Van Lancker et al.
2022
HRM in entrepreneurial firms: A systematic review and research agenda
DE1476248U
(enExample )
DE202015006102U1
(de )
2015-11-13
Fernauslesung von Gepäckstücken
EP0847943B1
(de )
2002-07-17
Vollautomatischer Warenaufzug
Cummings et al.
2024
On minimal non-σ-scattered linear orders
Zhang et al.
2015
Cyclic scheduling of flexible job-shop with time window constraints and resource capacity constraints
Fry et al.
1991
Implementing drum-buffer-rope to control manufacturing lead time
Kim et al.
2019
The Status of Nuclear Material Accountancy at KAERI
Shuraleva
2024
Labor Relations in the Context of the Precarity of Labor and Employment in Russia
Conway et al.
2020
From data to action
Ojogbo
2024
Analysis and development of shop floor management in a unique manufacturing company
Blažević et al.
2006
MES System Data Acquisition in Rolling Mill
EP0705045A3
(de )
2000-04-05
Verfahren zur Erhaltung der Systemzeitdaten beim Ausfall der Stromversorgung in Kommunikations-Vermittlungsanlagen
Lindblom
2021
Proactive order monitoring in available-to-promise chain: Possibilities in material availability reporting
Carlo et al.
2018
A Practical Collaborative Material Handling Strategy for Cross-docks
KASHIWADANI et al.
1982
A STUDY OF MULTIOBJECTIVE ACTIVITY ALLOCATION MODEL IN COASTAL AREA
DE1484741U
(enExample )
McCarthy
1991
Author's reply
WATANABE et al.
1990
The Locally Transitive Representation of a Strongly Connected Tournament
Collins
2002
CBOT's Neubauer ready to move on
Nechaev et al.
2011
Number of Loaders Optimization Serving the Warehouse Complex of Logistic System Taking into Account Their Repair
Tyroler
1988
Nicaragua: 80% Of Yatama Members Reported To Have Accepted Permanent Truce With Government
Buckingham
0
Trump Administration Rule Will Harm Immigrant Families and Ill-Serve America
Bai et al.
2008
The time limit assignment problems
Maiwald
2018
Already producing or still assembling?–Perspectives towards modular production and quality control in a digitized process industry