al.
1993
The formation of focused teams for technology exchange
Bai et al.
2008
The time limit assignment problems
Petrović et al.
0
Croatian border regions and processes of Europeanization
Maiwald
2018
Already producing or still assembling?–Perspectives towards modular production and quality control in a digitized process industry
KR20130010223A
(ko )
2013-01-28
음성명령을 통한 강재 적치장 관리시스템